HomeMy WebLinkAbout20181250 Ver 2_DCM Permit_20190913 (2)Permit Class
MODIFICATION/MINOR
Permit Number
137-13
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
t ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. _Department of Transportation,113 Airport Drive, Suite 100, Edenton, NC 27932
Authorizing development in Dare County at Ocean Outfall 47 at milepost 21.4. South Old
Oregon Inlet Road, Snort Nags HP d, as requested in the permittee's application letter dated 8/16/19, including the
attached workplan drawings 2 dated 8/8/19 & AEC Hazard Notice dated 10/11/18.
This permit, issued on 2113/19 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1 } Unless specifically altered herein, this Minor Modification authorizes the following changes to the
previous Minor Modification that was issued on 11/6/18: increase the length of the existing damaged
pipe that is authorized to be replaced to a total of 221 linear feet, increase the width of the trestle and
cofferdam to approximately 75 feet, and add two permanent 15" timber piles on either side of the last
concrete collar to delineate the end of the ocean outfall, all as depicted on the attached workplan
drawings.
NOTE: Based upon coordination with appropriate agencies, the activities authorized by this Minor
Modification are allowed to take place during the moratorium established in Condition No. 3
of the Minor Modification issued on 11/6/18. Any work in subsequent years shall adhere to
the full moratorium.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2021
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
. . IP/ - e=
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
N.C. Department of Transportation Permit No.137-13
Page 2 of 2
ADDITIONAL CONDITIONS
2) The National Park Service (NPS) issued Special Use Permit #USA19-5700-020 for the proposed
activities on 8/27/19. Nothing in this permit authorizes any activity that has not received approval from
NPS, if required, for work within the Cape Hatteras National Seashore.
3) If it is determined that additional permanent and/or temporary impacts are necessary that are not shown
on the attached workplan drawings or described in the authorization request, a permit modification
and/or additional authorization from DCM may be required. In addition, any changes in the approved
plan may also require a permit modification and/or additional authorization from DCM. The permittee
shall contact a representative of DCM prior to commencement of any such activity for this
determination and any permit modification.
4) The permittee and/or its contractor shall contact the DCM Transportation Project Field Representative in
Elizabeth City at (252) 264-3901 to request a pre -construction conference prior to project initiation.
5) This Minor Modification does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required. This includes approval, if required, from the U.S. Army Corps of
Engineers (USACE) and the N.C. Division of Water Resources (DWR).
6) This Minor Modification shall be attached to the original of Permit No. 137-13, which was issued on
12/20/13, as well as the amendment issued on 3/28/14, and all subsequent modifications, letters of
refinement and renewals, and copies of all documents shall be readily available on site when a Division
representative inspects the project for compliance.
7) All conditions and stipulations of the active permit remain in force under this Minor Modification unless
altered herein.
NOTE: A minor modification application processing fee of $100 was received by DCM for this project.