Loading...
HomeMy WebLinkAboutNCG080310_COMPLETE FILE - HISTORICAL_20180508STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. DOC TYPE Cy(HISTORICALFILE ❑MONITORING REPORTS DOC DATE ❑ aoly b50� YYYYMMDD STORMWATER May 8, 2018 David Burns Aaron Perdue UPS Freight 531 S. Eastern Blvd Fayetteville, NC 283021 On May 3, 2018, a City of Fayetteville Stormwater inspection was conducted at your facility. This facility located at 531 S. Eastern Blvd, in Fayetteville NC drains into the Cape Fear River Basin. A copy of the Compliance Inspection Report is attached for your review and records. The following is a list of items noted during the inspection of your Facility. • No Employee Training documentation. • Keep windblown debris swept around dumpster area. • Both Analytical and Qualitative Sampling need to be documented. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1669. Thank You, Samantha Taylor Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources (e-mail) Twila Josey, Stormwater Administrative Assistant fflti. 1. ... ® rrr • 433 Hay Street Fayetteville, NC 28301-5,537 (910) 43:3-1091 1 www.fayettevillenc.gov I vvww.faytv7.co.n>I I he City of Fayette�riIle, Nortli CarUtina does not discriminac on the basis of race, sex, sexual orientation, color, age, national origin. religion, or disability in its employment opportunities, programs, services, or activitit:s, Stormwater Facility Inspection Report/Checklist Facility Name: UPS Freight Inspection Type: Compliance NCG080310 Permit No.: NCSO Permit Effective 11/1/2012 Date (if applicable): Not Applicable Permit Status Active (If not currently permitted): Inspection 5 3 18 Discharges to: UT to Cross Creek Date: Facility Personnel David Burns Inspector(s): Samantha Taylor Assisting with Inspection Aaron Perdue 910-483-0375 (Name/Phone Number): Entry Time: 10:15 AM Exit Time: 11:30 AM 51C Code: 4231 TFlity Hours of 4-11 ration: Facility Description: Motor Freight Transportation and Warehousing File Review/History: Inspection Summary: During my inspection, I made observations of the facility and Stormwater outfalls. The facility was clean and neat in appearance. This form is a procedural guide for Inspectors to follow when conducting facility storm wafer compliance inspections. Page 1 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist 1. Site Inspection Were deficiencies observed with the following items? (inspector should comment on viola tions/deffciencies observed) yes No NA Repeat Finding 1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc. ❑ ® ❑ ❑ Comments: 2. Erosion Issues ❑ ® ❑ ❑ Comments: 3. Structural Stormwater BMPs ❑ ® ❑ ❑ Comments: 4. Illicit Discharges 1 Connections ❑ ® ❑ ❑ Comments: 5. Aboveground Storage Tanks (ASTs): List size, material type, and if secondary containment is provided ❑ ® ❑ ❑ Comments: 6. Underground Storage Tank (UST) Fill Port Area ❑ ❑ ® ❑ Comments: 7. Outdoor Material Storage Area(s) ❑ ® ❑ ❑ Comments: 8. Outdoor Processing Area(s) ❑ ® ❑ ❑ Comments: 9. Loading/Unloading Area(s) ❑ ® ❑ ❑ Comments: 10. Vehicle/Equipment Area(s): fueling, washing, maintenance, storage L.0 ® ❑ I ❑ Comments: 11, OillWater Separator I Pretreatment ❑ ❑ ® ❑ Comments: 12. Waste Storage 1 Disposal Area(s): scrap metal, dumpsters, grease bins, etc ❑ ® ❑ ❑ Comments: 13. Food Service Area(s) ❑ ❑ ® ❑ Comments: 14. Indoor Material Storage Area(s) ❑ ® ❑ ❑ Comments: 15. Indoor Processing Area(s) ❑ ® ❑ ❑ Comments: Page 2 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist L Site Inspection (continued) Yes No NA Repeat Finding 16. Floor drains — illicit connections ❑ ® ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® ❑ ❑ Comments: IL Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? ® ❑ ❑ ❑ If the site has a SPPP, then com lete questions in Sections 11 and 111. 1. Does the Plan include a General Location (t1SGS) map? ® ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate lat. and long. of point of discharge. - 2. Does the Plan include a "Narrative Description of Practices"? ® I ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including outfall locations and ® El ❑ drainage areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious • For each outfall, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site map does not match facility they must update their plan. 4. Does the Plan include a list of significant spills occurnng during the past 3 ❑ ❑ ® ❑ years? Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title III. 5. Have Stormwater outfalls been evaluated for the presence of non-stormwater ® ❑ ❑ Eldischarges? Signature required: • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship — General Partner or the Proprietor Municipality, State, Federal, or other public agency — either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? I ® 1 ❑ ❑ 1 ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? ® I ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 3 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist IL Stormwater Pollution Prevention Plan (continued) Yes No NA Repeat Finding • If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?) • Collected water observed for color, foam, outfall staining, visible sheens, and dry weather Flow prior to release • Document individual making observation, description of water, date, and time of release Retain record 5 years 8. Does the Plan include a BMP summary? ® ❑ ❑ ❑ Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. 9. Does the Plan include a Spill Prevention and Response Plan (SPRP)? I ® I ❑ ❑ ❑ • Assessment of potential pollutant sources based on materials inventory of the facility • Facility personnel responsible for implementing the SPRP shall be identified • Responsible person shall be on -site at all times during facility operations that have the potential to contaminate Stormwater runoff through spills or exposure of materials associated with the facility operations. 10. Does the Plan include a Preventative Maintenance and Good Housekeeping ® ❑ ❑ ❑ Plan? • Document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and systems • Inspect material handling areas • Regular cleaning schedules of these areas 11. Does the facility provide and document Employee Training? ❑ 1 ❑ ® ❑ • Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures, preventative maintenance activities for all personnel involved in any of the facility's operations that have the potential to contaminate stormwater runoff • Develop training schedule and identify facility personnel responsible for implementing the training 12. Does the Plan include a list of Responsible Parties? I ® I ❑ I ❑ ❑ Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP 13. Is the Plan reviewed and updated annually? I ❑ I ® I ❑ ❑ Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a significant effect on the potential for the discharge of pollutants to surface waters? Does plan include changes? 14. Does the Plan include a Stormwater Facility Inspection Program? ® I ❑ ❑ ❑ Inspect semi-annually at a minimum - once in Fall and once in Spring • Inspection and subsequent maintenance activities performed shall be documented o Record date and time o Individual performing inspection o Narrative description of the stormwater outfall and plant equipment and systems Records should be incorporated into the SPPP Stormwater Pollution Prevention Plan Comments: Employee training needs to be provided and the plan needs to be reviewed annually. Page 4 of 5 Rev. 0 Stormwater Facility Inspection Report/Checklist Ill. Qualitative and Analytical Monitoring Yes No NA Repeat Finding 1. Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ® ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ❑ ❑ ® ❑ 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Qualitative and Analytical Monitoring Comments: This facility does not meet the Qualitative or Analytical Monitoring requirements. IV, Permit and Outfalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Were all outfalls observed during the inspection? ® ❑ ❑ ❑ 3. If the facility has representative outfall status, has it been documented by the NC Division of Water Quality? ® ❑ ❑ ❑ 4. if the facility has a No -Exposure Certificate, has the facility self -inspected and documented this on an annual basis? ❑ ❑ ® ❑ Permit and Outfalls Comments: Page 5 of 5 Rev. 0 STORM WATER February 17, 2017 David Burns UPS Freight 531 S. Eastem Blvd Fayetteville, NC 283021 Mr. Bums: On February 15, 2017, a City of Fayetteville Stormwater inspection was conducted at your facility. This facility located at 531 S. Eastern Blvd, in Fayetteville NC drains into the Cape Fear River Basin. A copy of the Compliance Inspection Report is attached for your review and records. The Following is a list of items noted during the inspection of your Facility. No Employee Training documentation. • General clean-up of the grounds from windblown debris should be done on a regular basis. At the time of inspection, this facility was found to be in compliance. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091 Thank You Danny Strickland Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc' Mike Lawyer, NC Division of Energy, Mineral and Land Resources (e-mail) Twila Josey, Stormwater Administrative Assistant 433 Hay Street Fayetteville, NC 28301-5537 (910) 433-1091 1 www.fayettevillenc.gov I www.ftytv7.com 'l'he City of Payt.-ttvville, Norlta Carolina does not discriminate an the basis of race, sex, sexual orientation, color, rage, nationalorigin, religion, or disability in ita employment opportunities, Programs, services, or activities. . L Stormwater Facility Inspection Report/Gheeklist Facility Name: UPS Freight Inspection Type: Compliance .NCG080310 Permit No.: NCSO Permit Effective 11/1/2012 Date (if applicable): Not Applicable Permit Status (If not currently permlited): Inspection , 2/15/17 Discharges to: UT to Cross Creek Date: Facility Personnel Inspector(s): Danny Strickland Assisting with David Burns Inspection 910-483-0375 (Name/Phone Number): Entry Time: 09:20 AM Exit Time: 10:15 AM SIC Code: 4231 Facility Hours of 4-11 Operation: Facility Description: Motor Freight Transportation and Warehousing File Review/History: Inspection Summary: During my inspection, I made observations of the facility and Stormwater outfalls. The facility was clean and neat in appearance. Page 1 of 6 Rev. 0 5tormwater Facility Inspection Report/Checklist f This form Is a procedural guide for Inspectors to follow when conducting facility stormwater compliance lnspectinns.. Page 2 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist L Site Inspection Were deficiencies observed with the following Items? (inspector should comment on violations/deficiencies observed) Yes No NA Repeat Finding 1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc. ® ❑ ❑ ❑ Comments: wind-blown debris at outfall area 2. Erosion Issues ❑ ® ❑ ❑ Comments: 3. Structural Stormwater BMPs ❑ ® ❑ ❑ Comments: 4. Illicit Discharges [Connections ❑ ® ❑ ❑ Comments: 5, Ahoveground Storage Tanks (ASTs): List size, material type, and if secondary containment is provided ❑ ® ❑ ❑ Comments: 6. Underground Storage Tank (UST) Fill Port Area ❑ ❑ ® ❑ Comments: 7. Outdoor Material Storage Area(s) ❑ ® ❑ ❑ Comments: 8. Outdoor Processing Area(s) ❑ ® ❑ ❑ . Comments: 9, Loading/Unloading Area(s) ❑ ® ❑ ❑ Comments: 10. Vehicle/Equipment Area(s): fueling, washing, maintenance, storage ❑ ® ❑ ❑ Comments: 11. Oil/Water Separator 1 Pretreatment ❑ ❑ ® ❑ Comments: 12, Waste Storage I Disposal Area(s): scrap metal, dumpsters, grease bins, etc_ ❑ ® ❑ ❑ Comments: 13. Food Service Area(s) ❑ ❑ ® ❑ Comments: 14. Indoor Material Storage Area(s) j ❑ ® ❑ ❑ Comments, 15. Indoor Processing Area(s) ❑ ® ❑ ❑ Comments: Page 3 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist L Site Inspection (continued) Yes No NA Repeat Findin 16. Floor drains —illicit connections ❑ ® ❑ ❑ Comments: 17. Spill Response Equipment ❑ ® ❑ ❑ Comments: II. Stdrmwater Pollution Prevention Plan Does the site have a stormwater Pollution Prevention Plan (SPPP)? ® ❑ ❑ ❑ !f the site has a SPPP, then corn Iete uestlons In Sections Il and 7IL 1. Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate let. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® I ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc_ 3. Does the Plan include a detailed site map including outfall locations and drainage ® ❑ El ❑ areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outtall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and [tie % of each drainage area that is impervious • For each outfall, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand if the site has changed over time, i.e. if site reap does not match facility they must update their plan. 4. Does the Plan include a list of significant spills occurring during the past 3 years? 1 ❑ ❑ ® 1 ❑ Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title 111. 5. Have stormwater outfalls been evaluated for the presence of non-stormwater ® ❑ ❑ ❑ discharges? Signature required: • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship — General Partner or the Proprietor Municipality, State, Federal, or other public agency -- either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ I ❑ • Provide a review of the technical and economic feasibility of changing the methods of operations and/or storage . practices to eliminate or reduce exposure of materials and processes to stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 Page 4 of 6 Rev. 0 Stormwater Facility Inspection ReportlChecldist A Stormwater Pollutivn'Preventlon Plan (continued) Yes No- NA Repeat Finding • If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?) • Collected water observed for color, foam, outfall staining, visible sheens, and dry weather flow prior to release • Document individual making observation, description of water, date, and time of release Retain record 5 years 8. Does the Plan include a BMP summary? ® ❑ ❑ ❑ Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges, 9. Does the Plan include a Spill Prevention and Response Plan (SPRP)?-I ® 1 ❑ ❑ ❑ • Assessment of potential pollutant sources based on materials inventory of the facility • Facility personnel responsible for implementing the SPRP shall be identified • Responsible person shall be on -site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. 10. Does the Plan include a Preventative Maintenance and Good Housekeeping 10�01 ❑ ❑ Plan? • Document schedules of inspections and maintenance activities of slormwater control systems, plant equipment and systems • Inspect material handling areas • Regular cleaning schedules of these areas 11. Does the facility provide and document Employee Training? ❑ ® ❑ 1 ❑ • Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures, preventative rnaintenanco activities for all personnel involved In any of the facility's operations that have the potential to contaminate stormwater runoff • Develop training schedule and identify facility personnel responsible for implementing the training 12. Does the Plan include a list of Responsible Parties? ® 1 ❑ ❑ ❑ Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP 13. Is the Plan reviewed and updated annually? ® ❑ ❑ 1 ❑ Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a significant effect on the potential for the discharge of pollutants to surface waters? Does plan include changes? 14. Does the Plan include a Stormwater Facility Inspection Program? 10 ❑ ❑ ❑ • Inspect semi-annually at a minimum - once in Fall and once in Spring • Inspection and subsequent maintenance activities performed shall be documented o Record date and time . o Individual performing inspection o Narrative description of the stormwater outfall and plant equipment and systems • Records should be incorporated into the SPPP Stormwater Pollution Preventlon Plan Comments: Employee training needs to be provided. Page 5 of 6 Rev. 0 i • e, Stormwater Facility Inspection ReporllCheckl€st 11L Qualitative and Analytical Monitoring Yes No NA Repeat Findin _ 1. Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ❑ ❑ ® ❑ 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance El ❑ ® Elareas? Qualitative and Analytical Monitoring Comments: Qualitative Monitoring was done 6/22/15 and 12129115. This facility does not meet the Analytical Monitoring requirements. IV. Permit and Ouffalls 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Were all outfalls observed during the inspection? ❑ ❑ ❑ 3. If the facility has representative ourtfall status, has it been documented by the NC of Water Quality? ® ❑ El El 4. If the facility has a No -Exposure Certificate, has the facility self -inspected and documented this on an annual basis? ❑ ❑ ® ❑ Permit and Outfalls Comments: Page 6 of 6 Rev. 0 W ettevk_ 11 z 11 A Engineering & Infrastructure Stormwater Division February 4, 2016 Kenny Chavis UPS Freight 531 S. Eastern Blvd Fayetteville, NC 283021 Mr. Chavis: 433 Hay Street Fayetteville, NC 28301-5537 (910) 433-1613 wirvw. ei tyoffaye ttevil le.org On February 4, 2016, a City of Fayetteville Stormwater inspection was conducted at your facility. This facility located at 531 S. Eastern Blvd, in Fayetteville NC drains into the Cape Fear River Basin. A copy of the Compliance Inspection Report is attached for your review and records. The Following is a list of items noted during the inspection of your Facility. The list of Responsible Parties needs to be updated. • The Employee Training documentation needs to be provided. At the time of inspection, this facility was found to be in compliance. I would like to thank you and your staff for the time and assistance in conducting this inspection. If there are any questions regarding this report, please contact me directly at (910) 433-1091 Tha ou Danny and Stormwater Inspector City of Fayetteville Attachment: Copy of Compliance Inspection Report cc: Mike Lawyer, NC Division of Energy, Mineral and Land Resources (e-mail) Twila Josey, Stormwater Administrative Assistant Yau i 771e city of Fayetteville, North Carolina does not discriminate on the basis of race, sex, color, age., national origin, religion, or disability in its employment opporhinities, programs, services, or activities. Stormwater Facility Inspection Report/Checklist Facility. Name: UPS Freight Inspection Type: Compliance NGG080310 Permit No.: NCSO Permit Effective 11/1/2012 Date (if applicable): Not Applicable Permit Status (If not currently permitted): Inspection 2114I2016 Discharges to: UT to Cross Creek Date: Facility Personnel Inspector(s): Danny Strickladn Assisting with Kenny Chavis Inspection 910-483-0375 (Name/Phone Number): Entry Time: 09:20 AM Exit Time: 10:15 AM SIG Code: 4231 Facility Hours of 8-5 Operation: Facility Description: Motor Freight Transportation and Warehousing Flle Review/History: Inspection Summary: During my inspection, I made observations of the facility and Stormwater outfalls. The facility was clean and neat in appearance. Page 1 of 6 Rev. 0 5tormwater Facility Inspection ReportlChe.ckllst Fhis form is a procedural guide for Inspectors to follow when conducting facility stormwater compliance inspections. Page 2 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist I. Site Inspection Were deficiencies observed with the following Items? (Inspector should comment on viola tions/deliciencies observed) Yes No NA Repeat Finding 1. Stormwater System: catch basins, open ditches, channels, pipes, outfalls, etc. ❑ ® ❑ ❑ Comments: 2. Erosion issues ❑ ❑ ❑ Comments: 3. Structural Stormwater BMPs ❑ ® ❑ ❑ Comments: 4. Illicit Discharges/ Connections ❑ ® El El Comments: 6. Aboveground Storage Tanks (ASTs): List size, material type, and if secondary containment is provided El® ❑ ❑ Comments: 6. Underground Storage Tank (UST) Fill Port Area ❑ ❑ ® ❑ Comments: 7. Outdoor Material Storage Area(s) ❑ ® ❑ ❑ Comments: 8. Outdoor Processing Area(s) ❑ ® ❑ ❑ Comments: 9. Loading/Unloading Area(s) ❑ ® ❑ ❑ Comments: 10, Vehicle/Equipment Area(s): fueling, washing, maintenance, storage ❑ Z ❑ ❑ Comments: 11. 01VWater Separator 1 Pretreatment ❑ ❑ ® ❑ Comments: 12. Waste Storage l Disposal Area(s): scrap metal, dumpsters, grease bins, etc. ❑ ® ❑ ❑ Comments: 13. Food Service Area(s) ❑ ❑ ® ❑ Comments: 14. indoor Material Storage Area(s) ❑ ® ❑ ❑ Comments: 15, Indoor Processing Area(s) ❑ ® ❑ ❑ Comments: Page 3 of 6 Rev. 0 Stormwater Facility Inspection ReportlChecklist I. Site inspection (continued) Yes No NARepeat 16. Floor drains - illicit connections ❑ ® _ ❑ _Findin ❑ Comments: 17, Spill Response Equipment ❑ ® ❑ ❑ Comments: IL Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan (SPPP)? ® ❑ ❑ ❑ if the site has a SPPP then complete, questions in Sections II and ICI: 1. Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ Facility location in relation to roads and surface waters. Includes: name of receiving stream or name of municipal storm sewer system, and accurate lat. and long. of point of discharge. 2. Does the Plan include a "Narrative Description of Practices"? ® ❑ ❑ ❑ Should cover storage practices, loading and unloading areas, outdoor process areas, dust or particulate generating or control processes, waste disposal practices, etc. 3. Does the Plan include a detailed site map including ouffall locations and drainage ® ❑ ❑ ❑ areas? Should show • Location of industrial activities (storage areas, disposal areas, process areas, unloading and loading areas) • The drainage structures • Drainage areas for each outfall and activities occurring in the drainage area • Building locations • Existing BMPs and impervious surfaces and the % of each drainage area that is impervious • For each outfatl, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. This forces permittee to analyze the site with relation to stormwater discharges. It is also a tool for the inspector to understand it the site has changed over time, i.e. if site map does not match facility they must update their plan. 4. Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ® ❑ Needs to include corrective actions that were taken. The permittee needs to know what the reportable quantities are for wastewater, oil pollution, and SARA Title ill. 5. Have Stormwater outtalls been evaluated for the presence of non-Stormwater ® ❑ ❑ ❑ discharges? Signature required: - • Corporation - signed by Responsible Corporate Officer or assigned manager • Partnership or Sole Proprietorship -- General Partner or the Proprietor Municipality, State, Federal, or other public agency - either principal executive officer or ranking elected official 6. Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ • Provide a review of the technical and economic, feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to Stormwater. • In areas where elimination of exposure is not practical, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. 7. Does the facility provide all necessary secondary containment? �Y ® ❑ ❑ ❑ • Applies to liquid raw materials, manufactured products, waste materials, or by-products • Single AST capacity > 660 gallons • Multiple AS containers in close proximity to each other with a total combined capacity of > 1,320 i Page 4 of 6 Rev. 0 Stormwater Facility Inspection Report/Checklist 11. Stormwater Pollution Prevention Plan (continued) Yes No NA Repeat Finding • If connected to SW conveyance; controlled by manually activated valves or other similar devices? (Closed?) • Collected water observed for color, foam, outfall staining, visible sheens, and dry weather flow prior to release • Document individual making observation, description of water, date, and time of release Retain record 5 years B. Does the Plan include a EMP summary? ® ❑ ❑ ❑ Narrative description of BMPs to be considered including oil and grease separation, debris control, vegetative filter strips, infiltration and stormwator detention or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential sources to contribute significant quantities of pollutants to stormwator discharges and data collected through monitoring of Stormwater discharges. 9. Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® ❑ ❑ ❑ • Assessment of potential pollutant sources based on materials inventory of the facility • Facility personnel responsible for implementing the SPRP shall be identified • Responsible person shall be on -site at all times during facility operations that have the potential to contaminate stormwator runoff through spills or exposure of materials associated with the facility operations. 10. foes the Plan include a Preventative Maintenance and Good Housekeeping ® ❑ ❑ ❑ Plan? • Document schedules of inspections and maintenance activities of Stormwater control systems, plant equipment and systems • Inspect material handling areas • Regular cleaning schedules of these areas 11. Does the facility provide and document Employee Training? ❑ ® ❑ ❑ • Provide at a minimum, annual training for all personnel including: proper spill response, cleanup procedures, preventative maintenance activities for all personnel Involved in any of the faclilty's operations that have the potential to contaminate stormwater runoff • Develop training schedule and identify facility personnel responsible for implementing the training 12. Does the Plan include a list of Responsible Parties? L ® 1 ❑ ❑ ❑ Identify position responsible for the overall coordination, development, implementation, and revision of the SPPP 13. Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ Have there been any changes to the design, construction, operation, or maintenance of the facility, which would have a significant effect on Ile potential for the discharge of pollutants to surface waters? Does plan include changes? 14, Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ • Inspect semi-annually at a minimum - once in Fall and once in Spring • Inspection and subsequent maintenance activities performed shall be documented o Record date and time o Individual performing inspection o Narrative description of the stormwater outfall and plant equipment and systems • Records should be incorporated into the SPPP Stormwater Pollution Prevention Plan Comments: Employee training needs to be provided and the Responsible Parties list needs to be updated. Page 5 of 6 Rev. 0 Stormwater Facility inspection Report/Checklist [If Qualitative and Analytical Monitoring Yes No NA Repeat Finding_ 1. Has the facility conducted its Qualitative Monitoring semi-annually? ❑ _ ❑ ❑ Color Odor Clarity Floating Solids Suspended solids Foam Oil Sheen Other indicators 2. Has the facility conducted its Analytical Monitoring? ❑ ❑ ® Q 3. Has the facility conducted its Analytical Monitoring from Vehicle Maintenance areas? El ❑ ® ❑ Qualitative and Analytical Monitoring Comments: Qualitative Monitoring was done 6122115 and 12129/ 15. This facility does not meet the Analytical Monitoring requirements. A. Permit and outfalls -- 1. Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ 2. Were all autfalls observed during the inspection? ® ❑ ❑ ❑ 3. If the facility has representative outfall status, has it been documented by the NC of Water Quality? ® El ❑ El 4. If the facility has a No -Exposure Certificate, has the facility self -inspected and documented this on an annual basis? ❑ ❑ ® ❑ Permit and Outfalls Comments. i Page 6 of 6 Rev, 0 City 0f 7t tev& Engineering & hlfl'aStrUCtUCe Stormwater Division (910) 433-1656 August 27, 2013 Mr Omar Jones UPS Freight 531 S. Eastern Blvd Fayetteville, NC 28301 Dear Mr Jones; 433 Hay Street Fayetteville, NC 28301-5537 www.cityoffayetteville.org On August 16, 2013 a site inspection was conducted at your facility located at 531 S. Eastern Blvd. in Fayetteville, NC. This facility has been granted a Certificate of Coverage, NCG080310 under the General Permit NCG80000 with North Carolina Dept. of Environment &Natural Resources (NCDENR) for stormwater discharge. Stormwater from this facility drains into an unnamed tributary of the Cape Fear River in the Cape Fear River Basin. At the time of inspection this facility was found to be in compliance with the conditions set forth by the Certificate of Coverage issued by NCDENR. A copy of the field information collection report has been enclosed for your review and records. I would like to thank you and your staff for the time and assistance given to conduct this inspection and the effort given to comply with your Certificate of Coverage. If there are any questions regarding this letter or the inspection itself, please contact me directly. Dennis Miller Fayetteville Stormwater Ph. # 910-433-1655 dmiller@ci.fay.nc.us You The City of Payetloville. North Carolina does not di;criminaw on Iho ba;k of race, scx. color, age. naliimal origin, reii�ion. or disability in its empiopment oppononities, programs. sc" ice,. or activiiie;- a Ind li rl Perm}t#:tJC.GOtr0310 Plfective: sic: 10-3 j _ Contacti'erson: .dmm/-Ien}rC�- I Fnc}IityAddress: jf31-s,tA T•t�! 131�e('.1-,�• Inspection Date; Q 04 13_« _ _ Primary Inspector: ip Reason for Inspection: �,� ( _ Permit Inspection Type: of omp Lance Inspection eport ) owner; U Facility: VAS- n�►s cr - — Title: ,11gy4- e0-1 Phone: Q� 037 tA'G j Entry Time: 0- MM I;A me: ,4 pm' Phone, 16 - Q 7' /!r $s - - ► inspection Type: tWWN Facility stfittis: Compliant Question Areas: Storm water Notes/Comments: ❑ Not Compliant �(( I — - 92 M-- 339ALEXANDER STREET FAYETTEVILLE. NC 28301-5797 (910) 433-1660/1661 - FAX (910) 433-1647 www.cityoffayeticvillc.org An Equal Opportunity Employer Penn!(: OtiNmer — Facility: lnspactianData: InspectionTypc: Ramon foAlt-, [routine &==water Pollution Prevention Plen Yes No NA NE # Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ 4 Dori ti►e Plan Include a Gcnerol l.ocallvn (USGS) map? , 0 0 ❑ ❑ is ❑ ❑ ❑ # Does the Plan lnelude ti "narrative Description of Practices"? # Does the Plan include a detailed site map inoluding outihll locations slid drainage nrcas? M ❑ ❑ ❑ # Does the Plan Include a list ofsignfficant spills occurring during the past 3 years? f. ❑ ❑ ❑ # Has lh;, faclilly evaluated fcasibic alternatives to current practices? ❑ ❑ El ❑❑ El # Does the.facility provide all necessary secondary containment? # Does the Plan include aDMP summary? IN ❑ ❑ ❑ 4 Does the Plan include a Spill Preventlon m►d Response Plan (SPRP)? ❑ ❑ ❑ # Docs the Plan Include a Preventative Wintenance and Good Housekeeping Plan? ❑ ❑ ❑ #1 Does the facility provide and document Empioyce Training? ❑ ❑ ❑ # Does the Plan Include a list of Responsible Parly(s)? ❑ ❑ ❑ # is the Plan reviewed and updated annuall)l ❑ ❑ ❑ 4 Does the Plan include n Storrawater Facility Inspection Program? M ❑ [,_,] ❑ d Has the Stonnwatcr Pollution Prevention Plan been Implemented? N ❑ ❑ ❑ Coninrent: -. uallinllve logii0rin>; ## Has the faoiltry conducted its Qualitative Monitoringserni-anutlaBy? Comment: . ❑ ❑ ❑ ❑ ❑ ❑ ❑ tint tlealll>iOMWI-InQ H Iles the fuellityconducted ItsAnalytieal monitoring? ❑ ❑ ❑ ## Has the facllily conducted ItsAnalylicai ntonfioring from Vehicle Mafrttenance ereas? ❑ ❑ ❑ �ct'_ttl_�t nnrl Qutfnk[� # is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ [] 0 Were all ourfolts obser►'cd during the inspeatlen? ❑ ❑ ❑ ## if the facility has represoniative-outtali status;-ls it property dO'cUiiieiited by the 1)M9070 [� ❑ 0 flas the facility cvalualed all illicit (non storm water) discharges? ❑ E] ❑ Conmients: 99y � AVIFA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Larry Cross U P S Ground Freight Inc 1600 Cottonwood St Charlotte, NC 28206 Dear Permittee: Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal UPS Ground Freight, inc.--Fayetteville COC Number NCGO80310 Cumberland County In response to your renewal application for continued coverage under stormwater General Permit NCG080000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG080000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part I I of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://Portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://portal.ncdenr.or.g/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 (Nail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 4 FAX: 919-807-6492 Internet: www ncw+raterquahty.orq An Equal Opporlunity 1 Aflirmauve Action Employer NOne orthCaro(ina Naturally Larry Cross December 4, 2012 Page 2 of 2 Some of the changes include: + Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical Stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of SO mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office .0. r. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCG080310 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, U P S Ground Freight Inc is hereby authorized to discharge stormwater from a facility located at: UPS Ground Freight, Inc. --Fayetteville 531 Eastern Blvd Fayetteville Cumberland County to receiving waters designated as CAPE FEAR RIVER, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1,11, 111, and 1V of General Permit No. NCG080000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4ei day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission �oF W a rFgQ Michael F. Easley, Governor William G. Ross Jr., Secretary rNorth Carolina Department of Environment and Natural Resources p Alan W. Klimek, P.E. Director Division of Water Quality June 19, 2006 DEN FRO Mr. Phillip R. Warren JUN l t 20M UPS Ground Freight, Inc. D11 Y Q 10.00 Semmes Ave. Richmond, VA 23224 Subject: Permit No. NCGO80310 UPS Ground Freight, Inc. Formerly Overnite Transportation Co., Inc Cumberland County Dear Mr. Warren: Division personnel have reviewed and approved your request to change the your name under the General Permit, received on June 5, 2006, Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sincerely, ORIGINAL SIGNED BY KEN PICKLE Alan W. Klimek P. E. cc, DWQ Central Files Fayetteville Regional Office, Water Quatiry Section Stormwater Permitting Unit NNo hCarolma aturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/AtfirmaJve Action Employer— 50% Recycledl10% Post Consumer Paper I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCGO80000 CERTIFICATE OF COVERAGE No. NCG080310 STORM WATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, UPS GROUND FREIGHT, INC. is hereby authorized to discharge stormwater from a facility located at UPS GROUND FREIGHT, INC. 531 EASTERN BLVD. FAYETTEVILLE CUMBERLAND COUNTY to receiving waters designated as the Cape Fear River, a class C stream, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, I1, 1I1, IV, V, and VI of General Permit No. NCGO80000 as attached. This certificate of coverage shall become effective June 19, 2006, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day June 19, 2006. ORIGINAL SIGNED 2„ Alan W. Klimek, Director Division of Water Quality By Authority of the Environmental Management Commission Overniter Name change Subject: Overniter Name change From: Michellelhunter@aol.com Date: Tue, 6 Jun 2006 12:55:41 EDT To: sarah.young@ncmail.net CC: Michellelhunter@aol.com Subject: Fwd: Name change issue From: EPA@aol.com Date: Tue, 6 Jun 2006 12:16:29 EDT To: Michellelhunter@aol.com Subject: Fwd: Name change issue From: Stormwater@aol.com Date: Thu, 25 May 2006 10:36:11 EDT To: EPA@aol.com CC: Michellelhunter@aol.com Subject: Re: Name change issue From: JAWidener@upsfreight.com Date: Thu, 25 May 2006 10.28:46 -0400 To: Stormwater@aol.com John or Linda, This is the response I received from our Legal Department regarding the NC forms. Does it help? Thanks Jackie ----- Forwarded by Jackie A. Widener/Ops/Overnite on 05/25/2006 10:27 AM Lisa B. McKnight To: Jackie A. Widener/Ops/Overnite@OTC 05/25/2006 10:09 cc: AM Subject: Re: Name change issue(Document link: Jackie 1 of 3 6/6/2006 1:23 PM Overniter Dame change Widener's Mail) This isn't an ownership change - just a name change, so all we have are the articles of incorporation (which I've attached). There is no deed or bill of sale because it is just a name change. Maybe they have a different form for that? (See attached file: Name Change Filing.PDF) Lisa B. McKnight Law Department UPS Freight 1000 Semmes Avenue Richmond, VA 23225 Phone: 804-231-8841 Fax: 804-291-5848 Email: lbmcknight@upsfreight.com www.upsfreight.com Jackie A. Widener To: Lisa B. McKnight/Ops/Overnite@OTC 05/25/2006 10:00 cc: AM Subject: Name change issue Hi Lisa, We are filling out name change forms for various states and NC has requested legal documentation. Below is how the statement is worded. "Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change." Is this something I can provide the state? Where would I get it? Thanks Jackie NOTE: THIS DOCUMENT MAY CONTAIN CONFIDENTIAL AND NONPUBLIC INFORMATION. IT IS INTENDED ONLY FOR THE USE OF THE INDIVIDUAL(S) OR ENTITY(IES) NAMED ABOVE, AND OTHERS SPECIFICALLY AUTHORIZED TO RECEIVE IT. If you are not the intended recipient of this document, you are notified that any review, dissemination, distribution or copying of this communication is prohibited. If you have received this communication in error, please notify me immediately by return email, delete the electronic message and destroy any printed copies. Thank you for your cooperation. 2 of 3 6/6/2006 1:23 PM Overniter Marne change Fwd: Name change issue.eml Content -Type: messagelrfc822] r- - — - - - -- I - -- -- Fwd: Name change issue.eml ' Content -Type: messagelrfc822 lRe: Name change issue.eml Content -Type: messagelrfc822 'Name Change Filing.PDF Content -Type: applicationloctet-stream Content -Encoding: base64 3 of 3 6/6/2006 1:23 PM Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources August 23, 2002 WILLIAM K HALL OVERNITE TRANSPORTN CO-FAYETTEVILLE PO BOX 1216 RICHMOND, VA 23209 Dear Pcrmittcc: Alan W. Klimek, P.E., Director Division of Water Quality L 2002 Subject: NPDES Slormwater Permit Renewer Overnite Transportn Co -Fayetteville COC Number NCG080310 Cumberland County In response to your renewal application for continued coverage under general permit NCG080000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stortnwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The Following information is included with your permit package: A new Certificate of Coverage A copy of General Slormwater Permit NCGO80000 A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard; ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Delonda Alexander of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 584 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Fifes Fayetteville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 MA NCDENR Customer Service 1-800-623-7748 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG080000 CERTIFICATE OF COVERAGE No. NCC080310 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, OVERNITE TRANSPORTATION COMPANY is hereby authorized to discharge stormwater from a facility located at OVERNITE TRANSPORTN CO-FAYETTEVILLE 531 EASTERN BLVD. FAYETTEV I LLE CUMBERLAND COUNTY to receiving waters designated as the Cape Fear River, a class C stream, in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, IV, V, and VI of General Permit No. NCGO80000 as attached. This certificate of coverage shall become effective September I, 2002. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 23, 2002. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission WILLIAM PARKER OVEIZNI'I'E "I'IZi\NSPO[Z`I'N CO-FAYE' ]IT: PO BOX 1216 RICHMOND. VA 23209 Dear Pernlittee: Michae4 F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality i Decertlber 27, 2001it t FEB 2 7 2002 I Subject: NPDES Slormwalcr Pernlil Renewal OV1 RN1'hE'I'RANSPOIZ`I`N CC)-FAY1_TFI_ COC Number NCG080310 CtImbC1'lanl Cuunly Your tacility is Currently covered for stormwaler discharge under General Permit NCGO80000. This permit expires on August 31, 2002. The Division start is CUITC1111y in the process of rewriting this permit and is scheduled to have the perntit I'eissucd by late summer of 2002. Once the perntit is I'eissucd, your f:Wility would he Cli�,ihle for Continued CrnTI'MMC under the reissued pernlit. In order to assure your continued coverage under the "Cneral permit. you must apply 10 the Divisign of Walcr Quality (DWQ) rot- renewal of -your permit coverage. To make this renew:tl process easier, we arc informing You in advance drat your Pcrntil will be expiring. Inclosed you will find a General Nermil Coverage Renewal Application Form. The application must be Completed and rcturncd by March 4. 2002 in order to assure continue(] citveragc under the '�cltcral permit. Failure to rcyuest renewal within this time Period nlay result in ,r civil lSSCssnWI11 of at Ie,ISI $250.00. Lar'gcr penalties ntay he assessed depending oil the delinquency of tltC request. Discharge of siorrnwutcr from your facility without coverage uncicr a valid slormwaler NI'DF..S permit would Constitute a violation of NCGS 143-215.1 and Could result in ISSCSSrnenIS 01'Civil pcn,dtiCS 41.11) 10 $ I{}_000 per clay. Please note that recent federal Ic"islation has extended the "nu cxposure exclusion" to all opCratctrS of induSH-ial I:ICEIIt1CS in any of the ] ]Categories o{' "Stonn water discharges associated will) industrial activity." (except Construction activilics). If you Iccl your facility can certify a Condition of "no exposure". i.e. the 1',Icilty industrial rrMterialS ,utd oPCr,ltions ,trc not exposed to stormwater, yoir Can apply I'or the no exposure exclusion. For additional information contact the Central Ofticc Sutrnlwater Staff member listed helow or Check the Sutrmwater & General Permits Unit Wch Site at Ittlp:l/h2o,enr.statc.nC.us/Su/slOrmw;IICr.11tml 11' the suhjcct storniwater discharge to waters of the state has hecn terniinalcd. p1caSC CctmPICIC the Cr1CIoSCd Rescission Request Form. M.Iiling instructions are listed tun Iltc holtom of the f0111. YOU will he notilied when the rescission process has hecn Completed. If you ha VC any questions rCUMLling the permit renewal procedures please contact Ricky Revels of the Fayetteville Rcuional Office at 910-486-1541 or DClttnda Alexander of the Central Office Stornlwalcr Unit at (919) 733-5083, cxt. 584 Sincerely, Bradley liCnnCtl, SuPcrvisor SlOrniwaler and General Pci-mils Unit CC: Central Files Fava cvIl IC Rcponal ( )[Tice ®�� NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1-800-623-7748 I. tate'of North Carolina epartment of Environment, Health and Natural Resources ` Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary �•SP+F4 G�i'�. A. Preston Howard, Jr., P.E., Director �Nv v A RAG, or�l November 4, 1994 Joseph Frith Overnite Transportn Co -Fayette P.O.Box 1216 Richmond, VA 23209 Subject: General Permit No. NCG080000 _ Overnite Transportn Co -Fayette COC NCGO80310 Cumberland County Dear Joseph Frith: In accordance with your application for discharge permit received on 08/09/94, we are forwarding -herewith the •subject -certificate -of coverage to discharge -under the subject-statc-- NPDES-general permit: --- - --- This permit is issued pursuant to the requirements -of -North Carolina-General--Statute-443-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may, -require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any question concerning this permit, please contact Ms. Aisha Lau at telephone number 919/733-5083. cc: Fayetteville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 An Equal Opportunity Affirmative Action Employer Sincerely, orizinai Sieved BY David A. Goodrich A. Preston Howard, Jr. P.E. Telephone 919-733-7015 FAX 919-733-2496 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO. NCG080000 CERTIFICATE -OF COVERAGE No. _NCG08031.0 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATIQN SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Overnite Transportation Company is hereby authorized to continue operation of an oil water separator and discharge stormwater from a facility located at Overnite Transportation Company 531 Eastern Boulevard Fayetteville Cumberland County to receiving waters designated as the Cape Fear River in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1, III and fV of General Permit No. NCGO80000 as attached. This Certificate of Coverage shall become effective [November 4, 1994. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day November4, 1994. David A. Goodrich A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission 17 "VI "a -OF A 4 mq.7�_ .0 i�, Abs N- I f(I PAX