Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030061_MONITORING INFO_20190613 (2)
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE ❑ HISTORICAL FILE ,MONITORING REPORTS DOC DATE ❑ �bI �J �� D 3 YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 6/3/19 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # NJA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results . SAMPLE COLLECTION YEAR 2029 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec RECE1y�lor ® Monthly' May DISC GlNG TO CLASS ❑ORW ❑HQW []Trout ❑PNA hN 14 2D11 ❑zero -flow ❑Water supply ❑SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period:2 Outfall No. Date Sample Collected' (mo/dd/yr) 24hour rainfall amount, - Inches' -' Total Suspended Sol -ids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics5 Benchmarks ==_> _ - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA _ ' Monthly sampling (instead of semi-annual) must begin With.the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must'still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from anon -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. -For purposes of this,permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample'(formetal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the defi n ition, found in 40 CFR 469.31). Permit Date:11/1/2019-10/31/2019 REC E tt JUN 1 S 2019 CENTRAL 1`lL . - IDWR SEC Tlo U-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement far total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since fling the last discharge monitoring report. E further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Pri t (Signat r (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit team. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month.. ® No discharge this period ?2 Outfall Na. Date Sample Collected' '(mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664.(SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 2of3 Note: if you report o sample value in excess of the benchmark, you must implement rer 1, rier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orfainal and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discha e" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with•a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thaythere qke sigpificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." . b -]A (Date) Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater DischgM. Monitoringrt for North Carolina Division of Water Quariity GEneral Pen nft No. NCG03WW Date submitted 3 11/2079 COMRCATE'OFCOVOWENO. NOG03MI FAMUTYNAME Moon COUNTY2RM PBMN C0UIU NG SAMPLESJask Ft LaMar Jr LA00R4MRYBtvlror>Cgerjt f7 Lab cert. i 10 comments on sarnq* collacum o'ranatysls: Part A: $twmwater 8oh7arb and Monitoring Results SAMPLECOLLECMN YEAR 1" SAMPLEPEFM Ari-A re July -Dec or Monthly's DtSCMIRGlNG TO CItA . ORW HpW Trot PMA Zero -flow Water Supply SA other C REASE12EMEMBER TO SIGN ON AAGMAND/OR 3 -k No discharge this perioo"-4 OutW Na condde& amount Total2apasded Salida $M an0s Capper Lead Zinc Nan-Potar O6 G/ Tataf Petrakwn o�co lAndm>arks - 7Wmg1Lor50nWL4 6.0--Ro QWmg/L RO nWL 0.067nWL 75OWL 7mgIL SUO.7 2/ZV19 a59 ROMAVL ZI WS L <20L a L '&0MgIL Ma MG-2 W"19 aL59 <-6 L 7.2 M4MVL 420 ac"ingnC&OFWL I n/a ' Monthly sampling (instead of semiannual) must begin with the second consecutive benchmark era eedance for the same parameter at the same outfali. 2AY sampling periods with no discharge at any single outfalE. you must still submit this discharge monitoring report with a dteckmark here. sThe total Precipitation must be recorded using data from an on -site rain gauge. unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystal, or manufacture cathode ray tubes For purposes of this permit the definition of Total Toxic Organics isthat definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR433.11; for semiconductor manufacture use the definition as found in 40 CFR469.12; for electronic crystal m arKdacture use the definition as found in 40 CFR469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 111IM 8.1 WMIM19 RECE! V eS4VlF24S,last revised 10125f2072 H ADD Page of 3 . 0-8 2019 WR SECr1ZES • 10A) Facilities that incorporate a solvent managemeatplan into the Stormwater Pollution Prevention Plan may so oertify, and the requirement for TrO monitoring may be waived. The solvent management plan shall include a list of the total totdc organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification staterrrerrt: "Based upon my inquiry ofthe person or persons dfrectty responsible for managing compliance with the permit monitoring requirement fortotal toxic organics (TTOJ I certify that to the best of my ImMedge and belief, no dumping of concentrated Mite organics into the storrnwater or areas which are emosed to rainfall or stonYwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the an the provisions of the solvent management plan included in the Stomtwater Pollution Prevention Plan.. Name name) Title (Print ZO_ 1193 (Signatures (Date) Note: Resuftsmust be reported An numerical format. (figg notreaart Bela Detection Limit, BDL, cPQI, Nowdetect, ND, or other similar non -numerical format. When results are tieelow the applicable litmus, theymust be reonrted in fire i mnA `%cbfrmgd , where V is the numerical value of the detection limit, reporting limit, etc. in mg& Note: ffyou mponta=Tipbvahreinmmoffhebenchiurisyou ftxts b,pliarrait TAw1,rwZorrra3re;r1-i s Sae Geft dPen7tte2t Part & Vd dde Maintenance Area Monitoring Riestd& only fcw facilities averaging s 55 gal of new at/ per month No drscharcre this neriodn Ocrtla0 No Date Conectedl did/ ZO•bora rainfall a must " hxhw lYnrrpularO&WTPFfby EPA 1660 4M Total %*endedSoft pH Be7sirRnaiis� - l5mg/L 100mg/Lor50rng1L* &a-9.0SU Footnotes from Part A Woo apply to this Part B " See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective bendimark applies. Permit Date:11P1/2018-10/31/M19 ANU-245, last revised 10/25/2012 Page of 3 3b Able lfyuu repart a sw#e rahre In e>xe rs afthe beizM ark yntr must hrokma t Tier 1, Tier Z or 77er3 resllart= &e Genera! PtrmY teat , FOR PART A AND PART Q MONirORINQ Re'"St1LTS • AW CWM EXCEEDANCE TRIGGERS I— I iOafiMltia M SEE PERMIT PART If SECTION B: • 2 EXCEEDANCES IN A ROW FORT)-E SAME PARAMETEAAT THE SAME OUTFALL TRIGGER nEIT2RMUIRB SIM. SEE PERMIT PART II SECTION B. • TMR3: HAS YOUR FAC .M HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR TK SAME PARAMETER AT ANY ONE OUTFALL? YES NA FVM HAVE YOU CONTAM THE DWQ REGIONAL OFFICE? YES NO REGIONAL OFFICE CONrACr NAME MailanotioNraland9neowvctftDMRLn kdhoafl-IkAfsdraruerepartsYrithfn3Odaysofreaett Odmlab.rewts(oratendofrtlanrtarinone►llodin Division of Water Quality Atim: DWQ Central Files 1617 Mail Service Carter Raleigh, North Carolina 2769%1617 YOUiIAUSTOGNTtpSC> 11R 1Ol�fi}R4NY1_ RTAATffIHlREPOM ; '1 certify, under penalty of law, that this documern and all attachments were prepared under my direction or supervision in amordartce with a system designed to assure that qualified personnel prop" gather and evaluate the information aubrriined Based on rrty inquiry of the person or perms who manage the systerrt or those persons directly r or gathering the information, the tnfamiation submitted )s, to the best of my Iai edge and belief, true, aoourme, and complete. I am away@ tha0h2revq a penaltles for submitting false information, including the possibility of fines and imprisonment for kwMng violations." MOWN r. . Permit Date. 11112W81W3121 19 SWU-204last revised 10251=2 Page of 3 r Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 5/2/2019 CERTIFICATE OF COVERAGE NO, NCG030061 SAMPLE COLLECTION YEAR 2019 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthlyl A rii PERSON COLLECTING SAMPLES Jack H Taylor Jr DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑ LABORATORY Environment 1 Lab Cert. 010 Comments on sample PNA collection or analysis: Heavy pollen in RECEIVED ❑Zero -flow []Water Supply ❑ area SA 4 Part A: Stormwater Benchmarks and Monitoring Results MAY 14 200 ®other C WR SECTiG�i. i"Il..lr P DLEASE,REMEMBER TO SIGN ON PAGES 2 AND/OR 3 WR SE ❑ No discharge this period ?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics" Benchmarks - - 100 mg/L or 50 mg/!° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 4/2/19 0.96 122 mg/L 7.3 .026 mg/L <2.0 mg/L 0.434mg/L <5.0 mg/L n/a SDO-2 4/2/19 0.96 33 mg/L 7.0 .013 mg/L <2.0 mg/L 0.215 mg/L <5.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin.,wlth the second consecutive benchmark exceedance for the same parameter at the same outfall.. - z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark.here: 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving:water classifications where the more protective benchmark applies.--. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines-for-the.facility-subject-to-the-requirement-to.sample.(for_meta l-finishing.use-the-definition.as.found -in_40-CFR_433.11; -for _ semiconductor...._ manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan Into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan Included In the stormwater Pollution Prevention Plan." Name (Print name) S` Title (Pri t tl O� �1 (Signs ur (Date) TA Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format, "<XX mx/L", where XX is the numerical value of the detection limit, reporting limit, etc. In mg/L. Note: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. M No discharge this period?' Outfatl No. Date. Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G/TPH by EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks =__> - r - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU f Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 2 of 3 w Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses, See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. 0 TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE.OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one M of this DM& including all "No Discharge" reports, within 30 days of recelpt of the lab results for at end of monitoring period 1n the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that therq/are sl�qifignt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permit Date:11/1/2018-10/31/2019 5-1 (Date) SWU-245, last revised 10/25/2012 Page 3of3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 4/4/2019 CERTIFICATE OF COVERAGE NO. NCGO30061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES lack H Taylor Jr LABORATORY Environment 1 Lab Cert. #i 10 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR _Z019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec RECEIVED or ® Monthly' March DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA APR 2 2 200 ❑Zero -flow ❑Water Supply ❑SA CENTRAL FILES ®Other C DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non-Polar O&G/hour Total Petroleum Hydrocarbons I Total Toxic Organicss Benchmarks -> - - 100 mg/L or 50 mg/0 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 3/26/19 0.60 38 mg/L 7.3 .017 mg/L 2.0 mg/L 0.222mg/L <5.0 mg/L n/a SDO-2 3/26/19 0.60 12 mg/L 7.2 .072 mg/L <2.0 mg/L 0.062 mg/L <5.0 mg/L n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which'perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 46931). ' Permit Date: 11/1/2018-10/31/2019 n SWU-245, last revised 10/25/2012 Page 1 of 3 fi Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) r % (Date) Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of 'the benchmark, you must implement Tier 1, rier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?-' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inchee Rion -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks -�> _ - 15 `ing/l�' _ . 100 mg/L or 50 mg/L' 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2018-10/31/2019 5WU-245, last revised 10/25/2012 Page 2 of 3 4 120 1-0 Note: if you report a sample value In excess of the benchmark, you must implement rer 2, Tler 2, or Tier 3 responses. See General Permit text FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainal and one copy of this MR, includina all "No Dischome w reports. within 30 days of recelgt of theJob results for at end of manitorfna period in the case of "No Discharwe" reyorts� to: T Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: - I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those'persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge a nd belief, true, accurate, and complete. I am aware that tPere argAignific j+t penalties for submitting false inform ation,.includ i ng the possibility of fines and imprisonment for knowing violations." (Signature Permit Date:11/1/2018-10/31/2019 a ' to) - (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 6 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2/1/19 CERTIFICATE OF COVERAGE NO: NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # N/A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Ian -June ❑ July -Dec or ® Monthly' January DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA ®Other C FEB 12 2019 CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ® No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches a Total Suspended Solids pH, Standard units Copper _ Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks 100 mg/L or SO mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you -must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. . s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics ' (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is im plementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) a~2i aks o, �. Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical . format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No. Date Sample, Collected' (mo/dd/yr) 24-hour rainfall amount, Inches y; . •, Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 2 of 3 i Note: !f you report a sample value in -excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oricyinal and one copy of this DMR including all "No Discharge' reports, within 30 days of receipt of the lab results or at end of monitoring eriod in the case of "No Discharge" reports). to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617' YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thit therq aR sigAi ficant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature (Date) Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge. Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/4/19 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr . LABORATORY No Discharge Lab Cert. # N A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results RECEIVE 12MPLE PERIOD COLLECTION❑ Jan -June 18❑ July -Dec ,BAN 2 2 2019 or ® Monthly' December DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA CENTRAL FILES ❑Zero -flow ❑Water Supply ❑SA DWR SECTION ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® Nordischarge•this period?2 Outfall No. Date Sample Collected1. (mo/dd/yr) 24-hour rainfall amount, Inches3 � Total Suspended Solids pH, � Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic. Organics' Benchmarks ---> _ - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -Site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing,use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I.certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) HLO (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement rer 1, rer 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) '24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ==> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 2 of 3 a Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tiier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE -BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO REGIONAL OFFICE CONTACT NAME: Mail an original and one coov of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of „No Discharge" reports) to: , Division of Water Quality S Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 V YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thaythere are sig¢ificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." I - (Date) Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11/21/18 CERTIFICATE OF COVERAGE No. NCG030061 FACILITY NAME Moen _ RECEIVED COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr DEC 0 7 2018 LABORATORY No Discharge Lab Cert. # N/A Comments on sample collection or analysis: CENTRAL FILES DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or, ® Monthly' October DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA []Zero -flow ❑Water Supply ❑SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?' Outfall No. Date Sample P Collected' (mo/dd/yr) 24-hour rainfall amoun3, Inches Total Suspended Solids P H, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks 100 mg/L or 50 mg/1-4 6.0 — 9.0 0.007 mg/L 0.03 mg/1 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in40 CFR 469.31). Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be repdrted in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =_=> _ , - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/16/2017-10/31/2019 SWU-245, last revised 10/25/2012 Page 2 of 3 r. Note: if you report a sample value in excess of the benchmark, you must implement Tier T, Tier Z, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: a A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS_ SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME QUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE QUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one conv of this DMR includina all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are si&Qifi&t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date:11/16/2017-10/31/2018 (dale) SWU-245, last revised 10/25/2012 Page 3 of 3 November 13, 2018 Central Files Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Re: ABB Motors and Mechanical (Baldor Electric) General Permit No. NCG0030070 ABB Motors and Mechanical 70 Reems Creek Rd Weaverville, NC 28787 R CONI ID 10S6Z� C WR cT110N D Please note the name change above. We have been part of the ABB group for some time, operating as Baldor Electric. A name change request has been submitted Please find enclosed the stormwater discharge monitoring report for the semi-annual sampling that was conducted October 26, 2018. This sampling complies with the direction of Laura Herbert of the NC DENR Asheville Regional office. We understand that this relief expired when the new permit became effective 11 /01 /2018. Zinc continues to be problematic for us. No significant process sources of zinc or copper have been identified at our facility. We continue to believe that the major contributors are infrastructure sources. We have one production area that uses a small quantity of zinc chloride. This room previously vented to the roof area that drains to conveyance point D. We have completed a project that eliminates the possibility of this material making it to the roof. We have submitted the original data to the Regional DEMLR that we gathered when we asked for monitoring relief during the term of the previous permit. The intent is to provide the information that the previous relief was based on and ask for the same relief for the duration of the current permit. Please contact me with operational or compliance issues. Otherwise contact Dan March of Pisgah Environmental Services at 828-768-3335 or via email at Pisgah-air@vt.edu if you have questions or comments concerning technical aspects of this report. Sincerely, yvl Gary Massey Safety Coordinator Baldor Electric Company 828-645-1718 gary.massey(a),us.abb.com Page 1 of 1 -z Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted _November 7, 2018_ CERTIFICATE OF COVERAGE NO. N00030070 FACILITY NAME _ABB Motors and Mechanical, Inc. (previously: Baldor Electric Company) COUNTY - Buncombe PERSON COLLECTING SAMPLES -Dan March LABORATORY -Pace Analytical Lab Cert. # 40 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly} Imonthl DISCHARGING TO CLASS ❑ORW ❑HQW ®Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA (]Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' Outfall No. Date Sample Collected i (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks 100 mg/L or 50 mg/O 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L B 10/26/18 1.82 <2.9 6.5 <0.005 <0.005 0.310 <5.0 C 6.5 6.3 0.0081 <0.005 0.0575 <5.0 D <2.9 7.3 0.0057 <0.005 0.230 <5.0 E <2.9 7.4 <0.005 <0.005 0.0565 <5.0 F <32 7.3 <0.005 <0.005 0.0456 <5.0 G <2.7 6.4 <0.005 <0.005 0.0418 <5.0 H <3.0 6.2 <0.005 <0.005 0.0681 <5.0 1 <2.7 6.3 <0.005 <0.005 0.0415 <5.0 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469:12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring m, y be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Datz, S Name (Print name) ?k c., } P Title (Print title) ✓�� _ t[ • lZ• tv (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA. 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 r FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED T� E DWQ R.�GIOVAL FFICE? YES [qNO ❑ REGIONAL OFFICE CONTACT NAME: ",,AA HEr(1Tr Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the Jab results for at end of monitoring period in the case of "No Discharge" reports j to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Q1-1-C- (Signature of Permittee) Permit Date:11/1/2012-10/31/2017 P (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 f Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 10/31/18 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2018 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthly" September PERSON COLLECTING SAMPLES Jack H Tavlor Jr DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA LABORATORY No Discharge Lab Cert. # N A Comments on sample ❑zero -flow ❑Water supply ❑SA collection or analysis: RECEIVED ®Other C OV 13 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 FILES Part A: Stormwater Benchmarks and MonitoringResults DWR CENTRAL SECTION SECT10lV ® No discharge this period? Outfall No. Date Sample Collected" (mo/dd/yr) 24hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organl& Benchmarks -- => _ - 200 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA " Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitiveeceiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for,'metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) I a. �K_ (Date) Note: Results must be reported in numerical format Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ma/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 2664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 �, Page 2 of 3 e Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION a. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of this DM& including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Dischame" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that them are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permitteej � �- 2- (Date) Permit Date:11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater DischaEge'Monitorinig Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 9/25/18 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2028 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June [] July -Dec COUNTY Craven or ® Monthly' August PERSON COLLECTING SAMPLES Jack H Taylor Jr DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY No Discharge Lab Cert. # NNLA Comments on sample ❑Zero -flow ❑Water Supply [—]SAcollection or analysis: R EG F IVED ®Other C OCT 0 2 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTS FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION ® No discharge this period?' Outfall No. Date Sample p� Collected (mo/dd/yr) 24hour rainfall amount, Inches Total Suspended Solids Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic rganl Benchmarks 100 mg/L or 50 mg/L• 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L i mg/L SOO-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you musts ill'submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain,gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirementtto sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." AV( Name 104int name) Title [Print ti e (Signature) _U (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, 13DL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier I, Tier Z, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' OutFall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, IncheO Non -polar O&G/TPH by EPA 1664 (SGT HEM) Total Suspended Solids pH Benchmarks - => _ - 15 mg/L 100 mg/L or 50 mg/L* 5.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 2 of 3 ilk -Or Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail on original and one copy of this DMR, including all "No Discharge" repom within 30 ddaa rs afreceipt of the I results for at end of monitoring period in the case, of "No DischgMe" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that were ale sgnificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of i (Date) Permit Date: 11/16/2017-10/31/2018 , SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North'Carolina Division of Water Quality General Permit No. NCG030000 Date submitted-8/28/18 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr o 20$ LABORATORY No Discharge Lab Cert. # NLA_ Comments on sampleSE? collection or analysis: ;ENTRAL FILES MUR SECTION Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' July DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑zero -flow ❑Water Supply []SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?2 Outfall No. . Date Sample Collected (mo/dd/yr) 24hour rainfall amount, Inches3 Total Suspended Solids PH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks ===> _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 1S mg/L i mg/L SDO-1 NA SDO-2 NA Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies: 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition'found in 40 CFR 469.31). Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Pr' t itle] So- (Si- 9-- gnature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. K<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?Z Outfall No: Date Sample Collected' (mo/dd/yir) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 2664 (SGT-HEM) Total suspended solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 ski Footnotes from Part A also apply to this Part B " See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/16/2017-10/3112018 SWU-245, last revised 10/25/2012 Page 2 of 3 _;I Note: !f you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER i REQUIREMENTS. SEE PERMIT PART II SECTION B. 0 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all 'No Discha e" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Perm (Date) Permit Date: 11/16/2017-10/31/2018 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitorin_g Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date'submitted 6/6/2018 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2019 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven RECEIVED or ® Monthly' May PERSON COLLECTING SAMPLES Jack H Taylor Jr DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY No Discharge Lab Cert. # N/A Comments on sample JUN 13 zw ❑Zero -flow ❑Water Supply [:]SA collection or analysis: CENTRAL FILES ®Other C DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results ® No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks 100 mg/L or 50 mg/V 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA ' Monthly sampling (instead -of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall; you muss still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from anon -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water -classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to''sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listedin the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan."{� oa Name Print name) L+_I&_ % (Date) Note: Results must be reported in numerical format. Do not report Below'Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "OU mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample valve in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month. ® No discharge this period?' Outfall No. Date Sample Collected" irno/dd/yr? 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) . . Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/k or 50 mg/L* 6.0 — 9.0 su Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one ropy of this DMR, includine all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case of "No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 3 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there armAcant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Signature (Date Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 6/6/2018 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # NIA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly" June DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA flCw ❑Water SuRRIY ❑SA RECEIVED ®�he JUL 31 2a1PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CEtvT�,:,L I+rl`ILE Es M4jR SECTIO)\j ® No discharge this period?z OutFaIl No. Date Sample Collected i (mo/dd/yr) , 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Capper, Lead Zinc Non -Polar O&G/ Tote! Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks 100 mg/L or 50 mg/L4 6.0 — 0.0 0.007 mg/L - 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outf.all, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving. water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For -purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for,rrietal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal -manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to'employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ` a Lam! U�Q T(14 Name (Print name) -Zq A (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar nori-numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mz/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?i2 Outfall Na. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/1PH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks -- =� _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2of3 -0+ ., tijp Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reits within 30 da s o racel t of the lab results Lor at end of monitoring period in the case of "No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifgant p9palties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature of Permit Date:11/1/2012-10/31/2017 1-2- A- (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 RE(ggnJyLM ed 5/25/2018 CERTIFICATE OF COVERAGE NO. NCG030061 ,BAN 0 2 2019 FACILITY NAME Moen COUNTY Craven CENTRAL FILES PERSON COLLECTING SAMPLES Jack H Taylor Jr DWR SECTION LABORATORY Environment 1 Lab Cert. #f 10 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' November DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑zero -flow ❑Water Supply ❑SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --> ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Nan -Polar O&C/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks 100 mg/L or 50 mg/L' 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 1112118 1.17 16 mg/L 7.1 .009 mg/L <2.0 mg/L 0.037mg/L <5.0 mg/L n/a SDO-2 11/2/18 1.17 <2.6 mg/L 7.1 .038 mg/L <2.0 mg/L 0.056 mg/L <S.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies., 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes.. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines forthe facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the.stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) 5( q- t c&sk Title [Print Mel (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When -results are below the applicable limits, they must be_reported_in the format. "<XX ma/L where XX is the numerical vahie of the detection limit, reporting limit, etc. in mg/L. Note. if you report a sample value In excess of the benchmark, you must implement firer 1, Tier Z or Tier 3 responses. See Genera! Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' Outfall No Date Sample Collected' (mo/dd/,yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT•HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2018-10/31/2019 SWU-245, last revised 10/25/2012 Page 2 of 3 F� Note: if you report a sample value in excess of the benchmark, you must implement Trer 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainal and one copy of this DM& lncludina all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period In the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly res onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that..0ere ftre snificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) Permit Date:11/1/2018-10/31/2019 2-I�-�� (Date) 5WU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030600 Date submitted 5/25/2018 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY Environment 1 Lab Cert. # 10 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' April EC E C7 1,P)�P6RGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA [�C ❑Zero -flow ❑Water Supply ❑SA JUN 13 2M ®Other C CENTRAL FILES - PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH; Standard units Copper Lead Zinc Nan -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic' organics' O Benchmarks - 100 mg/L or 50 mg/L° 6.0 — 9.0 .0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L - 1=.mg/L SDO-1 4/24/18 1.34 16 mg/L 7.4 .012 mg/L <2.0 mg/L .181 mg/L <S.0 mg/L n/a SDO-2 - 4/24/18 1.34 , 5 mg/L 7.5 .077 mg/L Q.0 mg/L .075 mg/L <5.0 mg/L n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal.'manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the Tf0 monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print ttle) 3 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where. XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle_ Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' Oatfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids PH Senchmarft => _ - 15 mg/L 100 mg/L or 50 mg/L' 6.0 = 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or rer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: ' • A' BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one covv of this DMR includina all "No Discharae" reports. within 30 days of receivt of the lab results for at end of monitoring Period in the case of "No Discharae" reports) to: Division of water Quality Attn: DWQ Central Files y 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly respon ble for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that yhereg Sig fi ant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Resources General Permit No. NC6030000 CERTIFICATE OF COVERAGE NO. NCG03 0 O (6 I FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack Taylor LABORATORY No oischarge Lab Cert. p NIA Comments on sample collection or analysis: NIA Date submitted 4124118 SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or 0 Monthly',N--.h (month) C NG TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA R G C ETM ❑Zero -flow ❑Water Supply ❑SA APR 3 0 2018 *Other CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results 13WR SECTION n No discharge this period?? outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks ==> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 n1_07L SDO-1 N/A SD0-2 NIA 'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge.. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive,receiving water classifications where the more protective benchmark applies. S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal 'finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TT© monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." Name (Print name) Title (Prin itl (signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, tl-cXX mprJL". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tler 2, or 77er 3 responses. see General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month. 0 No discharge this period?2 Outfali No. Date Sample collected' (mo/dd/ ) 24-hour rainfall amount Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Senchmarks ===n _ - is mg/L 100 mg/L or 50 mg/L' 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCE5 IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES n■ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES X NO REGIONAL OFFICE CONTACT NAME: Mail an original and one In the case of "No Discho this DMR, includina all "No Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 to: ports, within 30 do f the lab results (or at end a YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: " I certify, under penalty of law, that thfs document and atl attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons di ILA for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that th a are nir penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date: 11/1/2012-10/31/2017 q-ZQ—a (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 3/31/2018 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # WA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec {r, �� �^�, or ® Monthly' February RECE1 VEDARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA MAY 0 201$ [_]Zero -flow [-]Water supply [-]SA ®Other C CENTRAL FILES DWRSPLEASE REMEMBER TO SIGN ON PAGES 2 AND OR 3 4 DWR SECTION / ® No discharge this period?iz Outfall No. Date Sample Collected' (mo/d.d/yr) 24hour rainfall.. amount, Inches; Total Suspended Solids pH,. Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks =__> _ - 100 mg/L or 50 mg/0 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date:11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. ' Note: if you report a sample value in excess of the benchmark, you must implement Trer 1, Trer 2, or Tier 3 responses. See General Permit text Part S: Vehicle Maintenance Area Monitorine Results: only for facilities averaging > 55 gal of new oil oer month. Q9 No discharge this period?z Outfail No. Date Sample 24-hour rainfall Coilecte& . amount, Non=polar O&G/TPFE by 4, K Total Suspended Solids" pii (mo/dd/yr) Inches EPA 1664'.(SGT_HEMj, Bencirmorks.==> 1L SOO mg/L or 50 mg/L*. 6.0 — 9.0 SU a ? Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date. 11/1/2D12-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 r Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ . REGIONAL OFFICE CONTACT NAME: Mail an original and one try of this DMA including all '"No Discharge" reports, within 30 da�rs_of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reoortsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly r ponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tgat tkre ar f ,gnifcant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 11/i/2012-10/31/2017 4-7-0 - 10 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 4 d, Semi-annual Stormwater Discharyte Monitoring Report_ for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2/15/2019 CERTIFICATE OF COVERAGE No. NCG03M2 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Tatrlor Jr LABORATORY Environment 1 Lab Cert. # 10 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® MonthW January f�p C C E I lVdEUGING TO CLASS ]ORWEjzerofl�HO❑W E]r routsup❑SA FEB 2 7 2m ®other C CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period Outbu Na. Date sample Collected' (mo/dd/yr) 244hour rainfall amount, Inches° Total Suspended solids pH, Standard units Copper Lead 23nc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks - 100 mg/L or 50 mW 6A — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L i mg/L "SDD-1 1/x3/18 0.38 191 mg/L 7.9 .061 mg/L 0.029 mg/L .619 mg/L I <5A mg/L n/a soo-2 1/23/tS 0.38 114 mg/L 7.7 .236 mg/L 0.035 mg/L .331 mg/L a.0 nWL n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics Is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor ' manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit mon#toring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print titii'L n (Signature) (Date) Note: Results must be reported to numerical format. Do not report Below'detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, thWmust be reported to the format, "4M rr aW where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value In excess of the bemAmarl4 you must Implement Tler 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Velhicle Maintenance Area Monitoring Results: only for faciiMes averaging > 55 gal of new oil per month. No discharge this period?' Outfall No. Date sanvie Collected {mo/dd/yr) 244wur rainfall amount. Inches' Non -polar O>}G/'1'PH by EPA 1664 (SGT-HEM) Total Suspended Solids pH 9eechnm ics -=a _ - 15 mg/L 1W mg/L or So mg/L' 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/l/2012-10/31/2D17 SWU-245, last revised 10/25/2012 Page 2 of 3 4 Note: If you report a sample value In excess of the benchmark you must Implement Tier 1, Tier 2, or Tler 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. w TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO Q REGIONAL OFFICE CONTACT NAME: Mall an original and one copy of this DMX IndudIna all 'No Discharaereports. within 30 days of receipt of the lab results for at end of monitorina period In the case of "No Discharae'reoorts) to. - Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there nsign"rit penalties for submitting false information, indudIng the possibility of fines and Imprisonment for knowing violations." r �i� --�z (Date) i Permit Date.11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report - for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/28/2017 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H TaylorJr LABORATORY No Discharge Lab Cert. # N/A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec Monthly'or December RECEN9ARGINGTO®LASS ❑O W❑HQW ❑Trout ❑PNA FEB 0 6 2418 ❑Zero -flow ❑Water Supply ❑SA ®other C CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?z • Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks =_> _ - 100 mg/L or So mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA ' Monthly sampling (instead of semi-annual) must -begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." 906c Name (Print name) 1 �5 7 Title (Print ti e t �[ (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, thew must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Her 1, Tier 2, or 7-ter 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?2 Outfall No. Date sample 'Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. a 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOU R FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this MR, including all "No Discharge" reports within 30 days of receipt of the lob results for of endue monitoring period In the case of "No Dischame" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge a nd belief, true, accurate, and complete. I am aware that there arp-signif^t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature (Date) Permit Date: 11/112012-10/31/2017 , SWU-245, last revised 10/25/2012 Page 3 of 3 Y� Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/26/2017 CERTIFICATE OF COVERAGE NO. NC6030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # N A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' December DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RSC- EIVED ❑Zero -flow ❑Water Supply ❑SA FEB 14 2017 ®Other C CEN_Nk FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ® No dischorge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks =__> _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L i mg/L SDO-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40-CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since fling the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." !Name (Print name) -3 (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No. Date'Sample Collected) (mo/dd/yr) 24-hour rainfall amount, Inches3 lUon'polar O&G/TPfi by EPA` •1664 (5GT=HEM)': " Total Suspenried Solids .. pH Benchmarks 100 mg%L or 54 mg/L• 6:0 = 9A SU Footnotes from Part A also apply to this Part B ' * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permi'� ale: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note. -If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE.OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period_ in the case of "No Discharge" reoorts) to: Division of Water Quality , Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 - YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there artf'�ignftant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature t. —S (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NM030000 Date submitted W27/2017 IEATIAiATE OF COVERAGE NO. NCGO30061 FACILITY NAME Moen COUNTY CZa%W PERSON COLLECTING SAMPLES Igk Her Jr LABORATORY EnWronment 1 Lab Cem 9 19 Comments on sample collection or anatyds:- Part A: Stermwater Benchmarks and Monitoring Resu is SAMPLE COLLECTION YEAR P17 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ®MonthWAgpmber F F 1\/ 4S ARGING TO cLAss ❑ORw ❑HQw ❑Trout ❑PNA i� JAN l 4 2D18 'flow, ❑water Supply ❑SA ®other. C DWR GEIMON �:PL9- -- REM1cMUR 0 SIChI'ON PAGES 2 AND/DR'3 a INFORMATION PROCESSING UNI n No dischame this neriod?z outfau No Date to11 xA-ltau rah" arrmeutt, Total Suspended Soilds 5taadard unitsOrprtic Coyper Lead _ Zinc Non�Palar ow Total Petroleum Tate Total nims BerrarrrrmWft 100 rng/L or So mg/L; 6A— 9.0 .0.007 rng/L 0.03 ng/L 0A67 rttg/L 15 ma/L 1 ntg/L sl>0.1 11/13/17 0»iS 31 mg/L 8.0 A31 mg/L 0.004 ntg/L .235 c5.0 mglL n/a 500-2 li W17 0.15 20 79 im mg/L 0=4 A31 ntg/L <SA n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the saute parameter at the same outfall. 2For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a dtedcmark here. 3The total predptiadon must be recorded using data from an on -site rain gauge. Unattended sites may be'epgible for a waiver of the rain gauge requirement. See General permit, Table 3 identifying the especially sensitive receiving water dassifigtlons where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permif the definition of Total Toxic Organics Is that definition contained In the EPA Effluent Guidelines for the facility subject to the requirement to sample {for metal finishing use the definition as found In 40 CFR 433.11; for semiconductor manufacture use the definition as found In 40 CFR' 469.12, fok'electrontc crystal manufacture use the definition as found In 40 CFR 469.22; and fear cathode ray tube manufacture use the definition found In 40 CFR 469.31). Perrnit Date:11/1/2012-10/31/2017 5WU-245, Last revised 10/25/2012 Page 1 of 3 Facilitles•that incorporate a solmettt management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be valved. The solvent management plan shall Include a list of the total torac organic compounds used and the other elements listed in the General Permit. For those faa. es electing to employ the TM monitoring waiver, the discharger shall sign the following certification statement; %aced Won my wry of the person or pawns directly responsible for managing compliance with the permit monitoring requinmwAt for total toxic ogpnks (Trot i certify that to the best of my humledge and belief, no dumping of corimrtrated tcaic organics into the stormwater or areas which are exposed to rainfall or stonim ater runoff has otcurred since titiltg the.last disdrarge moniftwing report 1 further certify that this fadljty is implementing the all the provisions of the sdvent management plan included in the Stormwater Pollution Reverrdon Plan.' Name (Print name) c� E Ba Gk� 77M�U �-2,-kg- P- (ba"), Note; ResLdts must be reported in nunumical format Do not reaart Below Detection limit, BDL, cPQI, Non -detect. ND, or other similar non -numerical fai naL; Whim results are below the applicable limits, them mun be r jg"d in the forrna&:M =W. where XX is the numerical value of the detection limit, reporting Ilm% etc. in mg/L None: Ifyou rgpart a sample v due in ewm of the benchmwadr, yarn must hr rrt Tier 4 Tier 2, or Tier 3 ngponsm See GemYd Pemtlt text Par! B: Vehlde Malrttei rice Anna Monitoring Results: only for W1.1 des-everaging > 3S gal of new oil per month. ® No discharge this period OMNI No. Data S=* coUetteP (mat ) 24hMff rainfall arnoun% inches' Nowpolar MOM by EPA 1W A -Hai) Total S Solids p ff Berrdrn>611b _ - is rrrg/L 100 m sIL or So m L• 6A— 2.0 5U Foubmtes from Part A also apply to this Part B • See General Permit text, Table S, idenWytrrg the espedaity sensitive receMng water dassificatlons where the more protective benchmark appikm Permit Date:11/1/2012-10/31/2017 Swu-gas, cast revised 10/25/2012 �. c Page 2 of-3 Nate: If you mpart a sample valve In muen of the bem*mariy you must implement Tier 1, Tler 2, or Tier 3 nm panses. See Genera! Piemiit tmt FOR EM A AND PARTS MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 0 SECTION S. a 2 EXCEEDANCES INA. ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUMEME?4rM SEE PERMIT PART Il SECTION B. a TIER S: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL7 YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? TIES ®NO ❑ REGIONAL OFFICE CONTACT NAME: Mallon lnal a one coovgf this VAVL Lh_d_u_dfta11'ftQftft0jlffremft wfWn30need PtoftheLab results for at enchof flngfturingdod in the Case of'ft Msdiaraeneaavtsl tn: Division of Water Quality Attn: DwQ Central Flies 1617 Mail Service Center Raleigh, North Carolina. 27699-1617 40U jAVM:Af h1jCER'l7F gj#ON FOIL ANYJNF6ftl%A1-niDN-RMK,- MD:. '1 cer*, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based_ on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, a=rate, and complete. I am aware thpt there M significant penalties for submitting false information, including_tlre possibility of fines and imprisonment for knowing violations." Z` (; Permit Date:11/1/2012-10/31/2017 SWU-245, last m%ised 10/25/2012 Page 3 of 3 RECEIVED DEC 0 7 2017 CENTRAL FILES DWR SECTIo1v Semi-annual Stormwater Discharee Monitories peaort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11/27/2017 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2017 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthly' October PERSON COLLECTING SAMPLES Jack H TavlorJr , ; ti DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑PNA LABORATORY No Discharge Lab Cert. JI N/A Comments on sample ❑Zero -flow ❑water supply ❑SA collection or analysis: _ ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Part A: Stormwater Benchmarks and Monitoring Results ® No discharge this period?? x� l y" �otk �ple r,;�,,In �24ourrainfail amounta:�ar;5tand�oyrd�units� hc rµ� c es a 'Total Suspended'Sotia!rq i''y to [upper 1 f.Lead 1;' , lnc� q Non-Poutf kTot I PColacta�s a WYiarlsons prganlw'' -:r:',i�m/d/Yr)a iBeireh'rnnrks =- ""?' {' k r# _10D mg/LroO�m'g/WL!0 9 0 .�0007&:g/ ff, C,0:03 0:067 mg/L� a.ta :a `'SS�rrig/Lp w. l:rrig/L't" soo-1 NA SDO.2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/i/2012-10/31/2017 SWU-245, last revised 10/25/2012 Pagel of 3 Facil [ties that incorporate a solvent management plan Into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Nome(Printname) V Title Print e (5lgnatur (Date) Note: Results must be reported in numerical format. Do not rep Bel w D tection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, th must he r 0 n Ste for at "<XX m " where XX is the numerical value of the detection limit, reporting limit, etc. In mg/L. Note: if you report a sample value In excess of the benchmark, you must Implement ►ler 1, Tier 1, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period v OtitfallNa kr r :'& i'ih '.' Data 5ampla n ��*� r .Collected A i 1 ! ; -.. r ea r 24 hour rainfall amnun Inche!'. ,.` ( M1 . 'a y e _ fNnn'•'polp�0&G/TPHbyr EP.A f1664 SGT HEM}l t '.: exert R °1 'i. 6 f t - "=`� 4 i Total Suspended,Sollds - : W (� t pH Benihmarks >7 " " ` 1 " " " ` K 1s rtig%L, '+ " 100;m8/tQor'S0 mg/L• f ,6'0-"9:O,SU Footnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies, Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Nate:.lf you report a sample value In excess of the benchmark, you must Implement Tier 1, T1er 2, or Tier 3 responses. See General hermit text FOR PART A AND PART B MONITORING RE5ULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FORTHE SAME PARAMETER AT THE SAME OUTFALL'TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEOENCES FORTHE SAME PARAMETER AT ANY ONE OUTFALL7 YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME; . f Mail an orlalnal and one copy of this DMR. Including all No_Ofschorae_" marts within 3QnmelntoLthe tab results (or of of monftorinperlod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly r onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware th ther r si nificant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing violations." (Signature Pe ittee (bate) Permit Date: 11/1/2012-10/31/2017 SWU-245,.1ast revised 10/25/2012 Page 3 of 3 RECEIVED NOV 08 2017 CENTRAL FH.ES DWR SEC-noN Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 10/25/2017 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2017 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ Juiy-Dec COUNTY Craven or ® Monthly' Sentember PERSON COLLECTING SAMPLES Jack H Taylor.l y DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY No Discharge Lab Cert. 4 N/A Comments on sample []Zero -flow []Water Supply ❑SA collection or analysts: ®Other C Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 � No discharge this ,period ?2 aIi a Non•Polar OGG/ll O4 utlaii No "Dte Sarrmple '24•hour rainfa c9e SusndedSoll pH ' Lead Zinc Total Petroleum:Ca Total Toxic �+ r �?pip �n� Ft ??per Hydrocarbons Organicss § (mo/dd r) Inches!" y n , mg/Lw 50 mg/L° r 6 0: 9 0 0.007 mg/LT 0 03 mg/L 0;067 mg/L 15 mg/L• l mg/L SDO.1 NA SDO-2 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ` See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan Into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facillties electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement; "Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requl rem ent for total toxic organics {TTO), I certify that to the best of my knowiedge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is implementing the all the provisions of the solvent management plan included In the StormwRtP.IIutjLDn Prevention Pan." p � IL�fSnLJ'11/ Name trrim name) u4 6 Title (Print el (Signatu (Date) Note: Results must be reported in numerical format Do not repart Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detectlon limit, reporting limit, etc. in mg/L. Note: if you report a sample value In excess of the benchmark, you must Implement 11er 1, 17er Z or Tier 3 responses. See General Permit text. Part B: Vehicle Mal ntenance Area Monitoring Results: only for facilities averaging > SS gal of new olI per month. No dischorae this Deriod F Bete Sample 24=hour rainfall Ouifall No x F 2t Coll cted z i, amount, . Non -polar O&G/TP�H by; Total.Suspendad solids ' pp pH m6%dd/ r Inches'. _. 111EPM1664. SGT,HEM). s t. 9enihmarks > �x 15'mg/L 10o mg/L of 50 mg/L' " "' '6.0 = 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must Implement TFer 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART AND_PART _0 MONITORING RESULTS; • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ®NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO REGIONAL OFFICE CONTACT NAME: Mall an orialaol and one roan of this AMR, includlaa all "No Aischarae" reports, within 30 days of recelpt of the lab results for at end of monitoring perlod in the case of "No Aischarae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center ! Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: 1.1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly espa able for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware tflat there re\sigrtf cant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." jSIgnaturW Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Dischante Monitoring Re ort for North Carolina Dhdslon of Water Quality General Permit No. NCGO30000 Date submitted 9/2S/2017 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR MZ FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June [] 1uNwDec COUNTY Craven or ® MonthW August PERSON COLLECTING SAMPLES r Jr y DISCHARGING TO CLASS ❑oRw ❑ [:]Trout Trout PNA LABORATORY Environment 1 tab Cent. 010 Comments on sample C E 1 VE D Elzero-flow ❑Water supply ❑SA collection or analysis: 0 C T 03 2017 ®Other C Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?' outfall No. Date sample ConE+�tedx (mo/dd/Vr) 244mur rah" amour Indhess Total Suspended solids PK units Copper Copper Lead Zinc �lon-Paler 08;G/ Total Petroleum Hyd rccu6or's Total Toxic Organt:0 Sendwmmb 1W mg/L or S0 mg/V 6A — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L is mg/L 1 mg/L S00-1 08/09/17 0.73 93 mg/L 7.3 A09 eO.WZ TML .045 mdL I -S.O L Na S00-2 08/09/17 0.73 its My& 7.6 .263 0A10 R.g48 mg/L c5A L n/a 1 Monthly sampling (instead of semi-annual) most begin with the seeondconsecutive benchmark exceedance for the same parameter at the same outfall. i For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors.- manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of�thls permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for -electronic crystal manufacture use the definition as found In 40 CFR 46912, and far cathode ray tube manufacture use the definition found in 40 CFR 469 31). Permit Dat_e:1111/2012-10/31/.2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed In the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the Wowing certification statement: "based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics ( TO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan Included in the Stornmater Pollution Prevention Plan." :�CLe— Name {Print name) Title (Print (Signature) (Date) Note: Results must be reported In numerical format Do not report Below Detection Limit, BDL, <PQL, Non -detect, NO, or other similar non -numerical format When results are below the applicable limits, theft must be reported In the format._"O(where XX is the numerical value of the detection limit, reporting limit, etc. In mg/L. Note. If you report a sample slue In excess of the bench nark you must brWlernent Tier t Tier 2, or TTer 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only far fediities averaging > 55 gal of new oft per month. M No dfschorge this perlod?2 flutfall Na. rate ` Caiiestedl (mo/dd/yr 244mur rainfall amount, Incites' NonlWar O8G/TPH by EPA 1664 SGT-HEM Total Suspended Soak pH Sendemartrs 1s nWL 1O0 mg/L or SO mg/V GA — 9.O SU Footnotes from Part A also apply to this Part B • See General Permit text, Table S. Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: li/VM12-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Nate: if you report a sample value In excel of Ow benchmark you must Implement Tier 1, Ver 2, or Tfer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • _. A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREII/UM SEE PERMIT PART 11 SECTION B. • 2 EXCEEDAmas IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B- • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mall an -orlainal and are copy ! QNS !nd dl 11 0 !n 1 0 or end d in the case of "No Disrhame" Division of water Quality - Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 OU MUH SIGlS CETIF RMA E D• IO "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inqulry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing violations." (Signature of PermIttee) q —Vol (Date) Permit Date: 11/i/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 r' . Semi-annual Stormwater Discharge -Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 8/28/2017 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2217 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan June ❑ July -Dec COUNTY Craven or ® Monthly' July PERSON COLLECTING SAMPLES Jack H Taylor) 3 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY No Discharge Lab Cert. # � Comments on sample ❑Zero flaw ❑Water Supply [:]SA collection or analysis: ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results No discharge this ueriod72 Outfall No. Data Sample Collected' (mo/dd/yr) 24•hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics' Benchmarks ==ate _ 100 mg/L or 50 mg/L4 6.0 — %0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L $00-1 NA SOO-2 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall, 'For sampling periods with no discharge at any single outfall, you must still'submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 R C N D CFMI-F�AL FILES DWR SECTION SWU-245, last revised 10/25/2012 Page 1 of 3 •�4 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons d;rectly responsible for managing compliance with the permit monitoring requi rem ent for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since flung the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Prrnt name) Title (r tltitle) (Signatu {Date} 0 Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format, when results are below the applicable limits, they must be reported In the format, "<XX ma/r.", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. 7 No discharoe this oeriod?2 Outfall No. Date Sample Collected' (mo/dd/yri 24-hour rainfall amount, Inches' Non -polo r O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ■•*> 1S mg/L 100 mg/L or 50 mg/L* 6.0— 9.0 sll Footnotes from Part also apply to this Part B ` See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: il/1/2012-10/31/2017 SWU-245, #ast revised 1o/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must Implement Tler 1, Tler Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING R T : • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriairial and one cony of this ON& including all "No 01scharl7e" reports, within 30 days of receipt of the lob results (or at end of morrltorina period in the case of " o Olscha o o: Division of Water Quality Attn: DWQ Central Files 1617 Mall Service Center Raleigh, North Carolina 27699.1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted, Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge a nd belief, true, accurate, and complete. am aware that there arq signlfic4q p<les for submitting false information, Including the posslbility of fines and imprisonment for knowing violations." )Signature of rmlt e) (Date) Permit Date: 1111/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 r.. REeEiVED AUG 10 2017 CENTRAL FILES DWR SECTION Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO30000 Date submitted 7/26/2017 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR 2017 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ®Monthly' June PERSON COLLECTING SAMPLES Jack H Taylor Jr DISCHARGING TO CLASS ❑ORW ❑NOW ❑Trout ❑PNA LABORATORY No Discharge tab Cert. fi N/A Comments on sample ❑Zero -flow ❑Water Supply ❑SA collection or analysis: ®Other g Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 15a No discharge this Deriod ?' i 'OutfalI No = y Date Sample s -Collected ecte_ (nio/dd/yrj . 24 hour rainfall amount, Inches' Total Suspended Soilds PH, standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Oranlq s g s.+ . ` 300 mg/L o� 50 mg/L 5.0 9 0 . 0 007,mg/I. 0:03 mg/L `= 0 O67 mg/L ,'. 15 mg/L >< mg/L SDO-1 NA SOO-2 NA Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/1/2012-10/31/2017 SwU•245, last revised 1o/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan Into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included In the Stormwater Pollution Prevention Plan." .!kou XI a Name (Print name) Tltle (Print t -k'7 (Signature) (Date) Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, lhgv must be reported In the format, "<XX L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facllitles averaging > SS gal of new oil per month. M No discharge this periodY Outfall No. Date Sample Collected' (mo%dd/ r) 24-hour rainfall amount, Inches' Non -polar O&G/TPH by EPA 1664.(SGT-HEM) total Suspended Solids„j. pH Benchmarks -■°i 15 n1g/L 100 mg/L or SD'mg/L' 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value In excess of the benchmark, you must Implement Tier 2, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULT • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainaf and one coov of this OMR. Includina all "No aischarae" reports, within 30 days of receipt of the lab results for at end of monitarina period In the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsinr gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that Opere are si^flctnt jerialtles for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of ermittee) (Date) Permit Date: il/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 RECEIVED JUN 2 0 2017 CENTRAL FILES DWR SECTION DljftM2 NiglIttodagLeRM for Noreft Carolina Dlvislon of Water QuatitY General Permit No. NC6030OW Daft worn tied Br32MI cERnwATE Of Covumg mm NCGO30061 iAIMPU 001A TM YCAR MZ •ACftM NAKU MM s+utl"PM7 JVWA= ❑A&PO c cmlx" g a► Mordw t PMM C0116 n"0 sinsj1P*KjMdgLft IMMAROM TO CIM E p�IQW Cme pia lAlROMORT i Lab cart. r JS e an sample � OWder Sup* 05A coflectlon of analydst Pot A: Stovmwater Bends nadti vW Rltatdtorheg Revuft PLEA-99M l M TO S M ON PAGES 2 AND/O0 3 rl AIa d7W&MM this aerrie v Lltr" Ifo. cwktu& snow". trwwo Todd handed lauds Staff � coppir Lad ZbK Ilorrelodr OIL#/ TOW 00001MM `n T rode A -sip - - 1M mp/►w!0 mp/L U-1A OAR me/L 0.03 m//L CA P mp/l 13 aa(l 1 m8A 6130-1 7 O" u nVil. 7.2 Al2 M& 0M an W401 4A 51304 7 0610 *MIA 71 MGMIA 4&M mrA AM 0.0 a ` MmOly sarWlig Onstead of sem l-annual) must begin with the second coraeartive benchmark eimeedanca for the same parameter al the same outfall. For camp ft periods with no dWathap at a+y single outran, you must still sabmit this discharge monluwlq report with a du3<kmark here. 'The total precipitet en must be few, ed using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gaup requirement 'See General ftnnlU Table 3 klantlTying the especlaily se Wom receivtng water classifications where the more protecthm bendurim applies. ' Total Tonic Organics sanpttng Is appticaMe only for time faciRtles whirl► perform metal ffnishing operations, mtinufatlure samicpr ors, manufacture electranic crystals, or marwfaetura radrode ray tubes. For purposes of this permit the de% tton of Total Toxic Organics Is that definition contained in the EPA Effluent Guidelines for the fadmy subject to the requlrernent to sample (for metal finishing use do definitlon as found In 40 CFR 433.11; for semloonductar manufaed re use the definition as found In 40 CFR 469.14 for dectrork crystal manufacture use the definition as found In 40 CFR 469-M and for cathode ray tube manufacture use the definition found In 40 CFR 469.31). Permit eats: 11/VM12-I W'31M17 swu-245. tan resksea 10/xs/M3 Pap 1 of 3 facilities that Incorporate a sobreret marngimmtt! plan into the Stormwater Pollu*m Preventiat Plan maT so certify, and the regulrernen for TtO monitoring may be weve& The son. rrmmog went Plan shall Include a IM of the WW toslc orgark compoun& used and the other elements listed in the General Permit. For those facilities elecft to employ the TTO monitoring welver, the dWwrger shag sign the following osrdf atim statement: "Bared upon my Utvov d ft Penal or pw" db COV responsible lbr MOMMOM oompBsnaa With the POW m WtkMb p t f(► rani toodc MO), f eerdfy dot to the best of my titowlsdita'ancl Osaaf, no dumi ft of concleiti sstad =01c orgaMa into the storatwster or n - wlddt are exposed to n &M or awn wnw rurwff has ocmn*d pace oft the fast dbdwp monitorlry report i further wrtihr that"hctBtY is implsnte mg the eb the prowl" s of the solvent ntans;ameett plan btdtrdsd to the SConuw�a�taLnrdt���llutlon PtarentJat Plan.' Nams (Prktt �irw�tte) C. .. b . Tftk {Print rr nn Now Remedb feast In reported in rahtrterlcal lbmtat.R& tecdon ' lmtt, elm <PCL Nondetec% NO, or other sbnbr rwr"xorterlal format. When results are below the t bin gmlby ' " where lat Is the numerical value of the datectton ftmit. reporting Arms, ett;.. in mg/t f es. f lwr+ report a vc w br estam altfle aoedtrncrk Mgr MMM TA9r 4 Tiler;, ar TW S rtt arttea. See Grrserd PW"* teat Part N: Vehhie Mal see rsca Area Mmdtcm ng Returlts: ottly for tadiitles sera&* > 55 gM of near all per nsortswt. Ud No &W-wroe this aerlhdN Ckaw WL I2ste semga taltactad' UWdAM 2i tmtrr rttfrtllea amauet, hdMs} ""10181oiti/T>aN by EPA 16M WMA Tatal Uspermw soads PM Amdhwob on* 33 MdL WO aWLOr tic msA* RO-9A M Footnotes tram Part A also apply to"Part B • Sea Oww ral Permh tend. Tahte S. i mdhft the wpKWIy semttfva recchOng water dassigat m when die more pr is 0 m Iterdtmari appon Permit Data:13/1/201Z-W3VM7 MU-245. last reared WnSl= Pge2ata At CO. ff pa apart a 1 Mille 83 9XVM a of are bendtMWk, ratr RUM 6ttplansnrt Tier 1, nb & or TW J MIPMAM sae coal Fbntlt tea A DENCHtMR1t E=EEDANCE TRI MUS TIER 1 WICAXRDMNM SEE PERMIT PART u SECWN IL • 2 EXCEEDAMM IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TMR 2 REWISIMM SEE PEROW PART p SEMM 6. + TTER 3r HASYOUR FACMM HAD ;OR MORE KNLTIAMRK E)MDENCES FOR THE SAME PARAMETER AT ANY ONE WWALL7 TO ®NO ❑ D YEf, mm YOU CONTACTED THE ma REGIONAL OFFICE? m ®NO ❑ REOMM OF= CONTACT NAME: DMsbn of Water Qu ttY Attn: DNQCUOM Fifes 1617 Map Service Center Rale4% NoO Qn&w TM9-1617 �{%�sttr iIStI d �CItTION fCR Ai�f1'ltl�l�fAROIr�J + , ardor pmt>M of hart, tint thh doaamanR and dl rrero prepared wrier my dhectlon ar supervlsmn it emordmsur with a Wswo derJV , to awe OW cptOW pmarn el prapato [OW and evaluatethe hdbrmatbn submitted. Based on my hmpAy of the person or pumas who ntansRe the grshm or throe pow* duet* sesparuMk for pdtw V Ow Womaskm tha htlbrnaft tarbrntusd b, Co the bat of »N iaiorategBa and btSkl, true, sowrase, erd m I Fete am aware that ttwre wa for vAmuttttg false htbarm nM% hndudtng the ponMMty of firs and Impwbonment for bx w ft vioiapttans 91 cw Lo& n (DwW, Permit Data: 11/2MIZ-W3Tf2M7 MOMS, hest rMsed IOMM12 Pala 3 of 3 fCDU Stormvvater Discharge autfall (SDO) Qualitative Monitoring Report Forgufdance ontilling out this form, please visit Permit No.:1j1Q.Q/-3/Q/Q .Q1W or Certificate of Coverage No.: tll�l�/QI IQI?J$l11 Facility Name: Moen County: Craven Phone No. 252-638-3300 inspector. Jack Taylor Date of inspection: 5/23/17 Time of inspection: 0825 Total Event Precipitation (inches): 0.70 Was this a'Representative Storm Evenr" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verffy whether Qualitative Monitoring must be performed during a "representative storm event'' or'measureabie storm event' (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a'measureable storm event." However, some permits do not have this requirement Please refer to these definitions. if applicable. A'representative storm evenC is a storm event that measures greater than 0.1 Inches of rainfall and that Is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A'measurable storm event is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm Interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, i certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page l of 2 SWU-242, last modlfled 7/31/2013 I. Outfall Description: Outfall No. SDO-1 Structure (pipe, ditch, etc.): Overland flow Receiving Stream: Quarry Pond Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light tan. cla" 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): a= 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 Is clear and 5 Is very cloudy: 1 2 0 4 .5 S. Floating Solids: Choose the number which best describes the amount of floating solids In the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 0 3- 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy- 1 © 3 4 5 7. Is there any foam In the stormwater discharge? Yes Q 8. Is there an oil sheen In the stormwater dischargeT Yes IYo 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution., . List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be Indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-24Z fast modified 7/31/2013 A i 7*A FCDEENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguldance on filling out this form please visit Permit No.: Ja/f -Q1.31 /WWW or Certificate of Coverage No.: fj1fj `i/Il/3/S 2.1fVl/ Facility Name: Moen County: Craven Phone No. 252-638-3300 Inspector: Jack Taylor Date of Inspection: 5/23/17 Time of Inspection: 0830 Total Event Precipitation (inches): 0.70 Was this a "Representative Storm Event' or "Measureable Storm Event' as defined by the permit? (See information below.) 0- Please verip whether Qualitative Monitoring must be performed during a 'mpresentadve storm event' or'measur�eable storm event' (raequtrements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a'representative storm event' or during a'measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A *representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Perrnittee or Designee) Page 1 of 2 SWU-242, list modified 7/31/2013 L Outfall Description: Outfall No. SDO-2 Structure (pipe, ditch, etc.): Overland flow to drainage grate Receiving Stream: Absorb into earth, run off towards US 70 Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light gm 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc,): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 O 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 © 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy- 1 © 3 4 5 7. is there any foam in the stormwater discharge? Yes Q a. Is there an oil sheen in the stormwater discharge? Yes ©a 9. is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2of2 SWU•242, Last modified 7/31/2013 C�mu�o��uo�� 90 IDO: 537 KOMM STOR1l1[ATSR (88AHROC8) ATTSa JACK TAYLOR C/O SHAMROClt•NNN BM1 DATB COLLECTBDs 05/23/17 3205 MOYSS BLW. DATE RBIPORTSD r 06/09/17 M M BMS .XC 28560 P Tots) Suspended Reddwe mg/l Copies, uo Lead, uo zhic, uo TPH (16ti4E), qo 70--I , 7I (Rl, Grub) (#Z, Grub) late Analyst Code L$ 91 03i2A/17 KKM 2540D-97 12 36 0345/17 LFJ EPA200.7 <2.0 <2.0 05/3l/17 MIM 3113E-04 75 33 05W/17 LFJ KPA200.7 <3 <5 05rW17 SFJ EPA1664B Environment 1, inc. P.O. Box 70",414 Oakmont Dr. f o-envilie_ Nr 27R5R CHAIN OF CUSTODY RECORD Page I_ of _I Phone1 r i .1me 1: - Fax (252) 756-0633, 1 ,: (SHAMROCK) SHAMROCK -NEW BERN 1 01 E ■ . ■�■��.�■�■■.�.■. 'u_•,it'�7i=_�ll:r �i7� 11 ��_ _z��l; NEZIN loss monsoons Nelson Olson NONNIC/O r• =. .r , . ! p.. r ., U, . . _:.. _ F "Meaf M M E [7] 12 -:4 N 0 0 0 0 N 0 N 0 M • , ■ MM., �mQ®e ■■■■■■■■■®■■■ 11EMEMENEEMENEEMEMEN■■■ now, PREEMENNEMENNOMMENN 150manw 'irt:" i � tiff /� f =SLIT-. /01�111�p ���. ' ! {IL�'1y11 � �- •I�r� 71 1. t� f� Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 5 19 17 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2017 FACILITY NAME National Salvage and Service_ Corporation RECEIVED SAMPLE PERIOD ® Jan -June ❑ July -Dec COUNTY Brunswick or ❑ Monthly' (month) PERSON COLLECTING SAMPLES Matt Smith JUN 03 2017 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical Lab Cert. 12 Comments on sample ❑Zero -flow ❑Water Supply ❑SA collection or analysis: CENTRAL FILES ®Other -C DWR SECTION r Benchmarks -and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this Outfall No. Oat le Collette (mo/dd/yr) 24-hour rainfall amount, ches' Total Suspended Solids pH, Standard units Copper Lead Zinc WO Molar O&G/ Total petroleum Hydrocarbons Total Tox Organics Benchmarks ===> _ 100 mg/L or 50 mg/t° b.0 — 9.0 0.007 mg/L 0.03 0.01i7 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the sec consecuti nchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, ust still submit this d"ift e monitoring report with a checkmark here. 'The total precipitation must be recorded using data fro on -site rain gauge. Unattended s ay be eligible for a waiver of the rain gauge requireme a See General Permit, Table 3 identifying the espe ' sensitive receiving water classifications where are protective benchmark applies. 'Total Toxic Organics sampling is applicabl for those facilities which perform metal finishing operatio anufacture semiconductors, manufacture electronic crystals, or manufacture c e ray tubes. for purposes of this permit the definition of Total Toxic Or s is that definition contained in the E Effluent Guidelines for the faci ' bject to the requirement to sample (for metal finishing use the definition as found i CFR 433.11; for semiconductor manufacture use the de n as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 469.22; and for cathode i tube manufacture a definition found in 40 CFR 469.31). Permit Date: 11/112012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 . 'ties that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, aril the requirement for TTO mo rPermay b ed. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the Gg� it. For t acilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inqu the person or persons directly responsible for managing compliance with the permit monitoring requir or total toxic organics (TTO), I certify that to the be y knowledge and belief, no dumping of concentrated toxic organics into the Stormwater eas which are exposed to rainfall or stormwater runoff has occurred sin ng the last discharge monitoring report. I further certify that this facility is i enting the all the provisions of the solvent management plan included in the water Pollution Prevention Plan." Name (Print Title (Print title) re) Date) Note: Results must be repo numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or o imilar non -numerical format. When result�ein low the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerica a of the detection limit, reportin ,mg/L. if you report a Sam !e value in excess o the benchmark you must implement Tier 1 Ter 2 or Tier 3 responses. See Genera! Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharae this neriod?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU SDO-1 5/5/17 Est. 1.6 <5.0 mg/L 18.6 mg/L N/A Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3a-e 7 ---- (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitorine Report for North Carolina Division of Water Quality General Permit No. NCGO30000 Date submitted 5/11/2017 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY Environment 1 Lab Cert. q 10 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® MonthW April DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RECE tt 1V ED ❑Zero -flow ❑Water Supply ❑SA MAY 18 20i7 ®ocher t CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period?2 oudall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Sows pH, Standard untts Copper Lead Zinc Nan -Polar O&G/ Total Petroleum Hydrocarbons total Toxk Organks s Benchmarks -- => - - 100 mg/L or S0 mg/L' 6.0 — 9.0 0.W7 mg/L &03 mg/L 0.061 nWL 15 mg/L 1 mg/L 5DO-1 04/Z4/17 1.41 24 mg/L 7.3 .020 mg/L x" mg/L .ZW mg/L c5.0 mg/L n/a. SDO-2 04/24/17 L41 110 mg/L 7.0 .337 mg/L .020 mg/L .424 uWL <5.0 nWL n/a Monthly sampling (instead of semi-annual) must begin,withthe second consecutive benchmark exceedance for the same parameter at the same outfall. x For sampling periods with no discharge at any single,outfall, you must still submit this discharge monitoring report witli a checkmark here. 3 The total precipitation must be recorded using data'from anon -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement.- ' See General Permit, Table 3 identifying the especially sensitive receiving vvater classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which peifo`rm metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requireinek to sample (for,metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31)'. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: `Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the sotvent'management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) (Date) y Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, thpy must be reported in the format, '<XX m V where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the ben6mark you must Implement Tier 1, Tier 4 or Tier 3 responses. See General Permit text. Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new all per month. No discharge this period r'2 Outfall Na. Date Sample Collected' (mo/dd/yr) 24-hoar rainfall amount, Indwns Non -polar O&G/'TPH by EPA 1664 (SGT-HEM] Total Steed Solids pH Bendimarb -- => _ - is mg/L 100 mg/L or So mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table S, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value In excess of the benchmark you must implement Tier 1, fler 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER i REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt d the lab resuks for at end of monitoring neriod in the case of No Dischartre" relrorts) to: _ ^ Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there arqNignifj43nt penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." - jDate) Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 AA. w►.wnwAw� NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit: httnJ/po�l.ngdenr.org/web/lr/nudes-stormwaterl Permit No.: or Certificate of Coverage No.: Facility Name: Moen County: Craven Inspector: Jack Taylor Date of Inspection: 4/24/17 Time of Inspection: 1125 Total Event Precipitation (inches): 1.41 Phone No. 252-638-3300 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which ,no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. y A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, last modified 7/31/2013 1. Outfall Description, Outfall No. SDO-1 Structure (pipe, ditch, etc.): Overland flow Receiving Stream: Quarry Pond Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light tan. clayish 3. Odor; Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 Q 4 5 5. Floating Solids; Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 © 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 0 4 5 7. is there any foam in the stormwater discharge?' Yes VSo a. Is there an oil sheen in the stormwater discharge? Yes No 9. is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU•242, Lest modified 7/31/2013 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: httn://portal,13cdenr.org f we ir/nilde"5-stomiMMtg[l Permit No.: WjC/Q/j/Q/Q/Q/Q/ or Certificate of Coverage No.: h/,jC/.G/,Q/3/Il/2j$/j,/ Facility Name: Moen County: Craven Phone No. 252-638-3300. Inspector: Jack Taylor Date of Inspection: 4/24/17 Time of Inspection:1130 Total Event Precipitation (inches)- 1.41 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 niches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event'" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter Interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. SDO-2 Structure, (pipe, ditch, etc.): Overland flow to drainage grate Receiving Stream: Absorb into earth, run off towards US 70 Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light gra 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 0 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 ® 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 5 7. Is there any Foam in the stormwater discharge? Yes ©o 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfail? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, last modified 7/31/2013 Wgnopo TM ad I ID#a 537 MORN 8TOR10IAT8R (6HAHROCK) ATT93 JACK TAYLOR C/O t3HIMOCK-trill BERN DATE COLLECTED, 04/24/17 3205 BRUSH BLVD. D11TB RBPORTBD s 05/09/17 NEW BBRR ,NC 20560 F RBVIZt48D BY Stormwater Stormtrater Analysis Method PARAA'iliMRS (91, Grab) (#I, Grab) Date Analyst Code Total Sips mimed Residue, mgA 24 110 04/25/17 KAC 254OD-97 Copper, ag/l 20 337 05/01/11 LFJ ZPA200.7 Lead, ug4 4 20 04/25/17 MTM 3113B.04 Zinc, uglt 210 424 05/01/17 LFJ EPA200.7 TPH (16M, mg/l <5 <3 04/27/17 SRI EPA1664B I•:ttvlt•imolvill.1.Inc. CRAIN OF CUSTODY .RE CORD PO RiA,, 708�. 11-4 0alanoui. Dr. pa ge of 'euvixViituelithuc-coill lfTSL111=c l l(.? CHLORPiC W.UTRALI4MOATCOLLECTION .. � i d, CHECK 08) t'I.n?ti1: S37 Wei: to KOEN STORMWATER (SHAMROCK) I.1�'1: P IP G CONTAINER TYPE PC ,'ITN: JACK TAYLOR CHEM CAL PRESERVATION �IO SAA11IItOCK-NEW BERN (� 1205 NEUSE BLVD. A C Qw BI?RN NC Aw 0 N A • IV{11 T} • NAC>H 252y 63&2900 ui $ - ItU, E • HCL r cc e C HrSQ, F - ZING AGETATEtN, 0Fl w olxa.EcTmry 0- a E G - NA TIi*SMFATE SAMPLE LOCATIQN DATF TIME 9to><mwater (#I, Grab) Y :� 3 CLASWICATION: V#MnWATERl.WMS1 ❑ Dr-MING WA1 ER StmuWater (m Grab) ' 3 D4NGQ SWD WASTE SECTiQN CHAIN Or',US YODY (SEAL! MAWTAINE:D DIJRING SIiIPM[--N1NELlW-IlY t% N SAWLESco f0ml3Y• i Pkam F*1 4z41z' SAMPLES RECEIVED IN LAB AT 7 L__ ,' C R { (SAMPLEFtJ DATSTW RECE Q (SIG ) !IME COIu�tEtdTS; U B i DATE=TIME RECENER13Y;5tG. DATETIME HE fIJOVISHE BY (SIG,) DA%TIME RECEIVED BY (SIG,) DATF-.TK PLEASE READ Insh ticlions for a omplefing this corm w the ren4ose 5idp, Sampler must piac:e a "C° for composite sample of a "G" tot N U 33 6 �,10 5 VoRm ef; Gfall sample in Me bucks aWve for each parameter requested. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 4/20/2-017 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # N A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 RECEI %EDMPLE PERIOD ❑ Jan -June ❑ July -Dec MAY 2 3 2017 or ® Monthly) March DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA CENTRAL FILES ❑Zero -flow ❑water Supply [:]SA DWR SECTION ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 El No discharge this Period?iz Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 < Total'Suspended Solids pH, Standard units Copper Lead -,Zinc Non Polar O&G% Total -Petroleum Hydrocarbons Total Toxic Organicss Benchmarks ==> _ - 100 mg/L or 56 mg/L° 6.0 - 9.0 0.007 mg/L . 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA SDO-2 NA - 1 Monthly samoline (instead of semi-annual) must beein with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with•a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample'(for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." V_0Afn_m_ f Name (Print name) S 1S� Title (Print titl (Signature) (Date) 1 Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period? Outfall No. pate Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non=p IaOi G/TPH by EPA 1664 (SGT=HEM). Total Suspended Solids pH Benchmarks =_> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of.3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART If SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® No ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharae" reports within 30 days of receipts the lab results for at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that toere are sWifpgnt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date: 11/1/2012-10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2/16/2017 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # NJA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec E^���� or ®MonthlylJanua R GC I DING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA MAR 13 2017 ❑Zero -flow ❑Water Supply ❑SA CENTRAL FILES ®Other C DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?' Outfa[I:No r 'y-r si - Date Sample= 1. , Collected (mo/dd/yr)' rs ''• +"- 24hour rainfall f .. A ;:. amount Inches3.'. r; -..�ixwvrdt� �."t'PY.~" `=a x- Tgtat`Suspended Solids Pa :�" �' '-fie' KPH; �`' :. r:_ .. ; Standard units S g state °fix .: Copped g Leath f ` a _ Zinc ,Hydrocarbons. . fig, Narl pOlarOS[G�S a_ . _y Tutal'Petroleum .... a; -- _ a? Tvtal Toxic', Organics s Benchmarks—=> - - l00 mg/L or 50;mg/L ?�6i0 ' 9 00.007 mg/Lx .. 0.03 mg/L 0.067. rr�gfL 15 mg/L _ l mg/L, S00-1 NA SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. . 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11,-for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit_ For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TrO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. s Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gat of new oil per month. ® No discharge this period?2 Date:Sample 24houriainfall w r - outfall No t ?!MA s collectedl Wamourrt, Norrpolar0&GH b�Y�,�= . b Total5uspended Solids H `P x s/.d_d%l►rj EPA_ i6b4.(SGT- M�.., y r s w Ind�ies� , Benchmarks -> `;1 15 t Z. �'mg%'r �, � 100 ing/iL or'SO rrEgf L• 6 0 - 9 0 ��� ,�.. �� Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: k Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of a- -n (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwa_t_er Discharge Monitoring Report, for North Carolina Division of Water Quality General Permit No. NCGO30000 Date submitted 2/16/2017 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Ta or Jr LABORATORY No Dlscharee Lab Cert. 810 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results IR& EIVEDSAMPLE SAAMPPLE oo p Jane ❑ July-0ec MAR 2 7 2017 or ® MonthW February DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA DWR�CFILES TION ®filow []Water Supply [:][:]SA` PLEASE-REMEMBER TO SIGN ON PAGES 2 AND/0111.3 4 ® No discharge this period?' outfall No. Date Sample Collected 24fiour rainfallpH, amount, Inches Total Suspended Solids T Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Total TOXIC Organks s BenrhnwrAs => - - 100 mg/L or So mg/L` "— 9.0 OA07 mg/L OM mg/L DA67 mg/L 15 mg/L i mg/L S1130-1 02/15/17 .82 40 mg/L 7.5 .025 mg/L AN mg/L .323 mg/L <5.0 mg/L n/a SDO-2 02/iS/17 .82 73 mg/L 7.1 .119 mg/L .008 mg/L .245 mg/L <S.O mg/L n/a i Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained In the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stomnwater runoff has occurred since filing the last discliarge monitoring report. I further certify that this Witty is implementing the all the provisions of the solvent management plan included in the 5totmwater Pollution Prevention Plan." Name (Print name) Title (Pri title) �A '3 _ao_�j NIX (Signature) (Date) Note: Results must be reported in numerical format Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, then must be reported in the format, "<0 m V where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L Now. # you report a sample value In exam of the bem*mark, you must Implement Tier 1, T1er 2, or 71er 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new all per month. No discharge this period?z Outfan No. Date Sample Collected' (mo/dd/yr) 24 mur rainfall amount, Inches Non -polar OSGPW by EPA 16" (SGT-HEM) Total Suspended Solids PH Berr *nwrh --a _ - 1s mg/L 100 mg/L or 50 aWV 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: il/i/2012-10/3112017 SWU-245, last revised 10/25/2012 � Page 2 of 3 NOW. 1f You report a sample value In excess of the benchmark you arrest implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION S. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK D(CEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ . REGIONAL OFFICE CONTACT NAME: Mail an orfainal and one corny of this DMR lndudlna all '9Yo pLuh rrae" reports. within 30 days of recelpt of the lob results for at end of monitorina period In the case of "No Dischome"' neporisl to: Division of Water Quality _ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared "under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations." [Signature of (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 AkT,,.FWV NCDE I�R Stormwater Discharge Dutfall (SDO) Qualitative Monitoring Report Forguldonce on fllling out thisform, please visit: http: / IpOEMl.ncdennore jweb11r/Opdes-stormwater/ Permit No.: �/i/Q/,/Q/Q/�/Q/ or Certificate of Coverage No.: X/.C/jj/Q/3/Q/2/,l/1/ Facility Name: Moen County: Craven Phone No. 252-638-3300 Inspector: Jack Taylor Date of Inspection. 2/15/17 Time of Inspection:1145 Total Event Precipitation (inches): 0.82 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event"' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is 'representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, ce jit t�at tju-kirepyrt i,�accurate and complete to the best of my knowledge: (SignaturepfPerrhittee or Pagel of 2 SWU•242. Last modified 7/31/2013 ti 1. Outfall Description: Outfall No. SDO-1 Structure (pipe, ditch, etc.): Overland flow Receiving Stream: Quarry Pond Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light tan. clayish 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 Q 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 Q 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 Is no solids and 5 is extremely muddy: 1 2 0 4 5 7. Is there any foam in the stormwater discharge? Yes B. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. SWU-242, Last modified 7/31/2013 Page 2 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguldance on fllling out this form, please visit: http:j j rtil.nc enr.org/web/web jlrjnpdcs-stormwater! Permit No.: or Certificate of Coverage No.: Facility Name: Moen County: Craven Phone No. 252-638-3300 Inspector: Jack Taylor Date of Inspection: 2/15/17 Time of Inspection:1155 Total Event Precipitation (inches): 0.82 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be per during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that Is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior., The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this of is accurate and complete to the best of my knowledge: SWU-242, Last modified 7/31/2013 Page) of 2 s I. OudWI Description: Outfall No. SDO-2 Structure (pipe, ditch, etc.): Overland flow to drainage grate Receiving Stream: Absorb into earth, run off towards US 70 Describe the industrial activities that occur within the outfall drainage area: Parking 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light gray 3. Odor: Describe any distinct odors that the discharge may have (Le., smells strongly of oil, weak chlorine odor, etc.): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 Is very cloudy: 1 2 O 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:. 1 2 03 , 4 5 G. Suspended Solids: Choose the number which best describes the amount of suspended solids -In the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 a3 4 5 7. is there any foam In the stormwater discharge? Yes Y�o B. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Observed Note: Low clarity, high solids, and/or the presence of foam, nil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. SM-242, last modified 7/31/2013 Page 2 of 2 Egowghmsm 1, hmmmUdo ID#1 537 XOBB STORKNATBR (BRAMROCK) ATTN i JACK TAYLOR C/O BRIMROCK-HEN BBRN DATE COLLECTED$ 02/15/17 3205 HOUSE BLVD. DATE RBPORTBD 1 03/14/17 MEN BSRK .NC 20560 y REVtBNED BY1 Stormrrater Stormwater Analysis Method PARAMETERS (#I, Grab) (#2, Grab) Date Analyst Code Total Suspended Residue, mgn 40 73 02/16/17 MAR 2540D-97 Copper, ugA 25 119 03W17 LFJ EPA200.7 Lead, ugll 3 8 03/09/17 MTM 3113E-04 Zinc, ugA 323 245 03/(W17 LFJ EPA200.7 TPH (1664B), RO <S <S 02/21/17 SEd EPA1664B Eiaviro►unent 1, xne.. CHAIN OF C: USTOD Y 'REC:ORD --t- 0SAIC& PRESERVATION m�ec DWWW SOUIDWASTESEaJON CHAIN 01"CU'STODY (SEAL) MAINTAINED DURING SHIPMENTMELIVERY , Nat B.", vrr - W W/921M.&Wwal PLEASE READ Instructions for completing tfiis torm on the "erne sine. Sampler must place a `C" for composite sample or a:'T for N° 331803 , Forik .; -- -- - - Grab sample in the bk,(Is above for each parameter requested. Semi-annual Stormwater Discharge Monitoring Report l for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 12/29/2016 CERTIFICATE OF COVERAGE NO. NCG030061 pC��++ I FACILITY NAME Moen RECEIVED COUNTY Craven n �, PERSON COLLECTING SAMPLES Jack H Taylor Jr JAN { LABORATORY No Discharge Lab Cert. # WA Comments on sampf3ENTRAL FILES collection or analysis: DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' November DISCHARGING TO CLASS []ORW ❑HQW []Trout ❑PNA []Zero -flow ❑Water Supply ❑SA ®Other C PkEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 F14A,Oa4ischarge this period: Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead nc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organlcss Benchmarks ==> _ - 200 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 NA j SDO-2 NA 1 Monthly sampling (instead of semi-annual) must begin witli the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit- For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) s Title (Print ti -�a-1 1�&_ (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, cPQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "clot mg/LA, where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new all per. month: ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes' from Part A also apply to this Part B ' See Ge*ral Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text .1� -..i- FOR PAR-fA AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discharge" reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware toat ther"re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permit Date: 11/1/2012-10/31/2017 o- (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 _Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11/9/2016 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # N/A Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results RECEIVED NOV 21 Z016 CENTRAL FILES SAMPLE COLLECTION YEAR 2016 DWR SECTION SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' October DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow []Water Supply ❑SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper ' Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks =__> _ - , 100 mg/L or 50 mg/L' 6.0 — 9.0 0.607 mg/L 0..03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 SDO-2 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement- 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a (vent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring maybe waged. The solvent anagemeni plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities a ecting to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Backed upon my inquir (TrQ), I certify that to 1 sto6water runoff has 5oh ent management E Note: Results must be repot format. Wen results are be limit, reporting limit, etc. in i Nate: If yqu report a Part B: f the persoI or persons directly responsible for managing compliance with the permit monitoring requdrement for total toxic organics best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or �urred smcfiling the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the included is the Stormwater Pollution Prevention Plan." Name (Print name) 5azi Title (Print 'de) okkp - (Signatur (Date) in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical the applicable limits, they must be reported in the format, "<)X mell", where XX is the numerical value of the detection value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. ce Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. I� No discharge this veriod?z .� �`s` f".i43 Outfa[t'IM •'S P p i mil. lY".A.JtA e Sample' I Collectedl !!•��, i - _i 24-#Our ra�nfaii�l ;amoUrit, . IF,a i SFr IAI F 1 i '; nd�es3i : e, s • - '1�41 } ,� s r1j i MOn-polarrOBrG/1PH brl 1r� Pi�U : L'".. I -- U .r.r is' EPA fG4`(Sfai-HEM)" j' c�������� n J, rt k" 16tal 5uspend�-Solids;: i ' 75 1� t,. _ _ . �i [ aE m �. pH. Mir Benchmaiks i _. . 6.0-9:0 SU f Footnotes �om Part A also ` See General Permit text, Tab to this Part B the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date 11/1/2012-10/31/0017 { SWU-245, last revised 10/25/2012 •- ` i I j I Page 2 of 3 Note: If you report a sample valve in excess of the benchmark, you must implement Tier 1, Trer 2, or Ter 3 responses. See General Permit text. FOR PART AAND PART MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. r TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on inal and one copy of this DMR, including all "No Discha e" reports, within 30 days of receipt of the lab results for at end of monitoring dod in the case o "No Discha e" reports) to. - Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Signature of (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11/9/2016 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr LABORATORY No Discharge Lab Cert. # NJA Comments on sample collection or analysis: Part A. Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Z016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' September DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flaw ❑Water Supply ❑SA R eEIVED ®OtherC NOV 2 1 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES DWR SECTION ® No discharge this period?' Outfall No. Date Sample Collected, (mo/dd/yrj 24fiour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non-Polar O&G/ Total Petroleum Hydrocarbons Tots! Toxic Organics Benchmarks 100 mg/L or SO mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 nWL IS mg/L 1 mg/L SDO-1 SDO-2 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX mglV, where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z Outfall No. date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 ing/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 s Page 2 of 3 Note: If you report a sample value in excess of the benchmarly you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: I . • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports within 30 days of receipt of the lob results for at end of monitoring period in the case _of"No Dischame" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted: Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 ' Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11/9/2016 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Jack H Taylor Jr REC E f VEO LABORATORY No Discharge Lab Cert. # NLA Comments on sample collection or analysis: NOV 2 1 2016 rgh : RAL FILES DWR SECTION! Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly; August DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA ❑Zero -flaw ❑Water Supply ❑SA ®Other C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?' Outfall No. Date Sample Collected1 (mo/dd/yr) 24-hour rainfall amount, Inchee Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organic Benchmarks =__> - - 1W mg/L or 50 mg/V 6.0 — 9.0 OA07 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 SOO-2 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. x For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plant into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since fling the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) 4A l-koAQ (Signature _6 (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format.'<U me/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Perm it text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O✓IiG/TPH by EPA 1fi64 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* fi.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. * TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports. within 30 dabs of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports! to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sigTifica/It penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature of l_ — (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3of3 Semi-annual Stormwater Dis::.rarge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG( Date submitted CERTIFICATE OF COVERAGE NO. NCG03 d o (. 3 FACILITY NAME (E _ M boLyw=, COUNTY PERSON COLLECTING SAMPLES '14A LABORATORYMewiiec -Elsa Lab Cert. # 1(.,5- ^� Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 6'1 'I SAMPLE PERIOD ❑ Jan -June❑ July-5eOft or® Montlilyl � onth DISCHARGING TO CLASS%❑ORW FIHQW r ❑PNA ❑Zero -flow ❑Water u 5A ❑Other - - PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period:? Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 � Total Suspended Solids � pH, Standard units :; Copper � � Lead Zinc Non -Polar O&G/ Total Petroleum HydracarEions Total Toxic Organics Benchmarks = => _ - 100 mg/L or 50 mg/0 6.0 - 9.0 0.007. mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L �o 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from anon -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 t Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may bq waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics! ; (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filingthe last discharge monitoring report. i further certify that this facili l g g p fy ty is implementing the a!1 the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." j i Name (Print name) Title (Print title) lie 1 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below, Detection. Limit, BDL, <PQL,.Non-detect, ND, or other similar non -numerical I ' format. When.results are below the applicable limits, they must be reported in the format, "_<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier-2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?2 Date'Sample 24-hour rainfall _ Outfall No i tNon-poarO&G/TPH by:Cllectedamoun pH' . . "HMTotal.-Suspended Solids:: 3::(mo/dd/yr) 'nches EPA 1664 (SGE) ` Benchmarks'==-� -. - ' 15�mg/L ;100. mg/L.or 50 mg/L*: , � � 6.0 --.9.0.5U i ,i Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date,.M41-1/2012-10/31/2017 5WU-245, last revised 10/2012 Page 2 of 3. Note: If yoi...-_part a sample value in excess of the benchmark, you must implei.... it Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART it SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER ATANY ONE OUTFALL? YES © NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑X NO ❑ REGIONAL OFFICE CONTACT NAME: T)WO_C nbml Fit" Mail an original and one copy o fthis DMR, including all "'No Discharge" reports, within 30 days of receipt of the tab results for at end of monitoring period in the case of "No Dischar e" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pen (ties for suKnitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) { at Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Daily Weather History & Observations 2016 Temp. VFi Dew Point I'M Humidity I%) sea Level Press. lin) Viisihility (mi) Wmd {mph) Precip. [in) Events Aug high avg low high avg low high avg low high avg law high avg low high avg high star 1 89 80 71 74 72 69 94 82 55 3011 30.06 29.99 10 10 10 13 5 - 02.2 Raiff . Thunderstorm 2 89 80 73 75 73 71 96 84 65 30.07 30.02 29.95 10 10 10 12 4 - 0.10 Rain . Thunderstorm 3 82 77 73 72 71 68 96 86 69 30.09 30.04 29.99 10 10 10 10 4 16 0.00 Rain 4 84 78 71 71 69 66 87 76 61 30.12 30.07 30.03 10 10 10 9 6 - 0.00 5 86 78 73 76 73 72 100 90 67 30.06 30.00 29.92 10 9 2 9 3 0.91 Rain. Thunderstorm 6 91 82 73 75 73 69 100 83 48 29.95 29.89 29.81 10 10 10 10 3 0.00 7 86 80 73 73 71 66 97 81 58 29.98 29.92 29.84 10 10 10 14 7 22 0.11 Rain. Thunderstorm 8 82 76 71 74 71 68 94 83 74 30.09 30.02 29.97 10 10 2 14 4 21 0.06 Rain 9 88 80 73 75 73 71 97 84 59 30.18 30.12 30.07 10 10 4 9 3 - 0.09 Rain 10 90 80 69 75 72 69 100 83 53 30.25 30.20 30.15 10 9 2 9 2 - 0.00 11 75 72 70 74 71 69 100 95 90 30.18 3037 30.16 10 9 2 4 O - 0.00 12 91 82 73 75 74 72 96 75 55 30.09 30.03 29.95 10 10 10 12 3 - 0.00 13 91 83 75 75 74 73 94 74 54 30.04 30.01 29.97 10 10 10 12 5 0.00 14 95 84 75 76 74 71 91 71 47 30.15 30.08 30.04 10 10 10 12 5 16 0.00 Thunderstorm 15 95 83 73 75 73 70 94 73 46 30.19 30-16 3012 10 10 10 10 3 - 0.00 Thunderstorm 16 93 84 75 74 73 71 94 72 49 3023 30.18 3051 10 10 10 10 4 - 0.00 17 95 84 75 75 72 68 90 71 49 30.17 30.12 30.05 10 10 10 12 6 22 0.00 Thunderstorm 18 91 82 73 74 71 67 100 72 47 30.10 30.06 30.00 10 10 10 12 3 - 0.00 19 89 82 75 75 72 70 100 78 55 30.02 29.97 29.91 10 10 10 9 5 - 0.01 Rain 20 90 80 71 74 72 68 100 79 50 29.96 29.99 29.82 10 10 2 8 2 21 0.16 Rain. Thunderstorm 21 93 82 73 76 73 69 100 89 52 29.97 29-87 29.81 10 8 2 15 4 32 0.17 Rain . Thunderstorm 22 84 74 63 66 61 54 100 67 35 3020 30.10 29.99 10 10 10 14 5 - 0,00 23 88 74 62 65 62 59 100 69 39 3030 3026 3020 m 10 10 9 2 - 0.00 24 84 74 63 67 65 63 100 77 48 30.32- 30.25 30.18 10 10 9 8 1 0.00 25 93 78 66 73 69 65 97 73 48 30.19 30-12 30.06 10 10 10 9 2 0.00 26 97 84 71 75 71 68 97 69 40 30.09 30-06 30.02 10 10 10 9 3 0.00 27 97 84 73 75 T3 71 100 81 44 30.14 30JO 30.06 10 8 2 17 4 24 0.22 Rain, Thunderstorm 28 89 79 70 73 68 64 97 73 45 30-22 30.15 30.10 10 10 9 13 4 18 0.00 29 88 78 68 70 66 61 100 71 44 30.16 30.12 30.08 10 10 9 10 4 0.00 30 91 78 66 70 67 64 100 72 42 30.13 30.07 29.99 10 10 10 10 2 0.00 31 93 80 68 71 69 66 100 73 44 30,02 29.96 29.88 10 10 8 8 2 OAO CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Nicholas W. Murphrey LABORATORY Pace Analytical Lab Cert. q 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality Genera! Permit No. NCG0300qp47 Date submitted 7 29 16 R - 2015 11 une ❑ July -Dec thly July (month) SAMPLE COLLECTIOP SAMPLE PERIOD ❑ l or 'DISCHARGING Tdb RECEIVED AUG 19 2m ❑ORW ❑HQW ❑Trout ❑PNK ❑2ero-flow ❑Water Supply ❑SA ®Other -C CENTRAL, FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar OAGJ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks ==> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.061 mg/L 15 mg/L i mg/L SDO-1 7/19/16 Est 0.90 348 mg/L 7.5 0.313 mg/L 0.0268 mg/L 0.362 mg/L <5.0 mg/L n/a SDO-2 7/19/16 Est 0.90 10.8 mg/L 7.0 0.0354 mg/L 0.0055 mg/L ND <5.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. x For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifyingthe especially sensitive receiving water classifications where the more protective benchmark applies. $ Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." [L Name (Print name) Title (Print title) Q (signatu ) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Ter 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of newoil per month. ❑ No discharge -this period?z Outfall No. Date Sample Collected (mo/dd/yr) - 24-hour rainfall amount, Inches Non -polar O&G/TPH by. EPA 16" (SGT:HEM) Total Suspended Solids pH Benchmarks => _ - 15,mg/L.• , 100 mg/L or 50 mg/V 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. r f Pesmit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement rer 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: . + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this, DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date: 11/1/2012-10/31/2017. (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 7 9 16 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2016 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthly' June (month] PERSON COLLECTING SAMPLES NA RECEO 420GING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY NA Lab Cert. NA Comments on sample collection or r,,, ®Zero-flo❑Ow [:]Water Supply ❑SA analysis: AUG 02 1c:,n the4� - Part A., Stormwater Benchmarks and Monitoring Results CENTRAL FILES DV1R SECTION PLEAkE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?2 Outfall No. Date Sample Collected"amount, (mo/dd/yr) 24-hour rainfall inches3 Total Suspended Solids pH' Standard units Copper Lead Zinc No 08cn- Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =-> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L -SD0-1 No Flow n/a SDO-2 No Flow n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single ouilfall, you must still'submit this discharge monitoring report with 'a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EP10 Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ra tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring maybe waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (770), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print t' le l [ (Signatur (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format,*<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?? Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total'Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L' 6.0 — 9.0 Su Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2.EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy otthis DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results jor of end of monitoring period_ in the case of "No Discharge"_re-ortsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that tj ere are�signijicant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Signature of 1' ZS • l�v (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ... .....wa.v.. .. u.u...u... wu...0 ....uu.� .... Nv.. �.w .. ..�.avu..f uu.0 .vu.v.m Station: KEWN - Craven County Airport Date of first observation: October 1, 1997 Station type: ASOS - Standard City, State: New Bern, NC County: Craven County Latitude: 35.07297220 Longitude:-77.04294440 Elevation: 18 feet above sea level Climate division: NC07 - Central.Coastal Plain - River basin: Lower Nauss Supported by: NOAA National Weather Service This page is created dynamically and should not be bookmarked. Instead, bookmark the DAW preceeding this. Retrieving hourly data from Craven County Airport for past 9 day(s) 31 observations for this period of record (93.9% data available; 2 missing records) If you need more historical data from a larger period of record, please contact us for assistance Q Date/Time of ob Hourly Precipitation (Eastern Standard Time) at Zm (in) 06/15/2016 00:54 H 06/15/2016 01:54 H 06/15/2016 02:54 H O6/15/2016 03:54 H 0.0001QCO 06/15/2016 04:54 H 06/15/2016 05:54 06/15/2016 06:54 H 06/15/2016 07:54 H 06/15/2016 08:54 H 06/15/2016 09:54 H 06/15/2016 10:54 H 06/15/2016 11:54 H 06/15/2016 12:54 H 06/15/2016 13:54 H 06/15/2016 14:54 H 06/15/2016 15:54 H 06/15/2016 16:54 H 06/15/2016 17:54 H 06/15/2016 18:54 H 06/15/2016 19:54 H 06/15/2016.20:54 H 06/15/2016 21:54 H 06/15/2016 22:54 H 06/15/2016 23:54 H 0.0001QC° 06/16/2016 00:54 H 06/16/2016 01:54 H .. ............� a�u.uvu..v..,. u. vu ..s uuy .... �.v.. �. �.. .. ..� ..vw.� ..uw .v......... 06/16/2016 02:54 H 0.0001QCO 06/16/2016 03:54K 0.124C° 06/16/2016 04:54 " 0.02Qca 06/16/2016 05:54 " 06/16/2016 06:54 " !Sum 0.14 Average llh.F a� , ; 1' 0 Mean (max+m(n)/z 0.1 'High 0.1 Low 0 . Quality Control flags that may appear above QCTBD 0 Not yet quality checked QCO 5 QC Score indicates good data QC1 0 QC Score indicates likely good data QC2 0 QC Score indicates likely bad data . QC3 0 QC Score indicates bad data NC CRONOS Database ye_oion 2.7.2 Query script last modified Apr 07, 2014 13:01:47 Page expelled in 0.061 secs. Station: KEWN - Craven County Airport Date of first observation: October 1, 1997 Station type: ASOS - Standard City, State: New Bern, NC County: Craven County Latitude: 35,0729722° Longitude:-77.04294440 Elevation: 18 feet above sea level Climate division: NC07 - Central Coastal Plain River basin: Lower Neuse Supported by: NOAA National Weather Service This page is created dynamically and should not be bookmarked. Instead, bookmark the p= proceeding this. Retrieving hourly data from Craven County Airport for past 1 day(s) 31 observations for this period of record (93.9% data available; 2 missing records) If you need more historical data from a larger period of record, please contact us for assistance oLJ © Date/Time of ob Hourly Precipitation (Eastern Standard Time) at Zm (in) 06/28/2016 00:54 " 06/28/2016 01:54 " 06/28/2016 02:54 " 06/28/2016 03:54 " 06/28/2016 04:54 " 06/28/2016 05:54 " 06/28/2016 06:54 " 06/28/2016 07:54 " 06/28/2016 08:54 " 06/28/2016 09:54 " 06/28/2016 10:54 " 06/28/2016 11:54 " 06/28/2016 12:54 " 06/28/2016 13:54 H 0,0001QCo 06/28/2016 14:54 " 0.0001QC° 06/28/2016 15:54 " 0.0001QCO 06/28/2016 16:54 " 0.08QC0 . 06/28/2016 17:54 " 0.03QC° 06/28/2016 18:54 " 0.0001QC° 06/28/2016 19:54 " 0.0001QC° 06/28/2016 20:54 " 0.0001QCa 06/28/2016 21:54 " 06/28/2016 22:54 " 06/28/2016 23:54 " 06/29/2016 00:54 " 0.02QC° 06/29/2016 01:54 " 0.0001QCO y yi\VarVa.i vuauu...r�.. ♦.aw•wa• yu uu.) a.aaYva. ,•�a�rr lr� aav wa a� wwau avaa awr ua 06/29/2016 02:54 H 06/29/2016 03:54 H 06/29/2016 04:54 " 06/29/2016 05:54 H 06/29/2016 06:54. H Sum 0.13 Average i/n,F aj_ 0 Mean (maxfmrn)/z 0 High s 0.1 . Lovir 0 Quality Control flags that may appear above QCTBD 0 Not yet quality checked QC0 10 QC Score indicates good data QC1 0 QC Score indicates likely good data QC2 0 QC Score indicates likely bad data QC3 0 QC Score Indicates bad data NC CRONOS Database version 2.7.2 Query script last modified Apr 07, 2014 13:01:47 Page expelled in 0.060 secs. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 6 3 16 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES NA LABORATORY NA Lab Cert. NA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec CC� ��aa _ �/ or ® Monthly' May (month) RECEI VE@ARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA JUN 3 0 Z016 ®Zero -flow ❑Water Supply ❑SA ❑Other -C CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches; Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks = => _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 No Flow n/a SDO-2 No Flow n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali. z For sampling periods with no discharge at any single outfali, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. . 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification.statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (iTO). I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print ti le (Signature) (Date) Note: Results must be reported in numerical format. Do not resort Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX ma/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period? Outfaq No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 1S mg/L 100 mg/L or SO mg/L* 6.0 — 9.0 SU 4 Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 10 u Note. if you report a sample value in excess of the benchmark, you must implement Ter 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one coon of this DMR. includina all "No Dischorae" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of 'No Discharge" reports) Division of Water Quality t a Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that thgre are sigpificA penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of (0 ( Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted S 11 16 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Nicholas Murphrey_ LABORATORY Pace Analytical Lab Cert. ## 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2016 SAMPLE PERIOD ❑ Jan June ❑ July -Dec or ® Monthly) April (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA flc ❑Water supply ❑sA RECEIVED Mother JUN a 8 Z010 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES DWR SECTION ❑ No discharge this period?' Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics$ Benchmarks => - - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 4/28/16 Est. 0.30 151 mg/L 7.8 0.138 mg/L 0.0109 mg/L 0.227 mg/L <5.0 mg/L N/A SDO-2 4/28/16 Est. 0.30 106 mg/L 6.6 0.0626 mg/L 0.0136 mg/L 0.116 mg/L <5.0 mg/L N/A ZMonthly sampling (instead of semi-annual) must begin with the secon&consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report withla(checkmark here. ;The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 5 See General Permit, Table 3 identifying the especially sensitive receiving/ water classifications where the more protective benchmark applies. Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to samptl6 for,inetal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.i2; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TrO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) ,q &� L� i CkSL I C� ��—r�� Title (Print t' to (Signatur (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, a<XX mpjC where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or rer 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?1 Dutfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 , Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks -- => _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • &BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART It SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge reportss within 30 days ofreceipt a the lab results (or at end of monitoring period in the case o "No Discharge reQortsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are *nifKant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permit Date: 11/1/2012-10/31/2017 S-NI-�o (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 ������� Date submitted 4 13 16 2�t6 CERTIFICATE OF COVERAGE NO. 30001 SAMPLE OLLE"12�0 AN 2 U FACILITY NAME Moen SAMPLE PERIOD '.July -Dec DN1R SECTION COUNTY Craven . or ® Monthly' fi11nk-liiTION PROCESS?�`at�) PERSON COLLECTING SAMPLES Nicholas Murphrev DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA LABORATORY Pace Analytical Lab Cert. # 12 Comments on sample ®Zero -flow ❑Water Supply [:]SA collection or analysis: []Other -C Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 N/A No flow N/A N/A N/A N/A N/A N/A N/A SDO-2 N/A No flow N/A N/A N/A N/A N/A N/A N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2For sampling periods with no discharge at any single'outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform 'metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirerYient to'sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) Title (Prir}rtitle) +Iq4V (Date) Note: Results must be reported in numerical format. Do not report BeloW Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the -format, "<Xx mz1V where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of the benchmark, you must implement'Trer 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar OSG/TPH by EPA 1664 (SGT HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 5o mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B . * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Pernfic-Datgi 1/1/2012-10/31/2017 7 SWU-245, last revised 10/25/2012 Page 2 of 3 Note. - If yQx;report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCE£DANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS_ SEE PERMIT PART 11 SECTION B_ • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an a ainal and one coov of this DMR. includina all "No Discharae" reoorts. within 30 days of receipt of the lab results for at end of monitorina oeriod in the case of "No Discharae' reoorts) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those person irectly respo sible fo athering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware jh#toere are signicant Ife alties for submitting false information, including the possibility of fines and imprisonment for knowing violations." _t (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 1W Semi-annual Sto_rmwater Discharge Monitoring Report ` for North Carolina Division of Water Quality General Permit No. NCG030000� Date submitted 3 3 16 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2016 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthlyl February (monfff}�" PERSON COLLECTING SAMPLES Nicholas W. Murphrev DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA LABORATORY Pace Analytical Lab Cert. # 12 Comments on sample RECEIVED ❑Zero -flow ❑Water Supply ❑SA collection or analysis: ®Other -C MAR 2 8 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION ❑ No discharge this period?z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH' Standard units copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks ===> - - 200 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 1S mg/L i mg/L SDO-1 No Flow n/a SD0-2 No Flow n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;.for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my Knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Na erint name) Title (Pr' t title) C [Si (Date) Note: Results must be reported in numerical format. Do not r"ort Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where,XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: !f you report a sample value in excess of the benchmark, you must implement Trer 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results_: only for facilities averaging > 55 gal.of new oil per month. El No discharge this period?z Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ==> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part 8 * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date-A/1/2012-10/31/2017 SWU-245, last revised-10/25/2012 Page 2 of 3 i Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one coov of this DMR. incdudina all 'No Dischame" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case of "No Discharge"' reports) to: Division of Water Quality Attn: DWQ Central Files , 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those perso s directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tat there are,,signjl icant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �1 (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report l'for North Carolina Division of Water Quality General Permit No. NCG030000 ate. Date submitted 12 30 15 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Nicholas W. Murphrey LABORATORY Pace Ana"cal Lab Cert. # 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2015 SAMPLE PERIOD ❑ Jan June ❑ July -Dec or ® Monthlyl December (month I tIGING TO CLASS ❑ORW ❑HQW [-]Trout�PNA RECE❑Zero-flow ❑Water Supply ❑SA JAN 2 0 Z016 ®Other -C CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period?z Outfall No. Date Sample 1 Collected (mo/dd/yr) 24hour rainfall amount, Inches3 Total -Suspended Solids H' 5tandardr = units . . eCapper f :Lead .° w a,Zinc;. Nan -Polar 0&G/Total Petroleum ;Hydrocarbons Total Toxic Organics; Benchmarks ==> _ - l00 mgJ! or 50'mg/L . 6:0;— 9 0 `. 0: 7 mgJL . 0.0 mg/L A067'mg/L. 15 mg/L i mg/L SDO-1 12/22/25 Est 0.20 894 mg/L 7.5 0.819 mg/L 0.05" mg/L 1.93 mg/L <5.0 mg/L n/a SDO-2 12/22/15 Est 0.20 83 mg/L 7.3 0.0414 mg/L 0.0055 mg/L 0.343 mg/L <5.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived_ The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) sc �Q<< Title (Print tile) N (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg L! where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of the benchmark you must implement rer.I, rer 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?-7 Date Sample 24-hour rainfall' OutfaEl No. Collectedi amount, Non -polar o&G/TPH by 3 Total Suspended solids pH (mo/dd/yr) Inches #rPA 1554 (5GT ITEM) . Benchmarks 15".mg/L" IDO mg/L or 50 mg/!6:0 - 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy ofthis DMlly induding all 'No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorina period In the case of'No Discharge" reportsl to: ,.-. _. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that therg4are sig*lcan4penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permit Date:11/1/2012-10/31/2017 )"S-[1V (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 12 11 15 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Nicholas W._Murphrey LABORATORY Pace Anal3dical Lab Cert. # 12 Comments oWse ei VEC) collection or analysis: G _ . DwsEcnoN rat FILZS R Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' November (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®Other -C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?z Outfall N°' Date Sample Collected' (mo/dd/yr) 24-four rainfall amount, Inches' Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks =__> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5DO-1 11/19/15 Est 0.35 38.4 mg/L 7.9 0.282 mg/L <0.0025 mg/L 0.0912 mg/L <5.0 mg/L n/a SDO-2 11/19/15 Est 0.35 6.6 mg/L 6.5 0.0228 mg/L 0.0149 mg/L 0.185 mg/L <S.0 mg/L n/a Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture - electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. Foi those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my, knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." At, EcLA-:jk_C Name (Print name) c V Title (Print ti e} (Signature (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, a<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. !f you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or rer 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (ma/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM} Total suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2of3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of DMR including all "No Discharge" resorts within 30 doys of receipt of the lab results Lor at end of monitorina period in the case of "No Dischome"reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tha}Rhere arq sig4ficant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date:11/1/2012-10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11 6 15 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES NA LABORATORY NA Lab Cert. NA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - Z62S SAMPLE PERIOD ❑ Jan June ❑ July -Dec r� or ® Monthly' October (montJh �7 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PN EZero-flow ❑Water Supply ❑S RECEIVED ❑Other-C NOV 12 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 VC CENTRAL FILES DWR SECTION No discharge this period?? Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar OAG/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks => _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 No Flow n/a SD0-2 No Flow n/a ' Monthly sampling (instead of semi-annual) must begin with the -second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be -waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certificatio n. statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) m tab SDe ct �4�-s's Title (Pri t title) (Si pat re) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, theV must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, rer 2, or Tier 3 responses See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall Na. Date Sample collected" (mo/dd/yr) 2"ourrainfall amount, 3 Inches Non -polar O&G/TPH by IPA 1664 (SGT-HEM) 'Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 5o mg/L' 6.0 — 9.0SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. 0 TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all No Discharge" re-Orts, within 30 days of receipt of the lob results jar at end of period in the case of No Dischme" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that Viere are signifigant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." i (gr (Date) ��!! iii Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ti Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 10 16 15 CERTIFICATE OF COVERAGE NO. NC6030061 SAMPLE COLLECTION YEAR - 2015 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthly' September (month PERSON COLLECTING SAMPLES Nicholas W. Murphrey � I DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout ❑PNA LABORATORY Pace_ Analytical Lab Cert. # 12 Comments on sam�``i v® ❑Zero -flow ❑Water Supply [:]SA collection or analysis: NOV 12 2015 ®Other -C CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?' OutFaIl No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 •Total 5uspended,Solids PH'. . Standard ' = units Copper • :._ Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =� _ _ ; 100, mg/L or 51) mg/L` 6 0 — 9.0 ` _0.007 ing/L 0.03 mg/L 0.067' mg/L 15 mg/L 1 mg/L SDO-1 9/25/15 Est OAS 38.S mg/L 7.7 0.144 mg/L <0.0025 mg/L 0.246 mg/L <5.0 mg/L n/a SDO-2 9/25115 Est 0.45 4.6 mg/L 6.2 0.0391 mg/L 0.0136 mg/L 0.107 mg/L <S.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40•CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469:31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 NY, Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring Inay b�t-waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." Name (Print name) bf iL_\t? K (Pr' t title} a zo- s ( ign re) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mKIC where XX is the numerical value of the detection limit, reporting limif, etc. in mg/L. Note. If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Ogtfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, a Inches Nort-polarO&G/TPH.by EPA 1664 (SGT-HEM) Total Suspended Solids pH. Benchmarks ==--> _ - 15 mg/L 100 mg/L or 50 mg/L" 6.0 - 9.0 SU. Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or rer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discha e" reits to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or thote persons directly, responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that thereXre significAr t pebalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 9 9 15 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2015 COD FACILITY NAME Moen ®fzf'+i���i ��UMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven RECEIVE V or ® Monthly' August (month) "a PERSON COLLECTING SAMPLES Nicholas W. Mur hr OCT 15 2015 DISCHARGING TO CLASS ❑ORW ❑HCtW []Trout ❑PNA w4 LABORATORY Pace Analytical Lab Cert. # 12 Comments on sampe❑Ze►o-flow ❑Water Supply ❑SA ENT�� FILES ®Other -C collection or analysis: DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3 ❑ No discharge this period?' Outfall No. Date Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, Inches? Total Suspended Solids PH, Standard units Copper - Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics s Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 8/25/15 Est 0.10 Not sampled Not Sampled Not Sampled Not Sampled Not Sampled Not Sampled Not Sampled_ S130-2 8/25/1S Est 0.10 238 mg/L 8.55 0.0417 mg/L 0.006 mg/L 0.162 mg/L <5.0 mg/L n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring r.• maybe waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Name (Print name) Title (Pri (5ignatu 9,22- ' 15 (Date) Note: Results must be reported in numerical format. Do not report Belo*petection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal. of new oil per month. ❑ No discharge this period?' outfall No. Date Sample Collected) Imo/dd/yr) 24-hour rainfall amount, Inches.' Non -polar OBEG/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks -- =s - - 15 mg/L 100 mgf L or SO mg/t" 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IZI IF YES, HAVE YOU CONTACTED THE D. Q REGIONAL OFFICE? YES I NO ❑ REGIONAL OFFICE CONTACT NAME:1)6-410 Mail an orirlinal and one copy of this DMR�includin all "'No DischaMe" resorts, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports! to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that 4mre are signific4nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -22-LI (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/2S/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report RMC ivr=o for North Carolina Division of Water Quality General Permit No. NCG030000 AUG 10 2015 Date submitted 7 13 15 CENTRAL FILES CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2015 DWR SECTION FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec :11110- COUNTY Craven or ® Monthly' July (month l a. PERSON COLLECTING SAMPLES Joseph C. Hollinger DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA C= LABORATORY Pace_ Analytical Lab Cert. # 12 Comments on sample ❑Zero -flaw ❑Water Supply ❑SA C.2 collection or analysis: ®Other -C Li.J PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 11�.. Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?z Outfall No. Date Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids PH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics s Benchmarks =_> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 7/13/15 0.7 42.5 mg/L 7.5 0.130 mg/L 0.0074 mg/L 0.635 mg/L <5.0 mg/L n/a SOO-2 7/13/15 0.7 19.0 mg/L 7.8 0.0205 mg/L <5.0 mg/L 0.028 mg/L <5.0 mg/L n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for. total toxic organics (TrO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) r Title i i9G_ft. i g_&ds (Date) Note: Results must be reported in numerical format. Do not repoK Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark you must implement rier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' . (mo/dd/yr) 24=hour rainfall amount, Inches3 Non -polar O&G/TPH.by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =_> _ - 15,;mg/L IM ff g/L or.50 mg/L` 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2of3 Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEE DANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn:'DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there arepignififjant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -I-S (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 w Semi-annual Stormwater Discharge Monitoring, Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 7 7 15 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2015 FACILITY NAME Moen SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Craven or ® Monthly' June (month) PERSON COLLECTING SAMPLES NA DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY NA Lab Cert. NA Comments on sample collection ECEI " ED ®Zero -flow ❑Water Supply [:]SA analysis: JUL 2 4 2015 ❑Other -C CENTRAL FILE$ PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SeCTION Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?' Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmorks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/1 0.067 mg/L 15 mg/L 1 mg/L SDO-1 No Flaw n/a S130-2 No Flow n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture . electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Fatalities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." "L V_ �) z Name (Print name) Title [lint Note: Results must be reported in numerical format. Do not report format. When results are below the applicable limits, they must be i limit, reporting limit, etc. in mg/L. l` 5 (Date) Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical d in the format, "<XX me/L", where XX is the numerical value of the detection Note: if you report a sample value in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring_ Results: only for facilities averaging > 55 gal of new all per month. ❑ No discharge this period? Outfal! No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPFI by EPA 1664 (SGT41EM) Total Suspended Solids pH Benchmarks ==> _ - 15 mg/L 100 mg/L or 50 mg/L' 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-1013112017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample valve in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: 0 A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART It SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on inol and one copy of this MR, including all "No Discharge" reports within 30 days of receipt of the lob results or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware Oat there arq significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." o" (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 :Z_ Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted WAS 1S CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES NA LABORATORY NA Lab Cert. NA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 201S SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly May Imonth) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA Zero -flow ❑Water Supply ❑SA ❑Other -C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' W" C=3 MIMIC Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, inches .3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks =_> _ - . 100 mg/L or 50 mg/L 6.0 — 9.6 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L l mg/L SDO-1 No Flow n/a SDO-2 No Flow n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform.metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). RFOR EED JUN 0 b 2015 Permit Date: 11/1/2012-10/31/2017 DWR SECTION SWU-245, last revised 10/25/2012 INFORMATION PROCESSING UNIT Page 1 of 3 r Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention} Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), l certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." �e 7�ZZ Name [Print name) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement tier 1, rer 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period 22 Qutfall No. , - _ Rate Sample -Collectedi - (mo/dd/yr) 24-hour rainfall amount;_ Inches 3 (ion-pplarO&G/TPH by EPA 1664:(SGT-HEM) = Total Suspended Solids pH Benchmarks -�> - _ . - 15 mg/L 100 mg/L or 50 mg/L* 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B s See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/25/2012 Page 2 of 3 Ndte: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AAND PART MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discharge" re orts to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsibfor gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that/there are �gnific } t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations-" (Signature of Permittee) jDatej Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 400 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 5 13 15 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Joseph C. Hollinger LABORATORY Pace Analytical Lab Cert. # 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' April (month) l��l VI�4RGING TO CLASS ❑ORW ❑HQW [:)Trout❑PNA 1 ❑zero -flow ❑Water supply ❑SA JUN 0 5 2015 ®Other -C DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 WORMATiON PROCESSING UNIT ❑ No discharge this period?z Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH' Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic s Organics Benchmarks ==a _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5DO-1 4/30/15 Est 0.25 Not sampled Not Sampled i Not Sampled Not Sampled Not Sampled Not Sampled Not Sampled SDO-2 4/30/15 Est 0.15 29 mg/L 7.14 0.0424 mg/L <0.0025 mg/L 0.259 mg/L <5.0 mg/L n/a ' Monthly sampling (instead of semi-annual) must,begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Fa.rilitie:;that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and'belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Nana (Print name) 5- (Date) Note: Results must be reported in numerical format. Do not report'R@jIw Detection Limit, BDL, <PQL, Non -detect, N D, or other similar non -numerical format. When results are below the applicable limits, they must be resorted in the format, "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Ter 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?? Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks = _ - 15 mg/L 100 mg/L or So mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit.text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 2 of 3 Note: it you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 fXCEE DANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this MR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorinaeerlod in the case of "No Discharge" reports) to: Division of Water Quality Attn_ DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware Q%at there_are flgnificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -u—�5 (Date) Permit Date:1111/2012-10/31/2017 SWU-245, last revised 10/2S/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2 10 15 CERTIFICATE OF COVERAGE NO. NCG030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES NA LABORATORY NA Lab Cert. NA Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results FIL't COP y SAMPLE COLLECTION YEAR - 2016 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® MonthW January (monthl DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ®Zero -flaw ❑Water supply ❑sA RECEIVED ❑Other-_C FE8.1 6 2g (6 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES DWR SECTION ❑ No discharge this period?' Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches; - Total Suspended Solids pN,µ Standard .. units Copper Lead Y,: Y -Zinc Non -Polar 08G/ Total Petroleum Hydrocarbons rocarbons Total Tojdc s Organics Benchmarks --> _ = 1..00 Mg/L or 50 mg/L z6.0 - 9.0 0'A07 mg/L 0:03 mg/L ` 0 067= mg/L ISM mg/L 1 mg/L SDO-1 No Flow n/a SDO-2 No Flow n/a f Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." Name (Print name) Title (Prin title) (Signs ure) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mpJL", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample valve in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. LJ No discharge this period?` Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifyingthe especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: !f you report a sample value in excess of the benchmark, you mast implement Tier 1, Tier 2, or rer 3 responses See General Permit text. FOR PARTAJ AIVD PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orfainal and one copv of this DMR, including all "Na Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" re its to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: • "I certify, under penalty of law, that this.docurnent and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that1here pre ggnificarit penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 C Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 12 30 14 CERTIFICATE OF COVERAGE NO. N00030061 FACILITY NAME Moen COUNTY Craven PERSON COLLECTING SAMPLES Michael Burns LABORATORY Pace Analytical Lab Cert. if 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - 2014 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ` []Zero -flow ❑Water supply ❑sA RECEIVE® ®Other-c ,BAN 2 $ 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES DWR SECTION ❑ No discharge this period?2 C7 .. 0 =44 Outfall No. Date Sample . Collected i (mo/dd/1►r) 24-houvrainfall •.amount, Inches; Total�Suspe.rided Sbtids pH, 5tandar units Coppery a Lead tnc s Non -Polar G&G/Total ' ,� = F Petroleum. Tt 61'Toxlc ' Organics s . BL*nL*marks => - - 100 mgJL or 50 mg/E. 6.0 — 9.0 0 00fmg/L 0A3 mg/L 0.067 mg,/E_ 15 mg/L 1 mg/L SDO-1 W16/14 0.29 inches Not sampled Not Sampled Not Sampled Not Sampled Not Sampled Not Sampled Not Sampled SDO-2. 12/16/14 0.29 inches 332 mg/L 6.53 0.162 mg/L 0.0299 mg/L 1.91 mg/L c5.0 mg/L n/a ' Monthly sampling (instead of semi-annual) must begin with'the second consecutive benchmark exceedance f6 the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from anon -'site rain gauge. unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving wafer cfassifi6aitions where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. Tor purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40.CFR 469.31). 1 - Permit Date: 11/1/2012-1D/31/2017 SWU-24S, last revised 10/2S/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (1TO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has oc6tred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan' included in the Stormwater Pollution Prevention Plan." Name (Print name) IIS -[S (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, NO, or other similar non -numerical format. When results are below the applicable limits, thM must be reported in the format, "<XX mg/L" where XX is the numerical value of the detection limit, reportinglimit, etc. in mg/,L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or her 3 responses. See General Permit text: Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month. ❑ No dischaj Outfail No. ate Sa� .: _j 24-haur rah fatl _ Collected' amount, No"obr•O&GMH by, Tatat'Stespended Solids (mo/dd/yr) Mdhes3 IEPA 1b64;(SGT-H1" aenchmarla JAIiII l 1M�mi±/1.YoIr 50 n iz/V this period' pH 6.0 - 9A Su Footnotes from Part A also apply to this Part B * See General Permit text, Table 5jdentifying the especially sensitive receiving water classifications where the more protective benchmark applies. IWO Permit Date: 11/1/2012-10/31/2ov SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchman% you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PARTA AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 0 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTIONS. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK E(CEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an orlainal and one coov of this DMR, indudina all Aft Discharge" reports, within 30 days of receipt of the lob results for at end of monitorina Period in the case of "No Dlscharige" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there pre sijj nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Date) ff Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/2S/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Re ort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 4 24 14 CERTIFICATE OF COVERAGE NO. NCG030061 SAMPLE COLLECTION YEAR - 2014 FACILITY NAME Moen SAMPLE PERIOD ® Jan -June ❑ July -Dec COUNTY Craven or ❑ Monthly' month PERSON COLLECTING SAMPLES Chris Hollinger DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical Lab Cert. # 12 Comments on sample � ���v�� ❑Zero -flow [:]Water Supply [:]SA collection or analysis: ®Other -C MAY052014 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWQIBOG ❑ No discharge this period?2 Outfall No. Date>5aritple` 1 Collected . (mo/dd/Yr)'. 24-hour rainfa[1 amount,. Inches ; - Total Suspended Solids PR' : Standard units Copper Lead ' Zinc Non -Polar O — Total Petroleum rocarbons Total Toxic s Organics . Benchmarks = > _ -' 100 rrlg/L.or W md1l 6A .- 9.0 0.007 mg/L :.' 0.03 Ing/L 0:067 mg/L 15 mg/L 11°hidl. S130-1 4/15/14 1.33 inches 131 mg/L 7.49 0.168 mg/L 0.0177 mg/L 0.144 mg/L [5.0 mg/L n/a SDO-2 4/15/14 1.33 inches 5.8 mg/L 6.53 0.0738 mg/L 0.0211 mg/L 0.128 mg/L <5.0 mg/L n/a 1 Monthly samoline (instead of semi-annual) must beein with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to'employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." �Ak� e- FO7klr Name (Print name) Title (Sign 5` 6- (Date) Note: Results must be reported in numerical format. Do not repor"elow Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format: When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Footnotes from Part A also apply to this Part B • See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: kf you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS_ SEE PERMIT PART II SECTION B. • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one ropy of this OMR, including all "No Dischar4etl ffAorts� within 30 days of receipt of the lob results for at end of monitoring period in the case of '"No Discharne® reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware th4 there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." W (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 aceAnalytrcal www,psoele6s.car+r April 23, 2014 Mr. Michael Burns Environmental Services 524 S. New Hope Rd Raleigh, NC 27610 RE: Project: MOEN SW Pace Project No.: 92197764 Dear Mr. Burns: Paco Analytical Services, Inc. 98001CInceyAve. Suite 100 Huntensvllle, NC 28070 (704)875-9092 Enclosed are the analytical results for sample(s) received by the laboratory on April 16, 2014. The results relate only to the samples included in this report. Results reported herein conform to the most current TNI standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. Analyses were performed at the Pace Analytical Services location indicated on the sample analyte page for analysis unless otherwise footnoted. If you have any questions concerning this report, please feel free to contact me. Sincerely, aroo, UNI , `f a`,ar,.i Angela Baioni angela. baioni@pacelabs.com Project Manager Enclosures cc: Christopher Hollinger, Environmental Services REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the written consent of Pace Analytical Services. Inc.. Page 1 of 13 acMnalytical e www.petalabaoom Paco Analytical Services, Inc. 9800 KinreyAve. Suite 100 Huntersville, NC 28078 (704)B75.9092 CERTIFICATIONS Project: MOEN SW Pace Project No.: 92197764 Charlotte Certification IDs 9800 Kincey Ave. Ste 100, Huntersville, NC 28078 Florida/NELAP Certification #: E87627 North Carolina Drinking Water Certification M 37706 Kentucky UST Certification #: 84 North Carolina Field Services Certification M 5342 West Virginia Certification #: 357 North Carolina Wastewater Certification M 12 VirginiwVELAP Certification M 460221 South Carolina Certification #: 99006001 Asheville Certification IDS 2225 Riverside Dr., Asheville, NC 28804 Florida/NELAP Certification #: E87648 Massachusetts Certification #: M-NC030 North Carolina Drinking Water Certification M 37712 North Carolina Wastewater Certification #: 40 South Carolina Certification #: 99030001 West Virginia Certification M 356 VirginiaNELAP Certification M 460222 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the written consent of Pace Analytical Services, Inc.. Page 2 of 13 aceAnalytical www.pacelabacom Paco Analytical Services, Inc. 980D Kincay Ave. Suite 100 Huntersvllle, NC 28078 (704)875-9092 SAMPLE SUMMARY Project: MOEN SW Pace Project No.: 92197764 Lab ID Sample ID Matrix Date Collected Date Received 92197754001 92197764002 SDO.2 SDO-1 Water Water 04/1511410:30 04/1511413:40 04/1611417:25 0411611417:25 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the written consent of Pace Analytical Services, Inc.. Page 3 of 13 aceAnalyticale www.pwalabs.com Pace Analytical Servlces, Inc. 9800 KlneeyAve. Suite 100 Huntersville, NC 28078 (704)875-9092 SAMPLE ANALYTE COUNT Project: MOEN SW Pace Project No.: 92197764 Analytes Lab ID Sample ID Method Analysts Reported Laboratory 92197764001 SDO-2 EPA 1664B CLW 1 PASI-C EPA 6010 JMW 3 PASI-A SM 25400 WRC 1 PASI-A 92197754002 SDOA EPA 1664E CLW 1 PASI-C EPA6010 JMW 3 PASI-A SM 25400 WRC 1 PASI-A REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Page 4 of 13 aceAnalytical' www.pBodab&COM Pace Analytical Services, Inc. 9800 Kincey Ava. Suite 100 Huntersville, NC 28078 (704)875-9092 ANALYTICAL RESULTS Project: MOEN SW Pace Project No.: 92197764 Sample: SDO-2 Lab ID: 92197704001 Collected: 04/15/14 10:30 Received: 04/16/14 17:26 Matrix: Water Report Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual 1694 SGT-HEM, TPH Analytical Method: EPA 1664B Total Petroleum Hydrocarbons ND mg/L 5.0 &0 1 04/17/14 12:57 6010 MET ICP Analytical Method: EPA 6010 Preparation Method: EPA 3010 Copper 73.8 uglL 5.0 2.0 1 04/17/14 16:20 04/18/14 18:54 7440-50-8 Lead 21.1 ug/L 5.0 4.0 1 0411711416:20 04118/1418:54 7439-92-1 Zinc 128 ug/L 10.0 5.0 1 04/17/14 16:20 04/18/14 18:54 7440-66-6 26400 Total Suspended Solids Analytical Method: SM 25400 Total Suspended Solids 5.8 mg/L 2.6 2.6 1 04/22/14 20:55 Date: 04/23/2014 02:17 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the written consent of Pace Analytical Services, Inc - Page 5 of 19 Pace Analytical Services, Inc. aceAnalytical a 9800 KlnceyAve. Suite 100 Huntersvltle, NC 28078 WWW.PW&Ms.com (704)875-9092 ANALYTICAL RESULTS Project: MOEN SW Pace Project No.: 92197764 Sample: $00-1 Parameters Lab ID: 92197754002 Collected: Report Results Units Limit 04/15/14 13:40 MDL DF Received: 04/16/14 17:25 Matrix: Water Prepared Analyzed CAS No. Qual 1084 SGT-HEM, TPH Analytical Method: EPA 1664B Total Petroleum Hydrocarbons ND mg/L 5,0 5.0 1 04117/14 12:57 6010 MET ICP Analytical Method: EPA 6010 Preparation Method: EPA 3010 Copper 168 ug/L 5.0 2.0 1 04/17/14 16:20 04/18/14 18:57 7440-50-8 Lead 17.7 ug/L 5.0 4.0 1 04/17/14 16:20 04/18/14 18:57 7439-92-1 Zinc 144 ug/L 10.0 5.0 1 04/17/14 16:20 04/18/14 18:57 7440-06-6 2640D Total Suspended Solids Analytical Method: SM 2540D Total Suspended Solids 131 mg/L 10.0 10.0 1 04/22114 20:56 I REPORT OF LABORATORY ANALYSIS ihls report shall not be reproduced, except in full, Date: 04/23/2014 02:17 PM without the written consent of Pace Analytical Services, Inc- Page 6 of 13 aceAnalytical ` www,pecdabs.com Pace Analytical Services, Inc. 9800 Kincey Ave. Suite100 Huntereville, NC 28078 (704)87&9092 QUALITY CONTROL DATA Project: MOEN SW Pace Project No.: 92197764 QC Batch: GCSV117283 Analysis Method: EPA 1664B , OC Batch Method: EPA 1664B Analysis Description: 1664 SGT HEM, TPH Associated Lab Samples: 92197764001, 92197764002 METHOD BLANK: 1180277 Matrix: Water Associated Lab Samples: 92197764001, 92197764002 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Total Petroleum Hydrocarbons mglL ND 5.0 04/17/14 12:52 LABORATORY CONTROL SAMPLE: 1180278 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec 'Limits Qualifiers Total Petroleum Hydrocarbons mglL 20 17.1 86 64-132 MATRIX SPIKE SAMPLE: 1180279 92197738002 Spike MS MS % Rec Parameter Units Result Conc. Result % Rec Limits Qualifiers Total Petroleum Hydrocarbons mglL ND 20 16.4 82 64-132 Date: 04/23/2014 02:17 PM REPORT OF LABORATORY ANALYSIS Thle report shall not be reproduced, except In full, without the written consent of Pace Analytical Services, Inc - Page 7 of 13 aceAnalytical *".pscelal)4wm pace Analytical Services, Inc. 9800 Klncey Ave, Suite 100 Huntersvllle, NC 28078 (704)875-9092 QUALITY CONTROL DATA Project: MOEN SW Pace Project No.: 92197764 QC Balch: MPRP115727 Analysis Method: EPA 6010 QC Balch Method: EPA 3010 Analysis Description: 6010 MET Associated Lab Samples: 92197764001, 92197764002 METHOD BLANK: 1180431 Matrix: Water Associated Lab Samples: 92197764001, 92197764002 Blank Reporting Parameter Unite Result Limit Analyzed Qualifiers Copper ug/L ND 5.0 0411811417:33 Lead ug/L ND 5.0 04118/1417:33 Zinc ug1L ND 10.0 04/18/1417:33 LABORATORY CONTROL SAMPLE: 1180432 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Capper ug/L 500 463 93 80-120 Lead uglL 500 451 90 80-120 Zinc ug1L 500 434 87 80-120 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 1180433 1180434 MS MSD 92197397011 Spike Spike MS MSD MS MSD % Rec Max Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD RPD Qual Copper uglL ND 500 500 466 463 93 93 75-125 1 20 Lead uglL ND 500 500 446 443 89 89 75-125 1 20 Zinc ug/L 194 500 500 622 612 86 84 75-125 2 20 Dale: 04/23/2014 02:17 PM REPORT OF LABORATORY ANALYSIS This report shell not be reproduced, except In full, without the written consent of Pace Analytical Services, Inc.. Page 8 of 13 aceAnalyticale wuwpecalabe.ow Pace Analytical Services, Inc. 9800 KlnceyAve. Suite 100 Huntereville, NC 28078 (704)875.9092 QUALITY CONTROL DATA Project: MOEN SW Pace Project No.: 92197764 QC Batch: WET/30655 Analysis Method: SM 2540D QC Batch Method: SM 2540D Analysis Description: 2540D Total Suspended Solids Associated Lab Samples: 92197764001, 92197764002 METHOD BLANK: 1183321 Matrix: Water Associated Lab Samples: 92197764001, 92197764002 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Total Suspended Solids mg/L NO 2.5 04/22114 20:44 LABORATORY CONTROL SAMPLE: 1183322 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Total Suspended Solids mg1L 250 252 101 80-120 SAMPLE DUPLICATE: 1183323 92197561001 Dup Max Parameter Units Result Result RPD RPD Qualifiers Total Suspended Solids mg/L ND ND 10 SAMPLE DUPLICATE: 1183324 92197643001 Dup Max Parameter Units Result Result RPD RPD Qualifiers Total Suspended Solids mg1L 10.0 12.6 23 10 D6 r REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, Date: 04/23/2014 02:17 PM without the written consent of Pace Analytical Services, Inc.. Page 9 of 13' aceAnalytical e wrrw.pecebb&COM Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Huntersvllie, NC 28078 (704)875-9092 QUALIFIERS Project: MOEN SW Pace Project No.: 92197764 DEFINITIONS OF - Dilution Factor, if reported, represents the factor applied to the reported data due to changes in sample preparation, dilution of the sample aliquot, or moisture content. NO - Not Detected at or above adjusted reporting limit. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL -Adjusted Method Detection Limit. PRL - Pace Reporting Limit. RL - Reporting Limit. S - Surrogate 1,2-Diphenylhydrazine (8270 listed analyte) decomposes toAzobenzene. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Rotative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates the compound was analyzed for, but not detected. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylemine using Method 8270. The result reported for each anslyte is a combined concentration. Acid preservation may not be appropriate for 2-Chloroathylvinyl ether, Styrene, and Vinyl chloride. Pace Analytical is TN accredited. Contact your Pace PM for the current list of accredited analytes. TN -The NELAC Institute. LABORATORIES PASI-A Pace Analytical Services - Asheville PASI-C Pace Analytical Services - Charlotte ANALYTE QUALIFIERS DS The relative percent difference (RPD) between the sample and sample duplicate exceeded laboratory control limits. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, Date: 04/23/2014 02:17 PM without the written consent of Pace Analytical Services, Inc.. Page 10 of 13 aceARalyticale WWW.p90*fab&oDM Pace Analytical Services, Inc. 9800KInceyAva. Suite 100 Huntereville, NC 28078 (704)875-9092 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: MOEN SW Pace Project No.: 92197764 Analytical Lob ID Sample ID QC Batch Method QC Batch Analytical Method Batch 92197764001 SDO.2 EPA 1664B GCSW17283 92197764002 SDO-1 EPA 1664E GCSW17283 92197764001 SDO-2 EPA3010 MPRP115727 EPA6010 ICP/14243 92197764002 800.1 EPA 3010 MPRP/15727 EPA S010 ICP114243 92197764001 SDO-2 SM 2540D WET130655 92197784002 800-1 SM 2540D WET130655 Date: 04/23/2014 02:17 PM REPORT OF LABORATORY ANALYSIS This report shell not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Page 11 of 13 uocurnent rvame: uocumam moviotru: nlirn vi. cQAmloical" Sample Condition Upon Racal ! (SCUR) Page 1 of 2 Document Number: Issuing Authority: F-CHR-CS-003-rev:14 Pace hluntersville Quality Office Client Name: ` Courier. ❑ Fed Ex ❑ UPS[:] USPS❑ Cllent❑ merclal� Pace Other Custody Seal on Cooler/Box Present: (t] yes--�C no Seals intact: ❑ yes ❑ no Packing Material: ❑ Bubble Wrap4�� s ❑ None Other Thermometer Used: IR Gun T1102 Type of Ice: Wei Blue None isamples on ice, cooling process has begun Temp Correction Factor T1102: No Correction T1301: No Correction I. Corrected Cooler Temp. 'C Temp should be above freezing to WC Biological Tissue Is Frozen: Yea No NIA Date and Initials of person examining g contents: C..+iJJ �If tElf�t Comments: Chain of CustodyPresent: Y s ❑No ❑NIA 1. Chain of Custody Filled Out: s4es ❑No ❑NIA 2. Chain of Custody Relinquished: bPY s ❑No ❑NIA 3. Sampler Name & Si nature on COC: Yes ❑No ❑NIA 4, Samples Arrived within Hold Time: es ❑ No DIVA 5, Short Hold Time Analysis 4-72hr : ❑Yea qo ❑NIA 8, Rush Turn Around Time Requested: ❑ es No ❑NIA 7. Sufficient Volume: lZY88 ❑No ❑NIA 8. �"�� P '��`� o•. C°�' Correct'Contalners'Usod: — -Pace Containers Used: -_[1Nd'-❑Wq Xs❑No ❑NIA Containers Intact: des ❑No ❑ WA 10, Filtered volume received for Dissolved teats ❑ ea ❑No NIA 11. Sample Labels match COC: -includes dateltime/ID/Anal sis Matrix: jyyes ❑No ❑NIA 12. All containers needing preservation have been checked. All containers needing preservation are found to be In compliance with EPA recommendstlon. exceptions: VOA, -coliform, TOC, O&G, WI-DRO water) s ❑No Ys ❑No Yes ❑No ❑NIA ❑NIA 13, Samples checked for dechlorination: Dyes ❑No I 14. Heads ace In VOA Vials ?Bmm : Dyes ❑No A 15. Trip Blank Present: Trip Blank Custody Seals Present Pace Trip Blank Lot # If purchased): ❑Yes ❑NoIN . ❑Yes ❑No/A IA 18. Client Notification/ Resolution: Field Data Required? Y 1 N Person Contacted: Datw Time: Comments/ Resolution: SCURF Review: Date: l ' L_ SRF Review: Darer Note: Whenever there I discrepancy affecting North Carolina compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office ( Le out of hold, incorrect preservative, out of temp, Incorrect containers) 11WOg92197764 AIM •, Page 12 of 13 CHAIN -OF -CUSTODY 1 Analytical Request Document M �ace ^^ r . The Chain ;f-- dy is !ECA! DOCUMENT- M relevant fields must be completed acaemb*. 0 Arralyti 1 r O" OTHER • 7 • product P SAMPLE I .•Air ARi Ds MUST •. • • • ® 1. ©r =r Mm . . ■o■■■■■■■■ 9011000r■■r■■■ r1la� E� v. i�C��� i ' » ■ ■!■■■/■■ FIRNIVit■■!■■■r lip imam ' I r • Sri 2 H rall v —0:1Z f, .43'tafn Hare: ay vgrwV ea ram you are arneMV aeoes HET 3p aay paymmra lams ana agreeing to laffi afafge of j.S% pw , M to my Aci not pW wahm 30 Cays.0 F-AIL-"20rev.07. 15-May-2007 Date: 4115114 Analyst: Joseph C. I1o11inaer _NCG030061 _ Reference Method: Certification # Facility Name: Moen, Inc. Permit #: pH Analysis (include edition e.a.. SM IWki Cal. Time Calibration Buffer 4.0 Calibration Huffer 10.0 *Check Buffer 7.0 Comments 10:00 4.0 10.0 TO *pll buffer checks are to be within t 0.1 pH units of The standards true value 4 buffer Lotfllidentifier: 1 7 buffer Lot#!identifier: 10 buffer LGO/identifier: Facility/Sample location Time Snm 1 TimeArtatyzeds pH Result ► Buffer Check value Comment Moen lncJSDO.1 13:40 7.49 7.0 Moen Inc1SDO-2 10:30 6.53 7.0 ♦ If sample Is measured in directly In the stream only time analyzed would be recorded. ► Indicates a recomWndEd drift check. (Use Buller 7.0) Should be within * 0.1 units of the buffer's true value) Calibration drift check is recommended when performing analysis at multiple sampling locations, *All pH results in pH units (i.e., s.u.). Annual Temperature Sensor Check Date: Total Residual Chlorine (TRC) Reference Method: (include edition) Facility/Sample Location Time Sampled Time Analyzed TRC Result u L or rn Daily check standard obtained value u L or m L Comment TRC check standard obtained true value (acceptance range mg/L) (Should recover within *10% of the check standard's obtained true value) Check/Gel Standard Lotillldenllffer: Annual Verification curve analyzed on Conductivity Reference Method: Ilnclude edition) Cal. Time Calibration Std Verification Std Optional Sid ►Check std Continents 1lndicates a recommended drin check.. Note all units are in pmhos/cm Calibration Standard Lotlllidentifier; Verification Standard Lotfilidentitier: Facility Temperature°C Cell Constant Result mhoslcm Adjusted mhoslcm• Comment • Enter NA (not applicable) irautomalic lemperalurecompensalion and cell constant are used. ATC annual check date: Dissolved Oxygen (DO) Reference Method: (include edition) Temperature °C Adjusted Air Calibration♦ %orm Calibration Time Facility/Sample Location DO reading mglL *Time Analyzed/Time Sampled Comments ♦ Based on appropriate altitude adjustment ♦ When performing analysis at multiple sampling locations, re -calibrations) should be performed every four hours. *Analysis time and sampling time the same. (Ideally the sample should be analyzed in -situ). Temperature Sensor Annual Check Date: Temperature Reference Method: (include edition) Facility/Sample Location Tem nature°C *Time Ana]yzedll'ime Sampled Comments 'Analysis time and sampling time the same. {Ideally the sample should be analyzed in -situ). Annual Verification date Settleable Solids Reference Method: finclude edition) Facility/location Time Sam 1cd Analysis Time Sample volume anal zed in mis Start time 45 minute stir time F.nd time Result mill. Comments Note: Samples must be gently agitated after 45 minutes and allowed to settle for an additional 15 min. Field Personnel Notes 04/04/2011