HomeMy WebLinkAboutNCG030321_MONITORING INFO_20190403STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE
❑HISTORICAL FILE
�/-MONITORING REPORTS
DOC DATE
❑ I o y p 3
YYYYMMDD
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 3122/19
CERTIFICATE OF COVERAGE NO. NCG03 0 3 2 1
FACILITY NAME W&W-AFCO Steel LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORYPrism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
_ g_ki�1or Q Monthly' Februa month
REC'FD[SGNG TO CLASS ❑ORW ❑HQW []Trout ❑PNA
A�� 4 ❑Zero -flow ❑Water Supply ❑SA
2019 Mother
CENT RAL FILE`' PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
OWR SECTION
0 No discharge this period?z
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar C&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
-
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.311.
Permit Date; 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan,"
Clyde Martin
Name (Print name)
Plant Manager
Title (print title) n
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Nan -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the defection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B. Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
Inehes3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/L4
Parameter Code
-
46529
NCOIL
00552
C0530
Footnotes from Part A also apply to Part B
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
w I'a
FOR PART AND PART B MONITORING RESULTS:
* A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
* 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
* TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ENO[]
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Q NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original copy of this DMR including al! "No Discharge" reports, within 30 days of recei t of the lab results Lor at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
SignafuWof Permittee
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General 'Permit No. NCG030000
Date submitted 2/26/2019
CERTIFICATE OF COVERAGE NO. NCG03 0 3 2 1
FACILITY NAME W&w-AFCO Steel LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin t�
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis: AR 08
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD Jan -June ❑ July -Dec
or Q Monthly' January month
_k DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
`.1 ❑Zero -flaw ❑Water Supply ❑SA
-.; Mother
FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
TION
0 No discharge this period:'
,:r, 1 �, ! ,;1,� '•
„illtJl,Ir,yr. �Elrh, i; ,.F!DateSample'.
,F�1,.4,SOutfall No.,llr E,
ilgrllil;ih ,"
�,�ll I L;:,
a ,.� . ;� ,I, l ,I
�,1 Collected3k(1
alp,• ,.: , ' ,,1..,it
II r
24-Hourrairifall
;i m„i,�t€•�,,;,a<< ,!
°.hl�l I amount;:' ''
' 1.: ;
Inches�1
�.,,;
,: I'
�TotaUSuspended Solids
I�:1 , r�lr ,r : r • "
pH,
Standa"rd units
Total Copper
Total Lead.:;
ar
y+ 'wr111Ih
;Total Zinc,
a�
Nori PolarC►&G/
; ..,
;Total'Petroleuml
;.}:.alp r:
Hydrocarbons��
r.,
Total Toxic,
I,..il,-•1...5;,f
Organlcs:,,i}i
Benchmarks !!+,fit
`� ? "''d"ps;
i, I� e; ��
��'�100�mg/L or 50 mg/L4
6.0 —9.0
0.010,mg1L
0.075 mg/L
0.126 mg/L"
, e 15 mg/L''r^ ` ;
ri mg/L;Lai�
'ParameterXoder�,'' !!
"lil; �li'illh6.,iH�lf�li�lhlill
lV,;,,,° 1,�46529.IH` �_I
<' . ., "'C0530: , "; :,:
0040D
01119..'
01051,",r
;i.;, 01094r�,�s,='
.Irll, .'��i00552_�,i ; l
11?fi11178141rjli ii
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWI.1-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Pr' t title)
Signat a Da e
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format "<XX m L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new oil per month.
❑ No discharge this period ?2
%
tfallNo
."I�k4't!l�Il1Iul�'i.�I�,l�„i•�aj,ll! l6d� ""�.;,I f ,, '�l:ydy.�11,,411�1�t,lI' IiLly.Icea+, P.,1ki1l_,�l'l,�l l.I.lf+l1.,E�
dite ie
i;H'
it�i;IiIt I.�.�IuIt1ii4'�G.1.1!i!l,1'lI5ie�+�. -Hm:liIt a/dii /f,Y r}
24
=Anch
New Motor Oil or
H draulicOilusa a
O&�CU41
Non-Polar3/Ttal
H d
Petroleum�ocar6ons
!
Total,i4lilFl,lVS 5�iut,L1.�.sjie.' lf!rn�iLd�l idlSi4ItIeLliPild,l!llIi
1qr1, Ll'..I1!
{i II�, :N,,I
Sallds ; N ;l flt+�"is+:Ljb!I°I.�ilIr-
mg/L
0mg/Lor50rtgLa15
1
Aarometer,,,Coale��l',,Vllli�ll�Ih
46529`
NCOIL .00552
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
.. ;p
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL7 YES EINO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES Q NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mall an original cop& of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitorina period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signatureof Permittee
��o -
Date
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 3 of 3
Storrnwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted 1/18/2019
CERTIFICATE OF COVERAGE NO. NCG03 0 3 2 1
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORYPrism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
p `` cc-- or � Monthly' December_ (month]
RECEID15GHRRGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
FEB 0 4 2019 []zero -flow ❑Water Supply ❑SA
*Other
CENTRAL FILES
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
0 No discharge this period?z
Outfall No.
Date Sample
l
Collected,
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
p H,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total
Organics,
Benchmarks
_
-
100 mg/L or 50 mg/L°
6.0-9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
01119
01051
01094
00552
78141
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same out all.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included In the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Tit4ae
't title)
Aj
Sig Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX_mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
pate Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
Inches3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/O
Parameter Code
-
46529
NCOI L
00552
COS30
Footnotes from Part A also apply to Part B
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART AAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES M NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES E] NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original copv of this DMR. including all "No Discharge" reports. within 30 days of receipt of the lab results tar at end of monitorina period in the
case of "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of
Permit Date: 11/1/2018-05/31/2021
Date
SWU-245, last revised 11/1/2018
Page 3 of 3
�A
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 12/31/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld_ Industries Bridxe,_LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' November (month)
RECE e�rSDARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
a Zd� ❑Zero -flow ❑Water Supply ESA ,AN
®Other
CENTRAL FIDES
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
® No discharge this period?z
�,, k.'ul 4 I • ' IIII, „i
I fr • ,} !
Lo ",�� I 1 �
,{ 01 ,I,lii4,�.1711�lII I i iR
I .. 14ti: , ,i
,fl 0utfalll o " o,!I
N 1 i� �tlr,i
ayl, `p " to . i' ,11 .
f I,.�,A t.t �It..11l�.••tl,...i .I:I�. JIH, Ilf 7.It
,I{, I.: .: +I I
V l 1 , 1
!.III+I��ti,.ltlltllllliil1.��
i,
DatelSiam le
I I;I;.F,iif}wer.p.,. ��
Sl..4
i o ectetl
I ivrr }
.;,
�r
mo dd r 'ill
is �� /�
.:,.,4 i' „l „„� �Sfu,.. L.
ii ' i I
i , t: ,iE
tt<��.Is�11,19�i'I t:f, !Ill I.
� ,f
24-hourlralnfall:
'k.,,rEin.11t E(
I . ' ..
I l amount ,
'� I'" I I
Ibl, 1. "3d
,I:: �ilillnches, .1'}.I
'.:.; ,�
r f,t••S-
,:r. , { I,�..I
.9,:.,,•�sl,,> 1.�� I5 ,f
:i:.L. r.. !EI{ hc,.l , I.IZ, {4 o•Yii4� . I I:
,.Total'Sus ended 5ollds'
, ...
L-! :.
P
r, 11
�'�l; Il ��;. I'.; -.t: I.
........
�' ,. �
'I,r: ' I:
1 , , ,:• ,
I"
- . . g, ,
,.. ..: -.,I'
Standard units'
� ;�
iA' I;
: ;..:- ,:, � 11,:ii�i
-f.:._ t .,V
Co er:''•I .
PP EE
�.i.� II`
.�
°',sl Ihi;`
i :�::I + r
Ip
,
lit., I f� ,I k :I
j �I � .I iFl
I'll l .I 111 ,i, '',
i.,it' r'lead�;l {1,I;!:''Zinc'9°I
'H•
r�` rill'''}._il
'.li.,,,l,�„!�ultl.'..II •:i�
qa I . I ,
I"e'�
�u l I
li. ti.t l
�,�•� I`n-P,olar'0&G/.
! t
, .�1uitl
I 5�..�, 7.
i� ! r,•I
t ,l'!+',
s•_ } rl-:
yi'!�� .' tse��l`I�ill�,l:
;, 1� r9�1� ,'A!I}„� !„i.
I f�`
! II,I.I:,,,
Tata .Petroleum
Il Il.I
&
,,H"drocarbons
.y
i.11l,l•t'I! ,.. I..{rl., 'i�l�l
! ,. I;:,, � :'�
r ,t
i! .'.I fr I I
I, N1t � .L�• ,n1Jj
Total;Taxlc,
iiilultil;lu 5.t1
Organ c ..,
I S EE
„I:.I:,, I�11,,.. .�
__ III
Benchmarks > i:i
.. .�:. , it•..t.'I' Il I,
I, .-. �. 1 .,
sill 1, i{ dl Iji }
!ii {!( jjIIS{{{ !l!!IIIBR_ 111I j}} 1. j}
., .... ! It-:
i Ili' u ,il :.{ill I i ,.:.._
1j} j} t�lll �Nk{jj ,ii {}}i l—�k�.I
..:.-.� . . ..:..
{; a,
1 4001mg/Vor,50Ag/L ,, i.
a ",
..'. V
..,_ _ a !l
I �s�l"A(, fi.0 � , 9.0 ,:,. �
, .:.007r I•„
L 0.007, mgl,L,
�,. R!1
A , 11
l;..I. :, I,:I. ! }
111, 31mg/UI !
i i , . ...:e,.., .L. It..i
vl" I,:I• :
�.:. II
N 0.067�„mg/L I�
.I �111.
II ;I. ,� : ;°t .I,,'
l �.i }ifI }j,ykSiiS g/,L t rJ I{ I tY
, ..;la11 Sl:..: s. IT "Pill ill
11, • .:L' �;���'
I � 11 mg/L„ rlpj
02
n Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement,
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 44 CFR 469.31).
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 1of3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan." '
Clyde Martin
Name (Print -name)
Plant Manager
Title (Print title)
(Sig re) Dat
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
1 ll� ,,, ; � 4 �
�1 „ it I i jj jj�HiEE l it
,I �ii
I n Yr Outfall No.l.
r.., 5
,1.$,�I 1
IIE....,� :�,
tnY!1.1>€;iEliiii��"ll�I�li�i111Yllll.�lu
I
14
rE'i
.
E I'
II
}� r
.t
i�
I
N
'
'ii� ;:,;.; � , ;, :�
I:1; i' !,
nl .�111i 11 "hill! �i:l�,'��
Date lam leil,s{?
p, ,� .
iCollected < I e,!
I' .:5.:1 _ I,3 ii
, .E,,;'°:
1 ��.3,1, r { . (E, ;r . �;t. i •, i i
Y , � �„ . N
�' 24-hour rainfall..9
' I
...Y.'nH amount
'Nl s
rinchesEPA;r1664(SGT-HEM)
'
�
, t 'i �� ! ;,, ;�.
,,I,•.Y
�
Non -polar O&G/TPH by
} , !!'
� .r,.l'• � �. �.,:' 11i; ; � Y
� , ; ! I, � , . ,i • x.�. � i! i ' ,�;
II � , �s = ,
Ik.:. + ,,
} r,
Total;Suspertided:5lol)ds. s
P �i���t�aUs�w„�ihh�r�:+��lil�,Aili
::� i�lp
'IIE .,�� �
,,;il I!'
, � iE
�: 1
, 4 a I Y
;,f,+ , !p!
li,li;,l 'nlj
�al�l4!!l�,lf�,i,.11i4!�i��tik;h�s°
"!.-: i. �.
Sdai � ly+. �.
1 , j
� , �i
A!!'p
i�
4, I Y,
„Y; ,,,I E.
pH1 II !',:
-Il f=.•,f.: , I, 111.nt, i.t'. fl i
i� , in4 t9.:4h,�li���id�dh��k
q1;'`�:i! j - �I �,� t;5{� I � �u.
1i1]�F: ��I��m 11� ) I f "�., ..L�.- f
! .I �','
iYi3`S',., r; it :.l, •r —�.1• -
{ i •I �
'7: :: i. -V, i.l
I �' --�-�I::..:,'
mg or
:!-,..
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value In excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one coy of this DAM, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
In the case of "No Discharge" resorts) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mali Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1:�13111A
(Dat )
Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/19/18
CERTIFICATE OF COVERAGE NO. NCG030321 SAMPLE COLLECTION YEAR 2018
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Guilford RE,Q� or ® Monthly' October (month j
PERSON COLLECTING SAMPLES Billy Robertson IU�QiSCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
110V 2 8 2018 Zero -flow 0WaterSuppIV OSA
LABORATORY Prism Lab Cert. # 402 ®Other
CENTRAL FILES
Comments on sample collection or analysis: DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormvaater Benchmarks and Monitoring Results
® No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics,
Benchmarks ===>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
, Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Director
Title ri title}
i tur (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, °<XX mgLL", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or So mg/L*
6.0 -- 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware #at there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Permitteej
Permit Date: 11/1/2012-10/31/2018
//-/9-e
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
s - Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 10/15/18
CERTIFICATE OF COVERAGE NO. NCG030321 SAMPLE COLLECTION YEAR 2018
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Guilford or ® Monthly' September (month)
PERSON COLLECTING SAMPLES Billy Robertson DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: 5tormwater Benchmarks and Monitoring Results
®Other
dive0�� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected l
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018
SWU-245, last revised 10/25/2012
Page 1 of 3
L:
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safetv Director
Ti e ( int title)
Q- (3 Ig
(Sign re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(ma/dd/yr)
24-hour rainfall
amount,
inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
Permit Date: 11/1/2012-10/31/2018
SWU-245, last revised 10/25/2012
Page 2of3
1``
Note: 1f you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri -Knight
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 da s of receipt of the lab results for at end of monitoring eriod
in the case of "No Discharae" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responyible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1
am aware that there ar,p sigrjfticant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
Permit Date: 11/1/2012-10/31/2018
10—f3 /L
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9 21 18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Guilford ^
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD [] Jan -June ❑ July -Dec
or ® Monthly' August _ (month)
R _I, S&ARGING TO CLASS ❑ORW ❑HQW ❑Trout . ❑PNA
SFp 2 6 2918 ❑Zero -flow ❑Water Supply ESA
®Other
CENTRAL FILES
DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?z
Date Sample
Collected' l
(mo/dd/yrj
24-hour rainfall
amount,Total
Inches 3
Suspended Solids
pr
Standard units d
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
k See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Directo
Title (P 'nt ' e}
q
(Sign ure (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?z
Outfall No.
pate Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B.
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCE=S IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am awake th46here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
ittee)
Permit Date: 11/1/2012-10/31/2018
q—z/—&1
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
�Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 8/16/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bridge, LLC _
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' July (month)
HARGING TO CLASS []ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
S'cG QN, PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
D
® No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics s
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicahle only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safetv Director
Titl (Pr'
zetitle)
(' re)
F-16 -/�(
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No dischorge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier responses. See General Permit text.
_J
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
r TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge," reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly wsponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there je significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
r- /C0`Ig'
(Date)
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 3 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL. OFFICE CONTACT NAME: Sherri Knight
Mail an original and one coov of this DMR. includina all "No Discharae" reports, within 30 days of receipt of the lab results for at end of monitorina period
in the case of "No Discharae" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly jrsponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there fe significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
(Date)
Permit Date: 11/1/2012-10/31/2018 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 7/5/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy, Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2DIS
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' June (month j
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
[]Zero -flow ❑Water Supply ❑SA
RECEIVED ®Other
JUL 0 9 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
® No discharge this period?z
Outfall No.
Date Sample
Collected l
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks =__>
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
1S mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
Jmay be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safetv Director
Titlee(Bint tie)
7-Z- le -
(Sig I n(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they, must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 4.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
.Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are ;jgnifAnt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
7-
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/12/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld_ Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' May (month)
REefff�,rDJsCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
!1 FF''M' �IT ❑Zero -flow ❑Water Supply []SA
JUN 2 Y 2018 ®other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
OWR SECTION
® No discharge this period?
Outfall No.
Sample
Date Sam
pl
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Wydrocarbons,
Total 'c
Organics'
Benchmarks
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
I
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Director
Title in title)
(Sign re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil Per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note:%lf you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART 8 MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTIONS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reportsl to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
b-p-1st
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
t
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 5/8/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. #i 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' April (rrmonth)
aING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow [_]WaterSupply [:]SA
®Other
CC -N I Rk\L Mr-5PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
D\PJR SeCT1OR
® No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total icss
Organnics
Benchmarks =__>
-
100 mg/L or 50 mg/0
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Director
Title int ' e)
(Sig e) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
PH
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you repsrt a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am avWre tot there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
of Permittee]
Permit Date: 11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
` Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/27118
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME — Hirschfeld Industries Bridge, LLC_ _
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2018
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' March (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
❑Zero -flow ❑Water Supply []SA
RECEIVED
ED ®Other
MAY 0 3 2018 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILE5
DWR 3.ECTM
® No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics-5
Benchmarks ===>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities thattncorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be,waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Director
Title rin itle)
(Sig Lure) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mell.", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you ftport a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER ATANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
of Permitteej
Permit Date: 11/1/2012-10/31/2017
q o-le
(Date)
SWU-24S, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/9/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
RECEIVED
MAR 18 2018
SAMPLE COLLECTION YEAR 2018 CENTIIAi F11F.
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec " SECTIO-
or ® Monthly' February (mon_th)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall .
amount,
a
Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks ===>
_
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
i mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement forTTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson _
Name (Print name)
Safety Director
Tltle ( int t' e)
q-
(Sign re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 2664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date. 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am awargthatthere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
of Permittee)
Permit Date: 11/1/2012-10/31/2017 `
9-i,5�
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
L
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 1/10/18
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME _Hirschfeld industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Billy Robertson
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ® July -Dec
or ❑ Monthly)_ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
®Other
R F(' RN/F V PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
JAN 19 2013
OWR SECTION ❑ No discharge this period?z
Outfail No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
I11
Total Suspended Solids
R
p H,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total
its'
Organnics
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/18/17
0.10
3.9
6.2
0.011
0.0077
0.60
BRL
02
12/18/17
0.10
BRL
6.3
0.013
0.0079
0.64
BRL
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Billy Robertson
Name (Print name)
Safety Director
Title Pri title)
(Si ture) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX melL", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
15 mg/L
100 mg/L or 5o mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION R.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Sherri Knight
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
re of Permittee)
Permit Date: 11/1/2012-10/31/2017
/-4t-!s,
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
►, Date submitted 12/6/17
CERTIFICATE OF COVERAGE No. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' December fmonthj
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED []Zero -flow ❑Water Supply ❑SA
JAN 2 3 2017 ®Other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
® No dischorge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organicss
Benchmarks ===>
_
-
100 mg/L or 50 mg/L"
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/20/16
0.51
0.49
02
12/20/16
0.51
1W
V 0 9
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same para7ther
same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a chec
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver gauge requirement.
a See General Permit, Table 3 Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CPR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. Forthose facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
1
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Signa re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. if you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =_: >
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
-,
FOR PART AND PART B MONITORING_ RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO 23
REGIONAL OFFICE CONTACT NAME:
Mall an original and one copy of this DMR, including all No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
In the case of "No Discharge" reports) to:
Division of Water Quality
Attw DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"i certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations,"
(Signature of Permittee)
(Date)
Permit Date: 1111/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Division of Energy, Mineral, and Land Resources
Land Quality Section / Stormwater Program
t:
National Pollutant Discharge Elimination System (NPDES)
Energy, MLneral PERMIT OWNER AFFILIATION DESIGNATION FORM
Land Resourres
EMVIPONMENTAt,r.UALITY (Individual Legally Responsible for Permit)
Use this form if there has been:
FOR AGENCY USE ONLY
Date Received
Year
Month pav
NO CHANGE in facility ownership or facility name, but the individual
who is legally responsible for the permit has changed.
If the name of the facility has changed, or if the ownership of the facility has changed,
do NOT use this form. Instead, you must fill out a Name -Ownership Change Form
and submit the completed form with all required documentation.
What does "legally responsible individual" mean:'
The person is either:
• the responsible corporate officer (for a corporation);
• the principle executive officer or ranking elected official (for a municipality, state, federal or other public
agency);
• the general partner or proprietor (for a partnership or sole proprietorship); C
• or, the duly authorized representative of one of the above. R C C E Ntz `
1) Enter the permit number for which this change in Legally Responsible Individual (`'`fl;akNja'tion")
applies: DENR-LAiN
STCRdNW cat- - lrr
Individual Permit (or) Certificate of Covefd&-r V.V; F' 1-"
N CS IN I C. I GO 1310131
2) Facility Information:
Facility name: Cq rc l .,r%A Ske1 6 t` 1 L L (-
Company/Owner Organization: q iar LL C
Facility address: Q03 5 W, or -
Address .
65154x NL 21-235
City State Zip
To find the current legally responsible person associated with your permit, go to this website:
htW://dec nc.2ov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stonnwater-program
and runt the Permit Contact Summary Report.
3) OLD OWNER AFFILIATION that should be removed:
Previous legally responsible individual: kwIV V 1,
C"YI;4�
First MI Last
4) NEW OWNER AFFILIATION (legally responsible for the permit):
Person legally responsible for this permit: 6illy
First M1 _ Last
Page I of 2
SWU-OWNERAFFIL-23March2017
NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form
(if no Facility Name/Ownership Change)
D 4-or
Title
ro I UAf(-q00r-f t)r- —_d4400
Mailing Address
City State Zip
21 ®AIrS4*14(-&'W1
Telephone E-mail Address
(315 ) (Wo— (463,_)
Fax Number
5) Reason for this change:
A result of- EEmployee or management change
❑ Inappropriate or incorrect designation before
❑ Other
If other please explain:
The certification below must be completed and signed by the permit holder.
PE 1 E CERTIFICATION:
I, t tr��a , attest that this application for this change in Owner Affiliation
(perso legally responsible for the permit) has been reviewed and is accurate and complete to the best of my
knowledge. I understand that if all required parts of this form are not completed, this change may not be
processed.
Signature Date
PLEASE SEND THE COMPLETED FORM TO:
Division of Energy, Mineral, and Land Resources
Stormwater Program
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
For more information or staff contacts, please call (919) 707-9220 or visit the website at:
http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Page 2 of 2
SW U-OW NE RAF FIL-23 Ma r2017
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 2/13/17
CERTIFICATE OF COVERAGE No. NCG030321 SAMPLE COLLECTION YEAR 2017
FACILITY NAME Hirschfeld Industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Guilford or ® Monthly'_ _ January_ (month)
PERSON COLLECTING SAMPLES Clyde Martin DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
CEIVED []zero -flow ❑Water Supply [:)SA1
LABORATORY Prism Lab Cert. # 402 Other
FEB � � Z�l%
Comments on sample collection or analysis:
GENTSEL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results DWRCTION
® No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,Standard
Inches
Total Suspended Solids
pH,
units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total
icss
Organnics
Benchmarks =__>
-
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
1/31/17
0.01
0.62
02
1/31/17
0.01
0.63
I Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469,31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
1`4ilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for Tf0 monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(sign re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Hate Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nite: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR includin all "No Discharge" reports, within 30 days of recei t of the lab results or at end of monitoring eriod
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Pelf hittee)
QV131/?-
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
LEONRARDT
ENVIRONMENTAL, P.C.
March 31, 2017
Hirschfeld Industries Bridge, LLC
9035 West Market Street
Colfax, NC 27235
Attn: Clyde Martin
Re: Stormwater Sampling Results
Dear Mr. Martin:
8392 Six Forks Road, Suite 101
Raleigh, North Carolina 27615
(919) 846-7492
FAX (919)847-8112
Enclosed is the Discharge Monitoring Report (DMR) for the sampling period from March
1 to 31, 2017. Please sign where indicated and forward an original and one copy in the
prepared envelope.
Please insure that you make copies for your files.
Sincerely,
LEONHARDT ENVIRONMENTAL, P.C.
Paul. W. Spangenberg
Env. Compliance Manager
En-ironmental Engineering
Consulting and Services
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/31/17
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Ind stries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. #i 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' March month
fjtS Rp 1NG�, TO CLASS ❑QRW ❑HQW ❑Trout ❑PNA
f V ❑2ero-flow ❑Water Supply [:]SA
MAY 3 0 201? ®other
CENTR,gL FILESLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
OwR SECTION
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
toxic
Organicss
Benchmarks ===>
-
100 mg/L or 50 mg/1.4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
i~
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plant may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Tltle (P lint title)
(Sig ure) (Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "OX mit/L", where XX is the numerical value of the detection
limit, reporting limit, etc, in mg/L.
Nate. If you report a sample value In excess of the benchmark, you must Implement filer 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
lnches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
P
FOR PART A AND PART B MONITORING RESULTS:
+ A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an original and one copy of this DMR lncludlna a!I "No Dlscharae" reports, within 30 days of receipt of the lab results %rat end of manitorin. oLerLod
In the case a "No Discharge' reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Pe
—1J/J;?�
(Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
I .t
LEONEFARDT
L � i
ENVIRONMENTAL, P.C.
May 5, 2017
Hirschfeld Industries Bridge, LLC
9035 West Market Street
Colfax, NC 27235
Attn: Clyde Martin
Re: Stormwater Sampling Results
Dear Mr. Martin:
8392 Six Forks Road, Suite 101
Raleigh, North Carolina 27615
(919) 846-7492
VAX (919)847-8112
Enclosed is the Discharge Monitoring Report (DMR) for the sampling period from April
25, 2017. Please sign where indicated and forward an original and one copy in the
prepared envelope.
Please insure that you make copies for your files.
Sincerely,
LEONHARDT ENVIRONMENTAL, P.C.
�fr
Paul W. Spangenberg
Env_ Compliance Manager
Environmental Engineering
Consulting and Services
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 515117
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Guilford ^
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) April (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED ❑Zero -flaw ❑Water Supply []SA
MAY 3 0 20 1 7 ®Other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
® No discharge this period?'
'.,�% 14 - - �i t�Y �, � ���i 11 (
E. E ! I I '
� k' i. �I� �I{.l
1 a � '. . 4
� n .:
� ..
I .;
1 - t. I 3 jy4
I I HF.f �l �
!U`. I.-' �•�
r 1 i 4
t'kll,
fioutfall No IIhf+^ail
t Date Sam le
i P I;
1S
24=hour rainfall'
� 1 ;I
i° .. 'I°
''''
I.
''TotahSus ended Solids:),
P
}�'
� P, a
11-
.,,
I�..I
Cb per -
PP
I
�,,. nt=;.',.
head
111
11 �..' I,
,�;.,, ,�„,�,f•I;
Zinc 1,.1
I
Non'Polarl0&G/
�l, t li, • I.1 l {.i,t.N
�, .tl , '13 �
Total,Petroleum
• I i
"< u
IlTotal,�To ic,
f .
Collected)
amount;
Standard units
i
:Organicss
;�!
lmo/,dd/Yr):„-,
p:," G 11
t, Inches.,I
_ ,
:.r•:r.tll.
.
..r " .o
l
'rl' I, ,
,_„�Lr
..id.l
k I .:} i.
Hydrocarbons�lii
.
;>I'.
�-
i EL1`!u.�••.L.1.1'>t�!��,Il
�eenchmarks >}1
-
100 mg/Lai 50 mg/L°
6.0,-9.0
.0:007 mg/L.
0.03 mg/L
0 067 mg/L
:- II
mg/LI"I ',�.�
,1im& 1
1.... ,.. 1
t tf
i JL..., .i...•:.
'; �,� ^' .,
�. , ;. ... ,. _ _ .. . •
'A".� 1
11.
�� M•1 .:I,, i•I
,� .CIS
. . I ..III: •.I rod.-. .f,h 11 .i { 1.111-
I ,Eli J, r .I» :IIfB
01
4/25/17
2.24
0.18
02
4/2S/17
2.24
0.18
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Totai Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 1 of 3
it
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: *�
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
�
(Signs re) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No dischorge this period?z
1
Outfalh,No
Date sample .
Collectetl#
dd/y�)
24-flour rainfall
amount,
"Inches3
Non-polar O&G%TPH by
EPA 1664 (SGT-HEM)
"TotahSuspended'SolidS'
A
{
+� ' "'"1 pH
i .1 "1:•. .I If
Benc►rmarks = '> ' "
-
-
15 mg/L
100 mg/,L or, 50:mg/L'"I .,
,.,, 6.0 9.0 5U 1,.,i
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART Il SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring eriod
in the case of "No Discharge" reports] to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date:11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
LEONHARDT
ENVIRONMENTAL, P.C.
May 17, 2017
Hirschfeld Industries Bridge, LLC
9035 West Market Street
Colfax, NC 27235
Attn: Clyde Martin
Re: Stormwater Sampling Results
Dear Mr. Martin:
8392 Six Forks Road, Suite 141
Raleigh, North Carolina 27615
(919) 846-7492
FAX (919)847-8112
Enclosed is the Discharge Monitoring Report (DMR) for the sampling event on May 5,
2017. Please sign where indicated and forward an original and one copy in the prepared
envelope.
Please insure that you make copies for your files.
Sincerely,
LEONHARDT ENVIRONMENTAL, P.C.
Paul W. Spangenberg
Env. Compliance Manager
•
Environmental Engineering
Consulting and Services
•
IC
nitori
for North Carolina Division of Water Quality General Permit No. NCG030000.
Date submitted 117/17
CERTIFICATE OF COVERAGE No. NCG030321
FACILITY NAME Hirschfeld Industries Bridle, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism I Lab Cert. #i 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
•
SAMPLE COLLECTION YEAR 2017 -
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' May (month)
DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA
❑Zero -flow ❑Water Supply []SA
®Other
RECEIVED PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 —)
.JUN 12 2017
CENTRAL Fil F ; ❑ No discharge this period?1
Outfall No.
Date Sample
Collected'
mo/dd/ r)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
SE
pH,
Standard units
'TION
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks ===a
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0,007 mg/L
0.03 mg/L
0.067 mg/L
1S mg/L
1 mg/L
01
5/5/17
1.28
0.43
02
5/5/17
1.28
0.42
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here,
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
"See General Permit, Table 3 Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433,11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found In 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities Aencorporate a solvent management plan into the Stormwater Polan Prevention Plan may so certify, and the requirement for TTO reoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(770), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the'last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included In the stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(sign ure) (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX ma/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehlcle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches3
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If yaport a sample value in excess of the benchmark, you must impont Tier 1, Tier 2, or Tier 3 responses. See General Permit text. •
FOR PART A A D PART B MONITORING RESULTS:
A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ED
REGIONAL OFFICE CONTACT NAME:
Mall an original and one cab ► ohls DMI_ lncludl� rill "No DlscharAe"resorts, within 30 days of receipt of the lab results for at_end atmonitorina period
In the case o "No Discha e" M arts to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mall Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
5l
(Date)
Permit Date:11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
LEONHARDT
ENVIRONMENTAL, P.C.
July 28, 2017
Hirschfeld Industries Bridge, LLC
9035 West Market Street
Colfax, NC 27235
Attn: Clyde Martin
Re: Stormwater Sampling Results
Dear Mr. Martin:
8392 Six Forks Road, Suite 101
Raleigh, North Carolina 27615
(919) 946-7492
FAX (919)847-8112
Enclosed is the Discharge Monitoring Report (DMR) for the sampling period January
2017-June 2017. Please sign where indicated and forward the original and one copy in
the prepared envelope.
Please ensure that you make a copy for your files.
Sincerely,
LEONHARDT ENVIRONMENTAL, P.C.
Tyler Miles
Environmental Specialist
Environmental Engineering
Consulting and Services
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 7/28/17
CERTIFICATE OF COVERAGE No. NCG030321
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2017
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly' (month)
RECEIVIPARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
AUG 18 2017 ®other
CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
® No discharge this period?'
Outfall No.
Date Sample
Collected l
(mo/dd/Yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
P H,
Standard units
Copper
Lead
Zinc
Non -Polar 0&G/
Total Petroleum
Hydrocarbons
ox5c
Organ
Organ ics
Benchmarks =__>
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L ;
15 mg/L
1 mg/L
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Signs —We) Dat
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX_mg/_t"_, where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
IncheS3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
-
-
15 mg/l.
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: 1f you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES [:]NON
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy ot this DMR including all "No Discharge' reports, within 30 days of receipt ot the lab results for at end of monitoring eriod
in the case of "No Discharge" reports j to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
(D te)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
r Date submitted 12/8/16
CERTIFICATE OF COVERAGE No. NCG030321
FACILITY NAME Hirschfeld Industries Bridee, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' November (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED ❑Zero -flow []Water Supply ❑SA
JAN 2 3 2017 ®Other
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
OWR SECTION
® No discharge this period?2
Date Sample
24-hour rainfall
pH,
Non -Polar O&G/
Total Toxic
Outfall No.
Collected'
amount,
Total Suspended Solids
Standard units
Copper
Lead
Zinc
Total Petroleum
Organicss
(mo/dd/yr)
Inches'
Hydrocarbons
Benchmarks
100 mg/L or 50 mg/1.4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
Click here
No Flow
Click here
to enter
to enter
text.
text.
02
Click here
No Flow
Click here
to enter
to enter
text.
r .
text.
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfali, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
l
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TfO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TT'O monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included In the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Sign atu ) (Dat
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format "<XX m L" where XX Is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===a
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Footnotes from Part A also appiy to this Part iB
" See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies,
Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an ar! Inal and one co -of this DMR Includin all "No Dischar e" re o__ within 30 da s o recei t o the lah results or at end o manitarin erlod
In the _case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, I
am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations."
Permittee)
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/8116
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' October _ _ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
RECEIVED
❑Zero-flow ❑Water Supply ❑SA
®Other
NOV 2 2 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
® No discharge this period?'
Date Sample
24-hour rainfall
pH,
Non -Polar O&G/Total
Toxic
Outfall No.
Collected'
amount,
Total Suspended Solids
Standard units
Copper
Lead
Zinc
Total Petroleum
Organics-,
(mo/dd/yr)
Inches]
Hydrocarbons
Benchmarks
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
Click here
No Flow
Click here
to enter
to enter
text.
text.
02
Click here
No flow
Click here
to enter
to enter
text.
text.
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Sign ure) ( ate)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier .1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 4.0 SU
Permit date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Footovotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of.t_he lab results Tor at end of monitoring geriod
in the case o "No Discharge" re orts to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Pepf(iittee)
//19)(o
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 10/20/16
CERTIFICATE OF COVERAGE NO. NW,0303321
FACILITY NAME Hirschfeld Industries Bridge. LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. B 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' September (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED []Zero -flow ❑Water Supply ❑SA
NOV 0 4 2016 ®other
CENTRAL FILESPLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
DWR SECTION
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks
-
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
9/26/16
.75
0.56
02
9/26/16
.75
0.57
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at t e same outfall.
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark hd
'The total precipitation must be recorded using data from an on-slte rain gauge. Unattended sites maybe eligible for a waiver of the rai ga a requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark apt ies�
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconduc or anufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition co Jined in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; o`i�s�miconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. 'for those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Signat e') (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the form at,-"<XX-mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(ma/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
It
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTIONS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, includiw al!_ "No Dischawe" reports, within 30 days of receipt of the lab results for at end of monitorina period
in the case of "No Discharge" reports to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Signature of
Permit Date: 11/1/2012-10/31/2017
!0
jDate)
SWU-245, last revised 10/25/2012
Page 3 of 3
RAIN EVENT DATA
FACILITY: Hirschfeld Industries Bridge, LLC _ _ _ X (- i 3'� /- -D �. - f
ADDRESS: 9035 West Market Street
Colfax, NC 27235
CONTACT PERSON: Clyde Martin TELEPHONE: (336) 993-2680
STORM EMENWNO TION
DATE
YEAR
MONTH
DAY
2016
8
27
HOURS
MINUTES
DURATION
72
0
PRECIP.
AMOUNT (IN.)
0.45
RUNOFF
VOL. (GAL.)
DAYS
HOURS
PRECEDING
EVENT
9
0
OWLE EXEGUT O F GE OR AUTi O - LED AGENT
PRINT
SIGNATURE
DATE
Clyde Martin
RE
QC
, E 1 V E D
r 2 1 2016
CENTRAL FILES
DWR SECTION
Lvw
ISM
�ixeoansowes. irrc
Full -Service Analytical &
Environmental Solutions
Leonhardt Environmental, P.C.
Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
NC Certification No. 402
NC Drinking Water Cert No, 37735
SC Certification No. 99012
Project: Hirschfeld Inds. (Colfax, NC)
Laic Submittal Date: 09/02/2016
Prism Work Order: 6090048
Case Narrative
09/14/2016
This data package contains the analytical results for the project identified above and includes a Case Narrative, Sample
Results and Chain of Custody. Unless otherwise noted, all samples were received in acceptable condition and processed
according to the referenced methods.
Data qualifiers are flagged individually on each sample. A key reference for the data qualifiers appears at the end of this case
narrative.
Please call if you have any questions relating to this analytical report.
Respectfully,
PRISM LABORATORIES, INC.
a -,-I
Angela D. Overcash
VP Laboratory Services
Data Qualifiers Key Reference:
Reviewed By Terri W. Cole For Angela D. Overcash
Project Manager
HT Sample received and analyzed outside of the hold time.
BRL Below Reporting Limit
MDL Method Detection Limit
RPD Relative Percent Difference
* Results reported to the reporting limit. All other results are reported to the M D L with values between M D L and
reporting limit indicated with a J.
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.D. Box 240543 - Charlotte, NC 28224-0543
Phone: 704/529-6364 - Toil Free Number: 1-80015294364 - Fax: 7041526-W9 Page 1 of 7
Environmental
Full -Service Analytical R
�nvt
ronmenteE Solutions
-7ueon,�oow� me
Sample Receipt Summary
09/14/2016
Prism Work Order. 6090048
Client Sample ID Lab Sample ID Matrix Date Sampled Date Received
Outfall 1
6090048-01 Water 08/27/16 09/02/16
Outfall2 6090048-02 Water 08/27/16 09/02/16
Samples were received in good condition at 4.2 degrees C unless otherwise noted.
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 springbrook Road - P.O. Sox 240543 - Charlotte, NC 2a224-0543
Phone: 704/529-6364 - Toll Free Number:1-800/5294364 - Fax: 7041525-0409 Page 2 of 7
i S M I Full -Service Analytical h
Environmental Solutlons
u.eowac�c nc
Laboratory Report
09/14/2016
Leonhardt Environmental, P.C.
Project: Hirschfeld Inds. (Colfax, NC)
Client Sample ID: Outfall 1
Attn: Paul Spangenberg
Prism Sample ID: 6090048-01
Suite 101, 8392 Six Forks Road
Prism Work Order: 6090048
Raleigh, NC 27615
Sample Matrix: Water
Time Collected: 08/27/16 09:50
Time Submitted: 09/02/16 15:03
Parameter
Result
Units
Report
MOIL
Dilution Method Analysis Analyst
Batch
Limit
Factor Date4Time
ID
General Chemistry Parameters
Oil & Grease (HEM)
22
mg1L
5.0
1.0
1 *1664B 9112/16 10:54
TJY
P610167
pH
4.6 HT pH Units
1 *SM4500-H B 912/16 16:27
EGC
P610060
Total Suspended Solids
BRL
mg/L
2.8
0.80
1 'SM2540 D 9/2/16 16:10
SLS
K10058
Total Metals
Copper
BRL
mg/L
0.010
0.00040
1 *200.7 918116 15:35
bgm
P610047
Lead
BRL
mg1L
0.0050
0.00090
1 *200.7 916116 19:37
bgm
P610047
Zinc
0.53
mg/L
0.030
0.010
1 *200.7 916116 19:37
bgm
P610047
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240643 - Charlotte, NC 28224-0543
Phone: 704V529-6364 - Toll Free Number. 1-800/529-6364 - Fax: 7041525-Mg Page 3 of 7
L[lkl_�Ws'I S M I Env Full -Service Analytical s
Environments! solutions
uao edc
Laboratory Report
09/14/2016
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
Project: Hirschfeld Inds. (Colfax, NC}
Sample Matrix: Water
Client Sample ID: Outfall 2
Prism Sample ID: 6090048-02
Prism Work Order: 6090048
Time Collected: 08/27/16 10:20
Time Submitted: 09/02/16 15:03
Parameter
Result
Units
Report
MDL
Dilution
Method
Analysis
Analyst
Batch
Limit
Factor
Date/Time
ID
General Chemistry Parameters
Oil & Grease (HEM)
33
mg1L
6.0
1.0
1
'1664B
9112116 10:54
TJY
P610167
Total Metals
Copper
BRL
mg/L
0.010
0.00040
1
*200.7
918/16 15:40
bgm
P610047
Lead
BRL
mg/L
0.0050
0.00090
1
*200.7
916/16 19:42
bgm
P610047
Zinc
0.50
mg/L
0.030
0.010
1
*200.7
9/6116 19A2
bgm
P610047
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Sox 240543 - Charlotte, NC 28224-0543
Phone: 7041629-6364 - Toll Free Number: 1$00152"364 - Fax: 7041525-M9 Page 4 of 7
�F I n n Full-5"ce Analyttcal R
' V Environmental Solutions
i �sow�iar�y nao
Level II QC Report
9/14/16
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
Total Metals - Quality Control
Project: Hirschfeld Inds. (Colfax, NC)
Prism Work Order: 609D048
Time Submitted: 9/2/2016 3:03:OOPM
Reporting
Spike Source %REC RPD
Analyte
Result
Limit
Units
Level Result %REC Limits RPD Limit Notes
Batch P610047 - 200.T
Blank (P610047-BLK1)
Prepared: 09/06/16 Analyzed: 09/08/16
Copper
BRL
0.010
mg1L
Lead
BRL
0.0050
mg1L
Zinc
BRL
0.030
mg1L
LCS (P610047-BS1)
Prepared: 09/06/16 Analyzed: 09/08/16
Copper
0.250
0.010
mg1L
0.2500 100 85-115
Lead
0,259
0.0050
mg/L
0.2500 104 85-115
Zinc
0.264
0.030
mg1L
0.2500 106 85-115
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 -Charlotte, NC 28224-0543
Phone: 7041529-6364 - Toll Free Number: 1-800/529-6364 - Fax: 7041525-0409 Page 5 of 7
All,
Full-Svice Anatyllicai LA1P I S M I Environmental 5o[utions
won�sowEs �Mt.
Level II QC Report
9/14116
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
General Chemistry Parameters - Quality Control
Analyte
Batch P610068 - NO PREP
Project: Hirschfeld Inds. (Colfax, NC)
Prism Work Order: 6090048
Time Submitted: 9/2/2016 3:03:OOPM
Reporting Spike Source %REC RPD
Result Limit Units Level Result %REC Limits RPD Limit Notes
Blank (13610058-BLK1) Prepared & Analyzed: 09/02/16
Total Suspended Solids BRL 5.0 mg/L
LCS (P610058-BSI) Prepared & Analyzed: 09/02/16
Total Suspended Solids 470 5,0 mg1L 477.0 99 90-110
Batch P610060 - NO PREP
LCS (P610060-BSI) Prepared & Analyzed: 09/02/16
pH 6.82 pH Units 6.880 99 98.5-101.5
Duplicate (P610060-DUP1) Source: 6090048-01 Prepared & Analyzed: 09/02/16
pH 4.65 pH Units 4.65 0 10
Batch P610167 - NO PREP
Blank (P610167-BLK1) Prepared & Analyzed: 09/12/16
Oil & Grease (HEM) BRL 5.0 mg/L
LCS (P610167-BSI) Prepared & Analyzed: 09/12/16
Oil & Grease (HEM) 34.8 5.0 mg1L 40.00 87 78-114
Prep Method: 200.7
Lab Number Batch Initial
Sample Extraction Data
Final DateMme
6090048-01
P610047
50
mL
50 mL
09/06/16
8:05
6090048-01
P610047
50
mL
50 mL
09/06/16
8705
6090048-02
P610047
50
mL
50 mL
09106/16
8:05
6090048-02
P610047
50
mL
50 mL
09/06/16
8:05
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 - Toll Free Number: 1-800/529-6364- Fax: 7041525-M9 Page 6 of 7
r_
Full Service Analytical A Environmental Solutions
440 Springbrook Road s P.O, Box 240543 * Charlotte, NC 28224-0543
Phone:704/629-6364 a Fax:7W628-0400
Client Company Name: Leonhardt Env, , P.C,
Report To/Contact Name: Darr Leonhardt
Reporting Address: 83V Six Forks Road, Suite 10
Raleigh, NC 27515
CHAIN OF CUSTODY RECORD
PAGE t OR QUOTE M TO ENSURE PROPER BILLING:
Project Name: Hirschfeld - Colfax
Short Hold Analysis: (Yes) . (No) UST Projecr (Yes) (No)
*Please ATTACH any project specific reporting (QC LEVEL I II I11 M
provlaiona and/or QC Requirements
Invoice To:
Leonm hardt Envlydnantal, P.C.
- _ - _
Address: 9982 six Forks Raod, Sulta 101
Phone: t9197646-7492 (Yes) iota)onr o11A
Fax I) {N D): Dart
Purchase Order NoJBllling Reference
TO BE FILLED IN BY CLIENT/SAMPLING PERSONNEL
Small (Yxe) (No) Email Address-lesi$bel4+ruth.n°'
Requested Due pate 1 Day 2 Days 3 pays 4 trays 6 Days ,
Certification: NELAC USACE FL
NC
EDO Type: PDF Excel —Other
"Worktnd Days" .: s s Days � Standard 10 days
Site Looation Name: Hirschfeld - Cotrax '.
Samples received attar 16:00 will be processed next business day.
SC! OTHER N/A
Asheboro, NC
Site Location Physical Address,
Turnaround time la based on business days. excluding weekends and holldays.
Y �
ol
Water Chlorinated: YES NO
— '
(SEE REVERSE FOR TERMS A CONDITIONS REGARDING SERVICES
RENDERED BY PRISM LABORATORIES, INC. TO CLIENT)
Sample load Upon COII@Ctlori: 'YES '� NO
P
TIME
MATRIx
SAMPLE CONTAINER
ANALYSES REQUESTED
PRISM
CLIENT
DATE
COLLECTED
IL
(SOr ,
PREBERVA-
l
LAB
'TYPE
SAMPLE DESCRIPTION
COLLECTED
MILITARY
WATER OR
'JIVES
/ .REMARKS
ID NO.
HOURS
SLUDGE)
SEE BELOW
.: NO..
SIZE
H- U
IZ N GL
r
01
8/2716
09:50
Water
G
2
QT
HCL
,/
b
01
8/27/16
10:00
Water
p
1
QT
None
01
8/27/16
10:05
Water
P
1
PT
HNO3
02
8/27/16
10:10
Water
G
2
QT
HCL
p�
02
8/27/16
10:20
Water
P
1
Qt
Non
02
8/27/16
10:30
Water
P
1
PT
HNO3
F7
Paul Spangenberg Hirschfeld
e
Sampler' Signature
Print NamAffiliatlDn
Sampled B Name
Upott relinqulshing, thle Chain of ustody Is your authorization for Prism to proceed with the analyses as requested above. Any changes must be PRISM USE
ONLY
eu mltted In ilivrifing to the Prism Projeot Manager.
There will be charges for -any changes attar analyses have been Initialized.
nq a y gnsture
so v y gnature J
Additional Comments:
/
sours
Relinquished ey Ignatur
Received By: (Signature) Data
1
d
Relinquished By. (Signature)
R ved For dam Laboralodes By: Date
i
Y
Method ol ShIptnerit: nt Group No.
SAMPLES ARE NOT ACCEPTED AND VERIFIED AGAINST CO TIL RECEIVED AT THE LABORATORY.
Fad Ex UPS Hand•dellvared Prism Field Service
Other Pick-up ,
NPDES: UST: GROUNDWATER:
DRINKING WATER: SOLID WASTE: RCRA: CERCLA LANDFILL
OTHER:
'
r NO � SC NC _ SC NC w SC I
CONDITIONS
NC _ SC _ NC _ SC _ NC _ SC _ NC _ SC _ NC _ SC _ NC _ SC
_
Ar21rMK1
Al
*CONTAINER TYPE CODES: A = Amber C = Clear 0 = Glass P = Plastic; TL = Teflon -Lined Cap VOA = Volatile Organics Analysis (Zero Head Space)
V i11v1\l�fY4
A
f
XRISM
Wuwmronim w_
Full -Service Analytical 8
Environmental Solutions
Leonhardt Environmental, P.C.
Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
NC Cerrrfication No. 402
NC Drinking Water Cert No. 37735
SC Certification No. 99012
Project: Hirschfeld Inds. (Colfax, NC)
Lab Submittal Date: 09/30/2016
Prism Work Order: 6090525
Case Narrative
10/04/2016
This data package Contains the analytical results for the project identified above and includes a Case Narrative, Sample
Results and Chain of Custody. Unless otherwise noted, all samples were received in acceptable Condition and processed
according to the referenced methods.
Data qualifiers are Flagged individually on each sample. A key reference for the data qualifiers appears at the end of this case
narrative.
Please call if you have any questions relating to this analytical report.
Respectfully,
PRISM LABORATORIES, INC.
Angela D. Overcash
VP Laboratory Services
Data Qualifiers Key Reference:
Reviewed By Angela D. Overcash
VP Laboratory Services
BRL Below Reporting Limit
MDL Method Detection Limit
RPD Relative Percent Difference
* Results reported to the reporting limit. All other results are reported to the MDL with values between MDL and
reporting limit indicated with a J.
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7114l529-6364 - Toll Free Number. 1-801t1529-6WA - Fax: 7"525-Mg Page 1 of 5
PONINiSMrvice
�Furl-SeAnalytical &
Fsrirvnmental Salutioni
n�c
Sample Receipt Summary
10/04/2016
Prism Work Order: 6090525
Client Sample ID Lab Sample ID Matrix Date Sampled Date Received
02
6090525-01 Water 09/27/16 09/30/16
Samples were received in good condition at 4.1 degrees C unless otherwise noted_
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529.6364 -Toll Free Number. 1-800152"3" - Fax: 704l5254M9 Page 2 of rJ
gig
S M i
Analyticals
APVi
we
Euvimn ten
Evironmental Solutions�eoru�s
Laboratory Report
10/04/2016
Leonhardt Environmental, P.C. Project: Hirschfeld Inds. (Colfax, NC) Client Sample ID: 02
Attn: Paul Spangenberg Prism Sample ID: 6090525-01
Suite 101, 8392 Six Forks Road Prism Work Order: 6090525
Raleigh, NC 27615 Sample Matrix: Water Time Collected: 09/27/16 15:50
Time Submitted: 09130/1616:00
Parameter Result Units Report MDL Dilution Method Analysis Analyst Batch
Limit Factor DalelTime ID
General Chemistry Parameters
Total Suspended Solids 13 mg1L 5.0 0.80 1 'SM2540 D W4116 12:19 SLS P6.10021
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 - Toll Free Number. i-8001529-6364 - Fax: 7CW5254MM Page 3 of 5
4�
AP ISM I Envim men �,�tlal s
Emlranmenta! 5olutlons
undu«ones wc.
Leonhardt Environmental, P.C. Project: Hirschfeld Inds_ (Colfax, NC)
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
General Chemistry Parameters - Quality Control
Level 11 QC Report
1014/16
Prism Work Order: 6090525
Time Submitted: 9/30/2016 4:00:OOPM
Reporting Spike Source %REC RPD
Analyte Result Limit Units Level Result %REC Limits RPD Limit Notes
Batch P6JO021 - NO PREP
Blank (P6J0021-BLKi) Prepared & Analyzed: 10/03/16
Total Suspended Solids BRL 5.0 mg1L
LCS (PGJ0021-BS1) Prepared & Analyzed: 10/03/16
Total Suspended Solids 490 5.0 mg1L 477.0 102 90-110
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 2M4-0543
Phone: 7041529-6364 -Toll Free Number. 1-8001529-6354 - Fax: 704152s-0409 Page 4 of 5
.ter....ua..... . ... ... ._. .......
:Yj r
'lz�Y+ IS111i� CHAIN OF CUSTODY RECORD
Vf c G I Aso ATonlae hole d n r u�
•�t ';�.7w1">>` i'i f'�vo- PAGE 1 OF QUOTE I TO ENSUnE PROPER BILLINGS
Full Service Analytical & Environments] SoilHirschfeld - Colfax`I3g��
Project Name: --- _ Ls'
448 5 ringhrook Road � P.O. Box 240543 � Charlotte, NC 29224-0543 ,.� � �' �" ' ^'� "'�� ' � n ' � ° %�� 1" _ �
p Short Hold Analysls: t P QFi;�i t9EF�V Tln±�lrari w l @
Phone: 7041528-6364 a Fax; 704/525-0408 (Yes} (No) UST Project {Yes) (No)ta,'tiniw� h i±� r, +lyr t� LL
Client Company Name: 'oaelvad W1TIN IQLt](Iv{yTiMM' 7 r ��r
Leonitardt Env. , P.C.. Please ATTACH any project specific reporting (QC LEVEL I.1! III IV) rn krk+.e fiv
oerr t_aanhardtprovisions and/or QC Requirements �A SXReport To/Contact Name: Laanherdt EnWronmernni, P.C./ Invoice To: ,RO ortin Address: 8392 Six Forks Read, Suite 10_ R t Eh7l�tiMET
Reporting — - — -- — Address: 9392 Six Forks Rand, Suite 101fgRp' 1 ;u1:;1`'a
Raleigh, INC 27615 ���+��'f
Phone: Fax (Yes) (No): ,n,naory. o„< - — Derr
Email (Yxs) (No) Email Address lenylronglwlaeuthxet Purchase Order NoJBlNing Reference
Requested Due Dale 1 Day 2 Days 3 Days 4 Days 5 Days
EDD Type: PDF_ Excel —Other Requ "Working Days" . 6-9 Days Standard 10 days
Site Location Name: HlrscMokl- Ca tax Samples received after 15:00 Wit be processed next business day.
Site Location Physical Address: Asheboro, INC Turnaround Ume is based on business days, excluding weekends and holidays.
(SEE REVERSE FOR TERMS & CONDITIONS REGARDING SERVICES
RENDERED SY PRISM LABORATORIES, INC. To CLIENT)-
TO BE FILLED IN BY CLIENT/SAMPLING PERSONNEL
Certification: NEI.AC USACE FL NC
SC_ OTHER NIA
Water Chlorinated: YES _ NO ✓
Sample Iced Upon Collection: YES NO
CLIENT
SAMPLE DESCRIPTION
DATE
COLLECTED
TIME
COLLECTED
MILITARY
HOURS
MATRIX
(SOIL,
WATER OR
SLUDGE)
SAMPLE CONTAINER
PRESERVA-
TIVES
ANALYSES REQUESTER
REMARKS
PRISM
LAS
ID NO.
"TYPE
SEE BELOW
. NO.
SIZE
02
912716
15:50
Water
P
1
PT
None
V/zow
Sampler's Signature
Paul Spangenberg
Sampled By (Print Name)
LEPC
Affiliation
' '
'
P t� '
Site ir(IYa3 Filnel l sir r
en °�rrvs.
Upo Inquishing, Chain of Cu tody your authorization
suOWWn writing III the Prism Project opdg0r. There will
for Prism to proceed with the analyses ae requested above. Any changes must be
be charges for any changes attar analyses Have been Initialized.
R uls d y gnafur
y. {{ gnat re
L'-�
G' `
Date
p
Iary ou s
/S6�
Additional Comments:
w"' x'U-+M + r- �I r '
'7$ to !r•��epartLre i'Iry}e , f2
RelfLiqu had By. (Slgnatu
O �i �
Rae By: {Slgnature
•_. r -
Date
�V'L V
�/
-
'S ,tl Yi'.4i YE,k'V allr+t.1�S+ fi�F,
nSl�ld'lteo,Fe4
, �, fill.
Re In ad 8y; {Signature)
Y"AP11SH
R el darn Lab rlea By;
Data
a�#�h�fir
or ipment: N L A PL c0 LER SHOD OBE WI ST S FORTRANSPORTATION TOT E L.AR RATOR
9A 8 ARE NOTACCEPfED AND VERIFIED AGMNST COC UNTIL RECEIVED AT THE LABORATORY_
Fad Ex UPS Hand -delivered Prism Field Service Other Pick-up
Log - In Group o.
NO 3 SCC UST: NC _ SC I GROUNDWATER-. _SC
SGTER: DRINKING CATER: SOLID
WASTE:SC NC _ 5C C NO LA SC LANDFILL
SC � OTHER:
NC _ SC
"CONTAINER TYPE CODIS: A = Amber C = Clear G = Glass P = Plastic, TL = Teflon -Lined Cap VOA = Volatile Organics Analysis (Zero Head Space)
SEE REVERSE FOR
TERMS & CONDITIONS
ORIGIINAL
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/30/16
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016_
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly' June (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
RECEIVED ®Other
OCT 21 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
® No discharge this period?'
Outfall No
:
r e
;Date Sample .
I Collected 1
(mo/dd/yri'
,24-hour rainfall
amount;'
"Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead •
Zinc
Non -Polar O&G/
' Total: Petroleum
Hydrocarbons
Total Toxic
5 1
Organics
g
Benctimarks'= -=>'
_ "+
' -
100 mg/4 or 50�mg/L°
fi.0 — 9.0
0.007 mg/L
0.03 mg/L
0:067 mg/L.
15 mg/L'
1 rttg/L'
01
02
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement t mp (for t i ' e the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; f I1 ro ry a a u use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.311.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
3
1-
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for T'0 monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. Fdr those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title Print title)
(Signa e) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX miz/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
i Outfall No """
i} w
v '''Date -Sample'"'
Collected'
.:I (mo/dd/yr) '.
24=hour rainfall
amount,
:Inches
Non -polar O&G/TPH by
EPA 1664'(SGT-HEM):
Total Suspended Solids,.,
�,,,; �� .,pH '
,Benchmarks =-=>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 - 9.0-SU ,
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS:
A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION S.
+ 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR including all "No Dischar e" reports, within 30 days of rece/pt of the lab results or at end of monitarinto Period
in the case of "No Discharge" reports) to:
Division of water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of sines and imprisonment for knowing violations."
(Signature
- 3d 1&
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/10/16
CERTIFICATE OF COVERAGE NO. NCGO30321
FACILITY NAME _Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ® July -Dec
or ❑ Monthly' (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
REC E NE []Zero -flow ❑Water Supply ❑SA
❑Other
OCT 21 2016
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DWR SECTION
❑ No discharge this period?z
C►utfall No
:Date Sample,:
Collected 1
[mo/dd/yr),
'24-hour,rainfall
amount, '
IncFi'es�
: Total'Suspended Solids
pH;
Standard units
Copper
Lead
Zinc
Non -Polar, O&G/
'" Total Petroleum
Hydracaibons
Total.Toxic
'Organics5
Benchmarks = >
_
-
100 mg/L or 50 mg/0'
6.0 -9.0
0.007 rn /L
0.03 mg/L _
0.067.mg/L .
15 mg/L, .
1 mg/L;
01
8/27/16
0.45
0
6.0
0
0
0.53
22
N/A
02
8/27/16
0.45
13
6.0
0
0
0.50
33
N/A
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
9-M-/(o
(Sign a e) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mgL" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No
i t
Date Sample
allected"
{'m'o/dd/yrj
24-hour rainfall
amount,
Inches'
I
Non -polar O&G/TPH by
EPA 1664 {SGT-HEM)
Total Suspended Solids
pH
Benchmarks,===>„ ,,
, ,,; ;. 117 ..
-
15 mg/L
100 mg/L or 50 mg/L*
.6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an on inal and one copy -of this DMR, including all "No Discharge" Mports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
C1-/a -/&
(SignaturAf Permittee) (Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
P 1
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 110/16
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford EE� / P
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. d 442
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly( May(m . onth)
lS�HA . GINTO CLASS ❑ORW (—]or
❑Trout ❑PNA
[]Zero -flow ❑Water Supply []SA
®Other
ECEIVE19LEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
MAY 2 4 2016
CENTRAL FILES
DWR 3ECrk -U,
❑ No discharge this period?12
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
rd
Standard units
a
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
OrgaMcs 5
Benchmarks =_=>
- -
-
200 mg/L or 50 mg/1.4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
1s mg/L
1 mg/L
01
5/2/16
1.47
0.15
02
5/2/16
1.47
0.13
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement,
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012
Page 1 of 3
F
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (Print title)
(Sig e) (Dat
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lncheS3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part IB
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
T !
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an orl lna! and one copy o this DM including,all "No Dischar e" reports, within 30 days o receipt o the lab results or at end of monftorin eriad
In the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Perm
Permit Date:11/1/2012-10/31/2017
5 /G
(Da ej
SWU-245, last revised 10/25/2012
Page 3of3
Aft
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 4/30/16
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries BrIclite. LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
EDEIVED
Part A: Stormwater Benchmarks and Monitoring Results MAY 2 4 2016
. .I ell CC
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ❑ Ian -June ❑ July -Dec
or ® Monthly' April (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
❑Zero -flow ❑Water Supply [:]SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -)
FIL&C JndV%dUsqhgrge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Salads
DWR SECTl4
pH,
Standard units
Copper
Lead
%�
Zinc
r'
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
_
-
100 mg/L or 50 mg/1.4
6.0 - 9.0
0.007 mg/L
0.63 mg/L
6.067 mg/L
15 mg/L
1 mg/L
01
e
02
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit.' For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Clyde Markin
Name (Print name)
Plant Mana er
Title (P int title)
(Signs e) (Date)
Note: (Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, theymust be reported In the format "<XX m L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this periodi2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks -==>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 -- 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
r
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL7 YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an orlainal and one copy Of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring perlod
In the case of "No Discharge" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
'5�11b lv
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3/1/16
CERTIFICATE OF COVERAGE No. NCG030321
FACILITY NAME Hirschfeld Industries Bridae, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A; Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2016
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly' __ . (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
�� []Zero -flow ❑Water Supply ❑SA
RECEIVED
C Other
MAR 3 0 2010 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
CEiVTRAL FILES
DWR SECTiO�
❑ No discharge this period?z
Outfail No.
Date Sample
Collected'
mo/dd/ r)
24-hour rainfall
amount,
inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Norr-Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organicss
Benchmarks
100 mg/L or 50 mg/L°
6.0 -- 9.0
0A07 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
2/16/16
1.04
12
7.4
0
0.0064
0.39
0
N/A
02
2/16/15
1.04
13
6.8
0
0,037
1.2
0
N/A
1 Monthly sampling (instead of semi-annual) must begin with? ��oriOTconsec,}ifM9 chlbark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, o i mustlstill sub is discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTd), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan Included in the stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title rfnt title)
3�3
(Si re) IF (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format, "OX mRLI, where XX Is the numerical value of the detection
limit, reporting limit, etc. In mg/L.
Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR'PAR'-A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mall an original and one copy of this DMR_ !n __, �" Discharge" reports, within 30 days of receipt of the lab results [or at end o monitorin erlod
cludln all No
in the case of "No Discharge" reports] to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
3 3116
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
V— Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 1/25/16
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME _Hi_rschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Clyde Martin
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR z015
SAMPLE PERIOD ❑ Jan -June ® July -Dec
or ❑ Monthly' (month)
RE
dffVtlG TO CLASS ❑ORW ❑HQW [:]Trout❑PNA
❑Zero -flow ❑Water Supply ❑SA
FEB .0 5 2016 ❑other
CENTRAL FILES)LEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
❑ No discharge this period?Z
outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pW,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics'
Benchmarks
-
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/30/15
1.04
4.5
7.3
0.017
0
0.88
0
N/A
02
12/30/15
1.04
32
7.5
0.014
0.012
0.55
0
N/A
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver,of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 1 of 3
!�
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager
Title (P 'nt title)
.?
(Signat e) (Da )
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar O&G/TPH by
EPA 1664 (5GT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 5U
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART li SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the tab results (or at end of monitoring_ period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I'certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are significant pen ties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
/ 7114
(SignaturEv,6f P�Jmittee)
Permit Date: 11/1/2012-10/31/2017
(Date
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/26/15
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bride LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Brandon Lock
LABORATORY Prism Lab Cert. # 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2015
SAMPLE PERIOD ® Jan -June ❑ July -Dec
or ❑ Monthly' _ __(month
DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA
❑Zero -flow []WaterSupply [_]SA
RECEIVED []Other
JUL 09 2016SE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
pWRL FILES
SECTION
El
No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24-hour rainfall
amount,
Inches$
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics$
Benchmarks
100 mg/L or 50 mg/0
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/9/15
0.16
0
6.1
O
0
1.1
0
N/A
02
6/9/15
0.16
0
7.4
0
0
0.13
0
N/A
1 Monthly samolina (instead of semi-annual) must
begin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found In 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
U
rn
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility Is Implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Clyde Martin
Name (Print name)
Plant Manager _
Title (Print title)
(Sign t ( at
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value In excess of the benchmark, you must Implement Tler 1, Tler 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amounts,
Inches
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
total Suspended solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L'
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value In excess of the benchmark, you must Implement Tler 1, Tier Z, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
^ • -A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
+ 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cony of this DMR Includlnpall "No Dlscharae" reports, within 30 days of receipt of the lab results for at end of monitorina period
In the case of "No Discharge" reoorts! to:
Division of water quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature
71w,) (,
(D te)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/23/14
CERTIFICATE OF COVERAGE NO.M-13030321 SAMPLE COLLECTION YEAR 2014
FACILITY NAME Hirschfeld industries Bridge, LLC SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
COUNTY Guilford or ® Monthly'June (month)
PERSON COLLECTING SAMPLES Randy Ba Ilff DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
CEJVEb ❑Zero -flow []Water Supply ❑SA
LABORATORY Prism Lab Cert. # 402 jU1 ❑Other
18 9�r4
Comments on sample collection or analysis: CENTRAL PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
�'lNnr��G
Part A: Stormwater Benchmarks and Monitoring Results
No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/ r)
24hour rainfall
amount,
Inches'
Total Suspended Solids
phi,
Standard units
Copper
Lead
Zinc
Non -Po lar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics'
Benchmarks n=:>
_
-
100 mg/L or 50 mg1V
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
6/6/14
0.08
0
5.3
0.012
0
0.14
0
N/A
02
6/6/14
0.08
8.9
5.5
0.015
0
0.039
0
N/A
1 Monthiv samDlina (instead of semi-annual) must
besin with the second consecutive benchmark exceedance for the same parameter
at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definit€on contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the 5tormwater Pal Iution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the
solvent management plan included in the 5tormwater Pollution Prevention Plan."
P cFF K6L)4E:
Name (Print name)
Plant Manager
Title (Pr t title
(5' nat (Date)
Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported In the format. "OX mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. In mg/L.
Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tler 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period
Outfall No.
date Sample
Collected'
{mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 16641SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==_>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OLITFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one covy of this DMR including all "No Dischar e" reports, within 30 days of receipt of the lab results or at end of monitoring Period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
7i,5/T
(Date)
Permit Date: 11/1/2012-10/31/2017
SWLI-245, last revised 10/25/2012
Page 3 of 3
i Pl��RISM
'7u�aors+c�orars,nc
Full -Service Analytical &
Environmental Solutions
Leonhardt Environmental, P.C_
Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
NC Certification No. 4a2
SC CertrTcaton No, 99012
NC Drinking water Cert No_ 37735
VA Certirxatioo No. 460211
DOD ELAP: L-A-B Accredited Certiixate No_ L23o7
ISO/1EC 17025: L-" Accredited Co.Ifcate No, L2307
Project: Hirschfeld Inds_ (Colfax, NC)
Lab Submittal Date: 06/112014
Prism Work Order. 4060263
Case Narrative
06232014
This data package contains the analytical results for the project identified above and includes a Case Narrative, Sample
Results and Chain of Custody_ Unless otherwise noted, all samples were received in acceptable condition and processed
according to the referenced methods.
Data qualifiers are flagged individually on each sample. A key reference for the data qualifiers appears at the end of this case
narrative.
Please call if you have any questions relating to this analytical report.
Respectfully,
PRISM LABORATORIES, INC.
Angela D. Overeash
VP Laboratory Services
Data Qualifiers Key Reference:
A Samples received in improper container. Transferred at bench.
HT Sample received and analyzed outside of the hold time.
BRL Below Reporting Limit
MDL Method Detection Limit
RPD Relative Percent Difference
Reviewed By Terri W. Cole For Angela D. Overcash
Project Manager
Results reported to the reporting limit. All other results are reported to the MDL with values between MDL and
reporting limit indicated with a J.
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P_O. Box 240543 - Charbtts, NC 28Z24-0543
Phone: 7041529-5364 - TOO Free Number: 1-&001529-6364 - Fax: 704(525-0409 Page 1 of 7
M1 Sample Receipt Summary
I t71 Y 1 I Fair-s��e,lwni� a
F�riroema�ts� soiuLioe4 06/23/2014
�s
Prism Want Order 4060263
Client Sample ID Lab Sample ID Matrix Date Sampled Date Received
Outtall1 4060263-01 Water 06/08/14 06/11/14
Outtall2 4060263-02 Water 06/08/14 06/11/14
Samples were received in good condition at 3.7 degrees C unless otherwise noted.
7tds report should not be reproduced, e=MA in ft Y, wMwxd the written =)sent d Prism Laboratories, Inc.
449 Wngbrook Road - P.O. Box 24VA3 - Charla te, NC 28224A.M
Phone: 7041529 W - Toll Free Nwnber. i4W529-63" - Fax: 7WS25-0409 Page 2 of 7
Laboratory Report
PRISM I Full -Service al Sct Oo 8 osrz3rzD,4
Enrironm�nul Solutions
�eowwic,Ea ..e
Leonhardt Environmental, P.C. Project: Hirschfeld Inds. (Colfax, NC) Client Sample ID: Outfall 1
Attn: Paul Spangenberg Prism Sample ID: 4060263-01
Suite 101, 8392 Six Forks Road Prism Work Order. 4060263
Raleigh, NC 27615 Sample Matrix: Water Time Collected: 06/08/14 16:15
Time Submitted: 06/11/14 15:30
Parameter Result Units Report MDL Dilution Method Analysis Analyst Batch
Limit Factor Date/Time ID
General Chemistry Parameters
Oa & Grease (HEM)
BRLA
mg/L
5.0
0.37
1
'1664A
6119/14 16:04
JAB
WOW
PH
5.3 HT
pH Unit
1
'SM4500-11 B
6M3M4 13:00
TIES
P4F0262
Total Suspended Solids
BRL
M91L
3.5
1.0
1
'SM 2540 D
6/13/14 15:50
JAB
NF0257
Total Metals
Copper
0.012
mglL
OA10
0.00060
1
*200.7
SM3114 19:41
BGM
P4F0232
Lead
BRL
M91L
0.0050
0.00068
1
'200,7
6113114 19:41
BGM
P4FO232
Zinc
0.14
MWL
0.030
0A050
1
*200.7
611311419:41
BGM
P41`0232
Thus report dfmdd not be raproctuoed. except in its entirety, without the written consent of Prism Lahoralones, Inc.
449 Sprm9brook Road - P.O. Bore 240543 - C ariotte, NC 28224-WA3
Phone: 70415294364 - Ta0 Free Nranber. - Fax; 704f525.0409 Page 3 0# 7
w R ISM l En'Yironm �vbm:
Laboratory Report
06/23/2014
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
Project; Hirschfeld Inds_ (Colfax, NC)
Sample Matrix: Water
Client Sample ID: Outfall 2
Prism Sample ID: 4060263-02
Prism Work Order 4060263
Time Collected: 06/08/14 16:35
Time Submitted: 06/11/14 15:30
Parameter
Result
Units
Report
MDL
Dilution
Method
Analysis Analyst
Bar
Limit
Factor
Datel ime
ID
Genera! Chemistry Parameters
ON & Grease (HEM)
BRLA
mglL
5.0
0.37
1
`1664A
6119114 16:04
JAB
P4F0351
pH
5.5 HT
p14 Units
1
'SM4500-H B
GM3M4 13 00
UES
P4F0262
Total Suspended SoOds
8.9
mglL
2.8
1.0
1
'SM 2540 D
6r13r14 15:50
JAB
P4F0257
Totaf Metals
Copper
o_m6
nIwL
aA10
OJi0060
1
'zoo.7
6n3M419:21
BGM
P4F0232
Lead
BRL
rnwL
0.0050
0.00068
1
'200.7
6113114 19:21
SGM
P4F0232
Zinc
0.039
mglL
0.030
0.0050
1
'200J
611311419:21
BGM
P4F0232
This report sh-4d not be repr-t—d, except in ft entirety. wittwrt the written consent of Prism Laboratories, true
449 SprbVbrook Road - P.O. Box 240543 - Charlotte, NC 28224.OW
Phone: 704F529-6364 - Tat Free Number. 14MMS294LVA - Fax: 7WS25O409 Page 4 of 7
CHAIN OF CUSTODY RECORD
�ra Full -Service Analytical &
I S M I
I
-
YES:: NO:: NIA
ti
:. TUR Environmental Solutions
'rLABORATOWE41NC.
PAGE OP ? QUOTI: O TO ENSURE PROPER 9{LI.INW
Samples INTACT upon amval?:
✓
•.-
Project Neme: 14 11RSGatF F LIP 0L� AY
Roceivad,ON WE ICE?
T
449 Springbrook Road • Charlotte, NC 28217
Phone 704I529-6384 Fax" 704/525-0409
Short Hold Analysis: (Yes) (No) UST Prof ect: (Yes) (NO)
PROPER PRESERVATIVES miilcetad1 : >
_ _ ;
OI
`Plasso ATTACH any project specific reporting (WC LEVEL 1 II III IV)
ReI.celvetl WtTHIN HOLDING TIMES? -
_�
to
Client Company Name: r U r c
u,
provisions or QC RequfreLnente
CUSFODY,SEALS INTACT?
/
a
Report To/Contact Name: ' r
Invoice To: tl
VOLATILES rec'd W10UT HEADSPACE?
Re o Eng Addre`s,s: c Y , rI t
Address: (i
PROPER, CONTAINER
U -
RAC Lir�N N G
TEMP.:. Therm iD:µ ° h . ,_ Observed: �G I Corr; ' �
°G
Phane:`i J"I M.-`j l W d Jax (Yes) (No):"! j`! NY'1-
Email Address:
EDD Type: PDF Excel Other
Site Location Name: �4; "C t: S
Site Location Ph aical Address: (
A f
xll,Purchase Order No./Billing Reference
Requested Due Data ❑ 1 Day O 2 Days O 3 Days Q 4 Days Q 5 Days
"Working Days" U 6-9 Days 0 Standard 10 days Q RPurea Woppr��ust Be
, j�G , Samples received after 14:00 will be processed next business day,
r Turnaround time Is based on business days, excluding weekends and holidays.
(SEE REVERSE RENDERED BYPOR PP18MRWBORATORIES.N C,TOCLIENTIS REGARDING SERYICBe
TO BE FILLED IN BY CLIENTISAMPLING PERSONNEL
Certification: N ELAC DOD FL NC
SC____ OTHER N1A
Water Chlorinated: YES_'NO_
Sample Iced Upon Collection: YES NO
CLIENT
$AMPLE DESCRIPTION
DATE
COLLECTED
TIME
COLLECTED
I ARY
HOURS
MATRIX
WATER OR
SLUDGE)
SAMPLE CONTAINER
PRT VE8 A
ANALYSIS REQUESTED ;
7 ar" v a.�'y t`� REMARKS
`f 4 Lam +
PRISM
N0
"TYPE
SEE BELOW
NO
SIZE
OUT .
J
Sampler's Signature
Sampled By (Print Name) 1 AHlilatlon J
i r e
e
Upon relinquishing, this Chain o Custody I authorization for Prism to proceed with the analyses as requested above. Any changes must be
submitted In writing to the Prls ProJeet Man er. There will be charges for an angas after analyses have been Initialized.
Relinquished y: na re
/1
23 rs Additional Comments:
6
SILO Arri'vpi: Time:. '
%lInquishedy netun)
RWAkvod W.{-Dote
SiteDepartura-Time:
rp y: n re
c or eto sa a.
L ry
Fleld Tech Fnn,
al1 up o.
AMPLES ARE NOT CEPTBD AND VERIFIED AGAINST CGC U CEIVED AT THE LABORATORY.
a a, :71Hwxld@IIv(
F Ex redlam Field Service O Other
: UST 0 NDWATER: DRINKING WATER: SOLID WASTE: RCRA: CERCLA LANDFILL
OTHER:
'
CXNC❑SC ❑NC Q5C I ❑ C ❑SC I ❑NC
❑SC ❑NC ❑SC ❑NC❑SC ❑NC ❑5C ❑NC 0SG
❑NC 0SC
`
`CONTAINER TYPE CODES: A = Amber C = Clear G= Glass P = Plastic; TL = Teflon -lined Cap VOA = Volatile Organics Analysis (Zero Head Space)
C)RiGINAI
:PRISM I Fn' �a
Level 11 QC Report
6/23114
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
General Chemistry Parameters - Quality Control
Project Hirschfeld Inds. (Colfax, NC)
Prism Work Order: 4060263
Time Submitted: 611IM14 3:30:00PM
Reporting Spike Source %REC RPD
Ana" Resull Limit Units Level Result %REC Limits RPD Lanil Notes
Batch P4F0257 - NO PREP
Blank (P41F0257-BLK1) Prepared & Analyzed: 06113/14
Total Suspended Solids BRL 5.0 mglL
LCS (P4F025743S1) Prepared & Analyzed: 06/13/14
Total Suspended Solids 510 5.0 m91L 468,0 109 90-110
Batch P4F0262 - NO PREP
LCS (P4FO26243S7) Prepared & Analyzed: 06/13/14
PH 6.86 PH Units 6.880 100 99-101
Duplicate (P4F0262-DUP7) Source: 4060263-02 Prepared & Analyzed: 06113/14
PH 5.58 PH Units 5.54 0.7 10
Batch PV0351 - NO PREP
Blank (P4F0351-BLK1) Prepared & Analyzed_ 06/19/14
Ga & Grease (HEM) BRL 5.0 m911-
LCS (P4F0351-BS1) Prepared & Analyzed: 06119/14
Oil & Grease (HEM) 39.0 5.0 nV& 40.00 98 78-114
Sample Extraction Data
Prep Alethod: 200.7
Lab Number Saaeh Initial Final Dateaihne
4D60263-01 P4F0232 50 mL 50 mL 06/13/14 8:45
4060263-02 P4F0232 50 mL 50 mL 0&13114 8:45
This reportshould not be rep and x ed, except in its entrety. without the writt n consent d Prism Laboratories. Inc.
449 Springltrook Road - P.O. Box 24OS43 - CharbCa, NC 26224-0543
Phone: 7041524-6384 - Tog free Number. 14 001529-6364 - Fait: 7W5254)409 Page 6 of 7
f
. r S M I
EuaviroR�eal 6oji time
Level 11 QC Report
6/23114
Leonhardt Environmental, P.C_
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
Total Metals - Quality Control
Project: Hirschfeld Inds. (Coffax, NC)
Prism Work Order: 4060263
Time Submitted: 6/11/2014 3:30:00PM
Reporting Spike Source %REC RPD
Result Limit Units Level Result %REC Limits RPD Limit Notes
Batch P4170232 - 200.7
Blank (P4F0232-BLK1)
Prepared B Analyzed: 06/13/14
Copper
BRL
0.010
mg/L
Lead
BRL
0.0050
mg1L
Zinc
BRL
0.030
mg1L
LCS (P4F0232-BSI)
Prepared & Analyzed: 06113114
Copper
9.254
D.D10
mg/L
0.2500 102 85-115
Lead
0.265
0.0050
mglL
0.2500 105 85-115
Zinc
0,266
0.030
mg/L
0.2500 106 85-115
This report stiould riot be mprodaoed, except in ds entirety, wffllouit the Written conseM of Prism Laboratories. Inc.
449 Sprtngbrook Road - P.O. Box 240543 - Chadfoflse, NC 26224aW
Phone: 7D41i24.6W - Toll Free Number.. 14MV529-6364 - Fax: 70,V5254MW Page 5 of 7
Permit No. NCG030000
�Tie;One
If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any I
Darameter at anv outfall;
Then: The permittee shall:
1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling
results.
2. Identify and evaluate possible causes of the benchmark value exceedance.
3. Identify potential and select the specific: source controls, operational controls, or physical
improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations
within the benchmark range.
4. Implement the selected actions within two months of the inspection.
5. Record each instance of a Tier One response in the SPPP. Include the date and value of the benchmark
exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the
date the selected actions were
TierTwo .
If: During the term of this permit, the first valid sampling results from two consecutive monitoring periods are
above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific
discharge outfall;
Then: The permittee shall:
1. Repeat all the required actions outlined above in Tier One.
2. Immediately institute monthly monitoring f.Qc all param Gam. Conduct monthly monitoring at every
outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly
[analytical and qualitative] monitoring shall continue until three consecutive sample results are below
the benchmark values or within benchmark range.
3. Submit a monthly monitoring report indicating "No Flow" if no discharge occurs during the sampling
period.
4. Benchmark exceedances for a different parameter separately trigger a tiered response.
5. Maintain a record of the Tier Two response and monitoring results in the SPPP.
7yei•-Tlir
During the term of this permit, if the first valid sampling results required for the permit monitoring periods
exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific
outfall on four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within
30 days of receipt of the fourth analytical results. DWQ may but is not limited to:
• require that the permittee revise, increase, or decrease monitoring frequency for some or all
parameters;
• rescind coverage under the General Permit, and require that the permittee apply for an individual
stormwater discharge permit;
• require the permittee to install structural stormwater controls;
• require the permittee to implement other stormwater control measures;
• require the permittee to perform upstream and downstream monitoring to characterize impacts on
receiving waters; or
• require the permittee implement site modifications to qualms for the No Exposure Exclusion.
Part II Page 7 of 10
HIRSCHFELD INDUSTRIES BRIDGE, LLC
COLFAX, NORTH CAROLINA
TIER II PERMIT COMPLIANCE INSPECTION
As required by General Stormwater Permit No. NCG030321, a compliance evaluation
was conducted on 6/27/14 in response to stormwater analytical parameter exceedence.
Present during the inspection were:
Paul Spangenberg Consultant — Environmental Compliance Manager
Phil Aiello Hirschfeld Industries Bridge, LLC — Plant Manager
1.) Areas where industrial activities are exposed to stormwater.
a) Scrap metal storage east of main building. Scrap metal was observed to be
oil free. No evidence was found of an impact to stormwater from the
storage of scrap metal.
b) Storage of spent shot from shot blasting northeast of main building. No
evidence was found that an impact to stormwater has occurred in this area.
c) Storage of finished products west of main building. No evidence was
found that an impact to stormwater has occurred in this area.
d) Storage of partially finished products north of main building. No evidence
was seen of any impacts to stormwater in this area.
e) Bag filter area northwest of the main building. Minor amounts of spent
shot were found on the ground surface. No Evidence was found that the
shot blast has impacted stormwater beyond the immediate area
surrounding the filter.
Summary: With the exception of some oil leakage from the yard crane, the
following were not found during the inspection:
a) leaks or spills from equipment, drums, barrels, or containers
b) off site tracking of industrial materials
c) tracking or blowing of raw, final, or waste materials
d) evidence or, or the potential for, pollutants entering the drainage system.
2.) Analytical monitoring results from sampling conducted on January 16, 2014
indicated the following exceedcnces.
Parameter Bench Mark Outfall 1 Outfall 2
Zinc 0.067 mg/1 0.14 mg/I---------
Copper 0.007 mg/1 0.012 mg/I 0.015 mg/l
PH 60.- 9.0 U 5.3 5.5
There is no apparent cause of the elevated level of copper and zinc; however a
likely cause of the elevated would be from the galvanized corrugated steel
structure of the manufacturing building. The exceedance on the pH could be
directly caused from acidic rain fall. This may also contribute to the elevated
zinc and copper dissolved from the naturally occurring soil. There are plans
to re -sample at the next rain event to evaluate the background of zinc and
copper levels to determine if the building is a contributing factor. No action
related to the elevated zinc level is recommended at this time. No other
source of zinc was found during the inspection.
3.) There are no structural BMP's present at the facility. No retention ponds, no
oil/water separators, and no collection basins are present. None structural
BMP's include the minimization of outdoor storage, the frequent disposal of
accumulated wastes, and the elimination of any oily wastes. These non-
structural BMP's appear to be adequate.
4.) Each of the two stormwater discharge outfalls was inspected. No evidence
was seen of any non-stormwater impacts at either outfall.
RECOMMENDATIONS
1) On -site activities. It is recommend to contain the shot blast residue.
Additional actions which might be considered are (1) install an impervious
surface in the area beneath the bag filter (2) perform more frequent clean-up
of the area (3) shelter the area from stormwater.
2) No evidence was found that the current SWPPP has any deficiencies. No
changes to the SWPPP are recommended at this time. All current initiatives
appear adequate to meet the goals of the SWPPP. Note that the SWPPP was
updated on 3/30/2013, prior to the date that the inspection was conducted.
CERTIFICATION
This inspection did not reveal any violations of the permit. No areas of non-compliance
with the S WPP ere noted.
Certified by:
Name ,.� Date: ''� 7 1
�.
Title
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/23/14
CERTIFICATE OF COVERAGE NO. NCG030321
FACILITY NAME Hirschfeld Industries Bridge, LLC
COUNTY Guilford
PERSON COLLECTING SAMPLES Brandon Lock
LABORATORY Prism Lab Cert. t# 402
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2014
SAMPLE PERIOD ❑ Jan -June ® July -Dec
RE'Cepy or ❑ Monthly' (month
I tGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
MAR 2 g 2015 ❑Zero -flow ❑Water Supply ❑SA
��R SaC FIDES [:]Other
ACT/ON PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organicss
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
01
12/22/14
0.11
0
5.3
0
0.0072
0.16
0
N/A
02
12/22/14
0.11
40
5.5
0.013
0.0085
0.73
0
N/A
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit bate: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
I T
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Manuel Gonzalez
Name (Print name) Plant Manager filihy�ff t 61-1 2JI-Z
Title (Print title)
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical .
format. When results are below the applicable limits, they, must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Non -polar 0&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ==>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part 8
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier z, or Tier 3 responses. See General Permit text.
FOR PART AAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCE5 IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one coy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results tor at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
z�
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
HIRSCHFELD INDUSTRIES BRIDGE, LLC
COLFAX, NORTH CAROLINA
TIER III PERMIT COMPLIANCE INSPECTION
As required by General Stormwater Permit No. NCG030321, a compliance evaluation
was conducted on 12/22/14 in response to stormwater analytical parameter exceedence.
Present during the inspection were:
Paul Spangenberg Consultant — Environmental Compliance Manager
Manuel Gonzalez Hirschfeld Industries Bridge, LLC — Plant Manager
Brandon Lock Hirschfeld Industries Bridge, LLC — Safety Manager
1.) Areas where industrial activities are exposed to stormwater.
a) Scrap metal storage east of main building. Scrap metal was observed to be
oil free. No evidence was found of an impact to stormwater from the
storage of scrap metal.
b) Storage of spent shot from shot blasting northeast of main building. No
evidence was found that an impact to stormwater has occurred in this area.
c) Storage of finished products west of main building. No evidence was
found that an impact to stormwater has occurred in this area.
d) Storage of partially finished products north of main building. No evidence
was seen of any impacts to stormwater in this area.
e) Bag filter area northwest of the main building. Minor amounts of spent
shot were found on the ground surface. No Evidence was found that the
shot blast has impacted stormwater beyond the immediate area
surrounding the filters.
Summary: With the exception of minor amounts of oil seepage from the yard
equipment, the following were not found during the inspection:
a) leaks or spills from equipment, drums, barrels, or containers
b) off site tracking of industrial materials
c) tracking or blowing of raw, final, or waste materials
d) evidence or, or the potential for; pollutants entering the drainage system
2.) Analytical monitoring results from sampling conducted on December 22,
2014 indicated the following exceedences.
Parameter Benchmark OutfallI Outfall2
Zinc 0.067 mg/l 0.16 mg/I 0.73 mg/1
There is no apparent cause of the elevated level zinc; however a likely cause
of the elevated zinc would be from the galvanized corrugated steel structure of
the manufacturing building or a naturally occurring in the soil. The
exceedance on the pH could be directly caused from acidic rain fall. This may
also contribute to the elevated zinc dissolving from the building or from
naturally occurrence in the soil. There are plans to re -sample at the next rain
event to evaluate the background of zinc levels to determine if the building is
a contributing factor. No action related to the elevated zinc level is
recommended at this time. No other source of zinc was found during the
inspection.
3.) There are no structural BMP's present at the facility. No retention ponds, no
oil/water separators, and no collection basins are present. Non-structural
BMP's include the minimization of outdoor storage, the frequent disposal of
accumulated wastes, and the elimination of any oily wastes. These non-
structural BMP's appear to be adequate.
4.) Each of the two stormwater discharge outfalls was inspected. No evidence
was seen of any non-stormwater impacts at either outfall.
RECOMMENDATIONS
1) On -site activities. It is recommended to contain the shot blast residue.
Additional actions which might be considered are (1) install an impervious
surface in the area beneath the bag filter (2) perform more frequent clean-up
of the area (3) shelter the area from stormwater.
2) No evidence was found that the current SWPPP has any deficiencies. No
changes to the SWPPP are recommended at this time. All current initiatives
appear adequate to meet the goals of the SWPPP. Note that the SWPPP was
updated on 1/ 16/2014, prior to the date that the inspection was conducted.
CERTIFICATION
This inspection did not reveal any violations of the permit. No areas of non-compliance
with the SWPPP were noted.
Certified by:
Name
-_ _
Date:
Title _Plot
FACILITY
ADDRESS
CONTACT PERSON
RAIN EVENT DATA
Hirschfeld Industries Bridge, LLC
9035 West Market Street
NC 2
Manuel Gonzalez
TELEPHONE: (336) 993-2680
STORM EVENT IN ORMATIO
DATE
YEAR
MONTH DAY
2014
12 22
HOURS
MINUTES
DURATION
22
30
PRECIP.
AMOUNT (IN.)
0.11
RUNOFF
VOL. (GAL.)0.05
DAYS
HOURS
PRECEDING
EVENT
6
12
R+INGiPLE EXEC*UTIVE OFF CER OR AUTI:IO � QED AGENT
PRINT
SIGNATURE
DATE
-f-h«vJ 6-VA 7j t7--
U ZWZ0I Si
12 22 14
34.76 Acres x 43,560 = 1514145.6 x .11= 1514145.E x .0833 = 13874.1 x 7.48 = 103778.3 / mg = 0.10 / 2
= 0.05
4� I S M
-LWMT=ES INC.
Full -Service Analytical &
Environmental Solutions
Leonhardt Environmental, P.C.
Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
NC Certification No. 402
SC Certification No. 99012
NC Drinking Water Cert No. 37735
VA Certification No. 460211
DoD ELAP: L-A-B Accredited Certificate No. L2307
ISOPEC 17025: L-A-B Accredited Certificate No. L2307
Project: Hirschfeld Inds. (Colfax, NC)
Lab Submittal Date: 1212312014
Prism Work Order: 4120458
Case Narrative
01 /09/2015
This data package contains the analytical results for the project identified above and includes a Case Narrative, Sample
Results and Chain of Custody. Unless otherwise noted, all samples were received in acceptable condition and processed
according to the referenced methods_
Data qualifiers are Bagged individually on each sample. A key reference for the data qualifiers appears at the end of this case
narrative.
Please call if you have any questions relating to this analytical report.
Respectfully,
PRISM LABORATORIES, INC.
Angela D. Overcash
VP Laboratory Services
6L- c-a-
Reviewed By Robbi A. ,tones For Angela D. Overcash
President/Project Manager
t'
Data Qualifiers Key Reference:
BRL Below Reporting Limit
MDL Method Detection Limit
RPD _ Relative Percent Difference
* Results reported to the reporting limit. All other results are reported to the MDL with values between MDL and
reporting limit indicated with a J.
This report should not be reproduced, except in its entirety, without the written consent of Pfism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 704/529-6364 - Toll Free Number: 1-8001529 6364 - Fax: 704/525-0409 Page 1
4,\
61.'R,
i S M Ezell -Service al Solutions
b
Environmental Solutions
Sample Receipt Summary
01 /09/2015
Prism Work Order: 4120458
Client Sample ID
Lab Sample ID
Matrix
Date Sampled
Date Received
Outfall 1 A-C
Outfall 2 A-C
4120458-01
4120458-02
Water
Water
12/22/14
12/22/14
12/23/14
12/23/14
Samples were received in good condition at 2.1 degrees C unless otherwise noted.
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratorles, tnc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-05"
Phone: 704/529-6364 -Toll Free Number: 1-800152"364 - Fax: 704f525-0409 Page 2 of 7
zl'hW
I S M I Pun -Service Analytical &
Environmental Solutions
u,eawToa�a .�
Laboratory Report
0110912015
Leonhardt Environmental, P.C. Project: Hirschfeld Inds. (Colfax, NC) Client Sample ID: Outfall 1 A-C
Attn: Paul Spangenberg Prism Sample ID: 4120458-01
Suite 101, 8392 Six Forks Road Prism Work Order: 4120458
Raleigh, IVC 27615 Sample Matrix: Water Time Collected: 12/22/14 13:30
Time Submitted: 12/23/14 14:30
Parameter Result Units Report MDL Dilution Method Analysis Analyst Batch
Limit Factor DateMme ID
General Chemistry Parameters
Oil & Grease (HEM)
BRL
mg1L
12
0.37
1
'166413
117115 11:30
JAB
P5A0066
Total Suspended Solids
BRL
mg1L
13
1.0
1
'SM 2540 D
12129/14 15:00
CDE
P41-0456
Total Metals
Copper
BRL
mg1L
0.010
0.0014
1
'200.7
115115 17A6
BGM
P5A0019
Lead
0.0072
mg1L
0.0050
0-00056
1
*200-7
115115 17:46
BGM
PSA0019
Zinc
1.6
mg1L
0.030
0.0024
1
*200.7
115115 17:46
BGM
PSA0019
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 - Toll Free Number: 1-800152"364 - Fax: 7041525.0409 Page 3 of 7
°\
Laboratory Report
®P R I S M Fun -Service Analytical h
LZircnmental Solutions
01/09/2015
Pueorwior:Ms we
Leonhardt Environmental, P.C.
Project: Hirschfeld Inds. (Colfax, NC)
Client Sample ID: Outfall 2 A-C
Attn: Paul Spangenberg
Prism Sample ID: 4120458-02
Suite 101, 8392 Six Forks Road
Prism Work Order: 4120458
Raleigh, NC 27615
Sample Matrix: Water
Time Collected: 12/22/14 13:45
Time Submitted: 12/23/14 14:30
Parameter Result Units Report MDL
Dilution Method Analysis Analyst
Batch
Limit
Factor Date/Time
ID
General Chemistry Parameters
Oil & Grease (HEM) BRL
mg/L 14 0.37
1 16646 117115 12:00 JAB
P5AD066
Total Suspended Solids 40
mg1L 9.3 1.0
1 "SM 2540 D 12129/14 15:00 CDE
P4L0456
Total Metals
Copper 0,013
Lead 0.0085
Zinc 0.73
mg1L
0.010
0.0014 1
*200.7
115115 17:54
BGM
P5A0019
mg1L
0.0050
0.00056 1
*200.7
115115 17:54
BGM
P5A0019
mg1L
0.030
0.0024 1
*200.7
115115 17:54
BGM
P5A0019
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 -Toll Free Number: 1-0001529-6364- Fax: 7041525-0409 Page 4 of 7
e
Abk� R I S M I Environmental
Analytical s
Envirpnmental Solutions
�4'i.emnron�s we
Leonhardt Environmental, P.C.
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
Total Metals - Quality Control
Project: Hirschfeld Inds. (Colfax, NC)
Level li QC Report
119/15
Prism Work Order: 4120458
Time Submitted: 12/23/2014 2:30:00PM
Reporting
Spike Source
%R -C RPD
Analyte
Result
Limit
Units
Level Result %REC
Limits RPD Limit Notes
Batch P5A0019 - 200.7
Blank (P5A0019-BLK1)
Prepared & Analyzed: 01/05/15
Copper
BRL
0.010
mglL
Lead
BRL
0.0050
mglL
Zinc
BRL
0.030
mglL
LCS (P5A0019-BS1)
Prepared & Analyzed: 01/05/15
Copper
0.255
0.010
mglL
0.2500 102
85-115
Lead
0.258
0.0050
mglL
0.2500 103
85-115
Zinc
0.269
0.030
mglL
0.2600 108
85-115
This report should not be reproduced, except in its entirety, without the written consent of Prism laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 - Toll Free Number: 1-800/529-6364 - Fax: 7041525-0409 Page 5 of 7
ha'I s n n I Eunvir nmee al Sol do B
' V' EnYiranmentel Solutions
—v —
Leonhardt Environmental, PC. Project: Hirschfeld Inds. (Colfax, NC)
Attn: Paul Spangenberg
Suite 101, 8392 Six Forks Road
Raleigh, NC 27615
General Chemistry Parameters - Quality Control
Level II QC Report
119115
Prism Work Order: 4120458
Time Submitted: 12/23/2014 2:30:OOPM
Analyte
Result
Reporting
Limit
Units
Spike Source
Level Result %REC
%RFC RPp
Limits RPQ Limit Notes
Batch P4LO456 - NO PREP
Blank (P41-0456-BLK1)
Prepared &Analyzed: 12l29114
Total Suspended Solids
LCS (P4L0456-BSI)
BRL
5.0
mg1L
Prepared &Analyzed: 12/29/14
Total Suspended Solids
Batch PSA0066 - NO PREP
440
5.0
mg1L
468.0 94
90-110
Blank (P5A0066-BLK1)
Prepared & Analyzed: 01/07/15
Oil & Grease (HEM)
LCS (PSA0066-BS1)
BRL
5.0
mg1L
Prepared &Analyzed: 01/07/15
Oil & Grease (HEM)
32.0
5.0
mg/L
40.00 80
78-114
Sample Extraction Data
Prep Method: 200.7
Lab Number Batch Initial Final Dateframe
4120458-01 P5A0019 50 mL 50 mL 01/05/15 8:05
4120458-02 P5A0019 50 mL 50 mt. 01/05/15 8:05
This report should not be reproduced, except in its entirety, without the written consent of Prism Laboratories, Inc.
449 Springbrook Road - P.O. Box 240543 - Charlotte, NC 28224-0543
Phone: 7041529-6364 -Toll Free Number: 18001529-6364 - Fax: 7041525-0409 Page 6 of 7
..au. �.,. . �»,., .. s_1..i. .._. �1.. r,_.,...r�i. �_�•i . �'+1:l.., :r,r.: 1..i �, - a.ul� �,u�,,. ar=1..��.. �,1- - _' - . -r-__
--✓ta
CHAIN OF CUSTODY RECORD
R.71 �,_ Full -Service Analytical &j tl Y 1 __L YES :. iNO N1A
Environmental Solutions PAG¢ OF QUOTE it To ENSURE PROPER BILLING: Sarriples INTACT upon ainvah
�114BONATORIES, INC. 0449 Springbrook Road •Charlotte, NC 28217 Project Name: C6L �� K Raeeived ON WET ICE?..;:.:
Phone 704152M364 •Fax: 7041525.0409 Short Hold Analysts: (Yes) (No) UST Project: (Yes) (NO) PROPER PRESERVATIVES tndicated?,' �
Client Company Name: rl Y rrt- -7.rw OLi 57,ei>;s Please ATTACH any project specific reporting (QC LEVEL 1 II 111 IV) RaIcelvo WITHIN HOLDING TIMES? ✓:; ��
provisions and/or QC Requirements CU$TODY.SE ALS INTACTt'
Report TolContact Name: f3�' A uY�oN LC L 1w Invoice To: - o N A p N V i o m �N rr4 L VQi ATILES roc d WIdUT HEADSPACE? w
Reporting Address: i C. - A 7'P.E - c PROPERCONTAIN RSuscci? _ �
Address: �' x v �! S 5 u i r& IUI
L. V0 , l i2 E Fiv S Acl&) NG Z 7 4 n `1 p q L �: c. u ur - n i' i 4' TEMP. Therm.ID: `C� (�. Cbsesved:�.� d I Gorr: � °C
Phone: F_:27 i 8-2rZ Fax (Yes)Cp:
Purchase Order No.lBllling Reference
TO BE FILLED IN BY CLIENIUSAMPLING PERSONNEL
Email Address: 61-Af4nn1v, LnStz L pi�S.J4r=F.cO,cu,n+
- Requested Due Date ❑ 1 Day ❑ 2 Days ❑ 3 flays ❑ 4 Rays CI 5 Days
Certification: NELAC -DoD
FL NC
EDO Type: PDF V Exce1_ ZOther
"Working Days" ❑ 6-9 Days L04tandard 10 days ❑ Rushrk MLst Be
Site Location Name: c:2L 1=A X
ved
Samples received attar 14:00 will be processed next business day.
SC OTHER
NIA
Site Location Physical Address: q o-34�_W = 11q iF4",T— Turnaround Urns is based on business days, excluding weekends and holidays. 1
Water Chlorinated: YES NO
'• o L FAX !JC1 �2 ='7'�- �s
Sr[_,
(SEE REVERSE FOR TERMS & CONDITIONS REGARDING SERVICES
�^ RENDERED
Sample iced Upon Collection: YES NO
p P ✓
TIME
MATRIX
SAMPLE CONTAINER
ANALYSIS REQUESTED
PRISM
CLIENT
DATE
COLLECTED
(SOIL,
PRESERVA-
REMARKS
SAMPLE DESCRIPTION
COLLECTED
MILITARY
WATER OR
'TYPE
NO.
SIZE
TIMES
t] �(�
1D NO.
HOURS
SLUDGE)
SEE BELOW
��
o Lt T F11 ILL. 0
12 - z f
1 3 ', 30
w FPrT�e
at'i
7--2-2 j�
!3'. 3o
tv71=t^
1
NoN�
v
c nn �'rr4 i w c
1tc��� r✓ i
cTr n
j1.1AL�, of C
t 2^2�-1y
i3r, C
�ATCR
�>�r it A
1z zz-I4
13:`fS
wrE2
C�
I
L-
�}�L
✓
Q�
ttr FALi- ct-zb
1 Z-zz-aK
i 3':Y s
wA're-.
,p
I U
NDh'E
Z Z 2' I Ll
i Zi . 11-5r"
IV A -FIE
�
it N V j
✓
Sampler's Signature
Sampled By (Print Name) 9,e A N 001V CO G jr- Affiliation p + oe t~crnp
Upon relinquishing, this Chain of Custody Is your authorization for Prism to proceed with the analyses as requested above. Any changes must be
submitted in writing to the Prism Project Manager. There will be charges for any changes after analyses have been initialized.
e Inpu a nature
9
Received SI nature ate 1 its ours
( 9 � �' Additional Comments
a }=
j5ite"Ar�r`i al-I'I�me ��,�rn�,� r
y
��" , :✓�./ ��..,,•1 r�I,, 1 -.�
r � :rail r
Rah'nquished By: (Signature)
..�]
Received By: (SignatureDateIte
flapanUfe Tlnte �rr _ti
xir: �: ;Id+...cn7i:-�' sxr<�'u%.,..I•� �..�+=y,.
-
ieid T6ch
Rellnqu shed By: (Signature)
eceived For P m La oratories B)(: Date
w / "'•� �--�
lviileage � M �
Method or Shipment: NOTE;ALLSAMPLE,SOOLERa SHOULDBE TAPED SHUT WITH C S DY EJEACS FOR TRANSPORTATION TO THE LABORATORY. COC uroup No.
SAMPLES ARE NOT ACCCEPTEO AND VERIFIED AGAINST CDC U R (; VED AT THE LABORATORY.
'O Fed Ek ❑ UPS ❑ Hand -delivered L3O ism Field Service U
01 her
NPDES: UST G UNDWATER: DRINKING WATER: SOLID WASTE: RCRA: CERCLA LANDFILL OTHER:
'
❑NC❑SC ❑NC ❑SC CAC ❑SC ❑NC
❑SC ❑NC ❑SC I ❑NC❑SC ❑NC 05CI❑NC ❑SC El NC ❑SC
❑ LI ❑ ❑
❑ n rt
'CONTAINER TYPE CODES: A = Amber C = Clear G= Glass P = Plastte; TL = Teflon -Lined Cap VOA = Volatile Organics Analysis (Zero Head Space)
ORIGINAL