Loading...
HomeMy WebLinkAboutNCG030385_MONITORING INFO_20171116STORMWATER DIVISION CODING SHEEP NCG PERMITS PERMIT NO. 3 O DOC TYPE ❑HISTORICAL FILE 14--UONITORING REPORTS DOC DATE 0 YYYYMMDD F Compliance Inspection Report Permit NCG030385 Effective: 11/16/17 Expiration: 10/31/18 Owner: Refabco Inc SOC: Effective: Expiration: Facility: Refabco Incorporated County: Mecklenburg 200 E 27th St Region: Mooresville Charlotte NC 28201 Contact Person: Joseph Thompson Title: Phone: 704-372-2100 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12113/2017 Entry Time: 09:30AM Exit Time: 09:45AM Primary Inspector. James D Moore Phone: Secondary Inspector(&): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stonnwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: M Storm Water (See attachment summary) page: 1 -t V,d permit: NCG030385 Owner - Faoilfty: Refaboo Inc Mepocwn Date: 1211312017 inspection Type . Compliance Evaluation Reason for Visit Routine Inspection Summary: The inspection was part of a request to rescind coverage under NCG030000. Based on the inspection the business has shut down and all material has been removed from the site. Rescission is recommended. Page: 2 Semi-annual Stormwater Discharge Monitoring Report =� for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 08/24/2015 CERTIFICATE OF COVERAGE NO. NCG03 0 3 8 5 (f ECEI sAEPCE COLLECTION YEAR 2015 FACILITY NAME REFABCO Incorporated' AUG 2 8 LE PERIOD ❑X Jan -June ❑ July -Dec COUNTY Mecklenburg or 0 Monthly' January (month)® PERSON COLLECTING SAMPLES James W. Willard II INENCO, Inc. CENTRAL FMCSIARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA LABORATORY Pace Analytical Services Lab Cert. # 12, 37706, 40, 37712 DWR SECTION ❑Zero -flow ❑X Water Supply ❑SA Comments on sample collection or analysis: ❑Other C,3 pH analysis conducted by INENCO, Inc., Lab Cert.# 5540 - -- PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 v Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non-Polar O&G/hour Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks =__> _ - 100 mg/L or s0 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-001 01/23/2015 1.14 67.0 7.40 0.0831 0.0176 0.5280 < 5.0 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not -report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reRorted in the format. "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yrj 24-hour rainfall amount, inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PARTS MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO ❑ 1F YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑X NO ❑ REGIONAL OFFICE CONTACT NAME: James Moore Mall an on inal and one copy of this DMIi including all "No Discharge" reports, within 30 days of receipt of the lab results or at end of monitoringperiod in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature 9f Permitteej Permit Date:11/1/2012-10/31/2017 B�zs-IS (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 PHONE (704) 372-2100 FAX (704) 372-6900 REINFORCING STEEL August 24, 2015 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 - 1617 Re: Stormwater Discharge Outfall Monitoring Report (DMR) Year 3, Period 1, Sample 5, 2015 and Monthly REFABCO, Incorporated (Mecklenburg County) General Permit NCG030000, Certificate of Coverage No. NCG030385 Dear Stormwater Permitting Unit; P.O. BOX 790086 CHARLOTTE, N. C. 28206 We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for REFABCO, Incorporated under General Permit Number NCG030000, Certificate of Coverage NCG030385. This submission is for stormwater discharge sampling during Year 3, Period 1, Sample 5 (January — June, 2015) and monthly sampling for Copper and Zinc as outlined in Part II, Section B of our stormwater discharge permit. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. Sincerely, Joseph . Thompson President REFABCO, Incorporated Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & I copy Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 07/14/2014 CERTIFICATE Of COVERAGE NO. NCG03 0 3 S 5 FACILITY NAME REFABCO Incorporated COUNTY Mecklenburg PERSON COLLECTING SAMPLES James W. Willard II (INENCO, Inc.) LABORATORY face Analytical Services Lab Cert. # 12, 37706, 40, 37712 Comments on sample collection or analysis: pH analysis conducted by INENCO, Inc., Lab Cert.# 5540 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD X❑ Jan -tune ❑ July -Dec or X❑ Monthly' May !month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow NWater Supply ❑SA RECEIVED [—]Other AUG U 4 2014 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 --> CENTRAL FILES I)WQ/BOG ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 -- 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-001 05/15/2014 1.31 50.0 7.21 0.0590 0.0117 0.2980 < 5.0 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 .. r Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring w may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L 100 mg/L or So mg/LI 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tiler 1, Tier 2, or rer 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO ❑ REGIONAL OFFICE CONTACT NAME: .lames Moore Mail an original and one copy Of this DMR including all "No Discharge" re arts within 30 days of receipt oL the lab results for at end of monitoring period in the, case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Signature of Permit Date: 11/1/2012-10/31/2017 8-(-ram ( Date) SWU-245, last revised 10/25/2012 Page 3 of 3 do PHONE (704) 372-2100 FAX (704) 372-6900 REINFORCING STEEL July 14, 2014 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 - 1617 Re: Stormwater Discharge Outfall Monitoring Report (DMR) Year 2, Period 1, 2014, May Monthly Monitoring REFABCO, Incorporated (Mecklenburg County) General Permit NCG030600, Certificate of Coverage No. NCG030385 Dear Stormwater Permitting Unit; P.O. BOX 790086 CHARLOTTE, N. C. 28206 We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for REFABCO, Incorporated under General Permit Number NCG030000, Certificate of Coverage NCG030385. This submission is for stormwater discharge sampling during Year 2, Period 1, (January ---- June, 2014) and serves as the May monthly monitoring as outlined in Part II, Section B of our stormwater discharge permit. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. Sincerely, 11� . Josephp L. Thompson " President REFABCO, Incorporated Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & I copy PHONE (704) 372-2100 FAX (704)372-69M REINFORCING STEEL May 27, 2014 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699 - 1617 Re: Stormwater Discharge Outfall Monitoring Report (DMR) Year 2, Period 1, Sample 3, 2014 and Monthly REFABCO, Incorporated (Mecklenburg County) General Permit NCG030600, Certificate of Coverage No. NCG030385 Dear Stormwater Permitting Unit; P.O. SOX 790086 CHARLOTTE, N. C. 28206 We respectfully submit the enclosed original and one copy of the Stormwater Discharge Outfall Monitoring Report for REFABCO, Incorporated under General Permit Number NCG030000, Certificate of Coverage NCG030385. This submission is for stormwater discharge sampling during Year 2, Period 1, Sample 3 (January — June, 2014) and monthly sampling for Copper as outlined in Part 1I, Section B of our stormwater discharge permit. If you have any questions or comments regarding this Stormwater Discharge Outfall Monitoring Report (DMR), please contact us at your convenience. `Sincerely, JosepK L. Thompson President REFABCO, Incorporated Enclosures: Stormwater Discharge Outfall Monitoring Report (DMR), 1 original & I copy Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 05/2712014 CERTIFICATE OF COVERAGE NO. NCG03 0 3 8 5 FACILITY NAME REFABCO Incorporated COUNTY _Mecklenburg PERSON COLLECTING SAMPLES James W. Willard II.(INENCO, Inc.) LABORATORY Pace Analytical Services Lab Cert. # 12, 37706, 40, 37712 Comments on sample collection or analysis: pH analysis conducted by INENCO, Inc., Lab Cert,# 5540 Part A, Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD 0 Jan -June ❑ July -Dec or 0 Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ❑X Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic organics5 Benchmarks -==> - - 200 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-001 04/07/2014 1.87 30.2 7.31 0.0183 < 0.005 0.0667 < 5.0 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 01 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do -not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part S: Vehicle Maintenance Area Monitoring Results. only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfal! No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEMI Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 200 mg/L or 50 mg/L" 6.0 -- 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑X 1F YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end o f monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 5-07-� c� (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3