Loading...
HomeMy WebLinkAboutNCG030691_MONITORING INFO_20190301STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V c� DOC TYPE F] Hlari t�RICAL FILE MONITORING REPORTS DOC DATE ❑ p�Ql / CI3 D1 YYYYMMDD Of Energy. Mineral and Land Resources ENVIRONMENTAL QUALITY March 1, 2019 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030691 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S_ REGAN Secretary S. DANIEL SMITH Interim Director MAR 04 2013 DENR-L4ND QUALITY STORMWATER FERMI i i ING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators Central Plant located on Chickasaw Road on February 6, 2019.. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, (7 es Moore Assistant Regional Engineer Land Quality Section Enclosed: Inspection report c.5tormwatei-Perrnitting--Brant-ham 7 Compliance_ Inspection Repo Permit: NCG030691 Effective: 11/01/18 Expiration: 05/31/21 owner: Industrial Fabricators SOC: Effective: Expiration: Facility: Industrial Fabricators Central Plant County: Gaston 105 Chichasaw Rd Region: Mooresville Gastonia NC 28052 Contact Person: Jeff Knight Title: Phone: 704-864-3032 Directions to Facility: turn left on hwy 321 south onto Forbes road, turn right at the second road on the right. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/06/2019 Entry Time: 02:OOPM Exit Time: 03:45PM Primary Inspector: Halliday Keen Phone: Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Cornpliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant [] Not Compliant Question Areas: E Storm Water (See attachment summary) Page 1 of 3 Permit NCG030691 Owner-Facility:Industnal Fabricators Inspection Date: 0210612019 Inspection Type : Compliance Evaluation Reason for Visit: Fallow -up Inspection Summary: This inspection was conducted as a follow up to a Notice of Deficiency issued on January 22, 2018- Since the initial inspection, Industrial Fabricators has created and implemented all aspects of the Stormwater Pollution Prevention Plan. This site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed Page 2 of 3 perms NCG030691 Owner - Facility: Industrial Fabricators inspection Date: 02l06l2019 Inspection Type : Compliance Evaluation Reason for Visit: roilow-up Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it property documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ■❑❑❑ ■❑❑❑ ■❑❑❑ ❑ ❑ ❑ ■❑❑❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ Cl ❑ ❑ ❑ ❑ ❑❑■❑ E ❑ ❑ ❑ Page 3 of 3 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 1, 2019 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030691 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Govemor MICHAEL S. REGAN Secreiary S. DANIEL SMITH Interim Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators Central Plant located on Chickasaw Road on February 6, 2019.. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, es Moore Assistant Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch } Permit: NCG030691 SOC: County: Gaston Region: Mooresville Compliance Inspection Resort Effective: 11/01/18 Expiration: 05/31/21 Owner : Industrial Fabricators Effective: Expiration: Facility: Industrial Fabricators Central Plant 105 Chichasaw Rd Contact Person: Jeff Knight Title: Directions to Facility: turn left on hwy 321 south onto forbes road, turn right at the second road on the right. System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Related Permits: Gastonia NC 28052 0 Inspection Date: 02/06/2019 Entry Time: 02:OOPM Exit Time: 03:45PM Primary Inspector. Holliday Keen Secondary Inspector(s): Phone: 704-864-3032 Phone: Phone: Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 Permit: NCG030691 Owner - Facility: Industrial Fabricators Inspection Date: 02106/2019 inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary, This inspection was conducted as a follow up to a Notice of Deficiency issued on January 22, 2018. Since the initial inspection, Industrial Fabricators has created and implemented all aspects of the Stormwater Pollution Prevention Plan. This site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed. Page 2 of 3 Permit: NOG030691 Owner - Facility: Industrial Fabricators Inspection Date: 02/06/2019 Inspection Type: Compliance Evaluation Reason for Visit: FOIIOw-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occumng during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? M ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes Na NA NE Has the facility conducted its Qualitative Monitoring semi-annually? M ❑ ❑ [] Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? E ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? E ❑ ❑ ❑ Comment: Permit and Outfalts Yes No NA NE # is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfails observed during the inspection? ■ 11 ❑ [] # If the facility has representative outfall status, is it properly documented by the Division? ❑ E 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ ❑ Comment: Page 3 of 3 Semi -Annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1 31 2019 CERTIFICATE OF COVERAGE NO. N00030691 FACILITY NAME: INDUSTRIAL FABRICATORS INC. —CENTRAL PLANT COUNTY :Gaston PERSON COLLECTING SAMPLES Ryan Osborne LABORATORY: PaceLabs-Ralei h Charlotte Asheville Lab Cert. f# 67/12/40 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results eee i 1 SEE 0 V �� cEN� � ZOIg OWR rS�Crr NL SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®Other C, PLEASE REMEMBER TO SIGN ON PAGE 3 4 ❑ No discharge this period?' Outfall No:' Date -Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper. Lead Zinc Non -Polar 0&G/ Total Petroleum Hydrocarbons Total Toxic organicss° Benchmarks -3 - 1q0 mg/La 6.0 - 9,0 0.Q10mg/L' ' 0.075 mg/L. ; , 0.126 mg/L' 15 mg/L 1 mg/L , S130#001 12/14/2018 0.71 86 7.79 0.022 0.007 319 45 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) v ' Title (Print title) NA (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No '' Date Sample Collected' (ma/dd/yr) .. 24-hour rainfall amount, IncheO Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks -_>, ` - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 5U NA NA NA NA NA NA Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO 1F YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on snot and one copy of this DMR, including all "No Discharge" reports, within, 30 days of receipt of the lab results or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pena)qs for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature Ingham, Owner/President (5--,l (bate) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 aceAnalytical' = wrnpare4Wacam December 24, 2018 Mr. James Willard II Inenco, Inc. 132 W. Statesville Ave Mooresville, NC 28115 RE: Project: WAS CENTRAL PLANT Pace Project No.: 92411020 Pace Analytical Services, LLC 9600 Kincay Ave. Suite 100 Hunleraville, NC 28070 (704)975-9092 Dear Mr. II: Enclosed are the analytical results for sample(s) received by the laboratory on December 17, 2018. The results relate only to the samples included in this report, Results reported herein conform to the most current, applicable TNIINELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. If you have any questions conceming this report, please feel free to contact me. Sincerely, Matthew Brainard matthew.brainard@pacelabs.com (704)875-9092 Project Manager Enclosures REPORT OF LABORATORY ANALYSIS This report Shan nol be reproduced, except in full, y without the wntten consenl of Pau Analytical SerACee, LLC. Page 1 of 12 �aceAnalytical' whTMeDcaW6s.wm Project: IFAB CENTRAL. PLANT Pace Prolert No.: 92411020 Charictte Certification IDs 9800 Klncey Ave. Ste 1 CO, Huntersville, NC 28078 LouislanalNELAP Certiflcation # LAI70028 North Carolina Drinking Water Certification #: 37706 North Carolina Field Services Certification M 5342 North Cnrclira Wastewater Certification #: 12 Asheville Certification IDs 2225 Riverside Drive, Asheville, NC 28804 FloridalNELAP Certification #: E87648 CERTIFICATIONS South Carolina Certification #; 99006001 Florid lNELAP Certification #: E87627 Kentucky LIST Certification #: 84 VirginloNELAP Certification #: 460221 North Carolina Wastewater Certification #: 40 South Carolina Certification #; 99030001 Massachusetts Certification #: M-NC030 YrginiaNELAP Cerlifcation M 4BO222 North Carolina Drinking Water Certification #: 37712 REPORT OF LABORATORY ANALYSIS This report shell not be reproduced, except in full. without the miaen concant of Pace Analytical Services. LLG, Pecs Artafytical services, LLC 9800 Kincey Ave, Suite 100 Huniersville, NC 28078 (704)975-9092 Page 2 of 12 zAnaoical' r »wwpacalaar.oam I SAMPLE ANALYTE COUNT Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 Pace Analytical Services, LLC 9800 Kncey Ave. Suite 100 Huntersv Ile, NO 2807B (704)875.9092 Analytes Lab ID Sampte ID Method Analysts Reported Laboratory 92411020001 SDO-001 EPA 1664B JMS i PASI•C EPA 200.7 Rev 4.4 1994 SH1 3 PAS I -A SM 254OD-2011 CRV 1 PASbA REPORT OF LABORATORY ANALYSIS This report shag not be reproduced, except in full, without the written con5unt of PoCe Analytical Services. LLC, Page 3 of 12 Analytical' s�s7.AaulaG'acdm ANALYTICAL RESULTS Pace Analytical Services, LLC 9000 Kincey Ave, Suite 100 Hunteraville, NC 28078 (704)V5-9092 Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 Semple: SDO-001 Lab 10: 92411020001 Collected: 121141'18 12:10 Received: 12/17118 14:25 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No, Oual 1664 SGT-HEM, TPH Analytical Method: EPA 1664E Total Petroleum Hydrocarbons NO ri 5.0 1 12122/18 04:03 200.7 MET Ili Analytical Method: EPA 200J Rev 4.4 1994 Preparation Method: EPA 200.7 Rev 4.4 1994 Copper 21.8 ugA. 5.0 1 12118118 07:15 12110/18 03:46 7440-50-8 Lead 1.2 ug1L 5.0 1 12118118 07:15 12/19118 03:46 7439-92-1 Zinc 319 ug1L 10.0 1 12118118 07:15 12l1911 a 03:46 7440-66-6 2540D Total Suspended Solids Analytical Method: SM 254OD-2011 Total Suspended Solids 86.0 mg1L 25.0 1 12118118 17A5 REPORT OF LABORATORY ANALYSIS This report shell not be reproduced, except in full, Date'. 1212412018 08:08 AM without the written consent of Pace Analytical Services, LLC,. Page 4 of 12 aceAnaly ical' srwpaahtbaran Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 QC Balch: 449295 QC Batch Method: EPA 1664E Associated Lab Samples: 92411020001 METHOD BLANK: 2460420 Associated Lab Samples: 92411020001 Parameter Units Total Petroleum Hydrocarbons ri LABORATORY CONTROL SAMPLE: 2460421 Parameter Units Total Petroleum Hydrocarbons mglL MATRIX SPIKE SAMPLE: 2460422 Parameter Units Total Petroleum Hydrocarbons mi Pace Analytical Se-li LLC 9800 Kincay Ave. Suite too Hunlersvill9, NC 28078 (704)875-9092 QUALITY CONTROL DATA Analysis Method: EPA 1664E Analysis Description: 1664 SGT-HEM, TPH Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 4.8 12122/1003:52 Spike LCS LCS % Rec Conc. Result % Rec Limits Qualifiers 19,2 22A 117 64-132 92411073001 Spike MS MS % Rec Result Conc. Result % Roc Limits Qualifiers NO 19.2 21.4 110 64-132 Ra.ult. pn.snbd an this psy. ar. In th. une. Inmcabd by the "Unit.' column sxupt whala an alti unit Is pr—ntrd to th. Hght of th. rr.alt. REPORT OF LABORATORY ANALYSIS This r"rl &hall not be reproduced, except In full, Date: 12/2412018 08:08 AM without the written consent or Pace Analytical Services, LLC, Page 5 of 12 ceAnaVical' wmrpacelabaronr Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 QC Batch: 448147 OC Batch Method: EPA 200.7 Rev 4.4 199, Associated Lab Samples: 92411021 METHOD BLANK: 2454979 Associated Lab Samples: 92411020001 Parameter Copper Lead Zinc QUALITY CONTROL DATA Analysis Method: EPA 200.7 Rev 4.4 1994 Analysis Description: 200.7 MET Matrix: Water Blank Reporting Units Result Limit Analyzed Ouaiiners uglL NO 5.0 12fl911802:11 ug1L NO 5.0 12f1911802:11 ug1L NO 10.0 12119/18 02:11 Pen Analytical 59rvicaa, LLC 9800 KinCey Ave. Suite 100 Hunts ilia, 1211018 (7D4)875-9092 LABORATORY CONTROL SAMPLE: 2454980 Spike LCS LCS % Rec Parameter Units Cont. Result % Rae Limits Qualifiers Copper ug1L 500 513 103 85-115 Lead ug1L Soo 495 99 05.115 Zinc ug1L 500 496 100 85.115 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2454981 2454982 MS MSD 92410895001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Cone. Cone. Result Result % Rec % Roc Lim" RPD Qual Copper ug1L 127 500 500 557 517 86 78 70-130 7 Lead uglL 5.2 500 500 480 467 95 92 70-130 3 Zinc uglL 2230 500 500 1610 1360 -124 -173 70-13C 17 M1 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2454983 2454904 MS MSD 92410981001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Cone. Cane. Result Result % Rec % Rae Limits RPD Qual Capper ug7L 0.0065 500 50D 499 497 99 98 70-130 0 mi Lead uglL NO 500 500 461 466 92 93 70-130 1 Zinc uglL 0.011 500 500 482 490 94 96 70-130 2 mgfL Raauha praaantW an this papa are In the unhs indicated by the "Unto' column oxnta wham an alternate unit IS praaantad Ia the right al the result. REPORT OF LABORATORY ANALYSIS This report shag not be reproduced, except in full, Date: 1 V2412i 08:08 AM without the r tim cprtaent or Pace Analytical Services, LLC. Page 6 of 12 aCEAnaViG3l s wwtrpacelaar.Txvn QUALITY CONTROL DATA Project: IFAB CENTRAL PLANT Pace Projed No.: 92411020 QC Balch: 448296 Analysis Method: SM 254OD-2011 QC Batch Method: SM 254UD•2011 Analysis Description: 25400 Total Suspended Solids Associated Lab Samples: 92411020001 METHOD BLANK: 2455624 Associated Lab Samples: 92411020D01 Parameter Total Suspended Solids Matrix, Water Blank Reporting Units Result Limtt Analyzed Qualifiers mglL NO 2.5 12M811817:41 LABORATORY CONTROL SAMPLE: 2455625 Parameter Units Total Suspended Solids mg1L SAMPLE DUPLICATE: 2455826 Parameter Units Total Suspended Solids ml SAMPLE DUPLICATE: 2455627 Parameter Units Total Suspended Solids r lL Pace Analytical Services, LLC 9800 Klncey Ave. Suite 100 Hunlerlhlla, NC 28078 (704)875-9092 Spike LCS LCS % Red Conc. Result % Rec Limits Qualifiers 251 248 99 90.110 92411087001 Dup Result Rasull RPD Qualifiers 164 158 3 92411030001 Dup Result Result RPD Qualifiers 10.5 10.9 4 Resulle presented on this page are In The units Indlcatad by th. "Unit." -plum- except wfiete en -it emete unit le pnanud to the rtghl at the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 1212412018 08:08 AM withoul the written consent of Pace Analytical Services, LLC, Page 7 of 12 aceAnalytical' nwrc�Lxelapi.pyn QUALIFIERS Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 DEFINITIONS Pace Analytical Service*, LLC 9800 Klncey Ave. Suite 100 Hunlereville, NC 20078 (704)878-9092 DF - Dilution Factor, d reported, represents the factor applied to the reported data due to dilution of the sample aliquot. NO - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit MDL- Adjusted Method DetecWn Umit POL - Practical Ouantitallon Llmlt. RL- Reporting Limit - The towest concentrabon value that meets project requirements for quantitative data with known precision and bias for a specific enelyle in a specific matrix. S - Surrogate 1,2-Dlphenylhydrnzlna decomposes to and cannot be separated from Azabanzene using Method 8270. The result for each analyte is a combined concenlreUon. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(0) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gei - Cleen-Up U - Indicates the compound was analyzed for, but not detected. Acid preservation may not be appropriate for 2 Chtoroethylvinyl ether. A separate vial preserved to a pH of 4.5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylonitrile by EPA Method 8260. N-Wrasodiphenylamine decomposes and cannot be separated from Dlphanylamine using Method 8270. The result reported for each enalyte is a combined concentration Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited ansiytes. TNI - The NELAC Institute. LABORATORIES PASI-A Pace Analybcal Services -Asheville PASI-C Pace Analytical Services - Charlotte ANALYTB QUALIFIERS M1 Matrix spike recovery exceeded OC limits. Batch accepted based on laboratory control sample (LCS) recovery. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date, 12/24/2019 08A8 AM withovf the wnften consent of Pace Analyticul Services, l Page 8 of 12 aceAnaiyticai* �w�n.pacaC70i.cWa QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: IFAB CENTRAL PLANT Pace Project No.: 92411020 Paco Aaatytical Services, LLC 9800 KinCey Ave. Sulte 100 Huntanolle. NC 28075 (704A75-9092 Analytical Lab 10 Sample ID QC Batch Method QC Batch Analytical Method Batch 92411020001 SOO.001 EPA 1664E 449295 92411020001 800-001 EPA 200.7 Rev 4A 1994 448147 EPA 200,7 Rev 4.4 1994 448226 92411020001 SDO-001 SM 25400-2011 448296 REPORT OF LABORATORY ANALYSIS This report shell not he reproduced, except In full, Date', 1212412018 08:08 AM without the wntlen Cori of Pace AnelyoCal SerWces, LLC. Page 9 of 12 Document Name: Dowmont Revfsad: February 7, Zola %diifldJ�i • Sample Condition on Rue1 CU P d 1 of 2 tlocumant No.: Issuing Autlbr ity: F AXC3433 Rev o6 Pace Carolinas Quality Office laboratory Mceiving samples: Ashttvllle ❑ Fdevin Greenwood ❑ Huntar vHle Ralelgh❑ Mtehanlcsville❑ _ WO#92411020 Project 4 Courier. Fad Ex UPS USP$ t Cllent ❑ Canmerrlal Pace ❑Other, ®4411O2f} Custody semipreasnt? []Yes 'No SeaisIntact? ❑Yes -1la' -- Data/tNtialtpawn ikam[nlas ConterteM��.�,�i paddngMaterld: []Bubble Wrap bilobleeags ©Nana © Other elologtcelTi Frown?. Thermometer, 7ypaofic C win pigL& ❑N= ❑Yes ❑No 0141 'sun to: Z�T446 Cooler Tempi ( Q: _ 2�4 Correction Factor: Add/Subtract f'C} j — r� � Temp slmut be show freeth:g to a'C CaalerTemp[m7eeted j': !`[sNnphsoutafrempaluru.Snnplam:eo,coding Pracau hubegun USDA Regulated Sell IM-jf/A, water sampSa) Old Mltti Mie In a auarynifne mna within the United States: c& NY, or SC (check maps)? Did neifts oAalnate from r foreign rourre {Sntem00001 fY, COMM---....-- ChainalCuttod Present? No A L Sam 1m trdvcdwitl>In Hdid T{nm? a rto N A 2 S1wRHOHTFrueAn s c72hr.7 u A 3. R IS Tiae Arwed Time uattsd? a • No N A 4. SumFlclentValame7. t9 o A 5, CotreetcWtahersusW? pace Wpk$netf Used? �jrn Afro Nd I7N/A A 6, Canntrlen htstl? rto N A 7. Otssolvadaea sis:5a his Field F tedt a No A a. EamptaubdAMatch000? 4ncludestrst md/1 Ana is Matrla: [316 f �`-� ❑NO - ❑N/A ' 4. Heads w h YIlA Vla[s �S 6F 11H 7Dyes Ho A 10. Trip elantpagett? TTF e1711t:QSb Serb Preumti ❑Yes n,._ ❑No aria _• MIA EN A xt. CaMMfNT$AS4WL1 DISCREPANCY Flefd Data Requlfed? ❑Yes []NO Wt ID ofsp,gt rantainers: CLIENT N071flfAilerdf RESptl1110N - Parson confuted: Project MtntgerSCURF Review: 1er0Jdct Mrngpr 3A F R•vlew: Date.Mme: ); Data' Page 10 of 12 r Document Name! Simple Condleon U SCIiAl oacumtntftevlsed: February 7, 2612 Pep lof t Document Na. F-CAR-CS. 3"ovAB Issuing AutbodW. Yare Grognas Qual olflca `check mark top half of box if pH end/or dechlorination is Project # WO# : 92411020 verified and within the acceptance range for preservation PM 14W8 pus Data: 01/02/19 samples. - _.. ___ ._ _ f;L1NT-84�INENtQ _..�m, _ _- _..._ _..._. " µ µtxeiption%V01` COliform, TnC, Dil and Graale, DR418G1S (w�iiterl DOC: ll.Hg *"Bottom half of box is to list number of battle on Ron a ONE on ONE a ME NO 0 0 MV Ilk on IN on monsoon king so M.- ON pH Adjustment tog for preserved Samples Sample IR rwe of Fucarmtive pN upon retalpt Oetapreauvetlon sdluzW Tlrae gfnev+tin ediuoed Amount of pmelvaim added tot t Vote: Waeneverlherals a dEter"anry etteetlnr Nattl+Garoena campu. ,.m�„s,,.w�r �, "•,••�^,,•^,��.,,^W.•_,,., Tit of hold, enolrma eretarvative, out of remp, Ineorrett contvMmm Page 11 of 12 gyp, q,, CHAIN -OF -CUSTODY f Analytieai Request Document ' :"p�.'�f7ifQ i%i � 0a LECLL VQCV:-SU. MI feWv�i fiWsrtsm w ON=kd.E wetly. ww..rdw.ca r L;ST RCRA OTHER ®� y '„w==+imy.�sr *czae�an�u:.��a tc �r xes�r u,.��.+n,�,a.,ye�n��„a+.5t����+r ��.�c«a,a u5a mer+aoan. - ra+tL•4�Q2wev 67. 7��kuq�ztxi7 INENCO, Nc. Report of Field Analysis Results Client: Industrial Fabricators Central Plant 105 Chichasaw Rd Charlotte, NC 28259 Gaston County 132 W, Statesville Are Moorcaville,NC 24115 (704)662-6192 Fsr. (704) M2.9144 inencagincnc61e can Project: Stormwater Sampling: Year 6, Period 2, 2018 Sample Date: 12/14/2016 Report Date: 12131/2019 Sample ID: $00-001 Analytical. Resutts Srmple.lD: SDO.001 Collected, 12l1412018 12:10 Parameter Result Unit Method Analyzed Analyst p11 7.79 SU 4500-H*B 12/14/2018 12:11 _ RRO Rcporitd 13y: V fumes W, Willard 11, Laboratory supervisor NC' Laboratory Fierd Certification No. 5540 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year 2018 Individual NPDES Permit No. NCS❑❑❑❑❑❑ or Certificate of Coverage (COC) No. NCG030691 This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: INDUSTRIAL FABRICATORS, INC.-CENTRAL PLANT County: Gaston Phone Number: (707) 864-3032 Total no. of SDOs monitored 1 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No :Total, r IVon'Po au li " x 1� 3 7 �h r ; > Rainfall, a :Suspended . pH Copper Lead ° k , Zinc 0&G/Total ; tatai+Toxic , t I 1, inches Solids t Si5 anda units Pet roleum C+rg I ni : , t q , r Hya car ons Benchmark N/A ; 100 mg/L 6.0-9.0 0.010 mg/L 0.075mg/L , 0.126 rng/L. 15 mg/L 1 mgJL bate 5ampleE�' Collected''` IE, immlddlyy'.�=r9°° 12/14/2018 0.71 86 7.79 0.022 0.007 319 <5 N/A SW U-264-Generic-13dec2012 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature ' _,/ R r Bingham, wnerlPresident DW Re Tonal Office Contact Information: For questions, contact your local Regional Office: MQOR-k VjN E REGIONAL.OFFICF, 610 East Center Ave., Suite 301 Mooresville, NC 28115 (704) 663-1699 Date - f SW U-264-Generic-13Dec2012 REt-r=jvt!1) JUL 18 2018 CENTRAL FILES DWR SECTION Semi -Annual Stormwater Discharee Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 713012018 CERTIFICATE OF COVERAGE NO. NCG030691 SAMPLE COLLECTION YEAR 2018 FACILITY NAME: INDUSTRIAL FABRICATORS, INC. —CENTRAL PLANT SAMPLE PERIOD ® Jan -June ❑ Juty-Dec COUNTY :Gaston or ❑ Monthly PERSON COLLECTING SAMPLES N/A DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY: PaceLabs-Raleigh/Charlo"e/Asheville ❑Zero -flow ❑Water Supply ❑SA Lab Cert. # 67/12/40 Comments on sample collection or ®Other C. analysis: Semi-annual samples were not collected in 1H18, in part, due to difficulty establishing O/F sampling locations and from staff PLEASE REMEMBER TO SIGN ON PAGE 3 4 turnover. Collection will resume in 2H18 once unrestricted access is established. Part A: Stormwater Benchmarks and Monitoring Results M No discharae this period?' Outfall No. Date Sample Cafkcted mo/dd/yr) 24fiour rainfall amount,, Inches' Total Suspended Solids pH, Standard units Lead Zinc . Nan-Polar0&G/Total ToPetroleum . Total Petroleum H rocarbons Toxic Organics' eenchmarics �> _ 100 mg/V 6.0 — 9.0 0-007 mg/l. 0.03 mg/L 0.067 oWL' .15 mg/L 1 mg/L SDOti001 NO FLOW NO FLOW No FLOW NO FLOW NO FLOW NO FLOW NO FLOW NO FLOW N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. ' Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR469.31). Permit Date: 11/112012-10/31/2017 SWU-24S, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." NA Name (Print name) NA &�Lg/ (%1tWAir"Z1 60lrs9Ci Title (Print title) NA NA (Signature) (Date) Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, cPQL, Non -detect, ND, or other similar non -numerical format. when results are below the applicable limits, thgy-must be reported In the format. "Otx mR/L", where XX is the numerical value of the detection limit, reporting limit, etc, in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier I, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month. ❑ No discharge this period i?utfap No DeSample Collected' (mv/dd/yr) 24-hour rainfall amount, inches, Hon -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended 5ofids pH Benchmarks ==>. _ IS mg/L 10o nWL or 50 mg/L• 6.0 � 9.o SU NA NA NA NA NA NA Footnotes from Part A also apply to this Part S See General permit tent, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies - Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you most implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART If SECTION B. • 2 EXCEEDANCFS IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an originral and one cony of this DMR, indudino al! No Discharge" reports, within 30 danof receipt of the lob results for at end of monitoring aeriod in the case o "No Discha e" re its to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering t information, the information submitted is, to the best of my knowledge a nd belief, true, accurate, and complete am aware that there are significant penalties fyfbmitting false information, including the possibility of fines and imprisonment for knowing violations." ,4 (Signatur ermittee) Roger gham, Owner/President Inate) Permit Date: 11/1/2012-10131/2017 SWU-245, last revised 10/2S/2012 Page 3 of 3 Energy, Mineral and Land Resources ENVIRONMENTAL DUALITY Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 ROY COOPER Gowmor MICHAEL S. REGAN s«>—y WILLIAM E. TOBY VINSON, JR. Interim DinGor March 23, 2018 RECEIVED MAY 15 2018 CENTRAL FILES GWR SECTION Subject: Compliance Evaluation Inspection Site Number WT002465 Pending NPDES Stormwater Certificate of Coverage- NCG030691 Gaston County, North Carolina Dear Mr. Bingham: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators Central Plant located on Chickasaw Road on March 15, 2018. The report should be self-explanatory; however, should you have any questions concerning this reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Permit: NCG030691 SOC: County: Gaston Region: Mooresville Compliance inspection Report Effective: Expiration: owner: Industrial Fabricators Effective: Expiration: Facility: Industrial Fabricators Central Plant 105 Chichasaw, Rd Contact Person: Jeff Knight Title: Directions to Facility: turn left on hwy 321 south onto fortes road, tum right at the second road on the right. System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Related Permits: Gastonia NC 28052 Phone: 704-864-3032 Phone: Inspection Date: 03115/2018 EntryTime: 10:OOAM Exit Time: 12:OOPM Primary Inspector. Holliday Keen Phone: Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COG Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) 1 Page: 1 R: perm. NCG030691 Inspection Date: 0311512018 Inspection Summary: Owner - Facility:Induslrial Fabricators Inspection Typo, Compliance Evaluation Reason for visit: Follow-up This inspection was conducted as a follow up to the Notice of Deficiency issued January 22, 2018 for Site Number WT002465 which has been assigned as NCG030691. At the time of inspection, the SWPPP was still in the process of being made and Analytical and qualitative monitoringhas not been conducted yet. Per Jack Hemdon, they have hired a third party company to assist with stormwater monitoring. Outfalls have been identified and safe access paths have been created. Additionally site cleanup and additional housekeeping methods have been enacted to reduce impacts to starmwater flowing over the site. Please complete and enact the SWPPP and conduct analytical and qualitative monitoring as soon as possible. A follow up inspection will be conducted March 29, 2018 to assess progress and site compliance. If you have any questions, please contact Holliday Keen at 704-235-2148 or by email at Holliday.Keen@NCDENR.gov. Page: 2 r .I permit NCGO30591 Owner - Facility: Industrial FabftatDB Inspection pate: 03F15Y2018 inspection Typo: Compliance Evaluation Reason for Visit: Foilow-up StomTwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ �' ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ M ❑ ❑ # Does the Plan include a list of significant spills occ wring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 0 [] ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ■ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ M ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ M ❑ ❑ # Does the facility provide and document Employee Training? ❑ M ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ■ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: The SWPPP had not been developed or implemented at the time of inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ M ❑ ❑ Comment: Qualitative monitoring has not been conducted or documented. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ M ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 00011 Comment: Analytical monitoring has not been conducted or documented. hermit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ M ❑ ❑ # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormivater) discharges? ❑ 0 ❑ ❑ Comment: During this inspection we identified potential outfalls on site but were unable to identify the outfall for two inlets in the paved area north of the building. Please investigate the inlet and pipe structure to determine the best sampling locations on site. The Certificate of Coverage COC for this facilLty is currently under review at the Raleigh Central Office. When the COC is issued, please ensure that a copy is kept on site. Page: 3 Site Inspection Report Site Number: WT002465 Site Name: Industrial Fabricators Central Plant Site Address: 2408 Forties Rd County: Gaston Directions: Latitude: Site owner Name: Bingham, Roger Inspection Elate: 03/15/18 Reason for Inspection: Follow -Up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Holliday Keen Secondary Inspector(s): Facility Compliance Status: ❑ Compliant E Not Compliant Program Areas: NPDES SW - Industrial Question Areas: ■ Failure to Secure NPDES S' Region: Mooresville Longitude: Phone: Phone: Inspection Summary: She Notice of Intent for this facility was received on February 13, 2018 and is currently under review. Please see the foider for NCG030691 for additional information. , page: 1 Site Number yyT002465 Owner. Bingham, Roger Inspection Date: 03/15/18 Inspection Type: Site Inspection (DOT) Reason for visit: Follow -Up Failure to Secure NPDES SW Permit Does the site have a NPDES Industrial Stormwater Permit? Comment: The Notice of Intent has been submitted and is Currently under review_ Yes No NA NE ❑ ■❑❑ page: 2