Loading...
HomeMy WebLinkAboutNCG080368_MONITORING INFO_20190110STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. I IV C& O � D3(o g DOC TYPE 1 ❑ HISTORICAL FILE fir MONITORING REPORTS DOC DATE ❑ Ail DI I � YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 12/28/2018 CERTIFICATE OF COVERAGE NO. NCG080368 SAMPLE COLLECTION YEAR 2018 FACILITY NAME United Parcel Service - Chapel Hill SAMPLE PERIOD ❑Jan -June �X July -Dec COUNTY Orange or F-]Monthlyl (month) PERSON COLLECTING SAMPLES Ryan R. Osborne (INENCO, INC. LABORATORY Pace Analytical Services, Inc. Lab Cert. # 12, 40, 37706, & 37712 LABORATORY INENCO, Inc. Lab Cert. # 5540 Comments on sample collection or analysis: D15CHARGING TO CLASS ❑ORW F]HQW Trout [—]PNA RECDEIVED BAN 10 Z019 CENTRINL FILES GVVR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) Zero -flow F_x ]WaterSupplyEISA OOther WS-V; NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 x yes no 1-1 No discharge this period ?z Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/I pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - SDO-001 10/26/2018 18.3 7.91 < 5.0 62 SDO-002 10/26/2018 16.4 7.41 < 5.0 62 SDO-003 10/26/2018 24.0 7.17 < 5.0 62 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method - 1664 (SGT=HEM), mg/L Total Suspended Solids mg/I pH, ` Standard units Permit Limit - 15 50 or 100 see permit Within 6.0 — 9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page Iof2 STORM EVENT CHARACTERISTICS: Date 10/26/2018 (first event sampled) Total Event Precipitation (inches): 2.20 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO IF XT IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES F7 NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including oll "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring „period in the case of "No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Additional copies of this form may be downloaded at: l -LA -19 (Date) htt2lZportal.ncdenr.or&Lweb/wg/ws/su/npdessw#tab-4 last revised April 11, 2013 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) / SPPP Annual Update DATA REVIEW FORM Calendar Year 2018 Certificate of Coverage (COC) No. NCGO80368 This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: United Parcel Service - Chapel Hill County: Orange K k . �% Phone Number: 919-790-7474 .... Xotal no. of SDOs monitored: Outfall No. SDO-001 CENTRAL FILES Is this outfall currently in Tier 2 (monitored monthly)? DOM SECTION Was this outfall ever in Tier 2 (monitored monthly) during the past year? If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes � Yes Yes QX No ❑X No ❑X No Total Rainfall, Inches Parameters, (units) Total Suspended Solids, (mg/L) pH, {Standard Units) Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), (mg/L) Benchmark N/A 50 or 100 see permit Within 6.0 — 9.0 15 Date Sample Collected 01/28/Z018 0.71 10.8 7.72 < 5.0 10/26/2018 2.20 18.3 7.91 < 5.0 Outfall No. SDO-002 Is this outfall currently in Tier 2 (monitored monthly)? Yes No �X Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes No UK If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Received approval from DWQ to reduce monitoring frequency ❑ Other Was this SDO monitored because of vehicle maintenance activities? Yes 0 No Total Rainfall, Inches Parameters, (units) Total Suspended Solids, (mg/L) pH, (Standard Units) Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), (mg/L) Benchmark N/A 50 or 100 see permit Within 6.0 — 9.0 15 Date Sample Collected 01/28/2018 0.71 10.6 7.62 < 5.0 10/26/2018 2.20 16.4 7.41 < 5.0 United Parcel Service -Chapel Hill SWU-264-Generic Annual DMR Last revised 5/17/2013 Outfall No. SDO-003 Is this outfall currently in Tier 2 (monitored monthly)? Yes No 0 Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes 7 No �X If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQto reduce monitoring frequency Other 71 Was this SDO monitored because of vehicle maintenance activities? Yes �X No Total Rainfall, inches Parameters, (units) Total Suspended Solids, (mg/L) pH, (Standard Units} Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), (mg/L) Benchmark N/A 50 or 100 see permit Within 6.0 — 9.0 15 Date Sample Collected 01/28/2018 0.71 16.6 7.42 < 5.0 10/26/2018 2.20 24.0 7.17 < 5.0 Outfall No. Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes 0 No ❑ If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Received approval from DWQto reduce monitoring frequency Other El Was this SDO monitored because of vehicle maintenance activities? Yes No Total Rainfall, inches Parameters, (units) Total Suspended Solids, (mg/0Method pH, (Standard Units) Non -Polar Oil and Grease/TPH EPA 1664 (SGT-HEM), (mg/L) Benchmark N/A 50 or 100 see permit Within 6.0 — 9.0 1s Date Sample Collected "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. including the possibility of fines and imprisonment for knowing violations." Signature: (A(,f 4 t / &Ak___, Date: 1 r `1 — 19 For questions, contact your local Regional Office United Parcel Service- Chapel Hill SWU-264-Generic Annual DMR Last revised 5/17/2013 August 22, 2018 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 - 1617 QU6 2 8 201e CGNTr�AL �t ° Rs. r10N Re: Stormwater Discharge Outfall Monitoring Report (DMR): Year 6, Period 1, Sample 11 - 2018 United Parcel Service — Chapel Hill 7411 Rex Drive, Chapel Hill, North Carolina (Orange County) General Permit NCG080000; Certificate of Coverage No. NCG080368. Dear Stormwater Permitting Unit; We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for the United Parcel Service — Chapel Hill under General Permit Number NCG080000, Certificate of Coverage No. NCG080368. This submission is for stormwater discharge sampling during Year 6, Period 1, Sample Number 1 I (January -- July, 2018) as outlined in Part 1I, Section B of our stormwater discharge permit. We are happy to report that all sample analytical results were below benchmark values and/or within the benchmark ranges. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. Sincerely, Vincent Mollo District Environmental Coordinator United Parcel Service, Inc. Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & 1 copy Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 07/08/2018 CERTIFICATE OF COVERAGE NO. NCGO80368 SAMPLE COLLECTION YEAR 2018 FACILITY NAME United Parcel Service - Chapel Hill SAMPLE PERIOD �X Jan -June D July -Dec COUNTY Orange or ❑Monthly' (month) PERSON COLLECTING SAMPLES Ryan R. Osborne (INENCO, INC.) LABORATORY Pace Analytical Services, Inc. Lab Cert. 4 12, 40, 37706, & 37712 LABORATORY INENCO, Inc. Lab Cert. 4 5540 Comments on sample collection or analysis: DISCHARGING TO CLASS ❑ORW DHQW Trout F_]PNA Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor ail per month? Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) Zero -flow EX Water Supply EISA Other WS-V; NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 X yes no No discharge this period ?2 Outfal I No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/I pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 1s - 5DO-001 01/28/2018 10.8 7.72 < 5.0 62 SDO-002 01/28/2018 10.6 7.61 < 5.0 62 SDO-003 01/28/2018 16.6 7.42 < 5.0 62 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 005S6 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids mg/I pH, Standard units Permit Limit - 15 50 or 100 see permit Within 6.0-9.0 i t I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 • last revised April 11, 2013 Page 1 of 2 t ti STORM EVENT CHARACTERISTICS: Date 01/28/2018 (first event sampled) Total Event Precipitation (inches): 0.71 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCFFDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO FX IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES F--] NO REGIONAL OFFICE CONTACT NAME: Mail an original and one tape of this DMR including a!1 "No Discharge" reports, within 30 days of receip__t of the lab results or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7lso!8 — 6f&� M�� (Signature of mittee) (Date) Additional copies of this form may be downloaded at: http://Portal.ncdenr.org/web/wg/ws/su/npdessw#tab-4 SWU-250 last revised Apri,*11, 2013 Page 2 of 2 January 8, 2018 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 - 1617 JAN 10 Z01,8 INFO�MAN D*R SECTION PROCESSING UNIT Re: Stormwater Discharge Outfall Monitoring Report (DMR): Year 5, Period 2. Sample 10 - 2017 United Parcel Service — Chapel Hill 7411 Rex Drive, Chapel Hill, North Carolina (Orange County) General Permit NCG080000; Certificate of Coverage No. NCG080368. Dear Stormwater Permitting Unit; We respectfully submit the enclosed original and one copy of the Stormwater Discharge OutfalI Monitoring Report for the United Parcel Service — Chapel Hill under General Permit Number NCGO80000, Certificate of Coverage No. NCG080368. This submission is for stormwater discharge sampling during Year 5, Period 2, Sample Number 10 (July — December, 2017) as outlined in Part 11, Section I3 of our stormwater discharge permit. We are happy to report that all sample analytical results were below benchmark values and/or within the benchmark ranges. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. Si cerel 7 41W /�/ Vincent Mollo District Environmental Coordinator United Parcel Service, Inc. Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), I original & 1 copy Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted 11/15/2017 CERTIFICATE OF COVERAGE NO. NCGO80368 FACILITY NAME United Parcel Service -Chapel Hill COUNTY Orange PERSON COLLECTING SAMPLES James W. Willard II (INENCO, INC.) LABORATORY Pace Analytical Services, Inc. lab Cert. # 12, 40, 37706, & 37712 LABORATORY INENCO, Inc. Lab Cert. # 5540 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑Jan -June [X July -Dec orMonthly' (month) DISCHARGING TO CLASS ❑ORW DHQW Trout [_]PNA Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) Zero -flaw 5]WaterSupply OSA E-flOther W5-V; NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 X yes no No discharge this period? 2 Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/I pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 SDO-001 10/16/2017 9.8 7.53 < 5.0 70 SDO 002 10/16/2017 4.5 7.34 < 5.0 70 SDO-003 10/16/2017 20.1 7.84 < 5.0 70 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable( Outfall No. Date Sample Collected, mo/dd/yr 00556 D0530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids mg/I pH, Standard units Permit Limit - 15 50 or 100 see permit Within 6.0 — 9.0 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 United Parcel Service - Chapel Hill r STORM EVENT CHARACTERISTICS: Date 10/16/2017 (first event sampled) Total Event Precipitation (inches): 0.16 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (Inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 2, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: * A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART fl SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES F--j NO rX IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES r1 NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring Period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: `I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12- }7 (signature of Urmitteel (Date} Additional copies of this form may be downloaded at: hit ortal.ncdenr.or web w ws sun dessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 06/14/2017 CERTIFICATE OF COVERAGE NO. NCGO80368 SAMPLE COLLECTION YEAR 2017 FACILITY NAME United Parcel Service - Chapel Hili SAMPLE PERIOD OJan-June ❑ July -Dec COUNTY Orange or ❑Monthly' (month) PERSON COLLECTING SAMPLES Ryan R. Osborne (INENCD, INC.) LABORATORY Pace Analytical Services, Inc. Lab Cert. # 12, 40, 37706, & 37712 LABORATORY INENCD, Inc. Lab Cert. # 5540 Comments on sample collection or analysis: DISCHARGING TO CLASS F_jORW F]HClW DTrout [:]PNA RECEIVED CENTRAL FILES DVVR SECTION Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Part A: Vehicle Maintenance Areas Monitoring Requirements (if applicable) [:]Zero -flow �X Water Supply OSA FX Other WS-V; NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 X yes no No discharge this period? Z Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/I pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 - 5DO-001 05/21/2017 8.8 6.77 < 5.0 70 SDO-002 05/21/2017 25.0 7.44 < 5.0 70 SDO-003 05/21/2017 30.8 7.57 < 5.0 70 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals {if applicable) outfali No. Date Sample Collected, mo/dd/yr 00556 00530 0040D Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids mg/I pH, Standard units Permit Limit - 15 50 or 100 see permit Within 6.0 — 9.0 i For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 05/21/2017 to 05/22/2017 (first event sampled) Total Event Precipitation (inches): 0.71 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES NO r IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES NO a REGIONAL OFFICE CONTACT NAME: _Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: ^ Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Additional copies of this form may be downloaded at: 6LI?4?Zl (Date) http://PoTtal.ncdenr.org/web/wg/WS/SU/ni)dessw#tab-4 5W U-250 last revised April 11, 2013 Page 2 of 2