Loading...
HomeMy WebLinkAbout19961033 Ver 1_COMPLETE FILE_19961111IMPORTANT To 0& Date__f Time WHILE YOU WERE OUT Phone _ AREA CODE NUMBER EXTENSION Message f??s -/fIh /te S -y c _e s zv Gorr, ? gned TELEPHONED PLEASE CALL CALLED TO SEE YOU WILL CALL AGAIN WANTS TO SEE YOU URGENT RETURNED YOUR CALL N.C. Dept. of Environmen Health. and Natur I es ur-cTes State of North Carolina Department of Environment, Health and Natural Resources AT4 • • Division of Water Quality, James Hunt, Governor p E H N R Jonathon B. Howes, Secretary A. Preston Howard, Jr., P.E., Director December 13, 1996 Guilford County DWQ Project # 961033 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS Mr. Martin Ruegsegger Pine Needle LNG Co., LLC P.O. Box 33068 Charlotte, NC 28233 Dear Mr. Ruegsegger. You have our approval to place fill material in 0.91 acres of wetlands or waters for the purpose of constructing natural gas pipelines and fire pond between SR 2019 and NC 68, as you described in your application dated 25 October 1996 with a revision dated 3 December 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Numbers 3022, 2732 and 2671. These certifications allow you to use Nationwide Permit Numbers 12, 14 and 26 when they are issued by the Corps of Engineers. This certification replaces one issued on 8 November 1996. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. The length of the culvert embankment at Rock Branch shall be reduced by 40 feet. A 75 foot wide construction corridor is allowed across the small wetland area at the edge of the Haw River flood plain. A 45 foot wide maintained corridor is allowed at this site as well.. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Winston-Salem DWQ Regional Office Mr. John Dorney Central Files 961033.Itr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper MEMO TO: ??4pih?c;J4? DATE: SUBJECT: Alf From: STArf 'Are it ?` •? Y QW m v?a?'?? `RSSrri. North Carolina Department of Health, and Natural Resources Environment, ?v ?? Printed on Recycled Paper State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt,Jr., Governor Jonathan B. Howes, Secretary A. Presto n Howard, Jr., P.E., Directo r APPROVAL of 401 Water Quality Certification Mr. Martin Ruegsegger Pine Needle LNG Co., LLC P.O. Box 33068 Charlotte, NC 28233 Dear Mr. Ruegsegger. ?EHNF=1 November 8, 1996 Guilford County DWQ Project # 961033 You have our approval to place fill material in 0.91 acres of wetlands or waters for the purpose of constructing a natural gas pipeline and fire pond between SR 2019 and NC 68, as you described in your application dated 25 October 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Numbers 3022, 2732 and 2671. These certifications allow you to use Nationwide Permit Numbers 12, 14 and 26 when they are issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Sincerely, Pr ston Howard, Jr. P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Winston-Salem DWQ Regional Office Mr. John Dorney Central Files 961033.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper DEC 83 '96 / O? : 58PM TRANSCO ENERGY CO FAX COV-ER Sl 6r'l ,> ; S Jett 7 ?r'r DELIVER FAX TO: Eric r 1 FAX PHONE #(919)733-9959 NUMBER OF PAGES FOLLOWING: 2 FAX FROM : Loretta M. Earnest TELEPHONE #: (713) 215-2641 FAX #: (713) 215-4551 P.1/3 Vj 40 DATE: 12/03/96 TIME: 2:40 p.m. (CST) Request for clarification of condition #7 - The construction corridor is limited to 40 feet in width and must be minimized to the maximum extent practicable. For your convenience, I'm sending: 1) the Attachment from our application - Please see No. 14, last paragraph; and 2) the Figure 1.2.2, Typical Right-of-Way Cross Section for the proposed construction corridor - The construction corridor in this detail depicts a 100' wide construction corridor. As stated in our application, we will reduce this to a 75' wide construction corridor across this wetland area (127' in length). If there is no rock/foreign material in the bottom of the trench, the pipeline will be laid on the bottom of the trench. If rock/foreign material is present, then the pipe will be placed on sand bag or dirt berm supports and the acceptable spoil or select backfill will be used to pad the ditch to cradle the pipe, If you have any questions, please call. Thanks! DEC 03 '96 ?lyioyl!!L•• 4? - ab. ?SL:.J?y?,,GGfi l.e11•ML?4.44 . 02:59PM TRANSCO ENERGY CO Pr2i3 Vii? - .a'- .r. M_. ,... ,.? • .. __ -'"c•• :.^ ::^ ..r.• 1?ti•:.•.• 'i•w%y-r.?..-.? •••; _r':.ir??-ate" : -.,. . , ? . .. .•?• ?•.neci+a.?-??..?'r?::_`?_??-.?, -.. ".sx'v='+?r?.??aai..e?•??a?.?r, _ '+-?%ra1'.:.7"?a_?n,.?•'f'::•: ._. Joint Application for Form - ryi•.Y.?18:? ' •iMRrMJ•rw r 4'. : r _ ?`I`/`W.MI d'+-T - £r• - 1 0 5<?:. •.: .•lr:_ •. :k? -, i'•, "*q` _ wy -,y:- . 6z;. ' ..-.iv:.?°" - "' ,ir;:ii"?ayAx.:ti.••::::! •, .r.. r , _. r •r•:•y:•C::!?+•F.r• ?':...•"'? • ,•r, ,.=1rr.-;?y:r... '???+•.?a.'xrxra.??.•_ x f '..r.:ggtiR•s;a.?.,.:,,?•• :•:a:.?;•:-.r?,..?. '' ' ;•,:• ,;; Installation of •.,-;:...; ? .... ?:?• ?z? ?.?._.....z??,? , •:. earthen dam and Srewater'pond o d . tributary to _ Rock Branch (a/k/a East Branch) - ixnpacts'waters of U S. only. 4 • ?:? , ?:;?:. . 2) Installation of -' •.... , - •- .. .:.: •• ....:?.°;.,,,,:: .- -',•;'.'? ,.'.• three-sided box culvert and embankment on Rock Branch for permanent road crossing - impacts waters of U.S. only, 3) Open-cut installation of 10" & 24" inlet/outlet natural gas pipelines across 0.2 acres of Haw River wetlands - temporary wetland impact only. [Note: Pipelines will be installed under the main body of the Haw River and associated wetlands by the construction technique of horizontal directional drill - No permanent or temporary wetland impact.] 14. Wetlands directly adjacent to the Haw River will be avoided by installing the Inlet and Outlet pipelines by horizontal directional drill. A small unnamed tributary and associated wetlands on the south side'of the Haw River will be affected by the installation of the Inlet and Outlet pipelines (0.2 acres). The temporary impact to this wetland could not be avoided. The final design for the horizontal directional drill of the Haw River was dependent upon the local substructure (i.e., hard rock vs. alluvial deposits). In order to avoid hard rock during the directional drill, the drilling equipment must be placed in the upland area located between the unnamed tributary/associated wetland (0.2 ac) and the Haw River/Associated Wetlands - See Site Plan, During the planning stages, an alternative pipeline route was reviewed by the Corps and NCDEHNR Water Quality. It was determined than the plan herein proposed by Pine Needle is superior to the alternate route as it results in the least amount of wetland impact possible. ` During a November 1995 onsite meeting with the Corps of Engineers and the NCDEHNR Water Quality planning, pine Needle agreed to limit its pipeline . construction corridor to 75 feet wide across this open-cut wetland crossing. After construction, in only this area, the permanently maintained right-of-way will be 55 feet wide, the pipelines spaced 25 feet apart with a 15-foot wide strip on the outside of each pipeline. f DEC 03 '96 02:59PM TRANSCO ENERGY CO P.3/3 PROPOSED !C' PIPELINE ROW CROSS-'SECTION c -° NATURAL ?n N?- OlJ f?SPOIL r i 25' 25' 25, ? TEMPORARY F'/:- SPACING C POWER ROW L_iNc -? NEW PERMANENT ROW CONSTRUCTION ROW PROPOSED ?OWERLINE ROW ---------------------------------------------------------------------------------- PROPOSED 24' PIPE?_INE ROW CROSS-SECTION ?4. K-7 L C - - NATURAL GROUND SPOIL .' ? u ray; ? / ' ?:?r? I 1 2t' 25' 25' TEMPORARY °/L SPACING POWFR? ROW 75 CIN, NEW PERMANENT ROW 100' CONSTRUCTION ROW ss' PROPOSED POWERLINE ROW LEGEND I PROPOSED PIPELINE rRQW RIGHT-OF-WAv NC =S: i) PJWER 'OLES ANO -TNES TQ 3c NS-ALLEl FOLLOWING iNS-ALLATION OF 'THE' PIP_-_INES, 2,1 a0T_ ?Hc IC" AND 2P' `PE _NES ARE PRC?OSED -C SEE ?NS"l AL_ED CURING TmE SAMa CON3TP.l__7iDP: 'E?IOO. I PINEa:?,NEE?LE PINE NEEDLE LNG PROJECT PIPELINES TYPICAL RIGHT-OF-WAY CROSS-SECTIONS FOR 24" & !C" PIPELINES FGUR = ?a?e? NOV 01 196 iO:23AM TRANSCO ENERGY CO P.2i3 FIN EEDLE' LNG COMPANY. LLC October 25, 1996 U.S. Army Corps of Engineers Water Quality Planning Raleigh Regulatory Field Office Division of Environmental Management Attention: Mr. John Thomas NC Department of Environment, Health & Natural Resources 6S 12 Falls of Neuse R., Suite 105 P.O. Box 29535 Raleigh, NC 27615 Raleigh, NC 27626-0535 Attention: Mr. John Dorney (Ron Linnville Winston-Salem) RE: , Notification/Application for Joint 404/401 Certification Proposed Pine Needle LNG Project - W.O.6920.01 Guilford County, North Carolina Gentlemen: Pine Needle LNG Company, LLC (Pine Needle), is proposing to cons=et a ligaeFied natural gas (LNG) peak demand facility in Guilford County, North Carolina. The proposed facility will be located near Transcontinental Gas Pipe Line Corporations ('Transco's) natural gas pipeline right-of-way, approximately 13 miles northwest of Greensboro and 1.8 miles southeast of the town center of Stokesdale, This facility will be constructed and operated to liquefy and store natural gas received from Transco's mainline natural gas transmission system for the purpose of meeting the winter peak shaving heating requirements to Pine Needle's subscribers in the rapidly developing North Carolina region. , The project site, including buffer area comprises 829 acres. In addition to the 49.9 acre LNG plant site, several ancillary facilities will be constructed to support the plant - I mile long inlet and outlet pipelines, a 1.7 mile long electric power line, two 24-foot wide a=SS roads, an earthen dam and a firewater pond. Pine Needle appreciates the assistance both agencies provided in addressing environmental concerns and issues durinb the planning stages of this project. As a result of our collaborative effort, we have moved the location of the proposed installation of the earthen dam and firewater pond away from Rock Branch to the unnamed east tributary of Rock Branch (we call it East Branch). As you recall, the purpose of the dam is to create a pond of sufficient capacity to hydrostatically test the LNG tanks during construction of the facility and later to provide an emergency firewater source during the operation of the LNG plant The earthen dam will also serve as a permanent road crossing for Fast Branch. After crossing the dam, the road will continue westward across Rock Branch, then enter the plant facility, At the road crossing of Rock Branch, a three-sided box culvert will be utilized, thereby leaving the rock bottom stream channel relatively unaffected by culvert installation, Although Pine Needle has proposed•to install piping in the dam to provide downstream releases during periods of higher flow when the firewater pond is full, Pine Needle does not propose to maintain a minimum flow in East Branch downstream of the dam. It has been determined that the 7-day, 1-in-10 year low flow for the subject drainage basin is generally a zero value; therefore, there is no minimum release requirement according to the North Carolina Administrative Code, It should be noted that Pine Needle's construction/filling schedule for the dam will permit passage of water to downstream habitats in the April 1 to June 1, 1997 time window. Pine Needle estimates that the impoundment will fill in approximately 290 days; during subsequent years overflow from the pond would provide downstream flow to lower reaches of East Branch. 2800 Posr Oak Boulevard ¦ P.O. Box 1396 ¦ Houston, Texas 77251.1396 r 713439.2000 NOV 01 '96 iO:23AM TRANSCO ENERGY CO P.3/3 Pine Needle does not anticipate the need to divert water from Rock Branch in order to fill the East Branch Impoundment either on initial filling or at a later date. However, we have included a provision for a sump and connecting piping to transfer water between Rock Branch and the East Branch Impoundment as suggested in NCDE M correspondence dated February 9, 1996 (filed with FERC 42/96). , We propose to install a 3' diameter by 5' deep sump in Rock Branch for the purpose of potentially transferring water to the East Branch Impoundment, if necessary and under favorable water quality conditions. Pine Needle does not intend to install a permanent pump or connecting piping at the Rock Branch sump. In the unlikely event that transfer from Rock Branch to the East Branch Impoundment is newmary, a pump and piping would be temporarily installed. In prior conversations, it was requested that pond maintenance be addressed. It has been determined that due to relatively low flows present in East Branch, the sediment load is low; therefore, no dredging of the fire pond is expected during the life of the project. Pine Needle respectfully requests that you review its application for Joint 404/401 Certification. • Enclosed for your review and approval are the following documents: F Joint Form for Nationwide Permits that require Notification to the Corps of Engineers or Section 401 Certification; ? Project Location Map of the Pine Needle Facility, Drawing No. 20-15-50/A-00002, Sheet 1 of 1, Rev. 0; • 8 %" x I I" Plan View of Proposed Firewater Pond; Site Plan - Wetland Delineation (Overall Project), Drawing No. 106, RevA; ? 8 %" x 11" Plan & Profile (Wetland Delineation) for 24" & 10" Lateral Pipeline Crossing the Haw River & Wetlands; Drawing No. 24-11501CE-3718-24, Sheets l to 4 of 4, Rev. 0 and Drawing No.'24-1 150/CE- 3 718- 10, Sheets 1 to 4 of 4, Rev. 0; ? Site Plan, Drawing No. 101, Sheet I, Rev. 0 and Rock Branch Creek Culvert and Embankment, Drawing No. 308, Sheets I to 10, Rev. 0 } Design/Spec Book - Rock Branch Creek Culvert & Embankment (ONLY I copy to COS & 2 copies to NCDEHNR Water Quality, please advise if more required). Construction of the Pine Needle LNG Project requires approximately 27 months from start to finish. The proposed construction start date for the facility is-February 1, 1997. During your review, please do not hesitate to contact me with questions, concerns or comments that you may have. My telephone number is (713) 215-2641. Your reply should be mailed to my attention at the following address: Pine Needle Operating Company, c/o Transcontinental Gas Pipe )vine Corporation, Attention: Loretta Eamest- Level 10, P.O. Box 1396, Houston TX 77251-1396. I'll be in calling you within the next two weeks. Respectfully submitted, Loretta M. Earnest Environmental Scientist Enclosures NOV 01 '96 10:22AM TRANSCO ENERGY CO P.1i3 Z;9l70 s rW M ANWMW ?WW FAX COVER SHEET DELIVER FAX TO, Greg Price FAX PHONE #(919)733-9959 NUMBER OF PAGES FOLLOWING: 2 FAX FROM: Loretta M. Earnest TELEPHONE #: (713) 215-2641 FAX #: (713) 215-4551 DATE: November 1, 1996 TIME: 10:10 am Thank you very much for calling back, I'm truly sorry for the inconvenience this has caused you. The following letter should be attached to the 7 copies of the Joint Form that you received via Fed-Ex. As we discussed, Ron Linville will be providing the 7 sets of drawings that are listed in the following letter. Once again, if it turns out that we need to provide additional copies of any or all of the drawings, please let me know. PIN N EEDLE LNG COMPANY, L L C October 25, 1996 r.NVh?? , 0;,' j ,, ; r9vO U.S. Army Corps of Engineers Raleigh Regulatory Field Office Attention: Mr. John Thomas 6512 Falls of Neuse R., Suite 105 Raleigh, NC 27615 NR O C T 2 9 19% Winston-Salem ?egionai Office -7c) 4-7 L? v'eC 4e v al/o 1// 41"d Water Quality Planning 4- Division of Environmental Management NC Department of Environment, Health & Natural Resources P.O. Box 29535 Raleigh, NC 27626-0535 Attention: Mr. John Dorney (Ron Linnville Winston-Salem) RE: Notification/Application for Joint 404/401 Certification In Proposed Pine Needle LNG Project - W.O. 6920.01 1 Z Guilford County, North Carolina ` ?p . GZ / _Y Gentlemen: ?G Pine Needle LNG Company, LLC (Pine Needle), is proposing to construct a liquefied natural gas (LNG) peak demand facility in Guilford County, North Carolina. The proposed facility will be located near Transcontinental Gas Pipe Line Corporations (Transco's) natural gas pipeline right-of-way, approximately 13 miles northwest of Greensboro and 1.8 miles southeast of the town center of Stokesdale. This facility will be constructed and operated to liquefy and store natural gas received from Transco's mainline natural gas transmission system for the purpose of meeting the winter peak shaving heating requirements to Pine Needle's subscribers in the rapidly developing North Carolina region. The project site, including buffer area comprises 829 acres. In addition to the 49.9 acre LNG plant site, several ancillary facilities will be constructed to support the plant -- 1 mile long inlet and outlet pipelines, a 1.7 mile long electric power line, two 24-foot wide access roads, an earthen dam and a firewater pond. Pine Needle appreciates the assistance both agencies provided in addressing environmental concerns and issues during the planning stages of this project. As a result of our collaborative efforts, we have moved the location of the proposed installation of the earthen dam and firewater pond away from Rock Branch to the unnamed east tributary of Rock Branch (we call it East Branch). As you recall, the purpose of the dam is to create a pond of sufficient capacity to hydrostatically test the LNG tanks during construction of the facility and later to provide an emergency firewater source during the operation of the LNG plant. The earthen dam will also serve as a permanent road crossing for East Branch. After crossing the dam, the road will continue westward across Rock Branch, then enter the plant facility. At the road crossing of Rock Branch, a three-sided box culvert will be utilized, thereby leaving the rock bottom stream channel relatively unaffected by culvert installation. Although Pine Needle has proposed to install piping in the dam to provide downstream releases during periods of higher flow when the firewater pond is full, Pine Needle does not propose to maintain a minimum flow in East Branch downstream of the dam. It has been determined that the 7-day, I-in-10 year low flow for the subject drainage basin is generally a zero value; therefore, there is no minimum release requirement according to the North Carolina Administrative Code. It should be noted that Pine Needle's construction/filling schedule for the dam will permit passage of water to downstream habitats in the April 1 to June 1, 1997 time window. Pine Needle estimates that the impoundment will fill in approximately 290 days; during subsequent years overflow from the pond would provide downstream flow to lower reaches of East Branch. 2800 Post Oak Boulevard ¦ P.O. Box 1396 ¦ Houston, Texas 77251-1396 ¦ 713-439-2000 Pine Needle does not anticipate the need to divert water from Rock Branch in order to fill the East Branch Impoundment either on initial filling or at a later date. However, we have included a provision for a sump and connecting piping to transfer water between Rock Branch and the East Branch Impoundment as suggested in NCDEHNR correspondence dated February 9, 1996 (filed with FERC 4/2/96).. We propose to install a 3' diameter by 5' deep sump in Rock Branch for the purpose of potentially transferring water to the East Branch Impoundment, if necessary and under favorable water quality conditions. Pine Needle does not intend to install a permanent pump or connecting piping at the Rock Branch sump. In the unlikely event that transfer from Rock Branch to the East Branch Impoundment is necessary, a pump and piping would be temporarily installed. In prior conversations, it was requested that pond maintenance be addressed. It has been determined that due to relatively low flows present in East Branch, the sediment load is low; therefore, no dredging of the fire pond is expected during the life of the project. Pine Needle respectfully requests that you review its application for Joint 404/401 Certification. Enclosed for your review and approval are the following documents: ? Joint Form for Nationwide Permits that require Notification to the Corps of Engineers or Section 401 Certification; ? Project Location Map of the Pine Needle Facility, Drawing No. 20-15-50/A-00002, Sheet 1 of 1, Rev. 0; ? 8 '/2" x 11 " Plan View of Proposed Firewater Pond; ? Site Plan - Wetland Delineation (Overall Project), Drawing No. 106, Rev. 0; ? 8 '/2" x 1 I " Plan & Profile (Wetland Delineation) for 24" & 10" Lateral Pipeline Crossing the Haw River & Wetlands; Drawing No. 24-1150/CE-3718-24, Sheets 1 to 4 of 4, Rev. 0 and Drawing No. 24-1150/CE- 3718-10, Sheets 1 to 4 of 4, Rev. 0; ? Site Plan, Drawing No. 101, Sheet 1, Rev. 0 and Rock Branch Creek Culvert and Embankment, Drawing No. 308, Sheets 1 to 10, Rev. 0 ? Design/Spec Book - Rock Branch Creek Culvert & Embankment (ONLY 1 copy to COE & 2 copies to NCDEHNR Water Quality, please advise if more required). Construction of the Pine Needle LNG Project requires approximately 27 months from start to finish. The proposed construction start date for the facility is February 1, 1997. During your review, please do not hesitate to contact me with questions, concerns or comments that you may have. My telephone number is (713) 215-2641. Your reply should be mailed to my attention at the following address: Pine Needle Operating Company, c/o Transcontinental Gas Pipe Line Corporation, Attention: Loretta Earnest- Level 10, P.O. Box 1396, Houston TX 77251-1396. I'll be in calling you within the next two weeks. Respectfully submitted, Loretta M. Earnest Environmental Scientist Enclosures DEM ID: ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit #): 12, 14 & ' 26 JOINT FORM FOR Nationwide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification WMIZ NGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ATTN: CESAW-CO-E Telephone (919) 251-4511 Telephone (919)733-5085 17 g 6 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES P.O. Box 29535 Raleigh, NC 27626-0535 ATTN: MR- JOHN DORNEY ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT. PLEASE PRINT. 1. Owners Name: Pine Needle LNG Company, LLC 2. Owners Address: P.O. Box 33068, Charlotte NC 28233 3. Owners Phone Number (Home): - (Work): 713/214-2539 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Regis red Agent - Martin C- RuPgACgger P.O. Box 33068, Charlotte NC 28233 704/364-3120 ' 5. Location of work (MUST ATTACH MAP). County. Guilford Nearest Town or City: Approximately 13 miles northwest of Greensboro, southeast of Stokesdale Specific Location (Include road numbers, landmarks, etc.):L.ocafed between S.R. 68 and S.R. 2019 Evers field Rd) approximately 1.8 miles southeast of the Stokesdale town center and approx. 1.0 mile north of Transco's existing pipeline right-of-way. 6. Name of Closest Stream/River.. Rock Branch and Haw River 7. River Basin: Haw River 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WS I, or WS II? YES [ ] NO [K ] 9. Have any Section 404 permits been previously requested for use on this property? YES [ ] NO V] If yes, explain. 10. Estimated total number of acres of waters of the U.S., including wetlands, located on project site: Reference attached drawines 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: East Branch = 0.10 ac Rock Branch = 0.13 ac Drained: 0 Flooded: East Branch = 0.48 ac (Total area of proposed firepond = 4.8 ac Excavated: 0.2 ac (Temporary impact - pipeline installation) TotalImoacted: 0.91 ac (0.2 ac wetlands, 0.71 waters of the U.S. ) 12. Description of proposed work (Attach PLANS-8 12" X 11" drawings only): See attached sheet 13. Purpose of proposed work: Proposed Pine Needle LNG Plant and ancillary facilities 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. See attached sheet 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) regarding the presence or any Federally listed or proposed for listing endangered or threatened species or critical habitat in the-permit area that may be affected by the proposed project Have you done so? YES Zx] NO [ ] RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS.-See attachment 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES [X ] NO [ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS.- See attachment 17. Additional information required by DEM: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. B. If available, representative photograph of wetlands to be impacted by project C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. (Previously provided) D. If a stormwater management plan is required for this project, attach copy. E. What is land use of surrounding property? Agricultural F. If applicable, what is proposed method of sewage disposal? On-site septic system Pine Needle LNG.Company by its Agent PIN,,NEEDLE OPERA NG CO ANY to Ls"?9k Owner's Signature 5 M Date Nick A.acilb Vice President ATTACHMENT Joint Application for 401/404 Certification Form 12. 1) Installation of earthen dam and firewater pond on unnamed tributary to Rock Branch (a/k/a East Branch) - impacts waters of U.S. only. 2) Installation of three-sided box culvert and embankment on Rock Branch for permanent road crossing - impacts waters of U.S. only. 3) Open-cut installation of 10" & 24" inlet/outlet natural gas pipelines across 0.2 acres of Haw River wetlands - temporary wetland impact only. [Note: Pipelines will be installed under the main body of the Haw River and associated wetlands by the construction technique of horizontal directional drill - No permanent or temporary wetland impact.] 14. Wetlands directly adjacent to the Haw River will be avoided by installing the Inlet and Outlet pipelines by horizontal directional drill. A small unnamed tributary and associated wetlands on the south side of the Haw River will be affected by the installation of the Inlet and Outlet pipelines (0.2 acres). The temporary impact to this wetland could not be avoided. The final design for the horizontal directional drill of the Haw River was dependent upon the local substructure (i.e., hard rock vs. alluvial deposits). In order to avoid hard rock during the directional drill, the drilling equipment must be placed in the upland area located between the unnamed tributary/associated wetland (0.2 ac) and the Haw River/Associated Wetlands - See Site Plan. During the planning stages, an alternative pipeline route was reviewed by the Corps and NCDEHNR Water Quality. It was determined that the plan herein proposed by Pine Needle is superior to the alternate route as it results in the least amount of wetland impact possible. During a November 1995 onsite meeting with the Corps of Engineers and the NCDEHNR Water Quality Planning, Pine Needle agreed to limit its pipeline construction corridor to 75 feet wide across this open-cut wetland crossing. After construction, in only this area, the permanently maintained right-of-way will be 55 feet wide, the pipelines spaced 25 feet apart with a 15-foot wide strip on the outside of each pipeline. United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636.3726 October 31, 1995 Ms. Loretta M. Earnest Senior Environmental Scientist Pine Needle LNG Company, LLC 2800 Post Oak Boulevard P.O. Box 1396 Houston, Texas 77251-1396 Dear Ms. Earnest: The U.S. Fish and Wildlife Service (Service) has reviewed your October 17, 1995, letter for construction of a liquefied natural gas peak demand facility in Guilford County, North Carolina. Our comments are provided in accordance with Section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Based on the information provided in your letter, the Service concurs that this project is not likely to adversely affect any Federally-listed endangered and threatened species, their formally designated critical habitat, or species currently proposed for Federal listing under the Endangered Species Act, as amended. We believe that the requirements of Section 7 of the Act have been satisfied. We remind you that obligations under Section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; (3) a new species is listed or critical habitat determined that may be affected by the identified action. Thank you for your cooperation with our agency. Sincerely, Tom Augspurger Acting Supervisor FWS/R4:JEllis:JE:10-25-95:919-856-4520 ext. 26:B:\pineneed ' 010 AV) A North Carolina Department of Cultural Resources James B. Hunt Jr., Governor Betty Ray McCain, Secretary June 26, 1996 James D. Bloemker, Archaeologist Transco P.O. Box 1396 Houston, Texas 77251-1396 Re: Archaeological survey report, Pine Needle LNG Plant, Guilford County, ER 96-7005, ER 96- 7616 Dear Mr. Bloemker: Division of Archives and History Jeffrey J. Crow, Director Thank you for your letter of May 28, 1996, transmitting the archaeological survey report by Lawrence Abbott and Kenneth Styer of New South Associates concerning the above project. For purposes of compliance with Section 106 of the National Historic Preservation Act, we concur that the following properties are not eligible for the National Register of Historic Places under Criterion D: 31 GF341 * *-31 GF345 * *, 31 GF355-357, 31 GF359-31 GF361 &361 * *, 31 GF362-31 GF366&366 * *, 31 GF367 * *, and 31 GF368-31 GF371 None of these sites retain sufficient integrity to yield information important in prehistory or history. Prehistoric archaeological site 31 GF358 may be eligible for the National Register, but testing is necessary for such a determination. Since the site is located outside your project area and will not be ?ffected, %,-.1e do not recoMmen- testing at this time. The two cemeteries (31 GF343* * and 31 GF344*) will be protected during construction by a temporary fence and will not be affected. In general the report meets our guidelines and those of the Secretary of the Interior and no further archaeological investigations are recommended. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. 930.-. t?3 m ry ? ub,CP ? R JUL ? 0 ftqQQ ti- c4 109 East Jones Street • Raleigh, North Carolina 27601-2807 ?V James D. Bloemker June 26, 1996, Page 2 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733-4763. Sir rely, David rook Deputy State Historic Preservation Officer DB:slw cc: FERC, Washington, D.C. L. Abbott, New South Associates, Mebane ` PROPOSED FIRE WATER POND TOTAL FIRE POND AREA: 4.8 ACRES AUTHORIZED UNDER NWP No.26 - 0 rr f a r ? / I a JURISDICTIONAL AREA : 0.1 ACRES / r CULVERT, EMBANKMENT AND DAM r AUTHORIZED UNDER NWP No.14 PROPOSED FIRE WATER POND r PROPOSED (SEE NOTE 1) DAM H \ r f . / UNNAMED TRIBUTARY TO R CEEKBRANCH fZ / r /ROCK BRANCH r CREEK f SUPPLEMENTAL WATER SUPPLY PUMP WELL. 3' DIA. X 5'-0 DEEP NOTES: ( SEE NOTE 2 ) 1. POND MAINTENANCE DUE TO RELATIVELY LOW FLOWS PRESENT IN EAST BRANCH THE SEDIMENT LOAD IS LOW, THEREFORE,Nb DREDGING OF THE FIRE POND IS EXPECTED DURING THE LIFE OF THE PROJECT 2.WATER SUPPLY WELL MAINTENANCE WELL WILL BE OESILTEO PRIOR TO EACH USE. AS NECESSARY PLAN VIEW L hy?? , r f J PURPOSE:PROVIOE FIRE WATER 400' 0 400' IN:EAST TRIBUTARY TO ROCK FOR THE PINE NEEDLE BRANCH CREEK LNG FACILITY AT!STOKESOALE ADJACENT PROPERTY OWNERS: SEE SCALE IN FEET DRAWING 101 SH.5 COUNTY OF: GUILFORD STATE: N,C. CHICAGO BRIDGE & IRON CO. 1501 N.DIVISION ST. SHEET 1 OF 1 DATE: 12 AUG 96 PLAINFIELO,IL. 60544 DEM ID: 6 1 0 3t ACTION ID: Nationwide Permit Requested (Provide Nationwide Permit #): 12, 14 6 26 JOINT FORM FOR Nationwide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification W LMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 A71N: CESAW-CO-E Telephone (919) 251-4511 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGE TENT NC DEPARTMENT OF EN MONMENT, HEALTH, AND NATURAL RESOURCES P.O. Box 29535 Raleigh, NC 27626-0535 ATTN: MR JOHN DORNEY Telephone (919) 733.5983 17 8 6 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DMSION OF ENVIRONMENTAL MANAGEMENri PLEASE PRINT. 1. Owners Name: Pine Needle LNG Companv, LLC 2. Owners Address: P.O. Box 33068, Charlotte NC 28233 3. Owners Phone Number (Home): - (Work): 713/214-2539 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Reuister . Agent - Martin C RvPgsPgger P.O. Box 33068, Charlotte NC 28233 704/364-3120 ' 5. Location of work (MUST ATTACH NIAP). County: Guilford Nearest Town or CitS': Approximately 13 miles northwest of Greensboro, southeast of Stokesdale Specific Location (Include road numbers, landmark, etc.):IaratP, (I hetween S.R. 68 and S . R. 2019 (EverE field Rd) approximately 1.8 miles southeast of the Stokesdale town center and approx. 1.0 mile north of Transco's existing pipeline right-of-way. 6. Name of Closest Stream/Riven Rock Branch and Haw River %. River Basin: Haw River 8. Is this project located in a watershed classified as Trout, SA, HQW, ORIN, VG'S 1, or R'S II? YES [ ] NO Vi 9. Have an), Section 404 permits been previously requested for use on this properr? YES [ ] NO V] If yes, explain. 10. Estimated total number of acres of waters of the U.S., including wetlands, located on project site: Reference attached drawings 11. Number of acres of waters of the U.S., including wetlands, impacted by the proposed project: Filled: East Branch = 0.10 ac Rock Branch = 0.13 ac Drained: Flooded:_ East Branch = 0.48 ac (Total area of proposed firepond = 4.8 a Rock Branch - 7sq ft pit Excavated: 0.2 ac (Temporarv impact - pipeline installation) Total Imoacted: 0.91 ac (0.2 ac wetlands, 0.71 waters cf the U. S. ) - 12 Description of proposed work (Attach PLANS-8 112" X 11" drawings only): See attached sheet 13. Purpose of proposed woric Proposed Pine Needle LNG Plant and ancillary facilities 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. See attached sheet 15. You are required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) regarding the presence or any Federally listed orproposed for listing endangered or threatened species or critical habitat in the-permit area that may be affected by the proposed project Have you done so? YES $X] NO [ ] RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS:-See attachment 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which maybe affected by the proposed project? Have you done so? YES [X" ] NO[ ] RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS: See attachment 17. Additional information required by DEM: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. B. If available, representative photograph of wetlands to be impacted by projecL C. If delineation was performed by a consultant, include all data sheets relevant to the placement of the delineation line. (Previously provided) D. If a stormwater management plan is required for this project, attach copy. E. What island use of surrounding property? __Agricultural F. If applicable, what is proposed method of sewage disposal? On-site septic system Pine Needle LNG.Company by its Agent PINE• NEEDLE OPERA NG ,CO ANY Owner's Signature 5 Date Nick A. tacil& Vice President ATTACHMENT Joint Application for 401/404 Certification Form 12. 1) Installation of earthen dam and firewater pond on unnamed tributary to Rock Branch (a/k/a East Branch) - impacts waters of U.S. only. 2) Installation of three-sided box culvert and embankment on Rock Branch for permanent road crossing - impacts waters of U.S. only. 3) Open-cut installation of 10" & 24" inlet/outlet natural gas pipelines across 0.2 acres of Haw River wetlands - temporary wetland impact only. [Note: Pipelines will be installed under the main body of the Haw River and associated wetlands by the construction technique of horizontal directional drill - No permanent or temporary wetland impact.] 14. Wetlands directly adjacent to the Haw River will be avoided by installing the Inlet and Outlet pipelines by horizontal directional drill. A small unnamed tributary and associated wetlands on the south side of the Haw River will be affected by the installation of the Inlet and Outlet pipelines (0.2 acres). The temporary impact to this wetland could not be avoided. The final design for the horizontal directional drill of the Haw River was dependent upon the local substructure (i.e., hard rock vs. alluvial deposits). In order to avoid hard rock during the directional drill, the drilling equipment must be placed in the upland area located between the unnamed tributary/associated wetland (0.2 ac) and the Haw River/Associated Wetlands - See Site Plan. During the planning stages, an alternative pipeline route was reviewed by the Corps and NCDEHNR Water Quality. It was determined that the plan herein proposed by Pine Needle is superior to the alternate route as it results in the least amount of wetland impact possible. During a November 1995 onsite meeting with the Corps of Engineers and the NCDEHNR Water Quality Planning, Pine Needle agreed to limit its pipeline construction corridor to 75 feet wide across this open-cut wetland crossing. After construction, in only this area, the permanently maintained right-of-way will be 55 feet wide, the pipelines spaced 25 feet apart with a 15-foot wide strip on the outside of each pipeline. United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 October 31, 1995 Ms. Loretta M. Earnest Senior Environmental Scientist Pine Needle LNG Company, LLC 2800 Post Oak Boulevard P.O. Box 1396 Houston, Texas 77251-1396 Dear Ms. Earnest: The U.S. Fish and Wildlife Service (Service) has reviewed your October 17, 1995, letter for construction of a liquefied natural gas peak demand facility in Guilford County, North Carolina. Our comments are provided in accordance with Section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Based on the information provided in your letter, the Service concurs that this project is not likely to adversely affect any Federally-listed endangered and threatened species, their formally designated critical habitat, or species currently proposed for Federal listing under the Endangered Species Act, as amended. We believe that the requirements of Section 7 of the Act have been satisfied. We remind you that obligations under Section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; (3) a new species is listed or critical habitat determined that may be affected by the identified action. Thank you for your cooperation with our agency. Sincerely, '' i `i Tom Augspurger Acting Supervisor 3to a WJ FWS/R4:JEllis:JE:10-25-95:919-856-4520 ext. 26:B:\pineneed ,? a 0to t North Carolina Department of Cultural Resources James B. Hunt Jr., Governor Betty Ray McCain, Secretary June 26, 1996 James D. Bloemker, Archaeologist Transco P.O. Box 1396 Houston, Texas 77251-1396 Re: Archaeological survey report, Pine Needle LNG Plant, Guilford County, ER 96-7005, ER 96- 7616 Dear Mr. Bloemker: Division of Archives and History Jeffrey J. Crow, Director Thank you for your letter of May 28, 1996, transmitting the archaeological survey report by Lawrence Abbott and Kenneth Styer of New South Associates concerning the above project. For purposes of compliance with Section 106 of the National Historic Preservation Act, we concur that the following properties are not eligible for the National Register of Historic Places under Criterion D: 31 GF341 * *-31 GF345 * *, 31 GF355-357, 31 GF359-31 GF361 &361 * *, 31 GF362-31 GF366&366 * *, 31 GF367 * *, and 31 GF368-31 GF371 None of these sites retain sufficient integrity to yield information important in prehistory or history. Prehistoric archaeological site 31 GF358 may be eligible for the National Register, but testing is necessary for such a determination. Since the site is located outside your area and will not Fi e offectod%e? .. e do not + cn ?. + , :estirg at this time. The two cemeteries (31 GF343* * and 31 GF344*) will be protected during construction by a temporary fence and will not be affected. In general the report meets our guidelines and those of the Secretary of the Interior and no further archaeological investigations are recommended. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. 109 East Jones Street • Raleigh, North Carolina 27601-2807 e93D31 6' JUL le of v L 61 RL James D. Bloemker June 26, 1996, Page 2 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733-4763. Sirac@rely, Z David rook Deputy State Historic Preservation Officer DB:slw cc: FERC, Washington, D.C. L. Abbott, New South Associates, Mebane GUILFORD COUNTY. NORTH CAROLINA 1E ? f 51 ?.? f ?_. ?`' ; ??,,? ??' ? t. it( 'Y? i?? ??.?., ?/ ifJ `' I ?•S Q u f'r q,. I !? I ?? 1rr ! i \•? r i gam, ! 1 Y 'Z so .-ti f PROPOSED- PINE NEEDLE LNG PLANT ?1 - M.P. 1.047 _ ! ` ^ rr,".rt,,,..- ''' ?• 1/ Ir It y 1 F 4 " ?r y! ('??a?? 1 ? 1 ? '. _ ?r? f ?? _ : fbOff ?Gt(ISr ?ft[YL •""» T y j( ?, , _ P11P ? ( • i. [' ty..-,r? ? r ?. C 1 ,1 to ? t? ;;! i ,p r? ??,C?•- '??; ??.G, .r ?- ` ??'! ??,r?,i ?, ?b?? tr i.. at: rt 1'? I•?Y#: `fj>f,.-T..i _ ?!^"5"` ?? - NrY!"11 ' -?'5?... ',,f 5•'1 . ?I It t't ? `n ? R.i1'.? M1???. ? } 7,( ? ?/ I ? fi .F'.. ? ? J , .!, ! tL1 + - ,i { i `. ?. X1111. .? /?,-. ?. , 1 `'S`?+1 kii )'•,? l?1yt rr((• Q.r J' ?. ? t'4.F.; ? ` ? I??y = 1 r•" ,f? ? , ??t`?`..?`L.f, /~? ?`-? ' r}(, ?,( ,?• ? ??? 'rrr'???? (y ; ? r t ?? I ?y -:' s? -`1'il •,? f,w r ??' '?v??1?`'r? ` ? l? rtrl ?' -h ')?? ???)- r,ryl7. y. c ! ? ?.. I' ~ • t ,?. 4? tJ Ref...no. D-in Dr . No. OT PINE NEEDLE NOTE: LNO COMPANY. LLC BASE FROM SUMMERFIELD, NORTH CAROLINA. 7.5 MIN. QUADRANGLE MAP, DATED 1969 PROJECT LOCATION MAP 0 REVISED 1994. PINE NEEDLE FACILITIES 2000 O 2000 GUILFORD COUNTY, NORTH CAROLINA D-n a D.A.S. Det. 8/13/96 ov. Oots SCALE IN FEET Ch.ok.d I!i " Det.6IM61 O $ o-ef Det.5 - ?O roved D En tn. 6 ' '? W.O. No. 6920.02 so.l. ShI DWG. - - &n-t i of 1 NO. n= n nn r nnr nn-=l NOTES TO CONTRACTOR: SCALE IN L THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL UNDER- DRAW FACILITIES NOW EXISTING BUT DOES NOT GUARANTEE THE ACCURACY OF THE INFORMATION SHOWN ON THIS MAP NOR DOES IT ACCEPT ANY RESPONSIBILITY FOR ERRORS IN LOCATION OR FOR FAILURE TO INDICATE ANY SUCH FACILITIES. 2. A MIND" CLEARANCE OF 12 INCHES BETWEEN THE PROPOSED PIPELINE AND ANY EXISTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 4. ELEVATIONS SHOWN ARE REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1988. INAYD m 5. BERINGS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM. HAD 19°3. 6. STATIONS SHOWN ARE BASED ON THE 24• LDE STATIONS. 7. FOR PIPE SPECIFICATIONS. REF. DWG. AND LEGEND. SEE SHEET 4 OF 4. Ref- D-ir g D.Q. No. PINENO? NEEDLE PINE NEEDLE 24' LATERAL CROSSING THE HAW RIVER & WETLANDS GUILFORD COUNTY. NORTH CAROLINA D,e- B .A Dote 8-14-96 Reviorod B ?L7 Date 911219( 14 6 ?w4f 4 z t 2 Den ... Deb Pro t E to , Dab / _u r GUILFORD CO TY NORTH CAR AL AL ABE BRENNER,•t el ? AL ELLEN I. DEES A Ak 5 Af- WETLANDS L.L. N0. AL ? M 4 I rH +1 1L L PROPOSED AL STA. 37 +18 (L HAW RIVER ' !o c r. A TGPL R/W X= 1716118 8 74 Y= 897102.0309 ch t fl/ AL U) N ' N N w 19L L ? N 40°25'05' W PROPOSED 10" PIPELINE N- 1 w FLOW PROPOSED 24' PIPELINE N N 1 AL 4L 4111 PROPOSED DUKE POWER CO. w AL , 1 i - P-P P P P AND TGPL R/W M z P P-P P PAP P -? PROPOSED DUKE POWER o COMPANY POWER LINE J u < • PROPOSED DUKE POWER < A A AL AL - COMPANY R/W illy • WETLANDS v •• WETLAND • DIRECTIONAL DRILL 1 PLAN UNDER WETLANDS + • BOUNDARY • , ., cn 100' NDER D U 0 100' AUT NORIIZE 2 O WETLAND IMPACT j 1 SCALE IN FEET 1 STA, 1 37+18 ?- HAW RIVEE? 1 O ............. ... . . ................. ... ................................. 8001 ............ ..... . . . . ...... .............. ..... ...... ....... ...... O .... . . ........................... ........ .................. ................................. ................. . . .. .. . NATURAL GROUND ...................................................................................................................................................... 7 ........................ ... .. . . ......................................................... ' 775 5 ............................................................................ .............. . ........ ...................................... ?ti)IIf .......... . ........ . 51 .. . . . ?- ............ . .. ... .................................................................................................................................... ................. 750 ... PRP 4Y ......... .... IPELME ..................... ................ ..._...._ ............................................. ........ 2 d _ ........................................................?R,3?p.c?a............................._ ......... ........ _........ ... i ......... .... _ ................................................... 725 0 '...2400 .................................... - - - - ,-. ............................................................................................................................................. v -- .-..- -..- ..-. --..,-...--.. O ......................................... DE . . NSE ... ROCK ...BEL.O.w ................... ............................................................................................................................... ....................... PROFILE TBM: CONCRETE MON. 100' 35.01' RT. M/L "A' 0 100' M/L "A" STA. 5824+41 ; in ELEV. 885.35 NOTES TO CONTRACTOR: SCALE IN FE T Ref- Drertng a No. T L THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL UNDER- EXISTING BUT FACILITIES NOW ° ? `S O E ° C3 E E 0. L E m P I N E ORMATION SHOWN O OR DOE S Ac c INF IT URACY THIS MAP N o ? ACCEPT ANY RESPONSIBILITY FOR ERRORS IN LOCATION OR FOR FAILURE TO INDICATE ANY SUCH FACILITIES. Z A MINIMUM CLEARANCE OF 12 INCHES BETWEEN THE PROPOSED PINE NEEDLE 24' LATERAL PIPELINE AND ANY EXISTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL UNDERGROUND UTILITIES PRIOR CROSSING THE HAW RIVER & WETLANDS TO BEGINNING T UC GUILFORD COUNTY. NORTH CAROLINA OWN ARE REFERENCED TO THE NATIONAL GEODETIC 4. ELEVATIONS SHOWN A VERTICAL DATUM OF 1SS& dAVD 68) 5. BRINGS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE 0roa- 8 A.S. Dete 8-14-96S FD,, /Z/ COODINATE STSTEMNAO 1983. STATIONS SHOWN ARE BASED ON THE 24' LINE STATIONS . e. Deb 7. FOR PIPE SPECIFICATIONS. REF. DWG. AND LEGEND. SEE SHEET 4 OF 4. N.O. No. IS-1. 4 -1150 'c ? o.. w?? 5-t ,f4 Dr No. CE-3718-24 II GUILF RD COUNTY, NORTH CAROLINA DISTURBED A2EA ' LIMIT PROP SED PINE EDLE DIRECTIONAL DR LL ' 1 r ` LNG PLA ILL UNDER WETLANDS I l ? AUTHORIZED UNDER I r NWP 12. NO WETLAND IMPACT ;' 1 r I r ' G 1 p O . i, i rl I I( i r? r N -f TGPLREW ~ N AL in I w N N 40°25'05" W PRO OSEO 10" PiP'EL••I " N N A' OW ; PR OSED 24 PIP L14 1 f.:: :: ;).':(+::i+:`:r;;rr;.::.'.'..??.;'.':...''2j?'!'"'`rrii: r;:: rriii:rr.•7•.? ;???i:'!:'lij'??'::;+::°i.'::'>:i>°;+r:'i;?:."?;?ir;?a?°i??• ii;iii;i;r ':,; ... .... 04 w AL ti -?PR POSED DUKE P WER u C MPANY POWER INE ABE BRENNER et eI PROPOSED DUKE POWER / o COMPANY R W m$ • WETLAND BOUNDARY + 1 Alt. I PLAN SILT FENCE FOR PLANT 1 50' WETLAND CONSTRUCTION. TO BE BUFFER ZONE 100' 0 100' REMOVED AS NEEDED I DIRECTIONAL DRILL SCALE IN FEET 1 ENTRY POINT STA. 44+79 10° FROM HORIZ. 10 ....... ........................ .........................................:................................. ........... ............ ..... ....... ... ........................................................................ NATURAL.. GROUND .....................'. MIN,..... ...................... ...... 800 .............................................. P5 ......................................................................................................................... ............................................................................. 77 .......................................................................................................... i0 ............................... ......................................... " ?:? .. ................................................. PROPOSED 24 ........................................................................................................... 750 `_..'423:or ......................................... ........... ?9.4................................................................... PIPELINE........... . . ................................................................... !5.........R= 200' ..................................... ..... ........ ....................... ................................... .................... ............. ..............................-err--W -......................... 725 ......... a.. i0°........ ..................................................................................... ..........................................................................................FLOW............................. . 1O .............................................................................................. W ENSE ROCK BELO ........................................................................................................................................................................... 700 .........i........._ J,..D...... .......................................... PROFILE TBM: CONCRETE MON. 100' 0 100' 35.01' RT. M/L "A" M/L "A" STA. 5824+41 ELEV. 885.35 q -Mmommol NOTES TO CONTRACTOR: SCALE IN FEET Rerenenoe D-i i. THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL UNDER- dT AROUND FACILITIES N EXIST ND DOES NOT GUARANTEE THE PINE O O N E E D LEA ACCURACY OF THE INFORMATION TIO ION SHOW OWN ON THIS MAP NOR ODES IT ACCEPT ANY RESPONSIBILITY FOR ERRORS IN LOCATION OR FOR Pm oft V-.4 -r FAILURE TO INDICATE ANY SUCH FACILITIES. 2. A MINIMIM CLEARANCE OF I2 INCHES BETWEEN THE PROPOSED PINE NEEDLE 24' LATERAL PIPELINE AND ANY EXESTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL urDERGRAIIND Ui[LITIES PRIOR > CROSSING THE HAW RIVER & WETLANDS TO BEOIWIMO CONSTRUCTION. GUILFORD COUNTY, NORTH CAROLINA 4. ELEVATIONS ONS SHOWN ARE REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1SSL OHAVD W 5. BEHINDS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE D-ern Elo .A. Dote 8-114-96 Bu ;60 Deb 9 !/2/9 COORDINATE SYSTEM, NAD 1983 & STATIONS SHOWN ARE BASED ON THE 24-LINE STATIONS. • pen fne•r Ddb b Pro E tnw Deb 7. FOR PIPE SPECIFICATIONS, REF. DWG. AID LEGEND, SEE SHEET 4 OF 4. ° v.0. No Soal. r °- & 24-1150 Sh.et eF p.a. ?. 7--1-E- f - 44 , .1 lzdl GUILFORD COUNTY. NORTH CAROLINA - ,90 LEGEND ELEVATIONS DISTURBED AREA LIMIT PROPOSED SILT FENCE DIVERSION TRENCH PIPE SPECIFICATIONS 1 P P- WETLANDS ROCK FILTER OUTLET WETLAND BOUNDARY BUFFER ZONE BOUNDARY TRENCH PLUG PERMANENT RIGHT-OF-WAY OVERHEAD POWER LINE TEMPORARY WORK SPACE 24' O.D. x 0.562' W.T. WT. PER FT. 140.810 MATERIAL: API-5L-X42 STEEL PIPE TYPE JOINT: WELDED METHOD OF INSTALLING: DIRECTIONAL DRILL L.L. No. 4 & 5 LINE 7-106 LOCATION MAP 20-15-50/A-00002! ALIGNMENT SHT. 24-1150/E-000-A SHT. 2 & 3 Refererwe Dr-tng org. No. PINENO? NEEDLE PINE NEEDLE 24' LATERAL CROSSING THE HAW RIVER & WETLANDS GUILFORD COUNTY. NORTH CAROLINA Dra- A De. 8-14-96 Rertered B . 9 9 ,e, Dept E tnwr D is Pro o sneer Date a ._ _ 7d-i1 f1 of 4 1 D- No. c?v N 40°25 0 ,14 N _T FLOW ?TPROPOSED DUKE POWER COMPANY POWER LINE PROPOSED DUKE POWER J COMPANY R/W ELLEN I. DEES L.L. N0. 4 8° FROM HORIZ. 17251........... PROPOSED 10" 4L 4L WETLAND BOUNDARY AL DIRECTIONAL DRILL UNDER WETLANDS AUTHORIZED UNDER NWP 12. NO WETLAND r.. N ' IMPACT PROPOSED 1 _ _ _ _ • TGPL R/W :- I?IL I N PIPS NE `. 24' PIPELINE ••• i N (wn I PROFILE TBM: CONCRETE MON. 35.01' RT. M/L 'A" 100' 0 100' M/L 'A' STA. 5824+41 ELEV. 885.35 SCALE TN FFFT Reference D-img 0."'% No. NOTES TO CONTRACTOR: L THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL UNDER- GROUND FACILITIES NOW EXISTING BUT DOES NOT GUARANTEE THE ACCURACY OF THE INFORMATION SHOWN ON THIS MAP NOR DOES IT ACCEPT ANY FIESPONSMILITY FOR ERRORS IN LOCATION OR FOR FAILURE TO INDICATE ANY SUCH FACILITIES. 2. A MIND" CLEARANCE OF 12 INCHES BETWEEN THE PROPOSED PIPELINE AND ANY EXISTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 4. ELEVATIONS SHOWN ARE REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1988.RNAVD 88) 5. BERINGS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM,NAD 1983. & STATIONS SHOWN ARE BASED ON THE 24' LIE STATIONS. 7. FOR PIPE SPECIFICATIONS, REF. DWG. AND LEGEND. SEE SHEET 4 OF 4. PINE?? EEDLE ? o N PINE NEEDLE 10' LATERAL c CROSSING THE HAW RIVER & WETLANDS GUILFORD COUNTY. NORTH CAROLINA Deft Weer Dete IPso Englnser Deu ro 7A - I I r%n GUILFORD CO UNT Y NORTH CAR jv--. AL A(- NYC 3L ABE BRENNER" et at ? AL I ELLEN I. DEES AL L.L. N0. 5 4 ? WETLANDS 1 L.L. NO. ? AL 4 I? 7 P o ?I?Ic PROPOSED ROPOSED STA. 3 +12 C HAW RIVER ? w GPL - T ? R/W X= 1716096.1661 10 Y= 897089 9510 - . m X AL N I F- Iw A?- N 40°25'05" W A- AL PROPOSED 10' PIPELINE Af- N 4-L 1 w N -T'- FLOW PROPOSED 24' PIPELINE In I N w b. AL Al//] PROPOSED DUKE POWER CO. 'v w - J -p -p P P P AND TGPL R/W ch I w P --p P P P -P P P-I Z PROPOSED DUKE POWER ' = v I COMPANY POWER LINE cr> x H' • • U ? ? ? AL AL ? AL ROPCOMPANYKR/WOWS • WETLANDS - 1 + •• WETLAND r N BO DIRECTIONAL DRILL 1 00 PLAN DARY U cl) 1. UNDER WETLANDS +? 100' 0 100' AUTHORIZED UNDER I 1 NWP 12. NO I WETLAND IMPACT 1 SCALE IN FEET 1 STA, I 37+12 E HAW RIVE I O ................................................................................................. .............. ............................................................................................. .......................................................... 800 7 ... ? iiTUl?iit:...Get'dURCf ................................................... . ............. ......................................................................................................................................................... . ........................................................ .............. ......................................... 775 5 F.L ........ ...................... ............ ....... ................................................................................................................... .............................................................PROPOSED...1fl•.... ..... .............. ............... .............. ........ 750 2 .. .._ . . ...................... .............. ................ .......................... .............. _ ...............................PIP ?........................... .............. ............ . 3 .. -'...--...... .-.. ?.?.._ ................... °. ............. .............. ...... ..... .. ......... ... ...........- -6-.. ,- .- . . .......... ...................... .. ................................... _ _ --- ---- ._ .. _.._...................L _ 2400'.............. ................ -..................................................................................... - 725 _ ................................. .. DENSE ROCK BELOW. `......0.........._. ............ .................................aa a2............... . .. . .. ........ .. .... ............... :.................. 700 PROFILE TBM: CONCRETE MON. 100' 0 100' 35.01' RT. M/L "A" M/L "A" STA. 5824+41 ELEV. 885.35 NOTES TO CONTRACTOR: SCALE IN FE T Ref- D-L q D.y. No. 1. THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL LNOER- GROUND BUT DOES NOT THE DTI EXISTING Y O H a m PINE N EEDLE FF T E N ACCEPT ANY RESPONSIBILITY FOR ERRORS IN LOCATION OR FOR NO ? ? p- dft 1?4 -4- FAILURE TO INDICATE ANY SUCH FACILITIES. 2. A MINIMUM CLEARANCE OF 12 INCHES BETWEEN THE PROPOSED PINE NEEDLE 103 LATERAL PIPELINE AND ANY EXISTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL UNDERGROUND UTILITIES PRIOR 2. CROSSING THE HAW RIVER & WETLANDS TO BEGINNING CONSTRUCTION. 4 EV T N E GUILFORD COUNTY NORTH CAROLINA ? . A L IO S SHOWN ARE REFERENCED TO THE NATIONAL GEODETIC , VERTICAL DATUM OF ISM ENAVD 88t 5. BERINGS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE D,a- A S. Date 8-14-96 Revle"ed B Dete COORDINATE SYSTEM,NAD 1983 /¢ ??w ` 6. STATIONS SHOWN ARE BASED ON THE 24• LINE STATIONS. G v' g. 7. FOR PIPE SPECIFICATIONS, REF. OWG. AND LEGEND, SEE SHEET 4 OF 4. S De•t t Dete Pro t t »e o M.O. No 24 O Soel• Sheet or4 D+ . No. CE-3718-in, GUILFORD. COUNTY, NORTH CAROLINA 1 2 ;? , J 1 '? DISTURBED ?IREA " LIMIT I ' ? PROPOSED PINE NEE E DIRECTIONAL DRILL 1 '/ I I ` N PLANT 1 UNDER WETLANDS I 1 I I AUTHORIZED UNDER . 1 AL NWP 12P NO ' W L LL I PROPOSED '& AL TGPL R/W F- N AL . - ` ml N 1 6 o ' PRO OSED 10' O'fPEL'•I " W N N 40 25'05" W ' N1 N AL A PR OSED 24' PIPELIIj ` N- v FLOW r. Z P '-P P -P P P -?PR POSED DUKE P WER u MPANY POWER INE i AL ABE BRENNER et el PROPOSED DUKE POWER / 0 WETLAND • BOUNDARY COMPANY R W 8 L.L. NO. g N / co +I L % 5 S i PLAN SILT FENCE FOR PLANT I 50'WETLAND CONSTRUCTION, TO BE BUFFER ZONE 100' 0 100' REMOVED AS NEEDED DIRECTIONAL DRILL SCALE IN FEET ENTRY POINT STA.45+31 FROM HORIZ O ........ NATURAL...GROUND ...............................'3'.MIN. ........................................................................ .... ......... ... . . . .. . .......................................................... ........... ..... .... . 00 ? 77 ............................... . . ........................ .... 775 1 ......... PROPOSED .10` .... ... .' 750 ................. ..................................... . PIPELINE 72 ...... I..... %.-.... .... ....... ............................. R= ..log ........................................................................................................................................................ 725 70 ............... . _ ............. .......................... ............. -...... ........ ...... ................ .......... -, . _ .. ............................................................................................... F sr......................................... .................. ............................................................................... .......................................................................................................................................................... 700 DENSE ROCK BELOW PRO FILE TBM: CONCRETE MON. 100' 35.01' RT. M/L "A' 0 100' M/L 'A' STA. 5824+41 ELEV. 885.35 -iiiiii NOTES TO CONTRACTOR: SCALE IN FEET Raferarwe D,-trg N- L THE COMPANY HAS MADE AN EFFORT TO LOCATE ALL U114ER GROUND FACILITIES NOW EXISTING BUT DOES NOT GUARANTEE THE PIN1B NEEDLE ACCURACY OF THE INFORMATION SHOWN ON THIS MAP NOR DOES IT ACCEPT ANY RESPONSIBILITY FOR ERRORS IN LOCATION OR FOR L- 1-4 C2 " p- oft P?4 FAILURE TO INDICATE ANY SUCH FACILITIES. 2. A MINIMUM CLEARANCE OF 12 INCHES BETWEEN THE PROPOSED PINE NEEDLE 10' LATERAL PIPELINE AND ANY EXISTING FACILITIES WILL BE MAINTAINED. 3. CONTRACTOR TO LOCATE ALL UNDERGROUND UTILITIES PRIOR CROSSING THE HAW RIVER & WETLANDS TO BEGDRTatNp CONSTRUCTION. GUILFORD COUNTY. NORTH CAROLINA 4. ELEVATIONS SHOWN ARE REFERENCED TO THE NATIONAL GEODETIC - VERTICAL DATUM OF 198B. (MAVD 88) 5. BERINDS SHOWN ARE BASED ON THE NORTH CAROLINA STATE PLANE D,a- .A S. Dote 8-14-96 Rerler a D. milli COORDINATE SYSTEM, MAD 1583. eel r Z y/iz?f6 ?r'ln?! G S,. STATIONS SHOWN ARE BASED ON THE 24* LINE STATIONS. S Dser t Dete Pro of trees. Dete 7. FOR PIPE SPECIFICATIONS. REF. DWG. AND LEGEND. SEE SHEET 4 OF 4 . 6920.02 WA. No. Style 1'.100, • on 5h..t ef4 D.,,. N. CE-3718-10, GUILFORD COUNTY. NORTH CAROLINA LEGEND Tw ELEVATIONS - - - - - - - - - - DISTURBED AREA LIMIT PROPOSED SILT FENCE DIVERSION TRENCH AL A- 411- 4& 4& WETLANDS ROCK FILTER OUTLET -?-??- ..... WETLAND BOUNDARY - - - - - - BUFFER ZONE BOUNDARY TRENCH PLUG PERMANENT RIGHT-OF-WAY - OVERHEAD POWER LINE TEMPORARY WORK SPACE PIPE SPECIFICATIONS 10.75' O.D. x 0.375' W.T. WT. PER FT. 41.59 • MATERIAL: API-5L-X42 STEEL PIPE TYPE JOINT: WELDED METHOD OF INSTALL ING:DIRECTIONAL DRILL L.L. No. 4 & 5 LINE 7-106 LOCATION MAP Refsrenoe 20-15-50/A-00002 000-A SHT.2 & 3 0.a No. PINE NEEDLE VIVO COMf?AN?'. f`?C PINE NEEDLE 10' LATERAL CROSSING THE HAW RIVER & WETLANDS GUILFORD COUNTY. NORTH ''OOC??AROLINA Dre.n 8 .A. Date 8-14-96 Revfered B P& Date 9?2 ?o Den E f Date Pro t E mer Dete C.ro.w 0 Rock. Branch Creek Culvert and EmbanIc-ment Pine Needle ]LNG Plant Guilford County, North Carolina 0 Contents: 1. Design Report 2. Technical Specifications 3. Design Computations 11 1 • • C? -r, ,- =T HANSON y - ENGINEERS INCORPORATE D *?` ® AN EMPLOYEE-OWNED COMPANY August 8, 1996 Chicago Bridge & Iron Technical Services Company 1501 North Division Street Plainfield, Illinois 60544-8929 Attn: Mr. James T. Julien Senior Design Engineer Re: Final Report Design of Rock Branch Creek Culvert and Embankment Pine Needle LNG Facility Guilford County, North Carolina Dear Mr. Julien: This letter report summarizes our analysis and design of the Rock Branch Creek Culvert and Embankment in Guilford County, North Carolina. The earth embankment will have a maximum height of 43 ft and a length of 380 ft at the crest. The top of the embankment has a 5.4 percent grade with a crest width of 28 ft, to accommodate an access road to the proposed LNG facility. The embankment upstream face and the downstream face slopes will be at 3.0:1.0 (horizontal to vertical). There will not be any permanent impoundment upstream from the embankment. A three-sided concrete culvert will carry the creek flow through the embankment. The purpose of the three-sided culvert is to minimize the modifications to the existing creek channel bottom and to preserve the natural rocky course of the stream. HYDROLOGIC AND HYDRAULIC CONSIDERATIONS: Some of the hydrologic parameters for the project were obtained from the Law Engineering hydrologic report. The upstream watershed drainage area is about 1,318 acres (2.06 square miles). A precipitation amount of 7.44 inches in 24 hours was used for the 100-yr design flood. Other hydrologic parameters considered were the runoff coefficient, the type of soil and vegetative cover in the watershed, and the time of concentration. Exhibit 1 shows the watershed area boundary and the site location of the proposed culvert and embankment across the Rock Branch creek. Exhibit 2 shows the General Plan for the project, including the roadway along the crest of the embankment. The three-sided culvert was designed as an open channel. The culvert will be able 0 to pass all floods, up to the 100-yr design flood event, without flowing full (under pressure). 1525 South Sixth Street • Springfield, Illinois 62703-2886 • 217/788-2450 • Fax: 217/788-2503 Corporate Office: Springfield, Illinois Peoria, Illinois • Rockford, Illinois • La Grange, Illinois • Kansas City, Missouri culvert.ltr Herndon, Virginia • Pleasanton, California • Atlanta, Georgia 95s3055A 8/8/96 ® PRINTED ON RECYCLED PAPER • The existing channel has a supercritical slope. Since we are not modifying the existing channel slope, the flow through the culvert will remain supercritical. The width of the culvert (16 ft) was selected to span the average existing channel width (see Exhibits 3, 4, and 5 for the culvert dimensions). The height of the culvert was designed as 10 ft with a provision of 8 ft minimum clearance above any obstruction on the creek. This provision will allow the culvert to pass the 100-yr design flood partially full. A bend in the alignment at the culvert entrance was introduced to better match the existing meander of the approach channel. The three-sided culvert was designed as a cast-in-place structure. Concrete wing walls and riprap were provided at the inlet and the outlet of the culvert to protect the structure and the earth embankment during floods. No energy dissipator is needed at the culvert outlet, because the proposed culvert will not change the existing supercritical flow conditions, and existing velocities will not increase significantly. The culvert outlets on a rocky channel bottom. There is no need to modify the existing natural conditions of the channel at the culvert outlet. Charts from the "Hydraulic Design of Highway Culverts" (Federal Highway Administration) were used to develop a culvert rating curve at the inlet. The HEC-1 computer program (U.S. Corps) was used to route the 100-yr flood event through the culvert to determine any backwater effects. The HEC-RAS computer program (U.S. Corps) was used to determine a water surface profile, for different floods, along the existing channel. The program assumed "critical flow" due to the supercritical slope of the channel. The result is conservative, since a lower water surface elevation will be produced if the actual flow is supercritical. In conclusion, the three-sided culvert will not change the hydraulic characteristics of the stream. It will continue to operate as an open channel, and no significant backwater or detention effects will be caused by the culvert and the embankment. GEOTECHNICAL CONSIDERATIONS: Geology: The location of the culvert and embankment is on the Rock Branch Creek near the confluence with the Haw River. The site is approximately 2 miles southeast of Stokesdale, North Carolina. The embankment lies in the Piedmont physiographic providence of the Appalachian Highlands. The Piedmont province is described as having rolling uplands, where the altitudes in the north are usually below 500 ft and the altitudes in the south are usually between 500 and 2,000 ft. The dominant bedrock material in this area is a Precambrian-aged metamorphic rock called mica gneiss. This material is composed primarily of mica gneiss, but also includes mica schist. Intruding the mica gneiss in this area HANSON ENGINEERS Culvert.ltr _ -i\000PCPATED 9SS3055A 8/8/96 ® TimTED p?NECVCEED VAVER 0 -3- is a Paleozoic-aged granite. The granite is a massive to weakly foliated, even-grained to porphyritic rock. The USDA Soil Survey of Guilford County indicates that the upper portions of the overburden are sandy loams and sandy clay loams. The typical soil profile in upland areas is generally described as consisting of a few inches of a sandy loam underlain by several feet of a clayey loam, which is in turn underlain by several feet of sandy loams and sandy clay loams. In valley areas, alluvial soils have not been significantly weathered by drying and desiccation, and thus are softer and have less clay content. Subsurface Profile: Exhibit 6 shows the boring locations at the culvert and embankment site. The borings were made and the logs provided to us by Law Engineering. In the area of the embankment in the valley (borings 24, 27, and 28), only a few feet of silty sands and sandy silts overlie a very hard and competent bedrock. In the abutments of the embankment (borings 25 and 26), sandy silts and silty very fine sands overlie shallow bedrock. In the west abutment, the overburden was approximately 12.5 ft thick. In the east abutment, the overburden was only about 3.5 ft thick. The locations for the upland (plant and tank area) borings are also shown in Exhibit 6. In the upland borings, the overburden is much thicker and consists of residual and alluvial sandy clayey silts, sandy silts, and silty sands over partially weathered rock, over rock. Seismic Considerations: We were provided with the seismic response spectra for the SSE and the OBE events, as developed by Law Engineering. A site period of 0.5 seconds (frequency = 2Hz) was chosen based on the minimum period recommended by the Structural Engineers Association of California (SEAOC) Standard No. 1 "Determination of the Characteristic Site Period." The SSE response spectra graphs were entered with a period of 0.5 seconds and a damping ratio of .15 to arrive at a site peak horizontal ground acceleration of 0.275 g. A seismic coefficient of 0.28 g was thus used in embankment slope stability analyses. Embankment Design: Exhibit 3 shows the proposed typical section of the embankment and a profile along the centerline of the embankment. The slopes of the embankment have been set at 3H:1V, based on the stability analyses. Soil parameters used for foundation materials were estimated based on N-values from the boring logs and descriptions contained in the Law Engineering soils report. Soil parameters used for compacted embankment were based on HANSON p, ENGINEERS Culvert.ltr vCC a>o:>rE 95S3055A 8/8/96 ® vpNtED ON RECVCLEO OAYED 0 -4- Table 5.1 in Chapter 5 of "Design of Small Dams" by the Bureau of Reclamation (1987). Exhibits 7 and 8 summarize the computerized slope stability analyses performed for the long term without seismic, and the long term with seismic cases. A seismic coefficient of .28 g was used for the seismic case, as discussed in the previous section of this report. Computed factors of safety are above normally accepted values, and the design is governed by the relatively high seismic coefficient used in the analysis. The embankment could consist of the typical sandy silt (and preferably, sandy clayey silt) materials encountered in the upland borings. Exhibit 9 and the Specifications provide guidelines for maximum rock fill sections, if construction schedules permit blasted rock from upland excavations to be used in the embankment. The guideline sections include a buffer earth zone between the rock fill and the culvert structure. A transition crushed stone is used between the rock fill and the earth fill, and earth fill buffer zones are incorporated above the rock fill and beneath the embankment surface. Also, an upstream sandy silt fill section with key trench is incorporated. It is estimated that 2 ft to 4 ft of bedrock removal will be required in the area of the culvert footings. The Specifications require that bedrock removal be done by mechanical methods. The Contractor may employ "controlled blasting" methods, provided he demonstrates that his method will not cause excessive fracturing of the surrounding rock. It should be noted that we are recommending the complete removal of the remains of an old rock dam that exist on the left bank of the creek channel at the centerline of the embankment (see Exhibit 4). We have been pleased to provide this information. Please contact us if there are any questions regarding this report. Very truly yours, HANSON ENGINEERS INCORPORATED David E. Daniels, P.E. Associate Partner el. N2oxrr J. Morales, PIE S Associate HANSON ENGINEERS Culvcrt.ltr NC0`10CF e 95S3055A s/s/9G ® FMWTED Ch PEDVttEDV.vEP cesLzs 1 • 2 0 • ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina TECHNICAL SPECIFICATIONS 0 • I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Regis- tered Professional Engineer under the laws of the State of North Carolina. Date Reg. No. 4033 Culvert.cov S/6/96 o¢.?N CAROB Q SEAL c) 4033 S•.F QJv *NA L L PGA 95S3055A ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina TECHNICAL SPECIFICATIONS CONTENTS DIVISION 2 - SITE WORK SECTION 02111 - CLEARING & GRUBBING SECTION 02112 - STRIPPING EXCAVATION SECTION 02206 - BORROW EXCAVATION SECTION 02222 - ROCK EXCAVATION SECTION 02223 - STREAM DIVERSION SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW SECTION 02225 - EMBANKMENT CONSTRUCTION - ROCK FILL SECTION 02226 - INTERNAL DRAINAGE SECTION 02228 - BEDDING FOR RIPRAP SECTION 02229 - RIPRAP SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK SECTION 03200 - CONCRETE REINFORCEMENT SECTION 03300 - CAST-IN-PLACE CONCRETE • Culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02111 - CLEARING & GRUBBING PART1 GENERAL 1.01 SECTION INCLUDES A. This item shall include the removal and disposal of all existing trees, stumps, logs, brush, plants, and other perishable material under the culvert and embankment, or as directed by the Engineer. PART 2 PRODUCTS Not Used • • PART 3 EXECUTION 3.01 CLEARING A. Clearing shall consist of trees, shrubs, and any other obstructions above ground surface. 3.02 GRUBBING A. Grubbing shall consist of the removal of roots, woody materials, and other debris, to a depth of not less than twelve (12) inches below ground surface. 3.03 FILLING HOLES A. Excavated holes below the original ground surface as a result of the clearing and grubbing operation shall be backfilled and compacted to the density of the adjacent soil to the original ground surface. Culvert.spc 02111-1 9SS3055A DIVISION 2 - SITE WORK SECTION 02111 - CLEARING & GRUBBING 3.04 DISPOSAL A. The contractor is responsible for the method of removal and disposal of all cleared and grubbed materials. B. When burning is permissible under controlling air pollution regulations, all burning of products of clearing and grubbing shall be done under the care of a competent watchman at such times and in such manner that neither vegetation on adjacent property nor that designated to remain will be jeopardized. C. Ashes or waste materials which will not burn shall be buried with a minimum of twelve (12) inches of soil cover or removed from the area by other methods approved by the Owner. D. In the interest of conservation, it is suggested that the Contractor make a reasonable effort to dispose of the material offsite for some useful purpose. Timber may be cut into appropriate lengths and utilized for making saw logs, posts, ties, cordwood, wood chips for papermaking or other uses, or other • similar use. is 02111-2 Culvert.spc 9553055A • DIVISION 2 - SITE WORK SECTION 02112 - STRIPPING EXCAVATION PART1 GENERAL 1.01 SECTION INCLUDES A. Stripping excavation shall include the stripping of the site, including cleaning the existing stream channel under the embankment of all unsuitable material. 1.02 RELATED SECTIONS A. Section 02937 - Topsoil, Seeding, Fertilizing, and Mulching PART 2 PRODUCTS Not Used • C PART 3 EXECUTION 3.01 STRIPPING A. Stripping the site shall include the carrying off and disposal of all weeds, grass or other vegetation, and removing topsoil to a minimum depth of six (6) inches as shown on the plans and as directed by the Engineer. B. The natural ground immediately below the stripped surface in the embankment areas shall be disked parallel to the longitudinal axis of the embankment, to a depth not less than six (6) inches in order to effect an intimate bond between the exposed ground surface and the embankment. 3.02 DISPOSAL A. All vegetation resulting from stripping operations shall be disposed of by burying, or as directed by the Engineer. B. All earth material which is of topsoil variety shall be stockpiled for placement later as specified under "Topsoil, Seeding, Fertilizing, and Mulching." C. Any excess topsoil shall be wasted within 300 yards of the site and shall be graded off to a smooth surface to blend with the existing topography or as directed by the Engineer. culvcrt.spc 02112-1 9SS3055A DIVISION 2 - SITE WORK SECTION 02206 - BORROW EXCAVATION PART1 GENERAL 1.01 SECTION INCLUDES A. This item shall include earth excavation from the upland borrow areas. Materials for the embankment shall be taken exclusively from upland borrow areas identified by the Owner. No materials shall be removed from the lake valley for embankment construction. 1.02 RELATED SECTIONS A. Section 02224 - Embankment Construction B. Section 02110 - Clearing and Grubbing C. Section 02111 - Stripping Excavation PART 2 PRODUCTS Not Used PART 3 EXECUTION 3.01 CONSTRUCTION A. All suitable materials from upland borrow areas, to be used in the embankment, shall be placed in a manner described under the heading "Embankment Construction." Suitable materials for the embankment include sandy clayey silts (CL), sandy silts (ML), and silty or clayey sands (SM or SC). B. Boring logs for borings taken in the dam and upland areas shall be provided by the Owner. • 02206-1 Culvert.spe 95S3055A DIVISION 2 - SITE WORK SECTION 02222 - ROCK EXCAVATION PART1 GENERAL 1.01 SECTION INCLUDES A. This item shall include rock excavation that will be required in the Culvert footing areas. It is estimated that the depth of rock removal will be 2 ft to 4 ft. 1.02 RELATED SECTIONS A. Section 03300 - Concrete Structures B. Section 02229 - Riprap PART 2 PRODUCTS Not Used PART 3 EXECUTION 3.01 EXCAVATION A. Rock shall be excavated primarily with mechanical equipment, such as hydraulic hoe rams, air operated jackhammers, and other similar equipment. B. The Contractor may employ controlled blasting, provided he shall demonstrate to the satisfaction of the Engineer that his method does not cause excessive fracturing of the surrounding rock. The demonstration shall be done at a location at least 300 ft downstream of the embankment and culvert, or in an upland location at least 300 ft from the embankment. The location of the demonstration shall be approved by the Engineer. 3.02 DISPOSAL A. Excavated rock may be used for riprap or embankment, provided it conforms to the requirements of Sections 02225 or 02229. Excess excavated rock shall be wasted as directed by the Engineer. 02222-1 culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02223 - STREAM DIVERSION PART1 GENERAL 1.01 SECTION INCLUDES A. Stream diversion during construction is the contractor's sole responsibility. This work consists of the design and scheduling of any necessary stream diversion so as to control erosion, prevent sedimentation or trap sediments, and maintain stream flow. The Contractor shall submit a plan for this work at least one week prior to the pre-construction meeting, for review and approval by the Engineer. 1.02 RELATED SECTIONS A. Section 02224 - Embankment Construction PART 2 PRODUCTS Not Used is PART 3 EXECUTION 3.01 DESIGN A. The Contractor shall design and prepare the construction schedule, including stream diversion with any necessary erosion control measures, sediment traps, stream control measures, and culvert designs. 3.02 PRE-CONSTRUCTION MEETING A. The Contractor shall submit a plan for this work at least one week prior to the pre-construction meeting for review and approval by the Engineer. 11 02223-1 Culvert.spe 95S3055A • • DIVISION 2 - SITE WORK SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW PARTI GENERAL 1.01 SECTION INCLUDES A. This item shall include the selecting, transporting, placing, and spreading in layers, wetting or drying, rolling, compacting, moisture control, and all other work incidental to the construction of the Earth Embankment as herein specified. 1.02 RELATED SECTIONS A. Section 02111 - Clearing and Grubbing B. Section 02112 - Stripping Excavation C. Section 02206 - Borrow Excavation PART 2 PRODUCTS A. Earth materials required for embankment construction shall be taken from upland borrow areas, as described in Section 02206 - Borrow Excavation. 2.01 MATERIALS PART 3 EXECUTION 3.01 EQUIPMENT A. Equipment used for mechanical compaction of the embankment shall be approved by the Engineer and shall comply with, but not be limited to, the following general requirements. B. Disk Harrow: The disk harrow shall be the tandem type, weighing not less than 150 pounds per foot of width. It shall be not less than seven (7) feet in width and shall be equipped with solid disks not less than 18 inches in diameter. Culvertspc 02224-1 95S3055A DIVISION 2 - SITE WORK SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW C. Tamping Roller: Compaction shall be accomplished with "Sheep's Foot" rollers exerting foot pressure of 300 to 400 psi. Tractors shall have sufficient power to pull the rollers satisfactorily when the drums are fully loaded with sand and water. During the rolling operation, the contractor shall keep the spaces between the tamping feet clear of material which would prevent obtaining the required compaction. 3.02 PREPARATION OF EXISTING GROUND SURFACES A. After all vegetation and earth materials unsuitable for embankment construction have been removed and disposed of as previously specified, the embankment area shall be prepared by plowing or disking to a depth of not less than six (6) inches, after which it shall be compacted to the density required for the construction of the embankment. B. When in the opinion of the Engineer additional precautions are necessary to bind the embankment materials to existing ground on hillsides or slopes, steps shall be cut into existing slopes before placement of the embankment material is started. C. In Key Trench areas, bedrock shall be exposed and cleaned to make tight contact with clayey materials. Loose and semi detached blocks of rock shall be removed. Knobs and overhangs shall also be removed. Depressions, cracks, and joints exposed will be filled with moist clay or cement grout at the direction of the Engineer, leaving a rock surface with smooth contours, against which the clayey soils can be compacted by heavy equipment. D. The remnants of an old rock dam, which is located on the east side of the valley immediately upstream of the centerline of the dam, shall be completely removed. 3.03 PLACING MATERIALS A. The Engineer shall direct the distribution and placement of all embankment materials to produce a mixture blended sufficiently to secure the best practical degree of compaction and, for this purpose may designate the location for placing individual loads. • 02224-2 Culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW B. No stones or broken concrete larger than five (5) inches in diameter shall be placed in the embankment. Should stones of such size or larger be found in otherwise approved material, they shall be removed by the Contractor and disposed of at no extra cost. C. The embankment shall be constructed in uniform layers not to exceed eight (8) inches in thickness, measured in the loose condition. Each layer of material shall extend for the entire length and width of the embankment, be true to cross sections and thoroughly compacted before the next layer is started. The embankment materials shall be leveled by means of bulldozers, blade graders or other approved equipment and disked sufficiently to break down oversized clods and to thoroughly mix the different soils or to obtain a uniform moisture content. If satisfactory results cannot be obtained by means of the disk, the use of a spiked tooth harrow may be permitted, but its use shall be substituted only with the permission of the Engineer. D. The compacted density of each fill layer shall be tested by a qualified soils technician before the next layer of fill is placed. If the density is below that specified, then that layer shall receive additional compaction until the required density is achieved. E. The top of each layer of fill shall be lightly disked prior to the placement of the next layer of fill so as to assure a good bond between successive layers of fill. If the surface of a completed layer of fill becomes dry prior to the placement of the next layer of fill, then that surface shall be moistened and disked prior to the placement of the next layer of fill. F. The Contractor shall maintain the embankment in a manner satisfactory to the Engineer until the final completion and acceptance of all work under this contract. In the event that approved material is lost after being placed in the embankment and before completion of the contract, due to floods, actions of the streams, or other causes, which in the opinion of the Engineer are avoidable or under control of the Contractor, then such material shall be replaced by the Contractor in a manner satisfactory to the Engineer at the expense of the Contractor. • 02224-3 Culvert.spc 95S3055A DIVISION 2 - SITE WORK SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW 3.04 MECHANICAL COMPACTION A. The required degree of compaction for the entire length and width of each layer shall not be less than 95 percent of the maximum dry density as determined by the Standard Proctor Compaction Test (ASTM D698). B. All uneven areas in the bottom of the Key Trench, or other areas of limited access, especially those around the culvert, shall be built in continuous horizontal layers not more than four (4) inches in thickness, loose measurement, and each layer shall be thoroughly compacted with a mechanical hand tamper weighing not less than twenty (20) pounds and having a tamping face not larger than six (6) inches by six (6) inches. No extra compensation will be paid for hand compaction, but it will be considered incidental to the item of work being accomplished. 3.05 MOISTURE CONTROL A. Prior to and during compaction of materials in the general embankment, the material in each layer shall have a moisture content of between minus two (-2) percent and within three (3) percent greater than the optimum moisture content as determined by the Standard Proctor Compaction Test (ASTM D698). The first three (3) feet of material placed in the Key Trench shall be placed at a moisture content between optimum and four (4) percent greater than optimum. B. If the moisture content of embankment materials as placed is less than herein specified or required for compaction, than application of water for this purpose shall be done at the site of excavation and shall be supplemented as required by sprinkling on the earth fill embankment if necessary. D. If the moisture content of embankment materials as excavated or placed is greater than that herein specified before compacting then the moisture content shall be reduced to within the limits specified above. The Contractor shall perform any or all work as may be necessary to aerate or otherwise dry the embankment fill materials to the required moisture content. No rolling shall be done until this has been accomplished. • 02224-4 Culvert.spc 9553055A • DIVISION 2 - SITE WORK SECTION 02224 - EMBANKMENT CONSTRUCTION - SOIL BORROW 3.06 FINISHED GRADING A. Finished grading of embankment shall mean surfaces true to grade, line and slopes indicated on the plans. The finished surfaces shall be free of all roots, rock, broken concrete, clods, and other objectionable material or debris resulting from construction operations. • E 02224-5 Culvert.spc 9553055A • E • DIVISION 2 - SITE WORK SECTION 02225 - EMBANKMENT CONSTRUCTION - ROCK FILL PART1 GENERAL 1.01 SECTION INCLUDES A. This item includes selection, placement, and compaction of rock fill in the embankment. Guidelines for maximum rock fill sections are shown on the plans, with a transition zone and a minimum thickness earth fill zones beneath the embankment surface. If rock fill is used, an upstream earth section with key trench shall be incorporated, as shown on the plans. A buffer earth section between the rock fill and the culvert shall also be incorporated. 1.02 RELATED SECTIONS A. Section 02111 - Clearing and Grubbing B. Section 02112 - Stripping Excavation C. Section 02206 - Borrow Excavation D. Section 02224 - Embankment Construction - Soil Borrow PART 2 PRODUCTS 2.01 MATERIALS A. Rock fill shall be taken from upland plant cut areas and/or from footing excavation for the culvert. Pieces of rock no larger than 2 square feet for any area of surface shall be used, and the rock fill shall be well graded so that the interstices are filled with smaller pieces or smaller material. B. The transition zone shall consist of crushed stone or gravel of the same gradation as subsequently specified in Section 02228 for Bedding for Riprap. PART 3 EXECUTION 3.01 EQUIPMENT A. Mechanical compaction of rock fill shall be accomplished by heavy vibratory compactors (4 tons or greater), hauling equipment and/or heavy tamping plates. Culvert.spc 02225-1 9553055A • DIVISION 2 - SITE WORK SECTION 02225 - EMBANKMENT CONSTRUCTION - ROCK FILL 3.02 PLACING MATERIALS A. Rock fill shall be placed in approximately horizontal layers not exceeding 3 feet in thickness and compacted by as many passes as determined to be necessary by the Engineer to achieve satisfactory density. • • 02225-2 Culvertspc 9553055A DIVISION 2 - SITE WORK SECTION 02226 - INTERNAL DRAINAGE PART1 GENERAL 1.01 SECTION INCLUDES A. The Internal Drainage shall include all the work necessary for the construction of the Culvert weep holes, as shown in the plans or as directed by the Engineer. 1.02 RELATED SECTIONS A. Section 02224 - Embankment Construction PART 2 PRODUCTS 2.01 FILTER FABRIC A. Filter fabric cloth for the weep holes (woven or nonwoven) must be composed of rot-proof, low-water absorbent fibers. The fiber network (woven or nonwoven) must be dimensionally stable (i.e., fibers must maintain their relative position with respect to each other) and resistant to delamination. The fabric must be free from any chemical treatment or coating that might significantly reduce porosity and permeability. The fabric must also be free from any flaws or defects which might significantly alter its physical properties. B. The following physical property requirements must be met: (1) Weight (ASTM D1910) - min. 4.0 oz./sq. yd. (2) Grab Strength (ASTM D1682 Specimen Tested Wet) - min. 100 lb. (3) Grab Elongation (ASTM D1682 Specimen Tested Wet) - min. 60% C. The fabric shall retain soil particles larger than 106 microns (No. 140 sieve), and shall pass aggregate particles finer than 25 microns. Handling of fabric shall be in accordance with the manufacturer's recommendations. Torn or punctured fabric shall not be used. 2.03 MATERIALS A. The Weep Hole Drains shall consist of crushed stone or gravel of the same gradation as subsequently specified in Section 02228 for Bedding for Riprap. • 02226-1 Cuivert.spc 9553055A • • r? DIVISION 2 - SITE WORK SECTION 02228 - BEDDING FOR RIPRAP PART1 GENERAL 1.01 SECTION INCLUDES A. Bedding Material shall be constructed to the lines and grades as shown on the drawings and shall be 6 in. thick. 1.02 RELATED SECTIONS A. Section 02226 - Internal Drainage B. Section 02229 - Riprap PART 2 PRODUCTS 2.02 MATERIALS A. The Bedding Material shall have the following gradations and consist of either crushed limestone or gravel: Sieve Sizes Percent Passing 1 1/2" 100 1" 70-100 1/2" 40-70 #10 10-40 #40 4-10 #100 0-4 PART 3 EXECUTION 3.01 PLACEMENT A. Before placing the bedding material, the subbase shall be graded to the elevations and sections shown on the plans. The material shall be spread on the subgrade in uniform layers using spreader boxes or other equipment approved by the Engineer. The material shall be placed to a thickness of 6 in. and in the manner approved by the Engineer. The top surface of the bedding material shall be graded smooth. Culvert.spc 02228-1 9553055A DIVISION 2 - SITE WORK SECTION 02229 - RIPRAP PART1 GENERAL 1.01 SECTION INCLUDES A. This item shall consist of furnishing, transporting, placing, and finish grading Riprap as hereinafter specified and as shown on the plans. The Riprap shall be 12 in. thick. 1.02 RELATED SECTIONS A. Section 02228 - Bedding for Riprap PART 2 PRODUCTS 2.01 MATERIALS A. Riprap shall be hard, heavy, durable stone quarried from undisturbed, consolidated deposits of rock. It shall be free from segregation, seams, cracks, and other structural defects, and when subjected to five (5) cycles of the sodium sulfate soundness test, it shall show no disintegration and not more than fifteen (15) percent of the pieces may show splitting, crumbling or spalling. B. The stone for riprap shall have a maximum weight per piece of 150 pounds and not more than five (5) percent shall weigh less than three (3) pounds per piece. The material shall be evenly graded and 30 to 70 percent of the material shall weigh 75 pounds or more per piece. PART 3 EXECUTION 3.01 PLACEMENT A. Riprap shall be placed as to produce a surface of approximate regularity and to a minimum thickness of 12 in. Some hand work may be required in areas adjacent to structures where careful handling shall be required or in other areas to obtain a relatively smooth and tight surface. The finished surface shall not project more than four (4) inches from a true plane for all other riprap areas. As near as practicable, the larger stone shall be placed along exposed final surfaces of the riprapped areas. • 02229-1 Culvert.spc 95S3055A DIVISION 2 - SITE WORK SECTION 02831 - CHAIN-LINK FENCES AND GATES PART1 GENERAL 1.01 WORK INCLUDED A. Fence framework, fabric and accessories B. Gates and related hardware C. Installation 1.02 SUBMITTALS A. Shop Drawings: Include complete details of fence and gate construction, fence height, post spacing, dimensions and unit weights of framework and concrete footing details. Actual samples and certificates of compliance may be requested. PART 2 PRODUCTS 2.01 MATERIALS A. Framework: Type I - Schedule 40 steel pipe with 1.8 ounces of zinc coating per square foot of surface area conforming to Standard Specification ASTM F-1083. All coatings to be applied inside and out after welding. Pipe shall be straight, true to section and conform to the following weights: Pipe Size Outside Diameter Weight Lbs ff t. 1 5/8" 2.27 2" 2.72 2 1/2" 3.65 3" 5.79 3 1/3" 7.58 4" 9.11 6 5/8" 18.97 • 02831-1 Culvert.spe 9553055A DIVISION 2 - SITE WORK SECTION 02831 - CHAIN-LINK FENCES AND GATES B. Fabric: Aluminized fabric shall be manufactured in accordance with ASTM A-491 and coated before weaving with a minimum of 0.4 ounces of aluminum per square foot of surface area. The steel wire and coating shall conform to ASTM A-817. Fabric to be 9 gauge woven in a 2 in. diamond mesh. Top selvage to be twisted and barbed. Bottom selvage to be knuckled. or, Zinc-coated fabric shall be galvanized after weaving with a minimum 1.2 ounces of zinc per square foot of surface area and conform to ASTM A-392, Class I. Fabric to be 9 gauge wire woven, in a 2 in. diamond mesh. Top selvage to be twisted and barbed, bottom selvage to be knuckled. 2.03 COMPONENTS A. Fence Posts: Fabric Line Post Terminal Post Height O.D. O.D. Under 6' 2" 2 1/2" 6' to 9' 2 1/2" Y B. Gate Posts: 3 in. O.D. C. Rails and Braces: 1 5/8 in. O.D. D. Gates: Frame assembly of 2 in. O.D. pipe with welded joints. Weld areas repaired with zinc-rich coating applied per manufacturer's directions. Fabric to match fence. Gate accessories, hinges, latches, center stops, keepers and necessary hardware of quality required for industrial and commercial application. Latches shall permit padlocking. E. Fittings: Post Caps - Pressed steel, cast iron or cast aluminum alloy designed to fit snugly over posts to exclude moisture. Supply cone type caps for terminal posts and loop type for line posts. All fittings to conform to ASTM F-626. Rail and Brace Ends - Pressed steel, cast iron or cast aluminum alloy, cut- shaped to receive rail and brace ends. C. 02831-2 Culvert.spc 95S3055A DIVISION 2 - SITE WORK SECTION 02831 - CHAIN-LINK FENCES AND GATES Top Rail Sleeves - Tubular steel, 0.051 thickness x 7 in. long, expansion type. Tension Bars - Steel strip, 5/8 in. wide x 3/16 in. thick. Tension Bands - Pressed steel, 14 gauge thickness x 3/4 in. wide. Brace Bands - Pressed steel, 12 gauge thickness x 3/4 in. wide. Truss Rods - Steel rod, 3/8 in. diameter merchant quality with turnbuckle. Barbed Wire Arms - Pressed steel, cast iron or cast aluminum alloy fitted with clips or slots for attaching three strands of barbed wire. Arms shall be set outward on a 45 degree angle and be capable of supporting a 250 pound load at outer barbed wire connecting point without causing permanent deflection. • Eli F. Tension Wire: Marcelled 7 gauge steel wire with minimum coating of 0.80 ounces of zinc or 0.40 ounces of aluminum per square foot of wire surface and conforming to ASTM A-824. H. Hog Rings: Steel wire, 11 gauge, with a minimum zinc coating of 0.80 ounces per square foot of wire surface. G. Tie Wires: Aluminum, 9 gauge, alloy 1100-H4 or equal. I. Barb Wire: If required, commercial quality steel, 12 1/2 gauge, two strand twisted line wire with 4 point barbs at 5 in. spacing. Coating shall consist of a minimum of 0.80 ounces of zinc per square foot of wire surface conforming to ASTM A-121 or a minimum of 0.30 ounces of aluminum per square foot of wire surface conforming to ASTM A-585. PART 3 EXECUTION 3.01 INSTALLATION A. General: Installation to conform to ASTM F-567. B. Height: Provide height as indicated on contract drawings. culvert.spc 02831-3 9553055A DIVISION 2 - SITE WORK SECTION 02831 - CHAIN-LINK FENCES AND GATES C. Post Spacing: Space line posts at intervals not exceeding 10 feet. D. Post Setting: Set terminal, gate and line posts plumb on steel base plates. Secure base plates to mounting surface with 4 1/2 in. diameter expansion anchors. E. Bracing: Brace gate and terminal posts back to adjacent line posts with horizontal brace rails and diagonal truss rods. F. Top Rail: Install through line post loop caps connecting sections with sleeves to form a continuous rail between terminal posts. G. Top Tension Wire: When top rail is omitted stretch tension wire through loop caps and fasten to terminal posts. H. Bottom Tension Wire: Stretch between terminal posts 6 in. above grade and fasten to outside of line posts with tie wires. 1. Fabric: Pull fabric taut with bottom selvage 2 in. above grade. Fasten to terminal posts with tension bars threaded through mesh and secured with tension bands at maximum 15 in. intervals. Tie to line posts and top rails with tie wires spaced at maximum 12 in. on posts and 24 in. on rails. Attach to bottom tension wire with top rings at maximum 24 in. intervals. J. Barbed Wire: Anchor to terminal extension arms, pull taut and firmly install in slots of line post extension arms. K. Gates: Install gates plumb, level and secure for full opening without interference. Anchor center stops and keepers in concrete. L. Fasteners: Install nuts for fittings, bands and hardware bolts on inside of fence. 3.02 COMPLETION A. The area of installation shall be left free of debris caused by the installation of the fence. is 02831-4 Culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING PART1 GENERAL 1.01 SECTION INCLUDES A. This item shall include the furnishing and spreading of topsoil to a depth of approximately six (6) inches as shown on the plans and herein specified or as directed by the Engineer. Furnishing and planting of seed and furnishing and application of mulch covering shall also be included. B. Areas to be covered with topsoil, seeded, fertilized, and mulched could include but not necessarily be limited to: a. Earth embankment surfaces. b. Areas disturbed by construction operations, and as directed by the Engineer. 1.02 RELATED SECTIONS A. Section 02224 - Embankment Construction • PART 2 PRODUCTS 2.01 MATERIALS A. Topsoil: This material shall consist of loose, friable, loamy nonacid soil, rich in organic matter and free from weeds and other objectionable vegetation which will prevent the formation of a suitable seed bed. Topsoil shall have demonstrated, in its original position, the ability to grow healthy grass. Material shall be obtained from the previously stockpiled topsoil associated with the stripping operation. If sufficient stockpiled stripping topsoil is not available, additional material shall be obtained from borrow areas as directed by the Engineer at no additional cost to the Owner. B. Seed: Purity of seed shall be a minimum of 95 percent and germination shall be a minimum of 85 percent. Label in conformance with USDA Federal Seed Act and applicable N.C. State laws. Seed mixtures shall be as follows: PJ 02937-1 Culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING Permanent seed mixture: Tall Fescue Sericea Lespedeza Kobe Lespedeza Annual Rye Browntop Millet Bahiagrass Crimson Clover Temporary seed mixture: 100 lb. per acre 30 lb. per acre 10 lb. per acre 35 lb. per acre 20 lb. per acre 15 lb. per acre 5 lb. per acre Fall (Aug. 15 - Dec. 15) Rye Grain 120 lb. per acre Winter/Spring (Jan. 1 - May 1) Rye Grain 120 lb. per acre Kobe Lespedeza 50 lb. per acre Summer (May 1 - Aug. 15) German Millet 40 lb. per acre C. Fertilizer: The fertilizer mix shall be ten (10) percent Nitrogen, ten (10) percent Phosphoric Acid and ten (10) percent water-soluble Potash (10-10-10) and applied at the rate of 1,000 pounds per acre. The following information shall be shown on the fertilizer bags: (1) Name and address of manufacturer (2) Name, brand or trademark (3) Number of net pounds of ready-mixed material in the package. (4) Chemical composition of analysis. (5) Guarantee. D. Mulch: All mulch material shall be small grain straw or other approved material free from weeds and noxious weed seed, and shall be approved by the Engineer. • 02937-2 Culvert.spc 9553055A DIVISION 2 - SITE WORK SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING ASPHALT for anchoring mulch shall be ASTM D977, Type RS-1 Emulsion. Asphalt shall not be applied to areas within 100 feet of any watercourse or wetland boundary. Straw shall be stalks of wheat, rye, oats, or approved straw, and shall be reasonably dry. Partially decomposed straw of the previous year's crop is preferred. Straw may contain a mixture of not more than 50 percent by volume of coarse, barnyard manure. Hay shall be obtained from field of timothy, red top, mature brome grass, or other native grasses, or from sources approved by the Engineer. It shall be reasonably dry. Partially decomposed hay of the previous year's crop is preferred. PART 3 EXECUTION 3.01 TOPSOIL A. The areas to be covered shall first be shaped, trimmed and finished in compliance with the plans, after all construction work in the area has been completed. Any irregularities or depressions in the surface due to weathering or other causes shall be filled or smoothed out before topsoil is placed at no additional cost. B. The topsoil shall be graded by machine and/or hand graded to produce a finished surface which is smooth, properly drained and free from ruts, stones, rocks, roots, and other foreign materials. 3.02 SEEDING A. Seeding Dates: Best Aug. 25 - Sept. 15 and Feb. 15 - Mar. 21 Possible Aug. 20 - Oct. 25 and Feb. 1 - Apr. 15 C7 02937-3 Culvert.spc 95S3055A DIVISION 2 - SITE WORK SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING No seeding shall be done during high winds, when the ground surface is too wet, nor when, in the opinion of the Engineer, soil and weather conditions are unfavorable for seeding. Seeding shall consist of the following operations: 1. Disking 2. Harrowing 3. Seeding 4. Brushing 5. Rolling Each operation shall follow the preceding one in as short a time as is practical to do so. B. Disking: This operation shall be accomplished with a disk harrow, the disks of which are set at a slight angle. The disking shall be performed both lengthwise and crosswise whenever practicable to do so. Should the area become crusted or hardened prior to harrowing, then it shall again be disked. C. Harrowing: Just prior to sowing seed, the surface of the area shall be thoroughly smoothed by means of a harrow. The harrow used shall be either a Meeker Smoothing Harrow or a 3-section Meeker Disking Machine or approved equal. Harrowing shall be first crosswise and then lengthwise where practical to do so. D. Seeding: The seeding shall be accomplished with a wheel-harrow grass seeder similar and equal to the ten (10) foot Thompson Grass Seeder. Whenever practical, the sowing operations shall be conducted in two directions at right angles to each other. The seeder shall be calibrated to give the proper rate of distribution. E. Brushing: Immediately following the sowing, the seed shall be lightly brushed into the soil by means of an approved chain drag. F. Rolling: Immediately after brushing, the seeded area shall be rolled with a tractor-drawn type roller known as the "Farmer Roller" or Golf Roller." G. Each area shall be brushed and rolled the same day the seed is sown. 02937-4 culvert.spc 9553055A • DIVISION 2 - SITE WORK SECTION 02937 - TOPSOIL, SEEDING, FERTILIZING, AND MULCHING 3.03 FERTILIZING A. Fertilizer shall be evenly spread over the seeding area before harrowing. Spreading of fertilizer shall be by any approved method which will insure uniform distribution over the seeding area. 3.04 MULCHING A. This method shall consist of applying a layer of asphalt-anchored straw mulch within 24 hours from the time of seeding on seeded ares. Mulch shall be applied at a rate of 1.5 tons per acre. B. The mulch shall be placed by equipment which will blow or eject, by means of a constant air stream, controlled quantities of the straw in a uniform pattern over the specified area. The rate of distribution shall be approximately 1.5 tons per acre with the exact rates to be specified by the Engineer. If, in the opinion of the Engineer, the straw mulch is excessively cut or broken, the Contractor shall take measures to reduce the cutting or breakage to a limit acceptable to the Engineer. The mulch shall be loose enough to permit air to circulate but compact enough to reduce erosion. C. Following the mulching operation, every precaution shall be taken to prohibit foot or vehicular traffic, or the movement of equipment over the mulched area. At any location where mulching has been displaced, the seeding or other work damaged as a result of that displacement shall immediately be repaired and the mulch covering replaced, at the Contractor's expense, in a manner satisfactory to the Engineer. U 02937-5 Culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK PART1 GENERAL 1.01 SECTION INCLUDES A. The complete installation of the formwork for cast-in-place concrete, with shoring, bracing and anchorage, openings for other work, form accessories, form stripping. 1.02 RELATED SECTIONS A. Section 03200 - Concrete Reinforcement B. Section 03300 - Cast-In-Place Concrete 1.03 REFERENCES A. ACI 347 - Recommended Practice For Concrete Formwork B. ACI 301 - Specifications For Structural Concrete For Buildings 1.04 DESIGN REQUIREMENTS A. Design, engineer and construct formwork, shoring and bracing to conform to design and code requirements; resultant concrete to conform to required shape, line and dimension. 1.05 QUALITY ASSURANCE A. Perform Work in accordance with ACI 347 and 301. 1.06 REGULATORY REQUIREMENTS A. Conform to applicable code for design, fabrication, erection and removal of formwork. 1.07 DELIVERY, STORAGE, AND HANDLING A. Store off ground in ventilated and protected manner to prevent deterioration from moisture. 03100-1 culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK 1.08 COORDINATION A. Coordinate this Section with other Sections of work which require attachment of components of formwork. B. If formwork is placed which results in insufficient concrete cover over reinforcement, request instructions from Architect/Engineer before proceeding. PART 2 PRODUCTS 2.01 WOOD FORM MATERIALS A. Softwood Plywood: 3/4 in. PS 1-83 "B-B" (concrete form) plywood, Class I, exterior grade or better, mill-oiled and edge sealed with each piece bearing legible inspection trademark. B. Architectural Plywood: 3/4 in. PS 1-83 "B-B" plyform, Class I, with High Density smooth overlay, 1 surface, edge sealed with each piece bearing legible • inspection trademark. 2.02 MANUFACTURERS - PREFABRICATED FORMS A. Weyerhauser Concrete Form B. Georgia Pacific, G-P Exterior Soft Wood Plywood Product C. Plywood and Door Corporation's Finn-Form 2.03 PREFABRICATED FORMS A. Preformed Steel Forms: Minimum 16 gage matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to tolerances and appearance of finished surfaces. B. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to tolerances and appearance of finished concrete surfaces. • 03100-2 Culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK 2.04 FORMWORK ACCESSORIES A. Form Ties: Snap-off type, galvanized metal, adjustable length, 1 inch back break dimension, free of defects that could leave holes larger than one inch in concrete surface; by Dayton-Sure Grip snap-in-form ties as manufactured by Dayton Superior Corp., Symons Ties as manufactured by Symons Corporation, Snap-Tys as manufactured by Richmond Corporation. Provide stainless steel form ties for all exterior surfaces exposed to view. Ties shall be removed after forms are removed, and holes filled with mortar that matches the adjacent surfaces. B. Form Release Agent: Colorless mineral oil which will not stain concrete, or absorb moisture; by Magic Kote manufactured by Symons Manufacturing Co., Form Coat manufactured by Concrete Services Co., Formcel manufactured by Lambert Corp. C. Corners: Chamfered, wood strip type; 3/4 X 3/4 inch size; maximum possible lengths. D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required, of sufficient strength and character to maintain formwork in place while placing concrete. PART 3 EXECUTION 3.01 EXAMINATION A. Verify lines, levels and centers before proceeding with formwork. Ensure that dimensions agree with Drawings. 3.02 EARTH FORMS A. Earth forms are not permitted, except for footings. 03100-3 Culvertspc 9553055A DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK 3.03 ERECTION - FORMWORK A. Erect formwork, shoring and bracing to achieve design requirements, in accordance with requirements of ACI 301. Metal forms shall be installed in strict accordance with manufacturer's directions and specifications. B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to overstressing by construction loads. C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores. D. Align joints and make watertight. Keep form joints to a minimum. E. Obtain approval before framing openings in structural members which are not indicated on Drawings. F. Provide chamfer strips on external corners of walls. 0 3.04 APPLICATION - FORM RELEASE AGENT A. Apply form release agent on formwork in accordance with manufacturer's recommendations. B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items. C. Do not apply form release agent where concrete surfaces will receive special finishes or applied coverings which are affected by agent. 3.05 INSERTS, EMBEDDED PARTS, AND OPENINGS A. Provide formed openings where required for items to be embedded in or passing through concrete work. B. Locate and set in place items which will be cast directly into concrete. • 03100-4 Cuivert.spc 9553055A . DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK C. Coordinate work of other Sections in forming and placing openings, slots, reglets, recesses, chases, sleeves, bolts, anchors, and other inserts. D. Install accessories in accordance with manufacturer's instructions, straight, level, and plumb. Ensure items are not disturbed during concrete placement. E. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain. F. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly fitted so joints will not be apparent in exposed concrete surfaces. 3.06 FORM CLEANING A. Clean and remove foreign matter within forms as erection proceeds. B. Clean formed cavities of debris prior to placing concrete. C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out ports. D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts or water to clean out forms. Use compressed air or other means to remove foreign matter. 3.07 FORMWORK TOLERANCES A. Construct formwork to maintain tolerances required by ACI 301. 3.08 FIELD QUALITY CONTROL A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and that supports, fastenings, wedges, ties, and items are secure. B. Do not reuse wood formwork more than three times for concrete surfaces to be exposed to view. Do not patch formwork. 0 03100-5 Culvert.spc 95S3055A DIVISION 3 - CONCRETE SECTION 03100 - CONCRETE FORMWORK 3.09 FORM REMOVAL A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads. B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finished concrete surfaces scheduled for exposure to view. C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms. END OF SECTION 03100 • • 03100-6 Culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03200 - CONCRETE REINFORCEMENT PART1 GENERAL A. The complete installation of the reinforcing steel bars, wire fabric and accessories for cast-in-place concrete and reinforced masonry. 1.02 RELATED SECTIONS A. Section 03100 - Concrete Formwork B. Section 03300 - Cast-in-Place Concrete 1.03 REFERENCES A. ACI 301 - Structural Concrete for Buildings B. ACI 318 - Building Code Requirements For Reinforced Concrete C. ACI SP-66 - American Concrete Institute - Detailing Manual . D. ASTM A615 - Deformed and Plain Billet Steel Bars for Concrete Reinforcement E. CRSI - Concrete Reinforcing Steel Institute Manual of Practice 1.04 SUBMITTALS A. Shop Drawings: Indicate bar sizes, spacings, locations, and quantities of reinforcing steel and wire fabric, and bending and cutting schedules. Contract drawings shall not be reproduced as the basis for shop drawings. B. Manufacturer's Certificate: Certify that products meet or exceed specified requirements. 1.05 QUALITY ASSURANCE A. Perform Work in accordance with CRSI Manual of Standard Practice, 25th Edition. • 03200-1 Cuivert.spc 95S3055A DIVISION 3 - CONCRETE SECTION 03200 - CONCRETE REINFORCEMENT B. Submit certified copies of mill test report of reinforcement materials analysis. 1.06 QUALIFICATIONS A. Design reinforcement under direct supervision of a licensed Structural Engineer experienced in design of this work. 1.07 COORDINATION A. Coordinate with placement of formwork, formed openings and other Work. PART 2 PRODUCTS 2.01 REINFORCEMENT A. Reinforcing Steel: ASTM A615, 60 ksi yield grade; deformed billet steel bars. 2.02 ACCESSORY MATERIALS A. Tie Wire: Minimum 16 gage. B. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture. C. Special Chairs, Bolsters, Bar Supports, Spacers Adjacent to Weather Exposed or Architectural Concrete Surfaces: Plastic coated steel type; size and shape as required. 2.03 FABRICATION A. Fabricate concrete reinforcing in accordance with CRSI Manual of Practice and ACI SP-66. B. Locate reinforcing splices not indicated on Drawings, at point of minimum stress. Indicate location of splices on shop drawings. 03200-2 Culvert.spc 9553055A DIVISION 3 - CONCRETE 00 SECTION 03200 - CONCRETE REINFORCEMENT PART 3 EXECUTION 3.01 PLACEMENT A. Place, support and secure reinforcement against displacement. Do not deviate from required position. Clean reinforcement of foreign particles or coatings. B. Do not displace or damage vapor barrier. C. Accommodate placement of formed openings. D. Conform to ACI 318-89 code for concrete cover over reinforcement. 3.02 SPECIAL AND MINIMUM REINFORCING STEEL REQUIREMENTS A. Where walls or other items are shown as built integrally with other sections, but are placed as separate pours, keys and dowels shall be provided. Dowels shall be the same size and at the same spacing as reinforcing. B. Provide corner bars of same size and spacing as main reinforcement at all intersections and corners. C. Where openings occur in walls or slabs, provide two (2) #5 bars at all sides and extending at least 2 feet beyond the corners and two (2) #5 bars at least 3 feet long diagonally across each re-entrant corner. 3.03 FIELD QUALITY CONTROL A. Contractor shall notify the Engineer at least 24 hrs. in advance of concrete placement for a particular portion of the culvert. Placement of reinforcing shall occur in such sequence that the Engineer has sufficient time to inspect the correctness of the reinforcing within the placement area. The Engineer retains the right to require necessary revisions be made before concrete is placed. END OF SECTION 03200 03200-3 Culvert.spc 95S3055A . DIVISION 3 - CONCRETE 1. ASTM C33 - Concrete Aggregates SECTION 03300 -CAST-IN-PLACE CONCRETE PART1 GENERAL 1.01 WORK INCLUDES A. Culvert B. Wing Walls 1.02 RELATED SECTIONS A. Section 03100 - Concrete Formwork: Formwork and Accessories B. Section 03200 - Concrete Reinforcement 1.03 REFERENCES A. ACI 301 -Structural Concrete for Buildings B. ACI 302 -Guide for Concrete Floor and Slab Construction C. ACI 304 -Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete D. ACI 305R -Hot Weather Concreting E. ACI 306R -Cold Weather Concreting F. ACI 308 -Standard Practice for Curing Concrete G. ACI 318 -Building Code Requirements for Reinforced Concrete H. ASTM C31 - Concrete Test Specimens J. ASTM C94 - Ready-Mixed Concrete K. ASTM C150 - Portland Cement 03300-1 Culvert.spc 9553055A U r? LJ • DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE L. ASTM C260 - Air Entraining Admixtures for Concrete M. ASTM C494 - Chemical Admixtures for Concrete N. ANSI/ASTM D994 - Preformed Expansion Joint Filler for Concrete (Bituminous Type) 1.04 SUBMITTALS A. Product Data: Provide data on joint devices, attachment accessories, admixtures. B. Manufacturer's Installation Instructions: Indicate installation procedures and interface required with adjacent Work. 1.05 PROJECT RECORD DOCUMENTS A. Accurately record actual locations of embedded utilities and components which are concealed from view. 1.06 QUALITY ASSURANCE A. Perform Work in accordance with ACI 301. B. Acquire cement and aggregate from same source for all work. C. Conform to ACI 305R when concreting during hot weather. D. Conform to ACI 306R when concreting during cold weather. 1.07 PRODUCT DATA A. Submit proposed mix design to Engineer for review prior to commencement of work. Identify source and provide material certificates for cement, fine and coarse aggregates. Provide recent laboratory gradation for fine and coarse aggregates and mix design information in accordance with ACI 301. B. Submit Control/Construction joint plan. 03300-2 Culvcrt.spc 9553055A DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE PART 2 PRODUCTS 2.01 CONCRETE MATERIALS A. Cement: ASTM C150, Type I - Normal Portland Type, Gray Color B. Fine and Coarse Aggregates: ASTM C33 C. Water: Potable 2.02 ADMIXTURES A. Air Entrainment: ASTM C260 B. Chemical: ASTM C494. Maximum 0.0501c Chloride Ion Contents C. The use of calcium chloride in any concrete is not permitted. 2.03 ACCESSORIES A. Non-Shrink Grout: Premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 2,400 psi in 48 hours and 7,000 psi in 28 days. B. Curing Compound: Dress and Seal No. 18 by L&M Construction Chemicals, MB-429 by Master Builders, or Sikagard Cure/Hard by the Sika Corporation. C. Epoxy Grouted Adhesive Anchors: Hilti, Red Head or Rawl 2.04 CONCRETE MIX A. Mix concrete in accordance with ACI 304. Deliver concrete in accordance with ASTM C94. B. Select proportions for normal weight concrete in accordance with ACI 301. • 03300-3 Culvert.spc 9SS3055A DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE C. Provide normal weight concrete of the following characteristics: 1. Compressive strength at 28 days: 4,000 psi 2. Slump: 4 inch - A tolerance of up to 1 inch above the maximum shall be allowed for one batch in any five consecutive batches tested. D. Use accelerating admixtures in cold weather only when approved by Engineer. Use of admixtures will not relax cold weather placement requirements. E. Use set-retarding admixtures during hot weather only when approved by Engineer. F. Water-reducing admixtures may be used in all concrete except footings and in strict compliance with the manufacturer's directions. Admixture to increase cement dispersion, or provide increased workability for low-slump concrete, may be used at the Contractor's option subject to the Engineer's acceptance. G. Add air-entraining agent to concrete mix for concrete exposed to the exterior H. Add air-entraining agent to concrete mix for concrete not exposed to the exterior (3% ± 1%). PART 3 EXECUTION 3.01 EXAMINATION A. Verify requirements for concrete cover over reinforcement. B. Verify that anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete. 3.02 PLACING CONCRETE A. Place concrete in accordance with ACI 301. B. Notify Engineer minimum 24 hours prior to commencement of operations. • 03300-4 Culvert.spc 95S3055A DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE C. Ensure reinforcement, inserts, waterstops and embedded parts are not disturbed during concrete placement. D. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken. E. Place concrete continuously between predetermined expansion, control, and construction joints. F. Contraction joints shall be tooled or saw cut in slab to a depth shown on the plans. G. When air temperature is between 80°F and 90°F, reduce the mixing and delivery time specified in ASTM C94 from 1-1/2 hours to 75 minutes. When the air temperature is above 90°F, reduce the mixing and delivery time to 60 minutes. H. Cold weather concreting. Comply with ACI 306 except as follows: 1. In freezing weather, provide suitable means for maintaining concrete temperature at a minimum of 70°F for three days, or 50°F for five days after placing. 2. Cooling of concrete to outside temperature: Not faster than 1° per hour for first day and 2° per hour thereafter until outside temperature is reached. 3. Maximum temperature of concrete produced with heated aggregated, heated water, or both, at any time during its production or transportation: 90'F. 4. Do not mix chemicals or other foreign materials in concrete to prevent freezing or to accelerate hardening of concrete, unless approved in writing by the Engineer. I. Hot weather concreting. Comply with ACI 305R. 1. ACI recommendations shall be observed when any combination of high air temperature, low relative humidity and wind velocity tend to impair the quality of fresh or hardened concrete. • 03300-5 Culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE 2. Retarding and water reducing admixtures shall be approved in writing for each concrete mix design prior to placement. 3.04 CONCRETE FINISHING A. Provide exterior concrete formed surfaces to be left exposed with smooth rubbed finish in accord with ACI 301. 3.05 CURING AND PROTECTION A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury. B. Maintain concrete with minimal moisture loss at relatively constant temperature for a period necessary for hydration of cement and hardening of concrete in accordance with ACI 308. 3.06 FIELD QUALITY CONTROL is A. Field inspection and testing will be performed in accordance with ACI 301. B. Testing firm will take cylinders, perform slump and air entrainment tests in accordance with ACI 301. C. Provide free access to Work and cooperate with appointed firm. D. Submit proposed concrete mix design to inspection and testing firm for review 14 days prior to commencement of Work. E. Three concrete test cylinders will be taken for every 50 or less cubic yards of concrete placed each day. F. One additional test cylinder will be taken during cold weather concreting, cured on job site under same conditions as concrete it represents. G. One slump and air content test will be taken for each set of test cylinders taken. 03300-6 Culvert.spc 9553055A DIVISION 3 - CONCRETE SECTION 03300 - CAST-IN-PLACE CONCRETE 3.07 PATCHING A. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements. B. Repair or replacement of defective concrete will be determined by the Engineer at no additional cost to the Owner. C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Engineer for each individual area. E • 03300-7 Culvert.spc 9553055A Precast Culvert Alternatives The contractor may propose for consideration by the Engineer a precast concrete culvert alternative. The alternative should be limited to replacing the cast-in-place concrete walls and slab with precast concrete alternative sections. Any contractor proposed alternatives shall comply with the following: a) Stresses in the concrete and steel at all sections shall meet the requirement of the design criteria noted on the plans. b) The contractor fully designs the elements of the precast concrete culvert. c) The contractor submits complete shop drawings and design calculations sealed by N.C. Registered Engineer for Engineer approval. d) The use of additional materials, such as concrete, reinforcement, joint materials necessitated by such alternative design, shall be at the Contractor's expense. e) The contractor shall bear all engineering and testing costs incurred by the owner in reviewing the contractor's alternative design. U • Culvert.spc 95S3055A • 3 • 0 • ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina COMPUTATIONS • I - HYDRAULICS DESIGN COMPUTATIONS 2 - GEOTECHNICAL DESIGN COMPUTATIONS (Refer to Final Report for Stability Analyses and to the Law Engineering Report for boring logs) 3 - STRUCTURAL DESIGN COMPUTATIONS I hereby certify that this plan, specification, or report was prepared by me or under m_v direct supervision and that i am a duly Regis- tered Professior.,-1 Er^rin nr u-der the laws of the Slate of N; )r; (':: ;>!irzi. ?A Reg. No. 4033 culvert.cov 8/6/96 ?(`p"'.?S,?° T1 °pr .'?eSSlo y' 0 SIB Q SEALr oCC 0 C s 4033 0 95S3055A • ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina HYDRAULICS DESIGN COMPUTATIONS 0 • Culvert.cov S/G/9G 95S3055A 5Y_LV1_1_!_!-___DATE€ ANSON ENGINEERS, INC. ENGINEERS - CONSULTANTS CHKD. 6Y------- DATE --------- S?=I!,!GFi_LD, ?FOF.;A d ROCKFORD, ILLINO!S /.'Vy,)2f3yG/C ,Je-'516.1 ?o?y?vr.9rio?s C 0 Al 7';!51V7-5 SHEET NO.____ /-_.OF_/-__ J0B N0.9553Q5?L? _6D0 yD2oG0 ?/? ff/(/D ?fyD?.s'f/G/c G'd/l!5/D?2?9T/DNS x/7 4/Q/Ts • ZfW,E - 6 /DAD c 616 ve-2 T - Zf7-IW6 C 642 vE • ft?C-/ /??UT-OUT?UT S'Utillilft? y ?lDO-ye? 5?-Y?.? 25-y?? FCoo a .s • ff?C-/ 100 - ye CO •yPGeyE cO??v>?i2 O UTpUT Ourj?IJT 0 • HYDROLOGIC AND -HYDRAULIC CONSIDERATIONS 0 0 • HYDROLOGIC AND HYDRAULIC CONSIDERATIONS Some of the hydrologic parameters for the project were obtained from the Law Engineering hydrologic report. The upstream watershed drainage area is about 1,318 acres (2.06 square, miles). A precipitation amount of 7.44 inches in 24 hours was used for the 100-yr design flood. Other hydrologic parameters considered were the runoff coefficient, the type of soil and vegetative cover in the watershed, and the time of concentration. Exhibit 1 shows the watershed area boundary and the site location of the proposed culvert and embankment across the Rock Branch creek. Exhibit 2 shows the General Plan for the project, including the roadway along the crest of the embankment. The three-sided culvert was designed as an open channel. The culvert will be able to pass all floods, up to the 100-yr design flood event, without flowing full (under pressure). The existing channel has a supercritical slope. Since we are not modifying the existing channel slope, the flow through the culvert will remain supercritical. The width of the culvert (16 ft) was selected to span the average existing channel width (see Exhibits 3, 4, and 5 for the culvert dimensions). The height of the culvert was designed as 10 ft with a provision of 8 ft minimum clearance above any obstruction on the creek. This provision will allow the culvert to pass the 100-yr design flood partially full. A bend in the alignment at the culvert entrance was introduced to better match the existing meander of the approach channel. The three-sided culvert was designed as a cast-in-place structure. Concrete wing walls and riprap were provided at the inlet and the outlet of the culvert to protect the structure and the earth embankment during floods. No energy dissipator is needed at the culvert outlet, because the proposed culvert will not change the existing supercritical flow conditions, and existing velocities will not increase significantly. The culvert outlets on a rocky channel bottom. There is no need to modify the existing natural conditions of the channel at the culvert outlet. Charts from the "Hydraulic Design of Highway Culverts" (Federal Highway Administration) were used to develop a culvert rating curve at the inlet. The HEC-1 computer program (U.S. Corps) was used to route the 100-yr flood event through the culvert to determine any backwater effects. The HEC-RAS computer program (U.S. Corps) was used to determine a water surface profile, for different floods, along the existing channel. The program assumed "critical flow" due to the supercritical slope of the channel. The result is conservative, since a lower water surface elevation will be produced if the actual flow is supercritical. In conclusion, the three-sided culvert will not change the hydraulic characteristics of the stream. It will continue to operate as an open channel, and no significant backwater or detention effects will be caused by the culvert and the embankment. • Culvert.hyd 9553055A 8/12/96 • EXMIB[T-S • 0 E • 0 0 0 1] • • r- -I LJ i6 B , w.t 735 i d / 11 i I OM 73S . ?I t II I I II i A I ? Ie. i ' lY 6 I ' ?r g7 I O[.l '335 d 80 'II e ° II ?i w d 5C+1 735 I i i 8 I d i 8 I I` R ? 8 ? d 1 :.?.. u u u ? a x t ?' ? v e j W s W A = W3i R W( Z ? w aaa 1 G a F d r O N m o F? W N J ? - Z O U 2 O J S Z N O Z ? W 5 O Z ? U S O j 7 yo Y W R V S W 7 ? Z O W g ? O. til !i z Q C F V) ?E ?tl0 UI o d' ^ C V N a o W Z g e g z ? a a _ V L, u H ? C J U u u u c x L_ J Ytl $a R i K R o ? d d d d - - ?W W° R 8 ? t o • • i 8 r a, a ;P Q in i w a } s !!! 8889 01 ? P.1 ? ? te < C N'. 6 6 ib E 3 « K ? ?? ? 7 ?? 4? b b b ? WS Z! 11 f i 1 f 1? yy ? _ q w Mpgp8g ?= !- D ?[ e ? ?K ? Kb b $ ee g b z5 ~ ? , / ld e,f??c1 Y$ 1y 1? yy qQ ? C J g = W g`B ?e Ya gX .g a a € d ( F < ac ci -.fl quy?j5 iF ' =$ G8 $B N H1 ib a v v ?x i5 f r 77.1 Xe 3€ ?:a? $ ?5ilf)f85:ii d d C7 3 ? I '?? u u u aS .t-.1 ?? W y a? W J _ .D'W A A ? $5 g e ?+ Z t! W d ? ? •y 1 1 I gy ti yg d ? as Z ? a S a Z r ( @ p ? Y _ e ? Wa g • ? H ? ?? 3 ;d ? ? E . = G g b Z ? g apNi. i i ?g?1n?? O ? BY`sb b I ? AI-.1 m ? l ? ------ E? a m J a 3 a - -- t? ?.. d ?' w o Q 5!8 88 b i-J n.-o k w d a.a-??.?.n i tg ` g ? ? ? Q cSa cEa e e ? J « Q x o s $ i ?kx I W ? 0 , c3 6 R ? d i R $ a c c?a c4 wo wo rro • THREE-SIDED- CULVERT 0 RATING CURVE 0 BY ___? -DATE __65---96 HANSON ENGINEERS, INC. ENGINEERS - CONSULTANTS CHKD. BY------- DATE --------- SPRINGFIELD. PECK:;; a ROCKFORD, ILLINOIS -4w-e-//- ---------------- U G VFW SHEET NO ------ /--__OF- JCe no.?53D5SA__6oc rlX /? 9A!5 -,5l b4 /) C'(JLV?4 7- e U/z VE __ ?? '114 EX/57/kG C ?,¢n/.VEC ?3aTTO?1 ? \• \ ? . `? _ ?/r ? ? r ? ?• L- zoo, 6D TjO" 51601-0e (if y4e'f6E) = o' o X 75 5= 0 ,0!75 (svPeeeleIrle4c) 28o zoo I) f?55U?/E !? oX - cyL YES T W/TH -A'IVT74- C4 ?ON T,20L ? tvSED ?N ME,e-i ? yT2/J?ICE Y?caci?Y W, S, EG ?D f? f?) i / Cofs) G?/I?? VE?oGi? y -D (?v? _ 0 0 '79 6.35 2 ,'g 76 4?8 3 93 02? 794,7 o.¢O 3.2 ?¢ -Z Z4- 5-1.2 ¢'?8 0,30 795,5 0,50 40 z0 320 64-.o 5.00 0.39 7r11o,3 0-60 ¢$ 26 4-16 76,0 5)4?- O.¢G 796-7 0,65 5.Z 29.E 4-74 83.2 5G9 0.50 797-/ o•7o 5-6 33 5728 89.6 5189 0.54 ioQ-Y2?9?-5 0,75 G,o ?77 5q?- 9G-o 61117 0,69 797-9 0180 (-14- 41 6 5( /0 2,? 6,40 o,64 798.7 01,70 -71 2 417 78 ? //51Z 6 • So 0172 '7 19.5 4,00 g,0 57 9/2 /za,o 71/2 0.79 R65614-7*5 12e0N1 gioo = 592 c; S 797,5 0 (-'? Go = 50 / s 7 9G, 9 / Zs = 395 c fs 796•/2 BY--A- ?%?l ----DATEHANSON ENGINEERS, INC. -- ENGINEERS - CONSULTANTS CHKO. BY------- DATE --------- SPRINGFIELD, PEOR: & ROCKFORD, ILLINOIS sex----------- • Gv vG Y,40--teT dl F?11313WIt /L "7' SHEET NO.___2 JCB 2? CSC /? C (,1G Vz:2 T ?Lou?/?G ,?TL yUL G _Z A-= W o H z 2 ff ? tit! v_ 00'0!5 H (?"-) R ae) Pw (R) A (-ft) v (fps) q (cfs) 4 6 4 24- 2, ?? 7.5G 4-84- > 32o s,?c?r 9? 28 3¢3 8.9 q' S SS > 592 0- DAt7% s ° G? UGY?2 T Gf1 /GC- /t?0 T ,?Gou??UCL ?v?DE.??2?55 U? E ) • Ve-G oc /Tid-'55 /f 7,"Z ? ?E 1-c-04 A Ro c4 y 60ml- • 70 /O - (Wrhl- /5?- 4uel1A11 UlbW C Z -0fAZAle,!5 Oz-- S, Ci To I6 G0 4u 7`f}? ?5 X ?r?ie 's c /f?•?/.?G 6D TTo? . ?GOGtJ W/6& %61t-11?-1A1-s lei//Ti?7itl life oz--f7`7391 m e- /VO 516 *1jam/C4W 7- 0,'Z T> 4 7EAlT/fill( E`j??G TS • MEC-1 INPUT-OUTPUT SUMMARY (100-YR, 50YR & 25YR) FLOODS • 0 HEC-1 INPUT /DO-y2 y?oOD PAGE 1 LINE ID ....... 1. ...... 2. ...... 3. ...... 4....... 5....... 6....... 7....... 8....... 9...... 10 • 1 ID ROCK BRANCH CREEK EMB - GUILFORD CO. - 100-YR FLOOD/TYPE-II DIST - 24-HR 2 ID NORT H CAROLI NA STATE - FOR CHICAGO BRIDGE & IRON- COUNTY NAME GUILFORD,NC 3 ID BY HANSON ENGINEERS INC., JOB #F 95S3055A-0600 NCEMBCU5.HC1 CULVERT * 24-HR 12-HR 6-HR * - 7.44 6.50 5.50 *DIAGRAM 4 IT 15 192 5 IO 1 0 6 JR PREC 1.00 7 KK POND 8 KM INFLOW HY DRDGRAPH COMPUTATION FOR CULVERT ENTRANCE 9 BA 2.06 10 IN 60 11 PB 7.44 12 PI .011 .022 .035 .048 .064 .080 .100 .120 .147 .181 13 PI .235 .663 .772 .820 .850 .880 .898 .916 .934 .952 14 PI .964 .976 .988 1.000 15 UD 1.20 16 LS 66 2 17 BF 0 -0.10 2 18 KK EMB 19 KM RESERVOIR ROUTING BY MODIFIED PULS - 16' X 8' THREE-SIDED CULVERT 20 KO 3 2 21 KP 1 22 RS 1 ELEV 791.5 23 SV 0 0.3 1.46 2.64 7.63 18.75 36.6 48.09 54.48 86.00 24 SE 790.0 794.0 798.0 800.0 804.0 808.0 812.0 814.0 815.0 820.0 25 SO 0 176 224 320 416 528 592 656 784 912 26 SE 791.5 794.3 794.7 795.5 796.3 797.1 797.5 797.9 798.7 799.5 27 SS 791.5 28 ST 832.1 29 ZZ 0 /00--//Z ?G00D PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES is TIME TO PEAK IN HOURS RATIOS APPLIED TO PRECIPITATION OPERATION STATION AREA PLAN RATIO 1 1.00 HYDROGRAPH AT POND 2.06 ROUTED TO EMB 2.06 1 FLOW 593. TIME 24.00 1 FLOW 592. TIME 24.00 ** PEAK STAGES IN FEET ** 1 STAGE 797.50 TIME 24.00 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION EMB (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 ............... INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 791.50 791.50 832.10 STORAGE 0. 0. 162. OUTFLOW 0. 0. 6128. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 797.50 0.00 1. 592. 0.00 24.00 0.00 *** NORMAL END OF HEC-1 *** • • HEC-1 INPUT 50-yk / 9 _5600b LINE ID. ...... 1. ...... 2 ....... 3.. ..... 4....... 5.. ..... 6.. ..... 7....... 8... .... 9...... 10 1 ID ROCK BRANCH CREEK EMB - GUILFORD CO. - 50-YR FLOOD/TYPE-II DIS T - 24-HR 2 ID NORTH CAROLINA STATE - FOR CHICAGO BR IDGE & IRON- COUNTY NAME GUILFORD,NC 3 ID BY HANSON ENGINEERS INC., JOB #r 95S3055A-0600 NCEMBCU6.HC1 CULVERT * 24-HR 12-HR 6-HR * - 6.60 5.70 4.80 *DI AGRAM 4 IT 15 192 5 IO 1 0 6 JR PREC 1.00 7 KK POND 8 KM I NFLOW HYDROGRAPH COMPUTATION FOR CULVERT ENTRANCE 9 BA 2.06 10 IN 60 11 PB 6.60 12 PI .011 .022 .035 .048 .064 .080 .100 .120 .147 .181 13 PI .235 .663 .772 .820 .850 .880 .898 .916 .934 .952 14 PI .964 .976 .988 1.000 15 UD 1.20 16 LS 66 2 17 BF 0 -0.10 2 18 KK EMB 19 KM R ESERVOIR ROUTING BY MODIFIED PULS - 16' X 8' THREE-SIDED CULVERT 20 KO 3 2 21 KP 1 22 RS 1 ELEV 791.5 23 SV 0 0.3 1.46 2.64 7.63 18.75 36.6 48.09 54.48 86.00 24 SE 790.0 794.0 798.0 800.0 804.0 808.0 812.0 814.0 815.0 820.0 25 SQ 0 176 224 320 416 528 592 656 784 912 26 SE 791.5 794.3 794.7 795.5 796.3 797.1 797.5 797.9 798.7 799.5 27 SS 791.5 28 ST 832.1 29 ZZ PAGE 1 0 50 - y2 ,moo PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES TIME TO PEAK IN HOURS RATIOS APPLIED TO PRECIPITATION OPERATION STATION AREA PLAN RATIO 1 1.00 HYDROGRAPH AT POND 2.06 ROUTED TO EMS 2.06 1 FLOW 502. TIME 24.00 1 FLOW 501. TIME 24.25 ** PEAK STAGES IN FEET ** 1 STAGE 796.91 TIME 24.25 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION EMS (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 ............... INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 791. 50 791.50 832.10 STORAGE 0. 0. 162. OUTFLOW 0. 0. 6128. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 796.91 0.00 1. 501. 0.00 24.25 0.00 0 HEC-1 INPUT ZS-y/Z PAGE 1 LINE ID....... 1. ...... 2. ...... 3.. ..... 4....... 5.. ..... 6....... 7....... 8... .... 9...... 10 1 ID ROCK BRANCH CREEK EMB - GUILFORD CO. - 25-YR FLOOD/TYPE-II DIS T - 24-HR 2 ID NORT H CAROLI NA STATE - FOR CHICAGO BRIDGE & IRON- COUNTY NAME GUILFORD,NC 3 ID BY HANSON ENGINEERS INC., JOB # 95S 3055A-0600 NCEMBCUT.HC1 CULVERT * 24-HR 12-HR 6-HR * - 5.60 4.80 4.00 *DIAGRAM 4 IT 15 192 5 IO 1 0 6 JR PREC 1.00 7 KK POND 8 KM I NFLOW HY DROGRAPH COMPUTATION FOR CULVERT ENTRANCE 9 BA 2.06 10 IN 60 11 PB 5.60 12 PI .011 .022 .035 .048 .064 .080 .100 .120 .147 .181 13 PI .235 .663 .772 .820 .850 .880 .898 .916 .934 .952 14 PI .964 .976 .988 1.000 15 UD 1.20 16 LS 66 2 17 BF 0 -0.10 2 18 KK EMB 19 KM R ESERVOIR ROUTING BY MODIFIED PULS - 16' X 8' THREE-SIDED CULVERT 20 KO 3 2 21 KP 1 22 RS 1 ELEV 791.5 23 SV 0 0.3 1.46 2.64 7.63 18.75 36.6 48.09 54.48 86.00 24 SE 790.0 794.0 798.0 800.0 804.0 808.0 812.0 814.0 815.0 820.0 25 SQ 0 176 224 320 416 528 592 656 784 912 26 SE 791.5 794.3 794.7 795.5 796.3 797.1 797.5 797.9 798.7 799.5 27 SS 791.5 28 ST 832.1 29 ZZ i/ 1l ?_ 1 25-?'/? `GOOD PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES TIME TO PEAK IN HOURS 0 RATIOS APPLIED TO PRECIPITATION OPERATION STATION AREA PLAN RATIO 1 1.00 HYDROGRAPH AT POND 2.06 1 FLOW 394. TIME 24.25 ROUTED TO EMB 2.06 1 FLOW 395. TIME 24.25 ** PEAK STAGES IN FEET ** 1 STAGE 796.12 TIME 24.25 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION EMB (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) • PLAN 1 ............... INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 791.50 791.50 832.10 STORAGE 0. 0. 162. OUTFLOW 0. 0. 6128. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 796.12 0.00 1. 395. 0.00 24.25 0.00 0 HEC-1 100-YR- COMPLETE COMPUTER OUTPUT • 0 HEC1 S/N: 0134300997 HMVersion: 6.33 Data File: NCEMBCU5.hcl *RR*R***** *****R****RRR*** OGRAPH PACKAGE (H EC-1) * 0!*L*O*O*D*H**Y*D*R* * MAY 1991 * VERSION 4.0.1E * R * RUN DATE 08/12/1996 TIME 12:58:13 * * x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx ........................................... ........................................... ........................................... ........................................... :.. Full-Microcomputer Implementation :.. by Haestad Methods, Inc. ........................................... ........................................... ........................................... ........................................... * * * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 * * 37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666 THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN T3), HEMS, HECIDB, AND HECIKW. THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRANT7 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM I ? ]l HEC-1 INPUT LINE ID ....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 1 ID ROCK BRANCH CREEK EMB - GUILFORD CO. - 100-Y R FLOOD/TYPE-II DI ST - 24-HR 2 ID NORT H CAROLI NA STATE - FOR CHICAGO BR IDGE & IRON- COUNTY NAME GUILFORD,NC 3 ID BY HANSON ENGINEERS INC., JOB # 95S 3055A-0 600 NCEMBCU5.HC1 CULVERT * 24-HR 12-HR 6-HR * 7.44 6.50 5.50 *DIAGRAM 4 IT 15 192 5 IO 1 0 6 JR PREC 1.00 7 KK POND 8 KM I NFLOW HY DROGRAPH COMPUTATION FOR CULVERT ENTRANCE 9 BA 2.06 10 IN 60 11 PB 7.44 12 PI .011 .022 .035 .048 .064 .080 .100 .120 .147 .181 13 PI .235 .663 T72 .820 .850 .880 .898 .916 .934 .952 14 PI .964 .976 .988 1.000 15 UD 1.20 16 LS 66 2 17 BF 0 -0.10 2 18 KK EMB 19 KM R ESERVOIR ROUTING BY MODIFIED PULS - 16' X 8' THREE-SIDED CULVERT 20 KO 3 2 21 KP 1 22 RS 1 ELEV 791.5 23 S:' 0 0.3 1.46 2.64 7.63 - -18.75 35.6 48.09 54.48 86.00 24 SE 790.0 794.0 798.0 800.0 804.0 808.0 812.0 814.0 815.0 820.0 25 SO 0 176 224 320 416 528 592 656 784 912 26 SE 791.5 794.3 794.7 795.5 796.3 797.1 797.5 797.9 798.7 799.5 27 SS 791.5 28 ST 832.1 29 ZZ PAGE 1 0 SCHEMATIC DIAGRAM OF STREAM NETWORK INPUT (V) ROUTING (--->) DIVERSION OR PUMP FLOW (.) CONNECTOR (<---) RETURN OF DIVERTED OR PUMPED FLOW 7 POND V V 18 EMB (***) RUNOFF ALSO COMPUTED AT THIS LOCATION • 0 HEC1 S/N: 0134300997 HMVersion: 6.33 Data File: NCEMBCU5.hc1 www«www«w«wxx««w«««w«««««x«xx«xwxww«w««ww w 49FLOOD HYDROGRAPH PACKAGE (HEC-1) * MAY 1991 * VERSION 4.0.1E w x * RUN DATE 08/12/1996 TIME 12:58:13 w w wwxw«wwwwxwwwxxwx««wwwwwwwwwwwxxxwwxw«www «««www«www««xwxw«wx*««xxw««««««««««««x« * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 w x «xwx«w««xw«x«xxx«««wwwwww««wwwwwwxwx«ww ROCK BRANCH CREEK EMB - GUILFORD CO. - 100-YR FLOOD/TYPE-II DIST - 24-HR NORTH CAROLINA STATE - FOR CHICAGO BRIDGE & IRON- COUNTY NAME : GUILFORD,NC BY HANSON ENGINEERS INC., JOB # 95S3055A-0600 NCEMBCU5.HC1 CULVERT 5 IO OUTPUT CONTROL VARIABLES IPRNT 1 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 15 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 192 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 2345 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL 0.25 HOURS TOTAL TIME BASE 47.75 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE JP MULTI-PLAN OPTION NPLAN JR SQUARE MILES INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT 1 NUMBER OF PLANS MULTI-RATIO OPTION RATIOS OF PRECIPITATION 1.00 www w«w www xww xww www www www www xww xww www www www wxw www wxw wxw www wwx www www wxw w«w www w«w www «wx w«w wwx www ««w xx« www«w«xxxwwwx« w w 401KK * POND w x wwwwwwwwwxwwxw INFLOW HYDROGRAPH COMPUTATION FOR CULVERT ENTRANCE 10 IN TIME DATA FOR INPUT TIME SERIES JXMIN 60 TIME INTERVAL IN MI NUTES JXDATE 1 0 STARTING DATE JXTIME 0 STARTING TIME SUBBASIN RUNOFF DATA 9 BA SUBBASIN CHARACTERISTICS TAREA 2.06 SUBBASIN AREA 17 BF BASE FLOW CHARACTERISTICS STRTQ 0.00 INITIAL FLOW QRCSN -0.10 BEGIN BASE FLOW REC ESSION RTIOR 2.00000 RECESSION CONSTANT PRECIPITATION DATA 11 PB STORM 7.44 BASIN TOTAL PRECIPI TATION 12 PI INCREMENTAL PRECIPITATION PATTERN 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.04 0.04 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.06 0.17 0.17 0.17 0.17 0.19 0.19 0.19 0.19 0.20 0.21 0.20 0.20 0.21 0.21 0.21 0.21 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 c SCS LOSS RATE STRTL 1.03 INITIAL ABSTRACTION CRVNBR 66.00 CURVE NUMBER RTIMP 2.00 PERCENT IMPERVIOUS AREA 15 LID SCS DIMENSIONL ESS UNITGRAPH TLAG 1.20 LAG UNIT HYDROGRAPH 26 END-OF-PERIOD ORDINATES 69. 213. 448. 662. 747. 730. 634. 503. 347. 254. 190. 141. 103. 76. 55. 40. 30. 22. 16. 12. 9. 7. 5. 4. 2. 1. HYDROGRAPH AT STATION POND DA MON HRMN ORD RAIN LOSS EXCESS COMP Q * * * DA MON HRMN ORD RAIN LOSS EXCESS COMP Q 1 0000 1 0.00 0.00 0.00 0. 2 0000 97 0.15 0.03 0.12 593. 1 0015 2 0.00 0.00 0.00 0. * 2 0015 98 0.00 0.00 0.00 591. 1 0030 3 0.00 0.00 0.00 0. 2 0030 99 0.00 0.00 0.00 572. 1 0045 4 0.00 0.00 0.00 0. * 2 0045 100 0.00 0.00 0.00 524. 1 0100 5 0.00 0.00 0.00 0. * 2 0100 101 0.00 0.00 0.00 451. 1 0115 6 0.00 0.00 0.00 0. * 2 0115 102 0.00 0.00 0.00 366. 1 0130 7 0.00 0.00 0.00 0. * 2 0130 103 0.00 0.00 0.00 282. 1 0145 8 0.00 0.00 0.00 0. * 2 0145 104 0.00 0.00 0.00 209. 1 0200 9 0.00 0.00 0.00 0. 2 0200 105 0.00 0.00 0.00 151. 1 0215 10 0.01 0.01 0.00 0. 2 0215 106 0.00 0.00 0.00 111. 1 0230 11 0.01 0.01 0.00 0. 2 0230 107 0.00 0.00 0.00 82. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 lei 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ol 1 1 1 1 1 0245 12 0.01 0.01 0.00 0. * 2 0245 108 0.00 0.00 0.00 60. 0300 13 0.01 0.01 0.00 0. * 2 0300 109 0.00 0.00 0.00 50. 0315 14 0.01 0.01 0.00 0. * 2 0315 110 0.00 0.00 0.00 42. 0330 15 0.01 0.01 0.00 0. * 2 0330 111 0.00 0.00 0.00 36. 0345 16 0.01 0.01 0.00 0. * 2 0345 112 0.00 0.00 0.00 30. 0400 17 0.01 0.01 0.00 1. * 2 0400 113 0.00 0.00 0.00 25. 0415 18 0.01 0.01 0.00 1. * 2 0415 114 0.00 0.00 0.00 21. 0430 19 0.01 0.01 0.00 1. * 2 0430 115 0.00 0.00 0.00 18. 0445 20 0.01 0.01 0.00 1. * 2 0445 116 0.00 0.00 0.00 15. 0500 21 0.01 0.01 0.00 1. * 2 0500 117 0.00 0.00 0.00 13. 0515 22 0.01 0.01 0.00 1. * 2 0515 118 0.00 0.00 0.00 11. 0530 23 0.01 0.01 0.00 1. * 2 0530 119 0.00 0.00 0.00 9. 0545 24 0.01 0.01 0.00 1. * 2 0545 120 0.00 0.00 0.00 7. 0600 25 0.01 0.01 0.00 1. 2 0600 121 0.00 0.00 0.00 6. 0615 26 0.01 0.01 0.00 1. * 2 0615 122 0.00 0.00 0.00 5. 0630 27 0.01 0.01 0.00 1. * 2 0630 123 0.00 0.00 0.00 4. 0645 28 0.01 0.01 0.00 1. * 2 0645 124 0.00 0.00 0.00 4. 0700 29 0.01 0.01 0.00 1. * 2 0700 125 0.00 0.00 0.00 3. 0715 30 0.02 0.02 0.00 1. * 2 0715 126 0.00 0.00 0.00 3. 0730 31 0.02 0.02 0.00 1. * 2 0730 127 0.00 0.00 0.00 2. 0745 32 0.02 0.02 0.00 1. 2 0745 128 0.00 0.00 0.00 2. 0800 33 0.02 0.02 0.00 2. 2 0800 129 0.00 0.00 0.00 2. 0815 34 0.02 0.02 0.00 2. 2 0815 130 0.00 0.00 0.00 1. 0830 35 0.02 0.02 0.00 2. * 2 0830 131 0.00 0.00 0.00 1. 0845 36 0.02 0.02 0.00 2. * 2 0845 132 0.00 0.00 0.00 1. 0900 37 0.02 0.02 0.00 2. * 2 0900 133 0.00 0.00 0.00 1. 0915 38 0.03 0.03 0.00 2. 2 0915 134 0.00 0.00 0.00 1. 0930 39 0.03 0.03 0.00 2. * 2 0930 135 0.00 0.00 0.00 1. 0945 40 0.03 0.03 0.00 2. * 2 0945 136 0.00 0.00 0.00 0. 1000 41 0.03 0.03 0.00 2. * 2 1000 137 0.00 0.00 0.00 0. 1015 42 0.03 0.03 0.00 2. 2 1015 138 0.00 0.00 0.00 0. 1030 43 .-0.03 0.03 0.00 3. 2 1030 139 0.00 0.00 0.00 0. 1045 44 0.03 0.03 0.00 3. * 2 1045 140 0.00 0.00 0.00 0. 1100 45 0.03 0.03 0.00 3. * 2 1100 141 0.00 0.00 0.00 0. 1115 46 0.10 0.10 0.00 3. 2 1115 142 0.00 0.00 0.00 0. 1130 47 0.10 0.10 0.00 4. * 2 1130 143 0.00 0.00 0.00 0. 1145 48 0.10 0.10 0.00 4. * 2 1145 144 0.00 0.00 0.00 0. 1200 49 0.10 0.10 0.00 5. * 2 1200 145 0.00 0.00 0.00 0. 1215 50 0.11 0.11 0.00 6. * 2 1215 146 0.00 0.00 0.00 0. 1230 51 0.11 0.11 0.01 8. * 2 1230 147 0.00 0.00 0.00 0. 1245 52 0.11 0.10 0.01 11. * 2 1245 148 0.00 0.00 0.00 0. 1300 53 0.11 0.10 0.02 16. * 2 1300 149 0.00 0.00 0.00 0. 1315 54 0.12 0.10 0.02 24. * 2 1315 150 0.00 0.00 0.00 0. 1330 55 0.12 0.09 0.03 35. 2 1330 151 0.00 0.00 0.00 0. 1345 56 0.12 0.09 0.03 49. 2 1345 152 0.00 0.00 0.00 0. 1400 57 0.12 0.09 0.03 65. 2 1400 153 0.00 0.00 0.00 0. 1415 58 0.12 0.09 0.04 84. * 2 1415 154 0.00 0.00 0.00 0. 1430 59 0.12 0.08 0.04 103. 2 1430 155 0.00 0.00 0.00 0. 1445 60 0.12 0.08 0.04 123. * 2 1445 156 0.00 0.00 0.00 0. 1500 61 0.12 0.08 0.05 143. * 2 1500 157 0.00 0.00 0.00 0. 1515 62 0.13 0.08 0.05 163. 2 1515 158 0.00 0.00 0.00 0. 1530 63 0.13 0.07 0.06 182. * 2 1530 159 0.00 0.00 0.00 0. 1545 64 0.13 0.07 0.06 202. * 2 1545 160 0.00 0.00 0.00 0. 1600 65 0.13 0.07 0.06 221. 2 1600 161 0.00 0.00 0.00 0. 1615 66 0.13 0.07 0.06 240. * 2 1615 162 0.00 0.00 0.00 0. 1630 67 0.13 0.06 0.07 258. * 2 1630 163 0.00 0.00 0.00 0. 1645 68 0.13 0.06 0.07 276. * 2 1645 164 0.00 0.00 0.00 0. 1700 69 0.13 0.06 0.07 293. * 2 1700 165 0.00 0.00 0.00 0. 1715 70 0.13 0.06 0.08 309. 2 1715 166 0.00 0.00 0.00 0. 1730 71 0.13 0.06 0.08 325. 2 1730 167 0.00 0.00 0.00 0. 1745 72 0.13 0.06 0.08 340. * 2 1745 168 0.00 0.00 0.00 0. 1800 73 0.13 0.05 0.08 355. * 2 1800 169 0.00 0.00 0.00 0. 1815 74 0.14 0.05 0.08 369. * 2 1815 170 0.00 0.00 0.00 0. 1830 75 0.14 0.05 0.09 382. 2 1830 171 0.00 0.00 0.00 0. 1845 76 0.14 0.05 0.09 396. 2 1845 172 0.00 0.00 0.00 0. 1900 T7 0.14 0.05 0.09 409. * 2 1900 173 0.00 0.00 0.00 0. 1 1915 78 0.14 0.05 0.09 421. * 2 1915 174 0.00 0.00 0.00 0. 1 1930 79 0.14 0.05 0.09 433. * 2 1930 175 0.00 0.00 0.00 0. 1 1945 80 0.14 0.04 0.10 445. * 2 1945 176 0.00 0.00 0.00 0. 1 2000 81 0.14 0.04 0.10 456. * 2 2000 177 0.00 0.00 0.00 0. 1 2015 82 0.14 0.04 0.10 467. * 2 2015 178 0.00 0.00 0.00 0. 1 2030 83 0.14 0.04 0.10 478. * 2 2030 179 0.00 0.00 0.00 0. 1 2045 84 0.14 0.04 0.10 488. * 2 2045 180 0.00 0.00 0.00 0. 1 2100 85 0.14 0.04 0.10 498. 2 2100 181 0.00 0.00 0.00 0. 1 2115 86 0.14 0.04 0.11 507. * 2 2115 182 0.00 0.00 0.00 0. 1 2130 87 0.14 0.04 0.11 516. * 2 2130 183 0.00 0.00 0.00 0. 1 2145 88 0.14 0.04 0.11 525. * 2 2145 184 0.00 0.00 0.00 0. 1 2200 89 0.14 0.04 0.11 533. * 2 2200 185 0.00 0.00 0.00 0. 1 2215 90 0.15 0.03 0.11 541. * 2 2215 186 0.00 0.00 0.00 0. 1 2230 91 0.15 0.03 0.11 549. 2 2230 187 0.00 0.00 0.00 0. 1 2245 92 0.15 0.03 0.11 557. * 2 2245 188 0.00 0.00 0.00 0. 1 2300 93 0.15 0.03 0.11 565. * 2 2300 189 0.00 0.00 0.00 0. 1 2315 94 0.15 0.03 0.12 572. * 2 2315 190 0.00 0.00 0.00 0. 1 2330 95 0.15 0.03 0.12 579. * 2 2330 191 0.00 0.00 0.00 0. 1 2345 96 0.15 0.03 0.12 586. * * 2 2345 192 0.00 0.00 0.00 0. *R*RRRRR*RR***RRR14***RRRRR*RR*RRR*RRRRRRR *RRR*RRRRRRRRRRR•RR R*******RRR*RRRRRRRR**RRR **R*RR **RRRR*R R***RR* RRRR**RRRRRRRRRRRRRI4RRRRtk TOTAL RAINFALL = 7.44, TOTAL LOSS = 3. 81, TOTAL EX CESS = 3.63 PEAK FLOW TIME MAXIMUM AVERAGE FLOW (CFS) (HR) 6-HR 24-HR 72-HR 47.75-HR 593. 24.00 (CFS) 518. 203. 102. 102. (INCHES) 2.336 3.656 3.661 3.661 (AC-FT) 257. 402. 402. 402. CUMULATIVE AREA = 2.06 SQ MI RR?RRRRRRRRRR 814141414#R14R*R*R1414**#*RRR*RR RRRRRRRRRRtRRRRRRRR RRRRRRRRRRRRRRRR***RRRRRR R*RRRR RRRRRRRR R}[RRRR* RRRR*RRR*RR*RRR*RR*RRRRRR HYDROGRAPH AT STATION POND PLAN 1 , RATIO = 1.00 88RR*88888888RRRRRRRRRRRRRRRRRRRBRR*RRR*8 8RRRRRRRt888R88RRRt R8RR8RR8RRRRR88888RRRR888 * RRR8RR RRRRRRRR R8RR8R8 R*RRRRR8R888RR8RRRR8R8RR8 DA MON HRMN ORD RAIN LOSS EXCESS COMP Q * * DA MON HRMN ORO RAIN LOSS EXCESS COMP 0 1 0000 1 0.00 0.00 0.00 0. 2 0000 97 0.15 0.03 0.12 593. 1 0015 2 0.00 0.00 0.00 0. * 2 0015 98 0.00 0.00 0.00 591. 1 0030 3 0.00 0.00 0.00 0. 2 0030 99 0.00 0.00 0.00 572. 1 0045 4 0.00 0.00 0.00 0. * 2 0045 100 0.00 0.00 0.00 524. 1 0100 5 0.00 0.00 0.00 0. * 2 0100 101 0.00 0.00 0.00 451. 1 0115 6 0.00 0.00 0.00 0. * 2 0115 102 0.00 0.00 0.00 366. 1 0130 7 0.00 0.00 0.00 0. 2 0130 103 0.00 0.00 0.00 282. 1 0145 8 0.00 0.00 0.00 0. * 2 0145 104 0.00 0.00 0.00 209. 1 0200 9 0.00 0.00 0.00 0. * 2 0200 105 0.00 0.00 0.00 151. 1 0215 10 0.01 0.01 0.00 0. * 2 0215 106 0.00 0.00 0.00 111. 1 0230 11 0.01 0.01 0.00 0. 2 0230 107 0.00 0.00 0.00 82. 1 0245 12 0.01 0.01 0.00 0. * 2 0245 108 0.00 0.00 0.00 60. 1 0300 13 0.01 0.01 0.00 0. * 2 0300 109 0.00 0.00 0.00 50. 1 0315 14 0.01 0.01 0.00 0. * 2 0315 110 0.00 0.00 0.00 42. 1 0330 15 0.01 0.01 0.00 0. * 2 0330 111 0.00 0.00 0.00 36. 1 0345 16 0.01 0.01 0.00 0. 2 0345 112 0.00 0.00 0.00 30. 1 0400 17 0.01 0.01 0.00 1. * 2 0400 113 0.00 0.00 0.00 25. 1 0415 18 0.01 0.01 0.00 1. * 2 0415 114 0.00 0.00 0.00 21. 1 0430 19 0.01 0.01 0.00 1. * 2 0430 115 0.00 0.00 0.00 18. 1 0445 20 0.01 0.01 0.00 1. * 2 0445 116 0.00 0.00 0.00 15. 1 0500 21 0.01 0.01 0.00 1. 2 0500 117 0.00 0.00 0.00 13. 1 0515 22 0.01 0.01 0.00 1. 2 0515 118 0.00 0.00 0.00 11. 1 0530 23 0.01 0.01 0.00 1. 2 0530 119 0.00 0.00 0.00 9. 1 0545 24 0.01 0.01 0.00 1. * 2 0545 120 0.00 0.00 0.00 7. 1 0600 25 0.01 0.01 0.00 1. 2 0600 121 0.00 0.00 0.00 6. 1 0615 26 0.01 0.01 0.00 1. * 2 0615 122 0.00 0.00 0.00 5. 1 0630 27 0.01 0.01 0.00 1. * 2 0630 123 0.00 0.00 0.00 4. 1 1 0645 0700 28 29 0.01 0.01 0.01 0.01 0.00 0.00 1. 1. * * 2 2 0645 0700 124 125 0.00 0.00 0.00 0.00 0.00 0.00 4. 3. 1 0715 30 0.02 0.02 0.00 1. * 2 0715 126 0.00 0.00 0.00 3. 1 0730 31 0.02 0.02 0.00 1. 2 0730 127 0.00 0.00 0.00 2. 1 0745 32 0.02 0.02 0.00 1. * 2 0745 128 0.00 0.00 0.00 2. 1 0800 33 0.02 0.02 0.00 2. * 2 0800 129 0.00 0.00 0.00 2. 1 0815 34 0.02 0.02 0.00 2. * 2 0815 130 0.00 0.00 0.00 1. 1 0830 35 0.02 0.02 0.00 2. * 2 0830 131 0.00 0.00 0.00 1. 1 0845 36 0.02 0.02 0.00 2. * 2 0845 132 0.00 0.00 0.00 1. 1 0900 37 0.02 0.02 0.00 2. * 2 0900 133 0.00 0.00 0.00 1. 1 0915 38 0.03 0.03 0.00 2. 2 0915 134 0.00 0.00 0.00 1. 1 0930 39 0.03 0.03 0.00 2. * 2 0930 135 0.00 0.00 0.00 1. 1 0945 40 0.03 0.03 0.00 2. * 2 0945 136 0.00 0.00 0.00 0. 1 1000 41 0.03 0.03 0.00 2. 2 1000 137 0.00 0.00 0.00 0. 1 1015 42 0.03 0.03 0.00 2. * 2 1015 138 0.00 0.00 0.00 0. 1 1030 43 0.03 0.03 0.00 3. * 2 1030 139 0.00 0.00 0.00 0. 1 1045 44 0.03 0.03 0.00 3. * 2 1045 140 0.00 0.00 0.00 0. 1 1100 45 0.03 0.03 0.00 3. * 2 1100 141 0.00 0.00 0.00 0. 1 1115 46 0.10 0.10 0.00 3. 2 1115 142 0.00 0.00 0.00 0. 1 1130 47 0.10 0.10 0.00 4. * 2 1130 143 0.00 0.00 0.00 0. 1 1145 48 0.10 0.10 0.00 4. * 2 1145 144 0.00 0.00 0.00 0. 1 1200 49 0.10 0.10 0.00 5. * 2 1200 145 0.00 0.00 0.00 0. 1 1215 50 0.11 0.11 0.00 6. * 2 1215 146 0.00 0.00 0.00 0. 1 1230 51 0.11 0.11 0.01 8. 2 1230 147 0.00 0.00 0.00 0. 1 1245 52 0.11 0.10 0.01 11. * 2 1245 148 0.00 0.00 0.00 0. 1 1300 53 0.11 0.10 0.02 16. * 2 1300 149 0.00 0.00 0.00 0. 1 1315 54 0.12 0.10 0.02 24. 2 1315 150 0.00 0.00 0.00 0. 1 1330 55 0.12 0.09 0.03 35. * 2 1330 151 0.00 0.00 0.00 0. ? 1345 56 0.12 0.09 0.03 49. * 2 1345 152 0.00 0.00 0.00 0. 1 1400 57 0.12 0.09 0.03 65. 2 1400 153 0.00 0.00 0.00 0. 1 1415 58 0.12 0.09 0.04 84. 2 1415 154 0.00 0.00 0.00 0. 1 1430 59 0.12 0.08 0.04 103. * 2 1430 155 0.00 0.00 0.00 0. 1 1445 60 0.12 0.08 0.04 123. 2 1445 156 0.00 0.00 0.00 0. 1 1500 61 0.12 0.08 0.05 143. * 2 1500 157 0.00 0.00 0.00 0. 1 1515 62 0.13 0.08 0.05 163. 2 1515 158 0.00 0.00 0.00 0. 1 1530 63 0.13 0.07 0.06 182. 2 1530 159 0.00 0.00 0.00 0. 1 1545 64 0.13 0.07 0.06 202. 2 1545 160 0.00 0.00 0.00 0. 1 1600 65 0.13 0.07 0.06 221. * 2 1600 161 0.00 0.00 0.00 0. 1 1615 66 0.13 0.07 0.06 240. 2 1615 162 0.00 0.00 0.00 0. 1 1630 67 0.13 0.06 0.07 258. * 2 1630 163 0.00 0.00 0.00 0. 1 1645 68 0.13 0.06 0.07 276. * 2 1645 164 0.00 0.00 0.00 0. 1 1700 69 0.13 0.06 0.07 293. * 2 1700 165 0.00 0.00 0.00 0. 1 1715 70 0.13 0.06 0.08 309. 2 1715 166 0.00 0.00 0.00 0. 1 1730 71 0.13 0.06 0.08 325. 2 1730 167 0.00 0.00 0.00 0. 1 1745 72 0.13 0.06 0.08 340. 2 1745 168 0.00 0.00 0.00 0. 1 1800 73 0.13 0.05 0.08 355. 2 1800 169 0.00 0.00 0.00 0. 1 1815 74 0.14 0.05 0.08 369. 2 1815 170 0.00 0.00 0.00 0. 1 1830 75 0.14 0.05 0.09 382. * 2 1830 171 0.00 0.00 0.00 0. 1 1845 76 0.14 0.05 0.09 396. * 2 1845 172 0.00 0.00 0.00 0. 1 1900 77 0.14 0.05 0.09 409. * 2 1900 173 0.00 0.00 0.00 0. 1 1915 78 0.14 0.05 0.09 421. * 2 1915 174 0.00 0.00 0.00 0. 1 1930 79 0.14 0.05 0.09 433. 2 1930 175 0.00 0.00 0.00 0. 1 1945 80 0.14 0.04 0.10 445. * 2 1945 176 0.00 0.00 0.00 0. 1 2000 81 0.14 0.04 0.10 456. * 2 2000 177 0.00 0.00 0.00 0. 1 2015 82 0.14 0.04 0.10 467. 2 2015 178 0.00 0.00 0.00 0. 1 2030 83 0.14 0.04 0.10 478. 2 2030 179 0.00 0.00 0.00 0. 1 2045 84 0.14 0.04 0.10 488. * 2 2045 180 0.00 0.00 0.00 0. 1 2100 85 0.14 0.04 0.10 498. 2 2100 181 0.00 0.00 0.00 0. 1 2115 86 0.14 0.04 0.11 507. * 2 2115 182 0.00 0.00 0.00 0. 1 2130 87 0.14 0.04 0.11 516. 2 2130 183 0.00 0.00 0.00 0. 1 2145 88 0.14 0.04 0.11 525. * 2 2145 184 0.00 0.00 0.00 0. 1 2200 89 0.14 0.04 0.11 533. * 2 2200 185 0.00 0.00 0.00 0. 1 2215 90 0.15 0.03 0.11 541. 2 2215 186 0.00 0.00 0.00 0. 1 2230 91 0.15 0.03 0.11 549. * 2 2230 187 0.00 0.00 0.00 0. 1 2245 92 0.15 0.03 0.11 557. * 2 2245 188 0.00 0.00 0.00 0. 1 2300 93 0.15 0.03 0.11 565. * 2 2300 189 0.00 0.00 0.00 0. 1 2315 94 0.15 0.03 0.12 572. * 2 2315 190 0.00 0.00 0.00 0. 1 2330 95 0.15 0.03 0.12 579. * 2 2330 191 0.00 0.00 0.00 0. 1 2345 96 0.15 0.03 0.12 586. * k 2 2345 192 0.00 0.00 0.00 0. kk*kk**kk*** *kkkkk*k kkk *kkkkk*kkk**kk**kkk kkk*kkkkkkkk*kk* *kkkkkk*kk *kkktkkkkkk k**kkk **kk*k kk*k**k* kkkkk**k kkkkkkkkk*kkkkk*kkkkkkk* TOTAL RA INFALL = 7.44, TOTAL LOSS = 3.81, TOTAL EXCESS = 3.63 PEAK FLOW TIME MAXIMUM AVERAGE FLOW (CFS) (HR) 6-HR 24-HR 72-HR 47.75-HR 593. 24.00 (CFS) 518. 203. 102. 102. (INCHES) 2.336 3.656 3.661 3.661 (AC-FT) 257. 402. 402. 402. CUMULATIVE AREA = 2.06 SQ MI ![k* kkk kkk kkk kkk kkk kkk kkk kkk kk* kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk kkk k*k kkt kkk kkk kkk #kk ******kkkk*kkk * * 18 KK * EMB * * ***kk********* RESERVOIR ROUTING BY MODIFIED PULS - 16' X 8' THREE-SIDED CULVERT 0 OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 2 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE kkk kkk 21 KP kkk kkk PLAN 1 FOR STATI kkk kk* *** kkk kkk ON EMB *** kkk kkk kkk kkk kk* k*k kkk HYDROGRAPH ROUTING DATA 22 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 791.50 INITIAL CONDITION X 0.00 WORKING R AND D COEFFICIENT 23 SV STORAGE 0.0 0.3 1.5 2.6 7.6 18.8 36.6 48.1 54.5 86.0 24 SE ELEVATION 790.00 794.00 798.00 800.00 804.00 808.00 812.00 814.00 815.00 820.00 25 SQ DISCHARGE 0. 176. 224. 320. 416. 528. 592. 656. 784. 912. &E ELEVATION 791.50 794.30 794.70 795.50 796.30 797.10 797.50 797.90 798.70 799.50 27 SS SPILLWAY CREL 791.50 SPILLWAY CREST ELEVATION SPWID 0.00 SPILLWAY WIDTH CODW 0.00 WEIR COEFFICIENT EXPW 28 ST TOP OF DAM TOWEL DAMWID COQD EXPD 1.50 832.10 0.00 0.00 0.00 EXPONENT OF HEAD ELEVATION AT TOP OF DAM DAM WIDTH WEIR COEFFICIENT EXPONENT OF HEAD COMPUTED STORAGE-OUTFLOW-ELEVATION DATA (INCLUDING FLOW OVER DAM) STORAGE 0.00 0.11 0.30 0.39 0.50 0.74 0.97 1.20 1.32 1.43 OUTFLOW 0.00 0.00 157.14 176.00 224.00 320.00 416.00 528.00 592.00 656.00 ELEVATION 790.00 791.50 794.00 794.30 794.70 795.50 796.30 797.10 797.50 797.90 STORAGE 1.46 1.87 2.35 2.64 7.63 18.75 36.60 48.09 54.48 86.00 OUTFLOW 672.00 784.00 912.00 992.00 1632.01 2272.02 2912.03 3232.04 3392.04 4192.05 ELEVATION 798.00 798.70 799.50 800.00 804.00 808.00 812.00 814.00 815.00 820.00 HYDROGRAPH AT STATION EMB FOR PLAN 1, RATIO = 1.00 PEAK OUTFLOW IS 592. AT TIME 24.00 HOURS FLOW TIME MAXIMUM AVERAGE FLOW S) (HR) 6-HR 24-HR 72-HR 47.75-HR 592. 24.00 (CFS) 518. 202. 102. 102. (INCHES) 2.336 3.655 3.661 3.661 (AC-FT) 257. 402. 402. 402. PEAK STORAGE TIME MAXIMUM AVERAGE STORAGE (AC-FT) (HR) 6-HR 24-HR 72-HR 47.75-HR 1. 24.00 1. 1. 0. 0. PEAK STAGE TIME MAXIMUM AVERAGE STAGE (FEET) (HR) 6-HR 24-HR 72-HR 47.75-HR 797.50 24.00 797.01 793.86 792.69 792.69 CUMULATIVE AREA = 2.06 SQ MI 0 STATION EMB (I) INFLOW, (0) OUTFLOW 0. 100. 200. 300. 400. 500. 600. 0. 0. 0. 0. 0. 0. 0 (S) STORAGE 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.8 1.2 1.6 0.0 0.0 DAHRMN PER 10000 1I------------------------------------------- ------------------- S--------------------------------------------------------- 10015 21 S 10030 31 S 10045 41 S 10100 51 S 10115 61 S 10130 71 S 10145 81 S 10200 91 S 10215 101 S 10230 111 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10245 121 S 10300 131 S 10315 141 S 10330 151 S 10345 161 S 10400 171 S 10415 181 S 10430 191 S 10445 201 S 10500 211 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10515 221 S 10530 231 S 10545 241 S 251 c 261 S 10630 271 S 10645 281 S 10700 291 S 10715 301 S 10730 31I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10745 321 S 10800 331 S 10815 341 S 10830 351 S 10845 361 S 10900 371 S 10915 381 S 10930 391 S 10945 401 S 11000 411 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11015 421 S 11030 431 S 11045 441 S 11100 451 S 11115 461 S 11130 471 S 11145 481 S 11200 49.1 S 11215 50.1 S 11230 51.I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11245 52.1 S 53. I S 54. I S 11330 55. I S 11345 56. I S 11400 57. OI S 11415 58. I S 11430 59. 1 S 11445 60. . I S 1150061....... I ..........................5........................... 11515 62. I S . 0 63. I S 64. I S 0 65. I S 11615 66. I S 11630 67. I S 11645 68. OI S 11700 69. I. S 11715 70. I S . 1173071 ....... .........I.......................5..................... 11745 72. I S. 11800 73. I S 11815 74. i S 11830 75. I S 11845 76. oI S 11900 77. I S 11915 78. I S 11930 79. I S 11945 80. I S 12000 81 . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . 12015 82. I S 12030 83. I S 12045 84. 1. S . 12100 85. I S . 12115 86. I S. 12130 87. .01 S. 12145 88. I S 12200 89. I S 12215 90. I S 91 . . . . . . . . . . . . . . . . . . . . . . . . . . . .. S . 92. f : S 93. oo I S 12315 94. I S 12330 95. I S 12345 96. I. S 20000 97. I. S 20015 98. I. S 20030 99. I S 20045 100. Io s 20100 101 . . . . . . . . . . . . . . . . . . . . . . .Io . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . 20115 102. 10 . S 20130 103. I0. S 20145 104. .I0 S 20200 105. Io s . 20215 106. .I S 20230 107. 10. S 20245 108. I S 20300 109. I S 20315 110. I 5 20330111.I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20345 112. I S 20400 113. I S 20415 114. I S 20430 115. I S 20445 116.1 S 20500 117.I S 20515 118.1 S 119.I S 120.1 S 20600 121.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20615 122.1 S 20630 1231 S 20645 1241 S 20700 1251 S 20715 1261 S 20730 1271 S 20745 1281 S 160 1291 5 130I S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 131I .S. 20845 1321 S 20900 1331 S 20915 1341 S 20930 1351 S 20945 1361 S 21000 1371 S 21015 1381 S 21030 1391 S 21045 1401 S 21100141I' ...............................S............................. 21115 1421 S 21130 1431 S 21145 1441 S 21200 1451 S 21215 1461 S 21230 1471 S 21245 1481 S 21300 1491 S 21315 1501 S 21330 1511 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21345 1521 S 21400 1531 S 21415 1541 S 21430 1551 S 21445 1561 5 0 1571 S 5 1581 S 0 1591 S 21545 1601 S 21600 1611 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21615 1621 S 21630 1631 S 21645 1641 S 21700 1651 S 21715 1661 S 21730 1671 S 21745 1681 S 21800 1691 5 21815 1701 S 21830171I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21845 1721 S 21900 1731 S 21915 1741 S 21930 1751 S 21945 1761 S 22000 177I S 22015 1781 S 22030 1791 S 22045 1801 S 22100 1811 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22115 1821 S 22130 1831 S 22145 1841 S 1851 S 1861 S 30 1871 S 22245 1881 S 22300 1891 S 22315 1901 S 223301911 ...............................5............................. SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION EMB (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 ............... INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 791 .50 791.50 832.10 STORAGE 0. 0. 162. OUTFLOW 0. 0. 6128. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 797.50 0.00 1. 592. 0.00 24.00 0.00 *** NORMAL END OF HEC-1 *** • 0 PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES 0 TIME TO PEAK IN HOURS RATIOS APPLIED TO PRECIPITATION OPERATION STATION AREA PLAN RATIO 1 1.00 HYDROGRAPH AT POND 2.06 ROUTED TO EMB 2.06 • 1 FLOW 593. TIME 24.00 1 FLOW 592. TIME 24.00 ** PEAK STAGES IN FEET ** 1 STAGE 797.50 TIME 24.00 C P-.? HEC-RAS WATER SURFACE PROFILE SUMMARY OUTPUT E 0 S U2 ??? P20?/GE • NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 6/3/96 ROCK BRANCH 800] ------ WS 3 WS 2 798 796 794 0 792 cz a? w 790- 788- ?g7 7861 784 0 50 -yk 25-y? WS1 Invert 0 1 Main Channel Distance (ft) 100 200 300 400 500 600 700 IKIxf- p /--Lo w I 1, • 394.00 HEC-RAS Plan: Plan 03 Re 794.501 798.17 1 ach: ROCK 798.53 BRANCH 8/ 0.006043 12196 u4.84 81.42 30.51 111` 502.00 794.501 798.61 1 799.04 0.005973 5.32 94.96 31.82 593.001 794.501 798.951 799.44 0.005908 5.66 105.99 32.84 :2 F 394.001 793.001 795.471 795.471 796.52 0.025297 8.22 47.92 22.87 < 502.001 793.001 795.86 795.861 797.06 0.0244081 8.77 57.24 23.98 a% <.: 593.00 793.001 796.161 796.161 797.47 0.024138 9.20 64.46 24.80 394.00 791.601 794.28 1 795.07 0.0185151 7.14 55.17 26.26 X37 '; 502.001 791.601 794.18 794.43 795.59 0.0343441 9.53 52.66 25.85 593.00 791.601 ! 794.43 794.731 795.99 0.034373 10.02 59.16 26.89 1 1 5 qt 2 /I r/e* ? I-C4U 92 394.001 789.101 791.23 791.231 792.05 0.025736 7.28 54.18 33.18 n:t1t92 502.00 789.101 791.52 791.52 1 792.48 0.024711 7.88 64.00 34.17 ,Qtl.A2 r 593.001 789.10 1 791.76 791.76 1 792.82 0.023636 8.27 72.27 34.99 1,561`89 1 394.001 786.20 1 789.20 1 789.39 0.003695 1 3.54 118.60 59.32 1.0189 502.00 786.20 ] 789.511 1 789.75 1 0.004010 3.971 137.66 1 61.94 1:0189 593.00 786.20 1 789.981 1 790.21 1 0.003317 1 3.96 167.26 65.80 '1.U 394.00 1 785.50 787.99 787.99 1 788.70 1 0.023228 6.82 64.46 65.80 1.0 502.00 785.50 1 788.501 788.27 1 789.09 0.014619 6.32 99.94 71.75 to 593.00 785.50 1 789.50 788.49 1 789.80 0.005149 1 4.65 176.77 1 81.92 0 MixED 14?Co w HEC- 798.53 798.17 RAS Plan: 0.36 Plan 03 Re 1.95 ach: ROCK B 0.07 RANCH 811 2M 394.00 30.51 799.04 798.61 0.44 1.91 0.08 502.00 31.82 799.44 798.95 0.50 1.89 0.08 593.00 1 32.84 796.52 795.47 1.05 1.10 0.08 394.00 22.87 797.06 795.86 1.19 1.10 0.071 1 502.001 23.98 797.47 796.16 1.31 1.121 0.071 1 593.00 24.80 795.07 794.281 0.79 3.01 0.00 394.00 1 26.26 795.59 794.18 1.41 1.46 0.02 502.00 25.85 795.99 794.43 1.56 1.46 0.02 593.00 26.89 792.05 791.23 0.82 2.35 0.19 393.98 0.02 33.18 w 792.48 791.52 0.96 2.30 0.22 1 501.84 0.16 34.17 792.82 791.761 1.06 592.57 0.43 1 34.99 Y 1 89,` :" 789.39 789.20 0.19 0.64 1 0.05 0.00 394.00 59.32 1.0189 k 789.75 1 789.51 0.24 0.63 0.04 0.28 501.72 61.94 1.0189 790.21 789.98 1 0.24 0.40 1 0.01 0.95 592.05 65.80 n: 1 1 788.70 787.99 0.71 0.00 1 0.00 4.32 389.68 65.80 1.0- 789.09 1 788.50 1 0.59 0.00 1 0.00 1 22.76 479.24 71.75 1.0 789.80 1 789.50 0.30 0.00 0.00 57.50 1 535.50 1 81.920 NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 1 DWNSTR SECTION-1 I 805 800 0 795 cz a? w 790 WS 3 WS 2 WS1 Ground • Bank Sta. 785 0 50 100 150 200 0 1 Station (ft) .15 .045 .15 -? NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 I CULVERT EXIT SECTION -- 2 1 .15 045 T 15 805 800 0 795 cz a? w 790 785 WS 3 WS 2 WS 1 ¦ Ground • Bank Sta 0 1 Station (ft) 0 50 100 150 . NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 I SECTION AT EMBANK AXIS - 2A I 15 i 045 -?I - .15 815 810 805 0 800 cu am w 795 790 785 WS 3 WS 2 WS1 Ground • Bank Sta 0 1 Station (ft) 0 50 100 150 200 • NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 CULVERT ENTRANCE SECT--3 I 815 810 805 c 0 cis m w 800 795 790 WS 3 WS1 WS2 ¦ Ground • Bank Sta 0 50 100 150 200 0 1 Station (ft) .15 .045 1 .15 1 114 NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 I UPSTREAM SECTION -- 4 I 815 810 805 c 0 cz m w 800 795 790 WS 3 WS 2 WS1 Ground • Bank Sta 0 50 100 150 200 250 Station (ft) .15 ?' .045 .15 ---? NORTH CAROLINA EMBANK CULVERT-NAT Plan: Plan 03 8/12/96 i UPSTREAM SECTION -- 5 I 815 810 805 c 0 :r W CD w 800 795 790 WS 3 WS 2 WS 1 Ground • Bank Sta 0 50 100 150 200 250 Station (ft) .15 .045- .15 --? ?J Plan: Plan 03 Reach: ROCK 798.95 0.50 BRANCH Riv Sta: 1.1231 Profil Leff 0.15 0 e: 3 8112195 0.045 0.150 799.44 an. {fi) F 200.00 200.0011 200.00 0.005908 a {aq fo 7 0.67 104.65 0.67 „ Cts) 593.00 1. ?lowr ds) 593.00 th {ft) 32.84 fl op Width (ft) 1.421 30.00 1.42 I (fUs) ,- 5.59 wog. vet (tug) 0.411 5.66 0.41 *&$I Dpth (it) 4.45 r Depth (ft) 0.471 3.49 0.47 , {fi) Netted Pil .' (to 1.71 31.41 1.71 ;; (cfs) 7715.0 V. (mss) 3.61 7707.81 3.6 Plan: Plan 03 Reach: ROCK BRANCH Riv Sta: 1.0852 Profile: 3 8112196 1 . ?I@Y-ift} 796.16t8tr>attt ' Left 06• harmets tl?llt OB HeBe(t) 1.31 :,t!-IAt. 0.045 s: EI@V {ft) 797.47 1 teeth' Len. (ft) 50.001 50.00 50.00 . Sfape'(ft)ft} 0.024138 low Area (sq ft) 64.46 otai {cfs) 593.00 Or!! {cfa) 593.00 °'1Altdttl {ft} 24.80 TO' Width (ft) 24.80 Y Tadaf MIS) 9.20 Avg. Vet. (*s) 9.20 f41Ax Chi Dpth (ft) 3.16 t*r. Depth (ft) 1 2.60 t 796.16 Wetted Per. (ft) 26.84 (cfa)..:??-. 3816.8 Conv.. (Cis) ! 3816.8; Plan: Plan 03 Reach: ROCK BRANCH Riv Sta: 1.0757 Profile: 3 8/12196 S.l ev ft) 794.43 £fement leftC M Chenrtet1- - , )Right ©B ,Head (ft) 1.56 Wt: n-Val. 0.045 00. Elev (ft) 795.99 Reach 1811. {ft} 140.00 140.00 140.00 $topes'{f M) 0.034373 f16W Area (sq ft) ? 59.16 {L-fit) 593.00 filmi (de) 593.00 !? Witflh,(ft} 26.89 ?op Width (ft). 26.89 ip Fj TdtitiffJs) ` 10.02 AVS. Yet. (ft/s) 10.02 titatc CM Dpth (ft) 2.83 Mydr. Depth (ft) 2.20 794.73 WettesdPer. ,(ft) 28.24 1 Cony:"lot (cfs) 3198.5 taN1v. (cfs) 3198.5 • Plan: Plan 03 Reach: ROCK BRANCH Riv Sta: 1.0189 Profile: 3 8/12/96 is (f t) { 789.98 Le#t "' I Ott t?B _... Ott} 0.24 t1-lief. 0.150 0.045 I rfl Elev (tt) 790.21 R+etich'LBn. (ft) 100.00 100.00 100.00 0.003317 E1t+w Area (sq ft) 20.581 146.68 ;CIOlal {Cfa} 593.00 tCfB} , , : 0.951 592.05 Width (ft) ; 65.80 m:W 1 " op, Width (ft) 17.861 47.95 s ?f xws) 3.55 Wig. VOL (ftls) 0.621 3.96 ? Melt 00th (it) 3.78 4#0# ,D*h (ft) 1.151 3.06 r 11lr.S,{itj ,.,: i+VetfedPer (ft) 17.98 48.90 fit C}$) 10296.0 Cfmr = ?" 1 223.1 ! 10072.9!; Plan: Plan 03 Reach: ROCK BRANCH Riv Sta: 1.0 Profile: 3 8/12/96 "yam , 789.50 `"'` t: Left :: Channel n ' .; Right a'' "rQ :3 (ft) 0.30 . Tt-Val. 0.1501 0.045 ?tltt {it) 789.80 . {ft} (ttlft) 0.005149 Ar00 (sq ft) 61.56 115.21 (da} 593,00 Fbw(cfe) :. z 57.501 535.50 Wktth (ft) 81.92 TOp VVidth (ft) 40.75 41.17 {tdi (ftls) 3.35 3ltrg: VOL (ftfs) 0.931 4.65 i tt ht`Dpth (ft) 4.00 0fdr4 'Opth (ft) 1 1.51 2.80 t1 1At 5. 788.49 ettsd Per. (ft) 40.87 1 41.93 Cov. Total {cfs) - 8264.1 00"(W., (sfs) 801.4 1 7462.8 1 Plan: Plan 03 Reach: ROCK BRANCH Riv Sta: 1.0492 Profile: 3 8/12196 • ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina GEOTECHNICAL DESIGN COMPUTATIONS (Refer to Final Report for Stability Analyses and to the Law Engineering Report for boring logs) • • culveri.cov 8/6/96 95S3055A -v-- tJ ?----CP.TE-------- •. --_: C0 T r, F------ g - - -- - ----------- ?--- ------ -------------- o- t` M w • V nm v a to 11 o- 0 a „ tA 0 ? ,o to I ?t ao v e- ? ?L 0 C16. S" -40 ,lotions and Construction Materials bution. The procedure for determining w ch of many submitted samples should be tested is in itself conducive to obtaining a rep- resentative range of values, since samples were selected from the coarsest, finest, and average soil within a potential source. For each soil property listed, the average and its 90 percent confidence limits are given `where sufficient data were available to deter- mine them. Since all laboratory tests, except large-sized permeability tests, were made on the minus No. 4 fraction of the soil, data on 'average values for the gravels are not available for most properties. However, an indication as to whether these average values will be greater than or less than the average values for the corresponding sand group is given in the table. The averages shown are subject to uncertainties that arise from sampling fluctua- tions, and they tend to vary from the true aver- ages more widely if the number of observations is small. The plus or' minus limits given are determined mathematically from the number of observations and from the standard devia- f the data used to determine the average. limits imply that the true average, ob- tained by securing and testing more and more ,samples under the same essential conditions, lies within the plus or minus values 9 chances 13" out of 10 [4]. The values for Proctor maximum dry densit3 and optimum water content were obtained by tests described in section 120. The other properties are based on tests made on samples compacted to Proctor maximum dry density at optimum water content. The value of void ratio, ec, is the ratio of the portion of the vol- ume of the soil mass occupied by water and air to the volume of the soil grains. It is derived from the Proctor maximum dry density and the specific gravity of the grains. The MH and CH soil groups have no upper boundary of liquid limits in the classification; hence, it is necessary to give the range of those soils in- cluded in the table. The maximum liquid lim- its for the MH and the CH soils tested were 81 and 88 percent, respectively. Soils with high- er liquid limits than these will have inferior engineering properties. (b) Permeability.-The voids in the soil mass provide passages through which water may move. Such passages are variable in size and the paths of flow are tortuous and inter- connected. If, however, a sufficiently large number of paths of flow are considered as act- ing together, an average rate of flow for the soil mass can be determined under controlled conditions that will represent a property of the TABLE 8.-Average properties of soils Proctor compaction Compressibility Shearing strength Soil classifi- Permeability, cation group maximum optimum Void ratio, e, k, dry density water feet per year Q 20 p.s.i„ G 50 p.s.i., C. C'.1 tan 0 in pounds content, percent percent p.s.i. P.S.I. per cubic root percent GW >110 <13.3 (') 27,0001 <1.4 >0.79 13.000 GP >110 <12.4 (') 64.0001 <0.8 >0.74 34, 000 GM >114 <14.5 (') >0.3 <1.2 <3.0 >0.67 GC >115 <14.7 (') >0.3 <1.2 <2.4 >0.60 SW 119}5 13.312.5 0.371' (') 1.4=' (') 5.710.6 (1) 0.7910.02 SP 11012 12.411.0 0.50=0.03 >15.0 0.6=0.3 (1) 3.30.9 (') 1 0.74-±-0.02 SM 114=1 14.5=0.4 0.46=0.02 7.5118 1.210.1 3.0=0.4 7.4-!-0.9 2.9=1.0 0.67-0.02 SM-SC 119=1 12.8=0.5 0.41=0.02 0.8=0.6 1.410.3 2.9=1.0 7.3=3.1 2.1=0.8 0.66=0.07 SC 115=1 14.710.4 0.48=0.01 0.310.2 1.2=0.2 2.410.5 10.9=2.2 1.6=0.9 0.60=0.07 M L 103}1 19.2=0.7 0.63=0.02 0.59=0.23 1.510.2 2 6=0.3 9. 711.5 1.3=' 0. _-0.04 'SL CL 109=2 16.8=0.7 0.54=0.03 0.13=0.07 1.0=0.2 2.2=0.0 9.2=2.4 3 2= 0.62=0. CL 10811 17.3=0.3 0.56=0.01 0.00.=0.03 1.4=0.2 2.6=0.4 12.611.5 ? 3 0.54=0.04 OL (') (') (') (') 14H 82=4 36.3=3.2 1.15=0.12 0.16=0.10 2.0=1.2 3.6=0.8 10.5=4.3 2.9=1.3 0.47=0.05 CH 94=2 25.5=1.2 0.8010.04 0.05=0.05 2.6=1.3 3.9=1.5 14.9=4.9 1.6=0.86 0.35=0.09 OH entry indicates 9o percent confidence limits of the average value. • Denotes insufficient data, > is greater than, < is less than. 3•uQ Q 96 DESIGN OF SMALL DAMS Table 5-1.-Average engineering properties of compacted soils. From the Western United States. Last updated October 6, 1982. Compaction Shear strength Laboratory Index Avg. placement USCS unit Mois- Effective soil type Specific gravity Maximum unit Optimum moisture weight Unit ture, stress No. 4 No. 4 weight, ' content, % Max. lb/ft' Min. lb/ft' weight, lb/ft' content, % e s lb/in V, degrees Values listed minus plus lb/ft 2.69 2.58 124.2 11.4 133.6 108.8 - - - - - Average of all values Standard deviation 0.02 0.08 3.2 1.2 10.4 10.2 - - - - Minimum value GW 2.65 2.39 119.1 9.9 113.0 88.5 - - - - Maximum value 2.75 2.67 127.5 13.3 145.6 132.9 - - - 0 Total number of tests 16 9 5 16 2.68 2.57 121.7 11.2 137.2 112.5 127.5 6.5 5.9 41.4 5 2 Average of all values Standard deviation 0.03 0.07 5.9 2.2 1 9 6.3 3 118 8.3 85.9 7.2 117.4 1.2 5.3 - 5.9 . 38.0 Minimum value GP 2.61 2.76 2.42 2.65 104.9 127.7 . 17.7 . 148.8 123.7 133.9 8.0 5.9 43.7 Maximum Total umber value tests 35 12 15 34 3 2.73 2.43 113.3 15.8 132.0 108.0 125.9 10.3 2 13.4 7 3 34.0 6 2 Average of all values Standard deviation 0.07 0.18 11.5 5.8 5 8 3.1 128 9 0.2 107.8 0.9 125.0 1. 9.1 . 9.7 . 31.4 Minimum value GM 2.65 2.19 92 2 87.0 0 133 . 29.5 . 135.1 108.1 126.9 11.5 17.0 36.5 value xi 2.92 . . 2 2 tests number Total 34 17 36 2.73 2.57 116.6 13.9 - - 111.1 15.9 10.2 1 5 27.5 7 2 Average of all values Standard deviation 0.08 0.21 7.8 3.8 - - 10.4 96 8 1.6 11 2 . 5.0 . 17.7 Minimum value GC 2.67 2.38 96.0 6.0 6 23 - - - - . 120.9 . 22.2 16.0 35.0 Maximum value 3.11 2.94 129.0 . 3 Total number of tests 34 6 37 0 2.67 2.57 126.1 9.1 125.0 99.5 - - - - - Average of all values Standard deviation 0.03 0.03 6.0 1.7 6.0 7.1 - - - - Minimum value SW 2.61 2.51 118.1 7.4 116.7 87.4 - - - - Maximum value 2.72 2.59 135.0 11.2 137.8 109.8 - - - 0 Total number of tests 13 2 1 12 2.65 2.62 115.6 10.8 115.1 93.4 103.4 5.4 5.5 37.4 0 2 Average of all values Standard deviation 0.03 0.10 9.7 2.0 7 8 7.2 105 9 8.8 78.2 14.6 88.8 - 5.4 3.0 2.5 . 35.4 Minimum value SP 2.60 2.77 2.52 2.75 106.5 134.8 . 13.4 . 137.3 122.4 118.1 5.4 8.4 39.4 Taal number value tests 36 3 7 39 2 2.68 2.18 116.6 12.5 110.1 84.9 112.0 12.7 6.6 5 6 33.6 7 5 Average of all values Standard deviation 0.06 0.11 8.9 3.4 6 8 8.7 5 88 7.9 61.6 11.1 91.1 5.4 1.6 . 0.2 . 23.3 Minimum value SM 2.51 3.11 2.24 2.63 92.9 132.6 . 25.5 . 122.9 97.1 132.5 25.0 21.2 45.0 Total number value tests 149 9 123 21 17 2.69 2.17 118.9 12.4 - - 115.6 14.2 5.0 33.9 9 2 Average of all values Standard deviation 0.04 0.18 5.9 2.3 - - 14.1 91 1 5.7 7 5 2.5 0.7 . 28.4 Minimum value SC 2.56 2.17 104.3 6.7 18 2 - - - - . 131.8 . 22.7 8.5 383 Maximum value 2.81 2.59 131.7 . 10 Total number of tests 88 4 73 0 9 98 22 1 6 34.0 3 Average of all values of • 2.69 - 103.3 19.7 - - . 11 5 . 8 9 ' Standard deviation 0.09 - 10.4 6 81 5.7 6 10 - - - - . 80.7 . 11.1 0.1 25.2 Minimum value ML 2.52 - . 0 126 . 34 6 - - 119.3 40.3 11.9 37.7 Maximum value 3.10 - . . 0 14 Total number of tests 65 0 39 2.71 2.59 109.3 16.7 - - 106.5 17.7 10.3 25.1 7 0 Average of all values Standard deviation 0.05 0.13 5.5 2.9 - - 7.8 85 6 5.1 11 6 7.6 0.9 . 8.0 Minimum value CL 2.56 2.42 90.0 6.4 29 2 - - - - . 118.7 . 35.0 23.8 33.8 Maximum value 2.87 2.75 121.4 . 0 31 Total number of tests 270 3 221 - - - Average of all values 2.79 - 85.1 33.6 - - - - Standard deviation 0.25 - 2.3 1.6 - - - - - _ Minimum value MH 2.47 - 82.9 31.5 - - - - - - Maximum value 3.50 - 89.0 35.5 - - - - 0 Total number of tests 10 0 5 0 C? .7 C7 X fo co 4-1 IM-4 n.4 m V110 OCIS Q+ I 01 Zoo m 0 hH /•1Z. wa xz um zo m 0m?, um f4f.N oa 4404 P4. P-4 Z CA t7 V? la tV ati x s~ ? VO PA41) VIA C fr foV S? 00?' N xo vE 0 ac a? F m m a t+7 r, qjj? V 1n N.K a x Nm i! c .., m NH U7 a ov a SH m(A •-1V a a 1n m vi tD m m,w nm m m In m n X 4?3 117 m 0? Q+ WQ 4400 h h I v N ** PCSTABL5 ** by ------Purdue University ---------------- -------------------------------------------------- --Slope Stability Analysis-- Simplified Janbu, Simplified Bishop or Spencers Method of Slices Run Date: 08-06-96 Time of Run: 11:18am Run By: BOB MANNS Input Data Filename: J:CULVSSS.IN Output Filename: J:CULVSSS.OUT Plotted Output Filename: J:CULVSSS.PLT PROBLEM DESCRIPTION BOUNDARY COORDINATES 6 Top Boundaries 8 Total Boundaries Rock Branch Creek Dam - Gullford Co., NC HEI Job No. 9553055 Boundary X-Left Y-Left X-Right Y-Right Soil Type No. (ft) (ft) (ft) (ft) Below Bnd 1 .00 90.00 100.00 90.00 2 2 100.00 90.00 226.00 132.00 1 3 226.00 132.00 261.00 132.00 1 4 261.00 132.00 312.00 115.00 1 5 312.00 115.00 387.00 90.00 1 6 387.00 90.00 400.00 90.00 2 7 100.00 90.00 387.00 90.00 2 8 -------------------- .00 ------------ 86.00 ---------- 400.00 ----------- 86.00 ----------- 3 ---------------- ISOTROPIC SOIL PARAMETERS 3 Type(s) of Soil Soil Total Saturated Cohesion Friction Pore Pressure Piez. Type Unit Wt. Unit Wt. Intercept Angle Pressure Constant Surface No. (pcf) (pcf) (psf) (deg) Param. (psf) No. 1 120.0 120.0 460.0 32.0 .00 .0 1 2 125.0 125.0 .0 32.0 .00 .0 1 3 150.0 150.0 9999.9 .0 .00 .0 0 ----------------------------------------------------------------------------- 1 PIEZOMETRIC SURFACE(S) HAVE BEEN SPECIFIED Unit Weight of Water = 62.40 Piezometric Surface No. 1 Specified by 2 Coordinate Points Point X-Water Y-Water No. (ft) (ft) 1 .00 90.00 2 400.00 90.00 -------------------------------------------------------------------------------- Searching Routine Will Be Limited To An Area Defined By 1 Boundaries Of Which The First 1 Boundaries Will Deflect Surfaces Upward Boundary X-Left Y-Left X-Right Y-Right No. (ft) (ft) (ft) (ft) 1 .00 86.00 400.00 86.00 -------------------------------------------------------------------------------- A Critical Failure Surface Searching Method, Using A Random Technique For Generating Circular Surfaces, Has Been Specified. 100 Trial Surfaces Have Been Generated. 10 Surfaces Initiate From Each Of 10 Points Equally Spaced Along The Ground Surface Between X = .00 ft. and X = 100.00 ft. Each Surface Terminates Between X = 199.00 ft. and X = 234.00 ft. Unless Further Limitations Were Imposed, The Minimum Elevation At Which A Surface Extends Is Y = .00 ft. 8.00 ft. Line Segments Define Each Trial Failure Surface. • • Following Are Displayed The Ten Most Critical Of The Trial Failure Surfaces Examined. They Are Ordered - Most Critical First. * * Safety Factors Are Calculated By The Modified Bishop Method * * Failure Surface Specified By 19 Coordinate Points Point X-Surf No. (ft) 1 100.00 2 107.81 3 115.71 4 123.68 5 131.67 6 139.67 7 147.63 8 155.53 9 163.34 10 171.02 11 178.54 12 185.88 13 193.00 14 199.88 15 206.48 16 212.79 17 218.78 18 224.43 19 229.38 Circle Center At X *** 2.604 Y-Surf (ft) 90.00 88.26 87.01 86.27 86.03 86.29 87.05 88.31 90.07 92.31 95.03 98.22 101.86 105.95 110.46 115.38 120.68 126.35 132.00 131.5 ; Y = 213.2 and Radius, 127.1 *** Failure Surface Specified By 20 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.83 88.34 3 115.73 87.14 4 123.70 86.40 5 131.70 86.15 6 139.69 86.36 7 147.66 87.04 8 155.58 88.20 9 163.42 89.82 10 171.14 91.90 11 178.73 94.43 12 186.16 97.40 13 193.39 100.81 14 200.42 104.64 15 207.20 108.88 16 213.72 113.51 17 219.96 118.52 18 225.89 123.89 19 231.50 129.60 20 233.59 132.00 Circle Center At X = 132.1 ; Y = 221.6 and Radius, *** 2.606 *** 135.4 ----------------- Failure --------------------------------------------------------------- Surface Specified By 16 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.75 88.03 3 4 115.64 123.62 86.71 86.07 5 131.62 86.10 6 139.59 86.80 7 147.47 88.18 8 155.21 90.21 9 162.75 92.89 10 170.03 96.19 11 177.01 100.09 12 183.64 104.57 13 189.87 109.59 14 195.65 115.12 15 200.95 121.12 16 203.45 124.48 Circle Center At X = 127.3 ; Y = 180.9 and Radius, 94.9 * ** 2.686 *** Failure Surface Specified By 16 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.74 87.99 3 115.63 86.66 4 123.61 5 131.61 . 6 139.57 7 147.44 8 155.16 9 162.67 10 169.91 11 176.82 12 183.37 13 189.49 14 195.14 15 200.28 16 201.50 Circle Center At X = *** 2.690 86.02 86.07 86.81 88.24 90.35 93.11 96.52 100.54 105.14 110.29 115.96 122.09 123.83 127.0 ; Y = 178.3 and Radius, *** 92.3 -------------------------------------------------------------------------------- Failure Surface Specified By 21 Coordinate Points • Point X-Surf Y-Surf No. (ft) (ft) i 88.89 90.00 2 96.78 88.69 3 104.73 87.76 4 112.71 87.21 5 120.71 87.04 6 128.70 87.26 7 136.68 87.86 8 144.62 88.85 9 152.50 90.22 10 160.31 91.96 11 168.02 94.08 12 175.63 96.56 13 183.10 99.41 14 190.44 102.61 15 197.60 106.16 16 204.59 110.05 17 211.39 114.28 18 217.97 118.82 19 224.33 123.68 20 230.45 128.83 21 233.86 132.00 Circle Center At X = 120.1 ; Y = 253.5 and Radius, 166.5 * ** 2.697 *** Failure Surface Specified By 19 Coordinate Points . Point No X-Surf (ft) Y-Surf (ft) . 1 100.00 90.00 2 107.87 88.54 3 115.81 87.57 4 123.79 87.09 5 131.79 87.11 6 139.78 87.62 7 147.71 88.62 8 155.57 90.11 9 163.33 92.09 10 170.94 94.54 11 178.39 97.45 12 185.65 100.82 13 192.68 104.63 14 199.46 108.87 15 205.97 113.52 16 212.18 118.57 17 218.07 123.99 18 223.61 129.76 19 225.32 131.77 Circle Center At X = 127.5 ; Y = 216.4 and Radius, 129.4 * ** 2.698 *** ------- ---------- Failure --------------------------------------------------------------- Surface Specified By 17 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 88.89 90.00 2 96.68 88.16 3 104.57 86.89 4 112.54 86.18 5 120.54 86.04 6 128.53 86.47 7 136.47 87.47 8 144.31 89.03 9 152.03 91.14 10 159.57 93.80 11 166.91 96.99 12 174.00 100.70 13 180.81 104.90 14 187.30 109.58 15 193.44 114.70 16 199.20 120.25 17 202.81 124.27 Circle Center At X = 118.5 ; Y = 198.2 and Radius, 112.2 • E *** 2.703 *** Failure Surface Specified By 20 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 88.89 90.00 2 96.76 88.56 3 104.69 87.55 4 112.67 86.96 5 120.67 86.81 6 128.67 87.08 7 136.64 87.79 8 144.56 88.92 9 152.40 90.48 10 160.16 92.45 11 167.79 94.84 12 175.29 97.64 13 182.62 100.83 14 189.77 104.42 15 196.72 108.38 16 203.45 112.71 17 209.93 117.40 18 216.15 122.43 19 222.09 127.78 20 226.30 132.00 Circle Center At X = 119.6 ; Y = 235.6 and Radius, * ** 2.708 *** 148.8 ------------------ Failure ------------------ Surface Specified -------------------------------------------- By 18 Coordinate Points Point X-Surf Y -Surf No. (ft) (ft) 1 88.89 90.00 2 96.72 88.38 3 104.64 87.26 4 112.62 86.63 5 120.62 86.50 6 128.61 86.87 7 136.56 87.74 8 144.45 89.10 9 152.23 90.96 10 159.88 93.29 11 167.37 96.10 521 593 O• r. f'1F ? © \\\\ co 10 1 V ' I 1 1 r f l 1 1 ° ° I to ; ° ; ( 1 CI ` i a , I 1 m ? 1 n. 1 1 0 O co I 1 O i mr 1 r L. -V 1 r O ? 1 ca r--- - - - - ? ?` Z ! r 1 41. • ik" 1 1 , ? 1 > 0 1 r r r H 1 I 1 5; ;M= - I I L16 r :G1 Z 1 1 • ;Zy j? mo ? r ,' 1Q 1 1 I O . ;mz , - 0 n ;a , \.1 e 9 1 , ? r . L r+t 2 ° to I o GG . - w •? ° I = o n o f• C O I AM C?a p n LA 'V r i o Ul x r / poc V) Z n % 'wA ul Q Z n m o ?? go to C m 2 ?C.* r4l:51-16.en6/.n m m o o p ®00400000 $ /:?? o\ v r 1 - ? C\/r N O r?nI i7?2 m c o C?i CI O ,z' ? n i ? Z S ice :. 'a Z Z R xn0 Z z n? g? e^ 0 8 1. - 8.? = N > £ 4 51 o n p g x /: d 6 o N Z > 7 4"=•. • m CA Q b (7F+ Nm ?jm 9 I:0 r (A Ms - NCA m 3 r7 N 0 mmN m X D X w•N IA U m n M et v W m m w m m x m m H A 7 ;a 0 30 0W IA etW IS moo Iz r.C) et'S' Id. /? 0 0 IL Ii j.+A • A k' C,C .. 9A 03 C rl c N? N? N?. r0 oil Ad ICC0 OZ wo X= DM zw z NCr O m Ooz 10 m• I? ?OLlI O+N W m FICA rcn r/? W a 3 E • K n I a =? aN 0 W m CA met X N m CA m my MID m m IA K n I m N me* X cn m to m eD ONO eD m m eD to 'b Nm Hm a r Gll ?F+ Vf N m 3 1+. 7 I I r w x I a Id'N U1 CA m n e'F v W m m w N m m ,p m ? H A 7 on IA f+ bd M? r • A A X 4 ..t% C3 CI N MY/) r+r. N?. . r H? A+ Ot wo mo Z ?'q VZi4 0 m coz 10 I ?D ?DCJI C+N W m F•ut rcn cn p 3 h O?DOO?C?C11?1WNF+yC N m ? i l ? wwwwwwwwww?? ! o+ a+ o+ cn cn cn ,p ,? ? o y ? i n O i m I II I ' ? V (B G I M N II t) m (n I i O Z '? w ..i r I ?i? C• C m i N ' Cl) r i n I I I r co I I w I w I r I i I O D K p n z o) ? O D r r r*i C CT N O v O ? n o ^? r O O O) ? ? U') D o ?o D Z o? m? O N N ?Z mD N Z r m u • L_J 0 z 0 3 e "45.3 awW 1{-/-t "WO "0'70 Y- O- 96-" TWO 71Y0 ups 190196 am ,>wwoo 3-1Q33N 3N Id *t 7'IVOLSGIdOtld cm m li- 1VA01" '0'N ',l1h ^ MOISM 0011 'AlNd0044 0 1N311NNYOR3 V a=5 3Lro 31YN8311M 1N°'; N G + N N + O S is 0£8 O?e 099 099 OL8 • u Ot OL 0 OZ USV3HLMON ONIH001) (SS31 80 'lJ Ol 1HO13H) NO1103S SSOaO 1N3WNNd8Y43 ld; SST, 80.0 n n V-13 AQNYS avu- 9L AVMOVOM V 1N3ANNV8A3 3 -i ('dLL) TOSdo1 ,9 'NIA ,8 0> OZ 0 OZ (1SV3H! MON 9NINO0I) (0'OL2 '13 3/10811 3S` E) N0003S SSONO 1N3WNNVGV43 11 AVMOVOM 11N3AHNVBA3 3 --1 HOOM 01 H3N32ll AD 33VJ6ns oeL O6L 0o9 o L9 ON LOCB Oy8 `I J1 \' J 12 174.67 99.37 13 181.75 103.10 14 15 188.59 195.15 107.25 111.83 16 201.41 116.80 17 207.36 122.16 18 212.62 127.54 Circle Center At X = 118.7 ; Y = 214.5 and Radius, 128.0 *** 2.722 *** Failure Surface Specified By 22 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 77.78 90.00 2 85.66 88.64 3 93.60 87.62 4 101.57 86.95 5 109.56 86.63 6 117.56 86.66 7 125.55 87.03 8 133.52 87.75 9 141.45 88.82 10 149.32 90.23 11 157.13 91.98 12 164.85 94.06 13 172.48 96.49 14 179.99 99.24 15 187.38 102.31 16 194.62 105.70 17 201.71 109.41 18 208.63 113.42 19 215.38 117.72 20 221.92 122.32 21 228.27 127.20 22 233.98 132.00 Circle Center At X = 113.0 ; Y = 270.6 and Radius, 184.0 * ** 2.723 *** ?J 1 7-? • r? U u? u7*•I u7•a m m W ka In 0i1 01 zc0 .R O ?7VJ z aaz W¢ =E VW zo m 0m um oa (ww .r . .wy Zw ow y I=0 a IOU A.. x a• &P4 V? V pc.M V'+'1 c.rq ff A !, V 410 xw 00 ox a c d H m OR d' u7 M r. v m N IA N.Fj x a x m Nis m •q c M u?y •IG4 0 a GO C mH ISO ••W a is in m In ? m m? •-•m m m u7 m N x +?m u7 m c+ c+ ooa aoo N N I ? ** PCSTABL5 ** by 0 --------------------------Purdue University ------------------------------------------------ --Slope Stability Analysis-- Simplified Janbu, Simplified Bishop or Spencers Method of Slices Run Date: 08-06-96 Time of Run: 11:15am Run By: BOB MANNS Input Data Filename: J:CULVSEIS.IN Output Filename: J:CULVSEIS.OUT Plotted Output Filename: J:CULVSEIS.PLT PROBLEM DESCRIPTION BOUNDARY COORDINATES 40 6 Top Boundaries 8 Total Boundaries Rock Branch Creek Dam - Gullford Co., NC HEI Job No. 9553055 Boundary X-Left Y-Left X-Right Y-Right Soil Type No. (ft) (ft) (ft) (ft) Below Bnd 1 .00 90.00 100.00 90.00 2 2 100.00 90.00 226.00 132.00 1 3 226.00 132.00 261.00 132.00 1 4 261.00 132.00 312.00 115.00 1 5 312.00 115.00 387.00 90.00 1 6 387.00 90.00 400.00 90.00 2 7 100.00 90.00 387.00 90.00 2 8 -------------------- .00 ----------- 86.00 ----------- 400.00 ----------- 86.00 ----------- 3 ---------------- ISOTROPIC SOIL PARAMETERS 3 Type(s) of Soil Soil Total Saturated Cohesion Friction Pore Pressure Piez. Type Unit Wt. Unit Wt. Intercept Angle Pressure Constant Surface No. (pcf) (pcf) (psf) (deg) Param. (psf) No. 1 120.0 120.0 460.0 32.0 .00 .0 1 2 125.0 125.0 .0 32.0 .00 .0 1 3 150.0 150.0 9999.9 .0 .00 .0 0 ----------------------------------------------------------------------------- 1 PIEZOMETRIC SURFACE(S) HAVE BEEN SPECIFIED Unit Weight of Water = 62.40 Piezometric Surface No Point X-Water No. (ft) 1 .00 2 400.00 1 Specified by 2 Coordinate Points Y-Water (ft) 90.00 90.00 A Horizontal Earthquake Loading Coefficient Of .280 Has Been Assigned A Vertical Earthquake Loading Coefficient Of .000 Has Been Assigned Cavitation Pressure = .0 psf -------------------------------------------------------------------------------- Searching Routine Will Be Limited To An Area Defined By 1 Boundaries Of Which The First 1 Boundaries Will Deflect Surfaces Upward Boundary X-Left Y-Left X-Right Y-Right No. (ft) (ft) (ft) (ft) 1 .00 86.00 400.00 86.00 -------------------------------------------------------------------------------- A Critical Failure Surface Searching Method, Using A Random Technique For Generating Circular Surfaces, Has Been Specified. 100 Trial Surfaces Have Been Generated. 10 Surfaces Initiate From Each Of 10 Points Equally Spaced Along The Ground Surface Between X = .00 ft. and X = 100.00 ft. Each Surface Terminates Between X = 199.00 ft. and X = 234.00 ft. Unless Further Limitations Were Imposed, The Minimum Elevation At Which A Surface Extends Is Y = .00 ft. 8.00 ft. Line Segments Define Each Trial Failure Surface. Following Are Displayed The Ten Most Critical Of The Trial Failure Surfaces Examined. They Are Ordered - Most Critical First. * * Safety Factors Are Calculated By The Modified Bishop Method * * Failure Surface Specified By 20 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.83 88.34 3 4 115.73 123.70 87.14 86.40 5 131.70 86.15 6 139.69 86.36 7 147.66 87.04 8 155.58 88.20 9 163.42 89.82 10 171.14 91.90 11 178.73 94.43 12 186.16 97.40 13 193.39 100.81 14 200.42 104.64 15 207.20 108.88 16 213.72 113.51 17 219.96 118.52 18 225.89 123.89 19 231.50 129.60 20 233.59 132.00 Circle Center At X = 132.1 ; Y = 221.6 and Radius, 135.4 *** 1.302 *** 40 Failure Surface Specified By 19 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.81 88.26 3 115.71 87.01 4 123.68 86.27 5 131.67 86.03 6 139.67 86.29 7 147.63 87.05 8 155.53 88.31 9 163.34 90.07 10 171.02 92.31 11 178.54 95.03 12 185.88 98.22 13 193.00 101.86 14 199.88 105.95 15 206.48 110.46 16 212.79 115.38 17 218.78 120.68 18 224.43 126.35 19 229.38 132.00 Circle Center At X = 131.5 ; Y = *** 1.305 *** 213.2 and Radius, 127.1 ----------------------------------------------------------------------------- Failure Surface Specified By 17 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 88.89 90.00 2 96.68 88.16 3 104.57 86.89 4 112.54 86.18 5 120.54 86.04 6 128.53 86.47 7 136.47 87.47 8 144.31 89.03 9 152.03 91.14 10 159.57 93.80 11 166.91 96.99 12 174.00 100.70 13 180.81 104.90 14 187.30 109.58 15 193.44 114.70 16 199.20 120.25 17 202.81 124.27 Circle Center At X = 118.5 ; Y = *** 1.343 *** 198.2 and Radius, 112.2 • E Failure Surface Specified By 16 Coordinate Points Point X-Surf No. (ft) 1 100.00 2 107.75 3 115.64 4 123.62 5 131.62 6 139.59 7 147.47 8 155.21 9 162.75 10 170.03 11 177.01 12 183.64 13 189.87 14 195.65 15 200.95 16 203.45 Circle Center At X *** 1.344 Y-Surf (ft) 90.00 88.03 86.71 86.07 86.10 86.80 88.18 90.21 92.89 96.19 100.09 104.57 109.59 115.12 121.12 124.48 127.3 ; Y = 180.9 and Radius, *** 94.9 ----------------- Failure --------------------------------------------------------------- Surface Specified By 16 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.74 87.99 3 115.63 86.66 4 123.61 86.02 5 131.61 86.07 6 139.57 86.81 7 147.44 88.24 8 155.16 90.35 9 162.67 93.11 10 169.91 96.52 11 176.82 100.54 12 183.37 105.14 13 189.49 110.29 14 15 195.14 200.28 115.96 122.09 16 201.50 123.83 Circle Center At X = 127.0 ; Y = 178.3 and Radius, 92.3 *** 1.346 *** 9 • Failure Surface Specified By 21 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 88.89 90.00 2 96.78 88.69 3 104.73 87.76 4 112.71 87.21 5 120.71 87.04 6 128.70 87.26 7 136.68 87.86 8 144.62 88.85 9 152.50 90.22 10 160.31 91.96 11 168.02 94.08 12 175.63 96.56 13 183.10 99.41 14 190.44 102.61 15 197.60 106.16 16 204.59 110.05 17 211.39 114.28 18 217.97 118.82 19 224.33 123.68 20 230.45 128.83 21 233.86 132.00 Circle Center At X = 120.1 ; Y = 253.5 *** 1.347 *** and Radius, 166.5 ----------------- Failure ------------------ Surface Specified --------------------------------------------- By 22 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 77.78 90.00 2 85.66 88.64 3 93.60 87.62 4 101.57 86.95 5 109.56 86.63 6 7 117.56 125.55 86.66 87.03 8 133.52 87.75 9 141.45 88.82 10 149.32 90.23 11 157.13 91.98 12 164.85 94.06 13 172.48 96.49 14 179.99 99.24 15 187.38 102.31 16 194.62 105.70 17 201.71 109.41 18 208.63 113.42 19 215.38 117.72 20 221.92 122.32 21 228.27 127.20 22 233.98 132.00 Circle Center At X = 113.0 ; Y = 270.6 *** 1.348 *** and Radius, 184.0 Failure Surface Specified By 20 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 88.89 90.00 2 96.76 88.56 3 104.69 87.55 4 0 112.67 86.96 5 120.67 86.81 6 128.67 87.08 7 136.64 87.79 8 144.56 88.92 9 152.40 90.48 10 160.16 92.45 11 167.79 94.84 12 175.29 97.64 13 182.62 100.83 14 189.77 104.42 15 196.72 108.38 16 203.45 112.71 17 209.93 117.40 18 216.15 122.43 19 222.09 127.78 20 226.30 132.00 Circle Center At X = 119.6 ; Y = 235.6 and Radius, *** 1.356 *** 148.8 --------------------------------------------------------------- Failure Surface Specified By 19 Coordinate Points Point X-Surf Y-Surf No. (ft) (ft) 1 100.00 90.00 2 107.87 88.54 3 115.81 87.57 4 123.79 87.09 5 131.79 87.11 6 139.78 87.62 7 147.71 88.62 8 155.57 90.11 9 163.33 92.09 10 170.94 94.54 11 178.39 97.45 12 185.65 100.82 13 192.68 104.63 14 199.46 108.87 15 205.97 113.52 16 212.18 118.57 17 218.07 123.99 18 223.61 129.76 19 225.32 131.77 Circle Center At X = 127.5 ; Y = 216.4 and Radius, *** 1.357 *** LI • Failure Surface Specified By 18 Coordinate Points Point X-Surf No. (ft) 1 88.89 2 96.72 3 104.64 4 112.62 5 120.62 6 128.61 7 136.56 8 144.45 9 152.23 10 159.88 11 167.37 12 174.67 13 181.75 14 188.59 15 195.15 16 201.41 17 207.36 18 212.62 Circle Center At X Y-Surf (ft) 90.00 88.38 87.26 86.63 86.50 86.87 87.74 89.10 90.96 93.29 96.10 99.37 103.10 107.25 111.83 116.80 122.16 127.54 129.4 118.7 ; Y = 214.5 and Radius, 128.0 *** 1.358 *** • SEISMIC 11 _Y ___- . _ -- n - - if P?SQf? El -INT_'ERS INC. c _.j ---D ATE5H--E T nO. --------OF____-- ENGINEERS - CONSULTANT S CNKD. BY_------ DATE --------- ?-?F.INGF;E-LD. ?=ORIA S =OCKFCR?, 1_LINO'S JOE NO..-------------------- --------- ---` --------------------------------- • T= RX ? ba4e-,Q en 5,540e 9,L No. ! C/ - E{ ° 5 &,z M iuEti e 5's CS S?e !.t/'a.v< Vc/a c i ?nb s?Cu/ve?? y = S ` 7a 30 7leca-aw?? Z ?,r e= 2 e?, e Z -- ?s = (6 C) f?= O. sr - see a7%-Zs see G. ?j?i? _ Ifx 3 d Z3 ,8x6Go O. S 5eG u? O• $-?e C- ?j bo ?f, s ??es (.Lse .7- Ff 44 se-s 6(;1% - 40 ,? of T_ • rs ec. (r/,rtq - T- = a. fir p Ct ? riz?k.,0 o? ?- 0. Z-7 S- IS ob ur e,:•Q L111 a • d) CL) v O a u = . -' O C 'c a C IT n x = 3 ? p s ?. E c O o= `a?uH v C ?r c?v y ?' L ? y U? C O y Q v a? C ^ ... y H .. y? _.? a O : L O c O O ^' E O H ? O x W ?. v G c v 32 3 _ c _? y Z cif aor _ ?;=: c U c? oco` LL ? _ Z Z F V« G v C u v C O C C y s '= A 'C '> W d V r`n ? ? C r0 Q V C W - C C O O C1 ^ _ - - ?1 U O O = v r -. y= as O W F- QF L) v1 c O r_ U C •• " ..1 N O .O - ?' O ea - U r. L u c '^ r ? y C' j E" O e?i Z C C p ? Q G C^ a= c> 0 0 u _ m 2 ?. 2 N- -> 1 ^-? E O. H d Q v G 1 ?; p CO u . u v •C , . 0 = C C u y C O " = •J L: .Z C E '?'v II If II N Cn :.? O N a C ?"` -. 3 U C . U o-- C v: ^ O N 17 O 0 21 0 v v v = a? p`?ca3a= °' C a n A a •? a) Z C G U tj u- v N a C N '^ .D v ? ? L'. N r •? N Q C7 CxS Q ? V ? C ? O ` ?3 ` 7 Y O ? • E C7 ?./ ?./ ? N,`? C c c c " = _ NQ ?c??o.°.`sr -• cE cc • • , N -J U V •> N4M` N ? ? - P. . CS CS Q ^ u O • -_ J y .7 7 C C".'7 U 1? ? u _C d O C C C es U '-' - ` " C N` v-.. V ??. ? w G E = 04 c :: ? = _ a c o? . N N ? -.0?_? go > u? u C C. G G •in O U O N ? y Z .O ., N C_ C .O C. N> _ .Y ' a a , G 3 E N c, ; IJ u .? a ?; J i c =? c u ci - ' •- V ?? c c v; c c c „? NEB °tj > ?= >+?` ?. C ?. C p N , GO^ E O??.y• rAC'' ,'? ` r ? I a C'? II CiJ II v v G T Off'- E N Y ? ` c- O H st l °N ? u `' "o r-' c.4' Eo 46 U? I IN II ^ N Co ^?.c e;7 no eu eo c • ? c.? a ?= a c-"" c c-? ` Cu u F IL,`` Q C O •C O C O C O 9 C C U G Q== 0 O E` J U E J U C N 0 0 ° E ?> E d a, 4 p u C3 a Ec a ? Ec Ec T ?y N V 0 N?c r- ms. X30 ?E c?°I lu o a''z GE `" ID aE> v0 yN; oiC h?-??? U V V G 6Xi V C C C ^? G7 C N 7 C cE3 oA L C ?Y ei N M [? O Z` ? u C :? N_ C X 6) u V E C T d ` C ?O u u C O _ u C v_ r1 u H O C G E O Cl E ° d N Q C'1 ^ ` e E r.u V- ..e=?- = = ^ O C . 'y O y ? 'yC p ' ? ' F - V u C _ E O C _ N .` v T N eS C N T O > _ • ° V H ? . N N U _ ?. G :.r .O N C N N O ^' '> U Z U >, (^. _ . ?' ? _ C U u r . ^ a? u u O N O C w G E 3 ?! ei a O .... • • Go .?. N O N .. N :S y -_ U ` y U r T ?'" T U 7 C 6r y 0 ° N N N > V _ - p 0 u U u Y V O v u O ` > ^` N v C_ -7 .7 C V v V y .N j N T V G L O G C u y C ?' G v T W O . O C R N u 0. F T u - N e?o?"?• ? a.c ? oo::>? c?;,?`ou? • ? '^?' Ec+ covi?_.=•o N u .- G L > •??, O C u O '.' O C O' ;/: ' .? ^ .?_ G E .. T ° '•? N .C C x !7: •C • v G u N C >` u u O ? 0 C a `J^ ru V ?° ' P C ` _ -14 O _ G i V zo_ v _ C O cam. O C Q GY 2 ' V •? N O- O N O K V ' C v v ? u E O O T 3 y v a >'? C O r - - ?, ? „ O _ - - - y E - ? O 3 > E O O O ' C» O Y p .` G _ •C C u u ;/; ai - - C ?' e`s O C vrn C ??, C --_' > + yr L. ° 'J a? y = Y e^.p..? u O p J p C? . C ?. • _ O _. - -• ';? L i _" C C- C C u > -. 7 N . O c G u y u `^ T _ _ u? L. _. u T u 67 C O 3 u C ' G : u •? u u y rn C =- O u •C es ? . ° Z u u_ V u C 7--0? ?„ v u :r C __ u ?. , u ' .. 7 > - . T Q v CO O m :? C y lu < C C r .: a i? 3 G >u e ? O :! `• C a C' H C <c L7 '^ E E •- U T C u C •N N G O C Y U O r. c? 7 .. . .. : V r' u O .V O ._ in `= ,? r C O y O N O u u u O V J O v 0 u T Y ? C `- O C a E G7 .; ,_ ^-? C v J ?r t? N T O u y u C e,? ? C•'W FG- tj E>°?'U UE pCr"? v Ov` L p? O?C?0 •C 0 0? II II II II 11 II 11 _ N ' C N Cu N GO C u u , n P3 c ? p ? _ : N V u N C C _ tr c CJ G M N p yr N O - OD .:. x C O ,? N -C ..... N C3 C di ca Q C ? N .. 'Cy . .C r : j -- O V N •`c N a? N L- 0 O C 7-J TV p a N n? O ,C c G E . ... cu 0 O ? ?t 4?V RY c c p G O E O t2 ?" O r^. y 0,0 "• C3 C tz O O C 0 Tlu C to C U V `• 4 0 ea a? 3 v cs y W ..pp CS a? ¢? fn m C7 ^ O ? C.1 i GY C G U C' vl V U U R d p y G ?. - O r C N 4 r U O U- x .? 7 E H •` • as O ?+ a0 v0 C\ T m O ? 41 ?, y V no E o"b> c a > o000 0.0 a O O N ? ?`-• U O eC4 C^ G O C 4? C .^ 4 rn E"' O o - tJ N. E'er en- ` u c E E w? o ° .- ? o ?• ° r 3 c ?. r r C O :: 'C _ . r H L:.. %. ..., c.. C CS vi p a C O in O O N ? Q 61 f C O V _ C v C' O C C C C O Cc y 0 0 p C G U^ O U ?0 ? a+ O y v N M C N j -tj > O ,v E 0 Et -= 0 43 t; C4 O erg O o o 0 a y v y N v O v `y 7 N C C' C -- C1 V e3 4 vi U-s Q h C _ ? C CI 7 a ... n v v e0 L v •H ^ ? r 3• >= c^ _ c _ CG C- C3 C) 8- Q w a? C3^ to t O h = O TC a O _U C - Gp of v C. 7 C O O C - C < HrD _ C C- v G Cl U O ci O vi h O r nn-T C UL 7 C ^ . - C y C Vf ? VI O? O C -L'Ll -z; ai v y ^ T _? V ... CJ IJ r - O y v ?- cd V _ n ?.n ?_ CU U° U r 6ri N ... O O J v V 11 a ,,, N. r-.+ C Ord ,O ?... -'- C _ ° 3- v tj c= G E° c u c I - -24 o ° c - O t M y z q p, n- p r _ e3 .C -C I C S ?? OU C3 to C R V C c..• C O ^ ° 0 > u 6 C3 2; E I Q F o °? o FTcz? 25 c° F to o f C i cU =' o c v: ,&:i F O .? V O N C C O G N C p G N r Z? N a r H U r U n ?O y E N° r u- a a n> a G] g v, 0 O N G1 O V ca: O G U h 42 v x U O v p a? 3 T c < O r r. U O H C v O 7 ? H > ° o 7 C V ° "J T '. C v 3 ? c -- N ON U O H N CS O C ? a0O O V V ? V ? 'O ? CO T G T O v 3 c ? U y O C c ri ? di ?u u r., 03 u v y F 03 v+ .v O a H Y1 ?. y> yl C > C7 r 13 cz CJ Z ° u V - E ... c 41 O C%1 C4 vl Z _ O u .rn di M u ?, n u C C C H 0 ej ac, 'r ?' ` 3' cn c= u 'c 'E v' ` N T N G C c ` O X V O 7 7 ?• O- "l Z Q ... al u G ` U J C cr "a G O O `u" u u '? ` 7 "> >''y G." W W O C v es u= O l O a ut C a C` CL. rn e.°- H ?_ c 3" E G ' a, ° E o o o c 'i G ZO ` a G u _?- 3 u O a_ ? T? ° ai O> c a- C s Fc ? ? o c E ?al E cc 'nai?v -13 O c-? c.o`n o c W u' C V) tu C- 7 O C C ^ = n = C- r O u - C - C G.. ?' ? ' ? I ^ .r v O U r ° C O 7 Hy . T i ` C O ?^ 'u N Y = V ' v. G) ¢l y ` ' ? O>> C .i C I v a C> 3 ?. .ate ': ' > C ? C Vf =z r: - . H ea ,7: u7 t 3 >^ O ^..p E C C p O Y u V O O ai ,n . ?.. rn C ^ T C C '"'X C ' h y u C eCS u u i ??• ll cn O O z F u i u v u '? ? v° c - v' p C C ° ?' ?' u •E O Q N C u n Ev, a E Q v cc u'-- 1 1 X 1 C \` G G C _ 11 i- Al! { ' 1 I.II _r.. Il I •f ( I.y. `I-.I_ -ht I-. I -? I L- F ? -T A _ - _ - - - -77 _ { r - I O -I I I lid f I.I - 1 - - O O O O N N M h ^L1??1 ?l - taRal laQdn ?o poiia: laluawepvn? oy sl - WalsRi la.(al-L to Oo.?a? laluawapu^i {° o!lay CN G\ n G; Y/ N r , o ? I > r Y e u U ? O O . s C a O CL o O ? ° W J O V p W LL O v o. O ? \ o ? C ` -l c a F = CL Z J n c _ W O E ? a A Y ? E c G z ? o W 9 c e1 c W N ? o - < y a J Q y O m N C W c O LL r c 6 Cr x C u C C • X_ O C -G -• ai 7 C C n >. C 7 a H v C ani N ?. = O y a. > .D u v E v_ "' ?? ?_' ?•? o n o a c C? E?.c c,_ o ? "" ? o a o :: 30 •` '? a - ?• u ?? ,v, u ;; O O 7 ?- N C C.. N y •„ V O M y a, G E v -' ?+ 4o8, N NC C u= O C" H U a>i >' L a o y ? o ? ? E o? ? ? 0 3 ?•?, = `"= -n 23 -2 4ci 03 r ?+ = v p O °? C G C Z= G u 7 T^ N U. r U T CiV > ?• !? y C >. v C-- __?Ec ?a? ??=cow 3na.°_a`,? ?' ac u E?? Tea,' N C O ^. U V C >. •E y_' ?+L O C^ -, E ur.. >+ Y a C uo N.NHu> oz= C =??' _°? c > u 3"No` E"E-_E• E2^ V u v •? y a a y >. C u G p 0 L O y r. O u C V •N G Vii .` vCf V C C ..O ° C - .,? O e? C O of N T? L- N V '? •N yr p r n _ 's O _ -' C C O T N? T O O i- u _ u it v O G 7°= C C O- C= 'y E r7 L_ G: tj O L 3? O> O O C H ?' N^ j N u u a' J C Z u' C 3 u? ?' O -^ -> y n a >1 --3 v h_ V° V^° u E C G w- C O O C ?' " T C C" G C C u V C .Q O O cc C3 CJ i?o J N uc_• O T u'_ E C G C -? u u 3 C= C > N u - c o o 3 = 3 3 v XY ?? c c c Via` 30 Oo -j CA E' C u E u ?^ v a O O CN C ??^ N .C Cu. O n "= CVivl HO N O- E N 7 _ ?• _ N -+ O C O CJ .. ?' .. 3 w O X V V O CCJ O C z ?^ -• 3 H^ IO d C r p _ N v_ G_ TAO ... V c3 - d t. v ? ` _ ^ ? O v ? a> G ? r. is - v "' ? • ? - ?' O 7 ^ - C - ? - ? E^ F- - c E "'3 E a ?? o ?; c c u a C u_ = E ,?„0 7 C u o N H N U_° C U .O v+ E y '7 a •N W N^ .?•C >'- ?- C O -.2 H c o >,. E ° u c? F= n E- uac E--u?cr _cC-N 5 q > u a G? ?•N v = c u •• C .? u u c. O u es > u n C\ C C O L ? O .-. C O ? L G V? C V? O 'N O= .. ?_` _ p^ E C •r V 3 r_ u v? E O ° _ u a? C r C O .. !+ c p° c i ? :17 .J. o >, C ?• c N_> N E u .o a u N E c - V N u 'c V E C C V` E 0 0" ^ (- > C G tj > O 7 = p C^ n G_ V C .V- u^ u u 3` E u 7 = '' V C " `•'„ r •I 'N -J _. ._.. c N C ^ •.? E N C 6 n v :J .. T•7 .-. - :! N -ej tj ° ? ? '.• u L _ v-, G'.. T7 N - ,»_ a c? C .-J.. C ? `, a '? O _" _ '_ • ` :p v1 C ?; J C - .. N C ? G :j T•r. O r; ? J ... v V CV ? V O v ?^ ?-?-? .. C v O- L O v ? ?_ ? V A N .. ;? z v_ O U' a 7 V L E u_ C c - N V N J J O v C >_ _ C V O O -.. C? '^ ?. C v G C `^ ?.? - ^. H v? C.D J V C= ?^ C y, n v C `u O "' G C O C N V C `? u? 'Vi N_ ?. C "? > •N .Vn ° 3 U. _ y• V T C r ?' ^ E u C C _ N O N C ?. C ?. y T v J '^,' C ` v U t :5 C3 > 0 .1 C4 t.) _^ ^ u DoE >? O C? .J.. - V C C 7 C C 'u j ?' E H r. O^ V N- _. O v CO O V O - S+ O- C V - L7 ^.? 'CJ - ? ... 'a N a? F•. ?^ C C - ^C•+ •C >.J v ` _ O C - r. y ,_ _ ` O u L p V N ?'?uu=?"v ?. a?7 `e- u_?O N?p3'T_O,„'` ?^r -?? •? p 0___ - T v v O C y, G p u_ p_ C _ C` y` y c O C n O .?''. ^_ _>• C j J' V V L - O :? '? ` 7 C v G7 U -'O?s O 7 V cs ° •? J O 7_ .. `? a V C C/1 H .' L r-- J C V T C .' v? .. >. E"" ?' p` ?, N vi F v ;r s cs z u,_c e, `?'t?u a- arm ^u E i to ` o c r- x u u> • = UE- 0 F ?+ ci a, _ ? u cc ?•? _ z 7 u 3 - C cr 3 w O C• - N N M CO E C C .r ° 3 3 -- to = p C C > lu '?. ' -u m co0o I o 'oa'- c.v -co EEN-; E ? ? =a 4 3 fo _ LSE W LnZ u< u•CZT•^?•?- 3?o.za <- C O H • ` ? C C > H Cam C y C E v`'i e C u i? ?? ? ? _ G• O `? /1 a '- ? :? n_ ;n . C OO C Oc. - p C H O ' ` __ t) Lu F- m d, vNxr%n 3/7 N ,0 ?E ->."?c 3 u c-, u zo e :s ?-. 3 COO Nv? LL O O O O O p O_ t, V7 en \0 0 vl? Y « ' ' ? > - p ? ? E? ? O C C V e o i . .- '-? 3 `n O e C _ > U O O cz -6 C - - u ar 30 ?? c CJ - ` °O 4.) J u • o 00000 L° c ' < ,? -43?°. N' = c = ? - ^•NM'n ? * :' C u.> ? c - C p C O ? ?+ ^ LV ? C u ^ v H C y u. C u?` N y u=> > O y 0 7 Y u 0 'C ar Ci] O H _ ?. - O n v - O v = u ? z> w Z< Z - .{•^r T Q u p U •S p- , H C ' O^ VI N 'C.? ?:. > - u •` G 7 Ci _ Cn - ., uu u C C C Boa,°? of .. • N ... - ?- p ?. N . p • -. E ._ O_ v - .N T 7 - >, Z. C 7 a ? •_, O ¢? >. ? ei '? > j, u v ?,,, C ?, ... ? v ? O 7 .. C . ? , O y C v ^, C ` O F ' E u c o u 4u c ? . = c .. z c3 .-'-c o or: u = _ C O ? ` C? ` ° u u C C < u ` ? > ^ a, 3 C cui CO ^? 3 J E' '.n O _ - C x C ? u v> .: ` G ' H_, • ,, u O O u a O yi O J U F H y > V C ;j •C- C O v _• O 7 O= O O .-.'v? H C C C '? v v > es. C' Co G E_ C O rn C _ E" u u ? y L 7 a O x- y • ' • C ' p- V V E O rif C '? ,n ?^ u C` :OY ?' O ? ?-' . .. ? - u r .? - e ?? N G H C. O C • -, ?•. E -.. n u ^ v i - ci3-E ,?, rn ? ae>>.?_ - ... r ii uc 3 E> ` u U _ E ?, p U • O - up C E .-:ac_ emu ? --= p``u_a,?^ -'` • ? ; ? _ . , ?-? ? w, O-^, O C C O 7 v > H :-0 U w C .'? u _ 3 p "'? ' C ? •/? p ej -3 r- r N o c u 3N? ° c u 3 u J ?, c E•= u° •5 N='c o` ° C u o cu v u O ?y€ Cc u ? 1 O ? aCO ? ? •o ?' J 04 z ? ° C = °3rc °' °E wCav -• " 1 = °'co N u " °?° O ° 1 _ -r ` u a? ? E r cv c c c `-' = ` 3 ' v ° c>.•N >.`._ > LL v O eo? u E y' C u a? :? _ a , ^ :s _ >? = °? O H O - v y? ?,_ _ G C F- c ^_ ^ v C C ? o O v .. c c E-= ; c `er '= < ° O. < U 7 CS `/ T o - n _ .C_. T ao`-_ '? 3 u u :s E, u" _ ?-• - - •? 3`^ c ?• n _. N ..• J ?/ :J u `/ ... V .? O c, U VI E :: .5 t o c C- o u v ai u U ? .7 =3 ? L U .x C u a v O C n? u C y ? t>i G T ?U U c _ c • o u .. ? > u H C. Z? v ? -cs o as C/?1 > c ? n k O v ? C1 C D v o C L?N L` G N N C V1 3 N N cl z I , L N ' =3 I 1 C14 o 1 I C) ° 9 II s ,, J i I I ?IIO Q r 1 g" ?z ` - _ N u fV ?Z o .9 I L I . ._. . II • _ I ?._?_? I I ?j_ I o ? c ? ? Z? N ? u Z\ ? u ZLZ t? G T =- C ?. O y II L•J ae_?9 C e a. h h- ; c o c - ' 9 Z` " c o b ' C o N E u fY L ""P O p O 'p T ? CL o00o E om3? c EECC q?q C?pT C q q R e0 O u? u q ?_• / U 2?uo u?mig a \ N /? / O ul N n -" / ? N w w w w w w zz z z z w 0 0 0 ? o .? (n N N N NN NN b b UBC - 1979 FICIRE 15 SEISMIC ZONE MAP OF THE UNITED STATES ) . ( For areas outside of the United States see Appendix Chapter 23 c? li e) i • U Y U O c`0 c ? o E LL .! U- N 0 o n a U U O ? N N O C V o a G ? r o U 'O v U y 3 o 1'7 F- x C C) ' U V co C N p C C.) N U ` N U N c7 .. U >. 'y C 0 G c E M N O O U T ? C ro G CZ tz U U C a o E tz r,3 U LL CL -- E Q .O e e a E ra F- 10-28 p M 1 0 = ? rfl ? o o Q v G ?p U V C G > 3 3 o C 0 0 O 5= • C C • > Co O L') C') Ln CO LL p ,- r- N C? o r ? U O. w O p CI U O _ E LL O .- N a Q q 3 N to, X E M U ?I O C: r U E (o C C O C U v: v r U N N r U v e7 O O Lo O o O O r, O C !? () N o E P N O O O ' O C O Lo O CI) C ) Lo O _ y C < N t: V N O O O C) O p n ? N E O T J ? O E O O O C1 Lo Lo M N Lo N - T U T N _ C C 1' U O N C ` 'o H L') U' a v O V y O 'C e C O N v N N ?- O e? > - O - v L7 O v O ?- w C N >- - LI) C LM y e7 II V O r U y > U O - p N C O G r E LL L C y O -j .. -.7 E N h C C r) n 3 ? ro 7 .C O G o V) v N M LL p U N z > Y U > = .+ p O T P (? C7 to (o v - H O > O U Q ra C Q O C ro C] U > > H it U U U - > U U ,o (o e V) a E U U U U Q N co 0 to Seminar Technical Papers ATC-35-1 co 0 A • ? ,-? cD Q1 Ca co 0) v v ? ai - „v O .- O coo E_ C? ti O G N ?, (n > Q v _ Z a? Jr. O p 0'a O C O Q 1A Q1 W W N O OJ L 10 7 C O N C 10 E Y w O E lL- z N J Y Y !n Joc C>XE<OHT Q J U U z T 00 vV 'x ca ? G _ O X 0 O 0 T- 0 H O X w 0 z N y L U U) Q O a_ 1 • ?UD papjn joS n to n O O N ^ iN133813d NI `% I Oildd JNIdAVG & Iron • TELEFAX TRANSMISSION Technical Services Company 1501 North Division Street Plainfield. Illinois 6064443929 Phone: 815-439.6000 FAX. 815-439-6217 Rae Aranas September 15. 1996 FAX NO.: 217-788-2603 8 OF PAGES: 12 (including cover page) TO:' Dave Daniels FROM: COMPANY: Hanson Engineers DATE: RE: Seismic Response Spectra Pine Needle LNG Facility Guilford County, North Carolina Dave, Attached is the site specific response spectra for the Pine Needle LNG Facility made by LAW Environmental. The response spectra covers damping ratios from 0.0 to 0.20 for both OBE and SSE events. Tabular coordinate points as well as smoothed response spectra curves for the OBE and SSE events are provided. Peak horizontal ground motions are also provided. Please note that vertical motion can be computed by taking 2/3 of the horizontal ground motion. Also attached is a correspondence from LAW Environmental regarding a request to clarify 'questions posed by CBI pertaining to the response spectra plots. The report samn=izes with the statement that one can conservatively connect the peaks to fill in the saddles found on the SSE response spectra plot. If you have any questions, please feel flee to can me, 815-439-6522. Sincerely, Rae R Aranas Associate Design Engineer ; J \? ? L4 r- cc: TDV/JTJ/RRA/JJG/Efile 951065 `.Dhl' In 'tin 1 7: C10 r KUM C.H 1 1 IVUUS I K 1 t5 JUL-14-1995 15:00 LAW ENa1Ra4lD4TAL INC r IU U1c1 rrztc-:)Uj r'HUM. Uri r?UlG 404 421 3486 P.es /- ?1 5CA 1007 r? C 10- V 4w U a 1- W a? i-t6 O O 0.1 W CL 0.01 0.01 I 5? 1 I 0.1 2 10 Frequency (Hz) SSE 0.0 dwr+ping SSE 0.005 davcr " ---------- SSE 0.02 damping - - - - - - - SSE 0.04 damping SSE 0.05 damping - - - - - SSE 0.10 damping - - - - SSE 0.15 dampng - - - - SSE 0.20 dKnping Piedmont Natural Gas Co. LNG Facility Guitford County, NC JUL 14 95 13:53 7 AYxr Smoothed LAW SSE EWOWEMNG Amb EWOOMONTAI 7ERVCEE Spe=a 100 Job Nk22-07963 Fgur• 7.14 TOTAL P.05 404 421 3486 PAGE.005 --- O O v+ v+ cn O _ CT adC p? C C C'?p? O D O O 0 0 0 - O ?? p ? 1 T TQ!R sty O O t!7 O O O v 0 U O N M O 'O 0 0 0 N O H t I O O O 1 O O I ? O O O O O O O O O O t37 O `O O O O O O O O O O H O O O Lo O O u) O tf) c M M N N O - O ( E) uoiaojajaooy alnjosgy-opnas,? A r V m a CD N C 0 a N m cr. W N to 'O N L O a e V) N m Q t to O N l37 N Q O Cl) 0 Z .O 0 n <4 T U A LL. CD Z J m m m z m C a • ROCK BRANCH CREEK CULVERT AND EMBANKMENT PINE NEEDLE LNG COMPANY, LLC Guilford County, North Carolina STRUCTURAL DESIGN COMPUTATIONS • E Culvcrt.cov S/6/9G 95S3055A Bl? ---- ',7E: -III ?l % -r-rte 9 5'ec *,4016 " • 6-D 9 i =I ? 141, /, 5, ?Ctn h//ciiG, aetjk c OOZ(/ZX/S)_ /D/ ? lT. S I /?7 S ?' = 00/ $ /? X ZL? = 47j/z - , ZGl ?SZ d C?? ' ea c -PAS V ------------- -- -- --- ----------- dG(G ? --- ----------------- 7'-0 "-? I •E ?n? ;? ?/Se ?vee??i%5 c}- - ?e ------------------ -- • CGcIUi°('?yv[G?7,(1? Des??1 r /o?,? ??? C/?cri />7s?a`e s??/?r? 1 - ?HQ ? LE of Ccn??? rE r3 Q ?? E : (See ( - - h ?o'r- J21?4 aoAsl; ??Ume Z4'' I I a, ,Ci?rnc eor7.5lder olso /2 )Yls ode ?f. (see p7a--h ? ?r 2/SA oar y ?.? 6; nc si, c ?rSic`e - (See /•? b'a.. - ?? ? ? ??SA a ?t a!?s r Z"Ire q'?pi>rc? 6ac?t!?/? ?vee/???/?s glan9 .S?lewal/ _ _. Ef=P = 4o n abo/e ,?,n s/a ? ?e% (Pet- /0 T I 1 ? I G 1 ?+• F f/ '04 ------------ac _<??ej ---=------------------ SC<.- ??( t( =ADS ? (N2 2r!? ?"NG%Y???" In LkGrle/' V%A& y J2-2 7 12 3i;.,s?rccjG(= G, l7 11 4, = L/Z /,.37) _ .017 J= , ?mss Gg30z? = 2?.?{ =2$;?3 C135 474 GS.?/ti3??1.59? ?L- "337s . (/zaw) M '5 = , 07-1 Z z, s?,Y If, 37 - X? x = . 997 z 2(4577) 7 -9,997 ?fo0? 3 ?D = ? ? (POA-s -/7,37 ?/ -, (0 4(l x•37)/ 4'r 5ho- cr r?JaQl1 = /(? ¢O C PGsL??; ,? ??h?{? ww, rPq r/ (u/„1ed- /3so (/% i?/Sf?> 0479 l c = .0979 ?3375? (/ ;v¢7g;{/? o?? a?- supPa?? - l? ?? • C, ------------------- = /OS- (G?f3 s??? (fie 2Z tea. i? a,! _ /mod (?9 Svc) /05= ?z? GOr 17371-.(,71/z?)> %I tJi Co '' /45 = 1. SP l? ??` cl« cr?:,4? Z = Z7• la z Fm,a - Z'n, Z7, (o /-?,frqd = /,Z,7 Z 177 07 _ l/ (v C l 30 ?D,? 474 00!4 /??.= 6,4, 5 X4.31; z = .?`? 3 =343 z 1 = l?? Mao (M ) 3 ? ??3 , 2og7 /2"v (/9.37x = 6.5al Z 9 ------Roc, ----- ----------- po-5 /41 v-e /50-?? (a9 Svc /30 = 9 &04, - 19.37 /- , to ?O As, r cg,? ? S9 ire ?CT /rJ k g 7 /A Z/FT Z _ 30, to 30• /o j Z(? 4ZL_z = l3/ 130 - a-j OA ua2 # 9 0 Co 2 ??, _ /z(s???3 f 8<Z??/9.9-?--s•??g? Z = 375 7 9 T = , 0791 (1064?) f (l , - , d 79/)(3750 = 4099 (a-?- mi(d1e) • ?f- pp?o5N? Old) z' s?de? L.213 = , 479 Cg9 / 474 le, GL?1d 7(4z9 9) 4- 3 (576/ \ C73 U?d a&6 z z #16 0 & " lzo/? ?6?el -? # 9 C? 6 p ??m sue/ Ic(', k3) - 1,?3 7- ---------/?oc Cep-------------------- %? wa S S Gt l? ew ;CIO/? Gee Vt, ;/- s/aio 2 ? /c = I /u A, -- UICt (? r ern n?c to -Pace -OL 494- _ 79CZ) .9? P iz 19.s?- 00675 .5 f LO7 1,95 ? Z? WU-? iz 25 ^ :, ?o?b w 4P ?l • ?`z -5cco (?-) ac% -tea /.9,SXrZ= =1937 /t/a slue ?{r•c -?. ?; a ir-c? per ?u_?v? ? Yr rum W z7-/JS cii?? sec??T? ?u =2v 1e evil l/G ^ Z < ? ?.. Z? 3 ? ?` fo o / Z * /2.37 = 2 /. 3 ? ZO ?6 lL tamp /?? , 6a- RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job -7S600 s-s-A 1525 South Sixth Street Page &ingfield, IL 62703 Date/ 9(O jCK BRANCH CULVERT-16'SPAN-SECTION 1 I J:\USERS\STRUCT\95S3055A\£HtVl6-1.R20 -??G?/I?Ot -F3 ?ZzD Units Option : US Standard AISC Code Checks : 9th Edition ASO Shear Deformation: No P-Delta Effects Yes Redesign No Edge Forces No A.S.I.F. 1.333 ---------------------------------------------------------------------------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 0.00 R R 0.00 2 0.00 9.00 0.00 3 17.00 9.00 0.00 104 17*00 *00 .iteriaL Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database MatL. Area Moment of As y/y Label Shape Set Inertia Coef -------------------------------------- (in"2)--------- (in"4)----------------- WALLIE CONC 144.00 1350.000 1.20 SLABIE CONC 288.00 4745.000 1.20 ? ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 9.00 2 2 - 3 SLABIE 17.00 3 3 - 4 WALLIE 9.00 F 7-T -t-a // 4f-v1,( r 0 3 f1 Cow RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date .CK BRANCH CULVERT-16'SPAN-SECTION 1 J:\USERS\STRUCT\95S3055A\CULV16-1.R2D ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)------- -- (ft)----- ---- (ft)---- 1 1 - 2 X 1.740 1.290 0.000 9.000 ? 3 3 - 4 X -1.290 -1.740 0.000 9.000 Member Distributed Loads,BLC 2: EARTH DEADLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -4.020 -4.020 / 0.000 17.000 -- ----------------------------------------------------------------------- -)ad Combination Self Wt BLC BLC BLC BLC BLC W E Description Dir Fac Fac Fac Fac Fac Fac DYNA S V ---------------------------------------------------------------------------- 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 9 6? RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date WICK BRANCH CULVERT-16'SPAN-SECTION 1 J:\USERS\STRUCT\95S3055A\CULV16-1.R2D Load Combination is 1 LATERAL + EARTH Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation --------------------- (in)------------ ----- (in)---------- ------ (rad)--------- 1 0.00000 -0.00000 0.00090 2 0.00120 -0.00712 -0.00324 3 -0.00120 -0.00712 0.00324 4 -0.00000 -0.00000 -0.00090 Load Combination is 1 LATERAL + EARTH Reactions Node Global X Global Y Moment ------------ ----------(K)------------------(K)---------- -----(K-ft)--------- 1 -1.42678 34.17000 0.00000 4 1.42678 34.17000 0.00000 Totals 0.00000 68.34000 0.00000 Load Combin ation is 1 LATERAL + EARTH - ,'- 0 Member End --------- Forces ---------------------- ---------------------- -------------------- Nodes - --_= I-End = - -- J-End - No I J Axial Shear Moment Axial Shear Moment ------------ ---(K)--------( K)------(K-ft)-------(K)----- ---( K)------(K-ft)-- 1 1- 2 34.17 1.43 0.00 -34.17 12.21 -51.55 2 2- 3 12.21 34.17 51.55 -12.21 34.17 -51.55 3 3- 4 34.17 12.21 51.55 -34.17 1.43 -0.00 Load Combination is 1 LATERAL + EARTH AISC Code Checks ---------------------------------------------------------------------------- Nodes Member Quarter Points No I J Maximum 0 1/4 112 3/4 L Shear ---------------------------------------------------------------------------- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 MEMBER DETAILED ANALYSIS ad Comb 1: LATERAL + EARTH Memb 1 : 1 - 2 Property : WALLIE Shape Length 9.88 ft Max Shear : 1.43 K Location : 8.88 ft Min Shear : -12.21 K Location : 9.88 ft Max Moment: 51.55 K-ft Location : 9.88 ft Min Moment: -8.59 K-ft Location 8.81 ft Max +Defl 8.8511 in Location 5.85 ft Max -Defl -8.8812 in Location 9.88 ft • Shear OgAj Moment hhh.- 4"qqq Max Unck : No Calc Deflected Shape Unity Check Not Calculated lD e, MEMBER DETAILED ANALYSIS *Ad Comb 1: LATERAL + EARTH Memb 2 : 2 - 3 Property : SLABIE Shape . Length 17.88 ft Max Shear 34.17 K Location 8.88 ft Min Shear -34.17 K Location 17.88 ft Max Moment: 51.55 K-ft Location . 17.88 ft Min Moment: Location . Max +Def 1 : Location . Max -Def 1 : Location . Max Unck . 0?1 -93.67 K-ft 14,+MAX 8.58 ft or S?L+b 8.8888 in 8.88 ft -8.2539 in ?= - 8.58 ft No Calc Shear Moment 94 Deflected Shape Unity Check Not Calculated /ob 0 ?F Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 1 J:\USERS\STRUCT\9553055A\CULV16-1.R2D Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 0.00096 2 0.00190 -0.00997 -0.00436 3 -0.00190 -0.00997 0.00436 4 -0.00000 -0.00000 -0.00096 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ---------------------- (K)------------------(K)---------------(K-ft)--------- 1 -3.86478 47.83800 ? 0.00000 4 3.86478 47.83800 0.00000 Totals 0.00000 95.67600 0.00000 Load Combination is 2 L + E FACTORED Member End Forces -------------------- ------------------- ---------------------- Nodes ---------- I-End ----- J-End No I J Axial Shear Moment Axial Shear Moment ---------------(K)---- ----(K)------(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 47.84 3.87 0.00 -47.84 19.31 -74.68 2 2- 3 19.31 47.84 74.68 -19.31 47.84 -74.68 3 3- 4 47.84 19.31 74.68 -47.84 3.87 -0.00 Load Combination is 2 L + E FACTORED AISC Code Checks ------- ------------------------ -------------------- ---------------------- Nodes --- Member Quarter Points No I J Maximum 0 ------- 1/4 1/2 3/4 ------------------------ L Shear -------------------- ---------------------- 1 1- 2 --- - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 MEMBER DETAILED ANALYSIS id Comb 2: L + E FACTORED Memb 1 : 1 - 2 Property : WALLIE Shape . Length 9.88 ft Max Shear : 3.87 K Location . 8.88 ft Min Shear : -19.31 K Location . 9.88 ft Max Moment: 74.68 K-ft Location . 9.88 ft Min Moment: -2.56 K-ft Location . 1.35 ft Max +Defl : 8.8638 in Location . 6.83 ft Max -Defl : -8.8819 in Location . 9.88 ft Max Unck : No Calc Shear Moment ........ ,P--.0aMAi Deflected Shape Unity Check Not Calculated is 6h MEMBER DETAILED ANALYSIS ad Comb 2: L + E FACTORED Memb 2 : 2 - 3 Property : SLABIE Shape Length 17.08 ft Max Shear : 47.84 X Location : 0.00 ft Min Shear : -47.84 K Location . 17.00 ft Max Moment: 74.68 K-ft Location . 17.00 ft Min Moment : -128.63 K-f t Location 8.50 ft. , or Slalp Max +Defl : 0.0000 in Location . 0.00 ft Max -Defl -0.3462 in Location 8.50 ft Max Unck : No Calc • Shear Moment Deflected Shape Unity Check Not Calculated • nt .e Diagram 0 ? - 7a--., RISA-2D (R) Version 3.03 q Hanson Engineers, Inc. Job /S53OS3-? 1525 South Sixth Street Page 0 ringfieLd, IL 62703 Date CK BRANCH CULVERT-16'SPAN-SECTION 1 J: \USERS\STRUCT\9553055A\^ "cr 6-r.=? "C- ?* eZ D Units Option : US Standard AISC Code Checks : 9th Edition ASO Shear Deformation: No P-Delta Effects Yes Redesign No Edge Forces No A.S.I.F. 1.333 ---------------------------------------------------------------------------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 0.00 R R 0.00 2 0.00 13.00 0.00 3 17.00 13.00 0.00 4 17.00 0.00 R R 0.00 ---------------------------------------------------------------- V Jaterial Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database Matt. Area Moment of As y/y Label Shape Set Inertia Coef -------------------------------------- (in"2)--------- (in"4)----------------- WALLIE CONC 144.00 1350.000 1.20 SLABIE CONC 288.00 4745.000 1.20 ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 13.00 / 2 2 - 3 SLABIE 17.00 ? 3 3 - 4 WALLIE 13.00 E /,D RISA-20 (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date K BRANCH CULVERT-16'SPAN-SECTION 1 :\USERS\STRUCT\95S3055A\CULV16-1.R20 ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEAOLOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 1 1 - 2 X 1.940 1.290 0.000 13.000 3 3 - 4 X -1.290 -1.940 0.000 13.000 Member Distributed Loads,BLC 2: EARTH DEAOLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -4.020 -4.020 0.000 17.000 ---------------------------------------------------------------------------- ad Combination Self Wt BLC BLC BLC BLC BLC W E . Description Dir Fac Fac Fac Fac Fac Fac DYNA S V ---------------------------------------------------------------------------- 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 0 /G RISA-20 (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date K BRANCH CULVERT-16'SPAN-SECTION 1 :\USERS\STRUCT\95S3055A\CULV16-1.R2D Load Combination is 1 LATERAL + EARTH Nodal Displacements --------------------------------------------------------------------------- Node Global X Global Y Rotation ------------- -------- (in)------------- ---- (in)---------------- (rad)--------- 1 0.00000 -0.00000 -0.00084 2 0.00139 -0.01028 -0.00291 3 -0.00139 -0.01028 0.00291 4 -0.00000 -0.00000 0.00084 Load Combination is 1 :. LATERAL + EARTH Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------------------(K)------------------(K)---------------(K-ft)--------- 1 -6.87551 34.17000 0.00000 4 6.87551 34.17000 0.00000 Totals 0.00000 68.34000 0.00000 Load Combination is 1 LATERAL + EARTH Member End Fords I*-- Nodes - I-End = J-End - No I J AxiaL Shear Moment Axial Shear Moment ---------------(K)--------( K)------(K-ft)-------(K)--------( K)------(K-ft)-- 1 1- 2 34.17 6.88 0.00 -34.17 14.12 -56.24 2 2- 3 14.12 34.17 56.24 -14.12 34.17 -56.24 3 3- 4 34.17 14.12 56.24 -34.17 6.88 0.00 Load Combination is 1 LATERAL + EARTH AISC Code Checks ---------------------------------------------------------------------------- Nodes Member Quarter Points No I J Maximum 0 1/4 1/2 3/4 L Shear ---------------------------------------------------------------------------- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 -/C( MEMBER DETAILED ANALYSIS d Comb 1: LATERAL + EARTH b 1 : 1 - 2 Property WALLIE Shape . Length 13.88 ft Max Shear 6.88 K Location 8.88 ft Min Shear -14.12 K Location 13.88 ft Max Moment: 56.24 K-ft Location . 13.88 ft Min Moment: -12.58 K-f t Location . 3.77 ft Max +Def 1 : 8.8356 in Location . 18.53 ft Max -Defl : -8.8228 in Location . 3.51 ft Max Unck : No Calc • Shear Moment -qqq??A Deflected Shape Unity Check Not Calculated 0 7,,-- MEMBER DETAILED ANALYSIS 0h d Comb 1: LATERAL EARTH Max Unck No Caic b 2 2 - 3 Property SLABIE Shape Length 17.66 ft Max Shear 34.17 ]{ Location 8.88 ft Min Shear -34.17 K Location 17.86 ft Max Moment: 56.24 X-ft Location 17.88 ft Min Moment: -88.99 K-ft Location 8.58 ft Max +Defl 8.6688 in Location 6.68 ft Max -Defl -8.2367 in Location 8.56 ft ?J Shear Moment Deflected Shape Unity Check Not Calculated 0 7- RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date ROCK BRANCH CULVERT-16'SPAN-SECTION 1 J:\USERS\STRUCT\95S3055A\CULV16-l.R2D Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 -0.00209 2 0.00228 -0.01440 -0.00361 3 -0.00228 -0.01440 0.00361 4 -0.00000 -0.00000 0.00209 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------- -----------(K)------- -----------(K)---------------(K-ft)--------- 1 -12.48825 47.83800 0.00000 4 12.48825 47.83800 0.00000 Totals 0.00000 95.67600 0.00000 Load Combination is 2 L + E FACTORED Member End Forces - ------------------------ -------------------- ----------- Nodes -------------------- I-End J-End No I J Axial Shear Moment Axial Shear Moment ----------- ----(K)--------(K)--- ---(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 47.84 12.49 0.00 -47.84 23.20 -85.20 2 2- 3 23.20 47.84 85.20 -23.20 47.84 -85.20 3 3- 4 47.84 23.20 85.20 -47.84 12.49 0.00 Load Combination is 2 L + E FACTORED AISC Code Checks -------- ------------------------ -------------------- ----------- Nodes ------------- Member Quarter Points No I J Maximum 0 ------- 1/4 1/2 3/4 ------------------------ L Shear -------------------- ----------- 1 1- 2 -------------- - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - E - 1?j MEMBER DETAILED ANALYSIS 41d Comb 2: L + E FACTORED mb 1 1 - 2 Property WALLIE Shape Length 13.88 ft Max Shear 12.49 K Location 8.88 ft Min Shear -23.28 K Location. 13.88 ft Max Moment: 85.28 K-ft Location . 13.88 ft Min Moment: -24.48 K-ft Location . 4.83 ft Max +Defl : 8.8341 in Location . 11.18 ft Max -Defl : -8.8655 in Location . 4.16 ft Max Unck : No Calc 1 ] Shear Moment Deflected Shape Unity Check Not Calculated is ?h MEMBER DETAILED ANALYSIS Comb 2: L + E FACTORED let 2 : 2 - 3 Property : SLABIE Shape Length 17.88 ft Max Shear : 47.84 X Location : 8.88 ft Min Shear : -47.84 X Location : 17.88 ft Max Moment: 85.28 X-ft Location : 17.88 ft Min Moment: -118.11 X-ft Location 8.58 ft Max +Defl 8.8888 in Location 8.88 ft Max -Defl -8.3878 in Location 8.58 ft Max Unck No Calc • Shear Moment Deflected Shape Unity Check Not Calculated 40 Moment Diagram .10 .8 0 RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date 7 ( 9? 0K BRANCH CULVERT-16'SPAN-SECTION 1 ? J:\USERS\STRUCT\9553055A\6o6.!61.R29 GV!(o I - 877, 4?'a. b Units Option : US Standard RISC Code Checks : 9th Edition ASO Shear Deformation: No P-Delta Effects : Yes Redesign No Edge Forces No A.S.I.F. 1.333 ------- Node --------- ------------------------------------------------------------ Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)- ------- (ft)----- (in,K/in)-- -- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 4.00 R R 0.00 2 0.00 13.00 0.00 3 17.00 13.00 0.00 4 17.00 0.00 R R 0.00 -----------------------------------------------------9----------------- teriaL Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------- Section ----- --------- Database ----------- MatL. ------------- Area ----------------- Moment of ------ As ----- y/y Label Shape Set Inertia Coef ---------- -------------- -------------- (in"2)---- ----- (in"4)------ ------ ----- WALL1 CONC 144.00 1350.000 1.20 SLABIE CONC 288.00 4745.000 1.20 WALL2 CONC 144.00 1350.000 1.20 ---------- I ----- J --------- ------------------------ I Releases J ----------------- End Offsets ------ ----- No Node Node Section x y z x y z Sec Sway I J L ength ---------- -------------- ------------------------ ------(in)----(in )----- -(ft) 1 1 - 2 WALL1 9.00 2 2 - 3 SLABIE 17.00 3 3 - 4 WALL2 13.00 e? G j 8 i Z j h f. 1 0 RISA-20 (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date K BRANCH CULVERT-16'SPAN-SECTION 1 \USERS\STRUCT\95S3055A\CULV16-1.R2D ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------ -(K/ft,F)----- (K/ft,F)---- ----- (ft)--- ------ (ft)---- 1 1 - 2 X 1.740 1.290 0.000 9.000 3 3 - 4 X -1.290 -1.940 0.000 13.000 Member Distributed Loads,BLC 2: EARTH DEADLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -4.020 -4.020 0.000 17.000 ---------------------------------------------------------------------------- ad Combination Self Wt BLC BLC BLC BLC BLC W E .?--Description Dir Fac Fac Fac Fac Fac Fac DYNA S V ---------------------------------------------------------------------- 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 1] `6 G RISA-20 (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date K BRANCH CULVERT-16'SPAN-SECTION 1 :\USERS\STRUCT\95S3055A\CULV16-1.R20 Load Combination is 1 LATERAL + EARTH Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation ------------------ --- (in)---------- ------- (in)------- --------- (rad)--------- 1 0.00000 -0.00000 0.00313 2 -0.17778 -0.00731 -0.00272 3 -0.18045 -0.01000 0.00307 4 -0.00000 -0.00000 0.00248 Load Combination is 1 LATERAL + EARTH Reactions Node Global X Global Y Moment ---------------------- (K)--------- ---------(K)---------------(K-ft)--------- 1 -0.06847 35.09600 0.00000 4 7.42847 33.24400 0.00000 Totals 7.36000 68.34000 0.00000 Load Combination is 1 LATERAL + EARTH Member End Forces Nodes - -------------------- I-End ------------ - ---------------------- J-End -------------------- No I J Axial Shear Moment Axial Shear Moment ---------------(K)---- ----( K)----- -(K-ft)-------(K)--------( K)------(K-ft)-- 1 1- 2 35.10 0.01 0.00 -35.10 13.62 -64.30 2 2- 3 13.57 35.10 64.30 -13.57 33.24 -48.55 3 3- 4 33.24 13.53 48.55 -33.24 7.47 -0.00 Load Combination is 1 LATERAL + EARTH AISC Code Checks - ----- ------------ ---------------------- -------------------- -------- -------- Nodes Member Quarter Points No I J Maximum 0 1/4 112 3/4 ----------- L Shear -------------------- ---------------------- 1 1- 2 ------------ ----------- - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - r te?- MEMBER DETAILED ANALYSIS d Comb 1: I LATERAL + EARTH b 1 : q m 1 - 2 Property : WALLi Shape Length 9.88 ft Max Shear 8.81 K Location 8.88 ft Min Shear -13.62 K Location 9.88 ft Max Moment: 64.38 K-ft Location . 9.88 ft Min Moment: 8.88 E-ft Location 8.86 ft Max +Defl 8.2848 in Location 7.29 ft Max -Defl 8.8888 in Location 8.88 ft Max Unck : No Calc rJ Shear ,qqq"q Moment Deflected Shape Unity Check Not Calculated ?-1 ? el MEMBER DETAILED ANALYSIS d Comb 1: LATERAL + EARTH b 2 : Fem 2 - 3 Property : SLABIE Shape Length 17.80 ft Max Shear : 35.10 X Location : 0.80 ft Min Shear : -33.24 X Location, : 17.00 ft Max Moment : 64.30 X-f t /?i?s ryrC ?' Location : 0.00 ft s? t (?/LL.ILS Min Moment: -88.90 X-ft Location 8.67 ft Max +Defl 0.8008 in Location 0.00 ft Max -Defl -0.2375 in Location 8.67 ft Max Unck No Calc • Shear Moment Def lected Shape Unity Check Not Calculated 1r? ?I MEMBER DETAILED ANALYSIS q d Comb 1: LATERAL + EARTH Imb 3 3 - 4 Property WALL2 Shape . Length 13.80 ft Max Shear 13.53 X Location 0.08 ft Min Shear -7.47 X Location 13.00 ft Max Moment: 48.55 X-ft Location . 0.80 ft Min Moment: -14.88 X-ft Location 8.97 ft Max +Defl 0.1804 in Location 13.80 ft Max -Defl 0.0080 in Location 0.00 ft Max Unck No Calc ?7- Shear Moment Deflected Shape Unity Check Not Calculated • 6? Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation --------------------- (in)----------------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 0.00562 2 -0.37354 -0.01036 -0.00324 L_J ?vi RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date .ROCK BRANCH CULVERT-16'SPAN-SECTION 1 J:\USERS\STRUCT\95S3055A\CULV16-1.R2D Node Global X Global Y Rotation --------------------- (in)----------------- (in)---------------- (rad)--------- 3 -0.37789 -0.01383 0.00397 4 -0.00000 -0.00000 0.00552 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------------------(K)------------------(K)---------------(K-ft)--------- 1 -1.09153 49.71531 0.00000 4 13.60353 45.96069 0.00000 Totals 12.51200 95.67600 0.00000 Load Combination is 2 L + E FACTORED Member End Forces ----- ----------------------- -------------------- ---------------------------- Nodes I-End ===______ = J-End = No I J Axial Shear Moment Axial Shear Moment ---------------(K)--------(K)------(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 49.72 0.92 -0.00 -49.72 22.26 -101.19 2 2- 3 22.09 49.72 101.19 -22.09 45.96 -69.27 3 3- 4 45.96 21.98 69.27 -45.96 13.71 -0.00 Load Combination is 2 L + E FACTORED AISC Code Checks ------- ----------------------- -------------------- -------------------------- Nodes Member Quarter Points No I J Maximum 0 ------ 1/4 1/2 3/4 ----------------------- L Shear -------------------- --------------------------- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 1? i MEMBER DETAILED ANALYSIS fem d C omb 2: L + E FACTORED b 1 : 1 - 2 Property : WALL1 Shape . Length 9.88 ft Max Shear : 8.92 K Location . 8.88 ft Min Shear : -22.26 K Location : 9.88 ft Max Moment: 181.19 K-ft Location . 9.88 ft Min Moment: -8.14 K-ft Location . 8.27 ft Max +Defl : 8.3965 in Location . 7.74 ft Max -Defl : 8.8888 in Location . 8.88 ft Max Unck : No Calc • Shear Moment Deflected Shape Unity Check Not Calculated 0 MEMBER DETAILED ANALYSIS fem d Comb 2: L + E FACTORED b 2 : 2 - 3 Property : SLABIE Shape Length 17.88 ft Max Shear 49.72 K Location 8.88 ft Min Shear -45.96 K Location 17.88 ft Max Moment : 181.19 K-f t ?a ma?C Location . 8.88 ft S1A4L) a"Cf- Min Moment : 418?48r-Nr&t l vat'' Location 8.84 ft Max +Defl 8.8888 in Location 8.88 ft Max -Defl -8.3897 in Location 8.67 ft Max Unck : No Calc • Shear Moment Deflected Shape Unity Check Not Calculated 0 MEMBER DETAILED ANALYSIS d Comb 2: F L + E FACTORED mb 3 : qe 3 - 4 Property : WALL2 Shape Length 13.00 ft Max Shear : 21.98 K Location . 0.00 ft Min Shear : -13.71 K Location . 13.00 ft Max Moment: 69.27 K-ft Location : 0.00 ft Min Moment: -29.63 K-ft Location : 8.58 ft Max +Defl : 0.3778 in Location . 13.80 ft Max -Defl : 0.8000 in Location . 0.00 ft • Shear kL-Nq??? Moment hhhhhh-? Max Unck : No Calc Deflected Shape Unity Check Not Calculated is o If- Moment Diagram Z- E P 92.41 86.86 1069.31 57.76 46.21 34.66 23.18 11.55 6.68 -11.55 -23.18 -34.66 -46.21 -57.76 -69.31 -86.86 -92.41 -163.97 -115.52 -127.87 • Moment Diagram(K-ft) Load Comb 2 r? 85.281 8.8 1.7 3.4 5.1 6.8 8.5 16.2 11.9 13.6 15.3 17.8 Mode 2 Location Along Member 2 (ft) Mode 3 ?i? Gam. ? o C, CID , = (,,,, i.7 "->s-Z„ Zv 00 7/ 7/)0 7'_ o ?yp rr7 vI 0 ?? ? ; n • c "-7 cu--- -?or POs /t7vc V--e( f; ? slat,,. 88.86 69.31 57.76 46.21 34.66 Z3.18 11.55 -8.88 -11.55 -23.18 -34.66 -46.21 -57.76 -69.31 -88.86 -92.41 -183.97 -115.52 -127.87 -138.62 Moment Diagram(K-ft) t - - L 128.631 ' #9@/8,1 #-90 /r, 8.8 1.7 3.4 5.1 6.8 8.5 18.2 11.9 13.6 15.3 17.8 Mode 2 Location Along Member 2 (ft) Mode 3 Cu-?o?s ?o? p0.5/ C ?1?5 /S t'?G CGt? -A V-0 sk-,ol 8 GVE' 12??OG 6.19.44( Ga?' ? or lZ?(? ,C = 19.44 29) _ 13 • S /C - ?0f ?a cr,? a Z/3 ps ?? v-e Lars "node 2 4 WOL b1,11 / /Q 3 ?? /urn Load Comb 2 74.681 p /0 , ,S53°ssA 7//7/96 Ss 2J 183.6: 97.88 92.12 86.36 88.68 74.85 69.89 63.33 57.57 51.82 46.86 48.38 34.54 28.79 23.83 17.27 11.51 5.76 8.88 -5.76 • 3 -S5.??1STr; 8.8 8.9 1.8 2.7 3.6 4.5 5.4 6.3 7.2 8.1 9.8 ng Member 1 Mode 1 Location Al (ft) Mode 2 o (?C lZ-S4! - I ? q =`?Q ?o (?`Y?? _ ?GO 7Sf'1Z 371 E 7 7 5-) W-14 ?Gu? CUB" ?-Or,7 Ce 5l r1 Moment Diagram(K-ft) Load Comb 2 73.85 9.Z 9 67.43 • 61.81 56.19 58.57 44.95 39.33 33.71 28.89 22.46 16.86 11.24 5.62 8.88 -5.62 -11.24 -16.86 -22.48 -28.89 -33.71 -49.626 8.8 1.3 2.6 3.9 5.2 6.5 7.8 9.1 18.4 11.7 13.8 Mode 3 Location Along Member 3 (ft) Mode 4 =r Pas' 5??? ?r vv c Just ? #P ? /z ??? ?? _ /Z 9s-53OSSA -7/ 7/90 0 HANSON ENGINEERS, INC. / BY DATE_7 ---!-(-? ENCINEERS-CQNSULTA.N-S SHEETItiO.OF 13 CHKD. BY ?!?-__C>TE 1'21 y 371RI`:GF:H_J. PEORIA & ROCKFCP.J. I' `JC'S JO8 --------- ejrzl? --Cr>°e AfU;? ,c- I?3 (3z•s? ?/- .? 3z•s??) d4? (F 91' slt2ar F-1017mi ?e-?Jh 6ac.2. o,` . ? L rr? ?- ??? r????i"?'-?` ? _.r?J?a ?C= .S-Z - _•? _ /Z, /vim. All, 0 BY__? _____DATE_J?L> )% HANSON ENGINEERS, INC. SHEET NO.__? i? ENGINEERS - CONSULTANTS CHKD. BY!y _DATE SPRINGFIELD, PEORIA & ROCKFORD, ILLINOIS JOB NO.._?5 9 l-- --------------------- ----------- R----oc -- -mch ti o s G • 1 W( M' c [ ro- - Z r. ?;rr,ln A09-DATE 1 1JC? HANSON ENGINEERS, INC. ?? fZ 6Y ___ __? L__lo ENGINEERS - CONSULTANTS SHEET NO.___?____OF CHKD. BY DATE ?L-? SPRINGFIELD,, PEORA & ROCKFORD, RO?ILLINOIS JOB N0.._?? ? 0 ---------_L4o C _ ?e'x- ---------------------- / 8 U/ ti p o / 4i 11 k) Lo lim 61c 7?P s /a1_? GG? /¢oo 74r le egr?k' O(ead leeld _ /(• 75-(/Z) f /, Zs??s? = Z. Z ,?/?' ? C % t /?c iCc ;? 4'5z'-11. G-a/- J ?l s LI ?esu/?s a-& 4 s/ 70 All- 54 %L- 4i' ? (3 9 sere t(fe WaLL /LCx - y 76 15 -"Ia,6 4=z.s A . Z(z,5?0z?- 30 3 HANSON ENGINEERS, INC. J1 BY ATEENGINEERS - CONSULTANTS S HEET N0.__Z-1:51- 0 CHKD. BY DATE SPRINGFIELD, PEORIA & ROCKFORD, ILLINOIS JOB NO.-_????QS?r f_ cctcz- 7- frac ? /o ?QccD ik7_ /o /OOT Cu/V?r?_/OW,72!/C[,C - ?IOVV U' e ill L/l? Load mus/ de CC6;-S4?A Z- , ,z r,4h DL = 8'( /?? + 1. zs( l5? _ /.15 &//? Lq ??? a l ?. 7D ! rIIO /C W 7- 0 -7rcoo ?- ?oQO?s ?a?sidw X11 Tack /yam Trac/oi- Z// ,? ?aC?t ?ft!G? 14 '-7" X 08" V?/G?e oR (c57 Wh??/ Tv??r?5craper- 714 ?[t l? ??PGL? 4s oo_O?s a-5 shoV'vn 11 _516% Z i I \ I 14711 I I ? I r I II i N ' ? i te- Z?,,5B3 ;or- c2vvek l__ /wall ?rle lid -!rack ?i-a?/or I I I I \ / /O I \ L \ i - -i I I I 5&?- _oxle..lcad= 4-o4 _ (Z7/)0 W . I?j . 54 CCm r0`S M C C I- - per- HANSON ENGINEERS, INC. SHEET NO._Z__ .YJ__.OF'?' By __DATE_ ENGINEERS - CONSULTANTS CHKD. BY-) -L-DATE SPRINGFIELD, PEORIA 6 ROCKFORD, ILLINOIS JOB NO..?_-S - • ------------?-------------- Corsi ca-' o t? /l GtC i!7/ 0h ? a? 6epler D ruf = yi ; ?•.J` -y-o G7? 106, r? Jc t v - - - - i l (iC?G`S CGY?•/e /f!1 Gt ? lam- 11-S - - - 91 C4'a 2 S L? lJ- --0147WS -- -. _ - • M c c -1- - //?? HANSON ENGINEERS, INC. BY ___/?"??SHEET ENGINEERS - CONSULTANTS U ?r--- CHKD. BY -----DATE SPRINGFIELD, ?FOR;A 8 ROCKFORD, ILLINOIS JOB NO..__!_S$?%?J --------- ------------------- Au 54 ,54 = 9 (&50,4, - /z, s(/ - , ( '45"C'rd= /,oz */D C 'Z'C4 crGlc4 Co.vl-o/ 1,07 _ , 00 TS - 3? i)' ? Ii /L.5 0.Z7) Z 57 74, / ?j?rd le ? _ /Z(/5 ?s = 3375 ??- - Z?r . /z34./?s> ?- Z a? cep-?Lcr -? of erg /l?f?r 3 = l7 Y>3 = X95/ /7? 3 = 0579 Ge<?1er ?c = (09S/,)(3375) r (/- , 095/ (//&7) - 1577 c,?cds l? X0579 (337S l (? OSJ9?(//107) _ /Z95 s??p/? a J /Jiro vrP(p-'-d u?= 7 (1377 . f ./s?z95 * z? /?SZ 523 2 = /?S /, / HANSON ENGINEERS, INC. 4 !L SHEET NO.____ BY-_-/=`?___OATE-7 C??Jg6 ENGINEERS - CONSULTANTS 25L' o'2 -,4 _-- CHKD. BY_`QD?,c DATE_7_,L„_ SPRINGFIELD. PcGP.IA b ROCKFORD, ILLINOIS JC6 NO.._ ____ ---------?o c--- err 7hec4 6k Y? = zo 4- zz.?- z? Z4, Z /c f ?pcr ?F /10,&7r/abl /o > z Z , r/O,? w, WSJ 6#m. 6a,-3 _ o - _ 47.4 4 ' - o -fop bars = 47, '0015 (16,e isD (ACS 0/8 - 9s ,C ! a ,L= 3(l - 3 - s = Wiz. S' 14<1 7#4¢ L /z c7 via.d -q Z? ir?j T S?a 12- I cE ht&? j HANSON ENGINEERS, INC. S ?Z-- BY-------------- ?/? DATE- /? ENGINEERS - CONSULTANTS SH.EET NO._-OF______ //? pp,, CHKD. BY4&-DATE SPRINGFIELD, PEOR;A & ROCKFORD, ILLING'S JOB NO.._!_S • ------------ f`U Cx----C ------------- Z: <«n -14 d Wa-ee s1<--? / Ile 6,1 a-0 h fop r izxaa??? ?s,d = Z5Z srr2 7'e--/ b ?. Z 4 ? ?, Z cv ?? ?c35g J = . ° 21a -? _ ? (iz? /4,.32 - /Z9S Z? 3375 - - - ? ?r- carp sr? 1 e = 3375 f urfu ?. 11??s is / zc1 bac irk /"?/sf? ?qa v?o l%ri' . 76- k? <74,'- ? ? i • RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 9-575-3 o= 14 1525 South Sixth Street Page Springfield, IL 62703 Date /5 b ROCK BRANCH CULVE RT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9 5S3055A\CT?LV44-? LttD -? 6VI6, Z 8 /?zD Units Option : US Standard (717 ,s, cue ior? - iz~t t?? RISC Code Checks : 9th Edition ASD si?.'? Shear Deformation: No P-Delta Effects : Yes Redesign : No Edge Forces : No A.S.I.F. 1.333 ---------------------------------------------------------------------------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 0.00 R R 0.00 2 0.00 8.63 0.00 3 17.25 8.63 0.00 4 17.25 0.00 R R 0.00 ---------------------------------------------------------------------------- Material Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database Matl. Area Moment of As y/y Label Shape Set Inertia Coef --------------------------------------- (in-2)--------- (in-4)----------------- WALLIE CONC 180.00 1400.000 j 1.20 SLABIE CONC 180.00 1400.000 1.20 ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 8.63 2 2 - 3 SLABIE 17.25 3 3 - 4 WALLIE 8.63 E RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date 10ROCK BRANCH CULVERT-161SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 3 8' OF FILL LATERAL LOAD 2 4 8' OF FILL DEAD LOAD 1 5 TRACTOR LOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------ ----- ------ ----- --- (K/ft,F)----- (K/ft,F)--- ------ (ft)------ --- (ft)---- 1 1 - 2 X 1.130 / 0.700" 0.000 8.625 3 3 - 4 X -0.700 j -1.130/ 0.000 8.625 Member Dist ----------- ribute ------ d Loads,BLC 2: EARTH DEADLOAD ------------------------- Memb I J ------- Start End ---------------- Start ----------- End No Node Node Dir Magnitude Magnitude Location Location ------ ----- ------ -------- (K/ft,F)----- (K/ft,F)--- ------ (ft)--------- (ft)---- 2 2 - 3 Y -2.200 „ -2.200 % 0.000 17.250 Member Distributed Loads,BLC 3: 8' OF FILL LATERAL LOAD Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ---------------------- --- (K/ft,F)----- (K/ft,F)---- ----- (ft)----- ---- (ft)---- 1 1 - 2 X 0.780 ? 0.350 / 0.000 8.625 3 3 - 4 X -0.350 ,- -0.780 0.000 8.625 Member Distributed Loads,BLC 4: 8' OF FILL DEAD LOAD Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------ ----- -------------- (K/ft,F)----- (K/ft,F)------ --- (ft)------ --- (ft)---- 2 2 - 3 Y -1.150 r/ -1.150 / 0.000 17.250 Member ------ Dist ----- ributed Loads,BLC 5: TRACTOR LOAD ---------------------------- Memb I ------------- J Start End ------------- Start ----------- End No Node Node Dir Magnitude Magnitude Location Location ------ ----- -------------- (K/ft,F)----- (K/ft,F)------ --- (ft)------ --- (ft)---- 2 2 - 3 Y -0.540 -0.540/ 0.000 17.250 (O G Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date *ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------- Load Combination Self Wt ------ BLC ----------------------------- BLC BLC BLC BLC ------------- W E No. Description Dir Fac Fac Fac Fac Fac Fac DYNA S V ---------------------------- ------ ----------------------------- ------------- 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 Y 3 8' FILL + TRACTOR 3 1.7 /4 1.4 ,5 1.7 Y Dynamic Analysis Data Number of modes (frequencies) 3 Basic Load Case for masses None BLC mass direction of action X only Acceleration of Gravity 32.20 ft/sec**2 Load Combination is 1 LATERAL + EARTH Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 -0.00000 -0.00000 0.00104 2 0.00138 -0.00303 -0.00285 3 -0.00138 -0.00303 0.00285 4 0.00000 -0.00000 -0.00104 Load Combination is 1 LATERAL + EARTH Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------------------(K)-------- ----------(K)---------- -----(K-ft)--------- 1 0.72707 18.97500 ? 0.00000 4 -0.72707 18.97500 0.00000 Totals 0.00000 37.95000 0.00000 Load Combination is 1 LATERAL + EARTH Member End --- - Forces - ------ ----------------------- -------------------- ---- ---- Nodes -------------- I-End J-End No I J Axial Shear Moment Axial Shear Moment ---------------(K)--------(K)---- --(K-ft)-------(K)----- ---(K)------(K-ft)-- 1 1- 2 18.98 -0.73 0.00 -18.98 8.62 -42.97 2 2- 3 8.62 18.98 42.97 -8.62 18.98 -42.97 3 3- 4 18.98 8.62 42.97 -18.98 -0.73 -0.00 0 &a _ RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Load Combination is 1 LATERAL + EAR AISC Code Checks --------------------------------------- Nodes Member No I J Maximum 0 1/4 --------------------------------------- 1 1- 2 - Not 2 2- 3 - Not 3 3- 4 - Not TH ----------------------------------- Quarter Points 1/2 3/4 L Shear ----------------------------------- Calculated - Calculated - Calculated - • 0 COc, MEMBER DETAILED ANALYSIS 0m m d Comb 1: LATERAL + EARTH Max Unck No Calc b 1 1 - 2 Property WALLIE Shape . Length 8.63 ft Max Shear -8.73 K Location 9.99 ft Min Shear -8.62 K Location 8.62 ft Max Moment: 42.97 K-ft Location 8.62 ft Min Moment: 9.89 K-ft Location 9.88 ft Max +Defl 8.9479 in Location 5.26 ft Max -Defl -8.8814 in Location 8.62 ft 1* Shear Moment Deflected Shape Unity Check Not Calculated 0 LaT MEMBER DETAILED ANALYSIS d Comb 1: LATERAL + EARTH lob 2 : 2 - 3 Property : SLABIE Shape Length 17.25 ft Max Shear : 18.98 K Location 8.86 ft Min Shear -18.98 K Location 17.25 ft Max Moment: 42.97 K-ft Location . 17.25 ft ?/ Min Moment : -38.86 K-f t ,?/? ?" ' ?t rway Location 8.62 ft !h s/a? Max +Defl 8.6866 in Location 8.88 ft Max -Defl -8.3217 in Location 8.62 ft Max Unck No Calc Shear Moment Deflected Shape Unity Check Not Calculated +1-? 7 • 0 C j RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job_ 1525 South Sixth Street Page Springfield, IL 62703 Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ENVELOPE SOLUTION Nodal Displacements Node Global X Global Y Rotation -------- ----------- (in)------ LC---- ------ (in)------ LC---- ------ (rad)----- LC- 1 max 0.00000 2 -0.00000 3 0.00127 2 min -0.00000 3 -0.00000 2 0.00125 3 2 max 0.00211 2 -0.00348 3 -0.00334 3 min_ 0.00149 3 -0.00424 2 -0.00384 2 3 max -0.00149 3 -0.00348 3 0.00384 2 min -0.00211 2 -0.00424 2 0.00334 3 4 max 0.00000 3 -0.00000 3 -0.00125 3 min -0.00000 2 -0.00000 2 -0.00127 2 ENVELOPE SOLUTION Reactions Node Global X Global Y Moment -------------------(K)------ LC---- -------(K)------ LC----------(K-ft)--- -LC- 1 max 1.03100 3 26.56500 2 0.00000 2 min -0.18622 2 21.80400 3 0.00000 2 4 max 0.18622 2 26.56500 2 0.00000 2 min -1.03100 3 21.80400 3 0.00000 2 ENVELOPE SOLUTION Member Section Results Nodes Member Quarter Points No I J I-End 1/4 1/2 3/4 J-End ----------- ---(K,Kft,in) LC(K,Kft,in) LC( K,Kft,in) LC(K,Kft,in) LC(K,Kft,in)LC-- 1 1- 2 A 26.57 2 26.57 2 26.57 2 26.57 2 26.57 2 21.80 3 21.80 3 21.80 3 21.80 3 21.80 3 V 0.19 2 -3.69 3 -5.96 3 -7.83 3 -9.31 3 -1.03 3 -3.76 2 -7.31 2 -10.47 2 -13.23 2 M 0.00 2 5.16 3 15.92 2 35.16 2 60.78- 2 -0.00 3 3.92 2 15.64 3 30.59 3 49.15 3 D 0.000 2 0.032 2 0.057 2 0.055 2 -0.002 3 0.000 2 0.031 3 0.054 3 0.050 3 -0.003 2 2 2- 3 A 13.23 2 13.23 2 13.23 2 13.23 2 13.23 2 9.32 3 9.32 3 9.32 3 9.32 3 9.32 3 V 26.57 2 13.28 2 0.00 3 -10.90 3 -21.80 3 21.80 3 10.90 3 0.00 2 -13.28 2 -26.57 2 M 60.78 2 -21.37 3 -44.88 3 -21.37 3 60.78 2 49.15 3 -25.14 2 -53.78 2 -25.14 2 49.15 3 D 0.000 2 -0.240 3 -0.373 3 -0.247 3 -0.012 3 0.000 2 -0.284 2 -0.442 2 -0.292 2 -0.015 2 (O P9 Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job_ Page Date *ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ----- ------ Nodes ------------- --- ------------- Member -------------- Quarter Points ------ --- ---------- --- No I J I-End 1/4 1/2 3/4 J-End ----- ------ ---(K,Kft,in) LC(K,Kft,in)LC(K ,Kft,in)LC(K,Kft,in) LC(K,Kft,in)LC-- 3 3- 4 A 26.57 2 26.57 2 26.57 2 26.57 2 26.57 2 21.80 3 21.80 3 21.80 3 21.80 3 21.80 3 V 13.23 2 10.47 2 7.31 2 3.76 2 1.03 3 9.31 3 7.83 3 5.96 3 3.69 3 -0.19 2 M 60.78 2 35.16 2 15.92 2 5.16 3 -0.00 2 49.15 3 30.59 3 15.64 3 3.92 2 -0.00 3 D 0.000 2 0.058 2 0.060 2 0.035 2 0.002 2 0.000 2 0.052 3 0.056 3 0.033 3 0.002 3 ENVE LOPE S OLUTION AISC ----- Code ------ Checks --- -- - - - -- --- -- - -- - - - - -- Nodes - -- ---- ---- -------- --- Member - -- - - Quarter Points - - -- - -- -- -- --- No ----- I J ------ Max lc ------------- 0 ---- lc 1/4 -------- lc ---- 1/2 lc 3/4 -------------- lc ------ L ---- lc Shear --------- lc --- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - to / RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date *ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 0.00127 2 0.00211 -0.00424 -0.00384 3 -0.00211 -0.00424 0.00384 4 -0.00000 -0.00000 -0.00127 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------------------(K)------------------(K)---------------(K-ft)--------- 1 -0.18622 26.56500 0.00000 4 0.18622 26.56500 0.00000 Totals 0.00000 53.13000 0.00000 Load Combination is 2 L + E FACTORED Member End Forces ----------------------- ---------- ----------- ----------- Nodes ------------ --------- I-End J-End No I J Axial Shear Moment Axial Shear Moment ----------- ----(K)----- ---(K)------(K-ft)-------(K)---- ----(K)--- ---(K-ft)-- 1 1- 2 26.57 0.19 0.00 -26.57 13.23 -60.78 2 2- 3 13.23 26.57 60.78 -13.23 26.57 -60.78 3 3- 4 26.57 13.23 60.78 -26.57 0.19 -0.00 Load Combination is 2 L + E FACTORED AISC Code Checks ------ ----------------------- ---------- ----------- ----------- Nodes ------------ --- Member Quarter Points No I J Maximum 0 ----- 1/4 1/2 3/4 ----------------------- L ---------- Shear ----------- ----------- 1 1- 2 ------------ ---- - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 ?j MEMBER DETAILED ANALYSIS ',ad Comb 2: L + E FACTORED ^ Qmb 1 : 1 - 2 Property : WALLIE Shape Length 8.63 ft Max Shear 8.19 X Location 8.88 ft Min Shear -13.23 X Location 8.62 ft Max Moment: 68.78 X-ft Location . 8.62 ft Min Moment: -8.81 X-ft Location . 8.89 ft Max +Defl : 8.8617 in Location . 5.35 ft Max -Defl : -8.8821 in Location . 8.62 ft • Shear -"4"q Max Unck : No Calc Moment Deflected Shape Unity Check Not Calculated r? (D ? MEMBER DETAILED ANALYSIS d Comb 2: L + E FACTORED 40mb 2 2 - 3 Property SLABIE Shape Length 17.25 ft Max Shear 26.57 K Location 8.88 ft Min Shear -26.56 K Location 17.25 ft Max Moment: 68.78 K-ft Location . 8.88 ft Min Moment: -53.78 K-ft Location 8.62 ft Max +Defl 8.8888 in Location 8.88 ft Max -Defl -8.4424 in Location 8.62 ft Max Unck No Calc 0 Shear Moment Deflected Shape Unity Check Not Calculated ?D7a,- RISA-2D (R) Version 3.03 Hanson Engineers, Inc. 1525 South Sixth Street Page Springfield, IL 62703 Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\ D 7- Units Option US Standard AISC Code Checks : 9th Edition ASD Shear Deformation: No P-Delta Effects : Yes Redesign No Edge Forces : No A.S.I.F. 1.333 ---------------------------------------------------------------------------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 0.00 R R 0.00 2 0.00 12.63 0.00 3 17.25 12.63 0.00 4 17.25 0.00 R R 0.00 ---------------------------------------------------------------------------- Material Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database Matl. Area Moment of As y/y Label Shape Set Inertia Coef -------------------------------------- (in^2)--------- (in-4)----------------- WALLIE CONC 180.00 1400.000 1.20 SLABIE CONC 180.00 1400.000 1.20 ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 12.63 2 2 - 3 SLABIE 17.25 3 3 - 4 WALLIE 12.63 ?J r ,~ Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 3 8' LATERAL EARTH 2 4 8' OF FILL DEAD LOAD 1 5 TRACTOR LOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------ ------------------- (K/ft,F)-- --- (K/ft,F)--- ------ (ft)----- ---- (ft)---- 1 1 - 2 X 1.330 - 0.700-' 0.000 12.625 3 3 - 4 X -0.700 -1.330/ 0.000 12.625 Member Distributed Loads,BLC 2: EARTH DEADLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location - - - - -----------------(K/ft,F)-----(K/ft,F)---------(ft)---------(ft)---- 2 2 - 3 Y -2.200 -/ -2.200 - 0.000 17.250 Member Distributed Loads,BLC 3: 8' LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)- ---- (K/ft,F)-------- - (ft)--------- (ft)---- 1 1 - 2 X 0.980 0.350' 0.000 12.625 3 3 - 4 X -0.350 = -0.980- 0.000 12.625 Member Distributed Loads,BLC 4: 8' OF FILL DEAD LOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -1.150 -1.150 ' 0.000 17.250 Member Distributed Loads,BLC 5: TRACTOR LOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -0.540 -0.540 ;, 0.000 17.250 /c RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date WOCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------- Load Combination Self Wt ------- BLC ---------------------------- BLC BLC BLC BLC ------------- W E No. Description Dir Fac ----------- - Fac ------- Fac Fac Fac Fac ---------------------------- DYNA S V ------------- --------------- - 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 Y 3 8' FILL + TRACTOR 3 1.7 4 1.4 5 1.7 Y Dynamic Analysis Data Number of modes (frequencies) Basic Load Case for masses BLC mass direction of action Acceleration of Gravity • 3 None X only 32.20 ft/sec**2 • / CA_ Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job_ Page Date *ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D Load Combination is 1 LATERAL + EARTH Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 0.00010 2 0.00146 -0.00444 -0.00281 3 -0.00146 -0.00444 0.00281 4 -0.00000 -0.00000 -0.00010 Load Combination is 1 LATERAL + EARTH Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ---------------------- (K)--------- ---------(K)---------------(K-ft)--------- 1 -3.65343 18.97500 0.00000 4 3.65343 18.97500 0.00000 Totals 0.00000 37.95000 0.00000 Load Combination is 1 LATERAL + EARTH Member End Forces --------- ----------------------- ------------------- ---------------------- Nodes --- I-End J-End No I J Axial Shear Moment Axial Shear Moment ---------------(K)---- ----(K)----- -(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 18.98 3.65 0.00 -18.98 9.16 -43.13 2 2- 3 9.16 18.98 43.13 -9.16 18.98 -43.13 3 3- 4 18.98 9.16 43.13 -18.98 3.65 -0.00 Load Combination is 1 LATERAL + EARTH AISC Code Checks ------ ----------------------- ------------------- ---------------------- Nodes ------ Member Quarter Points No I J Maximum 0 ------ 1/4 1/2 3/4 ----------------------- L Shear ------------------- ---------------------- 1 1- 2 ------ - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 9 /e MEMBER DETAILED ANALYSIS Comb 1: LATERAL + EARTH 4 Max -Defl : -0.8015 in Location . 12.62 f t 1 1 - 2 Property WALLIE Shape Length 12.63 ft Max Shear 3.65 K Location 0.88 ft Min Shear -9.16 K Location 12.62 ft Max Moment: 43.13 K-ft Location 12.62 ft Min Moment: -5.21 K-ft Location 2.90 ft Max +Defl 8.8470 in Location 9.22 ft .AJA Deflected 1111? Max Unck No Calc • Shear Moment Shape Unity Check Mot Calculated 9 /-)-- MEMBER DETAILED ANALYSIS d Comb 1: LATERAL + EARTH b 2 2 - 3 Property SLABIE Shape Length 17.25 ft Max Shear 18.98 X Location 8.86 ft Min Shear -18.98 X Location 17.25 ft Max Moment: 43.13 X-ft Location . 17.25 ft Min Moment: -38.78 X-ft Location 8.62 ft Max +Defl 8.8888 in Location 8.88 ft Max -Defl -8.3196 in Location 8.62 ft Max Unck No Calc 11 hhbbb. -qqqqq Shear Moment Deflected Shape Unity Check Not Calculated 0 I I RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job_ 1525 South Sixth Street Page Springfield, IL 62703 Date OR OCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ENVELOPE SOLUTION Nodal Displacements Node Global X Global Y Rotation -------- ----------- (in)------ LC---- ------ (in)------ LC---- ------ (rad)----- LC- 1 max 0.00000 2 -0.00000 3 0.00016 3 min 0.00000 3 -0.00000 2 -0.00049 2 2 max 0.00235 2 -0.00510 3 -0.00331 3 min 0.00158 3 -0.00621 2 -0.00346 2 3 max -0.00158 3 -0.00510 3 0.00346 2 min -0.00235 2 -0.00621 2 0.00331 3 4 max -0.00000 3 -0.00000 3 0.00049 2 min -0.00000 2 -0.00000 2 -0.00016 3 ENVELOPE SOLUTION Reactions Node Global X Global Y Moment -------------------(K)----- -LC----- ------(K)------ LC----------(K-ft)---- LC- 1 max -4.36148 3 26.56500 2 0.00000 2 min -7.08176 2 21.80400 3 0.00000 2 4 max 7.08176 2 26.56500 2 0.00000 2 min 4.36148 3 21.80400 3 0.00000 2 ENVELOPE SOLUTION Member Section Results Nodes Member Quarter Points No I J I-End 1/4 1/2 3/4 J-End ------------ --(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC-- 1 1- 2 A 26.57 2 26.57 2 26.57 2 26.57 2 26.57 2 21.80 3 21.80 3 21.80 3 21.80 3 21.80 3 V 7.08 2 0.37 2 -4.46 3 -7.61 3 -9.91 3 4.36 3 -0.47 3 -5.50 2 -10.52 2 -14.70 2 M 0.00 2 -5.91 3 2.10 3 22.30 2 62.33 2 0.00 2 -11.54 2 -3.21 2 21.38 3 49.25 3 D 0.000 2 0.011 3 0.039 3 0.055 3 -0.004 3 0.000 2 -0.009 2 0.015 2 0.045 2 -0.006 2 2 2- 3 A 14.70 2 14.70 2 14.70 2 14.70 2 14.70 2 9.91 3 9.91 3 9.91 3 9.91 3 9.91 3 V 26.57 2 13.28 2 0.00 3 -10.90 3 -21.80 3 21.80 3 10.90 3 0.00 2 -13.28 2 -26.57 2 M 62.33 2 -21.27 3 -44.78 3 -21.27 3 62.33 2 D 49.25 0.000 3 2 -23.59 -0.239 2 3 -52.23 -0.371 2 3 -23.59 -0.246 2 3 49.25 -0.012 3 3 0.000 2 -0.269 2 -0.423 2 -0.277 2 -0.015 2 /k? Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ----- ------------- Nodes ------ --- ------------- Member -------------------- Quarter Points ---- --------- --- No I J I -End 1/4 1/2 3/4 J-End ----- ---------(K,K ft,in) LC(K,Kft,in)LC(K,Kft,in)LC( K,Kft,in) LC(K,Kft,in)L C-- 3 3- 4 A 26.57 2 26.57 2 26.57 2 26.57 2 26.57 2 21.80 3 21.80 3 21.80 3 21.80 3 21.80 3 V 14.70 2 10.52 2 5.50 2 0.47 3 -4.36 3 9.91 3 7.61 3 4.46 3 -0.37 2 -7.08 2 M 62.33 2 22.30 2 2.10 3 -5.91 3 0.00 3 49.25 3 21.38 3 -3.21 2 -11.54 2 0.00 2 D 0.000 2 0.059 3 0.041 3 0.013 3 0.001 2 0.000 2 0.050 2 0.019 2 -0.006 2 0.001 3 ENVELOPE SOLUTION RISC ----- Code Checks ------------- ------ --- ---------- --- ----------- --------- ---- --------- --- Nodes Member Quarter Poi nts No ----- I J Max ------------- lc ------ 0 --- lc 1/4 ---------- lc --- 1/2 lc ----------- 3/4 1c --------- L ---- lc Shear --------- lc --- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date `ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 0.00000 -0.00000 -0.00049 2 0.00235 -0.00621 -0.00346 3 -0.00235 -0.00621 0.00346 4 -0.00000 -0.00000 0.00049 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ----------- ----------- (K)------------------(K)---------------(K-ft)--------- 1 -7.08176 26.56500 0.00000 4 7.08176 26.56500 0.00000 Totals 0.00000 53.13000 0.00000 Load Combination is 2 L + E FACTORED Member End Forces ------ ------------------------- ------------------- ----------- Nodes ----------- ---- I-End J-End No I J Axial Shear Moment Axial Shear Moment ----------- ----(K)---- ----(K)------(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 26.57 7.08 0.00 -26.57 14.70 -62.33 2 2- 3 14.70 26.57 62.33 -14.70 26.57 -62.33 3 3- 4 26.57 14.70 62.33 -26.57 7.08 -0.00 Load Combination is 2 L + E FACTORED RISC Code Checks - -------- ------------------------- ------------------- ----------- Nodes ---------- -- Member Quarter Points No I J Maximum -- 0 ---------- 1/4 1/2 3/4 ------------------------- L Shear ------------------- ----------- 1 1- 2 --------- - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 9 ?J. MEMBER DETAILED AMALYSIS 'md Comb 2: L + E FACTORED 41mb 1 1 - 2 Property WALLIE Shape Length 12.63 ft Max Shear 7.88 K Location 8.88 ft Min Shear -14.78 K Location 12.62 ft Max Moment: 62.33 K-ft Location . 12.62 ft Min Moment: -11.57 K-ft Location 3.28 ft Max +Defl 8.8475 in Location 9.85 ft Max -Defl -8.6895 in Location 2.53 ft Max Unck Mo Calc • 166 Shear Moment =0w,A Deflected Shape Unity Check Mot Calculated 0 (/c MEMBER DETAILED AMALYSIS Comb 2: L E FACTORED 2 : 2 - 3 Property SLABIE Shape Length 17.25 ft Max Shear 26.57 K Location 8.88 ft Min Shear -26.56 K Location 17.25 ft Max Moment: 6Z.33 K-ft Location . 8.88 ft Min Moment: -52.23 K-ft Location . 8.62 ft Max +Defl : 8.8888 in Location . 8.88 ft Max -Defl : -8.4226 in Location . 8.62 ft Max Unck : Mo Calc a Shear Moment y Deflected Shape Unity Check Not Calculated 9 RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 9.553:555A 1525 South Sixth Street Page Date ! Springfield, IL 62703 *ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\C-'U-L 1 - D--> Units Option US Standard /Z AISC Code Checks : 9th Edition ASD Shear Deformation: No P-Delta Effects Yes Redesign : No ?Q? caters;r f ?sz Y /?CU X?SI?f? NfOr%zscf ! V.p??s /I?aX s1 ? M 5/ate a?? warms Edge Forces : No A.S.I.F. : 1.333 ---------------------------------------------------------------------------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)----- (F)- 1 0.00 4.00 R R 0.00 2 0.00 12.63 0.00 :o 3 17.25 12.63 ? 0.00 4 17.25 0.00 R R 0.00 ---------------------------------------------------------------------------- Material Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy) --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database Matl. Area Moment of As y/y Label Shape Set Inertia Coef -------------------------------------- (in-2)--------- (in^4)----------------- WALLIE CONC 180.00 1400.000 1.20 SLABIE CONC 180.00 1400.000 1.20 ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 8.63 2 2 - 3 SLABIE 17.25 3 3 - 4 WALLIE 12.63 r? Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job_ Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 3 8' OF FILL LATERAL EARTH 2 4 8' OF FILL DEADLOAD 1 5 TRACTOR LOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ----- -------------------- (K/ft,F)----- (K/ft,F)--- ------ (ft)----- ---- (ft)---- 1 1 - 2 X 1.130 -? 0.700 - 0.000 8.630 3 3- 4 X -0.700 -1.330.( 0.000 12.630 Member Distributed Loads,BLC 2: EA ---------------------------------- Memb I J Start No Node Node Dir magnitude ------------------------- (K/ft,F)- 2 2 - 3 Y -2.200 RTH DEADLOAD ------------------------------------------ End Start End Magnitude Location Location ---- (K/ft,F)--------- (ft)--------- (ft)---- ? -2.200; 0.000 17.250 Member Distributed Loads,BLC 3: 8' OF FILL LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ---------------------- --- (K/ft,F)--- -- (K/ft,F)---- ----- (ft)----- ---- (ft)---- 1 1 - 2 X 0.780- 0.350- 0.000 8.630 3 3 - 4 X -0.350 _ -0.980-- 0.000 12.630 Member Distributed Loads,BLC 4: 8' OF FILL DEADLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -1.150 -1.150 % 0.000 17.250 Member Distributed Loads,BLC 5: TRACTOR LOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 40 2 2- 3 Y -0.540 -0.540: 0.000 17.250 G Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\95S3055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------- Load Combination Self Wt ------- BLC ---------------------------- BLC BLC BLC BLC ------------- W E No. Description Dir Fac ---------------------------- Fac ------- Fac Fac Fac Fac --------------- DYNA S V - 1 LATERAL + EARTH 1 1 ------------- 2 1 ------- ----- 2 L+ E FACTORED 1 1.7 2 1.4 Y 3 8'+TRACTR-FACTRD 3 1.7 4 1.4 5 1.7 Y Dynamic Analysis Data Number of modes (frequencies) 3 Basic Load Case for masses None BLC mass direction of action X only Acceleration of Gravity 32.20 ft/sec**2 r • Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job_ Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Load Combination is 1 LATERAL + EARTH Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation ------------- -------- (in)---------- ------- (in)---------------- (rad)--------- 1 -0.00000 -0.00000 0.00179 2 -0.06192 -0.00308 -0.00251 3 -0.06479 -0.00436 0.00295 4 -0.00000 -0.00000 0.00046 Load Combination is 1 LATERAL + EARTH Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ---------------------(K)------------------(K)---------------(K-ft)--------- 1 1.08518 19.29084 0.00000 4 3.83782 18.65916 0.00000 Totals 4.92300 37.95000 0.00000 • Load Combination is 1 LATERAL + EARTH Member End Forces ---------------------- - Nodes ----------- I-End ---------------------- --------- J-End ----------- No I J Axial Shear Moment Axial Shear Moment ---------------(K)--------(K)----- -(K-ft)-------(K)--------(K)--- ---(K-ft)-- 1 1- 2 19.29 -1.10 -0.00 -19.29 8.99 -46.21 2 2- 3 8.98 19.29 46.21 -8.98 18.66 -40.76 3 3- 4 18.66 8.97 40.76 -18.66 3.85 0.00 Load Combination is 1 LATERAL + EARTH RISC Code Checks ----------- ------------ Nodes ----------- ----------------------- Member Quarter Points -------- ----------- No I J Maximum ----------------------- 0 ----------- 1/4 1/2 3/4 -------------- L Shear ---- -- 1 1- 2 --------- - Not Calculated - -------- ---- - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 MEMBER DETAILED ANALYSIS *ad Comb 1: LATERAL + EARTH Memb 1 : 1 - 2 Property : WALLIE Shape Length 8.63 ft Max Shear : -1.10 K Location . 0.08 ft Min Shear -8.99 K Location 8.63 ft Max Moment: 46.21 K-ft Location . 8.63 ft Min Moment: -8.88 H-ft Location . 0.88 ft Max +Defl : 0.0954 in Location . 6.21 ft Max -Defl : 8.8808 in Location . 0.08 ft Max Unck : No Calc Shear Moment Deflected Shape Unity Check Not Calculated 11 Fi f MEMBER DETAILED ANALYSIS *ad Comb 1: LATERAL + EARTH Memb 2 2 - 3 Property SLABIE Shape . Length 17.25 ft Max Shear 19.29 K Location 8.88 ft Min Shear -18.66 K Location 17.25 ft Max Moment : 46.21 K-f t Location . 8.88 ft Min Moment: -38.37 K-ft Location . 8.88 ft Max +Defl : 8.8888 in Location . 8.88 ft Max -Defl : -8.3158 in Location . 8.88 ft Max Unck : No Calc hhhobb- Shear Moment Deflected Shape Unity Check Not Calculated 0 MEMBER DETAILED ANALYSIS *ad Comb 1: LATERAL + EARTH Memb 3 3 - 4 Property WALLIE Shape Length 12.63 ft Max Shear 8.97 K Location 8.88 ft Min Shear -3.85 K Location 12.63 ft Max Moment: 48.76 K-ft Location . 8.88 ft Min Moment: -5.78 K-ft Q?s t Location 9.68 ?'^ar i h ft Vv c?.CQs Max +Defl 8.8648 in Location 12.63 ft Max -Defl 8.8888 in Location 8.88 ft • Shear ikhhh, Moment hhhh- Max Unck No Calc Unity Check Not Calculated Deflected Shape E 62L Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ENVELOPE SOLUTION Nodal Displacements Node Global X Global Y Rotation -------- ----------- (in)------ LC-- -------- (in)------ LC---- ------ (rad)----- LC- 1 max -0.00000 2 -0.00000 3 0.00344 2 min -0.00000 3 -0.00000 2 0.00207 3 2 max -0.06770 3 -0.00354 3 -0.00278 2 min -0.18449 2 -0.00437 2 -0.00296 3 3 max -0.07080 3 -0.00502 3 0.00391 2 min -0.18903 2 -0.00602 2 0.00345 3 4 max -0.00000 3 -0.00000 3 0.00211 2 min -0.00000 2 -0.00000 2 0.00046 3 ENVELOPE SOLUTION Reactions Node Global X Global Y Moment --------------------(K)------ LC- ----------(K)------ LC----------(K-ft)---- LC- 1 max 1.42448 3 27.37279 2 0.00000 2 min 0.79784 2 22.15733 3 0.00000 2 4 max 7.57126 2 25.75721 2 0.00000 2 min 4.56462 3 21.45067 3 0.00000 2 ENVELOPE SOLUTION Member Section Results Nodes Member Quarter Points No I J I-End 1/4 1/2 3/4 J-End ------------ --(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC-- 1 1- 2 A 27.37 2 27.37 2 27.37 2 27.37 2 27.37 2 22.16 3 22.16 3 22.16 3 22.16 3 22.16 3 V -0.85 2 -4.10 3 -6.37 3 -8.25 3 -9.73 3 -1.44 3 -4.79 2 -8.35 2 -11.51 2 -14.27 2 M 0.00 2 6.16 2 20.40 2 41.89 2 69.77 2 -0.00 3 6.05 3 17.42 3 33.26 3 52.72 3 D 0.000 2 0.088 2 0.165 2 0.208 2 0.183 2 0.000 2 0.052 3 0.094 3 0.107 3 0.067 3 2 2- 3 A 14.22 2 14.22 2 14.22 2 14.22 2 14.22 2 9.71 3 9.71 3 9.71 3 9.71 3 9.71 3 V 27.37 2 14.09 2 0.81 2 -10.55 3 -21.45 3 22.16 3 11.26 3 0.35 3 -12.47 2 -25.76 2 40 M 69.77 52.72 2 3 -19.32 -19.64 3 2 -44.36 -51.76 3 2 -22.37 -26.61 3 2 55.83 46.63 2 3 D 0.000 2 -0.231 3 -0.366 3 -0.247 3 -0.014 3 0.000 2 -0.254 2 -0.417 2 -0.285 2 -0.016 2 Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 RISA-2D (R) Version 3.03 Job_ Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ----- ------------- Nodes ------ ---- ------------ Member -------------- Quarter Points ------ --- ---------- --- No I J I -End 1/4 1/2 3/4 J-End ----- ---------(K,K ft,in) LC(K,Kft,in)LC(K ,Kft,in)LC(K,K ft,in) LC(K,Kft,in)L C-- 3 3- 4 A 25.76 2 25.76 2 25.76 2 25.76 2 25.76 2 21.45 3 21.45 3 21.45 3 21.45 3 21.45 3 V 14.19 2 10.01 2 4.98 2 0.26 3 -4.57 3 9.70 3 7.40 3 4.26 3 -0.89 2 -7.60 2 M 55.83 2 19.40 3 0.77 3 -6.58 3 0.00 2 46.63 3 17.40 2 -6.49 2 - 13.18 2 -0.00 3 D 0.000 2 0.077 2 0.090 2 0.120 2 0.188 2 0.000 2 0.068 3 0.067 3 0.060 3 0.070 3 ENVE LOPE SOLUTION AISC ----- Code Checks --------- ---- Nodes ------ ---- ------------ Member -------------- Quarter Points ------ ---- --------- --- No ----- I J Max ------------- lc --- 0 lc 1/4 lc 1/2 lc 3/4 lc L lc Shear lc 1 1- 2 --- ---- -------- - ---- Not -------------- Calculated - ------ ---- --------- --- 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 • RISA-2D (R) Version 3.03 Job_ Page Date ROCK BRANCH CULVERT-16'SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Load Combination is 2 L + E FACTORED Nodal Displacements ---------------------------------------------------------------------------- Node Global X Global Y Rotation -------------- ------- (in)---------- ------- (in)---------------- (rad)--------- 1 -0.00000 -0.00000 0.00344 2 -0.18449 -0.00437 -0.00278 3 -0.18903 -0.00602 0.00391 4 -0.00000 -0.00000 0.00211 Load Combination is 2 L + E FACTORED Reactions ---------------------------------------------------------------------------- Node Global X Global Y Moment ---------------------- (K)------- -----------(K)---------------(K-ft)--------- 1 0.79784 27.37279 0.00000 4 7.57126 25.75721 0.00000 Totals 8.36910 53.13000 0.00000 Load Combination is 2 L + E FACTORED -Member End Forces -------------- -- - - - -- --- - --- Nodes ----- --- I-End -------------- - ------- ------------- -- J-End No I J Axial Shear Moment Axial Shear Moment ---------------(K)--------(K)--- ---(K-ft)-------(K)--------(K)------(K-ft)-- 1 1- 2 27.37 -0.85 0.00 -27.37 14.27 -69.77 2 2- 3 14.22 27.37 69.77 -14.22 25.76 -55.83 3 3- 4 25.76 14.19 55.83 -25.76 7.60 0.00 Load Combination is 2 L + E FACTORED RISC Code Checks ----- --- ---------- - -- - ------- - - --- Nodes ---- - - --- -------------------- Member Quarter Points ------------- No I J Maximum ----------------------- 0 --------- 1/4 1/2 3/4 ---------------------- L Shear -------------- - - 1 1- 2 -- - Not Calculated - - - -- 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - • ?k- MEMBER DETAILED ANALYSIS *ad Comb 2: L + E FACTORED Memb 1 : 1 - 2 Property : WALLIE Shape . Length 8.63 ft Max Shear : -8.85 K Location . 8.88 ft Min Shear : -14.27 K Location . 8.63 ft Max Moment: 69.77 K-ft Location . 8.63 ft Min Moment: 8.88 K-ft Location . 8.88 ft Max +Defl : 8.2185 in Location : 6.99 ft Max -Defl : 8.8888 in Location . 8.88 ft • Shear Moment Deflected Shape q,"" Max Unck : No Calc Unity Check Not Calculated 0 2'z MEMBER DETAILED ANALYSIS Wd Comb 2: L + E FACTORED Memb 2 2 - 3 Property SLABIE Shape . Length 17.25 ft Max Shear 27.37 X Location 8.88 ft Min Shear -25.76 X Location 17.25 ft Max Moment : 69.77 X-f t ?`" k i Location . 8.88 ft N9 Min Moment: -51.86 X-ft Location 8.97 ft Max +Defl 8.8888 in Location 8.88 ft Max -Defl -8.4178 in Location 8.86 ft • Shear bbbah.- qqqqq Max Unck No Calc Moment Deflected Shape Unity Check Not Calculated 0 MEMBER DETAILED AMALYSIS *ad Comb 2: L + E FACTORED Memb 3 : 3 - 4 Property : WALLIE Shape . Length 12.63 ft Max Shear : 14.19 E Location . 8.88 ft Min Shear : -7.68 K Location . 12.63 ft Max Moment: 55.83 K-ft Location 8.88 ft Min Moment: -13.38 r E-ft Location . 8.97 f 'Na e4S ft Max +Defl : 8.1898 in Location . 12.63 ft Max -Defl : 8.8888 in Location . 8.88 ft Max Unck : Mo Calc • Shear Moment Def lected Shape Unity Check Mot Calculated 9 f7. 9,'? RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date %i !? o ROCK BRANCH CULVERT-16'SPAN-SECTION 2 lcS J:\USERS\STRUCT\9 5S3055A\ - Z, -//?G{? ----- ----- ----------------- ------------------- -------------- j Units Option US Standard ''" ? AISC Code Checks : 9th Edition ASD T- 4' Shear Deformation: No Z P-Delta Effects : Yes r?, s /.s baced C'; Redesign : No 04UCA less pl?/'. r? Edge Forces : No vv"LU 4'/"am ', S;'-b_ A.S.I.F. 1.333/1/S ?Qu-..5 /t/l max -1-o 1?7Cr-Q,;C ?J ------------------------------------------ 75 vs 70 k-4 ------- Node Boundary Conditions No X-Coord Y-Coord X-dof Y-dof Rotation Temp. ----------- (ft)-------- (ft)----- (in,K/in)---- (in,K/in)---(r,K-ft/r)-----(F)- 1 0.00 4.00 R R 0.00 2 0.00 12.63 0.00 • 3 17.25 12.63 0.00 4 17.25 0.00 R R 0.00 ---------------------------------------------------------------------------- Material Elastic Poisson's Thermal Weight Yield Stress Label Modulus Ratio Coefficient Density (Fy). --------------- (Ksi)----------------------- (F)-------- (K/ft3)------ (Ksi)---- CONC 3600.00 0.20000 0.00000 0.150 4.000 ---------------------------------------------------------------------------- Section Database Matl. Area Moment of As y/y Label Shape Set Inertia Coef -------------------------------------- (in-2)--------- (in-4)----------------- WALLIE CONC 180.00 3000.000 1.20 SLABIE CONC 180.00 1400.000 1.20 ---------------------------------------------------------------------------- I J I Releases J End Offsets No Node Node Section x y z x y z Sec Sway I J Length ------------------------------------------------------(in)----(in)------(ft) 1 1 - 2 WALLIE 8.63 2 2 - 3 SLABIE 17.25 3 3 - 4 WALLIE 12.63 9 RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date *ROCK BRANCH CULVERT-161SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- BLC Basic Load Case Load Totals No. Description Nodal Point Dist. ---------------------------------------------------------------------------- 1 LATERAL EARTH 2 2 EARTH DEADLOAD 1 3 8' OF FILL LATERAL EARTH 2 4 8' OF FILL DEADLOAD 1 5 TRACTOR LOAD 1 Member Distributed Loads,BLC 1: LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)---- ----- (ft)----- ---- (ft)---- 1 1 - 2 X 1.130 0.700 0.000 8.630 3 3 - 4 X -0.700 -1.330 0.000 12.630 Member Distributed Loads,BLC 2: EARTH DEADLOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)--------- (ft)--------- (ft)---- 2 2 - 3 Y -2.200 -2.200 0.000 17.250 Member Distributed Loads,BLC 3: 8' OF FILL LATERAL EARTH Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)----- (K/ft,F)-- ------- (ft)----- ---- (ft)---- 1 1 - 2 X 0.780 0.350 0.000 8.630 3 3 - 4 X -0.350 -0.980 0.000 12.630 Member Distributed Loads,BLC 4: 8' OF FILL DEADLOAD Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)-- --- (K/ft,F)----- ---- (ft)---- ----- (ft)---- 2 2 - 3 Y -1.150 -1.150 0.000 17.250 Member Distributed Loads,BLC 5: TRACTOR LOAD ---------------------------------------------------------------------------- Memb I J Start End Start End No Node Node Dir Magnitude Magnitude Location Location ------------------------- (K/ft,F)-- --- (K/ft,F)---- -----(ft)----- ---- (ft)---- 2 2 - 3 Y -0.540 -0.540 0.000 17.250 r RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date *ROCK BRANCH CULVERT-161SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ---------------------------- Load Combination Self Wt ------- BLC ----------------------------- BLC BLC BLC BLC ------------ W E No. Description Dir Fac --------------------------- Fac ------- Fac Fac Fac Fac ----------------------------- DYNA S V ------------ - 1 LATERAL + EARTH 1 1 2 1 2 L+ E FACTORED 1 1.7 2 1.4 Y 3 8'+TRACTR-FACTRD 3 1.7 4 1.4 5 1.7 Y Dynamic Analysis Data Number of modes (frequencies) 3 Basic Load Case for masses None BLC mass direction of action X only Acceleration of Gravity 32.20 ft/sec**2 • 9 RISA-2D (R) Version 3.03 Hanson Engineers, Inc. 1525 South Sixth Street Springfield, IL 62703 ROCK BRANCH CULVERT-161SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D ENVELOPE SOLUTION Nodal Displacements Job_ Page Date Node Global X Global Y Rotation -------- ----------- (in)------ LC---- ------ (in)------ LC---- ------ (rad)----- LC- 1 max -0.00000 2 -0.00000 3 0.00177 2 min -0.00000 3 -0.00000 2 0.00096 3 2 max -0.02208 3 -0.00352 3 -0.00140 2 min -0.09412 2 -0.00435 2 -0.00165 3 3 max -0.02535 3 -0.00505 3 0.00231 2 min -0.09884 2 -0.00606 2 0.00195 3 4 max -0.00000 3 -0.00000 3 0.00085 2 min -0.00000 2 -0.00000 2 -0.00003 3 ENVELOPE SOLUTION Reactions Node Global X Global Y Moment -------------------(K)------ LC---------- -(K)------ LC----------(K-ft)---- LC- 1 max 1.96258 3 27.21760 2 0.00000 2 min 1.36748 2 22.02298 3 0.00000 2 4 max 7.00163 2 25.91241 2 0.00000 2 min 4.02652 3 21.58502 3 0.00000 2 ENVELOPE SOLUTION Member Section Results Nodes No I J 1 1- 2 A V M D 2 2- 3 A V M is D Member Quarter Points I-End 1/4 1/2 3/4 J-End (K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC(K,Kft,in) LC-- 27.22 2 27.22 2 27.22 2 27.22 2 27.22 2 22.02 3 22.02 3 22.02 3 22.02 3 22.02 3 -1.39 2 -4.63 3 -6.90 3 -8.78 3 -10.26 3 -1.97 3 -5.34 2 -8.89 2 -12.05 2 -14.82 2 0.00 2 7.33 2 22.76 2 45.42 2 74.48 2 0.00 2 7.19 3 19.70 3 36.68 3 57.28 3 0.000 2 0.045 2 0.084 2 0.106 2 0.094 2 0.000 2 0.024 3 0.042 3 0.046 3 0.022 3 14.79 2 14.79 2 14.79 2 14.79 2 14.79 2 10.25 3 10.25 3 10.25 3 10.25 3 10.25 3 27.22 2 13.94 2 0.65 2 -10.68 3 -21.58 3 22.02 3 11.12 3 0.22 3 -12.63 2 -25.91 2 74.48 2 -14.19 3 -38.64 3 -16.07 3 63.22 2 57.28 3 -14.26 2 -45.72 2 -19.89 2 53.50 3 0.000 2 -0.178 3 -0.294 3 -0.191 3 -0.014 3 0.000 2 -0.198 2 -0.340 2 -0.225 2 -0.017 2 "L--? 9e" RISA-2D (R) Version 3.03 Hanson Engineers, Inc. Job 1525 South Sixth Street Page Springfield, IL 62703 Date 0(OCK BRANCH CULVERT-161SPAN-SECTION 2 J:\USERS\STRUCT\9553055A\CULV16-2.R2D • ---------------- Nodes -------- ---- ------------ Member ------- Quarter ------------- Points ---- -------- ---- No I J I-End 1/4 1/2 3/4 J-End --------------(K,Kft,in) LC(K ,Kft,in) LC(K,Kft,in)LC(K,Kft,in) LC(K,Kft,in) LC-- 3 3- 4 A 25.91 2 25.91 2 25.91 2 25.91 2 25.91 2 21.59 3 21.59 3 21.59 3 21.59 3 21.59 3 V 14.77 2 10.59 2 5.57 2 0.81 3 -4.03 3 10.25 3 7.95 3 4.80 3 -0.30 2 -7.02 2 M 63.22 2 24.56 3 4.21 3 -4.87 3 -0.00 2 53.50 3 22.94 2 -2.80 2 -11.33 2 -0.00 3 D 0.000 2 0.049 2 0.059 2 0.071 2 0.098 2 0.000 2 0.039 3 0.038 3 0.029 3 0.025 3 ENVELOPE SOLUTION AISC Code Checks ---------------------------------------------------------------------------- Nodes Member Quarter Points No I J Max lc 0 lc 1/4 lc 1/2 lc 3/4 lc L lc Shear lc ---------------------------------------------------------------------------- 1 1- 2 - Not Calculated - 2 2- 3 - Not Calculated - 3 3- 4 - Not Calculated - 0 52.56 46.72 48.88 35.84 29.28 23.36 17.52 11.68 5.84 8.88 -5.84 -11.68 -17.52 -23.36 -29.28 -35.84 -48.88 -46.72 -52.56 Mode • Moment Diagram (k-f t) Load Comb 3 ? 95 53aS?"< 51.215 7?i5/9 GvO?s4 cca2 `b Cun,C( I Z W CL?LS (a / ?-via-? /on?/i?? aT ? / fJ /CJc - - 'rte ?S?18 l 4Z ? ? 51.573 8.8 1.7, 3.5 5.2 6.9 8.6 18.4 12.1 13.8 15.5 17.3 2 Local ionQQAlong 1 M tuber 2 (It) Mode 3 ?' W F ITT 6,0 V10(52, ) 4-0 l8 / z l 4 /z l? s) / =¢z 44L. can Cct-4 o r] U "T k?". v v v v+ ? - . cIeve(o?mcV1+ -Par- n(f?a ivr- Lot, 1%1 ?Ofz:) slab. 76.02 69.11 62.19 55.28 48.37 41.46 34.55 27.64 20.73 13.82 6.91 8.00 -6.91 -13.82 -20.73 -27.64 -34.55 -41.46 -48.37 -55.28 Moment Dia gram( K-ft) Load 69.7 7 5=2' P- 3.? -51. 859 ' :omb 2 0.0 1.7 5 5.2 6.9 8.6 10.4 12.1 13.8 15.5 17.3 Mode 2 L cation Along Member 2 (ft) Mode 3 3. z ' f /. ?3 = ?, 3 ' ?asf hods or ?d = 5'-Z ?' ?asf nee ?-- ca?YoPS atemzc aw fvsa-IIt'vz-2 ? a Leos S Z ?icr.-? o? vIGC/? E 76.17 971,94 67.71 63.47 59.24 55.81 58.78 46.55 42.32 38.88 33.85 29.62 25.39 21.16 16.93 12.69 8.46 4.23 8.88 • E P?qa-?Iv-?f she/ rtzt'o t=om #BC?/z" B0/8% 8.8 8.9 1.7 2.6 3.5 4.3 5.2 6.8 6.9 7.8 8.6 Mode 1 Location Along Member 1 (ft) Mode 2 41 -O" T Moment Diagram(K-ft) Load Comb 2 74.476 58.98 55.85 51.12 47.19 43.25 39.32 35.39 31.46 27.53 23.59 19.66. 15.73 11.86 7.86 3.93 9.99 -3.93 -7.86 -11.89 -15.73 Moment Diagram(K-ft) Load Comb 2 5.8 8 I I I I -13.377 8.9 1.3 2.5 3.8 5.1 6.3 7.6 8.8 18.1 11.4 12.6 Mode 3 Location Along Member 3 (ft) Mode 4 • 1?1 C J Load COfe l ,go-557a- C7 • l.W so Diagram 1 s'%?c ?Z' GUa-? CGt? 0 • .727 8.72 C a so / • • Wheel Tractor-Scrapers Specifications • Auger Scrapers. 1 Z • AEM Equipped I• ? *MV* MODEL 627E 637E Flywheel Power: Tractor 657E 272 kW 365 HP 336 kW 450 HP 410 kW Scraper Operating Weight (Empty) 550 HP 168 kW 225 HP 187 kW 250 HP 298 kW 400 HP 40 3 T Scraper Capacity (Heaped) 86 kg 89,035 lb 54 583 kg 120,233 Ib 75 875 kg 167,270 1 16 82 ' > Rated Load . m > 22 yd 23.7 m 31 yd' 33.6 m' 44 yd' 21 770 kg 48,000 lb 34 020 k 75 000 lb Operating Weight (Loaded) g , 47 200 kg 104,000 I 62 156 kg 137,035 lb 88 538 kg 195 233 lb 12 Average Load Time (Minutes)' , 3 075 kg 271,2701 7 min AUGER ATTACHMENT . 8 min 1.0 min Auger Diameter Auger RPM - 1320 mm 52" 1524 mm 60" 1676 mm " 66":>; Auger Power Variable 55 to 35 RPM Variable 55 to 35 RPM Variable 55 to 35 RPM Hydraulic Flow 149 kW 200 HP 201 kW 270 HP 354 kW 475 HP': 273 Umin 72 g m 397 U Cooling Flow p min 105 gpm 549 Umin 145 rgptit 64 Umin 17 gpm 132 Umi n 35 gpm 132 Umin 35 gpm System Pressure 27 580/41 370 kPa 400016000 psi 37 923 kPa 5500 psi 41 340 kP i Auger Control a 6000 ps electronic - electronic electronic 'Load times will vary with application and/or material type and condition. r The auger scraper is a self-loadin g system that offers an alternative to conventional ush ll auger is located in the center of the t , p -pu or elevating scrapers. TI scraper bowl and its hydraulic system is totally independent of the t t em. As material flows over the scra rac or-scraper sy pers' cutting edge, it is lifted by the'rotating auger in the same digger works. manner that a post he Advantages: • Self-load in equal or less time • Increased tire life • Requires shorter cut distance • Com lete mat i l • Broader material appetite p er a ejection (angled ejector pushes material) • Better material retention on haul road (closed apron instead of open elevator) ' TIRE OPTIONS 1800,25 16 PR E<' 23,5.25 ---------- 16 PR E? -- E, F-: 23.SR25 * E. :'. 26.5-25 26 PR E4 k; 265R25 . * E< ° 29.5.25 22 PR E: 29.5R25 * E. r 29.51R25 * * E: 29.5-29 28 PR E: F 29.5-29 34 PR E. E 29.5R29 E: E; 29.5-35 28 PR E: E: 29.5R35 * * E: 33.25.29 26 PR E: 33.25R29 * * E: E: 33.25R35 * + E: " E: f 37.25-35 30 PR (E- 37.25R35 * * E. 37.5-39 44 PR E. 37.5.39 52 PR E 37.SR39 * * E 40.5/75R39 * * E 1. Standard on 613C. 2 Standard on 615C. 3. Standard on 621 S. 4. Standard on 623E. Not availa 5. Standard on 621 E and 627E. 6. Not available on 623E. 7. Standard on 631E and 637E. 8. Standard on 651E and 657E. 8-6 DIU MODEL D9N Flywheel Power 276 kW 370 HP Operating Weight' 42 542 kg 93,789 lb Engine Model 3408 Rated Engine RPM 1900 No. of Cylinders 8 Bore 137 mm 5.4 Stroke 152 mm 6" Displacement 18 L 1099 in' Track Rollers (Each Side) 8 Width of Standard Track Shoe 610 mm 24" Length of Track on Ground 3.47 m 11'4.8" Ground Contact Area (W/Std. Shoe) 4.24 m' 6571 in' Track Gauge 2.25 m 7'4.6" GENERAL DIMENSIONS: - Height (Stripped Top)" 2.93 m 97.3'"? Height (To Top of ROPS Canopy) 3.91 m 12'9.8"0- Height (To Top of ROPS) - Overall Length (With S Blade) 6.87 m 22'6.4" (Without Blade) 5.17 m 16'11.5" Width (Over Trunnions) 3.25 m 10"8" Width (W/O Trunnions - Std. Shoe) 2.89 m 9'5.9" Ground Clearance 505 mm 19.9"¦ e Types and Widths: f Specifications i Track Type Tractors M?k JW4 D10N D11N 338 kW 520 HP 575 kW 770 HP 57 410 kg 126,565 lb 95 846 kg 211,302 lb 3412 3508 1900 1800 12 8 137 mm 5.4 170 mm 6.69" 152 mm 6" 190 mm 7.48" 27 L 1649 in' 34.5 L 2104 in' 8 8 610 mm 24" 710 mm 28 3.87 m 12'8.5" 4.44 m 147" 4.73 m' 7326 in' 6.32 m' 9800 in' 2.55 m 8'4" 2.89 m 9'6" 3.197 m 10'5.9 3.50 m 11'6"? 4.24 m 1311 "? 4.56 m 14'11 "? 7.76 m 25'5.3" 8.39 m 27'6" 5.59 m 18'3.9" 6.16 m 20'3" 3.72 m 12'2.2" - 3.30 m 10'9.8" 3.78 m 12'5" 615 mm 24.2"0 623 mm 24.5"¦ 5 65 m 18'6" ight le Straight/Angled - Universal 4.66 m 15'3.4" 5.26 m 17'3.2" 6.41 m 21'0 Semi-U 4.32 m 14'1.9'" 4.86 m 15'11.4" - "P" Straight/Angled - Fuel Tank Refill Capacity 792 L 209 U.S. 981 1023 L 270 U.S. gal 1490 L 394 U.S. ga 'Operating Weight includes ROPS canopy, operator, lubricants, coolant, full fuel tank, hydraulic controls and fluids, straight dozer with till, back-up alarm, seat belts, lights, rigid drawbar and front towing device. - D9N-Di 1N include track guides. - D9N and D10N equipped with SU-blades. - D11Nequipped with 813 mm (32-) extreme service track shoes. - D11N includes 111.1 Bulldozer, single shank ripper and ROPS cab. "Height (stripped top) - without ROPS canopy, exhaust, seat back or other easily removed encumbrances. ?Dimensions to flat of shoe. For dimensions to grouser tips add 84 mm (3.3-) for D9N, add 93 mm (3.7-) for D10N and 101 mm (4") for D11N. ¦SAE J1234 1-5 • • -- l?'? ---- - -7_1L71HANSON ENGINEERS, INC. CAT ENGINEERS - CONSULTANTS CciKD. cY < < ? DAT= _ _'! f i ?a SP=.iP: r!_?.,. , PECP;A 8 ROCKrCP.D. I_n'C'S Y?ir? v?a11 Des?y? v???J 1?ra//s acs l?cri?c??( c?v?/er?? ?Gri 7 GhGI r ?' ??Z , /,7 Cz/??frl- / 11Ctf? iG?-? SHEET NO.__------ CAF--/7? JO S N O..3 --?r---- ,17 4s rrov . U 5-9 /' z ? yer?r?c?C s?c?/ 6) 0 1z (-/Z? X ZZ (A) ?Gta./? -?ir,? cu??9 cua.C? ex?evrds ah ? ?o f?fr? of ?v? s/?,E? 0 40 --? mss; n 9oD ? /o = ? ,? t/ i' /?L ? !i;? wad/ s?•.i?J.?, vim; ?i%?c% /z 83 W? _ 7 (/Z83> 20 (/0 = 4 3. ?- ?-/s- z - 5= iz.s ?cc?cr?1 o (moo -79 /_>, sal -. 5 ?i = 4Z- 33 %L ?(/Zfi/t.S?/ • 1 772 is U/lde McGirr _ he wno- /aod -- 0115,?'4a?o cVQY ?iPLI ?r ?i,r SfG! ! jG^ `(? y 4 041 7-8 born caL-? f.. 5,1C <z, cJ</ /aP,oea . /? s.?? / soz = ?3? z l? L \?j ??/gel ?acl? o <u,CveYf bu=- ?ncreasFCl ?'? e? ?n Da•c v/ i HORIZONTAL CANTILEVER WINGWALL r, • USAGE The horizontal cantilever type wingwall shall be used for culverts requiring wing lengths 14 feet or less, and the design height (h) is 10 feet or less. If the length of any individual wing on a culvert exceeds 14 feet, the horizontal cantilever type wingwalls shall not be used for any wing, except as noted on plate 3/1.3. DESIGN CHART The nomenclature used in'the presentation of the design chart can be found on plates 3/2.2 and 3/2.4. The thickness of the wingwall and required reinforcement shall be obtained from the horizontal wingwall design chart on plate 312.5. In no case should the wingwall thickness exceed the barrel sidewall thickness by more than 2 inches; and if such a condition exists, the portion of barrel wall which must be cast monolithically with the wingwall shall be modified. This portion of the barrel shall be equal to half of the wingwall length, but not less than 6 ft. The termination of the wall thickness curves at the upper end of the chart 3/2.6 reflect the use of a maximum reinforcement ratio of one half of .75pb. The area of steel required per foot of wall height, will determine the h6 or h8 bar spacing and size. The values for area of steel on the chart are based on assumed bar sizes, and therefore the.maximum bars which can be used in design are given in the Table on page 3/2.3. The minimum primary flexural reinforcement, h6 or h8 bars, shall be #4 at 12 inch centers. The h3 and h7 bars should be the same size as the h6 and h8 bars respectively, and spaced as shown on plate 3/2.2. • ILL. 1/87 3/2.1 • AREA OF REINFORCEMENT in2/Ft. Bar Size 0.0 - 0.39 #5 0.4 - 0.59 #6 0.6 - 0.79 : #7L" 0.8 - 0.99 #8 1.0 - 1.5 #9 DESIGN EXAMPLES - Horizontal wingwall design chart 3/2.5. EXAMPLE 1: 54??- GIVEN: Fill = 14.51; h = 51-0"; L - 71-6" 1 Enter chart at fill equal to 14.51; project line vertically to line h = 5'-011; extend line horizontally from the intersection of these two lines, to the intersection of vertical length of wall (L = 71-611) line, project a line parallel to moment curve; at the intersection of wall thickness curve (8" wing), project a line horizontally to area of reinforcement, and read As = .45 in2 per foot. Referring to Table above, a 7#6 bar should be used, making the spacing of h6 or h8 bars #6 @ 11" cts. EXAMPLE 2: GIVEN: Fill = 42.0'; h = 7'-0"; L = 101-0" Enter charts at fill = 42.0'; vertically to h = 7'-0"; horizontally to f L = 101-011, at the intersection of these two lines draw a line parallel to moment curve at intersection of first wall thickness curve (il" wing); project a line horizontally to AS = .805 in2 per foot. Referring to Table above, a #8 bar should be used, making the spacing of h6 or h8 bars, #8 @ 11" cts. ILL. 10/88 3/2.3 i t • l(o an1OA Ob ° ?' w p? p O 0 S ti w V NW b o \' ti w a V b ?? 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V? - - - - - - IN in. IN, _ - --- - ?- - --- fr -- - -.? - - - ??- - ?_ . IE' lto- lzi- - - 8- -- --- - - - - --- - - - -- ?- -- ------ -- --- - -- - - - - H- 1-1 of O r R1 V- r Z O r r O` Z ti- w A saris loq yF anva uo 0/4701 aasJ J004 ul bs ui /uacuaOJofuiay Jo DaJV Q O 0 0 0 6 0 0 d 0 • 5704CD NJM NJN 7 24 96 AMY DAB DAB 7 24 99 wmm ?g1DED gQDED 7 IS !19 ppAINNCS 9JSJOJJ4 YCSONC 0.9 1J•I6 VAN ? ? ? ? U1 O O O 1,, 0 0 ) 0 o o $ o SEC. 0100 \\ V m \ co O O \ ° $--i \ o \ \ \ m m z j/ No_ o0 F - - - -- --------- -- ---o _SEC. MO r' F tJ P o K. ?f H N f D ° ? it $ i 11 E m a .I o 0i $ $ 00 o - SEC. 1+00 ° 0 a o 0 0 0 0 0 r z ? I c 0 I Z , r I r w 1 ro n z = m SEC. 1135 z ? - - - D a ? z 1 ---- ?_ rq re) m ° N N 10 m o C z r ;u >0 o O O T Iox + n Cb '00 i co p r D O O n D; i ? vi Z ? Q 'o 0 c: y 1N/I o co r A S] i p o R Iq ;u i Z --? SEC. 1±70 J N - a o sr i> O m ti a?eo o- 1? Fo m g? sa c 1 c: ? i ° o of i n I i r I, O Z n °- C m = C I 11 ? o cv? <7 ? i o 0 rq N _ SEC. 2+20 I O m _ SKIN. I C n n _ _ LEARANCE Z Q A =1 1 ° TV.) I I ZZ? C7 --- -- -- - -- - --- - - - - - - - - I cn m m m , r 1 1- (' I f( o - V pa i T m m cn • ? ?/ o VI U i t 19 ¦ [z .i ? ° 1 Y;IrlfD z TtT III Ed p rm 1 1 * BBC _-- SEC. 2+80 ° ?e S2 File Name: 0 0 0 w u>i. 0 t N III H L4 r'?6i3 O IA r, G rn V-l0• m ? s --? m N o o s p ----------- m e Ij O D 0 Of I ° I + N f Tl 2 Cf O ° T >° r D -- + • g F- r m°? m { p fi vvmrv-+p UI ? v T ? II 11 II 11 N NO ? v -I?N 0?4,1?N1 Z V-3' z 15 a r g 1 P ° c a D I 'I° s N .q 2 ---------- ? N p C d + r 4 ---------- N > N QS? ? N Z>?1-L/iQi?x O ? •tl '.1N=?C?7Ip O M f'1 C p o ?i N fk 2 D-/ms?;u 9 'o in c z m x -?1 C m rn O 3c O n ?rn ;u 's v F- C 0 pp z z ? :< a I 1 0 Q Z ttt rf frim z z r I1 1 Ed i 1"I o F xt m z MIN. CL o z? I v ? N 0 o ? D yn p P I I I I T ? I S D I =J R 0 MIIINII L11 I t0 d - ?F z o id Flle Noma: '2k ? n N a 0 V r Z P N T \ 0 .a . S I1 ? a v. a fa N .7 IA +?CO S ? ? Q ° ??? ? f.iT Gm ?61 mO? Binz ?? >? ?? ?aa cl zo >r,+> > Q ? ?i o y Iy- ? 2?Q m •3 l1 DWNNt?In? 1- I g - fl Q . 4 m U) r) FFrpp yz 9 !p ¢ R g 2 ? p ? V W ` +1 C ? Z ? m goo O 4^ !YY!{ 'v cl m m r T ? > Iip mm 8 y 1 ' 1 D z ?g o o 0 m jA ..I o ,y I•I m V L2 X m ? m 4 pp? o go I ~A I n I I I I +I P S I V-3•11 e'-o' i 8,-0' rl P N I ? ?I P 0 r CCYGNlO MEA NEA 7 24 96 WARN DAD DAD 7 21 96 RCWNfD MDL QQMq. 7 24 96 7 6WAWKS 95YJ055A CM NA770NC W,16 F/W 15 40 OA8 N +) 2'-0' 8'-0" MINIMUM_ _ w a = MINIMUM (TO BOTTOM OF TOP SLAB) ?o 0 0 ;J vo O z ?r s 1-11 X00; ilN =-+ >9 z , z m G) vc7,?• M , N?;u D owo C7 F ?C x D °Cl;u e g a , C g C7 A o? + w °m n z'-o' z'-o' 10'-0' ? MINIMUM MAXIMUM M (TO BOTTOM OF TOP SLAB) O EXTENSION Z 2'-1" MIN. fBARS H MIN. BARS o I ?• o ? 0 8 ? to I ? ?n C f ? m? n J g oN9 Iva ti I! Om N Ow nn 0?!f _99 -T1 0 $F" O ;' o?? O m -? Z 2'-0" 2'-0' 10'-0" t • MINIMUM MAXIMUM (TO BOTTOM OF TOP SUB) ALTERNATING /10 BARS a EX?NSIION 4 (O.F. OF WALL) (gym D 2'-0• ° z 1'- 4' 2'-0' IV-3" r `°7 z (n O1 MIN. MINIMUM -` i ?i to'-o• 1'-3• P J = 2'-0' < -- vmi ' IA m Z {N _TT. N ? -? -L I C.,? ?? - I- N 01 ;I 09 MAXIMUM ? o D o grill c D Fn Ili, ;d Z NI Kla ? og o n ;az z 01 I W O A [ yy? Q ° ?? ° N ;u --/I H m L O C4 ?? In 99 (mnn. Dr n v? ;u N m p 0 , V M 14 vVli c: O o --? e o ° , ? ? N z? o m Q t 1 a o O " V 2• Z C3 M o? rn q cf) ` CL Z m r'' 4 o D = g C % rn C) 2" C r s C _ ° r g L _ rn O cg F, ; ° rrri iu, I 0 0 C) Z 0 -?-1 O r D I r+ e M a L Cz' •, Z7 1 i/2• • ! i_ 7-c p al O 0 • P ?-i C_ i z O Z ° g .• b o z ? D 22 --I ? ITT EM n IN Ln a P o r ?c E L Ir 2'-0" p i N Ia y 4'-7- CUT OFF LOC-A 710N FOR ALTERNAIING /8 BARS = ro (O.F. OF WALL) It I ?' m?i2 FII• Name: • • • i A I6 C) D C r z G- s ; D r z r N M ? n a 4919 I lei Y O ? p lCA = ?'? ! p =7i m N C m "D m °O D (7 c m x Z O D oM rn z? A r G-) no C) c c A v -I D C G e' r m = M 0 ? Z S O Z F IM tt. Ed r M ? ? `?? `I R her if m= z 0 7 ry? -14 0 IE f'1 i i 0 ?Z C ?g nle Name: *? -? a! ° o? 4 0 0 Z 0 0 0 1 u CD co \,? ?xo R ? o a aa? A ? ? 'ERR ' ; ?, 5 0 Zm C) z G) r' M ;OK C2 0 ''' T. o z 0 -0 z s a + ? n < ++ r t H Z ?? fTl o Et a) y § (? m MMNN? z _ C Q C-) m cn qa In .r i ! Y ll z-, e " . ills Nome: x v OD m CA co '4 x OD OD V Z ((11 7 LL O 5?v7? y o O ^ m ig m mid r- WPM mga TV???? ? m !`l O ?? Q A ? r1A m t? N >? O t? II N v m / D W Q) x ti OD 0 OD v `so 00 ?w? ooc /? 'mss of 'x boo D -x-? y - 1 00 o ? so Ul pa x 4D o GV v e Yr _i kO m cn zz 0 O ° x o r 0 0 C) C) J 0 n.) x NO v 1 /V, o? O? m <U 0 ?pX so m m a z M M z A 0 0 D 0 0 0 w 1cul ww0 u M107,96 M 48 OAB i V aJ0 IJO UII Im NII DO co on w co IO ?II OII o OII O o TTT1TTTTTT1 IT1TrTTTTT?TITfTTTLITfTMl 23+0" 23+12.7 24+0 24112.71 lJ0 I p ? 0 0 0 0 c.? 0 F 25+0( 25+12.7( r .x O 71 F 00 ?z 0 o °o 10 ou A R o rn 26+OC o Z3 6 g o z- ..gig N l6 Z C M I+l -V 7 ' 27400 Z m z M It cm= m ?o> ? v 'K C c 0 M zoo ?pr Z I z z = Pr ! n =? t C ? n ? 1 R Q T 29+00 ? H _ Z F F m ? DIM TTT Ed r o s M "» IC, , 16 M i z z o m F a ; I D ro 0 ? Z 0 N O III Z V) M ; k n z j `rA z w 0 0 File Name: 0 0 0 °° 11 ' IAPAMNGS 95SJOSfA SiLSOMG W 7 6 AR56 OAO s 4 x r W; ULL+,-? OO ? ? 03 p O 1V0 V O O O ° O O a g ( i i[ER( L1 W _ i m O O ?S M mz ° 0 A n? o o SFj ? o 7? - -ao in o ? P P P LO P V 0 m :r ta 4 iF M - O - o\? > z \ Ili o c o T U U O co co Z t?0 f?0 O O p O S O O O O r O Z G7 0 C r z -? z m n z Q _ W 20 C Z m z oZ _I t? o m o N N -? 5d r o + O O C D ; O O O (7 N ° 'v° mo r fn o o $ U ;u M (A o ` V ? m o 0 q p ° J o o? Doti z ?_--? q, ?@ 1n C, ° a- c o S m m t{i - Z m r W O - G) z C A = C ?FM ITI 0 v C O CIO C. M1 , MIN. C Z O 0 o ?CLTyEpA'ANCE s+ zz t 1. a r? vl z z i?:{ +?I - - -- -- -- _ ! i 'C t P P P r (f ? ° ? IVa ? 1 b' T rn ?, ?? * U w ss H iF iF H ? A1* o RFFF Z ?t M g s s i EM 1t j' I r $_ r 11 SEC. 0+00 \ \ P \\ g \\ a \ 1 I SEC. 0+50 O! II o W 'I ? II II y 4 r I -1 ?I 11 `? SEC. ,+00 V 'V ?w I SEC. 1+35 o ; ip--i - - N I AM o m z I ,?z I m!j m s ?r I Ao z I; ? 1 P m 0 r g J i a l SEC. ,+7 o i I J =1io I l 1 ?? ? O? -=i?l i r i DA Iq m i 90 l I ?g N Fg ? o I c I ' i i r I OI PE III O N l ' O I i SEC. 2+20 i I \ i 1 1 I1 I? i Ii I, ?I I II I / 1 / SEC. 2+80 r O O N +? O O O + FIIs Nome Is F? is 1H 7 2A 96 7 24 96 7 24 96 1, W,4wvo 9SSJOJS4 CU 6fR170NC mlorI95 11•570AB f7 -y-1 PT O R 1• O ° T - - s ` M g + a N ? O \ Iz; r- - Ri 7j -- m ? ?; ° vbmr?o--Ipv C 0 5-1 z 1•-3" ? ? g ? 1'-3• ? 0 8? D I 1'-3' 9' 4- - ---------- 0 N R 0 z D ?• ? F m x In y 1 11 4 a g Rh ?4€ v ? ?SRR? n g Z8 N m m 70 C-) 0 Z c ? f*1 r+i O Z n a m s O M 0 G G7 r C= 0 Z Z O s ?-+ z z m t ?. n s r n z ? t(; gI y S r Gf >E??s ?N z G-) 2 Q2 U_ ? ? p? •u n 1/1 Z -------- A F Z 5m K 52 MIN, CL. Q i? o g .? Z =j ?M ?M c P ® Alk ---- ----' ?f P .. I z M Etj p r - F9 l 8 r ? P r? ?g 1 001 O 1 I° g E k n, N A r Z A 16+`.>D f 9 g y,°1 ? 'H!92 ' SKI z,? r4p 2 Fri To y gm m . > 5a ,r z r? emo x??„rfi ?rn Q 54 UJ Ai > O IMP Yak g g g ?? X M Cl) 48 A 4 o r Ao A Alin m? o 1 b 4 N ?i SI i I M? I 2' gS? g I a •o °o -0' 8'-0" 1'-3* e,' * T 0 b 7-? t 26+00 I I f - ? J ?- Q It ne Name: