Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20161175 Ver 3_PCN Form Submission_20190911
DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 tial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned * Version#* 20161175 3 Is a payment required for this project?* * No payment required What amout is owed?* * Fee received r $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Stephanie Goss:eads\szgoss Information for Initial Review 1a. Name of project: Chatham Park North Village Utilities - CLLC Pump Station to Decentralized Water Resource Recovery Facility (WRRF) 1a. Who is the Primary Contact?* S&EC, PA - Bob Zarzecki 1b. Primary Contact Email:* bzarzgcki@sandec.com Date Submitted 9/11/2019 Nearest Body of Water Robeson Creek Basin Cape Fear Water Classification WS -IV; NSW 1c. Primary Contact Phone:* (919)846-5900 Site Coordinates Latitude: Longitude: 35.755999 -79.161115 FA. Processing Information U County (or Counties) where the project is located: Chatham Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) F- Regional General Permit (RGP) F Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 12 - Utility Lines 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment CP North Village Utilities- ChUMB Statement of Availability 09Sept2019 (signed).pdf 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No FB. Applicant Information 1d. Who is applying for the permit? R Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Chatham Park Investors LLC 2b. Deed book and page no.: multiple 2c. Responsible party: Tim Smith 2d. Address Street Address 105 Weston Estates Way Address Line 2 CKY Cary Postal / Zip Cade 27513 2e. Telephone Number: (919)481-3000 2g. Email Address:* tim@prestondev.com 2a. Name(s) on recorded deed: Pittsboro Christian Village, Inc. 2b. Deed book and page no State / Rwince / Fbgim INC Country USA 2f. Fax Number: 58.34KB r Yes r No r Yes r No 2c. Responsible party: 2f. Fax Number: Gerald Baker, Jr. (919)542-5919 2d. Address Street Address 1825 East Street State / Rovince / Region Address Line 2 NC City State / Rovince / legion Pittsboro NC Postal / Zip Code Country 27312 USA 2e. Telephone Number: 2f. Fax Number: (919)542-3151 (919)542-5919 2g. Email Address:* bzarzecki@sandec.com C. Project Information and Prior Project History State / Rovince / Region Pittsboro NC 1. Project Information Country 1b. Subdivision name: USA (iF appropriate) Chatham Park 1c. Nearest municipality/town: Pittsboro 2. Project Identification 2a. Property Identification Number: 2b. Property size: multiple 15 2c. Project Address Street Address Russet Run to Eubanks Road Address Line 2 City State / Rovince / Region Pittsboro NC Postal / Zip Code Country 27312 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Robeson Creek 3b. Water Resources Classification of nearest receiving water:* WS -IV; NSW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12 -digit HUC in which the project is located. 030300020703 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Most of the proposed utility corridor is located within vacant woodland along tributaries of Robeson Creek and the Haw River. Adjacent land uses include Pittsboro Christian Village (an assisted living residential community), the newly constructed Chatham Park Way boulevard, Suttles Road and the Chatham Park mixed use office complex along Freedom Parkway including the SECU Jim & Betsy Bryan Hospice Home of UNC Health Care and the UNC Chatham Park Medical Office building. The project will connect the ebsting CLLC Pump Station along Russet Run to the new Chatham Park Decentralized Water Resource Recovery Facility (WRRF) located along Eubanks Road and US 64 Business East. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* 6 Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000). SAW -2019-01278; SAW -2016-02486; SAW -2015-01520; SAW -2013-00291 DWR#20161175v1&v2 Project History Upload SAW-2019-01278permitverification 1 x. pdf 9.98MB CP Thompson Street SD DWR Approval_6-3-2019.pdf 1.09MB 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) CP North Village Utilities - USGS Map.pdf 541.13KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) CP North Village Utilities - Soil Survey Map.pdf 2.39MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.5 4g. List the total estimated linear feet of all existing streams on the property: 10,000 4h. Explain the purpose of the proposed project:* To construct sanitary sewer & reclaimed water lines. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The overall project includes the construction of sanitary sewer lines (both gravity and forcemain) and reclaimed water lines between the existing CLLC Pump Station located on Russet Run road to the new Chatham Park Decentralized Water Resource Recovery Facility (WRRF) located on Eubanks Road and US 64 Business East. Heavy equipment typically used for such utility installation will be used such as excavators, etc. 4j. Please upload project drawings for the proposed project. CP North Village Utilities - IMPACT MAPS _North of US64 Bypass. pdf 1.22MB CP North Village Utilities - IMPACT MAPS—South of US64 Bypass.pdf 1.61 MB CP North Village Utilities - Sewer Planning Basin Plan (02Oct2018).pdf 235.88KB CP North Village Utilities - Aerial Map.pdf 876.85KB CP North Village Utilities - 2018.04.05-156100096-SuttlesFM.RCW-Reviewsubmittal-NFC.pdf 9.73MB CP WRF Grading & EC1.PDF 2.01 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: The USACE has field verified all jurisdictional wetlands and waters within the project area on multiple occassions, with the exception of those on the Woodson Tract, Pittsboro Christian Village property and the former ABCD Properties of the Triangle, LLC (now owned by Chatham Park Investors LLC). S&EC, PA conducted a delineation of wetlands and WoUS on these three (3) properties and potentially jurisdictional WoUS were accounted for in the attahced impact maps. The applicant is not asking for a JD verification associated with this permit verification request. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* R Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW -2010-00140 (original Approved JD); later field verified by Andy Williams 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Andy Williams / Bob Zarzecki & David Gainey Agency/Consultant Company: USACE / S&EC, PA Other: Town of Pittsboro & their consultant EEE verified streams for Riparian Buffers r Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Approved JD issued 5/12/2010; Later field verified by Andy Williams of the USACE in July 2015 and December 2016. The applicant is not asking for a JD verification to be issued with this NWP12 verification request. Sd1. Jurisdictional determination upload SAW-2010-00140.pdf 407.19KB 6. Future Project Plans 6a. Is this a phased project?* r Yes C No 7b. If yes, explain. This project will connect the new WRRF to existing and future upland development along Russet Run to include but not limited to the Mosaic project (a.k.a. Chatham Park Commercial Area "A") previously reviewed by the USACE. As such, there is an immediate need for this project. The utilities will also provide service to other development within the Chatham Park North Village Small Area Plan as depicted on the attached Chatham Park North Village Utility Plan Update Sewer Planning Basin map. However, there is not an immediate need for the remainder of these future utilities at this time and any associated impacts to WoUS. As such, any associated future impacts will be requested as part of the anticipated Individual Permit (IP) application. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? As discussed with the USACE, the applicant is in the process of developing plans for the remainder of Chatham Park and associated permit drawings to identify anticipated future impacts and will apply for these impacts within an Individual Permit (IP) application. [Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries F Open Waters r Pond Construction 2. Wetland Impacts m Buffers v 2g. Total Temporary Wetland Impact 0.216 2g. Total Wetland Impact 0.216 2g. Total Permanent Wetland Impact 0 000 2h. Comments: "North" = McKim & Creed, CLLC Pump Station & Force Main Improvements & Suttles Road Reclaim Water Extension exhibits for portion of project north of US64 Bypass (note the perennial stream along Russet Run road will be installed by direction drill or bore &jack methods) "South" = Withers & Ravenel, Chatham Park Sewer Interceptor exhibits for portion of project south of US64 Bypass All wetland impacts will be restored to original grade and reseeded with a wetland seed mix. 3. Stream Impacts 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W. * 2d. W. name * 2e. Forested* 2f. Type of 2g. Impact 3h. Impact F Jurisdicition*(?) area* North - Eibit 1 Sanitary Sewer T Headwater Forest Ex Wetland Yes Both 0.008 Both 3 38 (acres) South - Exhibit Sanitary Sewer & water T Bottomland Hardwood Forest Wetland Impact 1 Sanitary Sewer Y Both 0.184 1 Perennial Both 22 23 ffs (acres) South - Exhibit Sanitary Sewer & water T Headwater Forest Wetland Impact 2 Yes Both 0.024 5 Other Ui to Robeson Creek Intermittent Both 2 42 (acres) 2g. Total Temporary Wetland Impact 0.216 2g. Total Wetland Impact 0.216 2g. Total Permanent Wetland Impact 0 000 2h. Comments: "North" = McKim & Creed, CLLC Pump Station & Force Main Improvements & Suttles Road Reclaim Water Extension exhibits for portion of project north of US64 Bypass (note the perennial stream along Russet Run road will be installed by direction drill or bore &jack methods) "South" = Withers & Ravenel, Chatham Park Sewer Interceptor exhibits for portion of project south of US64 Bypass All wetland impacts will be restored to original grade and reseeded with a wetland seed mix. 3. Stream Impacts 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 31. Total stream and ditch impacts: 171 3i. Total temporary stream impacts: 171 3j. Comments: All stream impacts requested are for streams located on the portion of the project south of US64 bypass. Note the North perennial stream crossing along Russet Run road Will be installed by directional drill or bore -n -jack method to avoid direct impacts to both the stream and Russet Run road. Riparian buffer impacts are proposed on the south side of the stream to install the necessary work pits, etc. These buffer impacts will be permitted by the Town of Pittsboro. Impact S2 is a plunge pool just below an existing culvert pipe. Impact S4 is a section of an intermittent stream that broadens out. All stream impacts Will be restored to original grades and banks stabilized with core fiber matting and seeded. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact F (?) Jurisdiction* length* S1 Sanitary Sewer & water Y Tem ora P ry Other Vito Robeson Creek Intermittent Both 3 38 Average (feet) (linearfed) S2 Sanitary Sewer Y Tem ora P rY Other Ur to Robeson Creek Perennial Both 22 23 Average (feet) (lir:earfeet) S3 Sanitary sewer & water Y Tem ora P rY Other Ui to Robeson Creek Intermittent Both 2 42 AveraC7e (feet) (lir:ear fed) S4 Sanitary sewer & water Y Tem ora P rY Other Ur to Robeson Creek Intermittent Both 8 47 Average (feet) (linearfed) fl Sanitary Y sewer Temporary P rY Other Ui to Robeson Creek F77�_It_ 2 21 Average (feet) (lir:ear feet) 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 31. Total stream and ditch impacts: 171 3i. Total temporary stream impacts: 171 3j. Comments: All stream impacts requested are for streams located on the portion of the project south of US64 bypass. Note the North perennial stream crossing along Russet Run road Will be installed by directional drill or bore -n -jack method to avoid direct impacts to both the stream and Russet Run road. Riparian buffer impacts are proposed on the south side of the stream to install the necessary work pits, etc. These buffer impacts will be permitted by the Town of Pittsboro. Impact S2 is a plunge pool just below an existing culvert pipe. Impact S4 is a section of an intermittent stream that broadens out. All stream impacts Will be restored to original grades and banks stabilized with core fiber matting and seeded. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. F Neuse F Catawba F Goose Creek F_ Other F Tar -Pamlico F Randleman W Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact see comments below P UT to Robeson Creek No 0 0 6h. Total buffer impacts: Zone 1 Total Temporary impacts: 0.00 Total Permanent impacts: Zone 1 0.00 Zone 1 Zone 2 0.00 Zone 2 0.00 Zone 2 Total combined buffer impacts: 0.00 0.00 61. Comments: Note: Jordan Lake Buffer impacts Will be reviewed and approved by the Town of Pittsboro, NC. We clicked on the link but did not provide the specific impact details as the Town will permit them, but the "supporting documentation" link below would not pop up without clicking on the buffer impact link. Supporting Documentation CP North Village Utilities - IMPACT MAPS North of US64 Bypass.pdf 1.22MB CP North Village Utilities - IMPACT MAPS South of US64 Bypass.pdf 1.61 MB E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: All wetlands, streams and riparian buffers were delineated prior to designing the utilities. The utilites were designed to avoid impacts to these resources With the exception of these few crossings identified above. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: An erosion and sediment control permit will be issued for the project by Chatham County. This permit Will include sediment control measures such as silt fencing, etc. to protect downstream waters. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): r DWR V Corps 2d. If yes, which mitigation option(s) will be used for this project? W Mitigation bank r Payment to in -lieu fee r Permittee Responsible program Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Chatham Park Umbrella Mitigation Bank - Stinking Creek Bank Site 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.161 Attach Receipt and/or letter CP North Village Utilities - ChUMB Statement of Availability 09Sept2019 (signed).pdf 56.34KB 3c. Comments Wetland mitigation is proposed for all wetland impacts. The wetlands will be restored to original grades and planted in wetland seed mix, but mitigation is provided at a 1:1 ratio for the permanent conversion from forested wetlands to herbaceous wetlands. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? F- Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) F Other SCM that removes minimum 30% nitrogen rJ Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r- Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: Note that the project being the installation of sanitary sewer lines (gravity and force main) and water lines will not in of itself require a SMP. The overall Chatham Park development has an approved stormwater management element and specific requirements for both detention and water quality devices for all new development within the Chatham Park zoning district. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r- Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15ANCAC 2H.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project is a utility project to provide utilties to existing and future development. All development within the sewershed area will be subject to Chatham Park zoning requirements vdth specific elements regarding stormwater management, etc. to protect downstream water quality. As well as State Jordan Lake water supply watershed stormwater and density requirements. So, any additional development resulting from this project is not anticipated to impact downstream water quaity. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. The project involves the construction of sanitary sewer lines. The Town of Pittsboro, DEQ and utility operator of the Chatham Park Water Resource Recovery Facility (RRF) will ensure adequate capacity and treatment standards are met. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r^ Yes r No 5d. Is another Federal agency involved?* r^ Yes r No r Unknown Se. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r- No 5g. Does this project involve bridge maintenance or removal? r Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* f Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP & It's believed at this time that such blasting and percussive activities will not be necessary, but the contractors may encounter rock or hard materials during construction. All such measures will of course be limited the minimum needed for the installation. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Mapper website - The project is located within the piedmont region of NC far from any known EFH areas. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* SHPO HPO WEB website and Chatham Park historical assessment. Note that the utility lines will come close to an SHPO "1982 Survey Only" listed identified as CH0332 Frank Alston -Thomas -Womble House. This house is not on the National Register or one of the 10 identified historical sites in the attached Chatham Park 2008 Historical Assessment and has fallen into ruin or otherwise been demolished many years ago. The project does not impact or come close to the Riddle Cemetery or any of the other 10 historical sites. 7c. Historic or Prehistoric Information Upload CP North Village Utilities - SHPO Map.pdf 320.63KB CP North Village Utilities - Historical Assessment 2008.pdf 1.24MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: The project will obtain any necessary FEMA permits as administerd by the Town's floodplain administrator. No above grad filles are proposed to construct this project. 8c. What source(s) did you use to make the floodplain determination?* NC Floodplain Mapping website & FEMA DFIRM Miscellaneous Comments Miscellaneous attachments not previously requested. CP North Village Utilities - FEMA FLOODPLAINS.pdf 321.92KB Signature W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Bob Zarzecki Signature Date 9/11/2019 Environmental Consultants, 8412 Falk of NCUSC Road, SLJ1C 104, Raleigh, VC 27615 • Phone; (919) 8=46-5900 sandec.com PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: CHATHAM PARK — NORTH VILLAGE S&EC Project #9948.W36 f��T��►•iIIL'] The Department of the Army U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: ANDY WILLIAMS Field Office: USACE RALEIGH REGULATORY FIELD OFFICE I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff (as my agent) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC (as my agent) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PROPERTY OWNER INFORMATION: Name: Chatham Park Investors LLC Address: 100 Weston Estates Way, Cary, NC 27513 Phone No.: (919)481-3000 Email: timgVrestondev.com c Prop w r (pl print to ' Property Owner Signature We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Environmental Consultants, NC 27615 • Phone: (9['Y) 846-5900 sandec.com PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: CHATHAM PARK SEWER INTERCEPTER S&EC Project 49948.W36 Date: 2019 The Department of the Army U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: ANDY WILLIAMS Field Office: USACE RALEIGH REGULATORY FIELD OFFICE I, the undersigned, a duly authorized owner of record of the property/ properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff (as my agent) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC (as my agent) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PROPERTY OWNER INFORMATION: Name: Chatham Park Investors LLC Address: 100 Weston Estates Way, Cary, NC 27513 Phone No.: (919)481-3000 Email: tim(a prestondev.com Property Owner Signature I�IMM We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Environmental Consultants, 27()1.� • Aone: 0)N) 846-SOUO ;andec_com PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: CHATHAM PARK SEWER INTERCEPTOR S&EC Project #9948.W35 Date: 2019 The Department of the Army U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: ANDY WILLIAMS Field Office: USACE RALEIGH REGULATORY FIELD OFFICE I, the undersigned, a duly authorized owner of record of the property/ properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff (as my agent) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC (as my agent) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel Index Number(s) (PIN): 9751-02-78-1520 / Parcel ID 0075046 Site Address: 1825 East St., Pittsboro, Chatham County, NC PROPERTY OWNER INFORMATION: Name: Pittsboro Christian Village, Inc. Address: 1825 East St., Pittsboro, NC 27312 Phone No.: (q VV S 1 ' - � I S'\ Fax No.: (1iN%) 5 4 1- - S; -k\ c\ Mobile No.: (`t M,,)i �A-i y - 1. 1% ? Email: Property Owner (please print) • Date Property Owner Signature We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Detailed Delineation of Waters of the U lfth—it�i. mg gip• „ F-teaVVI-, "`,G7q• 1„_ 'r'� ` _ ,'.�frr ' -" .�i.,I1� r � - : C _ ,�-r©•, ! t r� •{ a _ . � , y J� ." _ � ___ � .r' �, , � _ "` 'i�', r`p` - S�i•er-,;r"•„wF�` i'iS+.`�k-•.'`(� .�,�i_��3�;::'�}-}j}���, 't--- 'f • !. _ r- ''It�"�` 71 ] rS'+�,•"s7 %.: _ - t•pes ':.�_1”- =sr/i' '`��.��• .�ir,y r•.-_ .+..�f` i J J, I�• . _ �'�,�-fir `��'ft61U[:'= •',i -._^-�" _ = rt !', �_• `,,S%-�.�:g"��`:f. {9ir t ��;;�:,f�� f jr4�?J , fr�r =- y;• r .. _ 'r1 1 .-t="_..fib 3+ •� `-I�1 ri+l t 5 flrt� f •. =7i.. \-irrRq a � ram �� � ..,; �,,f � �©r „� �f ,;�Yr' •,;: -.z•;� '� ' 3`r``' � �'' 671�;''1.�. �! � v . r ,• - S � ��.r .�; �; .� �' �1'.` �' irj��: ��/� •�`i �., ��! �:, � i „t j,+-,�ri� ' S iii ir�. r" 7'71y�n'' ,.: ' \ F3 I F,N � � r 5 • _ _ J,t ,J �+i }ti 4 -� _ [�i _.]:�\';`.:_.meq •� `'y�y,.fI¢� �i� }, r^i - • � , �� 1 _�� r J'04 �'�,__ �.`-,��•�f,, •- _ _ -•��'! �' 1, � 't `. t•. ''�°"71���-� - lt YN Station m& Force Main - Reclaim Water Extension - Improvements & Suttles Road fir'%:�.;' _ .ti •���_.,, North of US64 NNByp— ifs ` �'���� �a-�, � z �fl�;'• f 1;,��` 1 �..�- +'± ���, _� ti / m r�r=i �� r^ a s�11;, •; .;1 �� . ,�•'� 'Ir ? L •` C 1 rte_ S' i 1}"�{S r�2'£'^zcsi_`_ya� \z - { `kgt l 1 72 ` ," ..,; `;.'' `_ _I �, •,�'r`ti j', / ®'�' 1 1i� r'i r.:� m IF �` , ,' j ;• sem, rf,=. ` � , � � 1 �-�•�.' '-1®'. vet`"__= `_ s. :_ „'-`` ��;• '��_ �s' Legend 41 Perennial Stream Jurisdictional 771. lIntermittent Stream << Linear- y' �+ � ----^moi :� '� 1 �r`. �---- � !. •' ���_ __ � % l l Jurisdictional`•�__ �� m� � � � ,�`` �,•- r__,r - , 1, r f � ]��"4 �[ ir` f }( `jam j� ,•m `` ��� i lul Legend Panels 0 Political Areas Stream Centerline Cross Sections TTTTr Levee Flood Hazard Areas AE FIoodway (AE) 0.2 % Chance Annual Flood Hazard Future Conditions 1% Annual Chance Flood Hazard North Carolina Floodplain Mapping Program W1 * CP North Village Utilities - SHPO CP North Village Utilities Proiect C THAM 1HPO Site ID: CH0332 _ Frank Alston -Thomas -Womble — — House (1982 Surveyed Only) / demolished �Y f "-Vs ju Fi 1 r 1:1hV '10'", i September 5, 2019 1:62,293 0 0.42 0.85 1.7 mi NR Points NRHD Center Point F1 Boundary of Destroyed/Removed NR Listing SL and DOE entry 0 0.5 1 2 km # NR Individual Listing NR Boundaries SL Points Town of Cary, State of North Carolina DOT, Esri, HERE, Garmin, NR Listing, Gone ` National Register Boundary SL Individual Entry S&EC LZ NI N Wag14 f UD log,' .84 ta 1. JIS 04 �N PM CHATHAM PARK CLLC Pump Station N J IL N W E *�- S ME Q, 611E PiE Sit Nit GM ac C �Chatham Park - CLLC Pump Station orc ion & Force Main Imp & Sutt tat If Improvements ements & Suttles Road S Ira 1-1� _JRec aim Water Extension - . ..... P -5 7. .North � L, of US64 Bypass F 21 - 15 f 1J 1 22 12 616 ( 'J ad &E "hE 6, 8a GWE OD Ndc E LIE Ui. 33 7 31 J Pip ri —J=am 2 FW 37 28 C40 81E &K E Kd ld 42 Pt* Chatham Park Sewer South of US64 Bypass:Legend I L ® 47 Stream Buffer Origin/ Data Point NE 4 North Village Site Boundary F -A W W� 9. 30% Project No. Figure 2: Soil Survey Map 9948.W26 Chatham Park North Village Project Mgr.: Stream Buffer Origin BZ Determination Map Chatham Co., NC Scale: 1" = 1,100' 11/5/2015 NRCS 0 1,100 2,200 4,400 6,600 8,800 Feet Soil & Environmental Consultants, PA 8412 Falls orN— Road, Suite 104, Raleigh, NC 27615 - Ph.— (919)846-5900-F..: (919) 846-9467 —d—co. N W E F 'ARK Station 52: _45 rChotham Park- Sewer I nterceptc _ South of US64 Bypass 3 37 38 2 64 4 Legend Stream Buffer Origin/ Data Point 4 A;• North Village Site Boundary . W"J Ilk, Project No. Figure 1: USGS 9948.W26 Chatham Park North Village Project Mgr.: Stream Buffer Origin BZ Determination Map Chatham Co., NC Scale: 1" = 1,100' 11/5/2015 USGS Topographic Survey lecentrZiv�'ed. . . Water Resource Recovery Facility 0 1,100 2,200 4,400 6,600 8,800 Feet Chatham Park- CLLC Pum Station & Force Main Improvements & Suttles Road Reclaim Water Extension - •FRI North of US64 Bypass L2 1J 19 Eo 13 18 f 24-- 3 33 25 _45 rChotham Park- Sewer I nterceptc _ South of US64 Bypass 3 37 38 2 64 4 Legend Stream Buffer Origin/ Data Point 4 A;• North Village Site Boundary . W"J Ilk, Project No. Figure 1: USGS 9948.W26 Chatham Park North Village Project Mgr.: Stream Buffer Origin BZ Determination Map Chatham Co., NC Scale: 1" = 1,100' 11/5/2015 USGS Topographic Survey lecentrZiv�'ed. . . Water Resource Recovery Facility 0 1,100 2,200 4,400 6,600 8,800 Feet Statement of Mitigation Credit Availability Chatham Umbrella Mitigation Bank (SAW -2010-00982) Stinking Creek Stream & Wetland Mitigation Site September 9, 2019 U.S. Army Corps of Engineers (USACE) Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 N.C. Division of Water Resources (DWR) 401 & Buffer Permitting Unit Archdale Building — 91 Floor 512 North Salisbury Street Raleigh, NC 27604 Project: Chatham Park, North Village "CLLC Pump Station to DWRRF Utilities" County: Chatham River Basin: Cape Fear CU Location 8 -digit HUC): 03030002 Dear USACE & DWR Agents, In accordance with 33 CFR §332.8(r), we are providing this letter as confirmation that the following credits (Credits) from the Chatham Umbrella Mitigation Bank (Bank) are currently available. If a permit is issued, and the credits are still available, these credits (or portion of these credits required to satisfy permit mitigation requirements) will be allocated to Chatham Park Investors LLC (Applicant), once transferred, to satisfy a portion or all of the compensatory mitigation permit conditions required for the Chatham Park, North Village "CLLC Pump Station to DWRRF Utilities" project. • 0.216 acres of Wetland Mitigation Credits, and A Compensatory Mitigation Responsibility Transfer Form (Transfer Form) will be completed and executed pending permit issuance and receipt in full of any applicable payment for the Credits. We will send copies of the completed and executed Transfer Form to the Applicant, the USACE Project Manager assigned to the Bank (currently Mr. Andrew Williams) and, if needed, other regulatory agencies (e.g., DWR). An updated copy of the Bank's Ledger, reflecting the transaction, will be provided to the USACE. Should your office have any questions, please contact me at (919) 645-4300. Sincerely, Chatham Park Investors, LLC (Sponsor) Timothy R. Sal , Manager