January 11, 1996
McDowell County
DEM Project # 960002
APPROVAL of 401 Water Quality Certification
Mr. Charles Abemathy
McDowell County
10 East Court Street
Marion, NC 28572
Dear Mr. Abernathy:
You have our approval to place fill material in 0.2 acres of wetlands or waters for the purpose of
constructing the McDowell County Industrial Park-Phase 2 access road, as you described in your
application dated 22 December 1995. After reviewing your application, we have decided that this fill is
covered by General Water Quality Certification Numbers 2732 and 2671. These certifications allow
you to use Nationwide Permit Numbers 14 and 26 when they are issued by the Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new application.
For this approval to be valid, you must follow the conditions listed in the attached certification. In
addition, you should get any other federal, state or local permits before you go ahead with your
project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Environmental Management under Section 401
of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Asheville Field Office
Asheville DEM Regional Office
Mr. John Dorncy
Central Files
Donny Bridges; McGill Associates
' cerel ,
V ton Howard, Jr. P. .
960002.1tr
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper
-''
mc
A S S O c? A Tr i s
December 22, 199
Mr. John Dorney
North Carolina Dei
Division of Enviro
Water Quality Sect
Post Office Box 29
Raleigh, North Ca?
Dear Mr. Dorney:
I/---
616'06`0
VV A
artment of Environment, Health, and Natural Resources
nental Management
35
Mina 27626-0535 ,1( E'
Subject: McDowell County Industrial Park
Section 401 Certification for
Access Road Construction - Phase 2
I-40 and US 221, McDowell County
On behalf of McDowell County, please find enclosed seven (7) sets of plans and
completed/signed applications for the above project for your review.
This project completes the construction of the main access road serving the new
McDowell County Industrial Park, for a length of approximately five hundred (500)
feet. Approximately 1,250 lineal feet of access road has been previously permitted and
constructed, along with an additional 1000 lineal feet of roadway recently completed by
the North Carolina Department of 'T'ransportation. '['his project uses fill material from
one (1) of the six (6) industrial sites (Site 6) by beginning the earthwork on this site in
accordance with a preliminary grading plan. The project also relocates a stream and
fills the old stream bed on another site (Site 4) to allow construction of the access road
and to begin development of this second site. Storm drainage pipes and grassed ditches
will be installed and constructed to handle the runoff from the woods and overgrown
field which generally cover this site. Erosion control measures, including diversion
ditches, riprap check dams, silt fencing, and 4 sediment basins, will all be used to
prevent sedimentation into the nearby streams and adjoining wetland area.
Construction of the stream diversion channel will be scheduled to stabilize the channel
prior to allowing any water flow, and to minimize the exposure of unprotected earth.
Construction of this project is expected to begin in February, 1996 and be completed
by May, 1996.
E n g i n e e r i n g • P l a n n i n g • F i n a n c e
N1( Gill A%'No( ialeS, 1'.A. • V0. Bo 2 '51). AsItrriIIc, N(' 2SS02 • )? Rnuul Sitrc/. Acdrrill(" M 2SS01 • 704-25?-0575 • h'AX 7o4-25?-2 SIR
Mr. John Dorney
December 15, 1995
Page 2
We are also applying to the following agencies for approval for this project:
• U.S. Army Corps of Engineers
• North Carolina Wildlife Resources Commission
• U.S. Fish and Wildlife Service
• North Carolina Division of Archives and History
• N.C.D.E.H.N.R. Land Quality Section.
We look forward to your review and comments. If you have any questions,
please do not hesitate to call me or Dale Pennell of our office at (704) 252-0575.
Sincerely,
McGILL ASSOCIATES, P.A.
DANNY B. BRIDGES, P.E.
94236-15.doc
cc: Chuck Abernathy w/enc.
. T
DEM ID: ?C1C'CJ ?? ,. ,
ACTION ID:
11 Nationwide Permit Requested (Provide Nationwide Permit #):
JOINT FORM FOR
Nationwide permits that require notification to the Corps of Engineers
Nationwide permits that require application for Section 401 certification
WILMINGTON DISTRICT ENGINEER WATER QUALITY PLANNING A
CORPS OF ENGINEERS DIVISION OF ENVIRONMENTAL MANAGEMENT
DEPARTMENT OF THE ARMY NC DEPARTMENT OF ENVIRONMENT, HEALTH jz c n
P.O. Box 1890 AND NATURAL RESOURCES
Wilmington, NC 28402-1890 P.O. Box 29535 i?
ATTN: CESAW-CO-E Raleigh, NC 27626-0535 m
Telephone (919) 251-4511 ATTN: MR. JOHN DORNEY
Telephone (919) 733-5083
ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS.
SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT.
PLEASE PRINT.
1. Owners Name: _ Mc-Dowel 1 rn„nty
2. Owners Address: 10 East- Milrt Street'' Marion' NC 28752
3. Owners Phone Number (Home): N/A (Work): 704-652-7121
4. If Applicable: Agent's name or responsible corporate official, address, phone number:
Charles R. Abernathy, County Manaqer
5. Location of work (MUST ATTACH MAP). County:
McDowell
Nearest Town or City: Ma rzi Q„
Specific Location (Include road numbers, landmarks, etc.):_ A rnxi mate 1 y 14 i 1 e from i n erG ion
of I-40 and U.S. 221 along new access road into McDowell County Industrial Park
6. Name of Closest Stream/River: Hicks Branch
7. River Basin: copg„nd RrQad Rive
8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS H? YES [ ] NO [X]
9. Have any Section 404 permits been previously requested for use on this property? YES [ ] NO [X]
If yes, explain. N/A
10. Estimated total number of acres of waters of the U.S., including wetlands, located on project site:
9q etere
11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project:
Filled: 0.20 acre
Drained: 0
Flooded:
Excavated:
Total Impacted: 0.20 acre
12. Description of proposed work (Attach PLANS-8 1/2" X 11 •• drawings only): p_ agQMQ-t of RA„ ?
(140 T34 I a. n41
13. Purpose of proposed work:_ C'n ,l PtP a,•r o?, rnari rnnctn,rt inn ?nrl Pgi n cj TP r1PVP1 nT,mor,+
for MrDpwP11 ('minty 1nrl1, 3:2 al Park
14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures
taken to minimize wetland impacts. 2 Gt rPam? mutt hP r-rnG Pci to ,f 7FI ; r ,,, 1
,trpam must be filled to allow fill fnr j strial site
15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service
(NMFS) regarding the presence or any Federally listed or proposed for listing endangered or threatened species or critical
habitat in the permit area that may be affected by the proposed project. Have you done so? YES [X ] NO[
]
RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.
16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic
properties in the permit area which may be affected by the proposed project? Have you done so? YES [X ] NO [ ]
RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.
17. Additional information required by DEM:
A. Wetland delineation map showing all wetlands, streams, and lakes on the property.
B. If available, representative photograph of wetlands to be impacted by project.
C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the
delineation line. N/A
D. If a stormwater management plan is required for this project, attach copy. N/A
E. What is land use of surrounding property? Industrial Park
F. If applicable, what is proposed method of sewage disposal? ,n; i pa1 Treatment Plan
1 v;
Owner's Signature Date
MICHAEL LEE LEWIS
D.B. 280, Pg. 386
T, R- 2
McDOWELL COUNTY
INDUSTRIAL PARK
BOBBY J, CABLE
U.B. 288, Pg. 21
1 MORRIS LAUCHRIDCE
MICHAEL LEE LEWV? ?\ D.B. 268, Pg. 993
D.B. 280, Pg. 366
TR- 1 J
366 G 13/ ACRES
12 ACRES -?
3 0
.a
5 ACRES
4
1 CRES s 5
11 ACRES
PHASE 2
CONSTRUCTION
6
43 ACRES
11'f,'R B. HARRIS
B. 296, Pg. 243
A. C. FORTEHBER
D.B. 177, Pg. 216
1 C
D.B. 172, Pg. 79
SCALE: 1" - 400' DATE: DEC. 15, 1995 SHEET 1 OF 6
o°
.f
/ l
I
McGILL ASSOCIATES, P.A.
ACONS A ASHEVILLQ ORTHECAROUNA
?38 PROPS` -- -'
owl
PROPOS i RIP RAP CH,?
STR AM?HANNEL
I C
I 1 _
/ 00
PLAN
81+0?? - SCALE: 1'- 5? Ply
F- j
I'n PROPOSED
SILT FENCE / Z
(TYPICAL) :3
V ?' 0 81+0 / ` - now - _.. PROPOSED
/ ?'??' ?? _ -- - --- -_ ? // LIMITS OP.
/ - _ _-- - ?:'-F ?`. _ ?.? _ ? CONSTRUCTION
73
Mamma 0
\L 4%
- - ? NOTE:
CONSTRUCT STREAM CHANNEL BY EXCAVATING
FROM LOW END TO WITHIN 30' OF STREAM AT
C UPPER END - STABILIZE AND COMPLETE
CONSTRUCTION OF CHANNEL PRIOR TO REMOVAL
- OF LAST 30'. THEN COMPLETE STABILIZATION`
OF LAST SECTION.
1,390
1400
APPLICANT: PROJECT:
McDOWELL COUNTY, NORTH CAROLINA McDOWELL COUNTY INDUSTRIAL PARK
10 EAST COURT STREET ACCESS ROAD CONSTRUCTION PHASE 2
MARION, NC 28752 ADJACENT PROPERTY OWNERS:
PHONE: 704 652-7121 1. A.C. FORTENBERRY
PROPOSED CONSTRUCTION: 2. WALTER B. HARRIS
COMPLETE ACCESS ROAD AND BEGIN 3. BOBBY J. CABLE
SITE DEVELOPMENT FOR McDOWELL 4. MICHAEL LEE LENS
COUNTY INDUSTRIAL PARK 5 CHAMPION INTERNATIONAL
6. MORRIS LAUGHRIDGE
LOCATION: 7. NORTH CAROLINA D.O.T.
APPROXIMATELY 3/4 MILE FROM
INTERSECTION OF 1-40 do U.S. 221 MCGILL ASSOCIATES, P.A.
ALONG INDUSTRIAL PARK ACCESS RD.
COUNTY: STATE: CONSULTING ENGINEERS
McDOWELL NORTH CAROLINA
MATT. mri, ,G ,AAG cuccT eW ASHEVILLE, NORTH CAROLINA
•
`??? ??' -? \??,•` 11 l? j 1380
13 70
04
i /
= PROPO$tD /
a LIMITS OF CONSTRUCTION
o PROPOSED
FRENCH DRAIN AT STREAM
`' - - i BED ELEVATION-INSTALL AFTER
STREAM HAS BEEN DIVERTED
AND BEFORE PLACING FILL
APPLICANT: PROJECT:
McDOWELL COUNTY, NORTH CAROLINA McDOWELL COUNTY INDUSTRIAL PARK
10 EAST COURT STREET ACCESS ROAD CONSTRUCTION PHASE 2
MARION, NC 28752 ADJACENT PROPERTY OWNERS:
PHONE: 704 652-7121 1. A.C. FORTENBERRY
PROPOSED CONSTRUCTION: 2. WALTER B. HARRIS
COMPLETE ACCESS ROAD AND BEGIN 3. BOBBY J. CABLE
SITE DEVELOPMENT FOR McDOWELL 4. MICHAEL LEE LEWIS
COUNTY INDUSTRIAL PARK 5 CHAMPION INTERNATIONAL
6. MORRIS LAUGHRIDGE
LOCATION: 7. NORTH CAROLINA D.O.T.
I
Y 3
4 MILE FROM
PPRO
TE
/
A
X
MA
L
INTERSECTION OF 1-40 & U.S. 221 McGILL ASSOCIATES, P.A.
ALONG INDUSTRIAL PARK ACCESS RD.
COUNTY. STATE. CONSULTING ENGINEERS
McDOWELL NORTH CAROLINA
SCALE: 1" - 50'
DATE: DEC. 15, 1995
SHEET 3 OF 6 . ASHEVILLE, NORTH CAROLINA
EXIS IN
CULVE\RT
GRAS' L ROAD \\/ I
?OP?OSED 1 \I _ I 1 14
? 6 ?GHT-OF-WAIN
I
PLAN
SCALE: A"= 50' f - ' =
PROPOSED /
?Z SILT BASIN NO.3 - / /
(120'Lx2O'Wx2'D) \
t WEIR LENGTH 6' -
0,ROPOSED
DIVERSION DITCH / I I
(TYPICAL)
/ I
1380-
APPLICANT:
McDOWELL COUNTY, NORTH CAROLINA
10 EAST COURT STREET
MARION, NC 28752
PHONE: (704) 652-7121
PROPOSED CONSTRUCTION:
COMPLETE ACCESS ROAD AND BEGIN
SITE DEVELOPMENT FOR McDOWELL
COUNTY INDUSTRIAL PARK
LOCATION:
APPROXIMATELY 3/4 MILE FROM
INTERSECTION OF I-40 & U.S. 221
ALONG INDUSTRIAL PARK ACCESS RD.
COUNTY. STATE:
McDOWELL NORTH CAROLINA
SCALE- 1" a 50' DATE: DEC. 15, 1995 SHEET 4 OF 6
PROJECT:
McDOWELL COUNTY INDUSTRIAL PARK
ACCESS ROAD CONSTRUCTION PHASE 2
ADJACENT PROPERTY OWNERS:
1. A.C. FORTENBERRY
2. WALTER B. HARRIS
3. BOBBY J. CABLE
4. MICHAEL LEE LENS
5 CHAMPION INTERNATIONAL
6. MORRIS LAUGHRIDGE
7. NORTH CAROLINA D.O.T.
I ..
110
.°z
it
1 Q
McGILL ASSOCIATES, P.A.
CONSULTING ENGINEERS
ASHEVILLE, NORTH CAROLINA
\?C\Q
PLAN
LE: 1 "= 50'
'rte 1370
\ \ - \
_EXISTING \
_ - <«<< \ ` \ \ DIVERSION DITCI \
0000 PROflO?ED\
--
\SILT BASI 140.1 TO
: REPLACE S?`.\®AS ; -
75'4x10'Wx2 Dj,
EXISTI>?l
_ `BRIDGE. \ `. '.. . ;.;.`
U i -- _ r
SIL:T:6ASMI'l4
p!VERSION. -D1tH:... .. F-XISTIN6 .. .. .
2.54,5-Ac.) `. ;
?s,?a.... ,......: ` :: ; :
-PROP
:DROPi.INLE:T:•PROTEC•TFON--- . -';. _ .;.;.,.. ? _y.'...y_ _ ..,.,.
APPLICANT: PROJECT: \
McDOWELL COUNTY, NORTH CAROLINA McDOWELL COUNTY INDUSTRIAL PARK
10 EAST COURT STREET ACCESS ROAD CONSTRUCTION. PHASE 2
MARION, NC 28752 ADJACENT PROPERTY OWNERS: \
PHONE: 704 652-7121
R
PROPOSED CONSTRUCTION: 1. A.C. R ER B. HARRIS
COMPLETE ACCESS ROAD AND BEGIN 3. BOBBY J. CABLE SITE DEVELOPMENT FOR McDOWELL 4. MICHAEL LEE LEWIS
COUNTY INDUSTRIAL PARK 5 CHAMPION INTERNATIONAL
6. MORRIS LAUGHRIDGE
7. NORTH CAROLINA D.O.T.
LOCATION.
APPROXIMATELY 3/4 MILE FROM
INTERSECTION OF 1-40 & U.S. 221
ALONG INDUSTRIAL PARK ACCESS RD.
COUNTY: STATE:
McDOWELI NORTH CAROLINA
SCALE: 1" - 50' DATE: DEC. 15, 1995 SHEET 5 OF 6
Ax,Akx cGILL ASSOCIATES, P.A.
CONSULTING ENGINEERS
ASHEVILLE, NORTH CAROLINA
STORM DRAINAGE STRUCTURE SCHEDULE
DRAINAGE TYPE TOP INV. ELEV. INV. ELEV.
STRUCTURE ELEVATION (IN) (OUT)
A PRECAST
-----
1369
0
-----
CONC. HEADWALL .
B PRECAST _____
-----
1358
0'
CONC. HEADWALL .
C RIPRAP ----- 1363.0' -----
D PRECAST ----- ----- 1358.0'
CONC. HEADWALL
E DROP INLET 1364,5' ----- 1361.0'
F F.E.S. ----- ----- 1360.0'
NOTE:
1. SEDIMENT PROTECTION REQUIRED AROUND EACH STRUCTURE
IMMEDIATELY AFTER INSTALLATION OF STRUCTURE.
2. TOTAL DISTURBED AREA = 10.28 ACRES.
STORM DRAINAGE PIPE SCHEDULE
PIPE MATERIAL LENGTH SIZE SLOPE
A-B R.C.P. 110 LF 42" 10.0%
C-D R.C.P. 140 LF 84" 3.5%
E-F CMP 55 LF 18" 1.8%
NOTE:
1. LOCATION OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY.
EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
ANY DAMAGE TO EXISTING UTILITIES (SHOWN do NOT SHOWN) AS A RESULT OF
THIS CONSTRUCTION WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR
AND SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER_
2. ALL SURVEY DATA AND TOPOGRAPHIC INFORMATION PROVIDED BY WEBB A.
MORGAN & ASSOCIATES. P.A., REGISTERED LAND SURVEYORS. ASHEVILLE. N.C.
AND SUTTLES SURVEYING, MARION, N.C.
APPLICANT:
McDOWELL COUNTY, NORTH CAROLINA
10 EAST COURT STREET
MARION, NC 28752
PHONE: (704) 652-7121
PROPOSED CONSTRUCTION:
COMPLETE ACCESS ROAD AND BEGIN
SITE DEVELOPMENT FOR McDOWELL
COUNTY INDUSTRIAL PARK
LOCATION:
APPROXIMATELY 3/4 MILE FROM
INTERSECTION OF 1-40 & U.S. 221
ALONG INDUSTRIAL PARK ACCESS RD.
COUNTY. STATE:
McDOWELL NORTH CAROLINA
SCALE: NO SCALE DATE- DEC. 15, 1995 SHEET 6 OF 6
PROJECT:
McDOWELL COUNTY INDUSTRIAL PARK
ACCESS ROAD CONSTRUCTION PHASE 2
ADJACENT PROPERTY OWNERS.
1. A.C. FORTENBERRY
2. WALTER B. HARRIS
3. BOBBY J. CABLE
4. MICHAEL LEE LEWIS
5 CHAMPION INTERNATIONAL
6. MORRIS LAUGHRIDGE
7. NORTH CAROLINA D.O.T.
cGILL ASSOCIATES, P.A.
CONSULTING ENGINEERS
AAk A SHEVILLE, NORTH CAROLINA