Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG080649_MONITORING INFO_20181124
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V C& Q �/ D &7 / DOC TYPE 1 ❑ HISTORICAL FILE 9- MONITORING REPORTS DOC DATE ❑ p dl q I YYYYM MD D STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v CAD %130'4 DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ alli"7 11 � I� YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCG080649 FACILITY NAME Durham Maintenance Complex, Durham City Transit First Transit COUNTY Durham PERSON COLLECTING SAMPLES Doug Albrecht LABORATORY- ENCO Laboratories, Inc., Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ® July -Dec RECEIVED or ❑ Monthly' Marchlmonth) DISCHARGING TO CLASS ❑ORW _❑HQW ❑Trout ❑PNA OCT 2 4 2018 ❑Zero -flow []Water Supply ❑SA CIENTRAL FILES ®Other WS-IV•NSW oWR sl=cTlO>> PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes `no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) ❑ No discharge this period' Outfall-,, _ :`_` :Date N o: : Sample-Colleited, ;=Tatal Suspeided = ,,. �_ _� w. pH, Non-Polar;0il and drease/TP,H;EPA f- ,New Matar 0iI Usage,, r v. __'• --i.'' -ter: iffol5_olids, _' F ^-�_ units_,, ` ,=,Method=166,4 SGT=HEM mg/-L„_ , ; . _ .Standard , mg/_L"r ,+Annual average gal/mnw_, Benchmark -•50 ori00 see permit' `:_Withiii6 0�:9:0` _ ram; �: 4_ _ t_;=f' , M }=''�. �15 �1 Outfall-1 9/17/2018 27 7.2 BRL 300 Outfall-2 9/17/2018 19 7.2 BRL Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfalls, - - No. yy., .. • . _ Date .: Ena/.dd/,l►r _ , :_; = ;00556 66 GT HE L_ -1 4 (S M),8/.l olids, „ r '.. - mB/L _ = ; =x Standardni Pernrii#:Limit _ 50 or100 `see permit F , _` 6 0 '90x ff ge a any sin$ a -outtall, you must sti su mit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page I of 2 STORM EVENT CHARACTERISTICS: Date 9/''17 20113 (first event sampled) Total Event Precipitation (inches): 0.50 inches Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS. A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME; RRO Supervisor— Letter dated Sept 9, 2014 Mail an original and one cony of this DMR, including all "No Discharge" reports, within 30 days of receipto-the lab results_ for at end of monitoring Period in the case o "No Discha e" re orts to: Division -of_Water-Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. eased on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) /C)-2 2 — Lcal (Date) Additional copies of this form may be downloaded at: httpiHportbi.ncdenr.orR/web/wg/wsYsu%npdessw##tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 ' STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR)1 SPPP Annual Update DATA REVIEW FORM Calendar Year 2017 Individual NPDES Permit No. Certificate of Coverage (COC) No NCS❑❑❑❑❑❑ or -NCG NCG080649- This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: Durham Maintenance Complex. Durham City County: Durham Phone Number: (919 ) 560-1545 Total no. of SDOs monitored 2 Outfall No. 002 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ 44N30 2018 Other ❑ I - , !DWR;SECTION Was this SDO monitored because of vehicle maintenance activities? Yes ® No ❑ O'An4NRROCESSiNG UNrT Total Rainfall, inches Parameter, (units) Total Suspended Solids, mg/1 pH, Standard Units Non -Polar Oil and Grease/ TPH Benchmark N/A 100 Within 6.0-9.0 15 Date Sample Collected, mm/dd/yy 04/24/17 4.51 27 7.1 BRL 10/16/17 0.25 22 7.2 BRL SWU-264 - Generic Annual DMR Last revised 511712013 Additional Outfall Attachment Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ® No ❑ Total Rainfall, inches Parameter, (units) Total Suspended Solids, mg/I pH, Standard Units Non -Polar Oil and Grease/ TPH Benchmark N/A 100 Within 6.0-9.0 15 Date Sample Collected, mmldd/yy 01/20/17 >1 110 7.2 BRL 02/15/17 >0.5 84 7.4 BRL 03/31/17 >0.5 140 7.3 BRL 04/24/17 4.51 6.8 6.6 BRL 05/22/17 0.30 178 17.0 BRL 06/23/17 0.12 116 7.0 BRL 10/16/17 0.25 1120 17.4 BRL "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature Date /- Z s- zi r SWU-264 - Generic Annual DMR Last revised 511712013 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NC6080649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham RECEIVED PERSON COLLECTING SAMPLES Douelas Albrecht r�CV V LABORATORY _PRISM Laboratories, Inc. Lab Cert. q 402 MOV 0 9 2017 Comments on sample collection or analysis: CENTRAL F1fL,ES SECTION SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly( October (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ❑Water Supply []SA ®Other WS-IV:NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfal l No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfal I-1 10/16/2017 120 7.4 1 BRL 300 Outfall-2 10/16/2017 22 7.2 BRL 300 Part B:.Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 t For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 5WU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date _10/16/2017 (first event sampled) Total Event Precipitation (inches): 0.25 in Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 2, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTIONS. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one cagy Of this DMRLc_luding all "No Discharge_" reports, within 30 days of receipt of the lab results jor at end of monitoring period in the case of "No Discharge" reports? to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." a '.T.. �� L Za/-7 (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 NC®ENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: hn:llportal.ncdenr.org/web/ir/nndes-stortnwater/ 600 s% Permit No.: N/C/G/0/$/0/0/0/0 or Certificate of Coverage No.: N/C/G� 1R/(1 Facility Name: Durham Maintenance Complex, Durham Cif Transit. first Transit County: Durham Phone No. 919-560-1545 x126 Inspector: Douglas Albrecht Date of Inspection: 10116/2017 Time of Inspection: 10:00 Total Event Precipitation (inches): 0.25 in Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 3 SWU-242, Last modified 10/25/2012 F, 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) pipe leading into rock filter cascading outfall Receiving Stream: Goose Cree and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor. Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with Floating solids: 1 O 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 O 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. SWU-242, Last modified 10/25/2012 Page 2 of 3 F, 1. Outfall Description: Outfall No. Q02 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair. and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor. Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: O2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. SWU•242, Last modified 10/25/2012 Page 3 of 3 ti ' .., � � +. �'. �. c .. � t . ti F,� r;,,. � , . � � � I c .. ' ' ' ! , �t . k .� .;. ., k i .,�. � + .. �e ,. + ,� ', +.. �L.•' ._ i 'tom 1 J: t�s� r i �, .. I .. ...� :S .+ ;�r'e�' ;,. Sii'r. �;1 •�'.:+ ti: t' � � j i• y 1+'+ ' I L � I - Semi-annual Stormwater Distharee M I nit Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE No. NCG080649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES _ Douglas Albrecht LABORATORY PRISM Laboratories Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLEICOLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec REAM or ® Monthly' March month I�:' 15C RGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA JUL 21 Z011 ❑Zero -flow ❑Water Supply ❑SA CENTRAL FILES ®Other_ WS-IV:NSW_ DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 { - 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 200 see permit Within 6.0 — 9.0 ( 15 - Outfall-1 1 3/31/2017 140 7.3 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 ) 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge !monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 3/31/2017 (first event sampled) Total Event Precipitation (inches): >0.5 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated _Sept 9l2014_ Mail an original and one copy o f this DMR, including all "No Discharge" reports, within 30 days i of receipt of the lab results or at end of monitarina period in the case of "No Discharge" reports)- to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) - 1 - Lo 7 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp,/web/wct/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visitlit t r a 1. ncdennorg 1wehlr n d s-stormwater Permit No.: NIC/G/0/8/0/0/0/0 or Certificate of Coverage No.: Nf C/G/0/8/0/7/8/8 Facility Name: Durham Maintenance Complex, Durham City Transit, First Transit County: Durham Phone No. 919-560-1545 x126 Inspector: Douglas Albrecht Date of Inspection: 313112017 Time of Inspection: 1145 Total Event Precipitation (inches): > 0.5 inch Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) M Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement_ Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Qutfall No. 001 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy- 1 2 3O 4 5 5. Floating Solids: Choose the number which best describes the amount of floating -solids -in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 O 3 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 0 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe • Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 GO * Durham June 8, 2017 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Tier 2/3 Monthly Sampling — May 2017 Outfall 001 Durham City Transit Company 1903 Fay Street, Durham -North Carolina 27704 Permit No.kc0807g O (o 4� ' To Whom It May Concern: Please find two copies of the completed DMR for the referenced site for your files. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company Mr. Shamaine Cash Facility Supervisor Enclosures cc: James Azarelo, City of Durham Michael L. Walker, The EI Group, Inc. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham_ Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc. Lab Cert. q 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' May (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®Other WS-IV:NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 1 ' 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L _ New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 5/22/2017 1 78 7.0 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 1 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, 1 mg/L pH, Standard units Permit Limit - 15 50 or 200 see permit 6.0 — 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 5/22/2017 (first event sampled) Total Event Precipitation (inches): 0.30 In Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART it SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: _ RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy-acopy-d this DMR Including all "No Discharge" re orts within 30 days of recei t of the 1 b results or at end of monitoring eriod in the case of "No Discharge" reportsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wct/ws/suinp8essw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 LTXWJ NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit- http//portal.ncdenr.org/web/Ir/npdes-stormwater/ Permit No.: NIC/G/0 f 8/ /0/0/0/0/0 or Certificate of Coverage No.: NIC/GlO/81017/818 Facility Name: Durham Maintenance Complex, Durham City Transit, First Transit County: Durham Phone No. 919-560-1545 x126 Inspector: Douglas Albrecht Date of Inspection: 5/2212017 Time of Inspection: 8:30 Total Event Precipitation (inches): 0.30 in Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1of3 SWU-242, Last modified 10/25/2012 1. Outfall Description: Qutfall No. 001 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 40 5 5. Floating Solids: Choose the number which best -describes the amount of floating solids' in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 02 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 0 5 7. Is there any foam in the stormwater discharge? Yes No 8. is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 3 SWU-242, last modified 10/25/2012 �1. Outfall Description: Outfall No. 002 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service.__ 2. Color. Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor. Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): NIA 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1O 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 0 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 0 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 4. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 3 of 3 SWU-242, Last modified 10/25/2012 Semi-annual_Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY_ PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE'COLLECTION YEAR 2017 Rp���I IESQd�11PLE PERIOD ❑ lan-June ❑ July -Dec V Gv or ® Monthly' April (month) JUL 2 0 ZOIAISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply []SA CENTRAL FILES ®OtherWS-IV,NSW DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE -) Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample xCollected, mo/dd/yr 00530 00400 . 1 ! 00556 Total Suspended Solids, mg/L pH, Standard units Nan -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0— 9.0 15 - Outfall-1 4/24/17 6.8 1 6.6 BRL 300 Outfall-2 4/24/17 27 7.1 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 1 00530 _ 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, I mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 4 24 17 (first event sampled) Total Event Precipitation (inches): 4.51 in Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy of this DMR including all "No Discharge" re orts within 30 days of recei t of the lab results tor at end of monitoring period in the case of "No Discharge" renortsl_ta: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permitt 7-/'T La-7 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp,/web/wg/ws/su/nodessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this farm, please visit hit n,�portii.ncdenr.org/web/ir/npgies-storniwaterl Permit No.: N C G 0 8 0 0 0 0 or Certificate of Coverage No.: N C G 0 8 0 7 8 Facility Name: Durham Maintenance Complex —Durham City Transit. First Transit County: Durham Phone No. 919-560-1545 x126 Inspector: Douglas Albrecht Date of Inspection: 20 7 Time of Inspection: 10:30 Total Event Precipitation (inches): 4.51 in Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring mast be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 3 SwU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4O 5 S. Floating Solids: Choose the number which best describes the amount of floating -solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 O 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 O 5 7, Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No ' 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution; List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 3 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 002 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service, 2. Color. Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 10 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 02 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 20 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 3 of 3 SWU-242, Last modified 10/25/2012 Semi-annual Stormwater Discharge lVidnitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 SAMPLE COLLECTION YEAR 2017 FACILITY NAME Durham Maintenance Complex, Durham Ci RECEIVEMPLE PERIOD ❑ Jan -June ❑ July -Dec Transit, First Transit ���� I or ® Monthly' June (month) COUNTY Durham JUL 2 0 201 DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA PERSON COLLECTING SAMPLES Douglas Albrecht [! ❑Zero -flow ❑Water Supply [:]SA LABORATORY_ PRISM Laboratories, Inc._ Lab Cert. # 402 CENTRAL FILES ®Other WS-IV;NSW Comments on sample collection or analysis: DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this periodl Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 1 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 j 15 - Outfall-1 6/23/2017 16 7.0 BRL 300 Part 8: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, I mg/L pH, Standa'rd,units Permit Limit - 15 50 or 100 see permit 6.0 - 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date _6/23/2017 (first event sampled) Total Event Precipitation (inches): 0.12 in Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor— Letter dated Sept 9, 2014 Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receiat of the lab results for at end of monitoring period in the case of "No Discharge" reports)_ to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 7 l K—l7 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp/web/wq/ws/su/npdessw#tab-4 S WU-250 last revised April 11, 2013 Page 2 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For,guidance on filling out this form, please visit htt !!/nortal.ncdenr.orgLweb /ir/nudes-starmwaterL Permit No.: N/C/Gf 0/8/0/010/0 or Certificate of Coverage No.: N/C/G/0/0 j8f0 j7/8 j8 Facility Name: Durham Maintenance Complex, Durham City Transit, First Transit County: Durham Phone No. 919-S60-1S4S x126 Inspector: Douglas Albrecht Date of Inspection: 612312017 Time of Inspection: 10:00 Total Event Precipitation (inches): 0.12 in Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 3 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A _ 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 03 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 0 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 0 4 5 7. Is there any foam in the stormwater discharge? Yes Ng a. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes N-Q 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation, Page 2 of 3 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 002 Structure (pipe, ditch, etc.) Pipe leading into rock_ filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority_ vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): NIA 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 0 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 0 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: O2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 3 of 3 SWU-242, Last modified 10/25/2012 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NECG08Q649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc. lab Cert. If 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' February (month) RDISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ECLI V EQ ❑Zero -flow ❑Water Supply ❑SA MAR U 7 201r ®Other WS-IV:NSW CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfal l No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 2/15/2017 84 7.4 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page I of 2 STORM EVENT CHARACTERISTICS: Date 2/15/2017 (first event sampled) Total Event Precipitation (inches): >0.5 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTIONS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9 2014 Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." l� (Signature of Permittee) 3. Z ----1<zy (Date) �— Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wp/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 A��A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forquidance on filling out this form, please visit: http:.I.Iportal.ncdenr.org.1weblir/npdes-stormwater/ Permit No.: N jC/G j0/8/0/0/0/0 or Certificate of Coverage No.: N/C/G/0 j8 j0/7 j8 j8 Facility Name: Durham Maintenance Complex, Durham City Transit, First Transit County: Durham Phone No. 919-560-1545 x126 Inspector: Douglas Albrecht Date of Inspection: 2/1512017 Time of Inspection: 1145 Total Event Precipitation (inches): > 0.5 inch Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) M Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall F and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the I permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Pagel of 2 SWU-241'Last modified 10/25/2012 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) Pine leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 40 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 O 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy.- 1 2 O 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242'Last modified 10/25/2012 ww �i� ! MCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: htt ortal.ncdenr.or web lr n des-stormwaterh ,l C- �(ra $ 06�f Permit No.: N1C,IG10 8101010 f 0 or Certificate of Coverage No.: N/C% 2-0- JO�`!-1�81.� NC Facility Name: Durham Maintenance Complex, Durham City Transit, First Transit County: Durham Phone No.919-560-1545 x126 RECEI V ED Inspector: Douglas Albrecht FEB 10 _ Date of Inspection: 1 20 7 l Time of Inspection: 1045 CE DWR SECTION Total Event Precipitation (inches): > 1 inch Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 3 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) Pipe leading into rock it cascadingoutfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance, repair, and service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 l:J 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 O 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy, 1 2 3 0 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. - Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 3 5WU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. 002 Structure (pipe, ditch, etc.) Pipe leading into rock filter cascading outfall Receiving Stream: Goose Creek and Ellerbe Creek Describe the industrial activities that occur within the outfall drainage area: Durham Area Transit Authority vehicle maintenance repair, a -service. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): N/A 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: '1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 0 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 O 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 3 of 3 SWU-242, last modified 10/25/2012 Semi-annual Storm_wat_er Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO..NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit First Transit COUNTY Durham PERSON COLLECTING SAMPLES Doualas Albrecht LABORATORY PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' January month RECEOW_ RGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA FEB 10 ?017 ❑Zero -flow ❑Water Supply ❑SA ®Other WS-IV:NSW CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 . 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor 0ii Usage, Annual average gal/mo Benchmark - 50 or 100 see permit' Within 6.0 - 9.0 15 - Outfall-1 1/20/2017 110 7.2 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/C Total Suspended Solids, mg/L PH, Standard units Permit Limit - ` 15 50 or 100'see permit 6.0 - 90 i For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date _1/20/2017 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mall an orialnol and one copy o this DMR. Including all "No Discharge " reports, within 30 days of recel t of the lab results (or at end of monitoring period in the case of _'No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted, Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.n_cdenr.org/web/wct/wsl5u/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc._ Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly" December (month) DISCHARGING TO CLASS ❑ORW ❑HCIW ❑Trout ❑PNA RECEIVED ❑Zero -flow [:]WaterSupply [_]SA DEC 2 8 2016 ®other WS-IV;NSW_ CENTRAL_ FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) no ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 12/06/2016 130 7.3 BRL 300 Outfall-2 12/06/2016 150 7.2 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 12/06/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor _—_Letter dated Sept 9, 2014 Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/weblwq/ws/su/npdessw#tab-4 SWU-250 last revised April 1], 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit_ COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY_ PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly'september (month) RECL6'S kWLR�NG TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA ❑Zero -flow ❑Water Supply [—]SA NOV 16 Z016 ®Other WS-IV:NSW CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 OWR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 9/19/2016 98 6.9 BRL 300 Outfall-2 9/19/2016 15 6.7 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfal I No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page I of 2 STORM EVENT CHARACTERISTICS: Date 9/19/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. 2 EXCEE DANCES iN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor— Letter dated Sept 9,_2014 Mail an.oE ginal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) //-/S -?0/6 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wcl/ws/sulnpdessw#tab-4 S W U-25 0 last revised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE No. NCG080649 SAMPLE COLLECTION YEAR 2016 FACILITY NAME Durham Maintenance Complex, Durham City SAMPLE PERIOD ❑ Jan -June ❑ July -Dec Transit First Transit or ® Monthly' August (month) COUNTY Durham DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA PERSON COLLECTING SAMPLES Douglas Albrecht _ _ RECEIVED ❑Zero -flow ❑Water Supply ❑SA LABORATORY PRISM Laboratories Inc. Lab Cert. # 402 NOV 16 2016 ®Other WS-IV;NSW Comments on sample collection or analysis: CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE � DWR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfal I No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 9/1/2016 340 7.1 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. S W U-250 last revised August, 2013 Page t of 2 STORM EVENT CHARACTERISTICS: Date _9/1/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor— Letter dated Sept 9. 2014 Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wcl/ws/su/npdessw#tab-4 S W U-250 last revised August, 2013 Page 2 of 2 • ` Semi-annual. Stormwater Discharge Monitoring Report for __. for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 - SAMPLE COLLECTION YEAR 2016 FACILITY NAME Durham Maintenance Complex, Durham City SAMPLE PERIOD ❑ Jan -June ❑ July -Dec 9 or Mon1 May (month) Transit, First Transit th � COUNTY Durham f DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout❑PNA PERSON COLLECTING SAMPLES — Douglas Albrecht - ❑Zero -flow ❑Water Supply ❑SA LABORATORY_ PRISM Laboratories, Inc. Lab Cert. ## 402 - AUG 12 2016 ®Other WS-IV:NSW Comments on sample collection or analysis: CENTRAL FILES r= WIR SECTION � PLEASE:REMEMBER TO SIGN ON THE REVERSE 3 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per mo/nt/�h? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 - 9.0 15 - Outfall-1 5/5/2016 85 6.9 BRL 300 Part S: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 - 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page I of 2 - �,� � _�- . di V 1 r� ,a �. _f 9T6FtM EVENT CHARACTERISTICS: Date 5/5/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy of this DMR, including at/ "No Discharge" reports,_ within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge"reports) to: Division of Water Quality _,__: Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ignature of Permittee) 5' 5.7(31 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 S WU-250 last revised April 11, 2013 Page 2 of 2 �- Semi-annual Stor_mwater Discharge„ MonitoringRRepo_rt for North Carolina Division of Water Quality General Permit No. NCGO8000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: 0 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' O u tfa l l No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 4/12/2016 400 7.0 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfa I I No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 1 - STORM EVENT CHARACTERISTICS: Date _4112/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART 8 MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor_— Letter dated Sept 9, 2014 Mail an original and one copv of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharae"reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) _el /Z-��I (Date) Additional copies of this form may be downloaded at: htto://portal.ncdenr.org(webfwq/wsLsu/npdesswstab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE No. NCG080649-1, FACILITY NAME _ _ . Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY_ PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: MAY -92016 ,,. FORMA DVVR SECTION T1014 PROCE'SS1NG UNIT SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' February (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑zero -flow ❑Water Supply ❑SA ®Other WS-IV:NSW MAY — q ? PLEASE REMEMBER TO SIGN ON THE REVERSE 4 more +,DWR �"'r • rn,N,Dd aclyfVehicle uiActivities using han"5�5�,g.a,llons o�eSmotor � it per month? X yes _no (if YesI rePortYouranalYt cal results the tabemmed'atelY below) 'f��1 Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 2/3/2016 170 7.2 BRL 300 Outfall-2 2/3/2016 21 6.9 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 .0e - — STORM EVENT CHARACTERISTICS: Date 2/3/2016 (first event sampled) Total Event Precipitation (inches): >1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART It SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor— Letter dated Sept 9, 2014 Mail an oriainal and one cony of this DMR, includina all "No Discharge"reports, within 30 days of receipt of the lab results (or at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there arg significant penAlties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/nr)dessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 0 0 0 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCG080649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY_ PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly" November (month) ® ��IDIS�U GING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA R ❑Zero -flaw ❑Water Supply ❑SA FEB 0 5 2916 ®Other WS-IV;NSW CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) no ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 11/2/2015 54.0 6.8 BRL 300 Outfall-2 11/2/2015 4.0 6.8 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) O utfa I I No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 0 0 0 STORM EVENT CHARACTERISTICS: --Date' 11/2/2015 (first event sampled) Total Event Precipitation (inches): 1.6 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER I REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy, of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directl responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that the �e e significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ature of Permittee) (Dat ) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/weblwq/ws/su/npdessw#tab-4 S W U-2 50 last revised April 11, 2013 .Page 2 of -1�6I 5-- G =; % 0 Durham June 15, 2015 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Tier 3 Sampling:- March 2015 Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. h C G-a ?-0 � Yq To Whom It May Concern: RECF-NF-ID suN � 1 Z015 EMT SECTION Please find two copies of the completed DMR for the referenced site for your files. Sampling data of the discharge from Outfall No. 001 in March showed an exceedance of the threshold limit for TSS. Although not the case for all sampling events, the discharge from Outfall No. 001 has exceeded the threshold several times in the last couple of years. Since the City of Durham owns the property, we continue to communicate and work with City officials to resolve this issue. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company Mr. James Tinsley Risk Manager Enclosures cc: James Azarelo, City of Durham Michael L. Walker, The El Group, Inc. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water y General Permit No. NCGO80000 Date submitted �ual" � CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City_ Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORYPRISM Laboratories, Inc._ Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' March (month] DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®Other WS-IV:NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 3/5/15 290.0 6.4 BRL 300 Outfall-2 3/5/15 15.0 6.5 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 -- 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page] of 2 STORM EVEI`;-T CHARACTERISTICS: Date 3 5 15 (first event sampled) Total Event Precipitation (inches): 1.0 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring_ period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that th F9re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. 4 (� re of Permittee) ./ / -/;, 0 Additional copies of this form may be downloaded at: http://Portal.ncdenr.org/web/wq/ws/sulnpdessw#tab-4 SWU-250 last revised April 1], 2013 Page 2 of 2 l� Yq Go Durham March 25, 2015 \qe® 00 �p15 North Carolina Division of Water Qualityp� ���tLES Attn: DWQ Central Files C�NR SECTIQN 1617 Mail Service Center DW Raleigh, North Carolina 27699-1617 Re: Tier 3 Sampling — March 2015 Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 hL,� g �p Permit No. �' -t}-Q �LQ-A Up�t¢ - l 7 �1.CCr0 �a2 o d To Whom It May Concern: Please find two copies of the completed DMR for the referenced site for your files. Sampling data of the discharge from OutfalI No. 001 in March showed an exceedance of the threshold limit for TSS. Although not the case for all sampling events, the discharge from Outfall No. 001 has exceeded the threshold several times in the last couple of years. Since the City of Durham owns the property, we continue to communicate and work with City officials to resolve this issue. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company Mr. James Tinsley Risk Manager Enclosures cc: James Azarelo, City of Durham Michael L. Walker, The El Group, Inc. r '. I ' ijr� F- 0 "llrb- j/ i'f J "j, ol "If011iq P", "If4l i�-) (fil Jf( n. W ITP f 01.11C ()/,0 o , 11 ,(, 1 1 Ij 1. f, I - )T, Jr. r; 1;,7-)r 1.r c 1 j )j!f Or, j! "Ifs ryf r.r. (o .4 P()I(l I 11" r , 'Usr f j L Tjjr w- Y.r r I Or o 1 1. 0 Q T I Jj U; I OJT-. Ll .11 J _'000- ju f)j, jj"rjrt ()rt-1 i (i j I., I , j j — ') , — 1 'j— 3)1 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 -4 Date submitted CERTIFICATE OF COVERAGE NO. NCG080649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' March month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑5A ®Other WS-IV;NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) no No discharge this period' Outfal I No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 3/5/15 290.0 6.4 BRL 300 Outfall-2 3/5/15 15.0 6.5 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfal I No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Paget of 2 STORM EVENT CHARACTERISTICS: _ f Date 3 5 15 (first event sampled) Total Event Precipitation (inches): 1.0 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one coon of this DMR, includina all "No Discharae" reports, within 30 dovs of receipt of the lab results for at end of monitorina Period in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there as significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. �1 of Permittee) aol-6- (Date) Additional copies of this form may be downloaded at: http:llportal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY_ PRISM Laboratories, Inc_ Lab Cert. ti 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' January _ __ )month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA, ❑Zero -flow ❑Water Supply ❑SAIM ®Other WS-IV;NSW I"' r9F I PLEASE REMEMBER TO SIGN ON THE REVERSE Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) ❑ No discharge this period' Outfal l No. Date Sample Collected, mo/dd/yr 00530 .. 00400 00556 Total Suspended Solids, mg/L. pH, ..Standard.units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage,' Annual average-gal/mo Benchmark - 50 or'100 see permit Within 6.0 -'9.0' 15 - Outfall-1 1/12/15 230.0 5.8 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, rrib/dd/yr 00556 .00530 -00400. Non -Polar Oil and.Grease/TPH EPA Method ' 1664 (SGT=HEM), mg/L TotaI 4Suspencled,Solids, mg/L. 'Pop Standard units Permit Limit - 15 50 or 100 see permit J, 6.0=.:9:0, I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 pAOP, 1 of 2 STM4 EVENT CHARACTERISTICS: Date 1 12 15 (first event sampled) Total Event Precipitation (inches): 1.29 Date/ (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART I] SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO REGIONAL OFFICE CONTACT NAME: RRO Supervisor — Letter dated Sept 9, 2014 Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that thereare significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) Date) Additional copies of this form may be downloaded at: http:ljportal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Pave. 7. nf 7 W1 t1—r`N DURHAM CITY TRANSIT COMPANY vv ■ v February 17, 2015 North Carolina Division of Water Quality Attn: DWQ Central Files ®� 1617 Mail Service Center �T Raleigh, North Carolina 27699-1617 F Ee Z c �/Vr, Re: Tier 3 Sampling — January 2015 �E�lO8 Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. NCG080788 To Whom It May Concern: Please find two copies of the completed DMR for the referenced site for your files. Sampling data of the discharge from Outfall No. 001 in January showed an exceedance of the threshold limit for TSS. Although not the case for all sampling events, the discharge from Outfall No. 001 has exceeded the threshold several times in the last couple of years. Since the City of Durham owns the property, we continue to communicate and work with City officials to resolve this issue. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company C� IVIr. James Tinsley Risk Manager Enclosures cc: James Azarelo, City of Durham Michael L. Walker, The El Group, Inc. • lot P pram'101, 'I'AmO ".)i lotion I smov mumu .00W in I f 'n, .'14 Vmn TAU to -A WAC A I JOL tj mob lv"Md It W.-V I Al I Aff If Amy M, qj1q( 1 av 1 ImAdue" 5j; MUM: -,-: " "A' Jdj kunu Ponng W W sm? wolf! r ujq6un Jai! Q K ei,ml U../so ho�..,Q jilo-"vi W emminu Vi fIS huyl min V4000maun q; unhomb qd PQ ".fji�.V;4;ii Liljfjrir rj,k !I !12 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted l(- I' -7 CERTIFICATE OF COVERAGE No. NCG08 0 g -Y 1 FACILITY NAME CotOKIAL- f (h�-C-06` (7o - KJ�NNA �GL(S COUNTY CA& A-ke-1,f s PERSON COLLECTING SAMPLES �CSffkf - C��%Tty LABORATORY I SAS L-AA 5 Lab Cert. # o Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR 20//-f Sr -AT - SAMPLE PERIOD ❑ Jan -June my -Dec or ❑ Monthly' month) DISCHARGING TO CLASS ❑ORW P�tHQW�❑Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA ❑Other NOV 2 4 2014 CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION ❑ No discharge this period' :_�utfall; :Date s 00530 00400� , 00556 _. Total-5.uspended L phl, _= Nan Polar Oil and'Grease/TPH EPA NewMoto� Oil Usage, No _SamplesCoiiected, Starydard Met. fd 466*!sdT�_HEMj;-mg/L Annual a,Yerage units-� = - gal/mo Benchrrtarlc_ :, = _ 50 or 100 see permit = _... Withtn:6�09:0_- Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals - Outfail �: ©ate _. y} --� _- � 0 0530 0040 _ 0 " ` No ," ` Sain IelCollected _., =Nan P.olar0il=and 'Grease EPA IVtethod_ =7otal'Sus ended Solids µ- =. P H = _ _ L�_ z __P., Sta b� �,. g/ �.�•.. x>" L� �. r _ �, ndard units Rermrt,lim[t.__. -;- = , R '50'0� ip0'see "emit .. Y- m 0,9 0. =_�- - .. _15 �. _ - s p_6 4-/r Iq < S 3,7 40,4 Do !o-fSr iL S 7, 3 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date /a�TS /Y (first event sampled) it Total Event Precipitation (inches): d•s Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): i Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �0 e (Signathre of Permittee) ll -13-8 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wcl/ws/su/npdessw#tab-4 ,! i SWU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE No. NCGO80649 FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories, Inc._ Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly' (month) RECEJ1,15ECARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA NOV 17 LI!14 ❑Zero -flow [:]Water Supply ❑SA ®Other WS-IV;NSW CENTRAL !`ICES DIh1R SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 10/ 15/ 14 74 6.2 BRL 300 Outfall-2 10/15/14 BRL 6.0 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page l of 2 STORM E3VENT CHARACTERISTICS: Date 10115114 (first event sampled) Total Event Precipitation (inches): >1inch Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results tor at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there -are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �0/113 D1 t�ignature of Permittee) (D te) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp/web/wq/wlsu/ngdessw#tab-4 SWU-250 last reprised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCG080649- FACILITY NAME Durham Maintenance Complex, Durham City Transit, First Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht_ LABORATORY_ PRISM Laboratories, Inc. Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ® July -Dec ��I.iECU D��ArftGINor ❑ monthly' _ (month) G TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA S E P 3 0 2014 ❑Zero -flow ❑Water Supply ❑SA ®Other WS-IV•NSW CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes (if yes, report your analytical results in the table immediately below) Part A. Vehicle Maintenance Areas Monitoring Requirements (If applicable) no ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 8/1/14 500.0 6.0 BRL 300 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 t For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page I of 2 STORM EVENT CHARACTERISTICS: Date 8 i 14 (first event sampled) Total Event Precipitation (inches): >1inch Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Notification sent to Regional Supervisor Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitorina period in the case of "No Discharge"reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed -to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, ortKose persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there areAignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) 4 171�74101ale;/ (te) Additional copies of this form may be downloaded at: http://portal.ncdenr.or_g,/web/wq/ws/su/npdessw#tab-4 S WU-250 last revised April 11, 2013 Page 2 of 2 I DUHHAL'. CITY TRANSIT f MWIANY K../Ml/ ■ September 26, 2014 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Sampling Period Spring 2014 Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. NCG080788 To Whom It May Concern: Please find two copies of the completed DMR for the referenced site for your files. These results are associated with monitoring requirements associated with a Tier Two response requirement. The Raleigh Regional Office has been contacted regarding this threshold exceedance. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely. Durham City Transit Company r. James Tinsley Risk Manager Enclosures cc: Michael L. Walker, The El Group, Inc. a • a Semi-annual Stormwater Discharge Monitoring_ Report for North Carolina Division of Water Quality General Permit No. NCGO80000., Date submitted August 7, 2014 CERTIFICATE OF COVERAGE NO. NCGO80928 _ .SAMPLE COLLECTION YEAR 2014 FACILITY NAME Waste Industries - Stedman SAMPLE PERIOD ❑Jan -June 0 July -Dec • COUNTY CUMBERLAND or ❑ Monthlyl = (month) PERSON COLLECTING SAMPLES J D FREI/ SwSG O CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY -Pace Analytical Lab Cert. # 12 67 - REdffIT - ❑Zero -flow, , ❑Water Supply [:]SA Comments on sample collection or analysis: pH measured in field by 0 Other C, Sw SwSG Lab Cert No._5054Y AUG 0 6 Z014 y PLEASE REMEMBER TO SIGN 'ON THE REVERSE ., . r - •w: CENTRAL FILES Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of n�eW�mo o oil per month? ✓ yes' _no " (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - 001 1 07/21/14 16.7 6.83 < 5.0 +/- 90 002 07/21/14 < 8.3 6.75 ;f; < 5.0 - Part B: O'sl/water.Separators and.Secondary:ContainmentAreas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected; mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.'0 - 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 • • s STORM EVENT CHARACTERISTICS: Date 07/21/14 (first'e�ent sampled) Total Event Precipitation (inches): 0.7r ' .SF. Date (list each additional event sampled this reporting period, and rainfall amount) Total.Event Precipitation (inches):. r• - Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or firer 3 responses:" See General Permit text_ q - FOR PART AND PART B MONITORING RESULTS: • ; A'BENCHMARK,EXCEEDANCE,TRIGGERS TIER•1 REQUIREMENTS, SEE PERMIT PART II SECTION $. 1 . _ • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART If SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME -PARAMETER AT -ANY ONE OUTFALL? -.YES- ❑ NORO- IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ s , ;, REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this. DMRR including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to:j,-,- Division of Water Quality.- Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 • - - - - - <. -- - -.•• _=- -- YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons'who manage the system, or those persons directly responsible for Vthering the information, the informationsubmitted'is,;to the best of my,knowledge and,belief, true, accui-ate,,arid complete. I arri'aware that' . the ricant pe Ities for submitting false information, including the possibility of fines and imprisonment for knowing vioiation_s." . - _ •-.._-_ a .. "< � .�. � .•i-'J '`Y•: .� .i•..:ac ..! (Signa ure of Permittee) .., Additional copies of this form maybe downloaded at: http-.//portal.ncdenr.org/web/wglwslsulnpdessw#tab-4 - SWU-250 last revised April:] 1, 2013 Page 2 of 2 RECEIVE® JUL 0 9 Z014 CENTRAL FILES DWQIBOG Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO80649 FACILITY NAME _ Durham Maintenance Complex, Durham City Transit, irst Transit COUNTY Durham PERSON COLLECTING SAMPLES Douglas Albrecht LABORATORY PRISM Laboratories Inc. Lab Cert. # 402 Comments on sample collection or analysis; SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ® Jan -tune ❑ July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®Other_ WS-IV;NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A. Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Outfall-1 5/15/14 1 260.0 6.9 BRL 300 Outfall-2 5/15114 8.6 6.7 BRL 300 Part B; Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 .. �.. .. I I , � — ... j .. ' •4 I I � � ! � I _ _ I - _ ,.. 1 r ` .i � - � ' � � . � , Y �� i � � f . 1 _ � � ' � ... � � + !s. � ' � •j . N i - � ' ' ., _ I � • 4 � , .. ... .., _ i � �. ' ,J ' , 1 .. � } � . r I ' f— _ .. ... �. � r w .. �. i � , •a � i J . '. -, s , i i .. t � I I i , �. , �� c I � « � ' � I s � I � � � � 1 .. � I � p �, 5 Y � ! ! � , f' ' ' _ _ e( ' , � ' .� ,, �r � � i � � 1 . � 1 1 1 r STORM EVENT CHARACTERISTICS: Date 5 15 14 (first event sampled) Total Event Precipitation (inches): >1inch Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or rer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ No IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an odginal and one copy of this DMR, including all "No Discharae" reports, within 30 days of receipt of the lab results (or at end of monitorina period in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C, 4, C of Permittee] 3 Jas (D e) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/`su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 Er1 Ar**%_WA1-N T11/HHAM CITY TNA!' MT COMPANY ®J W/ ■ L July 7, 2014 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Stormwater Sampling Period Spring 2014 Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. NCG080788 To Whom It May Concern: Please find two copies of the completed DMR for the referenced site for your files. One sample value exceeded the benchmark value for the second consecutive sample period, and as such, Tier Two responses will be implemented according to the General Permit. Please contact us at (919) 657-7500 if you should have any questions regarding this monitoring event. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company L Mr. James Tinsley Risk Manager Enclosures cc: Michael L. Walker, The El Group, Inc. • -- ' ' � r.� � � ,. �'i I r ' a i � - f. _ , �� � ; ,., , I 'I +, i "(1 II �, ij � I� � + � I �i � � 'I j Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCG08_0 _6= _4 _9_ FACILITY NAME Durham Maint. Complex — Durham City Transit COUNTY Durham PERSON COLLECTING SAMPLES Michael Walker LABORATORY Prism Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' Aril month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA RECEIVED ❑Other MAY 14 ZN4 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons ofynewL+motor oi! per month? X yes _no �J Ib i l VIL ! kL� , (if yes, report your analytical results in the table immediately below) DWQIBOG Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 OOSS6 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - 001 04/07/14 Below Reporting Limit (12) 7.4 None Detected 320 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 NA I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 5WU-250 last revised April 11, 2013 Page 1 of 2 k � -.. STORM EVENT CHARACTERISTICS: Date 04/07/14 (first event sampled) Total Event Precipitation (inches): 1.51 Date N/A (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, T;er 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this AM including all "No Discharge" reports, within 30 days of receipt of the lab results tor at end of monitoring period in the case o "No Discharge" re arts to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) sIqof (Da e) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/weblwa/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 _ `''' .. 'y' —i. c - �j1- 1 �- -. -, t _ .. _• - � � • . — .i �- "'�P• _- � I,1L .rc__'_. �__ U'.Z � °L:7 •L is 1_ . - .fit• t '4 .. eJ :! tY `S. 1- (.... - - t} .4� .i� ..1� ' �- 'i 'i`.'!:-• �_'SJ '.e t'ti �.:14i• - '>w' _ .. _ Er1 `1 -Wt1 nVHHAMC1iv IRANSIT CoraFANY 111 tJ ■ W/ 1903 Fay St. Durham, NC 27704 May 9, 2014 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Tier Two Response Exceedance of Total Suspended Solids Benchmark Value Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. NCGO80788 To Whom It May Concern: The Durham City Transit Company is submitting results from monthly sampling conducted as part of a Tier Two Response to benchmark exceedances for two consecutive sample periods in 2013. Included are two copies of a DMR completed for April 2014. Sampling results for April 2014 indicate TSS below the benchmark value. Per the permit, this third consecutive sample result below the benchmark value satisfies the Tier Two Response requirement. The Durham City Transit Company will resume semi-annual analytical monitoring per the permit requirements. Please contact us or The El Group, Inc. if you should have any questions regarding these monitoring events. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company Mr. James Tinsley Risk Manager Enclosures cc: Michael L. Walker, The El Group, Inc. I � •+Its.. _, .I,r., .err' •�� t ti. ,.~ ,:. , IJ�'-�, ,}/'rt �'�7'". �Z�,i .� i •,. t:y, I� is r-jj :}": i ', ..t `,: ?�s,ihllr.•_ �� ,;,. �„r:� ., r• .. ' � . . �,�+�.ri't . �. ;I . - ; ;;�r�:.-! , ,� .. ri _�_ II'.'If. :i•'.1!'.".i�•1is], t�'..F�tir'.L'i+'t!�!, !.� !l ,. I`':1f,IO '['t')/.'�� I. .r !; Irir,,;, 11, .�..~t,;;.� Ir ' ;} ai:l ;,r'r��r! ', i ;fir-'�'rir.'z�rl-. •a•� �r'; .'r��`.. +�. ., . 't r1f� •'1'_ r:.r: 7 i� ti:,l.. e' "?; .:.d.<<i fi r7��1� •.-Ft}. :S:f, r� ,, � �� U1]92S .t� all li?]:. s:i. lE7i �',v�tu V �f.i ' i ' 0, ' mr1 At"NTt"N DURHAM CITY TRANSIT COMPANY vv ® v March 24, 2014 North Carolina Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: Tier Two Response Exceedance of Total Suspended Solids Benchmark Value Durham City Transit Company 1903 Fay Street, Durham, North Carolina 27704 Permit No. NCGO80788 To Whom It May Concern: 1903 Fay Durham, NC 27704 E(;ElVE APR - 9 2014 The Durham City Transit Company is submitting results from monthly sampling conducted as part of a Tier Two Response to benchmark exceedances for two consecutive sample periods in 2013. Included are two copies of a DMR completed for February 2014 and two copies of a DMR completed for March 2014. Please note sampling was not conducted in February 2014 due to adverse weather conditions and storm events taking place outside normal business hours. Sampling results for March 2014 indicate TSS below the benchmark value. Per the permit, monthly sampling will continue until results are below the benchmark value for three consecutive months. Please contact us or The El Group, Inc. if you should have any questions regarding these monitoring events. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Durham City Transit Company Mr. James Tinsley Risk Manager Enclosures cc: Michael L. Walker, The El Group, Inc. 0 (}. � a. s .. .:�. yr• ,�,f .� s' 'It` (I .. i Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE Of COVERAGE NO. FACILITY NAME Durham Maint. Complex— Durham City Transit COUNTY Durham PERSON COLLECTING SAMPLES Michael Walker LABORATORY Lab Cert. # Comments on sample collection or analysis: adverse weather, storm event outside normal operatine hours_ SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly) February (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ®Water supply []SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) ® No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfali No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 NA 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 5WU-250 last revised April 11, 2013 Page 1 of 2 71 1 i r S •_ - _ -Y .°J. 1 �:°' .- is 7 ` '-'-J 'S-i—' �` ' - - ! .. All STORM EVENT CHARACTERISTICS: Date N/A (first event sampled) Total Event Precipitation (inches): N/A Date N/A (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (Inches): Note. if you report a sample value in excess of the benchmark, you must implement Ter 1, Tier 2, or Tier 3 responses. See Genera! Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Ma!l an on lnai and one cony othis DMR, Including all "No Discharge" reportswithin 30 the lab results or at end o monitoring rlod In the case of "No Discharge' reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) cI W-y dlr ate) Additional copies of this form may be downloaded at: http://partal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 S W U-250 last revised April 11, 2013 Page 2 of 2 L. - (r• � r Semi-annual Stormwater Discharize Monitorini; Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted CERTIFICATE OF COVERAGE NO. NCG08_0_ —6_ _4_ _9_ FACILITY NAME _Durham Maint. Complex —Durham City Transit COUNTY Durham PERSON COLLECTING SAMPLES Michael Walker LABORATORY Prism Lab Cert. # 402 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' March (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []zero -flow ®Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 005S6 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - 001 03/07/14 130 6.9 None Detected 320 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 NA I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April I.1, 2013 Page l of 2 STORM EVENT CHARACTERISTICS: Date 03ZO7114. (first event sampled) Total Event Precipitation (inches): 2.27 Date N A (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, filer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mall an original and one copy of this DMR, including all "No Discharge" reports, rs+lthln 30_days of receipt of the lab results for at end of ma_nitorina Perlod in the case of "No Discharae" renortsJ to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there a�psignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) &IoW449111 ate) Additional copies of this form may be downloaded at: http://portal.ncdenr.ore/web/wq/ws/su/npdessw#tab-4 S WU-250 last revised April 11, 2013 Page 2 of 2