Loading...
HomeMy WebLinkAboutNCG030623_COMPLETE FILE - HISTORICAL_20190301STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE �FIISTORICAL FILE ❑ MONITORING REPORTS 0v M Q3 v l DOC DATE p YYYYMMDD Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 1, 2019 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030623 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH lnlerim Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators South Plant located at 4328 South York Highway on February 6, 2019. The report should be self-explanatory-, however, should you have any questions concerning this reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday. Keen@ncdenr.gov. Sincerely, '(' �Zv ames Moore Assistant Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch B Permit: NCG030623 SOC: County: Gaston Region: Mooresville Compliance Inspection Report Effective: 11/01/18 Expiration: 05/31/21 owner: Roger Bingham Effective: Expiration: Facility: Industrial Fabricators Main Plant 4328 S York Hwy Contact Person: Roger Bingham Title: Directions to Facility: intersection of Hwy 321 S & Crowders Creek Rd System Classifications: Primary ORC: Secondary ORC(sj: On -Site Representative(s): Related Permits: Inspection Date: 02106/2019 Entry Time: 02:001 Primary Inspector: Holliday Keen Secondary Inspector(s): Certification: Gastonia NO 28052 Phone: 704-864-3032 Phone: Exit Time: 03:45PM Phone: Reason For Inspection: . Follow-up Inspection Type: Cornpliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NGGC30623 Owner -Facility: Roger Bingham Inspection Dale: 0210612019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary This inspection was conducted as a follow up to a Notice of Deficiency issued on January 22, 2018 Since the initial inspection, Industrial Fabricators has created and implemented ail aspects of the Stormwater Pollution Prevention Plan. This site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed. Page 2 of 3 perrnit: NCGO30623 Owner -Facility: Roger Bingham Inspection Date: C210612019 inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Poilution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (UBGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall lacations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a 3MP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP}? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? N ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Pany(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? N ❑ ❑ ❑ Comment: Page 3 of 3 Semi -Annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/31/2019 CERTIFICATE OF COVERAGE NO. NCGi030623 FACILITY NAME: INDUSTRIAL FABRICATORS, INC. —MAIN PLANT COUNTY :Gaston PERSON COLLECTING SAMPLES Ryan Osborne LABORATORY:_ PaceLabs-Raleigh/Charlotte/Asheville Lab Cert. # _67/12/40___ Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June ® July -Dec or ❑ Monthly DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ]SA ®Other C, FEB 6 2019 C7RAL F�EB PLEASE REMEMBER TO SIGN ON PAGE 3 4 N [_J No discharge this period?z Data Sample p '24hour rain#all _ pH,Total _NorrPplar O&G/ Toxic- Outfall No _ 0116 tedl_ •amount, Total Suspended Solids - SCopper tandaM units Lead Zinc �. Total Petroleum Organicss (mo/dd/yr)::::. ' inches. . Hydrocarbons � Benchmarks —_> =' - : 101), rng%L° fi.0"= 9.0 - , :OA1 mg/L .::_� _ 0 D75 mg/L D.326 mp,/L 15 60A 1`mgJL u: 5DO#001 12/14/2018 0.71 1 7 1 7.50 1 0.007 1 <0.005 1 0.078 1 <5 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit, for those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention / nnt�tion Plan." 'r Name (Print name) Title (Print title) 244_-�Zy� NA (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. U No discharge - -Date Sample 244our rainfall - 72 Dutfall No Eollectedl amount, Non polar ©&G/TPH by'_ - - �. — I6ches3 :-EPA-IW(SGT- Mj. TatalSuspended Solids...pH = Benchnaiirks > ; -- _ °' 15 mg/L 1U0 mg/IL or;5p,mg/E* 6.0 9 0 SU NA NA NA NA NA NA this period?' Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" re arts) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penaltierfor submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date: 11/1/2012-10/31/2017 m, Owner/President (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Pace Analytical Services, LLC 9800 Kincey Ave, Suite 100 Huntemville, NC 28078 (704)87S9092 December 24, 2018 Mr. James Willard II Inenco, Inc. 132 W. Statesville Ave Mooresville, NC 28115 RE' Project: IFAB SOUTH PLANT Pace Project No.: 92411017 Dear Mr. I[: Enclosed are the analytical results for sample(s) received by the laboratory on December 17, 2018. The results relate only to the samples included in this report. Results reported herein conform to the most current, applicable TNI/NELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. If you have any questions concerning this report, please feel free to contact me. Sincerely, Matthew Brainard matthew.brainard@pacelabs.com (704)875-9092 Project Manager Enclosures l REPORT OF LABORATORY ANALYSIS This repon Shal not be raraodur d, except in full, without the written consent of Pace Analytical Se ces, LLC. Page 1 of 12 I�ZAIWkafa i Project: IFAB SOUTH PLANT Pace Project No.: 92411017 Charlotte Certification IDs 9800 Kincey Ave. Ste 100, Huntersville, NC 28078 LouisianalNELAP Certification # LA170028 North Carolina Drinking Water Certification M 37706 North Carolina Field Services Certification #: 5342 North Carolina Wastewater Certification #- 12 Asheville Certification IDs 2225 Riverside Drive, Asheville, NC 28804 FloridalNEiAP Certification #: E87W Massachusetts Certification #: M-NC030 North Carolina Drinking Water Certification #: 37712 CERTIFICATIONS South Carolina Certification #: 99006D01 Florida/NELAP Certification #: E87627 Kentucky UST Certification #: 84 Virginia/VELAP Certification #: 460221 North Carolina Wastewater Certification #: 40 South Carolina Certification #- 99030001 lfirginialVELAP Certfcation #: 460222 REPORT OF LABORATORY ANALYSIS This report shag nut 6e reprodured, except in full, without the nntten consent of Pace Analytical Services, U.C. Pace Analytical Services, LLC 9B00 Kinsey Ave. Suite 100 liuntersvile, NC 29078 (7D4)87S9092 Page 2 of 12 liG /'ii Wica a I SAMPLE ANALYTE COUNT Project: IFAB SOUTH PLANT Pace Project No.: 92411017 Pace Analytical Services, LLC 9803 KGncey Ave. Suite too HunleniAle, NC 28078 (704)8759092 Analytes Lab ID Sample ID Method Analysts Reported Laboratory 92411017001 SDO-001 EPA 1664B JMS 1 PASI-G EPA 200.7 Rev 4.4 1994 SH1 3 PASI-A SM 254OD-2011 CRV 1 PASI-A REPORT OF LABORATORY ANALYSIS This report shal not be *eproduced, efroept in fug, without the written consent of Pace Amytiral Services, LLG. Page 3 of 12 - CBAtt�tlCBf f — x�m.»acsla8s.own ANALYTICAL RESULTS Project: IFAB SOUTH PLANT Pace Project No-: 92411017 Pace Anatyklul services, LLC 9800 Kincey Ave. Suite 100 HuMersville, NC 28078 (704)875-9092 Sample: S130-001 Lab ID: 92411017001 Collected: 1211411810:31 Received: 12A711a 14:25 Matrix: Water Parameters Results Units Report Limit IJF Prepared Analyzed CAS No. Qual 1664 SGT-HEM, TPH Total Petroleum Hydrocarbons 200.7 MET ICP Copper Lead Zinc 2540D Total Suspended Solids Total Suspended Solids Date: 12/24/2018 06:07 AM Analytical Method: EPA 16646 NO mg1L 5.0 1 12122118 04:03 Analytical Method: EPA 200.7 Rev 4.4 1994 Preparation Method: EPA 200.7 Rev 4.4 1994 NO ug1L 5.0 1 1211811 B C7:15 12119118 03:43 744C-50-8 ND ug1L 5.0 1 1211811807:15 1211911803:43 7439-92-1 22A ug]L 10.0 1 12118/18 07:15 12 19118 03:43 744C-66-6 Analytical Method: SM 2540D-2011 5-7 mWL 2.5 1 1211 BI18 17:44 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the rrnden consent of Pace Ana"c:al Samms, LLC, Page 4 of 12 QUALITY CONTROL DATA Project: IFAB SOUTH PLANT Pace Project No.: 92411017 QC Batch: 449295 Analysis Method, EPA 16648 QC Batch Method: EPA 1664B Analysis DesclptiDn' 1664 SGT-HEM, TPH Associated Lab Samples: 92411017001 METHOD BLANK: 2460420 Associated Lab Samples: 92411017001 Parameter Units Total Petroleum Hydrocarbons i LABORATORY CONTROL SAMPLE: 2460421 Parameter Units Total Petroleum Hydrocarbons rrglL Pace Analytical Services, LLC 9WO Kircey Ave. Suite 100 Huai —le, NC 29079 1704ta7rr9092 Matrix Water Blank Reporting Result Limit Analyzed Qualifiers ND 4.8 12122/18 03:52 Spike LCS LCS % Rec Conc. Result % Rec Limits Qualifiers 192 22,4 117 64-132 MATRIX SPIKE SAMPLE: 2460422 92411073D01 Spike MS MS % Rec Parameter Units Result Conc. Result % Rec Limits Qualifiers Total Petroleum Hydrocarbons ni ND 19.2 21 A 110 64-132 Re ft Pe..d.d —ft. wit..r. In mm rmrn t.dk u d by m. 'ltrdW eegrme .ac.pe wara..n dr. n.r. unit I, pr...dr.d m rt» rtpM or dw r.su1L REPORT OF LABORATORY ANALYSIS This report steal not be reprodurxd, except m to. Date: 12124/2018 08:07 AM -It A the vrtinen consent of Pace Analypeal 5e*vicas, LLC. Page 5 of 12 r - ceAnal ticalf QUALITY CONTROL DATA Project. IFAB SOUTH PLANT Pace Project No.: 92411017 QC Batch: 440147 Analysis Method: EPA 200.7 Rev 4.4 1994 QC Batch Method: EPA 200.7 Rev 4.4 1994 Analysis Descnptlow 200.7 MET Associated Lab Samples: 92411017001 METHOD 9LANK' 2454979 Associated Lab Samples: 92411017001 Parameter Units Copper uglL Lead ug1L Zinc ug1L LABORATORY CONTROL SAMPLE 2454980 Parameter Units Copper ug1L Lead ug1L Zinc ug1L Matnx, Water Blank Reporting Result Limit Analyzed Qualifiers ND 5.0 12119/18 D2:11 NO 5.0 12119118 02:11 NO 10.0 12119116 02:11 Spike LCS LCS Cone. Result % Rec 500 513 103 Soo 495 99 500 498 100 Pace Analytical Semicaa. LLC 98M Kincey Ave. Suite 100 Huntmr he, NC 28078 I704J875-9092 % Rec Limits Qualifiers 85-115 85-115 85-115 MATRIX SPIKE & MATRIX SPIKE OUP€ICATE: 2454981 2454982 MS MSD 924108950D1 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result %Rec %Rec Limits RPO Qual Copper ug1L 127 Soo 500 557 517 86 78 70-130 7 Lead ug1L 5.2 500 500 490 467 95 92 70-130 3 Zinc ug1L 2230 5D0 500 1610 1360 -124 -173 70-130 17 M1 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2454983 2454984 MS MSD 92410981001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Copper ug1L 0.0065 500 500 499 497 99 98 70-130 0 mglL Lead ug1L ND 500 500 461 466 92 93 70-130 1 Zinc ug1L D,0f1 500 503 482 490 94 96 70-130 2 mg1L fteutb, pr. *W err ilia paw ara in am untt indkafsd by ara R1Nt.- t k nn fxcpr when an aka unk la preaarrod w ar rlgft & am maul REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 12/2412018 08-07 AM vnthout the wraen consent of Pace Analytical Services. LLC. Page 6 of 12 Zr►alytical' ! �'.pacrlahtcarti Pace Arntytiwl Services, LLC 91300 Kincey Ave. Suite 100 Huntersville, NC 28078 (7041875-9092 QUALITY CONTROL DATA Project: IFAB SOUTH PLANT Pace Project No.: 92411017 OC Batch: 448296 Analysis Method: SM 254OD-2011 OC Batch Method: SM 254OD-2011 Analysis Description: 2540D Total Suspended Solids Associated Lacs Samples: 92411017001 METHOD BLANK: 2455624 Matrix: Water Associated Lab Samples: 92411017001 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Total Suspended Solids mglL ND 2.5 12)18l18 17 41 LABORATORY CONTROL SAMPLE: 2455625 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Total Suspended Solids mg(L 251 248 99 90-110 SAMPLE DUPLICATE: 2455626 92411087001 Dup Parameter Units Result Result RPD Qualifiers Total Suspended Solids mg/L 164 158 3 SAMPLE DUPLICATE: 2455627 92411030001 Dup Parameter Units Result Result RPD Qualifiers Total Suspended Solids mglL 10.5 10.9 4 Rwuk, psswaad w ddk p+0• r. in the unka IrmikatW by th•'UMW column ­0 wh. —.kemat. unk Is prnenwd is &* OUM of the nsuR REPORT OF LABORATORY ANALYSIS This ,epo t shall not be reproduced, except in full. Date: 12/2412018 08:07 AM wUtout the wntien consent o1 Pace Analytical Services, LLC. Page 7 of 12 1ceAmWa y QUALIFIERS Project: IFAB SOUTH PLANT Pace Project No.: 92411017 DEFINITIONS ?ace Analytical Services, LLC 9800 Kncey Ave. Suite 100 Huntersvile, NC 2BO78 (704)(175- 092 OF - Dilution Factor, if reported, represents the factor applied to the reported data due to dilution of the sample aliquot. NO - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection lima and below the adjusted reporting limit. MDL-AdjustedMethod Detection Limit. PQL - Practical Quantitation Limit. RL - Reporting Limit - The lowest concentration value that meets project requirements for quantitative data with known precision and bias for a specific analyte in a specific matrix. S - Surrogate 1,2-Diphenylhydra:ine decomposes to and cannot he separated from Azobenzena using Method 8270- The result for each anaiyte is a combined concentration. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Di fefence NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates the compound was analyzed for, but not detected. Acid preservation may not be appropriate for 2 Chloroethylvinyl ether. A separate vial preserved to a pH of 4-5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and AcyloniMle by EPA Method 8260. N-Nitrosodiphenylamme decomposes and cannot be separated from Dlphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited anaWs. TNI - The NELAC tnsttute. LABORATORIES PASLA Pace Analytical Services -Asheville PASI-C Pace Analytical Services - Charlotte ANALYTE QUALIFIERS M1 Matrix spike recovery exceeded OC limits. Batch accepted based an laboratory control sample (LCS) recovery. REPORT OF LABORATORY ANALYSIS This repon shall not be reproduced, except in full. Date: 12124201 B 08:07 AM without the written consent of Pace Analytical Services. LLC- Page 8 of 12 AfWical r+�xpsoelntrra�.a QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: IFAB SOUTH PLANT Pace Project No.: 92411017 Lab 10 Sample ID QC Batch Method QC Batch 92411017001 SDO-001 EPA 1664B 449295 92411017001 SDO-001 EPA 200.7 Rev 4.4 1994 448147 92411017001 SDO-001 SM 25400-2011 4462% REPORT OF LABORATORY ANALYSIS This report shah not be repmduced, except in MI. Date: 121241201 B 08:07 AM without the written consertl of Pace Analpcal Sere M, LLC. Pace Analytical Services, LLC 9800 KIncey Ave. Suite 100 Huntersville, NC 26078 (704)B75-9092 Analytical Analytical Method Batch EPA 200.7 Rev 4.4 1994 448226 Page 9 of 12 000nnerK Name: Document Mubed- Febri 7. 2012 SankFiff L%Mo PavloQ_ DmmentMo.: laboratory rog"rig samples: - AahevW 0 Eden[] Gregmood Hwftrwflleb--'�- ftk'OEI Mh----fflkO WD#:-92411017.. C"rt&- 04d Ex f3ups MUSPS r1q., Cjcmmmw opaw 00thu:— 92411017 — - cmsiadv $a ft--t? Oyes BN stab baw) Clyes Paciftghtwtsiall Duwe Wnp "�Bubble flap DNone 11 Omer 92TO46 Ty"oficr, bi�K Elm. [;il+entrr.�Tl Coder Temp rc): 4-, k ConvrtFovFacrtsrAM/SubbzCfQ 0,() haeleiftgm. boeut WWis COO* TtWCorrected rq 5VCoBG0wwaftq— obmtezv L%DAReCd4WSol[ j *1Awaterumpiel i2ivP� a,. I r2n&wmne Um UattLd State.m CA, W. or SC (check m4po? oWuopl&sorwnrtmfmmAFQm4FLaurce 4y. Chain of Oxtedy P�fl ��Adw-.7Nn W. L s a,.� t."s :k 0 FkM Th-w? n A I Riah Tura Arand rum geguestibd? es 1(o, 4. -Pam e,,=rn Used? [20. CkR ONA 091A 6. Contabm tltzct? [I% DWA. 7. DL=fyeda2y&. �sles Reid mered? pas Ejft 11w—A a. Sample LabdsWtch CDC? ow. 9. flea is WAVWSJ�5-6=1? — [3- - (II/A 'a f Nmffti Trip B4nk -4gaiv seah Present? n WA MMMMMAALVU WSMPANCY Veld OM kftpt&O Oyu llfk Wt 10 ofsp_ft amitaums: — Person ombcL4: Oatpfiimc 4 D.M f i -e PrC4ftdMU,4Fj-SffRe-Jow: Data: Page 10 of 12 SL F gg p B P o x c ti ike. EP4U-525 mL PFurk 'Uhprosarred {NjA} ([Fl UP30.250 mL Piarnc VnArosemd {N jA) 902U-500 mL Plank Unprmend {NM ' ,Y►lr►-2 pLef PIIStSc VnREeserwfd {NJAI AMS425 mi. PEasUc H25O4 (Wi 4 21 (CF) Al-1 AZ 1-11,L Spam-250 mL plastic HNO3 (pH t 21 8NZ-225 mL Plastk2N Acatata 6 NaOH JA) zzzlP4G225 mL Plastic NaOH (pH > 21) (CF) WOFV•W)de-mouthed Glwlor Unpraserved AG1UA Oter Amber VnRrisawad {N/AI (C(-) AGIM-1 Ilter Amber HU (pH,; 21 AGM-250 mL Amber Unpresepmd (N/A) tCF) AG15-! hoer Ambe, H2SO4 (pH S 2J MM250 mL Amber HZSO4 (pH S 2) AG3A(fsO3A)-2SO mL Amber NH4CI (N/AI(LI-) D"14 40 mi. VOA NCI (NIAI WIM-40 mLVOA Na25203 (N/A) V¢aV•p mt VCIA Vnn rN/A1 DQW 40 hr4 VOA HtIPM IWA1 VOAK (evrab par ktt)-SttS:, kit IN/A) V/GK (A vre}e per kk*VPH/Gus kit (N/A) spat-125 mL staNe Pkstk (WA— Ub) $MT-250 mLStaAk. PLgk IN/A—kh) 01re,4250 mL Ptasttc INktx)25t}419.a-a.71 A(IOU•100 mL Amber Unpreservad Mats (NIA1 VSGU-2OmLWntlU*U*nvlalr (NIA) 06lU•4O mL AmlNr URpInONed V1alf {H/A] CHAIN-O F-CUSTODY ! Analytical Request Document ' ii�I'V fRf 1 �• The ChaOwf-Cumwty lr a LEGAL DOCUMENT. A111nlwnnt rwkb r-9 be rq**d Wwrnalr ....NplMa.rm P.v.: 6ecUtm A 3Ac1jon B Section C It dl-d Cuent kdamnalmn: R."Amd wq.dt lNa+sMew+' Irnelcn Infem.dw: JJ�� Lm9AnY' Y!'kr Rol d T.. A4unlgn C I a `� € Q % �] L I2 6 8 F 2 3 AdMNe, Z;ZCM, T4. C.M—y N— REGULA QRY AGEY �¢ PI r GROUNCND WATER ;r DRINKING WATER r UST `- RCRA -r OTHER EmM iC , 1'un.Mtr II�ti'WCY7tv\L.. �,C� OrJer No.: Wr. C,al. p,a„M� pJl��7 ,ate,,,, F , F �l.lyy SOP Location R.pgMleq o.. OMWTAT; . Prtypp 1t1 r Recimsted Analysis Flltafod tWN] i Seotl— O Mikt. c.1.. RegtirWL'4n14.nenu awr EtSi'[f65..1S:9RE ;NMrWOur F Nr:pW ft. tANfel1. Ww Prcrhlct P Entr9did 8t SAMPLE ID wig 04 Vvp IA-Z. 0-g 7 A Am Enmvle 1Dr MLN.:T BE UNIOLE g R 'd $ S� V m � w COLLECTED u� Y' 'n Aroseryntiv9S i '> cybYWrl. si„AT CVYJrULI\ LN KIW ']' Z Z �► .� � rL Pa. Project Np.� La41,D. DATE TINE AAT£ TIIoF i� I 7 - 3 _ E S l E 4 Ill Tt tg AOOITIGMAL COMMENTS LI ISRED BY I AFFYJATIDN pAFe TIPS' A006PTEb BY I AFFILfATION LIATE TIM4 SAMPLE CONaT1a7N9 1, r7 Lrst•d C.' /�s"GU L J ,i m rn m � SAMPLER NAME AND SIGNATURE i! F- J�r 111!!! U PRRIt Nsnw of AAEIPLtR: AATE Signed E16NATUR4 M SAMPLEN:,,.�� t1IAlOafYYF. � •krpwrlaru N. :#,.k"gj06,k+mw.raru uumpM. Apci.rN:130drrr aafmmll.rrnY An;t yygWuiw 14a11n1 W llA°41mlSmcrlq] rt'rYwoY ryl lNi. IISINtrvYali 132 W. Stat Olc Ave. Mwvesrilj,%NC 26115 INENCO INC. E�)662�1� Faz:(]R.)662.4194 incnco,'eiixrtcoinc.cnm Report at Field Analysis Results Client. Industrial Fabricators VC Plant 4820 S York Hwy Charlotte, NC 28268 Gaston County Projed: Stormwater Sampling: Year B, Period 2, 2018 Sample Date: 1211412018 Report Date: 12131/2019 Sample ID: SDO-001 Attalyticsl Results Sample ID: SD04WI Collected: 12J14P-018 11;42 Parameter Result Unit Method Analyzed Analyst PH 7.90 SU 4-%WH+S 1211412019 11:43 RRO Reported By: James W. Willard 11, Laboratory Supendso"r NC Laboratory Fidd CcrtiPtca"n No. 5540 STORMWATER DISCHARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year 2018 Individual NPDES Permit No. NCS❑❑❑❑❑❑ or p Certificate of Coverage (COC) No. NCG030623 )RECe/Inz 7 L- D This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. FEB 6 2019 Facility Name: INDUSTRIAL FABRICATORS, INC.-MAIN PLANT DURRSECr,LEs County: Gaston OAJ Phone Number: (707) 864-3032 Total no. of SDOs monitored 1 Outfall No. 001 Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No _= a�amete;. units S- _ Nan-Patar t - c - -#Total Total - R . �,Total.Toxtc Ra�rtfall Suspended �,,,� _ _..... :. -Capper, Lead Standard e�nrts, - g Petroleum Organics inehes.. Solids _ Y .R • - ._.._ �. .M F...:. =._ ;. Hydrocarbons Bench Mark 1V/A - -100. rng/L S p _ 9 (3 ... DAiU rng/L - 0.075 mg/l' : ' ..0126"mgjL, : _ 15 mg/l .� mg/L r .. -�D_ ate�Sample. 12/14/2018 0.71 7 7.50 0.007 <0.005 0.078 <5 NIA SW U-264-Generic-13Dec2012 I certi#y, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and impriso_gment for knowing violations." Signature Bingham, DWQ Re ig onal_Office Contact Information: For questions, contact your local Regional Office: 610 East Center Ave., Suite 301 Mooresville, NC 29115 (704)663-1699 Date % SW u-264-Generic-13Dec2012 RECEIVED JUL 18 2018 CENTRAL FILES DWR SECTION Semi -Annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 130/2018 CERTIFICATE OF COVERAGE NO. NCG030623 FACILITY NAME: INDUSTRIAL FABRICATORS, INC. -MAIN-PLA COUNTY :Gaston PERSON COLLECTING SAMPLES N/A LABORATORY: Pace Labs-Raleigh/Charlotte/Ashevilie Lab Cert. if 67/12/40 _ _ Comments on sample collection or analysis: Semi-annual samples were not collected In 1HIS, In part, due to difficulty establishing O/F sampling locations and from staff turnover. Collection will resume In 2H1B once unrestricted access is established. Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ® Jan -June ❑ July -Dec or ❑ Monthly DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ®tither C. PLEASE REMEMBER TO SIGN ON PAGE 3 3 ® No discharge this period?' Outfall No Date Sample. Collected r mo/ddl rj; ',24-hour rainfall ; amount, Inches', Total Suspended Solids' :. pH, Standard units Copper" Lead Zlnc Non -Polar O&G/ Total Petroleum racarbons Total Toxic Organics Benchmarks -_=> •100 mg/L' . , ' 6.0 - 9.0 ' 0.007 m&IC 0.03 ntg/L , : 0.067 mg/L 15 mg/L 1 mg/L SDOff001 NO FLOW NO FLOW NO FLOW NO FLOW NO FLOW NO FLOW NO FLOW NO FLOW N/A Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 7 Far sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. Fnr purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit late: 11/l/2012-10/31/2017 SWU-245, last revised 10/75/2012 Page I of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxicarganics iTTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." NA lFSr FN��� Name (Print name) NA Title (Print title) NA A `— � or 0 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format, "<XX mx/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tler 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period72 l7uNall Na Gate Sample > Collected' (mo/dd/ r '24 hour rainfall amount..'Nan ". Inches3' . ) polar O&G/TPH by ;EPA;1664{SGT-HEM . , . Total Sus ended Solids : P P H aerrchmarkr ===a ? . 15 mg/L� 100 mg/L or,50 mg/t* 6.0-,9 U 5U NA NA NA NA NA NA Footnotes from Part A also apply to this Part B ' 5ee General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES iN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B, • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEFDENCF5 FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO to IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab_ results for of end of monitoring period in the case of No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699.1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathefing the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties fq,�Zbmitting false information, including the possibility of fines and imprisonmentfor knowing violations." e (Signature of mittee) Roger BI am, Owner/President (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 bF ✓ 61� INDUSTRIAL FABRICATORS 4328 SOUTH YORK HWY GASTONIA, NC 28052 RECPIr/F Reference: No Exposure Certification # NCG030623 Industrial Fabricators Main Plant MAY 15 2018 4328 South York Hwy Gastonia, NC 28052 CEN7'RAL FILES OwR SECTION Dear Sir or Madam, Industrial Fabricators is cleaning the parking lot of all machinery, wooden skids, metal scrap and empty barrels. We have determined a sampling point and provided clear access to it. We have retained Applied Water Technology of Raleigh NC to provide the required sampling and testing as well as assist in developing our SWPPP and best management practices. We expect to complete the clean up within the next three to four weeks. Best regard ck H�don, y/Environmental Engineer Industrial Fabricators r RECEIVED FEB 13 2013 DENR-LAND QUALITY STORMWATER PERMITTING Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 23, 2018 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030623 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. TOBY VINSON, JR. Interim Director REGENED APR 2 4 2018 CENTRAL FILES DWR SECTION Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators South Plant located at 4328 South York Highway on March 15, 2018. The report should be self-explanatory; however, should you have any questions concerning this reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Permit: NCG030623 SOC: County: Gaston Region: Mooresville Compliance Inspection Report Effective: 11/16/17 Expiration: 10/31/18 Owner: Roger Bingham Effective: Expiration: Facility: Industrial Fabricators Main Plant 4328 S York Hwy Contact Person: Roger Bingham Directions to Facility: intersection of Hwy 321 S & Crowders Creek Rd System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Gastonia NC 28052 Title: Phone: 704-864-3032 Certification: Phone: Inspection Date: 03/15/2018 EntryTime: 10:OOAM Exit Time: 12:001PM Primary Inspector: Holliday Keen Phone: Secondary Inspector(a): Reason for Inspection: Follow-up Inspection Typo: Compliance Evaluation Permit Inspectlon Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG030623 Owner -Facility: Roger Bingham Inspection Data: 0311512018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This inspection was conducted as a follow up to the Notice of Deficiency issued January 22, 2018. At the time of inspection, the SWPPP was still in the process of being made and Analytical and qualitative monitoring has not been conducted yet. Per Jack Herndon, they have hired a third party company to assist with stormwater monitoring. Outfalls have been identified and safe access paths have been created. Additionally site cleanup and additional housekeeping methods have been enacted to reduce impacts to stormwater flowing over the site. Please complete and enact the SWPPP and conduct analytical and qualitative monitoring as soon as possible. A follow up inspection will be conducted March 29, 2018 to assess progress and site compliance. If you have any questions, please contact Holliday Keen at 704-235-2148 or by email at Holliday.Keen@NCOENR.gov. Page: 2 1. Permit: NCG030623 owner - Facility: Roger Bingham Inspection Date: 03YI51201 a Inspection Type: Compliance Evaluation Reason for Visit. Follow-up 5tgmwater Pollution Prevention Plan --- -- Yea No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ N ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? [] 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? [] 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ■ ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? [] 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ S ❑ ❑ # Is the Plan reviewed and updated annually? ❑ N ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ■ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ U ❑ ❑ Comment: The SWPPP had not been developed or implemented at the time of inspection. Qualitative Monitoring Yea. No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑ Comment: Qualitative monitoring has not be n conducted or documented. Analytical Monitoring Yea No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring has not been conducted or documented. Permit and Outfalls Yoe No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ X ❑ ❑ Comment: Durina this inspection we identified potential outfalls on site and safe access has been developed to outfalls, The SWPPP had not vet_ been-develoAed and illicit discharges had not been evaluated. Page: 3 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY CERTIFIED MAIL RETURN RECEIPT REOUESTED Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 �%4 `� O oL L�—�- January 22, 2018 ROY COOPER Governor MICHAEL S. REGAN Secretary 5 WILLIAM E. TOBY VINSON, JR. f d Interim Director n 1 , 7016 1370 0000 2595 8495 Bingham Properties, LLC 7016 1370 0000 2595 8501 Attention: Roger Bingham, Manager and Patricia Bingham, Registered Agent and Manager 323 Dover Road Kings Mountain, North Carolina 28086-8697 Subject: NOTICE OF DEFICIENCY NOD-2018-PC-0006 General Permit Number NCG030000 Certificate of Coverage Number NCG030623 Industrial Fabricators Main Plant Industrial Fabricators, Incorporated Gaston County, North Carolina Dear Sir and Madam, RECEIVE[) FEB 0 2 2018 CENTRAL FJLES (1WR SECT10tq Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the compliance inspection conducted on January 11, 2018 at your facility located at 4328 S York Highway, Gastonia, North Carolina. This inspection was conducted by Holliday Keen. This inspection was conducted as a routine inspection to evaluate compliance with Certificate of Coverage number NCG036623 issued to Industrial Fabricators, Inc. for this site on November 16, 2017. This permit covers on site activities including the manufacturing of metal products. The enclosed report should be self-explanatory. Please note the comments located in the summary portion of the inspection report. As noted by the inspector, the Stormwater Pollution prevention plan has not been created for this site which is a violation of permit condition Part II Section A stating that "The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP)." Additionally, Analytical and Qualitative Monitoring have not been conducted or recorded in the SPPP. This is a violation of permit conditions Part II Section B and State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Mooresville Regional Office { 610 Enst Center Ave Ste 301 f Mooresville, NC 28115 704 663 1699 i' Industrial Fabricators Main Plant NCG030623 January 22, 2018 Page 2 Part 11 Section D respectively. It was also noted on site that this site has not determined all applicable outfalls which is a violation of Part II Section A.1(c) of the general permit. Please review the violations as listed below and see the attached addendum for information about your permit. 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and properly implemented. Yes ❑ No 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No ® NA ❑ 3) Analytical Monitoring Analytical monitoring has been conducted and recorded in accordance with permit requirements. Yes ❑ No ® NA ❑ 4) Permit and Outfalls The permittee has not evaluated the stormwater outfalls for illicit discharges annually as required by the permit. Required Response Thank you for your attention to this matter. This office requires that the violations as described above be properly resolved. Unresolved violations may lead to the issuance of a Notice of Violation and/or assessments of civil penalties. Please provide a written response detailing the measures taken to bring your facility into compliance. Your response should document the initiation of the analytical and qualitative monitoring at the subject facility in accordance with the terms and conditions of the permit. This response should be received no later than 30 days from the date of this letter. If you have any questions or require any additional information, please contact Holliday Keen at (704) 235-2148 or Holliday.Keen@NCDENR.gov or me at (704) 663-1699. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Mooresville Regional Office HKlcys Enclosures: Inspection Report Industrial Fabricators Main Plant NCG030623 January 22, 2018 Page 3 1n71f7��l�1�1�1 The National Pollutant Discharge Elimination System (NPDES) program was established under the federal Clean Water Act and then delegated to the Division of Water Quality for implementation in North Carolina. The NPDES permitting program for stormwater discharges was established in 1990. Phase I focuses on site and operations planning to reduce pollutant sources. Through the NPDES permitting program industrial facilities that fall into one of the subject ten categories are required to obtain permit coverage under a general permit or an individual permit, depending upon the facilities SIC code and the industrial activity occurring at the facility. There are currently 19 active general stormwater permits in North Carolina. One condition that is applicable to both the general permits and individual stormwater permits is the requirement to develop and implement site -specific comprehensive Stormwater Pollution Prevention plans (SPPP). These plans are required to include a comprehensive evaluation of the site and operations to reduce pollutant sources and prevent pollutant discharge. Copies of the general permits and accompanying documents can be accessed from the following webpage: http://portal.ncdenr.org/web/wq/ws/su/npdessw#General_Permits_NPDES. Permit text, technical bulletins, discharge monitoring forms, and a Notice of Intent [which is the application for coverage under a NPDES General Stormwater Permit] can be found on this website. The following items are a subset of permit requirements and are listed to assist you and help bring your attention to certain permitting issues, process and condition requirements of your permit. Please see the above mentioned website to obtain a copy of the permit so you may fully comply with all the conditions therein. Failure to properly comply with conditions of the permit, like those hulleted below, is a violation(s) of the permit and subject to civil penalty assessment(s) of up to $25,000.00 per day. • Industrial facilities that fall into one of the subject ten categories are required to obtain permit coverage under a general NPDES stormwater permit or an individual NPDES stormwater permit • All persons desiring to have facilities covered by a General Permit must register with the Division of Water Quality (DWQ) by filing of a Notice of Intent (NOI) and Applicable Fees. • This Notice of Intent (NOI) must be submitted and a Certificate of Coverage issued prior to any discharge of stormwater associated with the industrial activity, process wastewater, and/or mine dewatering. • Once the Notice of Intent is received, DWQ will review and determine whether a Certificate of Coverage (COC) may be issued. If this Certificate of Coverage is issued the facility is covered by the General Permit. That is, the permittee is authorized to discharge stormwater, process wastewater, and/or mine dewatering pursuant to the type of General Permit until the permit expires or is modified or revoked. • Any other point -source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. Industrial Fabricators Main Plant NCG030623 January 22, 2018 Page 4 • There are currently 19 active general permits. Permit conditions vary accordingly; however, most of the permits have the following condition requirements (you must read your entire permit to ensure full compliance): o Development and compliance with the Stormwater Pollution Prevention Plan o Collection, reporting, and recording of Analytical Monitoring o Collection, reporting, and recording of Qualitative Monitoring o Collection, reporting, and recording of Vehicle Maintenance Monitoring (if applicable) o Records — Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of the analytical monitoring results shall also be maintained on site. The Permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip -chart recordings for continuous monitoring instrumentation, and copies of all reports required by this general permit for a period of at least 5 years from the date of the sample measurement, report, or application. o Expiration — The permittee is not authorized to discharge after the expiration date of the general permit. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180-days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subject to enforcement. Failure to renew your permit is a violation. o Transfer — The Certificate of Coverage (COC) issued pursuant to this general permit is not transferable to any person expect after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the Certificate of Coverage to change the name and incorporate such other requirements as may be necessary under the Ciean Water Act. The Permit is NOT transferable. o Name Change, Closure, or Facility Ownership change — Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. The Division of Water Quality views changes of name or ownership as a modification that requires the Director's approval and reissuance of the permit. Name and ownership changes require you to complete a Name/Ownership Change Form from the Division and mail it back to the Division of Water Quality along with all appropriate information. o Proper Operation and Maintenance is a requirement of the permit. Compliance Inspection Report Permit: NCGO30623 Effective: 11/16/17 Expiration: 10/31/18 owner: Roger Bingham SOC: Effective; Expiration: Facility: Industrial Fabricators Main Plant County: Gaston 4328 S York Hwy Region: Mooresville Contact Person: Roger Bingham Directions to Facility: intersection of Hwy 321 S & Crowders Creek Rd System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Gastonia NC 28052 Title: Phone: 704-864-3032 Certification: Phone: Inspection Date: 01/11/2018 Entry Time: 02:OOPM Exit Time: 03:OOPM Primary Inspector: Holliday Keen Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: ■ Storm water (See attachment summary) Page: 1 r' Permit: NCG030623 Owner - Facility: Roger Bingham Inspection Date: 01111/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: During this inspection I met with Jack Herndon and discussed site conditions and permit requirements. I noted that a Stormwater Pollution Prevention Plan (SPPP) has not been created, site outfalls have not been determined, and analytical and qualitative monitoring have not been completed. Please create and implement a SWPPP and a follow up inspection will be conducted to assess site compliance. If you have any questions, please contact our office at 704-663-1699 or by email at Holliday, Keen@NCDENR.gov. Page: 2 F Permit: NCGO30623 Owner. Facility: Roger Bingham Inspection pate: 01/11/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes_N_o NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ M ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ■ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ■ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ■ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ■ ❑ ❑ # Does the Plan include a SMP summary? ❑ [] [] # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ■ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ M ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ■ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: A Stormwater Pollution Prevention Plan has not been created for this facility. Qualitative Monitoring Yea No NA Ng Has the facility conducted its Qualitative Monitoring semi-annually? ❑ M ❑ ❑ Comment: Qualitative monitoring has not been conducted. Anah ical Monitoring Yea No NA NE Has the facility conducted its Analytical monitoring? ❑ M ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring has not been conducted_ Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 9 ❑ ❑ # Were ail outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ M ❑ ❑ Comment: All site outfalls have not yet been determined. Current known outfall is not accessible due to steep terrain and overgrown vegetation. Page: 3 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 1, 2019 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030623 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director MAR 0 4 2013 DENR-LAND QUALITY STORMWATER PEFRW i i ING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators South Plant located at 4328 South York Highway on February 6, 2019. The report should be self-explanatory; however, should you have any questions conceming this reports, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, ames Moore Assistant Regional Engineer Land Quality Section Enclosed: Inspection report rStormwater=Perriiitti g B anch- 1 Permit: NCG030623 SOC: County: Gaston Region: Mooresville Compliance InsMction Report Effective: 11f01I18 Expiration: 05/31/21 Owner: Roger Bingham Effective: Expiration: Facility: Industnal Fabricators Main Plant 4328 S York Hwy Contact Person: Roger Bingham Directions to Facility: intersection of Hwy 321 S & Crowders Creek Rd System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Gastonia NC 28052 Title: Phone: 704-864-3032 Certification: Phone: Inspection Date: 02/06/2019 Entry Time: 02:00PM Exit Time: 03:45PM Primary Inspector: Holliday Keen Phone: Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030623 Owner -Facility: Roger Bingham Inspection Date: 0210812019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This Inspection was conducted as a follow up to a Notice of Deficiency issued on January 22, 2018. Since the initial inspection, industrial Fabricators has created and implemented all aspects of the Stormwater Pollution Prevention Plan. This site was in compliance at the time of inspection and the Notice of Deficieny is now considered closed. Page 2 of 3 Permit NCG030623 Owner -Facility: Roger Bingham Inspection Date: 0210612019 Inspection Type : Co+npliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? x ❑ ❑ ❑ Comment Qualitative MonitorinSt Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annuaAy? 0000 Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Quffalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ [] 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3 IV CCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director September 14, 2012 Mr. Roger Bingham Industrial Fabricators Main Plant 4328 South York Hwy Gastonia, North Carolina 28052 Dee Freeman Secretary Subject: General Permit No. NG030000 Industrial Fabricators Main Plant COC No. NCG030623 Gaston County Dear Mr. Bingham: In accordance with .your application for a stormwater discharge permit received on March 26, 2012, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. Please note that the attached permit expires on October 31, 2012. Your COC will be automatically renewed to cover the full 5 year term of the soon to be reissued permit. In the interim you must abide by the terms of the expiring permit. You can review the proposed general permit changes once they are posted at: http://portal.ncdenr.org/web/wq/ws/su/current-notices If you have any questions concerning this permit, please contact Bill Diuguid, Staff Planner, Stormwater Permitting, at telephone number (919) 807-6369. Sincerely, ORIGWONEW for Cha' rTes�akild, P.E. 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX 919-807.64921 Customer Service: 1-877.623-6748 internet: www.nmateraualitv.ora None Carolina aturallry An Equal Opportunity) Affirmative Aclion Employer COC No. NCG030623 Mr. Roger Bingham Industrial Fabricators Main Plant September 14, 2012 cc: Mooresville Regional Office Central Files Stormwater Permitting Unit Files Attachments Page 2 of 2 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCGO30000 CERTIFICATE OF COVERAGE No. NCGO30623 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Industrial Fabricators Main Plant is hereby authorized to discharge stormwater from a facility located at Industrial Fabricators Main Plant 4328 South York Hwy Gastonia Gaston County to receiving waters designated as Crowders Creek, a Class C water body, Catawba River Basin; in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI of General Permit No. NCG030000, as attached. This Certificate of Coverage shall become effective September 14, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 14, 2012. Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission ' Id SinkiU, .06v8202 .INDUSTRIAL�FABRICATORS,INC,��PCN0K. 4328 S"YORK:IIWY -RO,'BOX 12885 AMOUNT GASTON IA,'. NC (70'4') 864-j632-FAX (704).--l- 204 AA �C. PAY J 4�c - TO THE ORDER. " AUVIORIZEED SIGNAT14M NCG030000 N.O.I. Final Checklist This application will be returned as incomplete unless all of the following items have been included: d Check for $100 made payable to NCDENR. This completed application and all supporting documents. L�J A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater outfalls corresponding to the drainage areas, (d) runoff conveyance features, (e) areas where materials are stored, (f) impervious areas, (g) site property lines. Copy of county map or USGS quad sheet with the location of the facility clearly marked on the map. Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee coverage under the General Permit. For questions, please contact the DWO Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 4 of 4 SW U-218-071408 Last revised 7114/08 Diuguid, Bill From: Parker, Michael Sent: Monday, June 25, 2012 9:26 AM To: Diuguid, Bill Cc: Krebs, Rob Subject: RE: NCG030623 Bill, You can also issue this one as well. Michael Parker From: Dluguld, Bill Sent: Wednesday, June 20, 2012 10:42 AM To: Krebs, Rob Subject: NCG030623 Rob Krebs, Mooresville Regional Office: _?i / *�L- o Please review the attached NOI application with the objective of responding to me with a recommendation to issue the permit. I recognize that you may not visit each new permittee during this NOI review, but it affords you the opportunity to log the permit into your regional database and add the facility to a future monitoring and compliance visit schedule. Therefore, your recommendation now to issue the permit serves as your acknowledgement that (1) the facility is located in your region, (2) that there are no current complaints outstanding about the facility that have not been dealt with, and (3) that the facility may ultimately be inspected by the regional staff. I've also attached a scanned copy of the NOI and a location map for your review. COC # i,Facility Location j City/County NCG030623 Industrial Fabricators Main Plant 4328 South York Hwy Gastonia/Gaston If you need any more info, give me a call. If you could send me a recommendation to issue the permit by 07/20/2012, I'd appreciate it, so I can issue their COC. I cannot issue the permit until the respective regional office reviews and comments back to me with a recommendation to issue the permit. Thanks. Bill Bill Diuguid, AICP Staff Planner, Stormwater Permitting Wetlands and Stormwater Branch Division of Water Quality I NCDENR 1617 Mail Service Center (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 91h Floor (Location & Parcels) Raleigh North Carolina 27699-1617 Phone: 919-807-6369 1 Fax: 919-807-6494 Website: http-//portal.ncdenr.orglweb/wq/ws/­su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.