Loading...
HomeMy WebLinkAboutNCG030452_MONITORING INFO_20190524STORMWATER DIVISION CODING SHEEP NCG PERMITS PERMIT NO. N CC7 O 3 O lf�� DOC TYPE ❑ FjFSTORICAL FILE L��MONITORING REPORTS DOC DATE ❑ 0�•� I � U � YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director December 19, 2013 Ms. Jill Pinkerman Environmental, Health, and Safety Manager United Technologies -Carrier 9701 Old Statesville Road Charlotte, North Carolina 28269 Pat McCrory, Governor John E. Skvada, ill, Secretary Subject: Compliance Evaluation Inspection United Technology Carrier -Charlotte NPDES Stormwater Permit NCG030452 Construction Stormwater Permit/S&EC Mecklenburg County, North Carolina Dear Ms. Pinkerman: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on December 11, 2013 by Ms. Donna Hood of this Office. Both the Sediment and Erosion Control/Construction Stormwater inspection(s) as well as the Industrial Stormwater Inspection reports are included. Please retain a copy of this letter and the associated inspections as documentation of the decisions contained therein. As discussed on the day of the inspection, the facility should consider the Construction Stormwater Permit the controlling permit until the construction project is completed and stabilized. Sampling normally required under the industrial stormwater permit (NCG030452) should resume after construction is complete. The report should be self-explanatory; however should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 ext 2193 or by email at donna.hood@ncdenr.gov. S' erely, gonna Hoo Environmental Specialist Enclosure Cc: Stormwater Permitting DH Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone 704-663-1699 / FAX: 704-663-6040 • Internet: http://portal.nedenr.org//webBrAand-quality An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper ALTI-KWAA '71 04, NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director December 19, 2013 Ms. Jill Pinkerman Environmental, Health, and Safety Manager United Technologies -Carrier 9701 Old Statesville Road Charlotte, North Carolina 28269 Pat McCrory, Govemor John E. Skvada, III, Secretary Subject: Compliance Evaluation Inspection United Technology Carrier -Charlotte NPDES Stormwater Permit NCG030452 Mecklenburg County, North Carolina Dear Ms. Pinkerman: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on December 11, 2013 by Ms. Donna Hood of this Office. Both the Sediment and Erosion Control/Construction Stormwater inspection(s) as well as the Industrial Stormwater Inspection reports are included.. Please retain a copy of this letter and the associated inspections as documentation of the decisions contained therein. As discussed on the day of the inspection, the facility should consider the Construction Stormwater Permit the controlling permit until the construction project is completed and stabilized. Sampling normally required under the industrial stormwater permit (NCG030452) should resume after construction is complete. The report should be self-explanatory; however should you have any this report, please do not hesitate to contact me at (704) 663-1699 ext 2 donna.hood@ncdenr.gov. // Acerely, Environmental Specialist Enclosure Cc: Stormwater Permitting DH uestions concerning I or by email at Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone 704-663-1699 / FAX: 704-663-6040 • Intemet: http://Dortal.ncdenr.or.qtwebAr/land-ouality An Equal Opportunity 1 Affirmative Action Employer-- 50% Recycled 110% Post Consumer Paper Compliance Inspection Report Permit: NCG030452 Effective: 11/01/12 Expiration: 10/31/17 Owner: United Technologies Carrier SOC: Effective: Expiration: Facility: United Technologies Carrier County: Mecklenburg 9701 Old Statesville Rd Region: Mooresville Contact Person: Sarita Allen Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/11/2013 Entry Time: 10:00 AM Primary Inspector: Donna Hood Secondary Inspector(s): Charlotte NC 28269 Phone: 704-921-3839 Certification: Phone: Exit time: 11:45 AM Phone: 704-663-1699 Ext2193 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: IN Compliant Q Not Compliant Question Areas: E Storm Water (See attachment summary) Page: 1 1 Permit: NCGD30452 Owner - Facility: United Technologies Carrier Inspection Date: 12/11/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The inspection was performed to assist the facility in coverage under the construction stormwater permit versus the industrial stormwater permit. Because the only outfall at the facility is currently heavily influenced by the construction activity and not by the industrial activity, the construction stormwater permit is considered the prevailing permit under the current site conditions. Once construction is complete and the site is stabilized, the exisitng industiral stormwater permit, NCG030452, will resume enforce. The expected completion date is April 2014. Page: 2 Permit: NCG030452 Owner - Facility: United Technologies carrier Inspection Date: 1211112013 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a 8MP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: See summaary section Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: See summary section Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: See summary section Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: See summary section Reason for Visit: Routine Yes No NA NE ■ DO 0 ■000 ■nnn ■000 ■nnn, ■0010 ■nnn ■non ■ ❑ ❑ ■nnn ■0l]0 ■ 0 D0 ■ 0 ❑ 0 ■nnn ■nnn Yes No NA NE ■000 Yes No NA NE ■nnn ❑❑■0 Page: 3 r Sedilllelltat]011/COIISti'LiCt]OlIoil &eport North Carolina Department of Environment and Natural Resources Land Quality Section: 610 East Center Avenue, Suite 301, Mooresville, NC 281 i 5 (704)663-1699 County: Mecklenburg Project: United Technologies -Carrier River basin: Catawba Person financially responsible: Project #: MECKL-7-014-500 Address: t. Project Location: 9701Old Statesville Road, Charlotte Pictures: No 2. Weather and soil conditions: Cloudy, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: Yes If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jill Pinkerman Title: Inspection report: Sent Report Date given/sent: December 18, 2013 9. Corrective action needed: 10. Comments: The inspection was made as assistance to the facility for compliance applicability of the construction stormwater permit (NCG010000) versus the industrial stormwater permit (NCG030452). The facility has one outfall which is currently heavily influenced by construction activities. Because the on site industrial activity currently has no influence on the outfall, the facility will consider the construction stormwater permit enforce, with the industrial permit monitoring being suspended until construction is complete. Once construction is complete and the site is stabilized monitoring.per permit requirements under NCG030452 will resume. Please contact the inspector if there are any questions. Reported by: Donna Hood Others present: Jill Pinkerman Date of inspection: December l 1, 2013 Time arriving on site: 10:00 AM Time leaving site: 11:45 AM cc: Air�-A NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director December 19, 2013 Ms. Jill Pinkerman Environmental, Health, and Safety Manager United Technologies -Carrier 9701 Old Statesville Road Charlotte, North Carolina 28269 Pat McCrory, Govemor John E. Skvada, 111, Secretary Subject: Compliance Evaluation Inspection United Technology Carrier -Charlotte NPDES Stormwater Permit NCG030452 Construction Stormwater Pen- it/S&EC Mecklenburg County, North Carolina Dear Ms_ Pinkenman: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on December 11, 2013 by Ms. Donna Hood of this Office. Both the Sediment and Erosion Control/Construction Stormwater inspection(s) as well as the Industrial Stormwater Inspection reports are included. Please retain a copy of this letter and the associated inspections as documentation of the decisions contained therein. As discussed on the day of the inspection, the facility should consider the Construction Stormwater Permit the controlling permit until the construction project is completed and stabilized. Sampling normally required under the industrial stormwater permit (NCG030452) should resume after construction is complete. The report should be self-explanatory; however should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 ext 2193 or by email at donna.hood@ncdenr.gov. $' erely, onria Hoo Environmental Specialist Enclosure Cc: Stormwater Permitting DH Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone 704-663-1699 / FAX: 704-663-6040 • Internet: http:/Iportal.ncdenr.org/webnrlland-quality An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Compliance Inspection Report Permit: NCG030452 Effective: 11/01/12 Expiration: 10/31/17 Owner: United Technologies Carrier SOC: Effective: Expiration: Facility: United Technologies Carrier County: Mecklenburg 9701 Old Statesville Rd Region: Mooresville Charlotte NC 28269 Contact Person: Santa Allen Title: Phone: 704-921-3839 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12111/2013 Entry Time: 10:00 AM Exit Time: 11:45 AM Primary Inspector: Donna Hood %���'l%3 Phone: 704-663-1699 Secondary Inspector(s): Ext.2193 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ■ Compliant 0 Not Compliant Question Areas: E Storm Water . (See attachment summary) Page: 1 Permit: NCG030452 Owner - Facility: United Technologies Carrier Inspection Date: 12/11/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The inspection was performed to assist the facility in coverage under the construction stormwater permit versus the industrial stormwater permit. Because the only outfall at the facility is currently heavily influenced by the construction activity and not by the industrial activity, the construction stormwater permit is considered the prevailing permit under the current site conditions. Once construction is complete and the site is stabilized, the exisitng industiral stormwater permit, NCG030452, will resume enforce. The expected completion date is April 2014. Page: 2 Permit: NCGO30452 Owner -Facility: United Technologies Carrier Inspection Date: 12J11/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ Q # Does the Plan include a General Location (USGS) map? ■ n ❑ n # Does the Plan include a "Narrative Description of Practices"? ■ Q ❑ n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ■ n n n # Has the facility evaluated feasible alternatives to current practices? ■ n ❑ # Does the facility provide all necessary secondary containment? ■ n n n # Does the Plan include a BMP summary? ■ n n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ 11 # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ C) n n # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ Q n # Is the Plan reviewed and updated annually? ■ n n n # Does the Plan include a Stormwater Facility Inspection Program? ■ n Q ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: See summaary section Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n Comment: See summary section Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 01 ❑ ■ Comment: _ See summary section Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ n # Were all outfalls observed during the inspection? ■ n ❑ n # If the facility has representative outfali.status, is it properly documented by the Division? ❑ n ■ n # Has the facility evaluated all illicit (non stormwaler) discharges? ■ n n n Comment: See summary section Page: 3 Carrier Division of Water Quality Attn. DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 RECEIVE p 5/21/2019 MAY 2 4 2Qi? CEN7-RAL FILL,,, CWR SECTIOpj Re: Stormwater Discharge Outfall Monitoring Report: March Tier III Year 1, Period 1 , 2019 United Technologies Carrier Mecklenburg County General Permit NCG030000, Certificate of Coverage NCG030452 Dear Stormwater Permitting Unit; We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for the United Technologies Carrier facility under General Permit Number NCG030000, Certificate of Coverage Number NCG030452. This submission serves as the March Tier III monthly for Year 1, Period 1, 2019, as outlined in our storm water permit. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR) submission, please contact us at your convenience. Sin Jua Un Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), I original & 1 copy Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 04/26/2019 CERTIFICATE OF COVERAGE NO. NCG03 0 4 5 2 FACILITY NAME UNITED TECHNOLOGIES CARRIER COUNTY MECKLENBURG PERSON COLLECTING SAMPLES JAME5 W. WILLARD II (INENCO, INC.) LABORATORY Pace Anatocal Services, Inc. Lab Cert. # 40, 37712 & 12, 37706 Comments on sample collection or analysis: INENCO, INC. NC FIELD CERT. NO.5540 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ® Jan -June © July -Dec or Monthly' March (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply ❑SA Other Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organlcss Benchmarks _ - 100 mg/L or 50 mg/0 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO-001 03//25/2019 0.33 51.0 7.44 < 0.0297 < 0.005 0.2940 < 4.8 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. -'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ��x )tom iC;f,-e 9 -Y-r_� Name (Print name) Ti le jPrint title) 'e�v _S -14c; Signature QLJ Dat Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be -reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. El No discharge this period?z Outfall No. Date Sample collected' (mo/dd/yr) 24-hour rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 200 mg/l. or 50 mg/O Parameter Code - 46529 NCOI L 00552 C0530 Footnotes from Part A also apply to Part 8 Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, iier 2, or Tier 3 responses. See General Permit text: Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. r 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO Q REGIONAL OFFICE CONTACT NAME: _Mail an original copy of this DMR including aH "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period in the case o "No Dischar e" re ogs to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date: 11/1/2018-05/31/2021 Da e SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report ' for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 04,26/2019 CERTIFICATE OF COVERAGE NO. NCG03 0 4 5 2 FACILITY NAME UNITED TECHNOLOGIES CARRIER COUNTY MECKLENBURG PERSON COLLECTING SAMPLES JAMES w. VYILIARD II (INENCO, INC.) LABORATORY Face Analytical Services, Inc. Lab Cert. If 40, 37712 & 12, 37706 Comments on sample collection or analysis: INENCO, INC. NC FIELD CERT. NO.5540 Part A, Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD Jan -June ® July -Dec or Monthly' March _ month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA DOther Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 02051 01094 00552 78141 SDO-001 03/25/2019 0.33 51.0 7.44 < 0.0297 < 0.005 0.2940 < 4.8 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." -,L CA_,A� _"C- r Name (Print name) —91Avr-Y Title (Print title) iZ Signature Da e Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must Implement 77er 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. date Sample Collected' Imo/dd/yr) 24-hour rainfall amount, inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 5o mg/0. Parameter Code - 46529 NCOIL 00552 COS30 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO 0 IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO Q REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DMR, inctudina al! "No Discharae" reports, within 30 days of receipt of the tab results for at end of monitoring period in the case o "No Dischar e" re arts to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Cancer �°' Il ntte9 T�chnaloptssRECEIVED MAY 0 6 2019 CENTRAL FILES DWR SECTION 4/26/2019 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 Re: Stormwater Discharge Outfall Monitoring Report: Feb Tier III Year 1, Period 1 , 2019 United Technologies Carrier Mecklenburg County General Permit NCG030000, Certificate of Coverage NCG030452 Dear Stormwater Permitting Unit; We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for the United Technologies Carrier facility under General Permit Number NCG030000, Certificate of Coverage Number NCG030452. This submission serves as the Feb Tier III monthly for Year 1, Period 1, 2019, as outlined in our storm water permit. No qualified rain event was observed during this period, however we are submitting the Blank DMR for this month. If you have any questions or comments regarding this Stormwater Discharge OutfalI Monitoring Report (DMR) submission, please contact us at your convenience. Si Ju U Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & i copy Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 04124/2019 CERTIFICATE OF COVERAGE NO. N0003 0 4 5 2 FACILITY NAME UNITED TECHNOLOGIES CARRIER COUNTY MECKLENBURG PERSON COLLECTING SAMPLES No samples collected during February LABORATORY Lab Cert. # Comments on sample collection or analysis: No samples collected due to winter weather and inability to obtain measurable event Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June [] July -Dec or E]Monthlyl FEBRUARY (month DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ❑Water supply []SA #Other class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches' Total Suspended Solids pH, Standard units Total Copper total Lead Total Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics' Benchmarks _ - 100 mg/L or 50 mg/L• 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 FOR PART AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART it SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO M REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results Lor at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified.personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penaltiSslor submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date:11/1/2018-05/31/2021 C;aie SWU-245, last revised 11/1/2018 Page 3 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (70),1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) ?Ln� r. Title (Print title) t / Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' butfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches' New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/O Parameter Code - 46529 NCOIL 00552 CO530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3