Loading...
HomeMy WebLinkAbout20161175 Ver 3_SAW-2019-01278permitverification1x_20190911U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2019-01278 County: Chatham U.S.G.S. Quad: Pittsboro GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Chatham Park Investors, LLC Tim Smith Address: 100 Weston Estates Wav Carv, North Carolina 27513 Telephone Number: 919-481-3000 E-mail: tim(dorestondev.com Size (acres) 101 acres (approximately) Nearest Town Pittsboro Nearest Waterway Roberson Creek River Basin Haw River USGS HUC 03030002 Coordinates Latitude: 35.723139 Longitude: -79.160737 Location description: The proiect site is located approximately 400 feet northwest of the Thompson Street, Juleann Street intersection near Pittsboro. Chatham Countv North Carolina. The Droiect is identified as the Chatham Park, Section 5.1, Thompson Street Subdivision. Description of projects area and activity: This verification authorizes the temporary and permanent impacts to tributar streams associated with the construction of a residential subdivision as follows: Roadwav Crossing #1: (Impact #S2) 23 linear feet of permanent impact for the installation/extension of an aluminum box culvert, (Impact #S3) 7 linear feet of permanent impact for the installation/extension of an aluminum box culvert, impacts include replacement of an existing 4' x 4' concrete box culvert with a 54 linear foot #61 L2 Aluminum Box Culvert; (Impact #S4) 55 linear feet of permanent impacts for a rip rap velocitv dissipation pad, (Impact S1) 29 linear feet of temporary impacts for construction access/dewatering and (impact S5) 7 linear feet of temporary impacts for a storm easement. Utilitv Crossing #1: (Impact #S6) 22 linear feet of temporary fill for the installation of a waterline crossing; Utilitv Crossing #2: (Impact #S7) 21 linear feet of temporary fill for the installation of a sewerline crossing; Utilitv Crossing #3: (Impact #S8) 22 linear feet of temporary fill for the installation of a sewerline crossing. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 29. Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 3/23/2019, and the enclosed plans labelled Thompson Street SD Impact Maps and Thompson Street Widening Impact Maps received on March 23, 2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. Special Condition: 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Remarks: Currently, the U.S. Army Corps of Engineers still consider Chatham Park as a single and complete non-linear project. The term single and complete non-linear project is defined in the January 6, 2017 Federal Register, 33 CFR, Chapter II, Issuance and Reissuance of Nationwide Permits; Final Rule and states, that it is the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. A single and complete project must have independent utility. Independent utility is also defined in the 2017 Nationwide Permit rules. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi - phased project that depend upon other phases of the project do not have independent utility. As such, the Corps of Engineers considers the proposed Chatham Park, Section 5. 1, Thompson Street Subdivision, as a component of the larger project, Chatham Park. While we have requested additional plans, including proposed impacts to jurisdictional waters, for the entire Chatham Park development, you have not provided those to date. The use of more than one Nationwide Permit (NWP) for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specific acreage limit. The threshold limits of the applicable NWPs are 0.5 acre of non -tidal waters, including the loss of no more than 300 linear feet of stream bed, unless the district engineer waives the 300 linear foot limit for intermittent and ephemeral stream beds by making a written determination concluding that the discharge will result in minimal adverse effects. Based on the information that has been submitted to date, impacts associated with the following three (4) projects: SAW -2015-01520 (Freedom Parkway), SAW -2013-02291 (Bojangles Sanitary Sewer), SAW -2016-02486 (Chatham Park Way, Phase 1) and SAW -2019-01278 (Chatham Park, Section 5. 1, Thompson Street Subdivision) are located within the Chatham Park PDD boundaries. Cumulatively, the total permanent impacts resulting in a loss of waters, do not exceed the threshold limits of the applicable NWPs. Corps Action ID Applicable Permanent Permanent Temporary Permanent Temporary NWP # Stream Stream Stream Wetland Wetland Impacts with Impacts Impacts Impacts Impacts loss of water without loss (linear feet) (acres) (acre) (linear feet) of water (linear feet) SAW -2013-00291 12 43 SAW -2015-01520 39 124 25 19 0.003 SAW -2016-02486 18 0.04 0.06 SAW -2016-02486 29 136 20 0.01 0.01 SAW -2019-01278 29 30 55 101 Totals 290 80 183 0.05 0.073 However, when either of these threshold limits (linear feet and/or acreage) is exceeded by subsequent projects within the boundary of Chatham Park (including but not limited to the three (3) projects listed above), an Individual Department of the Army permit may be required for all subsequent proposed work. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Andrew Williams at 919-554-4884 ex. 26 or andrew.e.williams2(dusace.armv.mil. Corps Regulatory Official: Expiration Date of Verification: 3/18/2022 Date: 2019.07.17 17:39:23 -04'00' Date: 07/17/2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.anny.mil/cm_apex/Vp=136:4:0 Copy furnished: Bob Zarzecki Soils and Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 Action ID Number: SAW -2019-01278 County: Chatham Permittee: Chatham Park Investors, LLC, Tim Smith Project Name: Chatham Park, Section 5.1, Thompson Street Subdivision Date Verification Issued: 07/17/2019 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or andrew.e.williams2@us ace. army. mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date I I / / SHEET A IMPACTS 1, 2, 3, 4 & 5 I—j I � III I I � I I Irl ' WETLAND & STREAM/ 100' / PERMANENT I (NO PERMANENT LOSS) 1 SCM #1 II I II � IIII !�111L1 Al LL I LL I I� DISSIPATOR �-1- w z WETLAND & STREAM TEMPORARY PERMANENT PERMANENT CROSSING m g M 0 a a z ¢ U STREAM - MAGENTA (NOT A LOSS OF WATERS) U U_ PERMANENT LU STREAM WETLANDS STREAM WETLANDS STREAM WETLANDS N (LF) (SF) (SF) (AC) (LF) (SF) (SF) (AC) (LF) (SF) (SF) (AC) - - - 1 COFFERDAM 29 172 - - 2 ROAD CROSSING - - 23 126 A 3 ROAD CROSSING 7 53 4 RIP -RAP DISSIPATOR 55 440 5-1 STORM EASEMENT 7 27 - - - TOTAL 36 199 30 1 179 55 440 - I I / / SHEET A IMPACTS 1, 2, 3, 4 & 5 I—j I � III I I � I I Irl ' WETLAND & STREAM/ 100' / PERMANENT I (NO PERMANENT LOSS) 1 SCM #1 II I II � IIII !�111L1 Al LL I LL I I� DISSIPATOR �-1- 7 e TEMPORARY I I / I (/ \ STREAM - BLUE I II I I \ on Date B Designer Scale T H O M PS O N STREET �Hj SJY AS NOTED ED111neoy /18 By Job No. WETLAND & STREAM IMPACTS 1CI 02150098.12 KC CNOO NT, �4S .8 ,I/ NL o L 1 I z � I I I o I I 1 LI I I I I I - - L - 1 7-- r I r I I GRAPHIC SCALE 200 0 100 200 400 1 inch = 200 ft. \/ WithersRavenel S.—No. WETLAND & STREAM OVERALL IMPACTS Ipp Engineers I Planners I Surveyors WS 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I license #: C-0832 I w—withersravenel.com STREAM -RED EXISTING ROAD CROSSING / STREAM - MAGENTA PERMANENT _ - — _ - - STREAM - RED I - - - 7 e TEMPORARY I I / I (/ \ STREAM - BLUE I II I I \ on Date B Designer Scale T H O M PS O N STREET �Hj SJY AS NOTED ED111neoy /18 By Job No. WETLAND & STREAM IMPACTS 1CI 02150098.12 KC CNOO NT, �4S .8 ,I/ NL o L 1 I z � I I I o I I 1 LI I I I I I - - L - 1 7-- r I r I I GRAPHIC SCALE 200 0 100 200 400 1 inch = 200 ft. \/ WithersRavenel S.—No. WETLAND & STREAM OVERALL IMPACTS Ipp Engineers I Planners I Surveyors WS 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I license #: C-0832 I w—withersravenel.com r �� /DB 48 P.G. 1067 I I cy y \ \ TRACT 1 /PB 20,'0, PG 119 / I ( PB 196, PG /3."z{ 11 I I o 678 R -AI (RESIT ENT!Ad 9751 �AGLICULTURE)I 1 \ I i\ \r' THOMpgON STREET I` 1 TEMPORARY I _ Ne z—_�___-__- `\IICOFFERDAM/STREAM — — CROSSING - - -- _ 3g y \ \ =FMS= —�_ �- F wu ORM LY PHAL Y a7 UE I&,1EY PG. f P06 .171 350 NTIAHIGH I / TTY} /w 0R I,0 c�ME L / ST,I Aq REWSI CONGRE IC RIST�;N PG. 2 I PB PB ' 1, P6. 53 -hIN: 9�7 1-117- 1 R 10 (R4SIDE TIAL- / EN ITY) i TEMPORARY BYPASS PUMP IMPACT 11 u (TEMPORARY) COFFERDAM 29 LF. -172 SF. i EXISTING 4'X 4'34 LF. CONCRETE I a�\ BOX CULVERT AND m Q Iw HEADWALLS I� l \ I ¢ (TO BE REMOVED) DB 3$2, PB 1\PG3 Y I VARIABLE / I J TIONAII WIDTH DEA(SITY) \ \ x TEMPORARY I = w = CONSTRUCTION INVERT (21'- 7" SPAN X 4'- 11"RISE) J z w EASEMENT(TCE) PROVIDE 1' BURY U) F m HIGI VARIABLE WIDTH STORM I / =ti /7 I/ I EASEMENTCn I, IMPACT #5 (TEMPORARY) / I I I STORM EASEMENT GRAPHICSCALE I d I 7LF. -27 SF. I so 0 25 50 100 1 1 1 I I I i I oo / 1 inch = 50 ft. I �� I I !�� i I I � I►, • ...... � �� III .............. .................... • .. �i`i`i�i`i`i`i`i`i`i`i`i`i`i`i - � 1 IMPACT #2 I (PERMANENT) ROAD CROSSING 23 LF. -126 SF. _ — 7 - t IMPACT #3- - (PERMANENT) ROAD CROSSING 7LF. -53 SF. 385— , L _� * TEMPORARY COFFERDAM IMPACT #4 — �\ �\ (PERMANENT NOT A LOSS OF WATERS) I I LL RIP -RAP DISSIPATOR aos ISLE 55 LF. - 440 SF. 1 LEAMOUT \ X11 I a�\ 0 7 AVI W BLE m Q Iw Q __J. S`DNQRA S. WOMBLA P6, 742 /a �I✓� \ I ¢ Lu I a DB 3$2, PB 1\PG3 I II :< J o�'.<I R-10 PIN W. 9751 V 7-5�6: (OE�IDENTIAL - \ I J I I of :mm) DEA(SITY) \ a — N \ LU z 3 \ to I �� I \\oma \ x `60\ \ �w I w /z to \ �� oN N \ / \ 100 -YR FLOODLINE PER J \" FIELD SURVEY FLOOD STUDY BY LIMITS WITHERSRAVENEL, INC. I PLUNGE POOL DETAIL PERMANENT (NO PERMANENT LOSS) NTS 3: STREAM - RED 3: ROAD CROSSING LU x J ¢o ow J Jw Fm PERMANENT 54 LF OF #61-L2 ALUMINUM BOX :mm) w > ¢ > x CULVERT WITH FULL ALUMINUM z = w = z INVERT (21'- 7" SPAN X 4'- 11"RISE) J z w z PROVIDE 1' BURY U) F m w ~ o APRON ELEVATION IN U PROPOSED HEADWALL INVERT ELEV. 378.10' EXISTING GRADE '�' EXISTING GRADE AT (TO MATCH EXISTING PROPOSED 1 INVERT ELEV. FLOW LINE OF CREEK CREEK BED) co M o rn I- LO 00 00 M M co 0 BACKFILL TO EXISTING EXISTING GRADE EXISTING 4' X 4' STREAMBED ELEVATION RIPRAP BASIN AT FLOW LINE CONCRETE BOX CULVERT AQUATIC PASSAGE BAFFLE CREEK (THALWEG) DISSIPATOR (TO BE REMOVED) @ MIDPOINT OF CULVERT *RIP RAP DISSIPATOR PADS SHALL BE INSTALLED AT OR BELOW EXISTING GRADE. I / IbH �\OR F�MERLY I \ LA RY W MANNING Pg. \ PIN: V51L117-629 R, 10 I(RE. IDE I At - HI -H386 I \\\ DEN TY) \I� WETLAND & STREAM IMPACTLEGEND PERMANENT (NO PERMANENT LOSS) DISSIPATOR STREAM - RED CEXISTING ROAD CROSSING STREAM -MAGENTA El PERMANENT STREAM - RED e TEMPORARY STREAM - BLUE UPSTREAM INVERT C 390 -0+50 0+00 0+50 1+00 DOWNSTREAM INVERT 390 i•1 385 380 375 IN U PROPOSED HEADWALL INVERT ELEV. 378.10' EXISTING GRADE 385 380 375 385 380 375 PROPOSED 1 INVERT ELEV. L HEADWALL 377.5' _T EXISTING GRADE co M o rn I- LO 00 00 M M co -0+50 0+00 0+50 1+00 DOWNSTREAM INVERT 390 i•1 -0+50 0+00 0+50 1+00 No. Revision Dale I Bv 1111nesi—er Scale III SJY AS NOTED THOMPSON STREETWIt ersRavene =�PP1NO. Drawn By WR Dd1e 11/29/18 WETLAND &STREAM IMPACT I0 Engineers I Planners I Surveyors A Checked By]ob No. WETLAND &STREAM IMPACTS 115 MacKenan Drive I Cary, NC 27511 1CI 02150098.12 t: 919.469.3340 1 license #: C-0832 I w—withersraveneLcom 385 380 375 PROPOSED 1 INVERT ELEV. L HEADWALL 377.5' _T EXISTING GRADE 385 380 375 0 00 Cl)M 0 U co 00 Cl) Cl) v � Cl) -0+50 0+00 0+50 1+00 No. Revision Dale I Bv 1111nesi—er Scale III SJY AS NOTED THOMPSON STREETWIt ersRavene =�PP1NO. Drawn By WR Dd1e 11/29/18 WETLAND &STREAM IMPACT I0 Engineers I Planners I Surveyors A Checked By]ob No. WETLAND &STREAM IMPACTS 115 MacKenan Drive I Cary, NC 27511 1CI 02150098.12 t: 919.469.3340 1 license #: C-0832 I w—withersraveneLcom f JJ ,, I� ' T T a.� �o os.A�. . .- sm ii �w oEVu EI SHEET 1.0 __ ._ w. __ -- _ 1```��`=_____ — _-------------- _m O =_ aE %n .r _ �1 Z u - _ /h --—-- SHEET 2.0 r ri i i �i 1 o11 DoE �Q Ht_.. ► - ' " ♦► i i H U rr r . ► ► , r �' ► ► r r i wr� r ►- ; ri i O � � i i; ♦ r Q f w SHEET 3.0 �,Ew� i I 1 ► .' �.. A z �� ♦ ♦ �. 41 z> co 0-6.,.-tiwF l� ♦ �� �` ��`� ��'i ♦ Y W JI —EITI-111-111E II l I / a \ ►`► \ 1' i ► SCM #1 �` ri _TIT'EN11 E-111 0111-1 E�p"N o 17 11 IINN I r 1� �04�000 o �Q x�n ten, ..w.�L tia� ' 3 THOMPSON ST r' SCM 42 ILE ,m L BEET ► ► 1 ► 1 J / I ��_ ---- ► 1� jIIT —� _ _ _ _ vI o II 1 -- - GRAPHICSCALE �� l 3 —� ��� 200 0 100 200 40( N 01 "' 1 ' h 200 ft Er / / — me — LU aTEMPORARY PERMANENT LU Z a v STREAM STREAM � U U LU N (LF) (SF) (LF) (SF) 1.0 1 WATER CROSSING 22 172 - 2.0 2 SEWER CROSSING 21 83 _ 3.0 3 SEWER CROSSING 22 170 - TOTAL 65 425 - f JJ ,, I� ' T T a.� �o os.A�. . .- sm ii �w oEVu EI SHEET 1.0 __ ._ w. __ -- _ 1```��`=_____ — _-------------- _m O =_ aE %n .r _ �1 Z u - _ /h --—-- SHEET 2.0 r ri i i �i 1 o11 DoE �Q Ht_.. ► - ' " ♦► i i H U rr r . ► ► , r �' ► ► r r i wr� r ►- ; ri i O � � i i; ♦ r Q f w SHEET 3.0 �,Ew� i I 1 ► .' �.. A z �� ♦ ♦ �. 41 z> co 0-6.,.-tiwF l� ♦ �� �` ��`� ��'i ♦ Y W JI —EITI-111-111E II l I / a \ ►`► \ 1' i ► SCM #1 �` ri _TIT'EN11 E-111 0111-1 E�p"N o 17 11 IINN I r 1� �04�000 o �Q x�n ten, ..w.�L tia� ' 3 THOMPSON ST r' SCM 42 ILE ,m L BEET ► ► 1 ► 1 J / I ��_ ---- ► 1� jIIT —� _ _ _ _ vI o II 1 -- - GRAPHICSCALE �� l 3 —� ��� 200 0 100 200 40( N 01 "' 1 ' h 200 ft Er / / — me — REFER TO SHEET 4.0 FOR / / I� / \ I I IMH 14 CHANNEL LINING DETAILS w w h w m m LL cc IMPACT 1 o Q (TEMPORARY) o� w- I w z w w J IY I PERPENDICULAR WATER CROSSING z I z O z I z l II I al 21 LF. -172 SF.o l¢ o �/� o I o I I `I,= I I � o I Q i \ o w I w wNJ/ 1 12n I � MH 13 � � � V- � jLu � FUTURE EDGEFIELD STREET CROSSING TO BE REQUESTED UNDER NWIP. 420 420 415 415 410 Jill Y W 1 11 1 1 1410 GCL Z 405 405 Eol15 12" DIP WATERLINE T COVER (RESTRAINED JOINT) 400 1400 L 30 LF 16" STEEL CASING PIPE 395 w 395 C111 Lq Co V OCN � N m Co r__ 0+00 0+50 1+00 1+50 2+00 HORIZONTAL GRAPHIC SCALE so 0 25 so 100 1 inch = 50 ft. VERTICAL GRAPHIC SCALE s o 2.s s 10 1 inch= 5 ft. O E w Z U J Z LLJN N Q O 3u �Q uw Q� �N a Z Z Ln 7) V z> O p r �z z wV) V) LLj Y W Q a 17 0 C Q O m H V Qa m: o U = z 01 o nG M I i / f � � I , 12 A z z� rsQ Q � N � N/ N REFER TO SHEET 4.0 FOR CHANNEL LINING DETAILS MH 11, �7 111111M 0, X40 LF RAISED BOARDWALK I (BY OTHERS) (NO IMPACT) IMPACT 2 / (TEMPORARY) PERPENDICULAR SEWER CROSSING / 21 LF. - 83 SF. / ,tee// 415 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ 415 ■:��■ ■ ■■■■■ ■■■�J■ I I ■�■\\ i i i■iCii ■ it ■■i■ ■� ■ Iii■■■ ■■ I I I ii■ ■■■■■ I ■■■ ■■■■■ ■■■■■ ■■■■■ _��■ MENEM Opp.92100 11 w6w-1090 Eli lmpmmlaqh, Moll NEW BONNE No No911MMEMEMEM ! ! IMMEMEMEMEMIN . . 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 HORIZONTAL GRAPHIC SCALE so o zs so goo 1 inch = 50 ft. 5 ft. O N E w N U �N Q N �o zu �Q N Lu u~ QN a a Z z �o 0 Ln V) V Z i = O p r �m z w� Y W Q a � 02 Q O C] V) H Qa a =o 0 �= Z VERTICAL GRAPHIC SCALE s o z.s s 10 1 inch= ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■■■■■ ■:��■ ■ ■■■■■ ■■■�J■ I I ■�■\\ i i i■iCii ■ it ■■i■ ■� ■ Iii■■■ ■■ I I I ii■ ■■■■■ I ■■■ ■■■■■ ■■■■■ ■■■■■ _��■ HORIZONTAL GRAPHIC SCALE so o zs so goo 1 inch = 50 ft. 5 ft. O N E w N U �N Q N �o zu �Q N Lu u~ QN a a Z z �o 0 Ln V) V Z i = O p r �m z w� Y W Q a � 02 Q O C] V) H Qa a =o 0 �= Z VERTICAL GRAPHIC SCALE s o z.s s 10 1 inch= I I w Iw w \I L m o°' z I z a w Iw � Q Y � z z Q / N / z V NoNo IMPACT 3 (TEMPORARY) i PERPENDICULAR, SEWER CROSSING 22 LF. -170 SF. MH 7 Wu i � REFER TO SHEET 4.0 FOR S CHANNEL LINING DETAILS I \ Ellie] 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 HORIZONTAL GRAPHIC SCALE 50 0 zs 50 100 1 inch = 50 ft. VERTICAL GRAPHIC SCALE s 0 z.s s 10 1 inch= 5 ft. O M E w N U N a `n < O zu nQ w u~ a uq a a zZ �o Ln V) V Z i = O p r z wV) V) Y W U" a a V" o C a p m �V Qa m: o u= Z ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 1 ■■■■■ ■■■■�I ■■■■■■■Li■1111'�i■■■1�1■■■■■■■■■■IIIA■■I>�LG■■■■■ � ■■■■■ ■1 �I ■■■ ■■■■■ ■.III,■■ ■■■■■ ��■■ • 1 ■LCi� ■■■■■ ■■■■■■■■■■II■■■■■■��■ I I ■■LIii �� TLC SLLC= �C.I ■■■■■■IIIA■■■■■■■■■■■■ I i"1■■ ■■■■■ ■■■■■ ■■■■■■■■■■II■■■■■■��■■■■■■■■_■_■IIIA■■■■■■■■■■■■ i% �_ l■■■■■■■■■■IIS■■��-==����� ■■■■■■■■■■■ • ■� ■L■■I■ • ■■■■■■■■■■ ..,, bb oommoommomm - mo, , . ■■ ■■I■ - ■■■■■■■■■■ • 1 ■■■■■■■■■ ■■■■■■■■■■■■■ ■■■■■■■■■■ • • ■■■■tl■■■■ ■■■■■■■■■■■■■ ■■■■■■■■■■ 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 HORIZONTAL GRAPHIC SCALE 50 0 zs 50 100 1 inch = 50 ft. VERTICAL GRAPHIC SCALE s 0 z.s s 10 1 inch= 5 ft. O M E w N U N a `n < O zu nQ w u~ a uq a a zZ �o Ln V) V Z i = O p r z wV) V) Y W U" a a V" o C a p m �V Qa m: o u= Z CRITICAL POINTS NOTES: A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices 'Horizontal staple spacing should be altered if necessary to allow staples to .. secure therhe charme! A A surface. �B �C In loose soil conditions, thee use of staple ors or stake lengths greater than 6"(15cm) may 10" be necessary to properly secure the (0) RECP's. Drawing Not To Scale 0 NORTH AMERICANThe GREEN Disclaimer: information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. 5401 St. N'cndcl - Q nrhiana Rd. PI1. 8()0-722-21140 20"(0.5m) -.,.14 Pos­'i11c. IN 47633 ""rr. rgrccn.com the up-slope portion of the trench. Drawn 17 2"-5" nrr_Grr �A 0.7 Staples per SQ.YD. 1.7 Staples per BO YD 2"-5" 2,r_5" 12.5cm) (5-12.5cm) I - (0.9m) I I I 1.6' 0.) I 3.3' 1 c1m) I 1.15 Staples per SQ.YD 2"_5" 2"-5" .12.5cm) (5-12.5c. r 4' (0.6m) (1.2m) I O O I 20"(0.5m) O 3.3' I o O 11' I I O O O 3.4 Staples per BO YD. NORTH Disclaimer: AMERICAN The information presented herein is general design information only. For specific applications, GREEN consult an independent professional for further design guidance. St.Wendel- Cynthiana Rd. PH: 800-722-211411 rville, IN 47633 www..agrecn.ator Drawn on: 5-4-17 CHANNEL INSTALLATION DETAIL 1. Prepare soil before installing milled ;.; IF 2"-5" including any necessary (5-12.5c nc!udmg a er__ ary �piirafnn, of a''•�••.^ r 10" lime, fertilizer, and seed (0) (zsem) 2. Begin at the top of the channel by 0 6"(15cm) deep X 6"(15cm) wide 1 1 trench with approximately 12" 20"(0.5m) deep.' 6"(15cm) wide trench with 1_20"(0 O O the up-slope portion of the trench. 10"(25cm) Anchor the RECPs with a row of3 O Y?3' extended beyond the up-slope portion �3 z (30cm) apart in the bottom of the O O O(1m)O trench. Backfill and compact the 3.75 Staples per SQ.YD. channel/culvert outlet as supplemental NORTH Disclaimer: AMERICAN The information presented herein is general design information only. For specific applications, GREEN consult an independent professional for further design guidance. St.Wendel- Cynthiana Rd. PH: 800-722-211411 rville, IN 47633 www..agrecn.ator Drawn on: 5-4-17 CHANNEL INSTALLATION DETAIL 1. Prepare soil before installing milled ;.; IF e control products (RECPs), including any necessary ': ':• ;. ' • • . . nc!udmg a er__ ary �piirafnn, of a''•�••.^ LINING seed. lime, fertilizer, and seed 2. Begin at the top of the slope by o 2. Begin at the top of the channel by - 6"(15cm) deep X 6"(15cm) wide anchoring the RECPs in a 6"(15cm) trench with approximately 12" CROSSING (SHEET 1.0) deep.' 6"(15cm) wide trench with v `n the up-slope portion of the trench. approximately 12"(30cm) of RECPs Anchor the RECPs with a row of3 v extended beyond the up-slope portion �3 z (30cm) apart in the bottom of the of the trench. Use ShonsMax mat at the trench. Backfill and compact the IMPACT 3: SEWER CROSSING channel/culvert outlet as supplemental the compacted soil and fold the scour protection as needed. Anchor the remaining 12"(30cm) portion of 3B RECPs with a row of staples/stakes compacted soil. Secure RECPs approximately 12"(30cm) apart in the over compacted soil with a row bottom of the trench. Backfill and Of staples/stakes spaced ompact the trench after stapling. Apply approximately 12"(30cm) apart seed to the compacted soil and fold the across the width of the RECPs. remaining 12"(30cm) portion of RECPs 3. Roll the RECPs (A) down or (B) back over the seed and compacted soil. prow horizontally across the slope. soil with, a of staples/stakes spaced RECPs will unroll with appropriate approximately 12" apart across the side against the soil surface. All width of the RECPs. RECPs must be securely fastened 3. Roll center RECPs in direction of water to soil surface by placing flow in bottom of channel. RECPs will staples/stakes in appropriate unroll with appropriate side against the locations as shown in the staple soil surface. All RECPs must be pattern guide. securely fastened to soil surface by 4. The edges of parallel RECPs must placing Stin appropriate be stapled with approximately 2" - locations ass shown in in the the staple pattern 5" (5-12.5cm) overlap depending guide. on the RECPs type. 4. Place consecutive RECPs ender -end 5. Consecutive RECPs spliced down (Shingle style) with a 4"£" overlap. Use the slope must be end over end a double now of staples staggered 4" (Shingle style) with an approximate apart and 4" on center to secure 3"(7.5cm) overlap. Staple through RE Pe overlapped area, approximately engfit edge of RECPs a1 top as 12"(30cm) apart across entire slopes must be anchored with a raw of RECPs width. staples/stakes approximately 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill and compact the trench after stapling. 6. Adjacent RECPS must be overlapped I approximately 2"-5" (5-12.5cm) (,Depending on RECPs tvoe) and stapled. Tin high Flow channel applications a staple check slot is recommended at 30 - - to 40 foot (9 -12m) intervals. Use a double row of staples staggered 4"(10cm) apart and 4"(10cm) on center over entire width of the channel. 6. The terminal and of the RECPs must be Drawing Not To Scale anchorea with a raw m stapies/stakes a roximatel 12" 30cm) 0cm ape art in a NORTH s (15cm) deep x 6"(15cm) wide trench. AMERICAN Backfill and compact the trench after GREEN [5401 stapling. St. Wendel -Cynthiana Rd. PH: 800-772-2040 yville, IN 47633 www.nagreen.com STAPLE PATTERN GUIDE 0 4:1 Slopes (A) 3:1 Slopes (B) 2:1 Slopes (C) 0 1:1 & Steeper Slopes (D) 0 Medium/High Flow Channel (D) E) High Flow Channel And Shoreline (E) NOTES: Use ECMDS0 for more accurate staple pattern selection. Drawing Not To Scale Disclaimer: The information presented herein is general design information only. Forspecific applications, consult an independent professional for further design guidance. Drawn on: 5-4-17 SLOPE INSTALLATIONO DETAIL I C 1. Prepare soil before installing rolled erosion control products (RECPs), RECOMMENDED including any necessary application of lime, fertilizer, and LINING seed. 2. Begin at the top of the slope by o anchoring the RECPs in a - 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" CROSSING (SHEET 1.0) (30cm) of RECPs extended beyond v `n the up-slope portion of the trench. C: �, N Anchor the RECPs with a row of3 v staples/stakes approximately 12" �3 z (30cm) apart in the bottom of the `� �' 3 trench. Backfill and compact the IMPACT 3: SEWER CROSSING trench after stapling. Apply seed to the compacted soil and fold the L/)' o remaining 12"(30cm) portion of L a o RECPs back over the seed and compacted soil. Secure RECPs L Y over compacted soil with a row J.J Of staples/stakes spaced .m N o approximately 12"(30cm) apart i w M across the width of the RECPs. 3. Roll the RECPs (A) down or (B) horizontally across the slope. `� RECPs will unroll with appropriate ,M rn side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4. The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. J 5. Consecutive RECPs spliced down the slope must be end over end Q (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through LLl overlapped area, approximately Q 12"(30cm) apart across entire RECPs width. 1n In loose soil conditions the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECPs. STREAM CROSSING DATA CALC. SHEAR RECOMMENDED LINING PERMISSIBLE STRESS, Ibs/ft2 LINING SHEAR STRESS, Ibs/ft2 MATERIAL IMPACT 1: WATERLINE 3.2 (UNVEGETATED) CROSSING (SHEET 1.0) 4.24 VMAX C350 12.0 (VEGETATED) IMPACT 2: SEWER CROSSING 3.0 (UNVEGETATED) (NORTH) (SHEET 2.0) 0.60 ERONET P300 8.0 (VEGETATED) IMPACT 3: SEWER CROSSING 3.0 (UNVEGETATED) (SOUTH) (SHEET 3.0) 2.29 ERONET P300 8.0 (VEGETATED) U Q ca G Q LU H Ln Z Z r O o Lin J) V Z >_ _ O p r m z W J) J) Y W = LU Q a ~n o C Z o Q O m H V Qa a =p o U = Z H � 31� SPACING BETWEEN 2"x 4" PICKETS TYPICAL THRU BOLTS WITH �2" (TYPICAL) WASHERS &NUTS. EXPOSURE ON EXTERIOR. 2"x 6" TOP RAIL II II PICKETS 4"x 4" POST II II 2"x 6" BOTTOM RAIL t ih J J J ll� ±HH—ELL: DECKING BEHIND FASCIA �" MAX. , FASCIA IT THRU BOLTS W/ WASHERS & NUTS. ANGLE EXPOSURE ON INTERIOR. = I -III -III (SEE INSET) - 1=III=lllllllllllllllllllllllllllllli 8' -6 - ON CENTER ELEVATION VIEW RAILING POST III=III=III=III=11 III-1Il=-III= 4^ �, 3.000 P.S.I. -III-II .`, III III= 1111111 CONCRETE �I N V ABC STONE -III-III=III=III=III=III FOOTING =III —iii"" 111112'- 6 -6 -III-IIIII •:: ill= I III= II=11' 1� (TYPICAL) 057 II IIITIII 4�. INSET z WASHED �III-11 - a" vli STONE III=11--- I-I ITI=ITI=� COMPACTED I-III=III= -III=-"'-' Y SUBGRADE 6" RAILING POSTS =_ _ - 11-I I I -I I -I I I -I I Ill 11 I I l l l I 1=III=III- 1=III=III-III-III=III=III="' =111=1 I 1=1 �111=1 11=' � II-='' NINTEROTE: l IOR SPANS ARE 8'-6" AND END SPANS ASSOCIATED WITH ABUTMENTS ARE 8'-2}t4" BUT SHALL BE SPACED APPROPRIATELY AS PER p o SEALED DESIGNS, N V ABC STONE -III-III=III=III=III=III BOTTOM RAIL _ F c �/�8"x 8" PILING DECKING �z 1� (TYPICAL) INSET z (INTERIOR VIEW) vli CROSS Y BEAMS THIS DETAIL IS SHOWN FOR ILLUSTRATION f)� LU PURPOSES ONLY AND SHALL BE DESIGNED Q BY OTHERS a u') o STANDARD BOARDWALK = E `` AF' Y V) J_ Q LLJ r) EXTEND RAILING 15 -FT BEYOND BOARDWALK ON U BOTH SIDES Q ►] Q Lu H V) CONCRETE ILI APPROACH Z Z p o 'n N V ABC STONE -III-III=III=III=III=III Z> p _ F c 1-1 11-1 11-1 i t -I I I- �z m w z vli LAG BOLTS W/ Y w WASHERS (TYP.) f)� LU Q a u') o = Qp m �N Q d a 2� Up o = Z POST o PICKETS 1;i MAX. 0 o �3T3T3 N o 0 THRU BOLTS WITH WASHERS & NUTS. ANGLE: TO BE APPROVED BY ENGINEER. SAW -2019-01278 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Tim Smith Chatham Park Investors, LLC File Number: SAW -2019-01278 Date: July 17, 2019 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. SAW -2019-01278 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Attn: Andrew Williams CESAD-PDO 3331 Heritiage Trade Drive, Suite 105 U.S. Army Corps of Engineers, South Atlantic Division Wake Forest, North Carolina 27587 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investiations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Andrew Williams, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137