HomeMy WebLinkAboutNCG030326_MONITORING INFO_20190403STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
❑ HISTORICAL FILE
MONITORING REPORTS
DOC DATE
❑ OY D 3
YYYYM MDD
L1�
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 4/3/2019
CERTIFICATE OF COVERAGE No. NCG03 0 3 2 6
FACILITY NAME W&W-AFCO Steel LLC T
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. #i 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
RECEIVE or E] Monthly' March _ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
APR ❑Zero -flow ❑Water Supply ❑SA
CENTiVkL RILES MOther
IDV':rR SECTiON'
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑■ No discharge this period??
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0,010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
i mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
01
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfali, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit pate: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
i, Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
.4ay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be -reported -in -the format,_"<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
inches'
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/L4
Parameter Code
-
46529
NCOIL
00552
C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 1.1/1/2018
Page 2 of 3
I
11711 PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
+ 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES 0 NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original cony of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature
Permit Date: 11/1/2018-05/31/2021
L/—g-/5
Date
SWU-245, last revised 11/1/2018
Page 3 of 3
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 3/27/2019
CERTIFICATE OF COVERAGE NO. NCG03 0 3 2 6 R�i�r�
FACILITY NAME W&W-AFCO Steel LLC FD
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden APR0.4 2019
LABORATORY Microbac Lab Cert. # r.:iLES
Comments on sample collection or analysis: it''� `'ECT10J11
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD [71 Jan -June ❑ July -Dec
or E] Monthly'February month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
❑■ Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?z
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
_
-
100 mg/L or 50-mg/L4
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
01
2/18/19
0.007
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines forthe facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(Tf0), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
Inches3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/L4
Parameter Code
-
46524
NCOIL
00552
C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES [D NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Q NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the
case of "No _Discharge"Mports)_to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and comp)ete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of Pe
3- ag-i9
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 2/2212019
CERTIFICATE OF COVERAGE No. NCG03 0 3 2 6
FACILITY NAME
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. #! 11 °DIVED
Comments on sample collection or analysis:
FEB 2 8 2019
CENTFzAL FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR SECrrON
SAMPLE COLLECTION YEAR 2Q19
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or 0 Monthly' JanuarV (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply [:]SA
Mother
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑■ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organicss
Benchmarks
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
01
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
STotal Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan,"
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Signat re Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must_be_reported in the format, "<XX mglU' where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
inches'
New Motor Oil or
Hydraulic Oil Usage
Non=Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
15 mg/L
100 mg/L or 50 mg/O
Parameter Code
46529
NCOIL
00552
C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO ❑
IF YES, HAVE YOU CONTACTED THE DEM LR REGIONAL OFFICE? YES Q NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an oriainal cony of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of
a
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 1/17/2019
CERTIFICATE OF COVERAGE NO. NCG03 0 3 2 6
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORYMicrobac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD [I Jan -June ❑ July -Dec
or El Monthly' December (month)
DISCHARGING TO CLASS ❑ORW ❑HCfW []Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
RECEIVED ❑.IOther
JAN 2 3 2019 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION ❑ No discharge this period?2
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics-,
Benchmarks
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Cade
-
46529
C0530
00400
01119
01051
01094
00552
78141
01
12/28/18
1.2
0.277
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
lu
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
Tay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mglU' where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?z
Outfall No.
pate Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
Inches3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/O
Parameter Code
-
46529
NCOI L
00552
CO530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES EI NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lob results (or at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of Permittee
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11 28/18_
CERTIFICATE OF COVERAGE NO. NCG030326 SAMPLE COLLECTION YEAR 2018
FACILITY NAME Hirschfeld Industries Bridjge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly' November month)
PERSON COLLECTING SAMPLES Roger Breeden �^+ vG p C DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
4r
LABORATORY Microbac Lab Cert. # it []Zero -flow []Water Supply ❑SA®Other
Comments on sample collection or analysis: DEC 0 5 2018
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
Part A: Stormwater Benchmarks and Monitoring Results
❑ No discharge this period?
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Sus ended Solids
p
PH'
Standard units
Co pper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics-'
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
01
11/12/18
2.1
0.159
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the Same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may r e waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
dts�,_ D, (TO, --- ) 1- a.9- r `�
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part 8
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
i
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION S.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
(Date)
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/2/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge. LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. #i 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) October month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
[]Zero -flow ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected l
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics5
Benchmarks ===>
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
Nov 16 2018
'Monthly sampling (instead of semi-annual) must begin with the second consecutive ben r�ls c�e�e�Ci a for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this dis report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.34
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
PerAlt. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signs ure)
/1- 3 -/ 3
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 2, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note.If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME QUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE QUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reportsl ta:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
m. 63
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2018
P— 3-i9
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater_Discharge MonitoringReport
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/28/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
RE!eQl!, �.._,,,, a or ® Monthly'August month)
IS`CHARGING TO CLASS ❑ORW ❑HCJW ❑Trout ❑PNA
OCT 03 2018 ❑Zero -flow ❑Water Supply ❑SA
®Other
CENTKFeL HLEL :
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?2
Outfall No.
Date Sample
Collected '
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pr
Standard d units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
T
Total oxic
Organics'
Benchmarks =__>
-
-
100 mg/L or 50 mg/La
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0,067 mg/L
15 mg/L
1 mg/L
01
8/30/18
0.5
7.17
<0.005
<0.01
0.393
<5.0
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible form an aging compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 Su
I
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
n. a�
of Permitteej
Permit Date:11/1/2012-10/31/2018
( Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8/7/18
CERTIFICATE OF COVERAGE NO. N CG030326 SAMPLE COLLECTION YEAR 2018
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly' July month)
PERSON COLLECTING SAMPLES Roger Breeden _ RECEI LPI�HARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Microbac Lab Cert. # 11 �� $ 2018 ®Zero -flow ❑Water Supply []SA
Comments on sample collection or analysis: Other
CCNTIR/-U, pilv
d� ix:1 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results
❑ No discharge this period?'
Outfall No.
Date Sample
Collected l
(mo/dd/yrj
24-hour rainfall
amount,
Inches
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks =__>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
7/17/18
1.0
1
0.698
02
7/17/18
1.0
0.758
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-24S, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement forTTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
�J�_ D - (S ns� ° —
(Signa ure) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format "<XX m L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
(Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample I
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =_=>
_
-
IS mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/2S/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART Il SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Thad Valentine
Mail an original and one copy of this DMR,_includina all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
In the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 11/1/2012-10/31/2018
q-7-1a
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 7/5/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. h 11 RECEIVED
Comments on sample collection or analysis:
JUL 13 2018
CENTNAL FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR SSECTiO"-
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' June month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply []SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
3
Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organicss
Benchmarks =__>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance forthe same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
-may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
, 0P) ---
(SignaVure)
�-s•1�3
(Date)
Note: Results must be reported in numerical format. Do_not_report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 3A days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 11/1/2012-10/31/2018
' -- 4,
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/18/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden _
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' May month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flaw ❑Water Supply [:]SA
RSCEIVEV ®Other
JUN 2 2 2018 PLEASE REMEMBER TO SIGN ON PAGES Z AND/OR 3 -)
CENTRAL FILES
DWR SECTION
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks =__>
-
-
100 mg/L or 50 mg/1.4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
5/19/18
0.9
0.547
02
5/19/18
0.9
0.565
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement forTTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Mana er
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
!Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier.2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 -- 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports), to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
Permit Date: 11/1/2012-10/31/2018
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted S/22/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' April month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply [:]SA
®Other
RECENED PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -)
MAY 3 0 2018
CENTRAL FILES
E�lA1G? crm ® No discharge this period?'
Outfall No.
Date Sample
Collected-
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
i mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CPR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CPR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CPR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWIJ-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(Tf0), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part iB: Vehicle Maintenance Area Monitoring Results: only for.facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?-?
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (5GT-HEM)
Total Suspended Solids
pH
Benchmarks =_=>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text.
FOR PART A AND PARTS MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES ITV A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES []NOIZ
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No -Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service'Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the hest of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Q:,, D, a - -
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2018
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/13/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ®Monthlyl March month)
� �; aDJVgt5ING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
'llr� ��// ❑Zero -flow ❑Water Supply ❑SA
APR 2 5 2018 ®other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES Z AND/OR 3 4
DWR SECTION
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics-5
Benchmarks ===>
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
3/12/18
0.8
<0.005
0.282
02
3/12/18
0.8
<0.005
0.286
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Perrtiit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden ^T^
Name (Print name)
Plant Manager__
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period,
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches a
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: Ef you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an oriainal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring_ period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
_@, a"
of Permittee)
1/— /6 -/q
(Date)
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/6/18
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash _ ^
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ® Jan -June ❑ July -Dec
��j�� or ❑ Monthly' month)
OII V IA[I[:]Trout❑ ING TO CLASS ❑ORW ❑HQW Trout PNA
REGE❑Zero-flow ❑Water Supply [—]SA
MAR 15 Z015 ®other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organlcss
Benchmarks
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
2/19/18
0.5
<1.67
6.6
<0.005
0.004
0.758
<5.0
----
02
2/19/18
0.5
4.50
6.7
<0.005
<0.003
0.080
<5.0
----
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1of3
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)a"" 6) ,
rtc
(Signat re)
-3- 10 -i 1�
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches s
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an original and one copy of this DMR, including al! "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
0, l�
(Signature of Permittee)
( Date)
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2/19/18
CERTIFICATE OF COVERAGE NO. NCG030326 SAMPLE COLLECTION YEAR 2018
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly' January month)
PERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
LABORATORY Microbac Lab Cert. # 11 ❑Zero -flow ❑Water Supply ESA
Comments on sample collection or analysis: Copper results. are an RECEIVE[) ®Other
order of magnitude higher than normal. Laboratory, _error is suspected.
FES 2 6 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES
❑ No discharge this period?'
DWR SECTION
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Own!&
Benchmarks =__>
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
1/23/18
<0.005
02
1/23/18
1.53
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceed ance for the same parameter at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), l certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Rokeer.Breeden
Name (Print name)
Plant Manager „., ., ......_, . ...., _,,._.
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO
REGIONAL OFFICE CONTACT NAME: _Danny Smith ^
Mail an original and one copy of this DMR including all "No Dischame" reports,_ within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and Evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature df Permittee)
Permit Date: 11/1/2012-10/31/2018
.D --;0,1—t
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 1/2/18
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
RFr'=1\/FDr ® Monthly' December month)
DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑RNA
JAN 0 9 2018 ❑Zero -flow ❑Water supply ❑SA
ry ScG�IGRI ®Other
SECTION
4 rQR��A'IL}idP47OC S5PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
-
-
100 mg/L or 50 mg/O
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/06/17
<0.005
02
12/06/17
<0.005
I Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
Stormwater runoff has occurred since filing the fast discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
_) M. a ,uj__ J3-/lg
(Signat re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be re orted in the format "<XX m L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
pate Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part 8
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: _Danny Smith
Mail an original and one copy of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lab results Lor at end of monitoring period
in the case of "No Discharge" reports) -to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"l certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Signature of
Permit Date:11/1/2012-10/31/2018
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12/5/17
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash —
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
44 � or ® Monthly' November month)
RECED A ING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
DEC 12 Z017 ❑Zero -flow ❑water Supply ❑SA
®Other
CENTRAL_ FILE;
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part S: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: I you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
s A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART Il SECTION B.
2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Ii SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: _Danny Smith
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results or at end of monitoring eriod
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
a.-� 0). ,
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
/j--s-11
( Date)
SWU-245, last revised 10/25/2022
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/9/17
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden_ _
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ® July -Dec
or ❑ Monthly' month
DISCHAR TO CLASS ❑ORW ❑HQW [:]Trout❑PNA
RECE1�� ❑Zero -flaw ❑Water Supply ❑SA
f� N4V 17 Z017 ®other
GCt4 AL IFILTEEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3
DWR SECYION
[_� No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Hon -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics,
Benchmarks ===>
-
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
10/16/17
0.3
1.32
0.013
<0.003
0.255
<5.00
-----
02
10/16/17
0.3
1.54
<0.005
<0.003
0.257
<5.00
-----
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found it 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/2S/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for 70 monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
3�,0 - �) - l; /LR.�
(Signature)
P_ )3-0
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part R: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1554 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
I
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mall an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
of Permitteej
jDatej
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/9/17
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' October month)
DISC NG TO CLA55 ❑ORW ❑HQW ❑Trout ❑PNA
� R o ❑Zero -flow [:]Water Supply ❑SA ®Other
�QV � 7 tip17
GDN C�Ls LEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DW
❑ No discharge this period?'
Outfall No.
Date Sample
Collected l
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics;
Benchmarks =__>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
10/8/17
0.9
0.008
02
10/8/17
0.9
0.009
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
Tay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
kermit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signat re) (Date)
Note: Results must he reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a somple value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an original and one copy of this_DW-including all "No Discharge" reports, within_30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTER:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
Permit Date:11/1/2012-10/31/2017
lt-- /j - I?
[Date]
SWU-245, last revised 10/25/2012
Page 3 of 3
4k
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 10/2/17__
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash -
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
REjUAaa ® Monthly' September _ —, monthl
,0 CLASS ❑ORW ❑HQW ❑Trout ❑PNA
OCT 11 2017 ❑Zero -flow ❑Water Supply [—]SA
®Other
CENTRAL FILES
DWR SECTIC EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
® No discharge this period?-'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =_->
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
.-Q,
.FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8.
• 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an original and one copy of this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports] to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
Permit Date: 11/1/2012-10/31/2017
/o-3—)7
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCGO30000
Date submitted 9 14 17
CERTIFICATE OF COVERAGE No. N00030326
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Row Breeden _
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' -August month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
[]Zero -flaw ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3
❑ No discharge this period?2
Outfall:No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
0rganics5
Benchmarks ==_>
-
-
100 mg/L or 50 mg/L'
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
8/29/17
0.0532
02
8/29/17
0.0143
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfaI[, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).n,l��'
SEP 2 1
permit Date: 11/1/2012-10/31/2017
1
t
d1' pia �'170NPROCc�.gi��,L'r�J,'1
SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Q 6), -----
(Signature)
9 - ) �,-1 �
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text.
Part 1B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall,No.
D ate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Nan -polar O&G/TPH by
EPA.1664 (SGT-HEM),,.,
Total Suspended Solids i
s pH
Benchmarks =__>:
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
mit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Danny Smith
Mail an oriainal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring Period
in the case of "No Discharge'-' orts to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. i
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
_ 0' 0
(Signature of Permittee)
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2.012
Page 3 of 3
- Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted . 8/31/17
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roeer Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
iI1LE PERIOD ❑ Jan -June ❑ July -Dec
EC, or ® Monthly' July month)
SEP 1 t 26RCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
CENTRAL FILES ❑zero -flow ❑Water Supply []SA
DV'VR SECTION ®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?'
Outfall No.
= Date Sample'
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids .
pH,
Standard units
Copper
Lead
Zinc -
Non-Polar O&G/
'Total Petroleum
Hydrocarbons
Total1oxic
s
Organics.
'Benchmarks =__>,
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.'007 mg/L
0.03 mg/L
.0.067 mg/L
15 mg/L'.
1 mg/L
01
7/28/17
<0.005
02
7/28/17
<0.005
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469,31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities'that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
5 .. &� - _a-.'L-�-
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX ms/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24=hour rainfall
amount,
inches
Non -polar O&G/TPH by'
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =_=>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: 'If 'you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No DischarcMe" reports within 30 days of receipt of the tab -results (or at end of monitoring period
in the case of "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/27/17_
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden _
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' June month)
DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA
❑Zero -flow ❑Water Supply []SA
RECEIVED ®Other
JUL 0 3 2011 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 �
CENTRAL FILES
DWR SECTION
No discharge this period?2
Outfall No.
Date Sample
p
'Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
p H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks ===>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/14/17
1.4
0.013
02
6/14/17
1.4
0.012
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for 7170 monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
P. i� %-,IQ-11
(Signatu ) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/0, where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
Date Sample
Callectedl
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within .30 days of receipt of the lab results (or at end of monitoring 'Period
in the case o "No Discharge," reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/27/17 _
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or E Monthly' May _ — month)
RECEIVEMDARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
JUL 0 3 2017 EOther
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
❑ No discharge this period?'
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
inches
Total Suspended Solids
pH,
Standardrd units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks =__>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
5/24/17
2
<0.005
02
5/24/17
2
40.005
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
rriay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. i further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden _
Name (Print name)
Plant Manager
Title (Print title) ^
m.
(Signa re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (5GT-HEM)
Total suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 3.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an original and one copy of this DM& including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Fifes
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
W
(Signature of Permittee)
6 - a nJ— l'1
( Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
} Date submitted 5 1 17
CERTIFICATE OF COVERAGE NO. N0003M, 6
FACILITY NAME Hirschfeld Industries Bridge. LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roster Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly'
month
DISCHARGING TO CLASS
RECEIVED
MAY 0 9 2017
❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply []SA
®Other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWlq SECTION
No discharge this perlod?2
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
4/24/17
3.94
10.7
6.5
<0.016
<0.003
0.014
<5.00
----
02
4/24/17
3.94
21.2
6.2
<0.016
<0.003
0.013
<5.00
------
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
y
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title) n
(Sign ure)
5 K )j
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
f
Outfail;No�' ; ;+It,
Date Sam le
"'• u�p ��
Collectetiil
24 hour rainfall
, I.iamount;
Inches3
Nan-palar;:0&G/,TPHiby�
EPA .4664 (SGT-NEM)
" II I. I�ld ,,1
Tatal 5uspen;ded Solids
e
;l}}.`; r
pH. i
{Benchmarks = >
_
-
15 mg/L
100 mg/ Vor 50 mg%L*+'
=' 6.0 = 9:0,5U
r'
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PARtf A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for Knowing violations."
6), G3
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
5- q-- l ?
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/13/17
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden -_-
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' April month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
[]Zero -flow ❑Water Supply ❑SA
RECEIVED ®Other
MAY 01 2017 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -�
CENTRAL FILES
DWR SECTION
❑ No discharge this period
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics5
Benchmarks
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
4/3/17
0.017
02
4/3/17
0.017
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling Is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the 70 monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the
solvent management plan included In the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
020� 6). S&U Y
(5ignaturej (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "<XX mall. where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note, If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month.
No discharge this period
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches'
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
* A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an orlainal and one copy o f this DM& Including all "No Discharge" reports, within 30 days of eceipt of the lab results for at end of onitorina period
In the case o "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
LI-1 1 -/ I
( Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
s for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted _ 3/9Z17,
:ERTIFICATE OF COVERAGE NO- LO - ' ti - SAMPLE COLLECTION YEAR 2017
ACILITY NAME - Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
:OUNTY Nash or ® Monthly) March month)
'ERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
ABORATORY Microbac Lab Cert. # 11 ❑Zero -flow [-]watersupply ❑SA
:omments on sample collection or analysis: �ECEIVED ®Other
MAR 2 1 2017 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 mil.
CENTRAL FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR 5F:r,-,,,.,
-�v f IV7V
No discharge this period?2
outfall No.
Date Sample
Collected'
Imo/dd/yri
24hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
TotalToxic
Organlcs5
sench►narks ===s
_
-
100 mg/L or 50 mg/L4
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
3/2/17
0.017
02
3/Z/17
0.016
Monthlv samolins (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same Darameter
at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
-lectronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
ffluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor
ianufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
ube manufacture use the definition found in 40 CFR 469.31).
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
aciiities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
aay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
lermit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report, I further certify that this facility is Implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Cam, �, �,�,,�--� 3 - � S- ► i
(Signature) (Date)
cote: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
ormat. When results are below the applicable limits, they must be reported In the format "OX m L" where XX is the numerical value of the detection
mit, reporting limit, etc. in mg/L.
later if you report a sample value in excess of the benchmark, you must Implement Tler 1, Tler 2, or Tler 3 responses. See General Permit text.
'art B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?2
outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches s
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==_>
-
-
15 mg/L
100 mg/L or 50 mg/L•
6.0 — 9.0 SU
ootnotes from Part A also apply to this Part B
See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
tote: ff you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
OR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
a TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
.EGIONAL OFFICE CONTACT NAME:
hall an oriainal and one copy of this DMR, includigne of "No Discharge" worts, within 30 days of receipt of the !ab results for at end of monftorina period
i the case o "No Discha e" reports]to:
livision of Water quality
AM: DWQ Central Files
617 Mall Service Center
aleigh, North Carolina 27699-1617
OU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
ssure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
hose persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
m aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations,"
�3
Signature of P rmitteel
3 - l :s ,
Date)
ermit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual_Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/2/17 _
CERTIFICATE OF COVERAGE NO_IW030326'
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roizer Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) Fre_bruary month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow []Water Supply [:]SA
RECE- IVED ®Other
MAR 2 1201? PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
® No discharge this period?2
outfall No.
Date Sample
1
Collected
(mo/dd/ r)
24hour rainfall
amount,
Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non-Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
organics s
Benchmarks --->
_
-
100 mg/L or 50 mg/L°
6.0 -- 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
"No Flow"
02
"No Flow"
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found In 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found In 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found In 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
�As,__ 3-P-0
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mbtIV where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must implement Tler 1, Tier 2, or Tler 3 responses. See General Permit text
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
• See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date; 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nbter If you report a sample value In excess of the benchmark, you must Implement Tler 1, 77er 2, or 77er 3 responses. See General Permit text.
FOR PART A AND PART 8 MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCE5 IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAM E;
Mallon orlainal and one copy of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorinaperlod
In the case of "No DischalRe"reports] to;
Division of Water quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, Including the possibility of fines and Imprisonment for knowing violations."
Permittee)
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2/2/17
CERTIFICATE OF COVERAGE NO. N0003IIM-
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' January month)
DISC`Hr G TO CLASS ❑ORW ❑HCtW [:]Trout ❑PNA
RECE AM []zero -flow []Water Supply ❑SA
FEg 0 8 zoo ®Other
CENTRAL FILEXEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DV1,r1R SECTION
❑ No discharge this period?'
Outfall No.
Rate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks ===a
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
1/23/17
0.014
02
1/23/17
0.010
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may., be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Perrhit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
RoLer Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signs ure) (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "cXX mALL", where XX is the numerical value of the detection
limit, reporting limit, etc, in mg/L,
Note: If you report a sample value in excess of the benchmark, you must Implement tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO JZ
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy at this DMR, Including all "No Discharge" ce2orts, within 30 days of retelpt of the lab results far at end of monitoring verlod
In the case oI "No Discharae"reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
a - 6-�
(Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12/12/16
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
PERSON COLLECTING SAMPLES
LABORATORY Microbac Lab Cert. # 11 — , IZ VED
Comments on sample collection or analysis: —��C 49
nowR SECTIp S
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' December month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected 3
(mo/dd/yr)
2a-hour rainfall
amount,
Inches3
Total Suspended Solids
PH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics5
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/5/16
0.11
0.169
02
12/5/16
0.11
.t
0.111
44
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the sa`me,p; amefer at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31),
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. Tba solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
C). a
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or firer 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A ANa PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature 66 Permittee)
Permit Date:11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/18/16
CERTIFICATE OF COVERAGE NOPAfi
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES 'Roster Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: 5tormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June [] July -Dec
or ® Monthly' November month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RE❑Zero-flow ❑Water Supply ❑SA
� IVED ®Other
NOV 2 8 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CEN7.RAL FILES
DWR SECTION
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
-
-
100 mg/L or 50 mg/L'
6.0 w 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
11/4/16
0.12
0.098
02
11/4/16
0.12
0.285
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perfo('m metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included In the stormwater Pollution Prevention Plan."
Ro;2er Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signatur) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, cPQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "OX mg/L". where XX is the numerical value of the detection
limit, reporting limit, etc, in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or filer 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 2 of 3
.i
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an orlainal and one cony of this DMR, including all "No Discharae" reports, within 30 days of receipt of the lab results far at end of monitoring period
In the case of "No Discharae" rewrtsl to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
a-). 63n-o-c�-
(Signature of Permittee)
//-
(Date)
Permit Date:11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 10/30/16
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME _Hirschfel_d Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' October month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
Elzero-fiow ❑Water Supply ❑5A
RECEIVED ED ®Other
NOV 2 9 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
® No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
PH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks ===>
_
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
FM
Ly-
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-2 45, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), l certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
pate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PAR —TA PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION S.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
i
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/19/16
CERTIFICATE OF COVERAGE NO. NCG =— 15. - SAMPLE COLLECTION YEAR 2016
FACILITY NAME Hirschfeld Industries Bride LLC SAMPLE PERIOD ❑ Jan -June ® July -Dec
COUNTY Nash
or El Monthly'
PERSON COLLECTING SAMPLES Roger Breeden 1)
Ga �
LABORATORY Microbac Lab Cert. # 11 DISCHARGING TO CLASS
Comments on sample collection or analysis: OCT 2 5 mb
DWR SECTION
Part A: Stormwater Benchmarks and Monitoring Results
❑ORW ❑HQW [—]Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics!;
Benchmarks =__>
-
-
100 mg/L or 50 mg/L^
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
9/19/26
.78
8.40
7.9
<0.0167
<0.003
0.051
<S.00
------
02
9/19/16
.78
6.80
7.8
<0.0427
<0.003
0.176
<5.00
------
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation: must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
r;� s
1W
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Per1V1. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included In the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
6)
(Sign ture) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mit/0 where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FORIART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO 21
REGIONAL OFFICE CONTACT NAME:
Mall an orl final and one copy of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab results tor at end 91 monitoring eriod
In the case of "No Dlscharne" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED;
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
lv-15-A
(Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 919116
CERTIFICATE Of COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Brldae, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' August month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow []Water Supply []SA
RECEIVED ®Other
SEP 26 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
CENTRAL FILES
DWR SECTION
❑ No discharge this perlad?2
Date Sample
24-hour rainfall
pH,
Non -Polar O&G/
Total Toxic
Outfall No.
Collected'
amount,
Total Suspended Solids
Standard units
Copper
Lead
Zinc
Total Petroleum
Organics"
(mo/dd/yr)
Inches'
Hydrocarbons
Benchmarks =__>
-
-
100 mg/L or 50 mg/0
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/21/16
., /
0.086
02
8/21/16
0.082
t f.�
V
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving watelc flc9'nqn%l
Rprotective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which pert m ais anufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the ditiTox Organics is that definition contained In the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469,31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised,10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Brsed upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO),1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)ao {�
A,, St a,eY� =
(Signature)
c -Do —Is.
(Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "OX ma/V where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?1
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amounts,
Inches
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A_ AND PART 0 MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3; HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an orlalnal and one copy of this DM& Including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring 0-erlod
In the case of "No Discharge" reportsl to;
Division of Water Quality
Attn: DWQ Central Files
1617 Mall Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED;
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
11�- -10 - / �
(Date)
Permit Date. 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
~` for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8/10/16
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
C lop Lop,
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' July month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Microbac Lab Cert. # 11 ® G���❑ ®� ro-TIOw ❑Water Supply ❑SA
ther
Comments on sample collection or analysis: f� G
AUG ZQ� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
Part A: Stormwater Benchmarks and Monitoring Results �vUR SECTION
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Total Suspended Solids
P , H
Standard units
Copper
Lead
Zinc
Non-Polar O&G/
Total Petroleum
Hydrocarbons
Total
its'
Organnics
Benchmarks ===>
-
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
7/31/16
0.061
02
7/31/16
0.092
'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceed ance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/7-012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be;.iaived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
�gyAp
• W lllt.t..r9-----'
(Sign ure)
�- ),I- kt
(Date)
Note: Results must be reported in numerical format. Do not -report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mgjL", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 4.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART 8 MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
1�-)1-/�
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
4b. Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted _ 7/20/16 _
:ERTIFICATE OF COVERAGE No. NCG030326
ACILITY NAME Hirschfeld Industries Bridge, LLC
:OLINTY Nash -
'ERSON COLLECTING SAMPLES Roner Breeden _
ABORATORY Microbac Lab Cert. # 11
:omments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
FIPZ
IL r-7� r a
AMP COLLECTION YEAR 2 SAMPLE COL CT 16 0
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' June month
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
[]Zero -flow []Water Supply ❑SA
RECEIVE® VoOther
AUG 10 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
No discharge this perlod?1
Outfall No.
bate Sample
Collected 1
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics 5
tenchmarks :=>
_
-
200 mg/L or 50 mg/I.°
6.0-9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
1S mg/L
1 mg/L
01
6/28/16
0.050
02
6/28/16
0.059
Monthly sampling (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
,lectronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
ffluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
lanufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
ube manufacture use the definition found in 40 CFR 469.31).
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
acilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
Aay b' Waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
'ermit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70),1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Rorer Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
lote: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
ormat. When results are below the applicable limits, they must be reported in the format "e= me/L", where XX is the numerical value of the detection
mit, reporting limit, etc. in mg/L.
late: if you report a sample value In excess of the benchmark, you must Implement Tier I, Tler 2, or Tler 3 responses. See General Permit text.
,art R: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
Ej No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yrl
24-hour rainfall
amount,
Inches'
Non -polar 0&G/TPH by
EPA 1664 iSGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 5U
ootnotes from Part A also apply to this Part B
See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
tote: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tler 2, or 77er 3 responses. See General Permit text.
40 —
OR PART A AND PART B MONITORIN,G RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
EGIONAL OFFICE CONTACT NAME:
/tall an or! lnal and one My of this DMR Including all "No Discha e" reports, within 30 days o recel t o the lab results or at end o monitoringerlod
the case of "No Discharne" reports] to:
livision of Water Quality
,ttn: DWQ Central Files
617 Mall Service Center
aieigh, North Carolina 27699-1617
OU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
ssure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
hose persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
m aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
signature of
ermit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
•� Date submitted 6/10/16
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' May month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED ❑Zero -flow ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3
CENTRAL FILES
DWR SECTION
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg�
1p!067 mg/L
15 mg/L
1 mg/L
01
5/30/16
0.479
02
5/30/16
0.086
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same ar pteNhe.
he same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitor' oga
h k
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may bF
i i le i gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where ther ive benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
.�
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name) ^TT
Plant Manager
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, °<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 5U
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
6~ I I -/ �
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
4
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/25/16
CERTIFICATE OF COVERAGE NO. NIE-GM3yM
FACILITY NAME Hirschfeld industries Bridge. LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roizer Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR Z016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' April month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
[]Zero -flow ❑water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
El No discharge this period?1
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
IncheO
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics$
Benchmarks === >
-
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
4/12/16
0.332
02
4/12/16
0.372
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfaI[, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found In 40 CFR 469,31). RFrFI\IED
MAY - 9 2Q16
"%'F RhAA 0 VSECTION NG UNIT
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or filer 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
If YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an orlainal and one copy of this DMR, Includina oil "No Discharge" reports, within 30 days of recelpt of the lab results !or at end of monitorina period
In the case of "No Discharge" reports] to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
5-,a-)t
(Date)
Permit Date:11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is Implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable Ilmits, they must be reported In the format, "<XX mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. In mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new fill per month.
❑ No discharge this period?2
Outfall No.
pate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/18/16
(COP
CERTIFICATE OF COVERAGE NO. N` 30326—) SAMPLE COLLECTION YEAR 2016
FACILITY NAME _ _Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly' March month
PERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW []Troutut ❑PNA
C
LABORATORY Microbac Lab Cert. # 11 ❑Zero -flow ❑Water Supply ESA
Comments on sample collection or analysis: RFORVE® ®Other
APR 2 8 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results 4WRSECTION
INFORMATION PROCESSING UNIT
n No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics,
Benchmarks
-
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L 1
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
3/20/16
0.557
02
3/20/16
0.175
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017
t
SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report..I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Roger Breeden �
Name (Print name)
Plant Manager
Title (Print title)
2:!�., 6)- ait zs
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format "<XX m I_', where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
i FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Moil an original and one copy of this DM& including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
-j. 5
( Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted _ 3/1QZ16
:ERTIFICATE OF COVERAGE No. NCCaQ3@2Zft,
ACILITY NAME Hirschfeld Industries Bridge, LLC
;OUNTY Nash
'ERSON COLLECTING SAMPLES Roger Breeden
ABORATORY_ Microbac _ _ Lab Cert. # 11
;omments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
W"
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly) ., 00"N
month) 14NEW
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑
SGG
GG vS� ❑Zeraflow ❑Water Supply
�1 01 ®Other
MAR � 1 1
Lr PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
DWR SEG�ION
n No discharge this perlod?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
p , H
Standard units
Copper
Lead
Zinc
Non-Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Drganlcss
:enchmarks a=-->
-
-
100 mg/L or 50 mg/L4
6.0 —9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
2/16/16
.49
12
8.1
<0.013
<0.003
0.367
<5.00
---
02
2116/16
.49
11.2
7.9
<0.013
<0.003
0.384
<5.00
-----
Monthlv samDline (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
,lectronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
ffluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
lanufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
ube manufacture use the definition found in 40 CFR 469.31).
ermlt Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 1 of 3
acilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
lay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
'ermit:I For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is Implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roggr Breeden
Name (Print name)
PlantMana er
Title (Print title)
m 3— is -U
(Signal re) iDate)
Jote: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
ormat. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
mit, reporting limit, etc. in mg/L.
late: if you report a sample value In excess of the benchmark, you must implement Tier 1, 77er 2, or Tier 3 responses. See Genera! Permit text.
'art B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks �= =>
-
-
15 mg/L -
100 mg/L or 50 mg/L"
6.0 -- 9.0 SU
ootnotes from Part A also apply to this Part B
See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
ermit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 2 of 3
late: If you report a sample value in excess of the benchmark, you must Implement Tler 1, Tler Z or Tier 3 responses. See General Permit text .
OR PART A AND PART B MONITORING RESULTS:
0 A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION 8.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
.EGIONAL OFFICE CONTACT NAME:
gall gn orialnal and one cony -of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitorina period
7 the case of "No Discharge" reportsl to:
livision of Water Quality
,ttn: DWQ Central Files
617 Mail Service Center
.aleigh, North Carolina 27699-1617
OU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
ssure that qualified personnel properly gather and evaluate the Information submitted. Based'on my inquiry of the person or persons who manage the system; or
hose persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
m aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
signature of Permittee)
ermit Date: 31/1/2012-10/31/2017
3-/,5-16
(Date)
SWU-245, last revised10/25/20.12
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2/12/16
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME _ Hirschfeld industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roaer Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) January month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
RECEIVED ®Other
MAy a 1 Z01PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
❑ No dischar- this period?2
Outfall No.
Date Sample
Collected
(mo/dd/Yrl
24-hour rainfall
amount,
Inthes3
Total Suspended Solids
pH,
Standard units
Copper
Lead f
, �'
'� Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics s
Benchmarks ===>
_
-
100 mg/L or 50 mg/V
6.0 — 9.0
0.007 mg/L
0 •mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
1/29/16
0.064
02
1/29/16
0.097
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
nFor sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report wit2-7-cavFh?ckrnark here.
The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for ai� r ofathe rig ee-req irement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protecil've Mnr, ��ngrk p ll�Is
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, m ha�ufacture
electronic crystals, or manufacture cathode ray tubes, For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/i/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
'Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signatu e) jDate)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mall". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period? 2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-flour rainfall
amount,
Inches
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==->
_
-
15 mg/L
100 mg/L or SO mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tler 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an original and one copy of this D_ MR, Including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
In the _case of"No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing violations."
(Signature of
5-- ;- s -) �
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Repo
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12/22/15
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge. LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. R 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR g015
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' December month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
®Zero -flow ❑Water Supply []SA
RECEIVED ®Other
JAN 0 5 Z016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
OWR SECTION
No discharge this periodt4
Outfall No.
Date Sample
Collected ,
(mo/dd/ r)
24-hour rainfall
amount,
inches'
Total Suspended Solids
p
r
Standard units
Copper
Lead
Zinc
Non-Polar O&G/
Total Petroleum
Hydrocarbons
Total c
nicssd
Organics
Benchmarks
100 mg/L or 50 mg1V
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/2/15
0.89
—_»._»
..»»»...
...........
........ ».
0.040
»»»»»
02
12/2/15
0.89
------
»._».»»
---------
0.052
' Monthly sampling (Instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit., For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is Implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
Q
(Signature)
J�--a%--(.5
(Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must bg reported In the format, "<Xx mst/1. where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this perlod?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note. if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an orlainal and one copy of this DMR Including all "No Discharge" Worts,. within 30 days of receipt of the lab results for at end of monitoring period
In the case of "No Discharge" reports) to;
Division of Water Quality
Attn: DWQ Central Files
1617 Mall Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED;
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
L�19
(Signature of Permittee)
/.,-.2,a-11
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12 3 15
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. q 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' November month)
R PNA
ED O CLASS De o fl offCIW ❑wat❑er SupplyTrout ❑❑SA
DEC 16 2015 U ®other r�
CENTRAL FILAEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24rainfall
amount,
Inches,
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non-Polar 0&G/hour
Total Petroleum
Hydrocarbons
Total Toxic
Organics,
Benchmarks -__>
_
-
100 mg/L or 50 mg/1.4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
11/10/15
0.89
..__...-
-----------
...........
...........
0.060
----......
......
02
11/10/15
0.89
_w»»..
..»»»».
___»»...
..»....».
0.052
1 Monthly sampling (instead of semi-annual) must begin with the Second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling perlods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. - or those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
> /.� y it
(Signature) (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "<XX mOV, where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
`See General Permit text, Table S, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an orlulna/ and one corny of this DMR, Including all "No Discharge" reports, within 30 days of recelot of the lab results for at end of monitoring period
In the case of "No Discharge" reports) ta;
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11 10 15
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridee, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAVLLECTION YEAR 2015
RIECIa L RIOD ❑ Jan -June ® July -Dec
month 1
1ZA$ or ❑ Monthly'
NOV
CFt4-T V*G TO CLASS ❑ORW ❑HQW []Trout ❑PNA C' 2
pwRSECTI ❑Zero -flow ❑Water Supply ESA i®
®Other � w
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks =__>
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
10/27/15
.38
3.33
6.7
0.015
<0.003
0,920
<5.00
------
02
10/27/15
.38
3.33
6.2
0.089
<0.003
1.05
<5.00
------
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. Fri those facilities electing to employ the T O monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(5igna re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier3 responses. See General Permit text.
FOR•PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B,
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days otreceilgt ot the lab results or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attw DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
WN
(Signature of Permittee)
d / d s
(date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8118115
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME _ Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or
Month
�i Cc �/ �G TO CLASS
RE
SEP 2 4 Zile
W ❑HQW ❑Trout ❑PNA
ro-flow ❑Water Supply [:]SA
CENTRAL FILESPLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
® No discharge this period?z
L"
®ea=
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
p H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks ===>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
0.269
----------
------
02
0.251
----------
------
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
Ntrre waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Per. . For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden QD 5 e. r� �. R EO EA;6
Name (Print name)
Plant_Manager*' P4A
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, _"<XXm/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitorina period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
0. & aR-1-D, 9 -1 It — l _e
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/17/15
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge. LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # it
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' September month)
"ECCI V gUG TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
OCT
2�)� ®Zero -flow ❑Water Supply ❑SA
05 ®Other
SECTION
TIONION
ES
DWR PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
�WR SE
No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics$
Benchmarks =__>
-
-
100 mg/L or 50 mg/LA
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
9/2/15
0.89
----------
----------
------ -----
-----------
0.083
----------
------
02
9/2/15
0.89
----------
-----------
-----------
-----------
0.091
----------
------
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
"See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Aj
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit"For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a somple value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
{Signature of Perm
9Lao' x
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
i' Semi-annual Stormwater Discharge Monitoring Report
S r- for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/8/15
CERTIFICATE OF COVERAGE NO. NCG030326 SAMPLE COLLECTION YEAR zoi5
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly'Ma
PERSON COLLECTING SAMPLES Roger Breeden month
LABORATORY Microbac Lab Cert. # 11 DISCHARGING TO CLASS ❑ORW [:]HOW []Trout ❑PNA
Comments on sample collection or analysis: ®Zero -flow ❑Water Supply ❑SA lipRECEIrr RECEIVED
®Other
V CM,D
JUN 18 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION
® No discharge this period?z
Outfall No.
Date Sample
1
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inche53
Total Suspended Solids
P , H
Standard units
Copper
Lead
Zinc
Non-Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
-
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
No Flow
----------
------
02
No Flow
----------
------
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
FacilitieF.that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
.may be-w1aived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
4rmit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signatur) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 sU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
.Note:, if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cony of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end t monitoring period
in the case o "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
No
(Signature of P
6 - ) b - /_-
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/3/15
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden month
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly'
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
RECEIVED ®Other
JUL 10 Z(j 1� LEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
CENTRAL FILES
DWR SECTION ❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
inches
Total Suspended Solids
PH.
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/3/15
.50
1.00
6.1
<0.0100
<0.00300
0.0200
<5.00
------
02
6/3/15
.50
3.20
6.0
<0.0100
<0.00300
0.0110
<5.00
------
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Cz
,Facilitt�s that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager_
Title (Print title)
(Signat e)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses, See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
pate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches s
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
,Not�?: If you report a sample value in excess of the benchmork, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "Na Discharge" reports, within 30 days o receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
u,
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
-)-cqs
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
T
.o.
Khuhlvhu
Semi-annual Stormwater Discharge Monitoring Report MAY 21 2015
for North Carolina Division of Water QualityGeneral Permit No. NCG030000 CENTRAL FILES
DWR SECTION
Date submitted 5/4/15
CERTIFICATE OF COVERAGE NO. NCG030326 SAMPLE COLLECTION YEAR 2o15
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD [] Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly'April
PERSON COLLECTING SAMPLES Roger Breeden month
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
- - RECEIVED ®Other
MAY 21 2015 PLEASE REMEMBER TO SIGN ON PAGES Z AND/OR 3 -lam
Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES
DWR SECTION
® No discharge this period?z
r—__
Dutfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
PHA
Standard units
Copper
lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic(
Organics-'
Benchmarks =__>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
4/19/15
1.15
----------
-----------
----------
---------
0.0102
----------
------
02
4/19/15
1.15
----------
-----------
.... _ ..
---------
0.0140
----------
------
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
t
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
- may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager ^
Title (Print title)
6) - QNL&,
(Signs ure)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement 'Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part 13
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharr ports, within 30_days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date:11/1/2012-10/31/2017
5-ly-Is
( Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/23/15
;ERTIFICATE OF COVERAGE N0. N0f}3M75-
AGILITY NAME _Hirschfeld Industries Bridge. LLC
;OUNTY Nash
PERSON COLLECTING SAMPLES Roper Breeden
ABORATORY Mlcrobac I Lab Cert. # 11
;omments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015 `
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® MonthlylMarch Fri
month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout V_NRECEIVED ❑Zero -flow ❑Water Supply
—�
APR 0 8 2W5 ®Other
CENTRAL FILES PLEASE REMEMBER TO SiGN ON PAGES 2 AND/OR 3
DWR SECTION
No discharge this perlod?2
Outfall No.
Date Sample
Collected'
{mo/dd/yri
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics5
=enchmarks =v=>
_
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
3/3/15
.5
----------
-----------
---------
---.....
0.12
----_..--
------
02
3/3/15
.5
----------
0.13------
Monthly samolins (instead of semi-annuall must
beein with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
lectronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics Is that definition contained In the EPA
ffluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
lanufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray-
ube manufacture use the definition found in 40 CFR 469.31).
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
ace ities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
'I,ag waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Signature) (Date)
lote: Results must be reported In numerical format. Do not report Below Detection limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
ormat. When results are below the applicable limits, they must be reported in the format, "<XX me/r where XX is the numerical value of the detection
mit, reporting limit, etc. in mg/L.
fate: If you report a sample value In excess of the benchmark, you must Implement filer 1, Tier 2, or Tier 3 responses. See General Permit text.
,art B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks == >
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
ootnotes from Part A also apply to this Part B
See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
lot,?: If you report a sample value In excess of the benchmark, you must implement 77er 1, 77er 2, or Tier 3 responses. See General Permit text.
OR PART A AND PART B MONITORING RESULTS:
0 A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
0 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
a TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
.EGIONAL OFFICE CONTACT NAME:
hall an on anal and one cony of this DMR Including all "No Discharge" re orts within 30 days of revel t of the lab results or at end of monitoring erlad
h the case of "No Dlscharae" reports) ta:
1Ivision of Water Quality
Atn: DWQ Central Files
617 Mail Service Center
.alelgh, North Carolina 27699-1617
OU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
ssure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
hose persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
m aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
3lgnature of Permitteel
ermit Date: 11/l/2012-10/31/2017
I./ _ C , /
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina DEMLR General Permit No. NCG210000
Date submitted
CERTIFICATE OF COVERAGE N0. N G21D a S 5-
FACILITY NAME kOUISIano___ at ►r_
COUNTY )(, ) JC•OS
PERSON COLLECTING SAMPL S
LABORATORY �i i Lab Cert. #
NS—
Comments on sample collection or analysis:
SAMPLE COLLECTION YEAR 2015 0
SAMPLE PERIOD Jan -June ❑ July -Dec Fv:z
or K Monthly' 4rV month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow r ❑Water Supply ❑SAS
Other_ C 1rd5 a " C " _
PLEASE REMEMBER TO SIGN ON THE REVERSE 4
Part A: Stormwater Benchmarks and Monitoring Results (Monitoring is required only if the facility stores exposed accumulations of sawdust, wood chips,
bark, mulch, or other similar material on site for longer than seven (7) days.)
❑ No discharge this period?z
f�utfall'Na
a
Date Sample
Collected 1
(ma/�d/yri.
24 hourrainfall
amount,
G; 3Chermical,Oxygen
Inches
Demand '
`
Tr �� ; a
Total Suspended Solids
�.�. �,. ,
Benchmarks >
"120 mg/L
a100mg/L orSO'mg/L n
001
2 ;La AwS
6, IS
0,15
8
u
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example._do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L". where XX is the numerical value of the
detection limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 8/1/2013-7/31/2018 SWU-245, last revised 7/31/2013
Page 1 of 2
i
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No dischorpe this period?2
Outfall No.
Date Sample
2a-hour rainfall
x' Y
.
-,,Collected1 ,;
amount,
3 ��
Non polarO&G by'EPA
.
Total°S u'spen'detl Solids
_.
(mo/dd/yr):
Inches
16fi4 (SGT-HEMJ
,
Benchmarks ===>
- .
15 mg/L ,
-100 mg/L�or50 nig/L
.Q
Gi
C
i- I
Is �u
a -o�
d I n wa r-
Footnotes from Part A also apply to this Part B
�Rant- r 1Gth+-,
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEE:DANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES �q NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIPMAL OFFICE? YES M NO ❑
REGIONAL OFFICE CONTACT NAME: Go-elTIC �/hi WS1Z`
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware Pat there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Date)
Date:8/1/2013-7/31/2018
SWU-245, last revised 7/31/2013
Page 2 of 2
4
3
Certified Mail — 7012 1010 0002 5668 2294
Return Receipt Requested
LP
BUILDING PRODUCTS
March 9, 2015
Central Files
NCDENR - DWQ
1617 Mail Service Center
Raleigh, NC 27699-1617 AR
RE: Stormwater Sampling — Feb 2015 c hj 12015
P g ��'_ � Nr�CT
Permit No. NCG210355 VVR 5 lLFS
Louisiana-Pacific Corporation 16I;
To Whom It May Concern,
Please find attached two copies of the Stormwater Discharge Outfall Monitoring Report for
outfalls 001, 002, and 003 as required General Permit No NCG210355. We will monitor
each outfall monthly until the benchmarks are achieved for three consecutive sampling
events.
Please note that due to past results we fall under Tier II requirements and will be submitting
reports monthly.
If there are any questions regarding this report, please contact me at (336) 696-3464.
Sincerely,
9 6�1' 4�
Roy Pbart
EHS Manager
cc: File
ADDRESS P.O. Box 98
Roaring River, NC 28669
TgL 336.696.2751
FA% $36.696.3443
WEB www.lpcorp.com
Semi-annual Stormwater Discharge_ Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/4/15
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld industries Bridae, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden month
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly'February
DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout ❑PNA
[]Zero -flow ❑water Supply ❑S
R�C�1 ®Other
VQSE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
AR 1 2015
CENTRAL FI
DWR SEC?'1nES ® No discharge this period?z
fL
P"
A
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Nan -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics-'
Benchmarks =__>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
2/10/15
.5
----------
-----------
----------
---------
0.129
----------
------
02
2/20/25
.5
--_.-___.-
-----------
----------
---------
0.124
----------
------
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Rog,er Breeden
Name (Print name)
Plant Manager
Title (Print title)
(Sig) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, theymust be reported in the format, "<XX mgIL", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==_>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
/dote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at en_dof monitoring
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"l certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
.63
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2/2/15
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridle, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015 C--T%
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec"'
or ® Monthly'January 91691
month
rX
01&SC A GIN G TO CLASS
FEB 112015 L!
❑ORW ❑HCJW [—]Trout ❑PNA
[]Zero -flow ❑Water Supply ❑SA
®Other
CFN rRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3
OVVR SECTiQN
® No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
1/12/15
2.88
----------
-----------
------ ---
---------
1.38
---------
------
02
1/12/15
2.88
----------
-------
----------
---------
0.263
----------
------
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance For the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement,
" See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. Fo: those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden T
Name (Print name)
Plant Manager
Title (Print title)
(Signature) — ^�
�__D- I - / 5
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me1L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 166�4 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit team.
FOR'IART A AND PART 13 MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cony of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results for at end of monitoring period
in the case o "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center .
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
,D—'1-15
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/8/14
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
month
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD [] Jan -June ❑ July -Dec
or ® Monthly' September
DISCHARGING TO CLASS
RECEIVED
❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
OCT 2 2 2014 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
CENTRAL FILES
DWR SECTION
® No discharge this period?2
,t, 61 .; �,:, .,.1
„i l„iiI,ljj �,�1, .�, I.1•i1,,1
it .I. 'k ' ,,
i;El,.,j :11,11.ij,lt,..l? 11:.:�
i
SamPle'
�, i-.:':, "k•" .',h
,i �- { 11a,1f•:1i,1,.1. F. I,=I.,�
.. -` •
E.:h_ h'�
., � n..`; �
� F
l :'9 . a ::i :. ' , 1:1
�1.61�,,,I�t {1 F I
�I, �, , �, .� , T;' ,
-. .i, - .I '3 -�... I
... � .,1
''�' 1, ',i ..,
1.h...�.r ,
: �. . i, 1. k
F. I. •.: H
�. .I'!1
=r l
„ '�,1 T. ,.: �
1, II , ,
1,-' I'1.. 'V . ..
, -�.
,..F, '.I i:�
li y it
}:. ., I,
,'�1 i.e ,�
f{'i.. ,:[,
,,:�.: t', ,j
�II�I'j y7, ":S
1. I..�:
,F,: 1. t,:,,.j,. f
1. It
.� 7 � a �.-fy,�,
E'E�Ii{j�l k Ei��.
r� 1, Yea i41
flcl•s"ff, ,.
}I
.,Non-PolarO&G .I,
/k:'
'`
�f� I.
,� t, t,7,:1,•;1t�;1�„I,°t.
.. ,rl
11fr Outfall'No1,l�i� j
t�. l,. j;
'IDate
,, q.113„ i1 ,,la,'ll,lP".;j
.,I �1
IFF
j;;24rhour:ralnfall
j:. ,' kl,l; la'I: ,t `,. :'k.;
i:,._.,amaunt,i;
1, , .rrr„ "L ,h I, ; , ,,1 , ,, ;.
l Total Sus ended SoNds:�
, - P..
f9, �,,, . ,
' t ,:p k�
•5tandardrunits
�S
a' r:,.' ,}`kl
o' erg.i
I a G„ PP „b ;. j
„k ,, y.
I
�'I
1.. .
., l Lead�t
`1j 1t . , , , :
j;
Z,
I . „inc€i J
�T_, I 1-_E�..
la jj _, :h j;,,1,
,ITotaUPetroleum „
I 1 -I'1:, ",':.,
Total Toxlc;l
�� d ,;l•:',:'k,; :,�
,. s ,..1
..j
Ij.:.Organies
j Jj=}.l.,l •Ii„ •:i,
l al;1a.
.,1Coilected, I-;,
I I..
'f.'�
¢...kl'f u . m,
I, I a .l , j'�,..�.
i 1,, ,•''
3,
I, .�,
,.t .�. e., I, I
I
1;:.dj11, :: i.'
I. H F'
G ,.r' i1
1.-
,. I j' -3
''i t'.'I:I,.I'II,
, ...I
f i
. ',.I: .; ,,
,t,l: CI.1
I �..} a } „
. 1. 9: �l !
:l'::{ r� t : ., ,
,,. ,I,
i , :I. :k,: , I a 1:5�;
i, ,
H drocarbdns.t;
Tj„k, x t,j
,rl1
1'i4 f
.;� ,� ,1► ..
mo dd . r
i / l.v ),5.1,E
.,,.j:` .,.
�:. Inches. ry ', t
1�aF t, ,f.. , I u .
a : ,;,,,l, IL. i,I Ise=, {1'!
C: i, l t f
.i
y. ;. .,
•
11.
I.. I... 1'r:,..1
, 5 a� tl :ht, 1. f, .f.:.,, ,.
t..:,l
,___ .I
I,Bx.etn.:�,c:: hu.m.[ a.:: r1 kus.>Lt.. ik•.
i ','.:j ..
,. ,1I1+ I1. 151..11,:11.A,�. 1$Sy� ,ll.I,:
y
4'.,'.'j."F I S I... :, .:
,... 1. 1 ta
11, 11]f,' ,Ea,', f 1�;.
-.g/L;ai5mg/L"I,
:
ca k:..
c`10.007'mg%Ll
0:067m /Lk
411
fl. CIS: k1 , .
,�j, .:.1_1.,7`1
I:.U,::..1f.1 ''..:
M110
.
♦. a ,. S L :.
_
': ' G.,
I..1
f
11:l -_i'j�t:.-:,`:'F.
01
9/8/14
1.44
2.25
6.90
<0.010
<0.0075
0.16
<5.00
------
02
9/8/14
1.44
3.50
6.70
<0.030
<0.0075
0.17
<5.00
------
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Manager
Title (Print title)
a., 6). Q nsc..A - to o14
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, theymust be reported -in -the format, "<XX mg/C where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
!Vote: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
w.l it i,QUtfdII1N0. Ali..`.[
l • -Ii 1F .: 1 `i �r.).lt
;,,iifXt'E'�sl; 411 }t}:Gia'i lZ k; t:l, al
lir'!'.;j'
,q tDateSample''..K:q;2�4-hour:rainfalO`-,
�. t,r.: i a.
St j':'I Collected�'t;.'t- ik
��.,4.F. ri 4,' :f.
i tt., limo�dd/yr)! t•
.' . 3 + _, a, } d„ `
j . t� },,amount,,i .} ,
, . i,.., 3 n"il,
°. °., , `Inches + .,,;.
A . l,. �i' s.-, 3
_,,: 1 � �'
;l ,"t,N t, �.,�: i;,
u} i; i,. •, .- N. 3i x, t
Non-polar10&G/TPH,3by1
,...:,,. ,
;,, EPA,,,1664(SG7-HEM)a,4
'.' �,� � :i '�+ '�;,•�''1 : . '.t ' 1 7,'.I, st%. t
': •'T {, ,, ai jrl i,:Iit
:. �, �.�IE. .',.�;�,
,1. ',-tt't I.t•7.t t 4 1 1 .h }, },Ii)
•i, w , •lr 1 I i, I,,.t 'i'Itl,
h;i Total Suspended Sohdsl
7:'ll.t S i. ^t^.4 ,,•„i, t, tt,1,1t,:t'�.q,,:Ft
;.I;411 tl 4i i l:'lt ii ill`j;
,il .1{t, ,
t i� , .11'l ( }. �. k..
lt,,.�:19 tl il'�t`•
1 pH
irdz`ii'•.tt it., [�''l},j�.i i
N �{ I
teenchrriarks > r ,
�� a nan•¢e�,r;l;
i N. Ib K'•'
1.: t
il, 4 1. tr , L,ly i, t- 1
s 1+
r i + �l ti t ,'�
,i t, if• h',' I,.,t i r�
3 l :..
} t 15 mg/L' tk7 3' ti a
(' � �
Ir' 100im L'o� 50 m L*t t I
t,. JQ/ gl 1 t i
�I �
k 1 I'
t 6 0 9 0 Sll l l'.
•ll,b�ll..u.. II-.t.,
Footnotes from Part A also apply to this Part 8
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
' Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMfi including all "No Discharge" reports, within 30 days „of recelpt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of PerffiFttee)
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8/21/14
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeden _
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
Monthly' August _ month)
R R41 SS ❑ORW ❑HQW []Trout❑PNA
❑Zero -flaw [:]watersupply ❑SA
AUG t 5 2014 ®Other
CENTRAL. FILES
DWQIBl91gASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
, r,.#, �
rl,.J I ].' "Jl: I
l., I I,.
r.f:..[�
(
u: �: I � { �, �.: l �'; a t•[4',t j
{7.:I•..
I t l f
'Outfall Noy ! ,t .l
i tr L €'
rr
„!I �,'.,t',' a• , � ..:
1, J I :. l is r',
� tt jj ff I I
m3� C:f�'„ l '1,} I..€I',6 ,I:; l
rate Sample
.., r i ;
;;Collected .''
,
mo dtl r) M
I ly 1,
:I • , I. 3.
I .J{:', �,
i
€J pf r II
- '• r�: ill .lr .�A, ,k J
24-hour.rainfall
r .r� €=r,,, _' ' r
° ; iamount,'
l ..
t,:
�:, a I:.
1, :Inches ,
J. }. i
1 r
� :,r ' - ��} �
1 } #.. t,. .:
:l'..,.. '.t„I: i''}-t[.' �t1,'E}^:J.,t<„,
F i f.. , ,
Total Sus ended Solids
P. , L {J
W; .',
E :.::. 1 }
f I I '1' y
I '''.�i:f� ,1.Is:1 It . 1 �. I:'t17..,
, tZ
u
tit
° a --�'€€ rf' "• d ,
'll}.}i, €Fi
I., �,.:.PH, i _�' ;
€ . I ; J
aStandardunits:
t.
I -f,' I
I i ,el .l�fl [J I.:r�:,
a € 14 �
°�G i` ', f :�
1 ' EE :' i,.' .�1
}':3::<�J.ril.•r...�.,,
; ., r� .,,J ,;
�Co er
, , rP,P r;
.E
sE .
!''3ir11 • , ki.tl.
-f � a �. f. �,
1.
t , ,,.
,. �.,; i,�;
,I' I,'i'.:.1 r3:
:',;;fl tr ..,.I:�
y
[ter,, Leatl i .:
f .,.
t #, i" ,
(_F�,sl:1�:J isf�tfl:t�
.�•
J r; I
�, i
-,!:',+:' i'
�,Ee :1 c
�.:r,. ir: a
{ # .i ,Zinc i. i,
} i..i,:7 '
: {
f! ii'f,F.rrl/.rl..J?i
:.�', � 1 � � . �; �}..�„ I
On—
N , Polar O&G
�,::, /,.,
n., :Pr:EN,I.: btfli' k4 F# = �'
. €a i r ; or, rr €r.rl
I , Total Petroleum �:
dracarbons r' J.
`, a Y:.
.I ?t} rf.:'il..rlitt� l„rl.iil'€I }I.I:G
...i I i ' j .!
�13•E ,� . 1.
{..
�Total,Toxic',
i Ec.E;' r's's''',
' Orgal nice
risJ�..�..f.eii'�,il
•l:.,l..- .. I. I ,I .I I...,
Benchmarks = > fL'
[ti.',fl'ifl7,,ill:'rl�%Cf': r,,i13.. ri'i}
, ^ 1"-,II I 1 .-:.j
i. • I _ `{ C . E
:.r-iif:��}{�l,'k.:I f.:CI ".'3'r:�i
:: -f
:'., ' ,
ll E�" '.},,..j.'I�. Ir•.'r.ir :r: .: :F.
i
.106 in I: or.50;m L ,i
:�-.I: .». 1' l •i..' .: 1: :: �.1....e.: i
6A'-'9:0 li
;N�sl
,
0.007 hi L
�•..iJi4..�.
�'
0.03 m , i :y {
r 0.067, mom.//L
1
T 3.:�'I}'
. ;r 15 `m i. i�{ h
13 1r mi ` t . l
�.
01
8/1/14
.84
<0.010
0.27
02
8/1/14
.84
<0.010
0.27
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance far the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 f SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report, I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant -Manager
Title (Print title)
►, a Q
(Signatur )
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they, must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
t }li:ril -',si,i Ii_��t-::l14-.4-,.,T1,
4i,•€I;,`sl .t�: i� i� ,t} ll 11` 1, 1, 1, it
rt}t'.St �t ,}l l_ 4 ,,:1 11
4}t,{1,..1,y,lrl,l l_! „t t, ..}�.1.1,144t
Litt v.at :i }t,1, ;},. 4
Ill 1},?putfall.No ! I.I �'lt
t {t {t l' •,':'tlt 41.t It i t'a11, 4,1, :fi .11.
1..}1lil,il
tl:,I,11::.Ll,,li:(mo/dd/Yr�.{r,,,,,.1,
4Iq..I-I 1;,
l•d:•'l:l.11i:lt:l,li.11'l:.l,,k,ll1
I, 1;1 I,, 1 . I t, 41 'lilr!},!";
}t.4p:1., l,. ll,,l :i1,:,11,1,: ,., ,}, r.
' ' 4 Date Sam le s;,tti{l.
�, 1, P,...a :.
il':l:.,l,l i �)•'-. ,;rr.. Al.: ll-Ll}
Collected l ila'J}
, �l1:t'1 1I t, tl.:l
}t1,41.1C1
'1-! 4 ,�:,'.I '•I'�: 11,1'r: I :3-1'..�
1..
.4.1 �.:4i;:t ttl tr k;'.I i t, ,.,
.t::, 1 . t
i- .24=hour rainfall ";
{l t4':l, aamount, I '°:..Non-
1, , ,. t . ,: ,,
it }} Illj,l: 3
.1>...,,.,..!„Inches..l..::l....:r�r
1, r;.; t r.p:, Y.
,.- .,'
k } 1 y .
1 s,' r t : e 1 r ,
r •. " .r'a.'a' ,'; :
ola'i.b&G/TPH
, . p . _, y
-,EPA1664 (SGT-H@M},I, IP„1;,11.,Gi:a
I .., ,'y,,l,!4,1i1:3if:1,1}I4,
y _1 1 t !t� t
h �. 4 r tl .: t 11 `t tl'.ri', } }1'�l'tk'4't':},�'i:11
i ly 4t 1 ',l l t
i. ; I I, : ,Lua' a 1,: Ir , ar [l''tt ,' .1 tl .+ 1
:1
41' ." I, l}l1
Total Suspend
,..s,.F.I.-,.F'...,la.t,,.,.�,ia�r11�11,,,��f�,
11i"JIltlzlltit,1},}Il,llll,kl.;i.
ij'�,tr!t {,} 1t114 :4 i
�4' ,i fi 1 i1 1d ] 1, A f I ttl s.
111 i„ !, t 1lllt
Il j , rt'
k�,:4t114tt,l,.
�ee`iichmarks,-1, I j, , ,1
l}
-,.}. tl'�lY.� u.:.•.. ll•M. 14' t5..1,1 ..i..,11...rySr
t t, r, +!41!1: Ehl'tt It },'l;.+iC�j
I �t t
I ri,• 7.• �f,t•II-ti.�11: 1i. 1.,�{.}•; l�rrl. .l,:t4;
, lt� �,:Ilzrl �, i };, , , .
y 1� t
at�tli,' 1,r.l1:i14-11..111.1'r�ll'1A .� 4}ti
:. -15 `m' " L t I
., g/ }_ ::
t. r'.• - ... F...Ai
i �/ mg/L"` 1. llai}
l00 m` L'o� 50
4� . 1:.Il.rtf. �l
1't k� b"}Y,s`0 SU11,};''
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the passibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
-xa.-
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8 1 14
CERTIFICATE OF COVERAGE No. NCG030326
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Nash
PERSON COLLECTING SAMPLES Ro er Breeden
LABORATORY Microbac Lab Cert. # it
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) July month)
DISCHARGING TO CLASS ❑0RW ❑HQW ❑Trout ❑PNA
RECE#�/�❑Zero-flaw ❑Water Supply [:]SAr Y D ®Other
AUG 0 5 2014
CENTRAL FILES
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
80(33
® No discharge this period?z
Outfail No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches 3,
Total Suspended Solids
P , H
Standard units
Copper
Lead
Zinc
Non-Polar O&G/
Total Petroleum
Hydrocarbons
Total
s
nics
Organics
Benchmarks
-
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
7/10/14
1.42
<0.0100
0.177
02
7/10/14
1.42
<0.0100
0.187
I Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden _
Name (Print name)
Plant Manager
Title (Print title)
dA4"� 6)_ 5 rzM4�=
(Signs re)
s _ y_ /I
(Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format, "OX ma/l.", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
IncheS3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==_>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
0 See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 2 of 3
Nate: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, Including aIi "No Discharge" reports, within 30 days of recelot of the lab results for at end ofmonitoring period
In the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date:11/1/2012-10/31/2017
B-y-ll
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Repo rt
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 7/3/14 _
CERTIFICATE OF COVERAGE NO. NgG430n& SAMPLE COLLECTION YEAR Z014
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Nash or ® Monthly' June month
PERSON COLLECTING SAMPLES Roger Breeden DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
LABORATORY Microbac Lab Cert. # 11 RECEIVED ❑zero -flow ❑Water Supply []SA
Comments on sample collection or analysis; ®Other
JUL 11 2014
Part A: Stormwater Benchmarks and Monitoring Results
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWQ/BOG
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organlcs5
Benchmarks
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/18/14
0.017
0.42
02
6/18/14
0.019
0.43
' Monthly samoline (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Faei�itles that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the fast discharge monitoring report. I further certify that this facility Is implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Roizer Breeden
Name (Print name)
Plant Manager _
Title (Print title)
Qoqa, Q- s/L"_ I- /o- iq
(Signatbre) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX.mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark you must Implement Tier 1, Tier 2, or Vera responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
f ;Y
Note: if you report a sample value in excess of the benchmark, you must Implement Tier 1, Ter 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy o this DMR Including all "No Discharge" reports, within 30 days of receI t of the lob results for at end of rnonitorfna aerlod
In the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQCentral Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, Including the possibility of fines and imprisonment for knowing violations."
{Signature of Permitteel
(Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi=annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/1 14
CERTIFICATE OF COVERAGE NO. NCG030326
FACILITY NAME Hirschfeld Industries Bridee. LL&
COUNTY Nash "
PERSON COLLECTING SAMPLES Roger Breeden' "
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
RECEIVED
JUN 12 2014
CENTRAL FILES
SAMPLE COLLECTION YEAR 2014 • DWOIBnG
SAMPLE PERIOD ❑ Jan -June. ❑ July -Dec
or ® Monthly' may month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply [:]SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
M No discharge this period:2
outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches-'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks
100 mg/L or 50 mg/L
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may-be;eligible. for a waiver of the rain gauge requirement.
See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31). .,
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Roger Breeden
Name (Print name)
Plant Mana er
Title (Print title)
m- 63Al,.� - /O -I�
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX me/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Nate: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenarice Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
5.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier Z or Tier 3 responses. See Genera! Permit text.
.,.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an ariaingl and one cony of this DMR, including g!1 "No Discharge" reports, within 30 days of receipt of the !ab results (or at end of monitoring period
in the case o "No Discharge" re orts to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATIQN_IFOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
6) , 63
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
6-A-1�(
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
r
Semi-annual Stormwater Discharge Monitoring Re ort
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 5/1/14
CERTIFICATE OF COVERAGE NO. N[6137002fW
FACILITY NAME Hirschfeld Industries Bridne, I.I.C.
COUNTY Nash
PERSON COLLECTING SAMPLES Roger Breeder
LABORATORY Microbac Lab Cert. # 11
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly' (ninth]
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
®Zero -flow [:]Water Supply []SA
R E C E I VED
Other
MAY 2 2 2014 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWQIBOG
No discharge this period?2
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour ralnfall
amount,
inches'
Total Suspended Solids
p , H
Standard units
Copper
Lead
Zinc
Non-Polar 0&G/
Total Petroleum
Hydrocarbons
Total
organics'
Organnics
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
4/15/14
0.45
2.50
6.70
<0.0100
4.00100
0.268
<5.00
N/A
02
4/15/14
0.45
4.S0
6.50
<0.0100
<0.00129
0.319
45.00
N/A
1 Monthly samoiing (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement,
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is Implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Roger -Breeden -Z. 5e.r n
Name (Print name) —
Plant Manager 10A ),iV m Ak h G C n,
Title (Print title)
2.�Ms D - 0 nxz& 5- 11- I y
(Signature) (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format, "<XX me/L", where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?'
Outfail No.
pate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part 8
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date; 11/1/2012-10/31/2017 SWu-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, Including olJ "Na Discharge" reports within 30 days of recut of the lab results (or at end of monitoring period
In the case of "No Discharge'" reoorts) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel property gather and evaluate the Information submitted, Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and Imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
5-/5-/y
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3