HomeMy WebLinkAboutNCG100025_MONITORING INFO_20130411STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/v C(O�'�a CD
DOC TYPE
❑HISTORICAL FILE
X MONITORING REPORTS
DOC DATE
O Q)o (3 9 I
YYYYMMDD
FiLE
NCDENR
North Carolina Department of Environment and Natural. Resources
Division of Water Quality
Pat McCrory - Charles Wakild, RE.
John E. Skvarla, ill
Govemor Director
Secretary
April 11, 2013
Mr. Charles Dixon
Strawberry Motor Co., Inc.
Post.Office.Box 834. - -
Dallas, North Carolina 28034
Subject: " Notice of Violation
Compliance Evaluation Inspection
Strawberry Motor Co., Inc.
Stormwater Permit No. NCG 100025
Gaston County
Tracking 4: NOV-2013-PC-0119
Dear Mr. Dixon:
Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the
subject facility on April 2, 2013 by Mr. Wes Bell of this Office.
This report is being issued as a Notice of Violation (NOV) due to the facility's failures to implement the
Stormwater Pollution Prevention Plan and perform the required qualitative and analytical monitoring, all violations
of the subject NPDES Stormwater Permit and North Carolina General Statute (G.S_) 143-215.1, as detailed in the
Stormwater Pollution Prevention Plan/Summary, Qualitative Monitoring, and Analytical Monitoring
Sections of the attached report. Pursuant to G.S. 143-215.6A, a civil penalty of not more than twenty-five thousand
dollars ($25,000.00) per violation, per day, may be assessed against any person who violates or fails to act in
accordance with the terms, conditions, or requirements of any permit issued pursuant to G.S. 143-2IS. 1.
It is requested that a written response be submitted to this Office by May 2, 2013, addressing the above -
noted violations in the attached report. In responding, please address your comments to the attention of Mrs.
Marcia Allocco_ The report should be self-explanatory; however, should you have any questions concerning this
report, please do not hesitate to contact Mr. Wes Bell at (704) 235-2192, or at wes.bell@ncdenr.gov.
Sincerely,
--CVY- Michael L. Parker
Regional Supervisor
Surface Water Protection Section
Enclosure:
Inspection Report
cc: Gaston County Health Department
WB
Mooresville Regional Office
One
Location: 610 East Center Ave.. Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 NorthCarolina
Intemet www,ncwaterquai4.org NQturall /
An Equal opportunity t Afrm4ve Action Employer — 30% Recycled110% Post Consumes paper fff��� �J
Compliance Inspection Report
Permit: NCG100025 Effective: 11/01/12 Expiration: 10/31/17 Owner: Strawberry Motor Co Inc
SOC: Effective: Expiration: Facility: Strawberry Motor Co Incorporated
PO Box 834
County: Gaston
Region: Mooresville
Contact Person: Charles A Dixon
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
On -site representative
Related Permits:
Dallas NC 28034
Title: Phone: 704-922-5791
Certification: Phone:
Charles A Dixon Phone: 704-922-5791
Inspection Date: 04/02/2013 EntryTime: 11:10 AM Exit Time: 12A0 PM
Primary Inspector: Wesley N Bell q� L %, �! Phone: 704 663-1699
l t Secondary InspectorExt.2192s}: _
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge COG
Facility Status: ❑ Compliant ■ Not Compfiant
Question Areas:
■ Storm Water
(See attachment summary)
Page: 1
Permit: NCG100025 Owner - Facility: Strawberry Motor Co Inc
Inspection Date: 0410212013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
STORMWATER POLLUTION PREVENTION PLAN (SPPP) cont'd:
Evidence of significant erosion was observed in the drainage area and stormwater outfall during the inspection. The
facility staff should incorporate the appropriate erosion control measures to prevent/minimize the runoff of sediments from
entering the stormwater discharges and receiving stream. These control measures should also be documented in the
SPPP as Best Management Practices (BMPs).
Several small oil stains °mere observed on the ground. The facility staff must ensure that all affected areas are properly
cleaned up and disposed as part of the SPPP's Spill Response Procedures. Please note that the failure to clean up oil
discharges can subject the responsible party to potential civil penalties. in addition, spill pruveritiurt and response should
also be addressed during the annual employee training event
Page: 2
Ir
Permit: NCG100025 Owner - Facility: Strawberry Motor Co Inc
Inspection Date: 04/02/2013 Inspection Type: Compliance Evaluation
Reason for Visit: Rome
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
■ ❑ Q
# Does the Plan include a General Location (USGS) map?
■ C! 11 0
# Does the Plan include a "Narrative Description of Practices"?
■ Q 13 0
# Does the Plan -include a detailed site map including outfall locations and drainage areas?
■ .n 0 0
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ■ Q 0
# Has the facility evaluated feasible alternatives to current practices?
❑ ■ ❑ Q
# Does the facility provide all necessary secondary containment?
n n ■ n
# Does the Plan include a BMP summary?
■ n Q n
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
Q ■ El D
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■ ❑ n
# Does the facility provide and document Employee Training?
Cl ■ n n
# Does the Plan include a list of Responsible Party(s)?
❑ ■ O n
# Is the Plan reviewed and updated annually?
❑ ■ 0 111
# Does the Plan include a Stormwater Facility Inspection Program?
n ■ n n
Has the Stormwater Pollution Prevention Plan been implemented?
0 ■ 0
Commeht: The facility had contracted a company to develop a Stormwater Pollution
Prevention Plan (SPPP) several years ago; however, the SPPP did not include all of the
requirements noted in the Permit. In addition, the SPPP had not been implemented to
include employee training (once per year), three year history of significant spills or a
notation that no spills occurred (if applicable), overall SPPP review and update (once
per year), facility stormwater inspections (twice per year),qualitativelvisual monitoring .
(twice per year), analytical monitoring (twice per year), and re-evaluations of each
stormwater outfall for the presence of non-stormwater discharges (once per year). See
"Summary" Section for additional comments.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ rl 0
Comment: No qualitative monitoring has been performed. Information has been
emailed to the on -site representative regarding qualitative monitoring forms and
supporting, guidance document
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ■ n n
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ■ ❑ ri
Page: 3
Permit: NCG100025 Owner - Facility: strawberry Motor Co Inc
Inspection Date: 04/02/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: No analytical monitoring has been performed. Information has been
emailed to the on -site representative regarding listing of NC certified commercial labs,
phi meter/analyses, and analytical monitoring forms.
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
At Wvte; all nutfalls nbsenmd during the inspection?
tt It the iacii4 i,es a eprosentative outfali status: is it property documented by the Division?
# Has tho facility evaluated all illicit (non stormwater) discharges?
Comment: The facility's stromwater ruttoff is discharged into an Unnarned tributary to
South Fork Catawba River.
Yes No NA NE
Page: 4