Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG080922_MONITORING INFO_20190507
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /V O�+ DOC TYPE ❑ HISTORICAL FILE � MONITORING REPORTS DOC DATE p dF/i 1 050� YYYYMMDD Semi-annual Stormwater Discharize Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted _5/7/19 CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. — Charlotte Intermodal COUNTY _Mecklenbuur RECEIVED PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 MAY 13 2019 Comments on sample collection or analysis: CENTRAL FILES Dwft kcTIC)p Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2019 SAMPLE PERIOD X Jan -June July -Dec or ❑ Monthly'. tmonth) DISCHARGING TO CLASS ❑ORW ❑HT1W ❑Trout ❑PNA ❑Zero -flaw ❑Water Supply ❑SA X Other: C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Outfall : , No. Date Sample Collected, rno/dd/yr 00530.- .00400 00556 Total Suspended Solids, mg/L pH,' Standard'units Non -Polar Oil and Grease/TPH EPA Method 16" (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 —.9.0 15 _ - 001 03/15/19 7 6.15 <5.9 150 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SG'T-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit. - 15 50 or 100 see permit 6.0 — 9.0 001 103/15/19 1 <5.9 7 6.15 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Pagel of 2 �. � � I r ' r� J � , � • � w � � � �� + � ] 1 V � F 5 � f . _ � .` _ "' ' S ! I � .,. � ' ._ � e ' I J. V. STORM EVENT CHARACTERISTICS: Date: 03/15/19 (first event sampled) Total Event Precipitation (inches): 0.2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one wptr of this DMR, including all 'No DischarQe'reQy_rtsR within 30 dM o f receipt of the lob results for of end of monitoring period 1n the case of'No Discharae'repoM) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signiygant pgRX9es fossubmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature (Date} Additional copies of this form may be downloaded at: http://Dortal.ncdenr.oryZwebLwq/ws/su/npdessw#tab-4 SWU-250 Iast revised October 25, 2012 Page 2 of 2 � t 'r I r .. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 11/5/18 CERTIFICATE OF COVERAGE No.: N00080922 FACILITY NAME: Norfolk Southern Railway Co. - Charlotte Intermodal COUNTY Mecklenbure PERSON COLLECTING SAMPLES J. Thurman Horne, P. E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements S3XW@@3LLECTION YEAR: 2018 REC I %r &- SAMPLE PERIOD Jan -June X July -Dec NOV 0 9 2019 or E] Monthly' (month) DISCHARGING TO CLASS [-]ORW DHQW OTrout [:]PNA CENTRAL t-lLtO L]zero-flow [:]water supply [-]SA DWR SECTION X Other:C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 0 No discharge this period' OutFall Date- 7 -0-M -0 fio/dd/frTa i- W5� H, _r in 1*7 rira-rd�iht ori-_k _P Nfo N67eA 6 0. 7Wtfil0 002 10/10/18 16 6.48 11 150 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X-yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals !" St No 1671 . -IM.S on- a Suspd,d., Solids, 664,11GTo" t N nn S Wlaw -,-7 7-Ft - APF-T,- r7m ii permit 001 10/10/18 21 16 6.48 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date: 10/20/19 (first event sampled) Total Event Precipitation (inches): 0.2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or rer 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all '"No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTER: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pengies for submitting false information, including the possibility of fines and imprisonment for knowing violations." /I Z /Of (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http:llportal.ncdenr,orgLweb/wq/ws/sulnpdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 r 1 Discharge Monitoring Report Checklist (Updated 8/14 CE IV D JUN 11201b CEN-1-RAL FILE; 1) Location/Facility: Charlotte, NC — Charlotte Intermodal Permit No. �(9' 2) ' Monthly ❑ ;Quarterly ❑ ;Semi-annual ■ ;Annual ❑ : Check all that apply 3) DMR limits: Provided on DMR Form ■ ;incl. below ❑ ;or attached ❑ ` 4) Are all items in compliance with the permit? Yes ■ No * �c �M I*A-rl"' ty�ccd ►� 5) If the answer to Item 4 is No, or if any parameter is nearly the limit, complete page 2 of this checklist in its entirety, identifying root cause and your corrective action. Any exception should be discussed in a cover letter, or on the DMR form. 6) When is this DMR due to the agency? 6/8/2018 7) If the checklist/ DMR is being submitted less than 3 business days from the date due, specify reason(s) 8) If any parties require copies other than the addressee, file and copy lists on your letter (facility personnel, etc.), please give specifics below under "Distribution List" or attached separately. Distribution list is attached separate I reviewed the attached DMR and I certify it to be accurate and complete. I. 46C." 5/25/2018 Engird n tions Date 2. Mana er. Envir. Operations Date Distribution List (Including Name, Title, and Complete Address): Operating Subsidiary: Norfolk Southern Railway Company Distribution List (Including Name, Title, and Complete Address): External Distribution: Mail the original DM and one copy to' Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Internal Distribution: Send backup documentation internally only. Vacant — Division Manager I (Intermodal Manager) Adam Motsinger —Regional Env, Ops. (Adam.Motsinger(a�nscorp.com) Leonard Stogner— Environmental Contractor (stogner3Ca.vnet.net) Notes We experienced an exceedance of a permit benchmark level during this monitoring period. The result of the analysis for Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), (17 mg/l) was slightly above the permit allowable threshold benchmark level (15 mg/l.) Norfolk Southern has followed the required procedure and completed a Tier I site inspection and that inspection was completed within the required two week time limit. From the inspection it appears that a significant rain fall event overwhelmed the oil water separator at this facility allowing bypass condition. This facility in its history has never experienced an exceedance of any constituents. Operating Subsidiary; Norfolk Southern Railway Company Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted _5/25/18 CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. -Charlotte Intermodal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2018 SAMPLE PERIOD X Jan -June July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑zero -flow ❑Water Supply ❑SA X Other: C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Outfail No: Date = : Sample Collected, _in' d/yr 00530 - _... `.._ �00400 '. . _ . = ': _.._Y 08556 L i i-_— F -` Total Suspended - ; Solids;_mg/L - � pH, rStandard:.unrfs�_ � Non Polar Oil and Grease/TPH PA r� tiMethod 1664.(SGT-HEMj mg/L__ New Motor Oil:Us g _ ., Annual'average;gal/.ma_: :Benchmark _.' = _ SO or.:300,seepermtf w-ow- FWrth�O.60 _z 15 - x� 001 04/15/18 34 6.45 17 150 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B. Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals OUtfaI No --Sam Date le Collected, mo/dd/Yr _r ._ 00sst 00530� '. :, 00400i ._ = - Non=Polar O�i and Grease TPHIPA�Method ... r '( GT FI / g/L� = .. °�- 1664 5_ _ EM)m _. i Total Suspended. Splids��t mom. -� _ �/L _=5 4, pH - = Y t nciard units.._ Permit bm�t , - 001 04/15/18 17 34 6.45 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 5WU-250 last revised October 25, 2012 Page l of 2 STORM EVENT CHARACTERISTICS: Date: 04/15/18 (first event sampled) Total Event Precipitation (inches): 1.2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Moil an original and one copy of DMR, including all "No Discharge" resorts, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there a cant {Sena or submitting false information, including the possibility of fines and imprisonm nt for knowing violations." (Signat of Penmittee) (Date) Additional copies of this form may be downloaded at:.http://portal.ncdenr-.orL,/web/wq/ws/su/nl)dessw#tab-4 5WU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitories Report for North Carolina Division of Water Qua ity general Permit No. NCG080000 Date submitted 3 111 CERTIFICATE OF COVERAGE NO.: NCG680922 FACILITY NAME: Norfolk Southern Railway Co. — Charlotte Intermodal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysiR CErVE®s: .ern V Q 9 2017 CENTRAL FILES Part A: Vehicle Maintenance Areas Monitoring Requiremer'MWR SECTION SAMPLE COLLECTION YEAR: 20117 SAMPLE PERIOD Jan -June X July -Dec or ❑ Monthly( (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA X Other: C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Out�#atl� a . N7n Date, Sample Collected mo/dd/yr , . �530 004Q0 00556 -.Total�Suspended Y Sofids;mg/L _ =' pt`I, Standardunits . L Non -Polar Oif and Grease/TPH EPA Method 1664;(SGtHEMj, mg/.L New Motor Oit Usage, Annual average gal/mo eeiicFiinark __ _ _, 50 or 100 seepermit Wrthira,6�s 0 .0 15 _ 001 1 08/31/17 9.9 6.62 <6.2 150 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall No: :. Da'teti" Sample Collected, , -mo F00556 00530 _ 00 --- Non -Polar Or) and:Grease/TPH EPA Method ,1664 (SGT'HEM)mg/,L Total Suspended;Solids, mg/1L p ; _ - Standard units I,ermiV mit 5076r1_OO,see;permit 6_ IBM 001 08/31/17 <6.2 9.9 6.62 i For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date: 08/31/17 (first event sampled) Total Event Precipitation (inches): 0.3 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of,this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results for at end a monitoring period in the case o "No Discha e" rearts to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penal ' fors mitting false information, including the possibility of fines and imprisonment for knowing violations." !!/3(r;L- (Signature of Permittee) (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 e Discharge Monitoring Report Checklist (Updated 8/14/12) 1) Location/Facility. Charlotte, NC -- Charlotte„Intermodal Permit No. NCG080922 2) Monthly [];Quarterly ❑ ;Semi-annual ■ ;Annual ❑ : Check all that apply 3) DMR limits: Provided on DMR Form ■ ;incl. below ❑ ;or attached ❑ 4) Are all items in compliance with the permit? Yes ■ No ❑ 5) If the answer to Item 4 is No, or if any parameter is nearly the limit, complete page 2 of this checklist in its entirety, identifying root cause and your corrective action. Any exception should be discussed in a cover letter, or on the DMR form. 6) When is this DMR due to the agency? 11/12/2017 7) If the checklist/ DMR is being submitted less than 3 business days from the date due, specify reason(s) 8) If any parties require copies other than the addressee, file and copy lists on your letter (facility personnel, etc.), please give specifics below under "Distribution List" or attached separately. Distribution list is attached separately. I reviewed the attached DMR and I certify it to be accurate and complete. 1. 11/3/2017 Engineer E O erations Date 2. It Manafer Envir. 6perations Date Distribution List (Including Name, Title, and Complete Address): Operating Subsidiary. Norfolk Southern Railway Company Distribution List (Including Name. Title, and Comnlete Address): External Distribution: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Internal Distribution: Send backup documentation internally only. Tom Jacoby — Division Manager I (Tom.Jacobv@nscorp.com) Adam Motsinger — Regional Env. Ops. (Adam. Motsin-ger(ftscorp.com] Leonard Stogner — Environmental Contractor (stogner3(&vnet.net) Notes None. Operating Subsidiary: Norfolk Southern Railway Company I' Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-0998 June 6, 2017 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Norfolk Southern Railway Company Charlotte Intermodal Charlotte, Mecklenburg County, North Carolina COC No: NCGO80922 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations S(yan.Naranio@nscorp.com Enclosed is the original and one copy of the 2017 first semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact David Patten at 404-985-2820 or by email at David. Patten(Mnscora.com. Respectfully Sub . ted, ?BryaInara njo System Manager Environmental Operations Attachments RECEIVED JUN 12 2017 CENTRAL FILES DWR SECTION Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qlity/General Permit No. NCG080000 u Date submitted � f l ;X CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. - Charlotte Intermodal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLE PERIOD X Jan -June July -Dec or ❑ Monthly( (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []Zero -flow [-]water Supply ❑SA X Other: C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Outfall No. Date Sample Collected,&otjalW§u`spen�,ed 0053D D0400 00556 lids, mg/L10 pH, Standard units Non-Paa'rr Dil and G7 rea e/TPH EPANew Met_hnd 1664 (SGT HEM), mg/L MotorOilmo/dil'. Annual average gal/mo (BenchmatRZ - 50 or 1001see permit Within 6.Q r., 15 001 05/01/17 9.3 6,24 <6.2 .150 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor.oil per month? —yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall No. Date Sample W1lected, moJ,dd/,yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664�(SGT HEMj, mg/L Tata! Suspended Solids, rng/L pH, tandard units Pernti '—w,t - 15 50�or 1001see permit fi.0,�9A 001 05/01/17 1 <6.2 9.3. 6.24 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page i of 2 STORM EVENT CHARACTERISTICS: Date: 05/01/17 (first event sampled) Total Event Precipitation (inches): 0.7 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: ♦ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end o f monitoring period in. the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sigg firant p,9naT.6bs footubmitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee) 4 (Date) Additional copies of this form may be downloaded at:.http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 S W U-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. —Charlotte Intermodal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE PERIOD Jan -June X July -Dec or ❑ Monthly' (month' DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply USA X Other. C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil arrd Grease/TPH EPA Method1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9:0 15 / 5_0 001 09/29/15 20 6.25 < 6.0 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals yes _no Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664-(SGt-HEM), mg/L TotalSuspended Solids, mg/L pH, Standard units. Permit Limit - 15 -50. or 1©10 see permit &0 — 9.0 001 09/29/15 < 6.0 20 6.25 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page I of 2 STORM EVENT CHARACTERISTICS: Date: 09/29/15 (first event sampled) Total Event Precipitation (inches): 0.3 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B_ • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 3�of receipt of the lab results for at end of f monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations_" ////-7 1S (D e) Additional copies of this form may be downloaded at: http:l/portal.ncdenr.org/web/wq/ws/suLnpdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report` for North Carolina Division of Water Qualit General Permit No NCGnQnnnn % Date submitted Y CERTIFICATE OF COVERAGE NO.: NCGO80922 SAMPLE COLLECTION YEAR: 2015 00 FACILITY NAME: Norfolk Southern Railway Co. —Charlotte Intermodal COUNTY Mecklenbure PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. #559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE PERIOD X Jan June July -Dec 040v- or ❑ monthly'- __ Imonth) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RECEIVED ❑Zero -flow [—]water Supply ❑SA X Other; C JU�,202015 CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION No discharge this period' Outfall No. Date Sample Collected, m_ o_ /dd/yr 00530 :' 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT.-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0 — 9.0 15 001 05/26/15 <3.6 6.53 < 6.2 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfal l No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit - 15 50 or 100 see permit 6.0 — 9.0 001 05/26/15 < 6.2 <3.6 6.53 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Pace l of 7 r STORM EVENT CHARACTERISTICS: Date: 05/26/15 (first event sampled) Total Event Precipitation (inches): 0.3 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports,within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) his zo (Date) Additional copies of this form may be downloaded at: http./Iportal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 S WU-250 last revised October 25, 2012 paoP 7 of') Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date Mybmitted CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. — Charlotte Intennodal COUNTY Mecklenburg, PERSON COLLECTING SAMPLES J. Thurman Home, P.E. LABORATORY: K & W Laboratories Lab Cert. #i559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE PERIOD Jan -June X July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA X Other: C JAN 18 2017 6gNT AL FILIES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR StCTION ❑ No discharge this period' OutfaN� No.t =sn Dat�e� Sa lei I ed s:ma/dd/yrr 04530 - 0040Q 00556 �T uspended rA Solids;�mg/L:�5tandardunsts pH,Iy: on -Polar Oil and Grease/TPH€EPA Method 1664;tSGTHEM},;rng/L . New Motorl�ge, Annuai.;arreragegal/mom =Benchmarks �. ¢ 50 or°100 see perrnit �WitEii 6 0 9 0 : 15 ��. �ti: RA r, 001 1 11/29/16 1 11 6.43 <6.2 150 gal/ma Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfall Z=DateF = _ - 00556� __00530� �00400_ N >n o° = Samele Collected, Non-Polae Od and Grease/TPH EPA Method' x -Total Suspended Solids, fir" ! pH, , J^kZ1664,(SGTHEM},_m"gJ^ L, mg/L Standard units Permrf:Limit 15 WO-IM- M *r-K 9"�' ""' ..; Al r-1V seep :�, 001 11/29/16 <6.2 11 6.43 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-0998 January 12, 2017 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Norfolk Southern Railway Company Charlotte Intermodal Charlotte, Mecklenburg County, North Carolina COC No: NCG080922 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations Bryan, NaranioAnseorp.com Enclosed is the original and one copy of the 2016 second semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact David Patten at 404-985-2820 or by email at David. PattenCEDnscorp.com. Respectfully Submitted, Bryan aranjo System Manager Environmental Operations Attachments I STORM EVENT CHARACTERISTICS: Date:11/29/26 (first event sampled) Total Event Precipitation (inches): 0.3 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy qFthis DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature4 f Permittee) /—/3 r? (Date) Additional copies of this form may be downloaded at:.http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Supporting Documentation (Internal Records Only, Do not submit to regulator) Operating Subsidiary; Norfolk Southern Railway Company Semi-annual Stormwater Discharge Monitoring Report A for North Carolina Division of Water Quality General Permit No. NCGOSOZ Date submitted Y 14 CERTIFICATE OF COVERAGE NO.: NCGO80922 FACILITY NAME: Norfolk Southern Railway Co. — Charlotte Intermodal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY: K & W Laboratories Lab Cert. 4559 Comments on sampje collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE PERIOD X Jan -June July -Dec or El monthly' moat DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA RECEIVED X Other: C APR 16 2016 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CENTRAL FILES MIR SECTION ❑ No discharge this period' Outfall a ' W Date ° ,Sample Colleeted, _.` - ' mo/dd/yr u;; 00530 „00400 00556, Total'Suspended Solids; mg/L . pH Standard units Non -Polar Oil a rid ,Grease/.TPH°EPA Method 1664 (SGT-HEM New:Motor-Oil Usage, Annual average gal/mo Benchmark -- - 50 or 100_see permit wmi6,6:0- — 9.0 J Q KOLA. o ": 001 03/13/16 7.1 6.78 < 6.3 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outtall No: Date Sample Collected, mo/rid/yr;.'_ 06556 00530 00400 Non -Polar Oil and Grease/TPH,EPA Method 1664 (SGT-HEM); rng/L . Total Suspended,Solids, mg/! pH, Standard units Permit Limn = ,° 15 50 or 1ri0 see permit j6A - 9:0 001 03/13/16 < 6.3 7.1 6.78 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date: 03/13/16 (first event sampled) Total Event Precipitation (inches): 0.1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART it SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X 1F YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and ones of this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of ."No,Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Y/ a /14 ( Date) Additional copies of this form may be downloaded at: http://Portal.ncdenr.org/web/wct/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2