Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG080820_MONITORING INFO_20190320
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V U& o 1)1� D DOC TYPE ❑ HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ a o )1 b% a-D YYYYM M D D Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-0998 March 12, 2019 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVED MAR 2 0 2019 CENTRAL FILES DWR SECTjoN RE: Norfolk Southern Railway Company Charlotte Engine Terminal Charlotte, Mecklenburg County, North Carolina Certificate of Coverage No. NCGO8080820 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations a rallo(Mnsco .c Enclosed is the original and one copy of the 2019 first semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact Adam Motsinger at 704-578- 1835 or by email at Adam. Motsin, er i)nscoro.com. Respectfu ly Su ' ed, 13ry Naranjo System Manager Environmental Operations Attachments Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted _.3/12/19 CERTIFICATE OF COVERAGE NO. NCG©8080820 SAMPLE COLLECTION YEAR Z019 FACILITY NAME Norfolk Southern Railway - Charlotte Engine Terminal SAMPLE PERIOD X Jan -June July -Dec COUNTY Mecklenbure or ❑ Monthly' (month) PERSON COLLECTING SAMPLES _ J. Thurman Horne, P.E. DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY K & W Laboratories Lab Cert; # 559 ❑Zero -flow ❑Water Supply [-]SA Comments on sample collection or analysis: X Other C Part A: Vehicle Maintenance Areas Monitoring Requirements PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Qutfall -_ Date _ 00530 _ Tofal Su pended : '- --pH; § ` on=PolarOla dsGrea e%fPH EPA w IlAvto OiE Usage" No Sample Collected, '' Lr---+s Anitualave�rag ;.mo/dd/yr Sands,_m g/Methodi6fi41[SGT�FIEM --Standard�untts. , m L al%mo; Benchrtiark _ - u,r 50 or 100rsee'per7tiit' - '"�Milhin6�0 9�0 _ = :: 15 -�-- _:; ;�,�-� _- x :, 001 01/29/2019 9.6 6.11 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals - No Sample Collected;s mo da r.. Non - Polar Oil and Grease/TPH EPA,Method 1664SGT-HEM X. L : Totalj; uspendedtSohds,pH, m L " Standardiumtsii IPermrtlamrt _ .. ,. .. _>15 _ 50 or lOQ see p m+t� 6'090 001 01/29/2019 <6.2 9.6 6.11 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 5WU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 01/29/2019 (first event sampled) Total Event Precipitation (inches): 0_1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample valve in excess of the benchmark, you must implement rer 1, Trer Z or rer 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all 'No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifignt pgaa(tigwfor submitting false information, including the possibility of fines and imprisonment for knowing violations." 3-13- r9 (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/w-s/su/npdessw#tab-4 SW-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted _.3/12/19 CERTIFICATE OF COVERAGE NO. NCGO8080820 FACILITY NAME Norfolk Southern Railway — Charlotte En ine Terminal COUNTY _ Mecklenburg_ PERSON COLLECTING SAMPLES _ J. Thurman Horne, P.E. LABORATORY K & W Laboratories Lab Cert. # 559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD X Jan -June July -Dec or ❑ Monthly( (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑zero -flow ❑Water Supply [_]SA X Other C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' Outfall No. Date Sample Collected, mo/,ddJ,yr 00530 Total Suspended Solids, mg/,L 00400' pH, Sfa_ndard units 0055fi Non-Pol'ar'Qil and Grease/FPHEEPA Method 11664 (SGTjHEM), mg/L New Motor Oil Usage, _Annual a%era_gFgal/.ma 5.0 or 100 see_permit Within 6.0,Q9.0 15 - 001 01/29/2019 9.6 6.11 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals ioutf'all No. Date .Sample Collected, mo/�d/,yr OQ55fi Nan -Polar Oil and Grease/TPH fPA Method 16fi4a;{SGTHEM), mg/L 00! 30 Tote) Suspended Solids, mgJL 004Q0 pH, NStandardMichMs Permit Limit - 15 50 or 100�see permit 6.Q,T9.0 002 01/29/2019 <6.2 9.6 6.11 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SW-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 01/29/2019 (first event sampled) Total Event Precipitation (inches): 0.1 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on inal and one capit of this DMR including all "No Discho e" re orts within 30 days of Mgei t o the lab results or at end a monitoringperiod in the case of "No Discharge" reports) to: Division of Water Quality T Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant jXnalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of 3- t3-t9 (Date) Additional copies of this form may be downloaded at: httl2://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Supporting Documentation Internal Records Only, Do not _subm to regulator Operating Scihsidiary: Norfolk Southern Railway Company K & W Laboratories 1121 Hwy 24/27 W Midland, North Carolina 28107 Tel (704) 888-1211 Fax (704) 888-1511 Client: Horizon Engineering & Consulting, Inc. 2510 Walker Road Mt. Pleasant, NC 28124 Results Report Date: 05-Feb-19 Order ID: 19013110 Project: NSRR Charlotte Engine Terminal Collect Date: 1/29/2019 Location: N.SCET-1,2 Collect Time: 5:05:00 PM REPORTING ANALYSIS SAMPLE # PARAMETER RESULT UNITS METHOD LIMIT DATE 19013110-01 OIf&Grease <6.2 mg/L EPA16648 6.2 2/1/2018 19013110.01 SGT-HEM, TPH <6.2 mg1L EPAIS64B 6.2 2/1/2019 19013110-01 TSS 9.6 mg/L SM2540D 3.6 1131/2019 NC Certification: 559 SC Certification: 99051 Certified By xnn4 G. Kraska / Lab Director K & W Laboratories 1121 Hwy 24127W Midland, NC 28107 Tel: 704-888-1211 Fax: 7044388-1511 Chain of Custody Record 11 •. c r n2510 WaDw Rd. Mt =I - I i, rter, _I I, - Rowmum .1 Engine - oil 11- -_►t=111E= 'i ■ - -;. ,■ IWIP 111111 ling . • 0 ESSE rI ■©rrrrrrr■ -. e me ilmill 11 ■rr©rrrrrrvr e ■rrrrrr�r�ri� ■rrrrrrrrrrerr e ■rrrrrrrrr■r�� ■rrrrrrrrrr■r e ■rrrrrrrrrr��� ■rrrrrrrrrr■r e ■rrrrrr■rrrr��rr��rrrrrrrrrr�rr e ■rrrrr��ri� ■rrrrrrrrrrrrrr e ■rrrrrrr■rr■r�� ■rrrrrrrrrrrr e rrrrrrrrrrr■r��errrrrrrrrrrrr� m rrrrrrr■rrr■rii��rrrrrrrrrrrrrr mF ■rrrrrrrrrrri ■rrrrrrrrrr�r r_ �r���rrrrrrrrrrrrrr Z Yz 9 WSS i .rrrr moire's m 520 Horizon Engineering 8 Consulting, Inc. MEMORANDUM To: Adam Motsinger C: Leonard Stogner (w/ attachments) From: J. Thurman Horne, P.E. Subject: NSRR — Charlotte Engine Terminal 2019 - First of two annual stormwater monitoring (sampling) results Date: March 4, 2019 Attached is the completed DMR, tab results and field qualitative (visual) inspection reports for the first of two, annual analytical stormwater monitoring and qualitative inspections that was done in January. This was the first of two required analyses per year. The DMR report (the original plus one copy) will need to be mailed to the state at the address on the second page of the form. This should be mailed by April 3, 2019. On the first page of the report form, there is a space at the top for completing the date the report is submitted. There is also a space on the first page for listing the amount of new motor oil usage. This will need to be completed by someone with knowledge of the on site activities. The amount to enter should be the average monthly usage over the course of the calendar year. This report needs to be signed and dated on the second page by the responsible corporate officer or his authorized representative. If you have any questions or need any assistance on this matter, please call me and we can discuss. This DMR is all that needs to be submitted to the state. The lab results and the field qualitative (visual) inspection reports do not need to be submitted. A copy of the reports and the supporting lab results should be kept on site for at least five (5) years. All that you need to do is complete the date submitted and list the amount of oil used on page 1 of the DMR and have page 2 of the report form signed (and dated.) Then submit the original plus one copy of the signed report to the state at the address on the second page. As required by the permit, the report must be submitted by April 3, 2019 to be within thirty days of receiving the laboratory results. Please let me know if you have any questions. Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit o e resources/enerev-mine-minr ]-l�ry and - permits /stormwater-permits/nodes-indUstrial-sw#tab-4 Permit No.: �[/�/_/_/�/_/_/�/_/ or Certificate of Coverage No.: h[/Q/LjfQ/,P/Q Facility Name: NorfQlk Southern Railway Colppanv — Charlottg Engine Terminal County: Recklenbure Phone No. 704-ZH-4455 Inspector: ) hurmaq Horne. P.E. Date of Inspection: 01/29/2019 Time of Inspection: 5:05 PM Total Event Precipitation (inches): 0.1 All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. , Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.): nine Receiving Stream: Little Sugar Creek Describe the industrial activities that occur within the outfall drainage area: Parking, maintenance and repair of railcars _ Pagel of 2 SWU-242, last modlfled 07/28/2017 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: feint grey 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): none 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: Qualitative Analysis = 2 (1 2 3 4 5) S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Qualitative Analysis =1 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: Qualitative Analysis =1 1 2 3 4 5 7. Is there any foam in the stormwater discharge? _ Yes ,ice No B. is there an oil sheen in the stormwater discharge? — Yes X No 9. Is there evidence of erosion or deposition at the outfall? _ Yes X No 10. Other Obvious Indicators of Stormwater Pollution: List and describe: None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, East modifled 07/28/2017 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted 12/10/18 CERTIFICATE OF COVERAGE No. NCGO8080820 FACILITY NAME Norfolk Southern Railwav - Charlotte Engine Terminal COUNTY Mecklenburg PERSON COLLECTING SAMPLES J. Thurman Horne P.E. LABORATORY K & W Laboratories Lab Cert. # 559 Comments on sample collection or analysis- Part A: Vehicle Maintenance Areas Monitoring Requirements R§jj&kpp ;j COLLECTION YEAR 2018 sAr A L PERIOD Jan -June X July -Dec DE90 Monthly' 'month) �12RIWHARGINGOrTO CLASS [:]ORW []HQW E]Trout [:]PNA CENT4R R, ES []Zero -flow E]WaterSupply [:]SA 'effi- X Other C DYVIRRECTION PLEASE REMEMBER TO SIGN ON THE REVERSE --> E] No discharge this period' U Date - ------ '�j1;111 Q- ;�Tota -,!�uspen I on-:Polar.0i 7ai KEPX4.- 110 —tf. 04,_ Pz. Fl- -Sol di, ign 6r4Wk;R-- j I '-wAnnUal �V6 Ad gal/W e seepermid hin 16 A ie�k-:Av� 001 11/09/2018 20 6.45 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals ... uffi 1 760- �6 5 QsA ��0040'6-,-: No ��Safiipld.Collei*o, - W.No 7P lar '01 OT 7 ya cicl/.#� -7Standai*.unIWL I�jr6kt Lim 7. ,6r - 10l] see permit �7. W 001 11/09/2018 <6.2 20 6.45 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 11/04/2018 (first event sampled) Total Event Precipitation (inches): 0_2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results !or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pe9k1ties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature I 1.0 A (Date) Additional copies of this form maybe downloaded at: http://portal.ncdenr.ore/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Supporting Documentation Internal Records Only, Do not submit m rexulator Operating Subsidiary. Norfolk Southem Railway Company Al V 40 Horizon Engineering & Consulting, Inc. MEMORANDUM To: Adam Motsinger C: Leonard Stogner (w/ attachments) From: J. Thurman Horne, P.E. Subject: NSRR — Charlotte Engine Terminal 2018 - second of two annual stormwater monitoring (sampling) results Date: November 29, 2018 Attached is the completed DMR, lab results and field qualitative (visual) inpection reports for the twice annual analytical stormwater monitoring that was done in November. This was the second of two required analyses per year. The DMR report (the original plus one copy) will need to be mailed to the state at the address on the second page of the form. This should be mailed by December 27, 2018. On the first page of the report form, there is a space at the top for completing the date the report is submitted. There is also a space on the first page for listing the amount of new motor oil usage. This will need to be completed by someone with knowledge of the on site activities. The amount to enter should be the average monthly usage over the course of the calendar year. This report needs to be signed and dated on the second page by the responsible corporate officer or his authorized representative. I was not sure how NSRR has been handling these signatures, but if you have any questions or need any assistance on this matter, please call me and we can discuss. This DMR is all that needs to be submitted to the state. The lab results do not need to be submitted and the field gualitative visual ini2ection reports. A copy of the reports and the supporting lab results should be kept on site for at least five (5) years. All that you need to do is complete the date submitted and list the amount of oil used on page 1 of the DMR and have page 2 of the report form signed (and dated.) Then submit the original plus one copy of the signed report to the state at the address on the second page. As required by the permit, the report must be submitted by December 27, 2018 to be within thirty days of receiving the laboratory results. Please note that the copy of the Charlotte Engine Terminal S WPPP that I was given, does not have the "In-house" qualitative inspection report form we are accustomed to seeing at Winston-Salem. Since these forms are not in this SWPPP and considering that the attached completed forms are the forms required by the state, these are the only forms I have prepared for this facility. If there are other forms that NSRR would also like completed, if someone will provide these forms I will try to use them as well (although I consider this to be redundant.) Please let me know if you have any questions. Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit https:j/deg.Uc,gov/about/divisions/energy-mineral-land- [e5ourcesjenergy-MiL,teral-land-per i jstormwater-permits fnndes-industrial-sw#tab-4 Permit No.. �[/�/_/_/_/_/_/_/_/ or Certificate of Coverage No.: b,/jC/- /Q/$/Q/-8/j/Q_/ Facility Name: Norfolk Southern RaiMay_Company - Charlotte Engin-eTeminal County: Mecklenburg Phone No. 704-7,88-„4455 Inspector: I. Thurman Herne. P.E. Date of Inspection: 11/09/2018 Time of Inspection:1.2:00 PM Total Event Precipitation (inches): Q2 -� All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: J. Thurman dmte_- (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.): nine Receiving Stream: Little Sugar Creek Describe the industrial activities that occur within the outfall drainage area: Page 1 of 2 SWU-242, Last modified 07/28/2017 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: feint grey 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.); none 4. Clarity; Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: Qualitative Analysis = 2 (1 2 3 4 5) S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Qualitative Analysis =1 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: Qualitative Analysis = 2 1 2 3 4 5 7. Is there any foam in the stormwater discharge? _ Yes (X No 8. is there an oil sheen in the stormwater discharge? _ Yes �L_ No 9. Is there evidence of erosion or deposition at the outfall? _ Yes 2L_ No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Feint grey color appears t4 befine soil particles from bare earthen areas adjacent to the Stormwater drainage channel. Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further Investigation. Page 2 of 2 SWU-242, Last modified 07/28/2017 K & W Laboratories 1121 Hwy 24/27 W Midland, North Carolina 29107 Tel (704) 888-1211 Fax (704) 888-151 l Client: Horizon Engineering & Consulting, Inc. 2510 Walker Road Mt. Pleasant, NC 28124 Project: NSRR Charlotte Engine Terminal Location: NSCET-1,2 Results Report Date: 21-Nov-18 Order ID: 18110908 Collect Date: 111912018 Collect Time: 12:00:00 PM REPORTING ANALYSIS SAMPLE # PARAMETER RESULT UNITS METHOD LIMIT DATE 18110908-01 01AGrease <8.2 mg/L EPA1664B 6.2 1112012018 18110908-01 SGT HEM, TPH <6.2 mg1L EPA1664B 6.2 11/20/2018 18110908-01 TSS 20 mg1L SM2540D 5.0 11/9/2018 NC Certification: 559 SC Certification: 99051 Certified By 6 e�g,ka G. Kraska 1 Lab Director K & W Laboratories Tel:704-888-1211 1121 Hwy 24127W Midland, NC 28107 Fax: 704-888-1511 Chain of Custody Record Client/Company: Horizon Engineering & Consulting, Inc. Deport To: Thurman Home Remarks: copy To: " 08G; Non -Polar O&GlTPH Bill To: Horizon Engineering EPA Method 1664 (SGT-HEM) IPO # co Mawr Types: UW-0rvildng Type of C ' ,address: 2510 Walker Rd. Mt. Pleasant, NC 28124 Phone: 704-788-4455 Cell: 704-798-7730 Email_ thurmanHome@Earthlink.net Wales wV4F:M1f wa waler P4 ULw c ftlect rums: NSRR-Char. Engine Terra. H c U � GWGraa�C wader oT. G-Glass U sampled By-- J. Thurman Horne, PE m 0 a �, Grab Preservatives Anal sis Requested to ca m U W rn0No. Ui YfP Item Sam le ID: u,! efr u¢ crab wwE rw E Down Comp oT Z P `C Date Time n t a N Lab L# 1 NSCET-1 Eff G sw lip 11/9/2018 12:00:00 Noon r i 1 i I i x ; x II109p8 2 NSCET-2 Eff IG sw 1 1113 11/9/2018 12:00:00 Noon ;x; 1 x 3 I .4 1 1 i r 1 1 I 1 1 5 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 r I 1 I 1 s 11 1 F 1 1 1 I 7 1 r 1 1 1 1 I 'r 1 I I ! 8 1 r 1 1 1 1 1 1 1 1 1 I I 1 (� 1 r 1 1 t 1 10 1 1 1 1 1 1 1 11 1 ! l 1 1 F 1 ! 1 f 1 1 ! ! 1 1 1 I 1 ! 1 1 1 ! 12 1 1 1 1 1 1 ! 1 e 1 1 1 R D Time: Received By: Date: Time: ' e 04 1 Sample Temp:?,s�Q°C !SZ On Ice: N R q ' Time: Received By. Date: Time: (D iiiElk A, Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-099B April 16, 2018 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Norfolk Southern Railway Company Charlotte Engine Terminal Charlotte, Mecklenburg County, North Carolina Certificate of Coverage No. NCG08080820 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations Brya n. Nara njo@nscorp.com RECEIVED APR 25 W8 CENTRAL FILES DWR SECTION Enclosed is the original and one copy of the 2018 first semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact Adam Motsinger at 704-578- 1835 or by email at Adam. Motsin er nscor .com. Respectfully Submitte Bryan ranjo System Manager Environmental Operations Attachments Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qua ity General Permit No. NCGO80000 Date submitted lU In CERTIFICATE OF COVERAGE NO. NCGO8080820 SAMPLE COLLECTION YEAR 2018 FACILITY NAME Norfolk Southern Railway — Charlotte Engine Terminal SAMPLE PERIOD X Jan -June July -Dec COUNTY Mecklenburiz or ❑ Monthly' (month) PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY K & W Laboratories Lab Cert. # 559 ❑Zero -flaw ❑water Supply [:]SA Comments on sample collection or analysis: X Other C - Part A: Vehicle Maintenance Areas Monitoring Requirements PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period' buffs''=00530. -7ntal Suspended pH Non Polar Oil and`Grease/TPH EPA New 11Aotor Oil Usage; No:_ Sample Collected, - =' rrio/dd/yr _ 5ol�ds,;r _ >� 64,(SGT,,HEM}, mg/L- Annual average - _ g/L � Staridard units x� L Method,1 ._ gal%ono Benchmark 50.or 100 see:perml INith�n 001 03/11/2018 26 6.34 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals : outfall Date"0055fi'- .�; - — - _ - �oa3o: -_ -00400 _ 5arnpteColl;NnP0 eTH IPAMethooalYpedNo Solids _ � pHected ., rrio/dd/yr . _ -16fi4 (SGT'HEM); mg/L : _.=. n►g/.L' . S d� ts` _ r 5'0:0140seepe - — 6'0 9j% _its- , 001 03/21/2018 <6.2 26 6• I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 03/11/2018 (first event sampled) Total Event Precipitation (inches): 0_2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significantpengltiq#or submitting false information, including the possibility of fines and imprisonment for knowing violations." c C (G (Signature ermittee) Y (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orglvveb/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qu lity eneral Permit No. NCGO80000 Date submitted l t14 CERTIFICATE OF COVERAGE NO. NCGO8080820 SAMPLE COLLECTION YEAR 2018 FACILITY NAME Norfolk Southern Railway -- Charlotte En 'ne Terminal SAMPLE PERIOD X Jan -June July -Dec COUNTY Mecklenburg or ❑ Monthlyi (month) PERSON COLLECTING SAMPLES J. Thurman Hoene, P.E. DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY K & W Laboratories Lab Cert. # 559 ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: X Other C Part A: Vehicle Maintenance Areas Monitoring Requirements PLEASE REMEMBER TO SIGN ON THE REVERSE --> ❑ No discharge this period' Outfall Date 0053- MNJENL0400 00556 No. Sample Collected, m_ o/_dd/.yr Tota! Suspended Sal_ids, m8/L p, wtalwaiunivs Non -Polar Oil and°Grease/TPH EPA M_ ethod 1664 {SGT HEM), mg/.L New Motor Oil Usage, A_n_ nu_al average gal/reo Bent _chmark' - (5'Olor 1001see permit Wathin16_0,�9_.0 15 - 001 03/11/2028 26 6.34 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Out#al! No. Date 00556 00530 Q[1_4Q0 1o111111111!Ill Sample Collected, mo/dd/yr Non -Polar Oil and Grease/TPH EPA Meihad 1fi64 (56T�NEM], mg/L Total Suspended Solids, mg/1L pH, Standard units Permit LimitX 11115411111 9.0 001 03/11/2018 <6.2 26 6•34 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Pagel of 2 STORM EVENT CHARACTERISTICS: Date 03/11/2018 (first event sampled) Total Event Precipitation (inches): 0_2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement tier I, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one coat/ of this DMR, including all "No Discharge's reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discha e" reports) to: Division of Water quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sigpjhcant pe s f4ubmitting false information, including the possibility of fines and imprisonment for knowing violations." / C (Signature ermittee) (Date) Additional copies of this form may be downloaded at:.http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 5WU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharee Monitorine Reoort for North Carolina Division of Water Qyality General Permit No. NCGO80000 Date submitted (f l 31 ! :�- CERTIFICATE OF COVERAGE NO. NCGO8080820 SAMPLE COLLECTION YEAR Z017 FACILITY NAME Norfolk Southern Railwav — Charlotte EnLine Terminal SAMPLE PERIOD X Jan -June July -Dec COUNTY Mecklenburg or ❑ Monthly' (month) PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA LABORATORY K & W Laboratories Lab Cert. li 559 ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: DECEIVE® XOther C NOV 092017 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CENTRAL, FILES Part A: Vehicle Maintenance Areas Monitoring Requirements DWR SECTION ❑ No discharge this period' Outfall No. Date 5amgle Collected,WToS514�u`spendw.ed 0053D lids, mg/L 00400 p�uqni Standa64 EI0556 il and GreaseTPH EP �M�thod(SGT�HEM], mg/L New Motor Oil Usage, Annu_a! ikragqjgk1/no rBei chmark 50ee permit Within 67Qj— .0 15 001 09/06/2017 1 27 6.82 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfa11 No. Date Sample Collected, 00556 NP�1664 (SG�HaEsMe]T,H EPAMehod on-aaGTr mg/L 00530 Total Suspended Saiids, mg/L 00400 pH, Standard units Permit Limit - 15 50 or 100 see permit 6A�9.0 001 09/06/2017 <6.2 27 6.82 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 09/06/2017 (first event sampled) Total Event Precipitation (inches): 1_0 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all ffNo Discharge" reports within 30 dot's of receipt of the lab results to at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pgpaWfs for submitting false information, including the possibility of fines and imprisonment for knowing violations." -Permittee) // 1-3 -� (Date) Additional copies of this form may be downloaded at: http://Portal.ncdenr.org/web/wa/ws/su/npdessw#tab-4 Swu-250 last revised October 25, 2012 Page 2 of 2 Discharge Monitoring Report Checklist (Updated 8/14/12) 1) Location/Facility: Charlotte, NC -- Charlotte Engine Terminal Permit No. NCG08080820 40 2) Monthly❑ ;Quarterly ❑ ;Semi-annual j ;Annual ❑ : Check all that apply 3) DMR limits: Provided on DMR Form ■ ;incl. below [];or attached ❑ 4) Are all items in compliance with the permit? Yes ■ No ❑ 5) If the answer to Item 4 is No, or if any parameter is nearly the limit, complete page 2 of this checklist in its entirety, identifying root cause and your corrective action. Any exception should be discussed in a cover letter, or on the DMR form. 6) When is this DMR due to the agency? 011/12/2017 7) If the checklist/ DMR is being submitted less than 3 business days from the date due, specify reason(s) 8) If any parties require copies other than the addressee, file and copy lists on your letter (facility personnel, etc.), please give specifics below under "Distribution List" or attached separately. Distribution list is attached separately. I reviewed the attached DMR and I certify it to be accurate and complete. 1. 4&�V_11 /2/2017 Engineer Env' p ations Date 2. 1 ! 310- Man er Envir. O erations Date Distribution List (Including Name, Title, and Complete Address): Operating Subsidiary,: Norfolk Southern Railway Company Distribution List (Including Name, Title, and Complete Address): External Distribution: Mail the original DMR and one copy with: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Internal Distribution: Send backup documentation Internally only. Tom Hatcher — Senior General Foreman (Thomas. Hatcherte'D.nscorg.com) Adam Motsinger — Regional Env. Ops. (Adam. Motsinger@nscorp.com) Leonard Stogner — Environmental Contractor (stogner3(o-)vnet.net) Notes None. Operating Subsidiary: Norfolk Southem Railway Company Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-0998 November 2, 2017 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Norfolk Southern Railway Company Charlotte Engine Terminal Charlotte, Mecklenburg County, North Carolina Certificate of Coverage No. NCG08080820 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations B.rvan.Naranig@nscorp.com Enclosed is the original and one copy of the 2017 second semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact Adam Motsinger at 704-578- 1835 or by email at Adam. Motsin er nscor .com. Respectfully Submitted, Bryan Na njo System Manager Environmental Operations Attachments Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE No. NCGO8080820 FACILITY NAME Norfolk Southern Railway —Charlotte Engine Terminal COUNTY Mecklenburg PERSON COLLECTING SAMPLES 1. Thurman Horne,PP,.E. LABORATORY K & W Laboratories Lab Cert. # 559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD X Jan June July -Dec or ❑ Monthly' (month) R E C �$�y D" TO CLASS ❑ORW ❑HQW [:]Trout❑PNA I� i V L1 ❑Zero -flow ❑Water Supply ❑SA APR 17 2017 X other C CENTRAL~ FILES PLEASE REMEMBER TO SIGN ON THE REVERSE 4 DWR SECTION ❑ No discharge this period' Outfall115 No. Date ple Collected, o/dd/,yr 00530 Total Sus® p" ded $o1 ds, mg/,L0 00400 pH, Standard units 00556 Non -Polar Oil arwd GT re' se/TPH EPA Method 1664y(SGTsHEMj, mgJ,l New Motor Oil Usage, Annual average gal/mo - 001 02/15/2017 7.6 6.38 <6.2 300 Did this facility perform Vehicle Maintenance Activities, using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals OutF'all �Nd.Sample Date CollectedIi , 00556 Nono-o1O664a(SGTreG_HaEsMTL�LTotal[Sge;dd od V mM 00530 �00�i100 JEF�WndardIwM PermitsLimit - 15 5016r 100 see perms 6.0-L--9.0 001 02/15/2017 <6.2 7.6 6.38 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 Norfolk Southern Corporation Safety and Environmental Department 1200 Peachtree St. NE — Box 13 Atlanta, GA 30309 Telephone (678) 772-0998 April 5, 2017 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Norfolk Southern Railway Company Charlotte Engine Terminal Charlotte, Mecklenburg County, North Carolina Certificate of Coverage No. NCG08080820 Dear Sir or Ma'am: Bryan Naranjo System Manager Environmental Operations Bryan, NeraniglMnscora.com Enclosed is the original and one copy of the 2017 first semi-annual Discharge Monitoring Report (DMR) for the above referenced facility. If you have any questions or need additional information, please contact David Patten at 404-985-2820 or by email at David. Pattenta-nscorp.com. Respectfull SuTid, Bryan Naranjo System Manager Environmental Operations Attachments STORM EVENT CHARACTERISTICS: Date 02/15/2017 (first event sampled) Total Event Precipitation (inches): 0_5 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AND PART 0 MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER ATANY ONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one cony of this DMR including all "No Discharges reports, within 30 days of receipt of the tab results for at end of monitoring period in the cased No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signet p ie fornitting false information, including the possibility of fines and imprisonment for knowing violations." 5V ��� tl 6 (l�- (Signature of ermittee) (Date) Additional copies of this form may be downloaded at:.http://Portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 2012 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCGO80000 Date submitted CERTIFICATE OF COVERAGE NO. NCGO8080820 FACILITY NAME Norfolk Southern Railway = Charlotte Eneine Terminal COUNTY Mecklenbure PERSON COLLECTING SAMPLES J. Thurman Horne, P.E. LABORATORY K & W Laboratories Lab Cert. 8 559 Comments on sample collection or analysis: Part A: Vehicle Maintenance Areas Monitoring Requirements SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD X Jan -June July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA X Other C PLEASE REMEMBER TO SIGN ON THE REVERSE 4 No discharge this period' Outfall ..: Date:. = 005301 -: -00400,= - Q0556 No. -Sample Collected, Tota! Suspended pH, NonPolOil aid'Grease/TPH EPA New Mato OEI Usage, _` rno dd/yr / _ g/ -Solids :.i � L n_St. ndard'units Nleth"od1fi64°(- ;: SGT-HEM), mg/L=TArtnual;average - ;: k gaIft Benchmark :50 or-100 see'permit Within-.6 0 L-9:0 _:. ' ` 1.5. = 001 02/15/201.7 7.6 6.38 <6.2 300 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? X yes _no (if yes, report your analytical results in the table immediately below) Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals Outfal! No. Date Sample Collected, �mo/dd/yr, 00556 - _ .,_, < 00530004QA;- Non -Polar Oil and Grease/TPH EPA'Method _ 1664 (SGT=HEM), mg/L _ Total:Suspeieded Solids; - pH; - Standard"unrts Permit Limit - 15 -50 or 100 see permit 002 02/15/2017 <6.2 7.6 6.38 1 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised October 25, 2012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 02/15/2017 (first event sampled) Total Event Precipitation (inches): 0_5 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO X IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this MR, including all "No Discharges reports within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are sign ificanjpenar Wy *itting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of 1//� //�F- (Date) Additional copies of this form may be downloaded at:.http://Portal.ncdenr.org/webLwq/ws/su/npdessw#tab-4 SWU-250 last revised October 25, 20I2 Page 2 of 2 Supporting Documentation Internal Records Only, Do not submitto regulator Operating Subsidiary: Norfolk Southern Railway Company Horizon Engineering & Consulting, Inc. MEMORANDUM To: Leonard Stogner C: David Patten (w/ attachments) From: J. Thurman Horne, P.E. Subject: NSRR — Charlotte Engine Terminal 2017 — first of two annual stormwater monitoring (sampling) results Date: March 13, 2017 Leonard, Attached is the completed DMR, lab results and qualitative (visual) inspection report for the twice annual analytical stormwater monitoring that was done in February. This was the first of two required analyses per year. The DMR report (the original plus one copy) will need to be mailed to the state at the address on the second page of the form. This should be mailed by April 9, 2017. On the first page of the DMR report form, there is a space at the top for completing the date the report is submitted. There is also a space on the first page for listing the amount of new motor oil usage. This will need to be completed by someone with knowledge of the on site activities. The amount to enter should be the average monthly usage over the course of the calendar year. This DMR report needs to be signed and dated on the second page by the responsible corporate officer or his authorized representative. I was not sure how NSRR has been handling these signatures, but if you have any questions or need any assistance on this matter, please call me and we can discuss. This DMR is all that needs to be submitted to the state. The lab results and qualitative visual inspection report do not need to be submitted. A copy of the report and the supporting lab results and qualitative (visual) inspection report should be kept on site for at least five (5) years. All that you need to do is complete the date submitted and list the amount of oil used on page 1 and have page 2 of the report form signed (and dated.) Then submit the original plus one copy of the signed report to the state at the address on the second page. As required by the permit, the report must be submitted by April 9, 2017 to be within thirty days of receiving the laboratory results. Please let me know if you have any questions. K & W Laboratories 1121 Hwy 24/27 W Mldiand, North Carolina 28107 TO (704) SM1211 Fax (704) 888-1511 Chant: Horizon Engineering & Consulting, Inc. 2510 Wa0mr Road MG Pleasant, NC 28124 Project: NSR A Charlotte Location: NSCET -1,2 8AWlPL.E S PARAMETER 1=60"l OUSGr m 17m1e0541 8QTT-ITEM, TPH 17021wmi TO Results Report Date: 07-Mar-17 OrderlD: 17021605 Collect Date: 2/1 V2017 Collect Time: 9.05:00 AM ,REPORTlNO ANALYSIS RESULT UNITS �nWL METHOD -� LIMIT DATE c6.2 EPA1664B 6.2 2MM017 4.2 "V& EPAISM 6.2 W/2017 7.6 rhp1L SM25400 V 2M712017 Certified By NC Certlficatlon: 559 SC Corti icatlon: 99051 O. Kreska l Lab Dfrae r LIM e ■■!■■■■■■�■ ■!!■■!soon e ■■!■■■■i■■ IIBRME !■■■■■■ m ■!!■■■■■�■��u���■■■■■■■■■■ Ai.� Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on oiling out this form, please visit: Permit No.: N./f,/_/. Facility Name; de County: Inspector: Date of Inspection: _ Time of Inspection: _ or Certificate of Coverage No.: h[1.C1ii/j2/-61-'-0j-?-lQ/ Total Event Precipitation (inches): _ 0, S Pho Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ["Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall I and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than i 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge frcm the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval Is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this sign aturerf'�k;Vfp)that this report is accurate and complete to the best of my knowledge: ittee or Designee) Page 1 of 2 SWU-242, Lastmoditled 10/25/2012 1. Outfall Description: Outfall No. OOf Structure (pipe, ditch, etc.) 06i� Receiving Stream: I-e- 5uA all — Describe the industrial activities tint occur within the outfall drainage area; 2. Color: Describe the color of the dischar a using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: jLe 42 a& 4 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.); , zzoh e- 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 (D 3 4 5 S. Floating Solids. Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: •••2 3 4 5 7. Is there any foam in the stormwater discharge? Yes60 8. Is there an oil sheen in the stormwater discharge? Yes 9. is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe Y Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be Indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 5WU-242, Last modified 10/2S/2012 1 IL Horizon Engines ng 8 Eonsulting, Inc. 2510 Walker Road Mt. Pleasant, N.C. 28124 704-7884455 Flow Meter Calibration Data Sheet Facility Name: Norfolk Southern Rail oad -Charlotte Yard__City: Charlotte State: N_C. Utility Name: CMUD Primary Device (weir. etc.): 2" Parshai Flume Flow Meter Manf.: ISCO Model: 4210 Serial No. I99COQ9�g__ Type: Bubbler: X Ultrasonic: Other: I. Primary Device: Comments: A. Level yes no B. Free Flow yes no C. Turbulence yes t/ no D. Blockage yes ✓ no E. Surface Buildup yes ✓ no F. Properly Mounted ✓yes no II. Meter: A. Programmed correct ✓yes no B. Calibration: 1. Calibrated with flow cut off ✓ yes no Flow Level Before O- apb " Flow Level After — QLooe " If calibrated with flow cut off, resume flow, compare measur d level to meter, verify that readings agree: t�yes no N.A. C. Check if level to flow conversion for primary device Is correct: ✓ yes _ no D. Check to see if flow is totalized correctly: v�yes no E. Units of measurement: non-resettable totalizer: 10 Cubic Feet LED display screen totalizer: Cubic Feet LED display screen flow level: Fee LED display screen flow rate: CFM Calibrated by: Date: ? o 'J. a orne, P.E. Time: Z a br PM ■