HomeMy WebLinkAbout310392_Inspection_20190730Division of Water Resources
Facility Number - 31 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: I / 1 Sul f 7 Arrival Tit�p1ye:- Departure Time: ® County:
iv
Farm Name: 4eyt V h"t ' 1 /�� �ZkiNn Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Phone:
Onsite Representative: Is �CIS Yy+ 41 1 Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Latitude:
Phone:
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
eLayer
Non -Laver
Poults
Design Current
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Longitude:
Region:
Design Current
Cattle Capacity Pop.
Calf
❑ Yes E� No ❑ NA ❑ NE
❑ Yes ❑ No [ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No qNA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes *0 ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes o ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard? ❑ Yes
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5
Identifier: -. �_ I
Spillway?:
Designed Freeboard (in): [q ,
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
�No ❑ NA ❑ NE
❑ No _ ❑ NE
Structure
" 6
❑ Yes [;�kNo ❑ NA ❑ NE
❑ Yes r7 No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes `� No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes FM No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes N6 No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes $No ❑ NA - ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [%No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes P No ❑ NA ❑ NE
❑ Yes [ANo ❑ NA ❑ NE
❑ Yes 7%No ❑ NA ❑ NE
❑ Yes �No ❑ NA ❑ NE
❑ Yes q No ❑ NA ❑ NE
❑ Yes FQ No ❑ NA ❑ NE
❑ Yes ILTAo ❑ NA ❑ NE
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑NA ❑NE
Page 2 of 3 21412015 Continued
Facili Number: Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes (g No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes ®No ❑ NA ❑ NE
the appropriate box(es) below.
T
❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes ❑ No MNA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes C�INo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes q No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes M No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes C5�No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? [:]Yes No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
Yr-f4r- nV- S1V� ��� �aeF�=L tLj�1 j j�j (UA,Qe/-- eV�;ks�
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: I I 1" (6`72 i
Date: 30
1 I2015