Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030563_MONITORING INFO_20151102
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE El HISTORICAL FILE @-MONITORING REPORTS DOC DATE ❑ YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted le CERTIFICATE OF COVERAGE NO. NCG03 SAMPLE COLLECTION YEAR Z41� FACILITY NAME fV? SAMPLE PERIOD [ Jan -June ❑ July -Dec COUNTY�.l.r� or El Monthly' month PERSON COLLECTING SAMPLES �/ �/ 1�� MARGING TO CLASS ❑ORW []HQW []Trout ❑PNA LABORATORY Lab Cert. # S � 2p15 ❑Zero -flow ❑Water Supply ❑SA' Comments on sample collection or analysis: ❑Other DWR SECTION ' PLEASE REMEMBER TO SIGN ON. PAGES Z AND/OR 3 Part A: Stormwater Benchmarks and Monitoring Resultt LLJJ No discharge this period?` ;. Date Sample p 24-hour rainfall H 3 P ' 9 Lead Non Paiar Q&G/ Total Toxic butfall No ;- seta a mount Total Suspended Sallds ar d units Capper Yins Total Petroleum Or anics s R . (mo/dd/yr} Inches ...;': :St ytan Hydrocarbons �21tChlilGl�[S. ape> �gp� i''. �� 1q0 mg/k or 50 m/L fi q 9 0 :: . 0.007 mg/L 0.033 mgJL 0.067 mg/i- 15 mg/L 1 mL 2 9- V -!f l `' 7 S 0,eos� / t 1VIUIILIIIY 7OFFI JJI1 11r, `11 I5L CCU UI ?CI111-d I I I 1 LAW) IFIUDL UCl;II1 WILFI LIIC DCL JFIU LUI IJCL.ULIVC UCI I II FIAT M1 CRI.CCU0114C 1U4 UIC �OIi1C POF OFIICLCF dL LIIC JdIIIC UULI tla. 2 For sampling periods with no discharge at any single'outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. b See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics Is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found In 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in.40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page l of 3 Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART If SECTION a. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES []NO[] IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: mail an original god one-cogyof this DMR Including 'No 01schamethl ce Period In the case ollNo 2tmhamgAmegj9J' Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR &NY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for.gathering the information, the Information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are slg ficant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date* 11/1/2012-10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 AIWA EM Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit http:!/nortal.ncd=r.oLg.j_wsb jwq f ws/su/nndessw -4 Permit No.: ��f�/R/_/_/_/_ /_/ or Certificate of Coverage No.: t9 !P Facility Name: 4a>eIZ G4eV1CI n7XJ ., Lr�G County: XOut..�.x/ Phone No. %4 - (o ff- .y ;l Inspector: �r&" d iZ f_ Date of Inspection: - 44- Ae7 -/5 Time of Inspection: Total Event Precipitation (inches): _ [ . Was this a "Representative Storm Event" or "Measureable Storm Eventp as defined by the permit. (See information below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event' (requirements vary, depending on the permit). Qualitative monitoring requirements vary_ Most permits require qualitative monitoring to be performed during a "representative storm evene or during a "measureable storm event." However, some permits do not have this requirement Please refer to these definitions, if applicable. A "representative storm event" is a storm event that.measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A `measurable storm evens is a storm event that results in an actual discharge from the permitted site outfali. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this,�gnatge, i certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) - Page 1 of 2 SWU-242, Last modified 10/25/2012 G 1. Outiall Descriptfon: Outfall No. Structure (pipe, ditch, etc.) I%lTGz44 Receiving Stream:gw Describe the industrial activities that occur within the outfall drainage area: /dl2 5 �r zI It!k/� 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc) and tint (light medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): A14 d 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: ` 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 3. 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids -and 5 is extremely muddy: 1. © 3 4 5 7. Is there any foam in the stormwater discharge? Yes S. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further'Investigation. Page 2 of 2 SWU-241 lastmodified 10/25/2012 W X\ Er- 'C' Rr- T EK Ril- - ---j --" E TE LLAAB MAN 11ritic., �S,) 5 Pinewood Plaza Drive - P.O. Box 1056 Granite Falls, NC 28630 Phone (828) 396-4444 - Fax (828) 396-5761 CLIENT: Power Curbers, Inc. PHONE NUMBER: 7U4 6 �� �$ - Attn. David Hancock TYPE SAMPLE: Storm Water 727 Bendix Dr. 28146 No. LOCATIONS: 2 Salisbury, NC 28145-1639 SAMPLER NAME: naa� IC : Sample Collection Information TYPE CONTAINERS ANALYSIS REQUIRED Sample Location FacilityName DATE TIME TEMP. Grab/ Composite No Plastic/ Glass Location 1 r� r _ laS d 211 Grab 3 Plastic& Glass Oil & Grease, Pb, TSS Location 2 I• Ub Grab 3 Plastic& Glass Oil & Grease, Pb, TSS fi' ,ENTRAL I Alm FILE Relinquished By: 4 Z`�f'S Date: `7� 7�' /�` Time: ��• �Q Reciev Date: Time: ��/'Q Relinquished By: Date: Time: Rec'9 Aid By: Date. Time: PRESERVATION: ja--�o 4° 04 [] Na0 [ 03 jJDechlornating Agent j J Other SAMPLE TEMP. @ LAB (°C) 3 10 RESEARCh & ANAtyT1CA1 LABORATORIES, INC. For: Water Tech Labs, Inc. P.O. Box 1056 Granite Falls, NC 28630 Attn: Joe Gragg Report of Analysis 5/ 14/2015 aII191111 ANA(n.1i�i �m NC ##34 x; - '; = NC #37701 ti 04;111 all►`t Client Sample ID: Power Curbers #2 Lab Sample ID: 3414-04 Site: Water Tech Labs Collection Date: 4/20/2015 11:00 Lead, Total EPA 200.7 <0.005 mg/L 0.005 AA 412812015 NA = not onohlzed P.O. Box 473 106 Short Street Kemersvi1e, North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0326 www.randalabs.Com Page 1 ral coa basic Ad RESEARCh & ANA[YTICAt LA ORATORIES` INC. For: Water Tech Labs, Inc. P.O. Box 1056 Granite Falls, NC 28630 Attn: Joe Gragg Report of Analysis 5/14/2015 MAL sn CC:ap NCt734 Z NC 437701 • 4 Client Sample ID: Power Curbers #1 Lab Sample ID: 3414-03 Site: Water Tech Labs Collection bate: 4/20l2015 10:45 Lead, Total EPA 200.7 <0.005 mg/L 0.005 AA 4/28/2015 NA = not analyzed P.O. Box 473 106 Short Street Kemersville. North Carolina 27284 Tel: 336-996-2841 Fax: 336-996-0325 www.randalabs.com Page 1 ral coa Basic v1d wArFR rECH LRes.Inc. POST OFFICE BOX 1056 • 45 PINEWOOD PLAZA DR. GRANITE FALLS, NORTH CAROLINA 28630 (828)396-4444 SAMPLE: Power Curbers #2 COLLECTION DATE. 4/20/2015 PERMIT #. COLLECTION TIME: 11:00 ADDRESS: Power Curbers, Inc. RECEIVED DATE: 4/21/2015 P.O. Box 1639 RECEIVED TIME. 11:10 Salisbury, NC 28145 REPORTED: 5/14/2015 ANALYSIS RESULTS UNITS DATE ANALYST TSS 75.0 mg/L 4123/15 jrg Lead <0.005 mg/L 4/28/15 Oil & Grease 14.0 mg/L 4124/15 jdg F LOG ID: 1504-374 REPORTED BY. NC CERTIFIED LAB # 50 fl� Tony Gragg, Lab Supervisor DATER TECH LOIRS-irlc. POST OFFICE BOX 1056 - #5 PINEWOOD PLAZA DR. GRANITE FALLS, NORTH CAROLINA 28630 (828) 396A444 SAMPLE: Power Curbers #1 COLLECTION DATE: 4/20/2015 PERMIT#: COLLECTION TIME: 10:45 ADDRESS: Power Curbers, Inc. RECEIVED DATE: 4/2112015 P.O. Box 1639 RECEIVED TIME: 11:10 Salisbury, NC 28145 REPORTED: 511412015 71- A Li 1ytS'0'-` V I. Mt Z ANALYSIS :RESULTS'UNITSDATE ANALYST TSS 56.0 mg/L 4123/15 irg Lead <0.005 mg/L 4/28115 Oil & Grease <5.6 mg/L 4/24115 jdg LOG ID: 1504-373 REPORTED BY: NC CERTIFIED LAB # 50 fflll� * Tony Gragg, Lab Supervisor 1.14 A���� NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Mr. Dyke Messinger, President Power Curbers, Inc. 727 Bendix Drive Salisbury, North Carolina 28145-1639 Subject: Dear Mr. Messinger: September 22, 2009 Notice of Violation Natural Resources Compliance Evaluation Inspection NOV-2009-PC-0804 Power Curbers, Inc. COC No. NCG030563 Rowan County, NC Dee Freeman Secretary Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted at the subject facility on September 15, 2009, by Mr. Michael L. Parker with this Office. The enclosed report should be self-explanatory. Please note the comments located in the summary portion of the inspection report. It was noted by Mr. Parker during his inspection that a Stormwater and Pollution Prevention Plan (SPPP) has been developed for your facility, however, during his review of the Plan, several components of your Plan were lacking in detail as required by Part H, Section A of your permit. Furthermore, qualitative and analytical monitoring has not been performed as required by Part H, Section B. Such being the case, this inspection report is being issued as a Notice of Violation for the failure to comply with the terms and conditions of your General Permit. Please be advised that NCGS 143-215.6A(a)(2) provides for a civil penalty of not more than $25,000 per day per violation, which may be assessed against any person who fails to act in accordance with the terms, conditions and requirements of such Permit. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St Ralegh, North Carolina 27604 Phone: 919.807-63001 FAX: 919M7-64921 Customer Service: 1-877-623.6748 Internet: www.ncwaterquality.org An Equal Opportunity l Affirmative Action Empbyer N&LhCarolina Naturally Mr. Dyke Messinger September 22, 2009 Page Two It is requested that this Office be provided a written response detailing the measures taken in order to bring your facility into compliance. This response should be received by no later than 30 days from the date of this letter. If you have any questions, comments, or need assistance with understanding any aspect of your permit, please do not hesitate to contact Mr. Parker at (704) 663-1699 or me. Sincerely, Robert B. Krebs Regional Supervisor Surface Water Protection Section /mlp Enclosure cc: Shelton Sullivan — NPS/ACO Unit I4 Permit: NCG030563 SOC: County: Rowan Region: Mooresville Compliance Inspection Report Effective: 01/07/08 Expiration: 10/31/12 Owner: Power Curbers Inc Effective: Expiration: Facility: Power Cutters, Inc.-Bendix Drive 727 Bendix Dr Contact Person: Brett A Houser Title: Directions to Facility: The facility is located 112 mile south of Exit 76 on 1-85. Bendix Drive is the service road. System Classifications: Primary ORC: Certification: Secondary ORC(s): On -Site Representative(s): Salisbury NC 28145 Phone:704-636-5871 Phone: On -site representative David Hancock Phone: 704-647-6166 Related Permits: Inspection Date: 09/1512009 Entry Time: 09:00 AM Exit Time: 10:40 AM Primary Inspector: Michael L Parker'hi(rr,, Phone: 704-663-1699 Ext.2194 Secondary inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Cl Compliant ■ Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 Permit: NCG030563 Owner - Facility: Power Cuters Inc Inspection Date: 09/15/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The SPPP included a general location map and a site map, however, both maps lacked the detail as required by Part II, Section A, No. 1 (a) and (c) of the General Permit. The SPPP did not include a list of significant spills during the past 3 years as required by Part ll, Section A, No. 1 (d). If there have been no significant spills in the past three years, it should be so noted in the SPPP. The BMP summary as required by Part II, Section A, No. 2 (c) did not provide in detail the existance of any BMPs or whether the use any BMPs are under consideration for pollutant removal. There was a brief mention of of a Spill Prevention and Response Plan (SPRP) in the SPPP, however, the personnel (or team) responsibile for implementing the SPRP was not identified. In addition, the SPRP should be stormwater specific as required by Part II, Section A, No. 3. Some employee training on spill response and clean-up is provided, however, it should be documented in the SPPP on an annual basis as required by Part II, Section A, No. 5. Based on information provided to the inspector during the inspection, there has been a recent change in the facility contact and this change has resulted in some difficulty in locating various records related to the SW permit and the SPPP, which was maintained by the former facility contact. These records included the possibility of any Qualitative or Analytical monitoring which may have been collected by the former facility contact. Information provided to the inspector was that this facility had relocated to this site in the past two years Page- 2 Permit: NCG030563 Owner -Facility: Power Curbers Inc Inspection Date: 09/1512009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ r 1 n n # Does the Plan include a General Location (USGS) map? ■ n n n # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the flan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the plan include a list of significant spills occurring during the past 3 years? n ■ Cl n # Has the facility evaluated feasible alternatives to current practices? n ■ n n # Does the facility provide all necessary secondary containment? ■ n Cl n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ O .n 0 # Is the Plan reviewed and updated annually? n n ■ n # Does the Pian include a Stormwater Facility Inspection Program? n n ■ n Has the Stormwater Pollution Prevention Plan been implemented? n ■ n n Comment: See inspection summary. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n ■ n n Comment: Qualitative monitoring could not be produced during the inspection (see inspection summary). Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n ■ n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ n Comment: Analytical monitoring could not be produced during the inspection (see inspection summary). Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ n n n # Were all outfalls observed during the inspection? ■ n n n # If the facility has representative outfall status, is it properly documented by the Division? n n ■ n # Has the facility evaluated all illicit (non stormwater) discharges? ■ Cl n Cl Page: 3 t Permit: NCG030563 Owner - Facility: Power Curbers Inc Inspection Date: 09/15/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: The SPPP should include a reference to the existance of any illicit (non stormwater) discharges as required by Section A, Part I, No 1 (e). If there are no illicit discharges, it should be so noted in the SPPP. Page: 4