Loading...
HomeMy WebLinkAboutNCG100030_MONITORING INFO_20170110STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. NuGlotoo 30 DOC TYPE ❑ HISTORICAL FILE $, MONITORING REPORTS DOC DATE ❑ o9 0.17 C,) / I__ YYYYM MDD CERTIFICATE OF COVERAGE NO. NCGl00030 FACILITY NAME MatlocWs Used Cars PERSON COLLECTING SAMPLE(S) It STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Rowan PHONE NO. 704 ) 704-278-2258 CERTIFIED LABORATORY(S) Lab #-� �+ I RECEt Lab # UED PLEASE REMEMBER TO SIGN ON THE REVERSE Part A: Stormwater Benchmarks and Monitoring Results JAN 10 Z011 CENTRAL FILES For sampling periods with no discharge, you must submit thif)WOZ eTi poring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. r0utfall`I`; ' i Date: ; ,'00400 00530 --'- 77023`; _': • 01051 78141 No p } Sample C611ected r Total :' �, p H ",Total Sus ended P ,: Non- olar p - Eth lene GI col Y Lead Total" i Tot al Toxic .,' mo/dd/year Rainfall;..' . Standard Solids (TSS), ;' a;0&G/TPH .. mg 'H ,ti' " Recoveralsle, y`':'Organics3,• a. 0.,i i inches Units mg/L (Method 1664 r 'ttg/L mg/l. :;. SGT-HEM), mg/L i f. i F y} r. ';; _ 6: --9i01 h Yr 2 400/50 15 .S,cool,"', �. Benchmark";.r : , .rF r►;` ;' _ , � (Tiers�24fic131 4.03 ,t�i 1.0' Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. ISee If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SW U-251, last revised October 25, 2012 Page 1 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." VL N I Q }k-,LA N7D�� Name (Print name) Title (Print title) Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sigpificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee (Date) Form SWU-251, lost revised October 25, 2012 Page 2 of 2 CERTIFICATE OF COVERAGE NO. NCG100030 FACILITY NAME Matlock's Used Cars and PERSON COLLECTING SAMPLE(S) CERTIFIED LABORATORY(S) Part A: Stormwater Benchmarks and Monitoring Results STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT b# Lab # SAMPLES COLLECTED DURING CALENDAR YEAR: 100� (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Rowan PHONENO.( 704 ) 704-278-2258 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. ' Outfall "' .` i, ---- .Ot0 S1"Date -141' No !i ' Sample Cllected, Total ;pli, Total Suspertided Non -polar Ethylerie Giycdl, Lead, Total ,.Total Toxic,:: ! mo/dd/year Rainfall, Standard , Solids (TSS), O&G/TPH mg/L Recoveragle, Or anics3,. g lj' ilt ` ,;u''` „ inches . Units mg/L (Method 1664 mg/L mg/L 1 { z I, SGT-HEM), mg/L �;�.. r ' 1 f:� �, l:'_ si ,l ; ! jl (�i }FI 11j ;I 1.-. I . I I i�.�3..' :.. . !�-. Y� 'z... •1 Jw - 8.000' I. �i��• 6 0.- 9 0 iQ0/50 a 15 �� 2,and 3 ;1:Benchmark, . : (Tiers, ( ) 4 aft Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 1See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter,40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, lost revised October25, 2012 Page 1 of 2 ex, w : STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) ?L/-W7- Title (Print title) Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that tAre are signific4pt pena(tles for submitting false information, including the possibility of fines and imprisonment for knowing violations." ittee or r A -JP (Date) Form SWU-251, lost revised October25, 2012 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT CERTIFICATE OF COVERAGE NO. NCGI00030 SAMPLES COLLECTED DURING CALENDAR YEAR: —ZO (Th(s monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Matlocles Used Cars and Parts COUNTY Rowan PERSON COLLECTING SAMPLE(S) _ t= M rEf-C I ED PHONE NO. 704 ) 70�4-278-2258 CERTIFIED LABORATORY(S) Lab # t> V G Part A: Stormwater Benchmarks and Monitoring Results Lab # JUL 27 1U11 PLEASE REMEMBER TO SIGN ON THE REVERSE --> CENTRAL FILES DlA'R SECTION For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. Oiitfall Date i i�pq.,, Sample Collected,:: mo/dd/year, :F; . ; ,; Total .' .', : "Rainfall,- Inches 00400 ' 60530 - - - - 77023 ' s;; OS051 , ; 78141 pH, Standard Units :Total Suspended Solids (TSS), mg/L i Non -polar O&G/TPH (Method 1664 SET -HEM), mg/L Ethylene Glycol, M9 #.�`� r, -; Lead`,Total Recoverable;'!'-,..,,Organics3, It , ,. =Total Tbxjc ,. f !, Benchmark' 4 i.�.: - 6 0=.9.01 :. 100/502: r 15.(Tiers a: 8,000 = 2 and 3} 0:03, ;�,,,. u 101 f }:. .0 O Z. 2, i'c D D �005 A Note: if you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 2 or Tier 2 responses in the General Permit. 1See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-2S1, lost revised October 25, 2012 Page 1 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) 7&5h7 Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware th 4tihere are significant penalt#s for submitting false information, including the possibility of fines and imprisonment for knowing violations." 71n;--11 7 (Date) Form SW U-251, last revised October 25, 2012 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT CERTIFICATE OF COVERAGE NO:_�-NCG100030 FACILITY NAME PERSON COLLECTING SAMPLE(S) JLEV llq 1�t�I T - CERTIFIED LABORATORY(S) STATMJ I L.L. lab f#_ 14 L 1 C Lr Lab ## SAMPLES COLLECTED DURING CALENDAR YEAR: GV (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Rowan I PHONE N0. 70a) 704,2 8-2258 RECEIPEAPREMEMBER tOvAIGQ4NTHE REVERSE 4 Part A: Stormwater Benchmarks and Monitoring Results CENTRALFIIILES For sampling periods with no discharge, you must submit this discharge rr#�li7iA�JbP'mnoting "No Flow" or "No Disch rge' ,ifl�n 30 days of the end of that period to comply with permit reporting requirements. Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 1See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range Is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, lost revised October25, 2012 Page 1 of 2 STORMWATER DISCHARGE OUTFAI.L (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." It 1 r�l N[]_�2 Name (Print name) Title (Print title) Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant y*naltles for submitting false information, including the possibility of fines and imprisonment for knowing violations." or (Date) Form SWU-251, lost revised Qctober25, 2012 Page 2 of 2 CERTIFICATE OF COVERAGE NO. NCG100030 FACILITY NAME Matlock's Use PERSON COLLECTING SAMPLE(S) CERTIFIED LABORATORY(S) -4 and P Part A: Stormwater Benchmarks and Monitoring Results STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: Zo�lo (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Rowan PHONE NO. ( 704 ) 704-278-2258 b i# Lab i# PLEASE REMEMBER TO SIGN ON THE REVERSE For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. „ t 1 i>Outfallllrl J ii,f it 1 1 i11,'. f4,.Date. , il,,!s rl , {;I 7,•a fitir it l"Isi !,I I iN: _tl, 11 1 i,Ill Oa400 �I ., li !._ .., ,I s, 0053{i.,tfl fl _Y'A' �".i-: -.j i7r 4. • .' i'i., � - :;; It 1 {Si 5'... -.it }lYl 1 7702E 1� k .. ,�.,. ., , ES_,tilt �t.l,,,l 01051•II r1,, ..I ,.. i. "iE�V,EI` 1 9 7$i'41is t.,tE h t i >t:;16�lII ,d 1'y 'j l �' ' ir. 1 ; No. ,.; I .�� - ii =, ! � , . '1 .,. • t 4„ .i FF 1, I! 'd'•'r ;EIl51 oll"cted t• 5ample'C a ,: [5r " -.":. I,1 qa;-�tl i,'t , .... 9a�iiE ,t4• .. ,....:>< -+ Wiry' f. ,i!' Ir ITotaII,,. I,- L 1 I , i..it!. . ' a;"=- i:. 17l�' i 1 :I I. i it i � pH, f yy !, 1'•. L -€E3 CRi,vS,. lil.. ,3'. a'J ., Total Sus ended �� , _.. P I¢p, .1_. .., .. 'fy� :Non--olat P p3- :`• t :'a.- .a ,m -Eth iene.Gl =co is Y... Y .1, ,Ir ,A -.I'.;. i. �t I 1.,'. 'I ".._ - { i1 , 4rY a-` E Lead, Total; F E.r'' It i „Tot* I xk;,4. �-. ii r:lx 1 }- f� 1 f , al 1 �1 ii.,: i ,i3i§t, I�I: I., H: i .. Iti i r' ,EE.,} N, .:°'I� ino/dd/years ! li l i }I,ti Rainfall,�t [1,_ I d �� ; Standar : ,1 - Solids. TSS r,. { ( ), ., -;: .,s O&G/TPM ,1 . ... 1�., mg/L ,... Recoverable;'' i• ,.YE z I #! I 's i Or 4 €a ► s I IIL i' f.r11 J IE,. f{~ t Ejj€ E Indies:.,,,,,tUnits j,� 1 = ;t y j � f i'.. i t L g/. r;., .(Method 1664: t.i La '•t' anics y E ` It vti. a . SGT-HEM) rng/L ,is;:E= - f 1 - '.,I I t ...t: .[•. ,g�I,: _ ,�,1. € tli �?€ II �'4 ,�I. ,. �-,. {i,ll 1 € {-- r5; ..1, I� ;9;t� ;-111 l i . i;��� t _t_ ..I•E¢i341 ,.E.,. r l 'N7tt.x:r1;'t+ii`{IN; 1 i..:! ll�,.,r 1''. 1 1 E Li', !. 4 iEst.I. III 1.1. E € } i rl ,: S :li�i •1 _I ,II it 31, .f .t:• '§.:'—' " i t `:}• II,- 2' ... ; `:i' ..i ! , .�,_...-i,. ;a,000� ,t ,.t'E i •� 1 I,cll .,N;'..,yy nlal,a Ik`f Y�iil. 3v[i^Jx E I �(Tiers',2.and�3j i ;! „il, E.. :!1 '.T .L .E,�ilosslfoh.1'L, -' 1. -t, r .. 1,�l3enchmark iz_. ��� � i- 6 0 d �.,., 100/50 3 ..15 ,d I f } F i uil• „II y Il,.i� ,� , ,, :Lrg iallL ISO3 Z G5, L o1b Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 1See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, lost revised October25, 2012 Page 1 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) L,461 ( jM Title (Print title) Signature Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Date "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant p9nalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." or xq:�-?,� (Date) Form SWU-251, last revised October25, 2012 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT CERTIFICATE OF COVERAGE NO. NCG100030 FACILITY NAME Matlock's Used Cars and Parts PERSON COLLECTING SAMPLE(S) I CERTIFIED LABORATORY(S) Lab #I Lab # Part A: Stormwater Benchmarks and Monitoring Results SAMPLES COLLECTED DURING CALENDAR YEAR: ZO1S (This monitoring report shall;be received by the Division no later than 30 days from the date the facility;,receives the sampling results from the laboratory.) Rowan PHONE NO.( 704 ) 704-278-2258 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. ;ii. �•s:�e i l;Outfalil ,q ° i� M. No a ? i.� �If�ll']a ! �f} >, ...i... j1 :l „`, 14 r; •I cDate,:; M .< [. -. d 'SampleCollected; l '4 . �"' �. 'mo dd ear ;,, ' tl I,.. l y •., a � ,r' 4€ , �_F,.. i i!� i i 4tsI�n �I 1 u,i �T L�{"� '�9t1` d! •1;.'�ttt $t1 sy'}� ,STutal �I(,, ?III 8A}.,:Y� !! 4 , 9 Rainfap=,'t$Etl9uSolids , , . �t . ,,:pinches... �lA,;.,,[:a,��, a a S "H 1 l a ..el'i+ T� dM I z 1lli ,;C Q0400 s °�. i5� Il 3i,iP`. R,1 a 00530 .. i.' - - ; ,J7023, t.-:, : � 01U51i j :<il i `,7814i , {}i:iG•c m ,,�,pH;, y;l ,t 4, ,.Llnits � id,,� ,,, �,i=s 1' 4 a: ' 1'.. 4;;TotalSuspertdedf; Y TSS " ( ):' „; m L . �,�- , g/ !� .�� ,! € 1 n°, } ;,, 1�SGT 1' Non -polar 1 O&G PH ,. IT ( Method HEM) — mglL r t j EtiiyleiieGlycol, i ° :.1. x_ m L gl . 'I Lead, Total e" �verablet} R cm -i.:.i'. ..'I Total Toxic .AOrganics , s, �' h„ `;. �i,,,1g.ctdd1,1 }a.i�, p ak r h�.. .IWll a. } ..• n+,-ri II ,.Ylit}'i S ` _>' ,:..; ,£i J ,-!t :.al5�}x�, 6 ,€. -�iS - 1,t3, ,.S- i. �i ,. •li R. €iSi. E Zi1i0.,£ �. .i{. 5 ,QL'Q (Tiers 2and 3), i .. , 7 1!.a0€ ;enchm 1� Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 1See if pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, last revised October 25, 2012 Page 1 of 2 19 44 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT f , - Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee or Designee) (Date) Form SWU-251, last revised October25, 2012 Page 2 of 2 CERTIFICATE OF COVERAGE NO. NCG100030 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: Z01' (This monitoring report shall be received by the Division no later than 30 day from the date the facility receives the sampling results from the 1abotptory.) FACILITY NAME Matlock's Used Cars and Parts COUNTY Rowan PERSON COLLECTING SAMPLE(S) Le�-J l —1 PHONE NO.( 704 ) 704-278-2: CERTIFIED LABORATORY(S) Lab# RECEIVED Lab # I FEB 0 2 2016 PLEASE REMEMBER TO SIGN ON C] Part A. Stormwater Benchmarks and Monitoring Results CENTRAL FILES DWR SECTIan.: For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. & Outfall z l,r� t n 5 .: -;4 141•.•�' S ut } ,.•:{,�Is4i1f" " „�i3`I '. . i4 i'tl „ �,1.! ��'., , Dates , ;", t, i ,n al e�:.,.�1 a'Sam le Collected,; �t'p�, 1 Amb .ddj. earl.,1,A� / /Y . t ii. r i 1Jj', l' i'''.s 14 ]'.� YSII��.,. , ,.1 1, ` ..� .a.. ��+�., is i,, t, „tit, +Y:" 1 Total 1` ,i;�;.uRainfall, �`: k ti. nchestr j,�= s- �Y� 1 ill -. r'�t ,. N.. il, .th •�! QQ400 „� 0053Q e77023 O1Q5� 7i3141 ,_ H, p .! _; Standard 14 �� units ,, t b. total Sus ended P .r Solids TSS ( 1 mg/L ,.' Non- olar.. P i'.O&G TPH / [Method.1664 SGT=HEM), mg/L Eth Iene G1 ccl Y Y . r 4a gl ! 1 ,`Lead,`Totah;' n 4 c, Reco erablp;' , 1!1 S < .•i�i Si ";',7otalToxic,l.l'' w It;• '.,. s11 ,;3,s�;. ` �= Or" a`nlcs ,s iztl.i 1 -i l fY �gsllly:,.� , iw ,�, ",�,, .., T'I„ I h le C<i :. .:x+nVl .A,%91..91',.. ' �1 ,;,• � , E !.' i Nh.. �n4.. ,3t5q ,,1- xt�l�lS..a3l! 3u fl.,•..lr� .r'...I �. „ , gn ; , ,1! ��, , , ,, , ns�l.r � t i .,i lt�'� �`e ,'4 1 r 10 � �� ,, .�� , �, : ��: i� i• ilk.iy., .4:.. 6 Q ,;:.9,0 , , .�^^�� ], I..1_ _ iQ0�50 � ! 15 , _�; a naa .,,'. , �.,'� I. (Tiers.2 and:3]� � , ,,, - t e5 �91 - �0:03„, ;.; -i,� � Iw 1 li.,• p l i , .L 1^� ,��1;1 .0 Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, lost revised October 25, 2012 Page 1 of 2 o .� _�. e �~ � � .:! r ._ A "M. ,r .�'. STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." LL EV 1 th-4 Name (Print name) Title (Print title) 12121')1,15- Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee or Designee) (Date) Form SWU-251, last revised October25, 2012 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT CERTIFICATE OF COVERAGE NO. NCG100030 SAMPLES COLLECTED DURING CALENDAR YEAR:1_S (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Matloi.A% Used Cars and Parts • ... COUNTY Rowan - PERSON COLLECTING SAMPLE(S) RECEIVED NO. ( 704 ) 704-278-2258 CERTIFIED LABORATORY(S) Lab # Lab # 'AUG 3 Z�15 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES DWR SECTION For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. Outfall• No. pate Sample Collected, ' mo/dd/year Total Rainfall, inches 00400 '.. -. 00530 ---- 77023.. . 01051 78141 pH;- "Standard Units Total Suspended Sallds (TSS), mg/L• Non -polar O&G/TPH (Method 1664 SGT-HEM), mg/L' Ethylene Glycol, mg/L Lead, Total Recoverable; mg/L _Total Toxic ' Organics3;', R. mg/L Benchmark - - 6.0," 9.01 100/502 15 ' .. ;., 8,000 (Tiers Wand 3) 0.03 ' 1.0 Ilip'49 #9 %W ftow� 1% 1 W W Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. ;See If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were belcw the benchmark pH range of 6-9. 2See General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form SWU-251, last revised October25, 2012 Page 1 of 2 +A� i� „� '�� ..ILA .�.�....,z: �cs3.V' � sei,� p� � •+fie ; i :a.�siC 71 ( .fir '� ....... � +«�.i%'� Rwa';Y'' �5 f�+ti•... .Q��p u � �.. �{7 �` 'v STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) P1.y4q I muftl Title (Print title) ;71ZOIL 5- Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ittee 7 (Date) Form SWU-251, last revised October 25, 2012 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT CERTIFICATE OF COVERAGE NO. NCG100030 SAMPLES COLLECTED DURING CALENDAR YEAR: 2h1� (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Matlock's Used Cars and Parts t' COUNTY Rowan PERSON COLLECTING SAMPLE(S) PHONE NO. 704 ) 704-278-2258 CERTIFIED LABORATORY(S) Lab # Lab #. Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON THE REVERSE 4 For sampling periods with no discharge, you must submit this discharge monitoring form noting "No Flow" or "No Discharge" within 30 days of the end of that period to comply with permit reporting requirements. Outfall No. Date Sample Collected, ma/dd/,year Total • Rainfall, Inches' 00460• • 00530 77023 - 01051 `f . 'W �78141 pH, ' Standard Units Total Suspended Solids (TSS), mg/L Non -polar O&G/TPH (Method 1664 SGT-HEM), mg/L Ethylene Glycol, mg/L Lead, Total" "Recoverable,,• mg/L ; " - Total Toxic 1. " 3 Organics• ; mg/L { Benchmark :. .; _ • 6.0 - 9.01 100 50� � 15 0 (Te $ 2 a nd 3) . 0.03. -1A• Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 15ee If pH values outside this range are recorded in sampled Stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9. 25ee General Permit text to identify whether the more protective benchmark applies for especially sensitive receiving waters. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. Form 5WU-251, last revised October 25, 2012 Page 1 of 2 6. j YAJ el tZI. - -f &t� , ir KA -.46 i 1i CNN 1, -a4 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ll i� '� 1 G� Name (Print name) Title (Print title) Signature Date Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." rmittee or (Date) Form SWU-251, last revised October 25, 2012 Page 2 of 2 RECEIVED .Tames DIVISION OF WATER QUALITY Environmental MAR 0 7 2013 Management, Inc.�� MOORE v,LLE REGIONAL OFFIr March 6, 2013 ATTN: Mrs. Marcia Allocco North Carolina Department of Environmental and Natural Resources Division of Water Quality Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 RE: Notice of Deficiency Compliance Evaluation Inspection Matlock's Used Cars and Parts/Cool Springs Road Stormwater Permit No. NCG100030 Rowan County, NC Tracking # NOD-2013-PC-0081 Dear Mrs. Allocco: James Environmental Management, Inc. (JEM) on behalf of Matlock's Used Cars and Parts has prepared the following response to the Notice of Deficiency issued by the North Carolina Department of Environmental and Natural Resources, Division of Water Quality following the Compliance Evaluation Inspection NOV-2013-PC-0081 of Stormwater Permit No. NCG 100030. Stormwater Pollution Prevention Plan (SPPP) Comment: SPPP does not include a list of significant spills occurring during the past 3 years. Response: No significant spills have occurred within the past 3 years and no spill information was recorded in the SPPP. In the future, if/when no significant spills occur, the facility will keep its SPPP current by entering `no spill ' documentation at least annually. Comment: Annual facility stormwater inspections are performed by a contracted consulting firm (who also developed the SPPP); however, the Permit requires twice per year inspections. Response: As noted, annual stormwater inspections are conducted by JEM. Facility personnel perform visual site inspections frequently. Future 600 Round Rock West Drive, Suite 201 9 Round Rock, Texas 78681 • (512) 244-3631 o Fax. (512) 244-0853 J James Environmental Management, Inc. observations will be documented in the SPPP in such a manner that the site is being formally inspected semi-annually. Comment: The permittee must ensure the following is documented and maintained on -site: annual SPPP review/update and annual re- evaluation of all stormwater outfalls for the presence of non- stormwater discharges. Response: During annual inspections performed by JEM, the SPPP is reviewed and updated as necessary. This includes updating appropriate areas of the SPPP as well as the addition of an Annual Site Inspection Report in the Annual Compliance Evaluation section of the SPPP. Additionally, during the inspection, each outfall is investigated and evaluated for any potential issues or changes. If any issues or changes are discovered, the SPPP is modified accordingly. In the future, however, JEM will include in the Annual Site Inspection Report a statement re -certifying that, if applicable, each outfall lacks any new non-stormwater discharges. Comment: The permittee must ensure the following is documented and maintained on -site: all analytical monitoring data/DMRs for the past five years. Response: As noted, the facility was unable to collect samples during representative storm events in 2012. "No Flow " monitoring reports have been prepared and are being submitted to the Division of Water Quality. This information will be properly documented in the SPPP. Qualitative Monitoring Comment: No qualitative monitoring was performed in 2012. The facility staff were not able to perform these measurements during a representative storm event. The facility staff must ensure that this information/monitoring status is documented in the SPPP for each applicable outfall and six-month monitoring period. Response: The facility staff was unable to perform qualitative monitoring and no Stormwater Discharge Outfall Qualitative Monitoring Report (SDO) forms were completed. Additional training will be implemented 600 Round Rock West Drive, Suite 201 • Round Rock, Texas 78681 • (512) 244-3631 • Fax: (512) 244-0853 James Environmental Management, Inc. emphasizing SDO importance and proper methods to document that no qualifying rain event occurred. Analytical Monitoring Comment: No analytical sampling events were performed in 2012. The facility staff were not able to collect samples during representative storm events. No monitoring reports with "No Flow" were submitted to the Division within thirty -days following each six- month monitoring period as required by the Permit. The facility staff must ensure that this information/monitoring status (including monitoring reports) is documented in the SPPP for each applicable outfall and six-month monitoring period. Response: As noted, the facility was unable to collect samples during representative storm events. "No Flow" monitoring reports have been prepared and are being submitted to the Division of Water Quality. This information will be properly documented in the SPPP. Please feel free to call if you have any questions or require more information. Sincerely, Beth Kelker 600 Round Rock West Drive, Suite 201 • Round Rock, Texas 78681 • (512) 244-3631 • Fax: (512) 244-0853 L NCDE�IR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. John E. Skvada, III Govemor Director Secretary February 14, 2013 Mr. Jeff Matlock, Owner Matlock's Used Cars & Parts, Inc. 15055 Cool Springs Road Cleveland, North Carolina 27013 Subject: Notice of Deficiency Compliance Evaluation Inspection Matlock's Used Cars & Parts/Cool Springs Road Stormwater Permit No. NCGIO0030 Rowan County Tracking #: NOD-2013-PC-0081 Dear Mr. Matlock: Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on January 30, 2013. Please inform the staff responsible for the implementation of the Permit of our findings by forwarding a copy of the enclosed report. This report is being issued as a Notice of Deficiency (NOD) due to the deficiencies noted in the Stormwater Pollution Prevention Plan and Analytical Monitoring Sections of the attached report. Please note that the requirements for monitoring stormwater are now based on a "measureable storm event" and not "a tenth of an inch" as required in the previous permit. This modification will allow your staff more flexibility in collecting stormwater samples as required by the Permit. It is requested that a written response be submitted to this Office by March 7, 2013, addressing the above -noted deficiencies in the attached report. In responding, please address your comments to the attention of Mrs. Marcia Allocco. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Mr. Wes Bell at (704) 235-2192, or at wes.bell@ncdenr.gov. Sincerely, Michael L. Parker Regional Supervisor Surface Water Protection Section Enclosure: Inspection Report cc: Rowan County Health Department WB Mooresville Regional Duce One - Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 r Phone: (704) 663-1699 4 Fax: (704) 663-60401 Customer Servioe: 1-877-623-6748 NorthCarolina Internet www.ncwaterqual4.org Naturally An Equal Opportunity % Affirm five Action Empbyer - 30% Recyded110% Post Consumer paper :1 Compliance Inspection Report Permit: NCG100030 Effective: 11/01/12 Expiration: 10/31/17 Owner: Mattocks Used Cars & Parts Inc SOC: Effective: Expiration: Facility: Mattocks Used Cars & Parts Inc County: Rowan 16055 Cool Springs Rd Region: Mooresville Cleveland NC 27013 Contact Person: Jeffrey D Mattock Title: Owner Phone: 704-278-1616 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(sy, On -site representative Kevin Hunter Phone: 704-278-2258 On -site representative Joey hood Phone: 704-278-2258 Related Permits: Inspection Date: 01/30/2013 Entry Time12.45 PM Exit Time: 02:20 PM Primary Inspector: Wesley N Bell Phone: 704-663-1699 Secondary Inspector(s):- Ext.2192 Reason for Inspection. Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge COC Facility Status: ❑ Compliant ■ Not Compliant Question Areas: N Storm Water (See attachment summary) Page: 1 Permit: NCGI O0030 Owner - Facility: Mattocks Used Cars & Parts Inc Inspection Date: 01/30/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 -raj---- — ----�- Permit: NCGI00030 Owner - Facility: Matlocks Used Cars & Parts Inc Inspection Date: 01/30/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ 0 Q # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ Q O 0 # Does the Plan include a list of significant spills occurring during the past 3 years? Q ■ # Has the facility evaluated feasible alternatives to current practices? ■ 0 ❑ Q # Does the facility provide all necessary secondary containment? n n ■ o # Does the Plan include a BMP summary? ■ ❑ n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ Q # Does the facility provide and document Employee Training? ■ Q ❑ n # Does the Plan include a list of Responsible Party(s)? ■ n ❑ • 0 # Is the Plan reviewed and updated annually? ■ ❑ Q Q # Does the Plan include a Stormwater Facility Inspection Program? 0 ■ n n Has the Stormwater Pollution Prevention Plan been implemented? ■ n ❑ Comment: The Stormwater Pollution Prevention Plan (SPPP) was organized and well maintained. Annual facility stormwater inspections are perform by a contracted consulting firm (who also developed the SPPP); however, the Permit requires twice per year inspections. In addition, the permittee must ensure the following is documented and maintained on -site: annual SPPP reviewlupdate, annual re-evaluation of all stormwater outfalls for the presence of non-stormwater discharges, a three year history of significant spills or a notation that no spills occurred, and all analytical monitoring data/DMRs for the past five years. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n o ❑ ■ Comment: No qualitative monitoring was performed in 2012. The facility staff were not able to perform these measurements during a representative storm event. The facility staff must ensure that this information/monitoring status is documented in the SPPP for each applicable outfall and six-month monitoring period. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n f_i n ■ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ■ Page_ 3 Permit: NCG100030 Owner - Facility: Mattocks Used Cars & Parts Inc Inspection Date: 01/30/2013 Inspection Type: compliance Evaluation Reason for Visit: Routine Comment: No analytical sampling events were performed in 2012. The facility staff were not able to collect samples during representative storm events. No monitoring reports with "No Flow" were submitted to the Division within thiry-days following each six-month monitoring period as required by the Permit. The facility staff must ensure that this information/monitoring status (including monitoring reports) is documented in the SPPP for each app!icable natfall and six-month monitoring period. Permit and Outfafls # is a copy of the Permit and the Ccrlificate of Coverage available at the site? # Were all outfalls observed during the inspection? # if the facility has representative outfall status, Is it property documented by the Division Al Has the facility evaluated All illicit (non stormwater) discharges? Comment: The facility has designated two stormwater outfalls. The facility staff should continue to implement the appropriate best managment practices (bank stabilization, ground cover, detention basins, etc.) to reduce/miniize soil erosion and potentially elevated total suspended solids levels during rainfall events. FCC Environmental has been contracted (as -needed basis) to remove used motor oil and antifreeze for proper disposal. Used motor oil is also reused in a heating system and any recovered gas is reused in the on -site equipment. Yes No NA NE Page: 4