HomeMy WebLinkAboutNCG030483_MONITORING INFO_20181029STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/V
l
DOC TYPE
❑HIS ORICAL FILE
a -MONITORING REPORTS
DOC DATE
❑ OZDD�J'
YYYYMMDD
Semi-annual Stormwater Discharge Monitoring Report
---
for North Carolina Division of Water Resources General Permit No. NCG030000
f'
CERTIFICATE OF COVERAGE NO. NCG03 0 4 8 3
Date submitted 716118
FACILITY NAME CMG-Rebar Carolinas
COUNTY Gastonia
PERSON COLLECTING SAMPLES Ran Williams
LABORATORYwaypoint —Lab Cert. # 415 OREC E I1/ E
Comments on sample collection or analysis:
Out of temp 0 C A 9 2018
CEN i k/-NI- FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION
SAMPLE COLLECTION YEAR 201B
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ■❑ Monthly' October (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
[]Zero -flaw ❑Watersupply ❑SA
NOther C
PLEASE REMEMBER TO SIGN ON PAGES Z AND/OR 3 4
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks -=->
_
-
- 300'mg/L nr 50 mg/L
-&O -mT%0- -
0:007Wfi1VL
--0:03"mg/L
-0:067-rhk/L
15_mg%L
1 mg/L
1
10/11/18
2.43
<4.8
6.8
0,0027
<0.0033
0,233
<4.8
2
10/11/18
2.43
<10.0
7.8
0.0075
0.0363
0.0399
<1.4
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management.plan shall include a.list of the total toxic organic compounds used and the other elements listed. in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred si.ice filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Joseph
Name (Print name)
Schimmel
Title (Print title)
o 6 1 J
(Si nature) I (Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format,_"<XX mg/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in Excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
i]ate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L'
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date; 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 41 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑
1F YES, HAVE YOU CONTACTED THI= DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30
case of "No Discharge" renortsl to:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
of receipt of the lab results (or at end of monitoring period
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knoiuledge and belief, true, accurate, and complete,
am aware that there are signi 'cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
4-"96"-,dIb a b dA I"
(Signature Permittee) (Date) '
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Resources General Permit No. NCG030000
Date submitted 716118
CERTIFICATE OF COVERAGE N0. NCG03 0 4 $ 3 SAMPLE COLLECTION YEAR 21)18
FACILITY NAME CIVIC debar Carolinas T SAMPLE PERIOD ❑ Jan -June Q July -Dec
COUNTY Gastonia or ❑ Monthly(_ (month)
PERSON COLLECTING SAMPLES Ron Williams DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
LABORATORY waypoint Lab Cert. q 415 4 j /D ❑Zero -flow ❑Water Supply ❑SA
Comments on sample collection or analysis: 1 2 9 2d18 QOther c
GU;�fi 5F1L� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
Part A: Stormwater Benchmarks and Monitoring Results
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'-
Total Suspended Solids
pH, .
Standard units
Copper
Lead
Zinc '
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organi.cs5
Benchmarks ===>
_
-
100 mg/L or 50 mg/L
6.0 — 9.0
0.007 mg/L
0.03 mg/L-
-0.067 mg/L
15 mg/�
-- 1 mg%L
1
7/24118
0.55
12
7.3
0.0082
<0,0033
0.0156
<4.5
2
7124118
0.55
112
7.0
0.0174
0.0363
0.58
0.8
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Joseph
Name (Print name)
Schimmel
Title (Print ti le)
(Si ature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX_me/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier I, filer 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No dischorge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L'
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B,
• 2 EXCE EDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one
in the case of "No Wscha
this DMR, including all "No
uivlsion of water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
to:
ports, within 30 days of receipt of the lab results (or at end
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
A,60U-- 0211$
(Signature of
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Resources General Permit No. NCG030000
Date submitted 7l6118
CERTIFICATE OF COVERAGE NO. NCG03 0 113-
FACILITY NAME CNIC Reber Carolinas
COUNTY Gastonia RECEIVED
PERSON COLLECTING SAMPLES L 10 2018
LABORATORY Lab Cert. #
Comments on sample collection or analysis: CENTRAL FILES
OwR SECTION
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ❑■ Monthly) June (month)
DISCHARGING TO CLASS ❑ORW ❑HCIW []Trout ❑PNA
❑Zero -flow [-]Watersupply []SA
DOther C
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
■ No discharge this period?2
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics5
Benchmarks =__>
-
100 mg/L or 50 mg/L°
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
G See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Joseph
Name (Print name)
Schimmel
Title (Print titl,La e)
-a 07/6/18
( igna re) (Date)
Note: Results must be reported in numerical format. Do not repot Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format._"<XX me/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1564 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMA, including all "No
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
4l2311 S
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
,Y
Fm,TeN
Powering Business Worldwide
Central Files
Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
RE.- Semi-annual sampling and reporting of site storm water
Eaton Corporation
2900 Doc Bennett Road
Fayetteville NC 28306
General Permit No. NCGO30000
Certificate of Coverage: NCGO30489
,June 29, 2018
Dear Sir or Madam:
Eaton Corporation
2900 Doc Bennett Road
Fayetteville NC 28306
Please accept our storm water certificate of analysis and related reporting requirements from
our Eaton Corporation facility located at 2900 Doc Bennett Road, Fayetteville NC 28306.
If you have questions, please call me at 910-677-5219. Please direct all questions to Mark
Faircloth, Environmental Health and Safety Analyst at telephone number 910-677-5219,
email at MarkJFaircloth@Eaton.com or in writing to Eaton Corporation 2900 Doc Bennett
Road Fayetteville NC 28306
i
Mark J. Faircloth
REGi
Environmental, Health and Safety Analyst
Eaton eFNr 2018
2900 Doc Bennett Road Dt� RyA( F,
Fayetteville NC 28306 R S�cCritFS
Telephone: 910-677-5219
Email: MarkJFaircloth@Eaton.com
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted; June 29, 2018
CERTIFICATE OF COVERAGE NO. NCG030489
FACILITY NAME: EATON
COUNTY Cumberland
PERSON COLLECTING SAMPLES Technician Poythress
LABORATORY Microbac Lab Cert. # _NCDNR #11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or X Monthly' June (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑RNA
[]Zero -flow ❑Water Supply ❑SA
[]Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?z
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
topper
Lead.
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
-
100 mg/L or 50 mg/L
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
SDO1
6/12/2018
0.10
<4.17 mg/L
5.9
<0.005 mg/L
<0.010 mg/L
0.038 mg/L
<5.0 mg/L
SD02
6/12/2018
0.10
23.8 mg/L
6.9
<0.005 mg/L
<0.010 mg/L
0.061 mg/L
<5.0 mg/L
SD03
6/12/2018
0.10
<4.17 mg/L
6.3
<0.005 mg/L
<0.010 mg/L
0.047 mg/L
<5.0 mg/L
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for 1TO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
/nA/_e .T 1-�4—vACc67W
Name (Print name)
(!5-h'S ipnV4zI
Title (Print title) —
6
(Signature) (Da e)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Qutfall No.
Date Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =_->
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
" See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES M NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES-OO �n
N,
REGIONAL OFFICE CONTACT NAME: A&O CULL �ilyre�"C F61'UNAC c1fZ"ieC�
Mail an original and one copy of this DMP, including o!! "No Discharge" reports, within 30 days of receipt of the tab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for.5ubmitting false information, including the possibility of fines and imprisonment for knowing violations."
�,,n✓�lc� �r�C�/ � a� 2�I�
(Signature of Perrnittee) {Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3of3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Resources General Permit No. NCG030000
Date submitted 04/23/18
CERTIFICATE OF COVERAGE NO. NCG03 0 4 8 3
FACILITY NAME CMC Rebar Carolinas
COUNTY Gastonia
PERSON COLLECTING SAMPLES Robert McMurray
LABORATORYWaypoint Analytical Lab Cert. # 415
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June [] July -Dec
or ❑■ Monthly) March_ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
R Y ..per ❑Zero -flow [:]WaterSupply ❑SA
� . f� t,.,1 QOtherC
APR 2 6 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
C_N_rf?AL r;tF_^
��
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics"
Benchmarks ===>
-
- .
100 mg/L or 50 mg/L`
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
1
03/12/18
0.47
326
6.2
0.026
0.024
0.105
<4
2
03/12/18
0.47
8.96
2.9
0.003 J
<0.003
0.440
<4.3
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/2S/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Joseph
Name (Print name)
Schimmel
Title Print title) Q
(sifnature
4/23/18
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they mUjt be reported in the forma "<XX L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
0 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one
in the case of "No Discho
F this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitoring
uIVISIOn OT water Kesources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
to:
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are signific nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
141-1-1 t1.J 4/23118
Permittee)
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Qua itKz)
neral Permit No, NCG030000
Date submitted 1 T
CERTIFICATE OF COVERAGE . NCG03_L-),'� 9-3 SAMPLE COLLECTION YEAR �+�r
FACILITY NAME SAMPLE PERIOD [] Jan -June July -Dec
COUNTY or ❑Monthly' (month)
PERSON COLLECTING SAMPLES i DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY S66 Q ; Lab Cert. # e ❑Zero -flow ❑Water Supply ❑SA
Comments on sample collectio or analysis: CL IUED ❑Other
AN 2 8 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -)
Part A: Stormwater Benchmarks and Monitoring Results CENTRAL F'lLEgDWR SECTION
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks
_
-
100 mg/L or 50 mg/L
6.0 -- 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
00
-7
1.9
C2
o •OC
1-10. 0®3
01 X'q
V
/ ocI5;�
V 1_5-
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
;The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
" See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes, For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note; Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "OX ms/l', where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
15 mg/L
100 mg/L or 50 mg/L*
6.0 —9.0 5U
Footnotes from Part A also apply to this Part S
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
Permit Date; 11/1/2012-10/31/2017 SwU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you mast implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an oriainal and one copy. of this DMR, including all "No Dischar e" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" repo to:
Division of Water Quality
Attm DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signatut'e of
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COV
LABORATORY cc -I r b Cert. #
Comments on sample collection or a lysis:
Part A: Stormwater Benchmarks and Monitoring Results
:SAMPLE COLLECTION YEAR rPQ/45"
SAMPLE PERIOD ❑Jan -June July -Dec
RECE1 FARQ or ❑ Monthly"_ (mouth)
D S A NG TO CLASS ❑ORW ❑HQW []Trout ❑PNA
JAN 21 2016 ❑Zero -flow ❑Watersupply RSA
CENTRAL_ FILES ❑Other
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
n No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
i Inches3
Total Suspended Solids
PH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks
100 mg/L or 50 mg/L
6.0 —9.0.
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg&
1 rrg/L
001
I
0- -71
340mIL
k
0. o 37
. fA L
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an.on-site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge. requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling Is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
ar�a�,
o � ; mtlse J by �.a� k_S /
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Alan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed In the General
Permit. For those facilities electingto employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic: organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature) (Date)
Note; Results must be reported in numerical format. D-4 not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mRIV where XX is the numerical value of the detection
limit, reporting limit, etc. In mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collectedr
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==_>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 —9.0 SU
Footnotes from Part A also apply to this Part B
" See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
M Mite: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR R PART A AND PART B MONITORING RESULTS:
RIGG
• A BENCHMARK EXCEEDANCE TRIGGERS
_
ERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART If SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES [D NO[]
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an on final and one ca-py of this DMR including all 'No Dis ar e" Marts, wifthin .30 days of recei t of the lab results Lor at end ofmonLt_or1nQ veriod
In the case of "NQ Dlscharae" resorts) to
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina. 27699-1617
YOU MU LIQ IM15 CERTIFICATION_ FOR ANY INFORMATION_ REPORTED;
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1 / I
{Signature of Permltkee) (Date)
Permit Date. 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
STORMWATER DISCHARGE OUTFALL (SDO)
ANNUAL SUMMARY DATA MONITORING REPORT (DMR)
Calendar Year aO 1
Individual NPDES Permit No. NCS❑❑❑❑❑❑ or RECEIVED
Certificate of Coverage (COC) No. NCG®®KI®®® JAN 2 6 2015
This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. CENTRAL FILES
DWR SECTION
Facility Name:' -
County:'
Phone Number: (1101) ii.5_ 9191)1 Total no. of SDOs monitored —A.
.__
Outfall No.
Is this outfall currently In Tier 2 (monitored monthly)? Yes ❑ No ['
Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No [+�
If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? i
Enough consecutive samples below benchmarks to decrease frequency ❑ C�2
Received approval from DWO to reduce monitoring frequency ❑
Other ❑ C�a
Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No mzc
Patbmetef ' units
Rrainfall„ ota
,cses "� o� �� ��nG 'a
f' g. , . P
AMM47mark N/A I /V) iftA 1 nh7 ..,A I 1_ _hRn rn.' L -ALL ftw I 1 i a►w
N
SW U-264-Generic-13Dec2012
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system. designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Signr-
Date
For questions, contact your local Regional Office:
DWO 13eai6nal Office Contact Information:
2090 US Highway 70
225 Green Street
610 East Center Avenue/Suite 301
Swannanoa, NC 28778
Systel Building Suite 714
Mooresville, NC 28115
(828) 296-4500
Fayetteville, NC 28301-5043
(704) 663-1699
(910) 433-3300
O
,
3800 Barrett Drive
943 Washington Square Mall
127 Cardinal Drive Extension
Raleigh, NC 27609
Washington, NC 27889
Wilmington, NC 28405-2845
(919) 791-4200
(252) 946-6481
1617 Mail Service Center
(910) 796-7215
585 Waughtown Street
Winston-Salem, NC 27107
Raleigh, NC 27699-1617toAre''
.,
(336) 771-5000
(919) 807-6300
.>`hlbrtfi:`Carolfnas waler._
SW U-264-Generic-13Dec2012
Scalia
1
-- m
~ CMG.
July 25, 2014
Division of Water Quality
Attn:. DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Re: CMC Rebar Carolinas
C.O.C. No.: NCG030483
Stormwater Discharge Monitoring Report
Dear Sir or Madam:
DECEIVED
JUL 2 9 2014
CENTRAL FILES
DWQIBOG
Please find enclosed one original and one copy of a stormwater discharge monitoring
report for the above referenced facility for the period of January 2014 - June 2014.
Please contact Alan Gillespie at 205-599-7939 should require additional information.
Sincerely,
CMC Rebar Carolinas
Scott Richardson
Area Project Manager
Enclosures (2)
Cb7C Rebar
2528 N. Chester Street
Gastonia, NC26052
704-865-6511
V w-Cfn1C.CoM
COMMITMENT
YC3U CAN COUNT ON
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6-25-14
CERTIFICATE OF COVERAGE NO. NCG030483
FACILITY NAME CMC Rebar Carolinas
COUNTY Gaston
PERSON COLLECTING SAMPLES Glenn Shealy, Scott Richardson,
Alan Gillespie
LABORATORY Pace Analytical Lab Cert. # 12 & 40
LABORATORY Shealy Env. Services Lab Cert. # 329
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑IiQW ❑Trout ❑PNA
❑Zero -flow []WaterSupply []SA
[—]Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
❑ No discharge this period:
Outfall No.
Date Sample
Collected'
(mo/cdd/yr)
24-haur rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/Tntal
Total Petroleum
Hydrocarbons
Toxic
Organics5
Benchmarks ===>
-
-
100 mg/L or 50 mg/0
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
001
03/29/14
0.46
0.0106
0.00S
0.0433
< 5.0
N/A
001
06/12/14
0.41
35.1
8.0
0.0144
0.0056
0.193
< 5.0
N/A
002
04/15/14
1.70
7.6
0.0004
0.0011
0.0021
< 5.0
N/A
002
06/26/14
0.93
94
6.8
0.0088
< 0.01
0.45
N/A
' Monthly sampling (instead of Semi-annualf must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
r
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since fi ling the last discharge monitoring report. i further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not_r Rort Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: 1f you report a sample value In excess of the benchmark, you must implement Tier 1, Tier, , or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2of3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ N0 ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cony of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reportsJto:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
7- l �Z
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3