Loading...
HomeMy WebLinkAboutNCG030440_COMPLETE FILE - HISTORICAL_20171129STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v uC, DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE o� I � I 1 a- �l YYYYMMDD Division of Energy, Mineral, and Land Resources Land Quality Section / Stormwater Program ?n National Pollutant Discharge Elimination System (NPDES) Energy Mineral & PERMIT OWNER AFFILIATION DESIGNATION FORM Land Resources tiHAMM:4ENTA1. OUAU,TY (Individual Legally Responsible for Permit) Use this form if there has been: FOR AGENCY USE ONLY Date Received Year Month Da NO CHANGE in facility ownership or facility name, but the individual who is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must Fill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual' mean?RECEIVED The person is either: • the responsible corporate officer (for a corporation); 14riv I A • the principle executive officer or ranking elected official (for a municipality, state, ral or other public agency); 11LAR-LAND QUALITY • the general partner or proprietor (for a partnership or sole proprietorship),VATER pERMITTING • or, the duly authorized representative of one of the above. 1) Enter the permit number for which this change in Legally Responsible Individual ("Owner Affiliation") applies: Individual Permit (or) Certificate of Coverage N I C I S I I I I I I I I N I C I G 10 v L/ ILI 10 2) Facility Information: Facility name: r o rA f10 /J —Troru Pe-4 Company/Owner Organization: Z0rjQ6f-A1-10,N Facility address: O S Ta p s} r-,A / J v Address C0)0"Ur City State Zip To find the current legally responsible person associated with your permit, go to this website: http: //deg.nc, g(>v/about/divisi ons/enerU-mineral-land-rgsources/energy_-mineral-1 and-permi is/stortnwater-program and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed; Previous legally responsible individual: 7:DyMe5 k i First M1 L� 4) NEW OWNER AFFILIATION (legally responsible for the permit): Person legally responsible for this permit: Roe, r+ (til.orro,, First M1 Last Page 1 of 2 S WU-OWNERAFF1Lr23Marc h2017 NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form (if no Facility Name/Ownership Change) PA- - iAA166f2 - Title Mailing Address r 1U� z072 City State Zip (330)471-63f2 rn10 rf.mbrrowQhmkeA5 �.(_br►� Telephone - E-mail Address Fax Number 5) Reason for this change: Employee or management change A result of: ❑ Inappropriate or incorrect designation before ❑ Other I. f other please explain: The certification below must be completed and signed by the permit holder. PERMITTEE CERTIFICATION: I,6r�2T I yI ®k'®vi , attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processed. 11-d -17 Signature Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please call (919) 707-9220 or visit the website at: http://deg.nc.P, v/about/divisions/energy-mineral-land-resources/stormwater Page 2 of 2 5 WU-OWNERAFFlLr23Mar2D 17 rw TIMKENSTEELV Robert Morrow Operations Manager � (� January 28, 2016 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 RE: TimkenSteel Tyron Peak Plant — Stormwater General Permit No. NCG030000 To Whom It May Concern: The purpose of this letter is to provide TimkenSteel Corporation's Tyron Peak Plant's (the "Plant") semi-annual stormwater benchmark sampling results (enclosed) pursuant to Stormwater General Permit No. NCG030000 (Metal Fabrication) and to report Tier I and II Response Actions relating to the same. The Plant obtained coverage under Stormwater General Permit No. NCG030000 on April 17, 2014, but overlooked the addition of new copper and zinc benchmark monitoring requirements. Accordingly, these parameters were not included in the Plant's 2014 benchmark testing program, but were included in 2015. Results of note from the 2015 sampling events were as follows: • On October 27, 2015, copper was detected at 0.0107 mg/l at Outfall No. 2. • On April 8, 2015, zinc was detected at 0.0766 mg/1 and 0.078 mg/1 at Outfall Nos. 1 & 2. • On October 27, 2015, zinc was detected at 0.0821 mg/l and 0.079 mg/1 at Outfall Nos. & 2. Initial Tier One Response Actions based on these results was delayed, but the Plant is currently taking all required Tier One and Tier Two Response Actions required under its Stormwater General Permit (e.g., stormwater management inspection, monthly monitoring, etc.). The Plant will be submitting the results of this increased monitoring to the Agency within the next thirty (30) days and is evaluating potential stormwater improvements and background impacts contributing to copper and zinc levels. In the meantime, however, we request a meeting with North Carolina Department of Environmental Quality to further discuss these sampling results and the Plant's ability to meet TimkenSteel Corporation - Tryon Peak Plant 205 Industrial Park Drive, Columbus, NC 28722 T 828-894-6227 M 8z8-817-6333 robert.morrow@timkensteel.com .. TiMKENSTEELV Robert Morrow Operations Manager new benchmark requirements despite best management practices. We would appreciate it if you would contact Jody Splawn at 828-894-6259 to further discuss this matter and schedule an in - person meeting. Sincerely, Robert Morrow Operations Manager Enc. CC: Shawna Riddle Environmental Senior Specialist Energy, Mineral, and Land Resources 2090 U.S 70 Swannanoa, NC 28778-8211 Timken Steel Corporation - Tryon Peak Plant 205 Industrial Park Drive, Columbus, NC 28722 T 828-894-6227 M 8z8-817-6333 robert.morrow@timkensteel.com Y a&a NasnVioe Tesfi erica �: • 29M Foster CtmghromDme,- G7 " Chain of Custody Record :N>e=rlvsMoa C. P114f1e {B45)'728 0177:FeX (S15) 7Z63/04 " wf crAtWR ,n. ww;warcwrw, tt�rrwa ', _ N s a,r 5pp44 �r{pp r c�t.rtawro r+ar - CW CllerttlliTORRBtIOn= KnaW,JimC �/ 48D-40190-t19691 1m Ima' mcCam : Pegs t of 1 wA . I E - �O �Z : 3 Il. l� r l .2-�.• 1. GalaTech Inc Analysis Requested LaSalle 135 South S Suite 3500 ' , '?c A-HCL M-Hntrie ATRRgo■amd1Y - - - } - •' r _ B-Niok N-Notts' y Chicago ' - - - _ 1• - C-7nAbft ' O-AsN■OQ E-Nak5p4. q-N%?SM - _ �Purti3m�. 12 000t(Tdi a 0rda nottequ�red ;� r H=AemmAoa 'r- ooerr��arata `a + i a waaeer cheryl.horrigtp com - ISS-LKQ T WMSfil�rH�ll;' ice/ Ml r « ■ r: t� Cl Iryftnd Isr ... st _ to,For Afanths « Fl Custody Seats Intact CttSLody Seal ND.:, Colder Terapaahasp} °C ■ftQ Q111Bf R4Rt■tks e Yeas `; A No lWDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. James Liggett TimkenSteel Corporation 205 Industrial Park Dr Columbus, NC 28722-9758 Dear Mr. Liggett: April 17, 2014 John E. Skvarla, III Secretary RECEIVED APIs 2 5 Z014 CENTRAL FILES DWQl80G Subject: NPDES General Permit NCG030000 TimkenSteel Corporation Formerly The Timken Company Certificate of Coverage NCG030440 Polk County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 807-6300. Sincerely, for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Asheville Regional Office, L. Herbert Stormwater Permitting Program Files Central Files Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 - Internet: http://portal.nedenr.orglwebAr/ An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030440 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, TimkenSteel Corporation is hereby authorized to discharge stormwater from a facility located at TimkenSteel Corporation — Tryon Peak 205 Industrial Park Dr Columbus Polk County to receiving waters designated as unnamed tributary to Whiteoak Creek, a class C water in the Broad River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I,11,111, and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 17, 2014. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 17, 2014 for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission tii' V i ��� Division of Water Quality / Surface Water Protection �� National Pollutant Disch:u•gt: FJimination System NCDENR PERMIT NAME/OWNERSHIP CHANGE FORM FOR AGENCY USE ONLY at@ Received Yaer tnth I Da I. Please enter the permit number for which the change is requested. NPDES Pennit ( or) Certificate of Coverage N I e t s 10 1 1 1 1 INIC10101310 41410 11. Permit status prior to requested change. a. Pennit issued to (company name): The Timken Company b. Person legally responsible for permit: _ James_ Lin sett First M1 I.ast RwEwl2012AR23 Plant Manager Title 205 Industrial Park Dr Permit Holder ktailing Address Columbus NC 28722-9758 City Slate Yrr { 828 ) 894-3811 (828 1 894-8123 Pt me Feu c. Facility name (discharge): The Timken Company - Tryon Peak d. Facility address: 2Q5 Industrial Parkr Address Columbus NC 28722-9758 Ciq• State Zip e. Facility contact person: Mr_Jodv T-B9la n (828 ) 894-6259 First / MI/ Last Mine Please provide the following for the requested change (revised permit). a. Request for change is a result of: ❑ Change in ownership of the Facility ❑X Name change of the facility or owner(see below) 11'eaherhle(me echlahr The Timken Company spinning off steel business Into TimkenSteel Corporation b. Permit issued to (company name): TimkenSteel Corporation c. Person legally responsible for perinit: _ James Liggett Firxl MI I.:rst d. Facility name (discharge): e. Facility address: Plant Manager Title 205 Industrial Park Dr Pcrnit Hiiklur Mailing Address Col umhlts NC 87 2-975A City State 7.ip t 828) 894-5011 iim.litaoettt')a.timken.com P(xxtc H-nail Address TimkenSteel Corporation - Tryon Peak 205 Industrial Park Dr Address Columbus NC 28722-9758 city State AV mn first MI Est ( 828 ) 894-6259 Jody. splawn@timken.tom Ptxan E nail Address t NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 IV. Permit contact Information (if different from the person legally responsible for the permit) Permit contact: Andrew R Farber Firm M 1 Lam Sr. EH&S Analyst - Steel Taic ..,. 1835 Dueber Ave SW (Mailcode _HSO-11) _ _ kkiling A4ldre.s Canton OH "706 City Sue 7.ir t 330 ) 471-3643 farberadtlmken.com MWIC H mail Address V. Will the permitted facility continue to conduct the same Industrial activities conducted prior to this ownership or name change? Q Yes ❑ No (please explain) VI Required Items: THUS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ® This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership {such as relevant pages of a contract deed. or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request. the aigned Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): L JHm°°`�g."Ittest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I undcrstand that if all required parts of this application are not completed and that if all r uired supporting information is not included. this application package will be returned as i tp ete. 03/24/2014 ig natu re Date APPLICANT CERTIFICATION I. James LiggeSnGtit that this application for a namelownership change has been reviewed and is accurate and complete to the beat of my knowledge. [under -land that if all required part. of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. 03/24/2014 --z--�ignature Date RevsW 72008 PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section Ib 17 Mail Service Center Raleigh. North Carolina 27699-1617 nCENR North Carolina Department of Environme Division of Water Qui Beverly Eaves Perdue Governor Dan Lake The Timken Company 1835 Dueber Ave Sw Canton, OH 44706 Dear Permittee: Charles Wakild, P. E. Director I December 4, .511 0 � /✓CG? 03 0 440 : n a•77111cI2f,�z o'�� /��S77ons Q7s �o w/9�n%rijy and Natural Resources Dee Freeman Secretary Subject: JtiIPDES Storm water Permit Coverage Renewal /The Timken Comnanv -Trvon Peak COC Number NCG030440 In response to your renewal application for continued coverage under Stormwater General Permit NCG030000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). J4 � T I fy ('s�'�T a Q.,� � . S o� 11 O Gu The following information is included with your permit package: Gr o Z r4 It + J • A new Certificate of Coverage (COC) • A_copy of General Permit NCG030000 • A copy of the Technical Bulletin for the General Permit Steer �r csiiyoToS c�r+der`St9�,;fa�.aN�t~ • Two copies of the Discharge Monitoring Report DMR Form provides s ppaee fie►— ,r Pof �► �9 ( �„� • Two copies of the Qualitative Monitoring Report Form . N CQo 3 yir{HXL Cane i. LAk 17YK Rs The General Permit authorizes discharges of Stormwater, V� specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months frqM the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. 110 The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant ch nges in the General Permit since your last COC was issued are noted either in the Draft Permit act Sheet that accompanied the public notice (http://portal.ncdenr.ora/web/wq/ws/sulcurrent- notices), or I the Response to Comments / Summary of Changes an ec nlca u e documents that are posted on t e Stormwater Permitting Unit's we ite with the new General Pe mit. Please httorta .ncdenr.or web w ws 5u n dens (click on'GeneraI Permits' abJ to review that information for your sp ific General Permit carefully. p07AS GG' h in /Vb /7%d�7 '47 �rL ] t ►tid�s 1617 Mail Service Center, Ralegh, North Carolina 27699.1617 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 One Carolina Internet: www.ncwatenaualiEy.ora An Equal Opportunity 1 Affirmative Action Emptoyar atuLru!!y i Dan Lake - December 4, 2012 Page 2 of 2 Some of the changes include: • Par II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections B, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections B, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections B, C: The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on -site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections B, C: The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV,to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NC6030000 CERTIFICATE OF COVERAGE No. NCG030440 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Timken Company is hereby authorized to discharge stormwater from a facility located at: The Timken Company - Tryon Peak 205 Industrial Park Dr Columbus Polk County to receiving waters designated as Whiteoak Creek, a class C waterbody in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, and IV of General Permit No. NCGO30000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission NN A �O 7 � r f7 � DAN LAKE TIMKEN CO-TYRON PEAK PLT PO BOX 6928 CANTON, OH 44706 Dear Permittee: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality August 23, 2002 Subject: NPDES Stormwater Permit Renewal TIMKEN CO-TYRON PEAK PLT COC Number NCG030440 Franklin County In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Asheville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 V NCDENR Customer Service 1-800-623-7748 Michael F. sGovernor 1 William G. Ross Jr., Jr., Secretary l North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director {{. Division of Water Quellty-- � December 27, 2001 5 : � MICHAEL E KARAMAN n' ~ ' APR ! 0 2002 , TIM KEN CO-TYRON PEAK POST OFFICE BOX 6928 .- .: ti , `, . �, � Y!41TEE, QU::LI a 1`.SECiIOi+l CANTON, OH 447,0.6�'"c a 1 u,CVII-i_E fitGlia!1L OFFICE a r,� . `�j ��,,} +&Ubject: NPD) S Stormwater Permit Renewal J�i TIMKEN CO-TYRON PEAK PLT 't•+'r`" COC [dumber NCG030440 Franklin County Dear Permittee: 0 Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties ol' up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the 1 I categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site at http://h2o.enr.state.nc,us/su/storinwater.himI If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. if you have any questions regarding the permit renewal procedures please contact Jim Reid of the Asheville Regional Office at 828-251-6208 or Bill Mills of the Contra] Office Stormwater Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Asheville Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ®M NCDENR Customer Service 1-800-623-7748 �� iN A TF9 �qo MICHAEL E KARAMAN TIMKEN CO-TYRON PEAK PLT POST OFFICE BOX 6928 CANTON, OH 44706 Dear Permittee: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality December 27, 2001 Subject: NPDES Stormwater Permit Renewal TIMKEN CO-TYRON PEAK PLT COC Number NCGO30440 Franklin County Your facility is currently covered for stormwater discharge under General Permit NCG030000, This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must be completed and returned by March 4, 2002 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of Stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day, Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the ] 1 categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site at http://h2o.enr,state.nc.us/su/stormwater.btm] If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Jim Reid of the Asheville Regional Office at 828-251-6208 or Bill Mills of the Central Office Stormwater Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Asheville Regional Office M"A NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699.1617 (919) 733-7015 Customer Service 1-800-623-7748 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director July 17, 1998 Mr. Michael E. Karaman The Timken Co-Tyron Peak Plt. Post Office Box 6928 Canton, Ohio 44706 L19WA'T4 NCDENR Subject: General Permit No. NCG030000 The Timken Co-Tyron Peak Plt. COC NCG030440 Franklin County Dear Ms. Karaman: In accordance with your application for discharge permit received on April 17, 1998, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Tony Evans at telephone number 9191733-5083 ext. 584. Sincerely, ORIGINAL SIGNED BY WILLIAM C, MILLS A. Preston Howard, Jr., P. E. cc: Raleigh Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DMSION OF WATER QUALITY GENERAL PERMIT NO. NCG030000 CERTIFICATE OF COVERAGE No. NCG030440 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELEMNATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Timken Company, Tryon Peak Plant is hereby authorized to discharge stormwater from a facility located at The Timken Company, Tryon Peak Plant 205 Industrial Park Drive Columbus, NC Polk County to receiving waters designated as an unnamed tributary to White Oak Creek, Class C, in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective July 17, 1998. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 17, 1998. ORIGINAL SIGNED BY WILLIAM C. MILLS A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission i,,6\���� �--�� i r + �✓�� p-4 Kw a 'Fan •` ate$$ `• !'`"• i••�. ti a•' p } a� 'LL 10 1028 tit 1,110 a %f Akt / 1531 r %r7,0! r'• . ' Mid ~ ( !! ` era ; ' '..♦.w� 'L068 l f/ ♦ G( `t? �%-Pl I �` i53� if W It nk •'`• i(� •�, ; Colufttbus \ i� �, •p ;i` Ilk 1I37 flAiVDRgvMI 1 193 4mfi Nw 10' 194 t`• SCALE 1:24 000 1 = . 2 0 1 MILE 1000 0 1D00 2000 3000 4000 5000 6000 7000 FEET 1 .5 0 1 KILOMETER CONTOUR INTERVAL 40 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 N. gf-�-A C. QUADRANGLE LOCATION THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS FOR SALE BY U. S. GEOLOGICAL SURVEY, RESTON, VIRGINIA 22092 A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS_ IF, (LABLE ON REQUEST `t b '95 FACILITY: t n e, m ken C� v. ) Tr� oc) PeA k pjc�nj COUNTY: Pb k NPDES: MAP#: Fl4SC� DSN FLOW: ' N/A SUB BASIN: 0,3" O 8 - O a LATITUDE: S r� LONGITUDE: RECEIVING STREAM• 1 CA)h ;iv okk e re.'k STREAM CLASS: C, DISCHARGE CLASS: EXPIRATION DATE: 08^1 / Oa