HomeMy WebLinkAboutNCG030195_MONITORING INFO_20190329STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT N0.
/V t q,5,
DOC TYPE
❑� TORICAL FILE
' MONITORING REPORTS
DOC DATE
❑ iX 0 (l 6 3 c;�"y
YYYYMMDD
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000
Date submitted - 29 - 1
CERTIFICATE OF COVERAGE NO. NCG030195
FACILITY NAME W. A. Brown Inc.
COUNTY
PERSON COLLECTING SAMPLES _ J. Thurman Horne, P.E.i=r-EFIVE
LABORATORY : K & W Laboratories Lab Cert. # 559 APR 2 4 "19
Comments on sample collection or analysis: C:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2019
SAMPLE PERIOD E J Jan -June ❑ July -Dec
or ❑ Monthly 1 (month)
DISCHARGING TO CLASS []ORW []HQW Trout A
Zero -flow ❑ Water SupplyA
Other C ❑
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
I I No discharge this period?z
Outiall No.
- =
Date Sample
-
Collected'amount,
=
(mo/dd/yr)
` 24-hour rainfall
.1 6es3
-Total Suspended Solids
pH; .
Standard units
Total Copper
`Total Lead
-
Total Zinc:
_
'Non Polar O&G/.
Total: Petroleum
= -
r on
Hydroca bons =
Total Toxlc�.
Organics _.
__
BencfrmQrks
_
-=v -
100 mg/C or:50 mg/L4
6.0 - 9.0
0.010 mg/L
0.075 mg/Ln
. 0.126 mg/L
15 mg/L
Parameter code
- : - - -
'46s24
_ --.CO530. -
0040t3
01119
01051 , :
: 01094
00552
78141'er
001
02/16/19
0.9
16
6.71
0.011
<0.005
0.042
<6.2
NA
i Monthly samoline (instead of semi-annual) must beein with the second consecutive benchmark
exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
s The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See
General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic
Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or
manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the
facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as
Permit Date: 11/1/2018-05/31/2021
Page 1 of 3
found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition
found in 40 CFR 469.31).
SWU-245, last revised 11/1/2018
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may
be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For
those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I
certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater
runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan
included in the Stormwater Pollution Prevention Plan."
Name (Print name)
o� Gr�tnc D errz�:�NS
Title (Print title)
Signature Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format.
When results are below the applicable limits, they must be reported in the format, "<XX ma/L", where XX is the numerical value of the detection limit, reporting
limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?'
011 �0. Date Sample Collected'-' - -hour rainfall amount, New Motor Oil:or Non -Polar O&G/ Total = Total Suspended
-- -
_.... g
(mo/dd/yrj _Mches3 W.: • Hydraulic Oil,Usa a Petroleum Hydrocarbons Solids
Benchmarks - = _ - .. _ 15 mg/L-.. - 00 mg/L ar 50 mg/L•..
Parameter Cade:, - _ _ 46529 Nt011. - . _ . 00552 C0530
Permit Date:11/1/2018-05/31/2021
Page 2 of 3
Footnotes from Part A also apply to Part B
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
SWU-245, last revised 11/1/2018
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCE5 FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ Ebo IF YES, HAVE YOU
CONTACTED THE DEMLR REGIONAL OFFICE? YES NO ❑ ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitoring period in the case o
"No Discharge" reports] to:
Division of Water Quality Attn: DWQ
Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of Permittee
3-Z9,11)
Date SWU-245, last revised 11/1/2018
Permit Date: 11/1/2018-05/31/2021
Page 3 of 3
,C Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
< Date submitted t2 -.W - )9
CERTIFICATE OF COVERAGE NO. NCG030195
SAMPLE COLLECTION YEAR: 2018
FACILITY NAME • W. A. Brown, Inc. SAMPLE PERIOD Jan -June X July -Dec
COUNTY Rowan RECEIVE or ❑ Monthly' _ month)
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E. if ISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY: K & W Laboratories Lab Cert. # 559 JAN 0 2 2019 ❑Zero -flow ❑Water Supply ❑SA
Comments on sample collection or analysis: X Other: C
CENT waL FILES
- — :PWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results
❑ No discharge this period?Z
Outfall No.
Date Sample
1
Collected -,
(mo/dd/yr) -.
24-hour rainfall
amount,
lnches3
Total Suspended Solids
`pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total! Toxic
Organics s
Benchmarks =_>
-
100 mg/L'or 54 mg/L
6.0:- 9.0
0:007 mg/L
0.03 mg/L
4:067 mg/L
15 mg/L
i mg/L
001
10/10/19
1.1
<2.8
6.72
<0.005
<0.005
<0.005
<6.2
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
11
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
maybe waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General ro
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: )f you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text.
Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfal! No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
-:amount,
lnches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmcrks
15 mg/L
100 mg/L or 50 mg/L
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2D17 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text -
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
+ TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy ofthis DMR, including all "No Discharge' reports, within 30 days of receipt_of the lab results for at end of monitoringperiod
in the case o "No Discha e" re its to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
R-),- a 1- VR
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG030195
FACILITY NAME: W. A. Brown, Inc.
COUNTY Rowan _
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E.
LABORATORY: K & W Laboratories Lab Cert. # 559
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR: 2017
SAMPLE PERIOD X Jan -June July -Dec
or ❑ Monthlyfy (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
RECEIVED X Other: C
JUN 12 2017 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
CENTRAL FILES
DVVR SECTION ❑ No discharge this period?2
Outfall No.
Date Sample
i
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =_
_
-
100 mg/L or mg/L
6.0 = 9.0
0.007 mg/L
0.03 mg/L
0.067. mg/L
15 mg/L
1 mg/L
001
05/04/17
0.2
<2.8
6.32
<0.005
<0.005
<0.005
< 6.2
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L', where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24=hour rainfall
amount,
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L-
' 6.0 - 0.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case o "No Dischar e" re orts to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -
(Signature of Permittee)
Permit Date:ll/1/2012-10/31/2017
(—P—/- 17
(Date)
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water. Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG0303.95
FACILITY NAME: W. A. Brown, Inc.
COUNTY Rowan
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E.
LABORATORY: K & W Laboratories Lab Cert. # 559
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR: 2017
SAMPLE PERIOD X Jan -June July -Dec rr
or ❑ Monthly' N 4;;L � 2D1_1nonth1
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED
R ❑Zero -flow ❑Water Supply ❑SA
i D X Other: C
JUN 11 2017
GFN i mil_ FILESPLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION!
No discharge this period?2
outfall No.
Date :Sctedample
Col#e 1
(mo/dd/yr)
24=ho, ur rainfall
amount,
3
.Inches
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
' s
Organics
Benchmarks
100 mg/L or 50 mg/L
&0 — 9.0
0.007 m I L
0.03 mg/1
0.057 mg/L
15 mg/L
1 FrWA
001
02/15/17
0.2
<2.8
6.32
0.010
<0.005
0.240
< 6.2
i Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
f`
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX_mg/L" where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Trer 3 responses. See General Permit text
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil.per month.
❑ No discharge this period?2
Outfall No.
Date Sample
,
Collected
.(mo/dd,/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
IS mg/L
100 mg/L or 50 mg/L•
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
' See General Permit text, Table S, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit tent.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one cry of DMR including all "No Discharge" reports, within 30 days of receipt of the lab results Lor at end of monitoring period
in the case of "No Discharge" reparts) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete_ I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
- 1. .3-I(P-1-7
(Signature of Permittee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted
CERTIFICATE OF COVERAGE NO. NCG030195
SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: W. A. Brown, Inc. SAMPLE PERIOD X Jan -June July -Dec
COUNTY Rowan or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E. ISCHARGING TO CLASS ❑ORW ❑HQW OTrout ❑PNA
LABORATORY: K & W Laboratories Lab Cert. # 559 R EC E I Vii�/ E lf []Zero -flow ❑Water Supply USA
Comments on sample collection or analysis: MAY 2 0 2016 X Other: C
olon
MME-=
(. NTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR-'3 4
DWR SECTION
Part A: Stormwater Benchmarks and Monitoring Results
[] No discharge this period?Z
Outfall No_
Date Sample
1
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
dtal Toxic
�+' S
ganics
Benchmarks =__>
_
-
100 mg/L or 50 mg/L
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
mg/L
001
03/13/16
0.2
<3.1
6.34
<0.005
<0.005
<0.005
< 6.0
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfail.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for Tf0 monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit' For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(Tf0), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample valve in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Non -polar O&G/TPH by
EPA 1654 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXC€EDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one ropy of this DMi, including all "No Discharge" r_ports, within 30 days of receiet of the lab results (or at end of monitoring period
in the case of "No Discham" reports) to.
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
[Signature of
(Date)
Permit Date: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted L/q / L L
—T— 9
CERTIFICATE OF COVERAGE NO. NCG030195
FACILITY NAME: W. A. Brown, Inc.
COUNTY Rowan
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E.
LABORATORY: K & W Laboratories Lab Cert. # 559
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR: 2015
SAMPLE PERIOD Jan -June X July -Dec
or ❑ Monthly; (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
RECEIVED ❑Zero -flow ❑Water Supply ❑SA
X Other: C
FEB .98 2016
CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
DWR SECTION
❑ No discharge this period?2
Outfall No.
Date Sample
i
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
pH,
Standard units
Copper
-
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
5
Drganics
Benchmarks ===>
-
-
100:mg/L or 50 mg/0
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
001
11/30/15
0.8
<3.6
6.65
<0.005
<0.005
0.006
< 5.9
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 swu-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
0--
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX m-g/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No discharge this period?Z
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks =__>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: if you report a sample value in excess of the benchmark, you must implement rer 1, Tier 1, or Tier 3 responses. See General Permit text.
.FOR F;eRTAAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central File$
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:11/1/2012-10/31/2017
(Date)
SWU-245, last revised 10/25/2012
Page 3of3
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 3 -3 r - i y
CERTIFICATE OF COVERAGE NO. NCG030195
FACILITY NAME: W. A. Brown, Inc.
COUNTY Rowan
PERSON COLLECTING SAMPLES: J. Thurman Horne, P.E.
LABORATORY: K & W Laboratories Lab Cert. # 559
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and, Monitoring Results
SAMPLE COLLECTION YEAR: 2014
SAMPLE PERIOD X Jan -June ❑ July -Dec
or ❑ Monthly' (monthl
DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑PNA
❑Zero -flow (]Water Supply ❑SA
X Other: C
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -)
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected'
(moJdd/yr)
24-hour rainfall
amount,
Inches;
Total Suspended Solids
PH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks =__>
_
-
100 mg/L or 50 mg/L
6.0 - 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
001
03/03/14
0.2
it
6.82
0.02
0.006
0.156
< 5.6
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
" See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
RECEIVED
APR 0 4 2014
Permit Date:11/1/2012-10/31/2017 G WO/TRA�OG , FIL13ES
DSWU-245, last revised 10/25/2012
WQI
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: '
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
(Signature)
(Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Ter 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfalk No.
Date Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
s
Inches
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
-
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text
FOR PART A AND PART B MONITORING. RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER i REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION i3_
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one My oL this DMR includin all "No Discharge" reports within 30 dayso receipt v the fah results or at end o monitoringeriod
in the case of "No Dischame" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
" I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
re of Permitteej
(Date) }
Permit Date: 11/1/2012-10/31/2017 5WU-245, last revised 10/2S/2012
Page 3 of 3