Loading...
HomeMy WebLinkAboutNCS000250_NCDOT Columbus Co Construction Inspection_20190827Wilmington Regional Office Site Inspections for 2019 NCDOT MS4 Audit Permit No. NCS000250 Audit ID Number: Inspection Date(s):� NCS000250_NCDOT MS4 Audit_2019 08/27/2019 Field Site Visits: ® Municipal Facilities. Number visited: Choose an item. ❑ MS4 Outfalls. Number visited: Choose an item. ® Construction Sites. Number visited: 1 ❑ Post -Construction Stormwater Runoff Controls. Number visited: Choose an item. ❑ Other: . Number visited: Choose an item. ❑ Other: . Number visited: Choose an item. �z� ��: � E I} �' "'i -� s. - - i f drw > ,. s �i!-r.,f.=•• z--. Brian Lambe, Environmental Specialist DEMLR Taylor Young, Assistant Sediment Specialist DEMLR Inspection Report Brian Lamb _ Date: 09/03/2019 _� Signature Inspec on R p th r: Date Signature Blythe Jordan, Resident Engineer I NCDOT Jason Johnson, Assistant Resident Engineer I NCDOT Site/Project Name: Date and Time of Site Visit: R-5749 Interchange at US74/76 and SR1001 Hallsboro Rd 08/27/2019 9:30 Columbus County Site/Project Address: Operator: BMCO CONSTRUCTION, INC. 210 Hallsboro Road South Hallsboro, NC Project Type (Commercial, Industrial, Residential, CIP, Roadway, etc.): Roadway NCG Permit ID Number: Disturbed Acreage: Recent Enforcement Actions (Include Date): None Name of MS4lnspector(s) evaluated: Jason Johnson, Assistant Resident Engineer; Blythe Jordan, Resident Engineer l�me(s) andTttle�s��SRe;Repralhr�s)'Presattt puritgtheSftB.Vlsit: Name Title Jerry Yarborough, NCDOT Roadside; Jason Bullard, NCDOT Roadside; Ben DeWitt, REU Sit@DOCatll�ritBtiM1/TI`eitliitg. _ - - Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific? Yes. Site follows NC DOT procedures for erosion control and NCGO10000. Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions? Yes, the erosion control plans are onsite. They are continually updated with minor changes and repairs. What type of stormwater training do site employees receive? How often? Site is inspected by NC DWR/DOT inspectors monthly. Ms. Jo Anne Steinhaus of DWR and Mr. Jerry Yarborough have been instrumental in conveying information on new requirements of the NCGO10000 to the contractors. Inspector Tralinfng/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Inspector is NC DOT certified, amongst other qualifications. Did the MS4 inspector appear knowledgeable about MS4 and NCGO10000 requirements for construction sites? Yes. Discussed concrete washout issues and the ongoing problem of trucks washing out in random locations. Discussed forms and rain gauge documentation. Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/storm water pollution prevention BMPs? Yes. The inspector exhibited knowledge of erosion control techniques. Many of the issues with this site were early during the project prior to swales and stormwater control measures were installed. Those issues were dealt with promptly and expertly. During inspection, a crew was removing a small amount of sediment from the highway side swale(401/404) by hand. Does the MS4 inspectors process include the use of a checklist? Yes. Does the MS4 inspectors process include taking photos? Did not ask. Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)? Yes. Does the MS4 inspectors process include walking the entire site and inspecting all points of discharge? Yes. Did the MS4 inspector miss any obvious violations? If so, explain: No. Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Yes. Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact? Yes, evident during concrete washout and secondary containment discussion. G1mRq, j1t , What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? Site is generally in compliance with no outstanding issues other than general maintenance. If compliance issues were identified, what timeline for correction/follow-up was provided? NA MOOS/oft"beryW91*00inendatfons