HomeMy WebLinkAboutNCS000410_FINAL PERMIT_20170227STORMWATER DIVISION CODING SHEET
M54 PERMITS
PERMIT NO.
ffc� 0 U
DOC TYPE
VFINAL PERMIT
❑ ANNUAL REPORT
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
❑ d'� I 1 � aa'1
YYYYMMDD
Energy, Mineral &
Land Resources
ENVIRONMENTAL QUALITY
February 27, 2017
Scott Buffkin, Village Manager,
Village of Clemmons
3715 Clemmons Road
Clemmons, NC 27012
Subject: NPDES Permit Number NCS000410
Village of Clemmons
Dear Mr. Buffkin:
ROY COOPER
Governor
MICHAEL S. REGAN
SecrPlary
TRACY DAVIS
Director
RECEIVED
ftB is
CENTR AL FILES
DWR S CTIOI l
We are forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the
requirements of North Carolina General Statute 143-215 .l and the Memorandum of Agreement between
North Carolina and the US Environmental Protection agency dated May 9, 1994 (or as subsequently
amended).
If any parts contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing
upon written request within thirty (30) days following receipt of this letter. This request must be in the
form of a written petition, confonning to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611 -
7447. Unless such demand is made, this decision shall be final and binding. This permit does not affect
the legal requirements to obtain other permits which may be required by the other State, Federal or Local
Agency.
If you have any questions concerning this permit, please contact Mike Randall at telephone number 919-
807-6374 or mike.randall a,ncdenr.gov.
Sincerely
>7—�a �-
for Tracy E. Davis, P.E., CPM
Division of Energy, Mineral, and Land Natural Resources
cc: Mike Mitchell, EPA Region IV
Central Files
ec: Stormwater Permitting Files
DEQ Regional Office
Attachment
Nothing Compares---.—
SState of North Carolina I Environmental Quality I Energy, Minerml and land Resources
512 N. Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
919 707 9200
STATE of NORTH CAROLINA
DEPARTMENT of ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
PERMIT NO. NCS000410
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
the Village ofClemmons
is hereby authorized to discharge stormwater from their municipal separate storm sewer system located:
within the Village of Clemmons corporate limits
to receiving waters Yadkin River, Ingram's Branch, Blanket Creek, Lasater Lake, Johnson Creek, Muddy
Creek, and unnamed tributaries to them, all within the Yadkin -Pee Dee River Basin in accordance with
the discharge limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V,
VI, VII and VIII hereof.
This permit shall become effective February 20, 2017.
This permit and the authorization to discharge shall expire at midnight on February 19, 2022.
Signed this day February 20, 2017.
for Tracy E. Davis, P.E., CPM
Division of Energy, Mineral, and Land Natural Resources
By the Authority of the Environmental Management Commission
PERMIT NO. NCS000410
TABLE OF CONTENTS
PART I PERMIT COVERAGE
PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES
SECTION A: PROGRAM IMPLEMENTATION
SECTION B: PUBLIC EDUCATION AND OUTREACH
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE)
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS
SECTION F: POST -CONSTRUCTION SITE RUNOFF CONTROLS
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR MUNICIPAL
OPERATIONS
SECTION H: TOTAL MAXIMUM DAILY LOADS (TMDI.S)
SECTION I: ELECTRONIC REPORTING OF REPORTS [G.S. 143-215.1(b)]
PART III PROGRAM ASSESSMENT
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS
PART V STANDARD CONDITIONS
SECTION A: COMPLIANCE AND LIABILITY
SECTION B: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
SECTION C: INSPECTION, ENTRY AND AVAILABILITY OF REPORTS
PART VI LIMITATIONS REOPENER
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VIII DEFINITIONS
0
PERMIT NO. NCS000410
PART I PERMIT COVERAGE
A. During the period beginning; on the effective date of the permit and lasting until expiration, the
Village of Clemmons is authorized to discharge stormwater from the municipal separate storm
sewer system (MS4) to receiving waters Yadkin River, Ingram's Branch, Blanket Creek, Lasater
Lake, Johnson Creek, Muddy Creek, and unnamed tributaries to them, all within the Yadkin -Pee
Dee River Basin. Such discharge will be controlled, limited and monitored in accordance with
the permittee's Stormwater Quality Management Program, herein referred to as the Stormwater
Plan. The Stormwater Plan shall detail the permittee's stor nwater management program for the
five-year term of the stormwater permit including, for each measure identified in the permit, a
narrative description of the program, a table that identifies each best management practice (BMP)
used, the frequency of the BMP, the measurable goals for each BMP, the implementation
schedule, funding and the responsible person or position for implementation.
B. All discharges authorized herein shall be managed in accordance with the terms and conditions of
this permit. Any other point source discharge to surface waters of the state is prohibited unless it
is an allowable non-stormwater discharge or is covered by another permit, authorization, or
approval.
C. This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
D. This permit covers activities associated with the discharge of stormwater from the MS4 owned
and operated by the permittee within the corporate limits of the permittee. The permit applies to
the corporate limits of the permittee, as well as areas that seek coverage under this permit through
inter -local or other similar agreements with permittee. Agreements for coverage under this
permit shall be approved by the Division of Energy, Mineral, and Land Resources, herein referred
to as the Division.
E. The Division may deny or revoke coverage under this permit for separate entities and require
independent permit coverage as deemed necessary. In addition, the permittee may petition the
Division to revoke or deny coverage under this permit for specific entities.
F. All provisions contained and referenced in the Stormwater Plan along with all provisions and
approved modifications of the Stormwater Plan are incorporated by reference and are enforceable
parts of this permit.
G. The permit requires the proper implementation of the Stormwater Plan. To the extent allowable
under State and local law, the permittee must develop and implement a Stormwater Plan in
accordance with Section 402(p)(3)(B)(iii) of the Clean Water Act. The purpose of the
Stormwater Plan is to establish the means by which the permittee will describe how it is in
compliance with the permit and with the provisions of the Clean Water Act. Compliance with the
six minimum measures in 40 CFR § 122.34(b) and with the requirements of this permit constitute
compliance with the Clean Water Act to reduce the discharge of pollutants from the MS4 to the
maximum extent practicable, to protect water quality, and to satisfy the applicable water quality
requirements of the Clean Water Act. Implementation of best management practices consistent
with the provisions of the Stormwater Plan constitutes compliance with the standard of reducing
pollutants to the maximum extent practicable.
Part I Page 1 of 2
PERMIT NO. WkO0410
H. The permit authorizes the point source discharge of stormwater runoff from the MS4. In
addition, discharges of non-stormwater are also authorized through the MS4 of the permittee if
such discharges are:
1. Permitted by and in compliance with another permit, authorization, or approval, including
discharges of process and non -process wastewater, and stormwater associated with
industrial activity; or
2. Determined to be incidental non-stormwater flows that do not significantly impact water
quality and may include:
• water line and fire hydrant flushing;
• landscape irrigation;
• diverted stream flows;
• rising groundwater;
• uncontaminated groundwater infiltration;
• uncontaminated pumped groundwater;
• discharges from uncontaminated potable water sources;
• foundation drains;
• air conditioning condensate (commercial/residential);
• irrigation waters;
• springs;
• water from crawl space pumps;
• footing drains;
• lawn watering;
• residential and charity car washing;
• flows from riparian habitats and wetlands;
• dechlorinated swimming pool discharges;
• street wash water;
• flows from firefighting activities.
3. The Division may require that non-stormwater flows of this type be controlled by
the permittee's Stormwater Plan.
I. Unless otherwise stated, full compliance with the requirements of the permit is expected upon the
effective date of the permit.
Part I Page 2 of 2
PERMIT NO. NCS000410
PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES
(,yDL�71�U]isI:A�:ifZ!]:�►5■1u1�■�lu'1�1►YItnIY[U►1
The permittee will implement, manage and oversee all provisions of its Stormwater Plan to control to the
maximum extent practical the discharge of pollutants from its municipal storm sewer system associated
with stormwater runoff and illicit discharges, including spills and illegal dumping. The overall program
implementation however, will be subject to, at a minimum, either 1) an annual review by the Division to
determine implementation status and progression toward meeting the pollutant control intent of the
Stormwater Plan, i.e., a compliance audit, or 2) a voluntary assessment process as established by the
Stormwater Association of North Carolina (SWANC), NC APWA and their partners that is at least as
stringent as the annual review described herein. Voluntary assessments may be conducted by the local
government, another local government with and NPDES MS4 permit, or an independent third party and
shall be reviewed and approved by the Division. This includes, but is not limited to, the following areas:
The permittee will maintain adequate funding and staffing to implement and manage the
provisions of the Stormwater Plan and meet all requirements of this permit. The Stormwater Plan
shall identify a specific position(s) responsible for the overall coordination, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented and
position(s) assignments provided.
2. The permittee will implement provisions of the Stormwater Plan and evaluate the perfonnance
and effectiveness of the program components at least annually. Results will be used by the
permittee to modify the program components as necessary to accomplish the intent of the
Stormwater Program. If the permittee implements the six minimum control measures and the
discharges are determined to cause or contribute to non -attainment of an applicable water quality
standard, to address the non -attainment, the permittee shall expand or better tailor its BMPs
within the scope of the six minimum control measures.
The permittee is required to keep the Stormwater Plan up to date. Where the permittee determines
or is informed by the Division that modifications are needed to address any procedural, protocol,
or programmatic change, such changes shall be made as soon as practicable, but not later than 90
days, unless an extension is approved by the Division. When it notifies the Division of proposed
modifications, the permittee will include an explanation and justification of the proposed changes.
The permittee shall provide at least 30 days for the Division to provide feedback on proposed
modifications. Major modifications to the Stormwater Plan shall not take effect until approved by
be submitted to the Director for approval.
4. The permittee is required to make available its Stormwater Plan to the Division upon request. The
permittee is required to keep an up-to-date version of its Stormwater Plan available to the
Division and the public online. At a minimum, the permittee The online materials shall include
ordinances, or other regulatory mechanisms, or a list identifying the ordinances, or other
regulatory mechanisms, providing the legal authority necessary to implement and enforce the
requirements of the permit.
5. The Division may review reports submitted by the permittee to assure that the
Stormwater Plan is implemented appropriately to address the requirements of the permit.
The Division may require modifications to any part of the permittee's Stormwater Plan
where deficiencies are found. If modifications to the Stormwater Plan are necessary, the
Division will notify the permittee of the need to modify the Stormwater Plan to be
Part 11 Page 1 of 15
PERMIT NO. NCS000410
consistent with the permit and will establish a deadline to finalize such changes to the
program.
6. Pursuant to 40 CFR 122,35, an operator of a regulated small MS4 may share the responsibility to
implement the minimum control measures with other entities provided:
a. The other entity, in fact, implements the control measure;
b. The particular control measure, or component thereof, is at least as stringent as the
corresponding NPDES permit requirement; and
C. The other entity agrees to implements the control measure on behalf of the MS4.
Unless implemented by the State or where delegated by the state, the permittee remains
responsible for compliance if the other entity fails to perform the permit obligation and
may be subject to enforcement action if neither the permittee nor the other entity fully
performs the permit obligation.
7. The Permittee shall maintain, and make available to the Division upon request, written
procedures for implementing the six minimum control measures. Written procedures shall
identify specific action steps, schedules, resources and responsibilities for implementing the six
minimum measures. Written procedures can be free standing, or where appropriate, integrated
into the Storm Water Management Plan.
Part II Page 2 of 15
PERM IT NO. NCS000410
SECTION B: PUBLIC EDUCATION AND OUTREACH
Objectives for Public Education and Outreach
Distribute educational materials to the community or conduct equivalent outreach
activities about the impacts of storm water discharges on water bodies and the steps that
the public can take to reduce pollutants in storm water runoff.
2. BMPs for Public Education and Outreach
The permittee shall implement the following BMPs to meet the objectives of the Public Education
and Outreach Program and shall notify the Division prior to modification of any goals.
BMP
Measurable Goals
a. Goals and Objectives
Defined goals and objectives of the Local Public Education and
Outreach Program based on community wide issues.
b. Describe target pollutants
The permittee shall maintain a description of the target
and/or stressors
pollutants and/or stressors and likely sources.
c. Describe target audiences
The permittee shall identify, assess annually and update as
necessary target audiences likely to have significant storm water
impacts and why they were selected.
d. Describe residential and
The permittee shall describe issues, such as pollutants, likely
industrial/commercial issues
sources of those pollutants, impacts, and the physical attributes
of stormwater runoff in their education/outreach program.
e. Informational Web Site
The pennittee shall promote and maintain, assess and update as
necessary internet web site designed to convey the program's
message.
f. Distribute public education
The permittee shall distribute stormwater educational material to
materials to identified target
appropriate target groups. Instead of developing its own
audiences and user groups. For
materials, the permittee may rely on Public Education and
example, schools, homeowners,
Outreach materials supplied by the state, and/or other entities
and/or businesses.
through a cooperative agreement, as available, when
implementing its own program.
g. Maintain I-iotline/Help line
The permittee shall promote and maintain a stormwater
hotline/helpline for the purpose of public education and
outreach.
h. Implement a Public Education
The permittee's outreach program, including those elements
and Outreach Program.
implemented locally or through a cooperative agreement, shall
include a combination of approaches designed to reach the target
audiences. For each media, event or activity, including those
elements implemented locally or through a cooperative
agreement the permittee shall estimate and record the extent of
exposure.
Part 11 Page 3 of 15
PERMIT NO. NCS000410
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION
1. Objectives for Public Involvement and Participation
Comply with State and local public notice requirements when implementing a public involvement
and participation program.
2. BMPs for Public Involvement and Participation
The permittee shall implement the following BMPs to meet the objectives of the Public
Involvement and Participation Program and shall notify the Division prior to modification of any
goals.
BMP
Measurable Goals
a. Volunteer community
The permittee shall include and promote volunteer opportunities
involvement program
designed to promote ongoing citizen participation.
b. Mechanism for Public
The permittee shall provide and promote a mechanism for public
involvement
involvement that provides for input on stormwater issues and the
stormwater program.
c. Hotline/Help line
The permittee shall promote and maintain a hotline/helpline for
the purpose of public involvement and participation.
Part II Page 4 of 15
PERMIT NO. NCS000410
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION (1DDE)
1. Objectives for Illicit Discharge Detection and Elimination
a. Implement and enforce a program to address the detection and elimination of illicit
discharges into the MS4,
b. Maintain a storm sewer system map, showing the location of all major outfalls and the
names and location of all waters of the United States that receive discharges from those
outfalls;
c. Prohibit, through ordinance, or other regulatory mechanism, non -storm water discharges
except as allowed in this permit and implement appropriate enforcement procedures and
actions;
d. Implement a plan to detect and address non -storm water discharges, including illegal
dumping, to the MS4;
e. Inform public employees, businesses, and the general public of hazards associated with
illegal discharges and improper disposal of waste; and
f. Address the following categories of non -storm water discharges or flows (i.e., illicit
discharges) only if you identify them as significant contributors of pollutants to the MS4:
water line flushing, landscape irrigation, diverted stream flows, rising ground waters,
uncontaminated ground water infiltration, uncontaminated pumped ground water,
discharges from potable water sources, foundation drains, air conditioning condensation,
irrigation water, springs, water from crawl space pumps, footing drains, lawn watering,
individual residential car washing, charity car washes, flows from riparian habitats and
wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or
flows from firefighting activities are excluded from the effective prohibition against non -
storm water and need only be addressed where they are identified as significant sources
of pollutants to waters of the United States).
BMPs for Illicit Discharge Detection and Elimination
The permittee shall implement the following BMPs to meet the objectives of the Illicit Discharge
Detection and Elimination Program and shall notify the Division prior to modification of any
goals.
BMP
Measurable Goals
a. Maintain an Illicit Discharge
Maintain a written Illicit Discharge Detection and Elimination
Detection and Elimination
Program, including provisions for program assessment and
Program
evaluation and integrating program.
b. Maintain adequate legal authorities
The perrnittee shall maintain an IDDE ordinances or other
regulatory mechanisms that provides the legal authority to
prohibit illicit connections and discharges.
c. Maintain a Storm Sewer System
The permittee shall maintain a current a map showing major
Map of Major Outfalls.
outfalls and receiving streams.
d. Implement a program to detect dry
The permittee shall maintain a program for conducting dry
weather flows
weather flow field observations in accordance with written
procedures.
Part 11 Page 5 of 15
PERMIT NO. NC8000410
BMP
-Measurable Goals
C. Investigate sources of identified
The permittee shall maintain written procedures for
illicit discharges.
conducting investigations of identified illicit discharges.
f. Track and document investigations
For each case the permittee shall track and document 1) the
illicit discharges
date(s) the illicit discharge was observed; 2) the results of the
investigation; 3) any follow-up of the investigation; and 4) the
date the investigation was closed.
g. Provide Employee Training
The permittee shall implement and document a training
program for appropriate municipal staff, who as part of their
normal job responsibilities, may come into contact with or
otherwise observe an illicit discharge or illicit connection.
h. Provide Public Education
The permittee shall inform public employees, businesses, and
the general public of hazards associated with illegal discharges
and improper disposal of waste.
i. Provide a public reporting
The permittee shall promote, publicize, and facilitate a
mechanism
reporting mechanism for the public and staff to report illicit
discharges and establish and implement citizen request
response procedures.
j. Enforcement of the IDDE
The permittee shall implement a mechanism to track the
ordinance
issuance of notices of violation and enforcement actions as
administered by the permittee. This mechanism shall include
the ability to identify chronic violators for initiation of actions
to reduce noncompliance.
Part II Page 6 of 15
PERMIT NO. NCS000410
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS
Pursuant to 40 CFR 122.35(b), the permittee may rely on the Winston-Salem/Forsyth County
Sediment and Erosion Control Program to comply with this minimum measure. The Winston-
Salem/Forsyth County Sediment and Erosion Control Program effectively meets the maximum extent
practicable (MEP) standard for Construction Site Runoff Controls by permitting and controlling
development activities disturbing one or more acres of land surface and those activities less than one
acre that are part of a larger common plan of development as authorized under the Sediment Pollution
Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code. The
Winston-Salem/Forsyth County Sediment and Erosion Control Program continues to be monitored by
the State to ensure the County effectively meets the MEP standard established by the Sediment
Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code.
The NCGO1 0000 permit, as administered by the State, establishes requirements for construction site
operators to control waste such as discarded building materials, concrete truck washout, chemicals,
litter, and sanitary waste at the construction site that may cause adverse impacts to water quality.
The permittee shall provide and promote a means for the public to notify the appropriate authorities
of observed erosion and sedimentation problems. The permittee may implement a plan promoting the
existence of the North Carolina Department of Environmental Quality (NCDEQ or DEQ), Division of
Energy, Mineral, and Land Resources "Stop Mud" hotline to meet the requirements of this paragraph.
Part II Page 7 of 15
PERMIT NO. NCS000416
SECTION F: POST -CONSTRUCTION SITE RUNOFF CONTROLS
1. Objectives for Post -Construction Site Runoff Controls
a. Implement and enforce a program to address storm water runoff from new development
and redevelopment projects that disturb greater than or equal to one acre, including
projects less than one acre that are part of a larger common plan of development or sale,
that discharge into the small MS4. The program shall ensure that controls are in place that
would prevent or minimize water quality impacts.
b. Implement strategies which include a combination of structural and/or non-structural best
management practices (BMPs) appropriate for the community;
C. Use an ordinance or other regulatory mechanism to address post -construction runoff from
new development and redevelopment projects; and
d. Ensure adequate long-term operation and maintenance of BMPs.
2. BMPs for Post -Construction Site Runoff Controls
The permittee shall implement the following BMPs to meet the objectives of the Post -
Construction Stormwater Management Program. To the extent there is any conflict between this
permit and the post -construction ordinances adopted by the permittee as approved by the
Division, the post -construction ordinances shall apply with regard to permit compliance.
BM.P Measurable Goals
a. Adequate legal authorities Maintain through ordinance, or other regulatory mechanism,
adequate legal authorities designed to meet the objectives of
the Post -Construction Site Runoff Controls Stormwater
Management program.
The permittce shall have the authority to review designs and
proposals for new development and redevelopment to
determine whether adequate stormwater control measures
will be installed, implemented, and maintained.
The permittee shall have the authority to request information
such as stormwater plans, inspection reports, monitoring
results, and other information deemed necessary to evaluate
compliance with the Post -Construction Stormwater
Management Program.
The permittee shall have the authority to enter private
property for the purpose of inspecting at reasonable times any
facilities, equipment, practices, or operations related to
stormwater discharges to determine whether there is
compliance the Post -Construction Stormwater Management
Program.
Part 11 Page 8 of 15
PERMIT NO. NCS000410
BM.P
Measurable Goals
b. Strategies which include
Strategies which include Stormwater Control Measures
Stormwater Control Measures
(SCMs) appropriate for the MS4, include, but are not limited
(SCMs) appropriate for the MS4
to compliance with 15A NCAC 02H Section .1000
effectively meets the Post -construction Stormwater Runoff
control requirements.
c. Plan reviews
The permittee shall conduct site plan reviews of all new
development and redeveloped sites that disturb greater than
or equal to one acre (including sites that disturb less than one
acre that are part of a larger common plan of development or
sale). The site plan review shall address how the project
applicant meets the performance standards and how the
project will ensure long-term maintenance.
d. Inventory of projects with post-
The permittee shall maintain an inventory of projects with
construction structural stormwater
post -construction structural stormwater control measures
control measures
installed and implemented at new development and
redeveloped sites, including both public and private sector
sites located within the permittee's corporate limits that are
covered by its post -construction ordinance requirements.
e. Deed Restrictions and Protective
The permittee shall provide mechanisms such as recorded
Covenants
deed restrictions and protective covenants that ensure
development activities will maintain the project consistent
with approved plans.
f. Provide a mechanism to require
The permittee shall implement or require an operation and
long-term operation and
maintenance plan for the long-term operation of the SCMs
maintenance of Stormwater Control
required by the program. The operation and maintenance
Measures (SCMs).
plan shall require the owner of each SCM to perform and
maintain a record of annual inspections of each SCM.
Annual inspection of permitted structural SCMs shall be
performed by a qualified professional.
g. Inspections of Structural
To ensure that all stormwater control measures meet the
Stormwater Control Measures
permittee's performance standards and are being maintained
pursuant to the maintenance agreement, the permittee shall
develop and implement a written inspection program for
structural stormwater controls installed pursuant to the
permittee's post -construction program.
The permittee shall document and maintain records of
inspections, findings and enforcement actions and make them
available for review by the permitting authority.
Part 11 Page 9 of 15
PERMIT NO. NCS000410
BMP Measurable Goals
g. Educational materials and training The permittee shall make available through paper or
for developers electronic means, ordinances, post -construction
requirements, design standards checklist, and other materials
appropriate for developers. New materials may be
developed by the permittee, or the permittee may use
materials adopted from other programs and adapted to the
permittee's new development and redevelopment program.
h. Enforcement The permittee shall track the issuance of notices of violation
and enforcement actions. This mechanism shall include the
ability to identify chronic violators for initiation of actions to
reduce noncompliance.
3. Post -construction Stormwater Runoff Controls for New Development
a. In order to fulfill the post -construction minimum measure program requirement the
permittee may use the Department's model ordinance, design its own post -construction
practices that meet or exceed the rules found in 15A NCAC 02H 1000, or develop its
own comprehensive watershed plan that is determined by the Department to meet the
post -construction stormwater management measure required by 40 Code of Federal
Regulations § 122.34(b)(5) (1 July 2003 Edition).
b. The permittee shall meet the requirements of the post -construction program for
construction projects that are performed by, or under contract for, the permittec. To meet
this requirement, the permittee may either develop the necessary requirements for post -
construction controls that will pertain to their own projects, or develop procedures to
ensure that the permittee meets these requirements by complying with another entity's
Phase II Stormwater Management Programs for post -construction. If the permittee
decides to rely on another program for compliance with these program areas for their own
projects, they shall indicate in their Stormwater Management Program that the permittee
will fully comply with the requirements of the second party's post -construction programs.
Pursuant to 15A NCAC 02H .0150, for areas draining to Nutrient Sensitive Waters,
permittees, delegated programs, and regulated entities must use stormwater control
measures (SCMs) that reduce nutrient loading in order to meet local program
requirements, while still incorporating the stormwater controls required for the project's
density level. Documentation shall be provided where it is not feasible to use
stormwater control measures (SCMs) that reduce nutrient loading. In areas where the
Department has approved a Nutrient Sensitive Water Urban Stormwater Management
Program, the provisions of that program fulfill the nutrient loading reduction
requirement.
d. The design volume of SCMs shall take into account the runoff at build out from all
surfaces draining to the system. Where streets "convey" stormwater, all SCM shall be
sized to treat and control stormwater runoff from all surfaces draining to the SCM
including streets, driveways, and other impervious surfaces.
Part 11 Page 10 of 15
PERMIT NO. NCS000410
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR MUNICIPAL
OPERATIONS
1. Objective for Pollution Prevention and Good Housekeeping for Municipal Operations
Implement an operation and maintenance program that includes a training component and
has the ultimate goal of preventing or reducing pollutant runoff from municipal
operations.
b. Provide employee training to prevent and reduce storm water pollution from activities
such as park and open space maintenance, fleet and building maintenance, new
construction and land disturbances, and storm water system maintenance.
BMPs for the Pollution Prevention and Good Housekeeping for Municipal
Operations
The permittee shall implement the following BMPs to meet the objectives of the Pollution
Prevention and Good Housekeeping Program and shall notify the Division prior to modification
of any goals.
BMP
Measurable Goals
a. Inventory of municipally
The permittee shall maintain, a current inventory of facilities and
owned or operated facilities
operations owned and operated by the permittee with the potential
for generating polluted stormwater runoff.
b. Operation and Maintenance
The permittee shall maintain and implement, evaluate annually
(O&M) for municipally. owned
and update as necessary an Operation and Maintenance (O&M)
or operated facilities
program for municipal owned and operated facilities with the
potential for generating polluted stormwater runoff. The O&M
program shall specify the frequency of inspections and routine
maintenance requirements.
c. Spill Response Procedures for
The permittee shall have written spill response procedures for
municipally owned or operated
municipally owned or operated facilities.
facilities
d. Streets, roads, and public
The permittee shall evaluate existing and new BMPs annually that
parking lots maintenance
reduce polluted stormwater runoff from municipally -owned
streets, roads, and public parking lots within their corporate limits.
The permitte must evaluate the effectiveness of these BMPs based
on cost and the estimated quantity of pollutants removed.
f. Operation and Maintenance
The permittee shall maintain and implement an O&M program for
(O&M) for municipally -
the stormwater sewer system including catch basins and
owned or maintained catch
conveyance systems that it owns and maintains.
basins and conveyance systems
d. Identify municipally owned or
The permittee shall maintain a current inventory of municipally -
maintained structural
owned or operated structural stormwater controls installed for
stormwater controls
compliance with the permittee's post -construction ordinance.
Part I1 Page 11 of 15
PERMIT NO. NC5000410
BMP
Measurable Goals
e. O&M for municipally -owned
The permittee shall maintain and implement an O&M program for
or maintained structural
municipally -owned or maintained structural stormwater controls
stormwater controls
installed for compliance with the permittee's post -construction
ordinance.
The 0&M program shall specify the frequency of inspections and
routine maintenance requirements.
The permittee shall inspect and maintain municipally -owned or
maintained structural stormwater controls in accordance with the
schedule developed by permittee. The permittee shall document
inspections and maintenance of all municipally -owned or
maintained structural stormwater controls.
f. Pesticide, Herbicide and
The permittee shall ensure municipal employees and contractors
Fertilizer Application
are properly trained and all permits, certifications, and other
Management.
measures for applicators are followed.
g. Staff training
The permittee shall implement an employee training program for
employees involved in implementing pollution prevention and
good housekeeping practices.
h. Prevent or Minimize
The permittee shall describe and implement measures to prevent
Contamination of Stormwater
or minimize contamination of the stormwater runoff from all areas
Runoff from all areas used for
used for vehicle and equipment cleaning.
Vehicle and Equipment
Cleaning
Part lI Page 12 of 15
PERMIT NO. NCS000410
SECTION I: TOTAL MAXIMUM DAILY LOADS (TMDLs)
Objective of a Water Quality Recovery Program: Reduce levels of the pollutant of
concern in accordance with approved Waste Load Allocation (WLAs) assigned to
stormwater in an approved TMDL.
2. The Permittee shall comply with the requirements of an approved TMDL.
Within 12 months of the final approval of a TMDL, the permittee's annual reports shall
include a description of existing programs, controls, partnerships, projects, and strategies
to address impaired waters and a brief explanation as to how the programs, controls,
partnerships, projects and strategies address impaired waters.
Within 24 months of the final approval of a TMDL, the permittee's annual reports shall
include an assessment of whether additional structural and/or non-structural BMPs are
necessary to address impaired waters and a brief explanation as to how the programs,
controls, partnerships, projects and strategies address impaired waters.
Within 36 months of the final approval of a TMDL, the permittee's annual reports shall
include a description of activities expected to occur and when the activities arc expected
to occur.
6. If there was no storm water waste load allocation in the TMDL, in lieu of developing a
Water Quality Recovery Plan, the permittee shall evaluate strategies and tailor and/or
expand BMPs within the scope of the six minimum measures to enhance water quality
recovery strategies in the watershed(s) to which the TMDL applies. The permittee shall
describe the strategies and tailored and/or expanded BMPs in their Stormwater
Management Plan and annual reports.
Part 11 Page 13 of 15
PERMIT NO. NCS000416
SECTION I: ELECTRONIC REPORTING OF REPORTS 1G.S. 143-215.1(b)]
The final NPDES Electronic Reporting Rule was adopted and became effective on December 21,
2015. These federal regulations require electronic submittal of all MS4 program reports by no
later than December 21, 2020, and specify that, if a state does not establish a system to receive
such submittals, then permittees must submit monitoring data and reports electronically to the
U.S. Environmental Protection Agency (EPA).
2. This special condition supplements or supersedes the following sections within Part IV of this
permit (Reporting and Record Keeping Requirements):
• Paragraph 1. Records
• Paragraph 3. Annual Reporting
• Paragraph 8. Report Submittals
3. Reporting Requirements [Supersedes Part IV, Paragraph 3.(a.)-(b.)] Note depending on what
EPA request in annual e-reporting [Supersedes Part IV, Paragraph 3.(a.)]
Starting on December 21, 2020, the permittee shall electronically report the following compliance
monitoring data and reports: Separate Storm Sewer System (MS4) Program Reports (See Part III
2., Program Assessment annual report)
The permittee may seek an electronic reporting waiver from the Division (see "How to Request a
Waiver from Electronic Reporting" section below).
4. Electronic Submissions [Supplements Part IV, Paragraph 8.]
In accordance with 40 CFR 122.41(t)(9), the permittee must identify the initial recipient at the
time of each electronic submission. The permittee should use EPA's website resources to identify
the initial recipient for electronic submission.
Initial recipient of electronic NPDES information from NPDES-regulated facilities (initial
recipient) means the entity (EPA or the state, tribe, or territory authorized by EPA to implement
the NPDES program) that is the designated entity for receiving electronic NPDES data [see 40
CFR 127.2(b)]. As of permit issuance, The NC DEQ anticipates that EPA will be the initial
recipient for electronic MS4 Program Reports.
EPA plans to establish a website that will also link to the appropriate electronic reporting tool for
each type of electronic submission and for each state. Instructions on how to access and use the
appropriate electronic reporting tool will be available as well. Currently, Electronic Reporting
Rule information is found at: https://www.epa.54ov/compliance/final-national-pollutant-
discharge-elimination-system-npdes-electronic-reporting-rule
Electronic submissions must start by the dates listed in the "Reporting Requirements" section
above. The permittee must electronically submit MS4 annual program reports no later than the
15' of the month following the completed reporting period. The permittee must sign and certify
all electronic submissions in accordance with the requirements of Part IV, Paragraph 8. (c.) of this
permit.
Part 11 Page 14 of 15
PERMIT NO. NCS000410
How to Request a Waiver from Electronic Reporting
The permittee may seek a temporary electronic reporting waiver from the Division. To obtain an
electronic reporting waiver, a permittee must first submit an electronic reporting waiver request to
the Division. Requests for temporary electronic reporting waivers must be submitted in writing
to the Division for written approval at least sixty (60) days prior to the date the facility would be
required under this permit to begin submitting monitoring data and reports. The duration of a
temporary waiver shall not exceed 5 years and shall thereupon expire. At such time, monitoring
data and reports shall be submitted electronically to the Division unless the permittee re -applies
for and is granted a new temporary electronic reporting waiver by the Division. Approved
electronic reporting waivers are not transferrable. Only permittees with an approved reporting
waiver request may submit monitoring data and reports on paper to the Division for the period
that the approved reporting waiver request is effective.
Information on eDMR and the application for a temporary electronic reporting waiver are found
on the following web page:
littp://deg.nc.gov/about/divisions/water-resources/edinr
Records Retention [Supplements Part IV, Paragraph 1.]
The permittee shall retain records of all Program Assessment annual reports, including electronic
submissions. These records or copies shall be maintained for a period of at least 3 years from the
date of the report. This period may be extended by request of the Director at any time [40 CFR
122.41].
Part 11 Page 15 of 15
PERMITNO. NCS000410
PART Ill PROGRAM ASSESSMENT
The Division may request additional reporting and monitoring information as necessary to evaluate the
progress and results of the Permittee's Stormwater Plan.
A. Implementation of the Stormwater Plan will include documentation of all program components
that are being undertaken including, but not limited to, inspections, maintenance activities,
educational programs, implementation of BMPs, enforcement actions, and other stonnwater
activities. Documentation will be kept on -file by the permittee for a period of five years and
made available to the Director or his authorized representative upon request.
B. The permittee's Stormwater Plan will be reviewed and updated as necessary, but at least on an
annual basis to identify modifications and improvements needed to maximize Stormwater Plan
effectiveness to the maximum extent practicable. The permittee shall develop and implement a
plan and schedule to address the identified modifications and improvements. The permittee must
submit annual reports to the Department within fifteen months from the effective date of this
permit. Subsequent annual reports must be submitted every twelve months from the scheduled
date of the first submittal. Annual reports that include appropriate information to accurately
describe the progress, status, and results of the permittee's Stormwater Plan and will include, but
is not limited to, the following components:
1. The permittee will give a detailed description of the status of implementation of the
Stormwater Plan as a whole. This will include information on development and
implementation of each major component of the Stormwater Plan for the past year and
schedules and plans for the year following each report.
2. The permittee will adequately describe and justify any proposed changes to the
Stormwater Plan. This will include descriptions and supporting information for the
proposed changes and how these changes will impact the Stormwater Plan (results,
effectiveness, implementation schedule, etc.).
3. The permittee will document any necessary changes to programs or practices for
assessment of management measures implemented through the Stormwater Plan.
4. The permittee will include a summary of data accumulated as part of the Stormwater Plan
throughout the year along with an assessment of what the data indicates in light of the
Stormwater Plan.
5. The annual report shall include an assessment of compliance with the permit, information
on the establishment of appropriate legal authorities, inspections, and enforcement
actions.
C. The Director may notify the permittee when the Stormwater Plan does not meet one or more of
the requirements of the permit. Within 90 days of such notice, the permittee will submit a plan
and time schedule to the Director for modifying the Stormwater Plan to meet the requirements.
The Director may approve the plan, approve a plan with modifications, or reject the proposed
plan. The permittee will provide certification in writing in accordance with Part IV, Paragraph 7
(c) to the Director that the changes have been made. Nothing in this paragraph shall be construed
to limit the Director's ability to conduct enforcement actions for violations of this permit.
D. The Division may request additional reporting information as necessary to evaluate the progress
and results of the permittee's Stormwater Plan.
Part III Page 1 of 1
PERMIT NO. NCS000410
e
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS
A. Records
The permittee shall retain records of all monitoring information, including all calibration and
maintenance records and copies of all reports required by this permit, for a period of at least 5
years from the date of the sample, measurement, report or application. This period may be
extended by request of the Director.
B. Annual Reporting
The permittee will submit reporting and monitoring information on an annual basis. The
annual report shall document:
a. A summary of past year activities, including where available, specific quantities
achieved and summaries of enforcement actions.
b. A description of the effectiveness of each program component
C. Planned activities and changes for the next reporting period, for each program
component or activity.
d. Fiscal analysis.
2. Reports submitted to satisfy other State Stormwater Reporting requirements satisfy the
annual reporting requirements of this permit to the extent that the reports satisfy Part III,
paragraph B 1-5, Part IV, paragraph B 3 (c) and Part II Section 1, Electronic Reporting
[g.s. 143-215.1(b)] of this permit
3. Completion and submittal of the reporting information contained within the online BIMS
Stormwater Management Program Assessment (SMPA) satisfy Part 111, paragraph B 1-5,
Part IV, paragraph B 3 (c) and Part 11 Section I, Electronic Reporting [g.s. 143-215.1(b)]
of this permit through 2020.
4. Posting the results on the permittee website of the assessment process as established by
the Stormwater Association of North Carolina (SWANC), NC APWA and their partners
as conducted by another local government, a third party, or a self -assessment, satisfy Part
III, paragraph B 1-5, Part IV, paragraph B 3 (c) and Part II Section I, Electronic
Reporting [g.s. 143-215.1(b)] of this permit.
C. Twenty-four Hour Reporting
The permittee shall report to the Division any noncompliance that may constitute an imminent
threat to health or the environment. Any information shall be provided orally within 24 hours
from the time the permittec became aware of the circumstances. A written submission shall also
be provided within 5 days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes, the
period of noncompliance and if the noncompliance has not been corrected, the anticipated time
compliance is expected to continue, and steps taken or planned to reduce, eliminate, and prevent
reoccurrence of the noncompliance.
D. Additional Reporting
In order to properly characterize the permittee's MS4 discharges or to assess compliance with this
permit, the Director may request reporting information on a more frequent basis as deemed
Part IV Page 1 of 2
PERMIT NO. NCS000410
necessary either for specific portions of the permittee's Stormwater Plan, or for the entire
Program.
E. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts or submitted
incorrect information in a permit application or in any report to the Director, it shall promptly
submit such facts or information.
F. Planned Changes
The perrnittee shall notify the Director of any planned modifications to the Stormwater Plan.
Notice shall be given as soon as possible when deleting a provision of the approved Stormwater
Plan; or where the modification could significantly change the timeframe for implementation of
parts of the program or negatively influence the effectiveness of the approved program. Notice of
any changes is required at least through the annual report.
G. Report Submittals
All reports required herein, not submitted electronically shall be submitted to the
following address:
Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
All applications, reports, or information, other than those submitted electronically, shall
be signed by a principal executive officer, ranking elected official or duly authorized
representative. A person is a duly authorized representative only if
a. The authorization is made in writing by a principal executive officer or ranking
elected official;
b. The authorization specified either an individual or a position having
responsibility for the overall operation of a regulated facility or activity or an
individual or position having overall responsibility for environmental/stormwater
matters; and
C. The written authorization is submitted to the Director.
Any person signing a document under paragraphs (a) or (b) of this section shall make the
following certification:
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
Part IV Page 2 of 2
PERMIT NO. NCS000410
PART V STANDARD CONDITIONS
SECTION A: COMPLIANCE AND LIABILITY
1. Duty to Comply
The pernittee shall comply with all conditions of this permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit
termination, revocation and reissuance, or modification; or denial of permit coverage upon
renewal application.
The permittee shall comply with standards or prohibitions established under Section
307(a) of the Clean Water Act for toxic pollutants within the time provided in the
regulations that establish these standards or prohibitions, even if the permit has not yet
been modified to incorporate the requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject
to a civil penalty not to exceed the maximum amounts authorized by Section 309(d) of
the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note)
as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$37,500 per day for each violation). Any person who negligently violates any permit
condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment for not more than 1 year, or both. Any person who knowingly violates
permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of
violation, or imprisonment for not more than 3 years, or both. Also, any person who
violates a permit condition may be assessed an administrative penalty not to exceed
$16,000 per violation with the maximum amount not to exceed $137,500. [Ref: Section
309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).]
C. Under state law, a daily civil penalty of not more than twenty-five thousand dollars
($25,000) per violation may be assessed against any person who violates or fails to act in
accordance with the terms, conditions, or requirements of a permit. [Ref: North Carolina
General Statutes 143-215.6A]
Any person may be assessed an administrative penalty by the Administrator for violating
sections 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or
limitation implementing any of such sections in a permit issued under section 402 of this
Act. Pursuant to 40 CFR Part 19 and the Act, administrative penalties for Class I
violations are not to exceed the maximum amounts authorized by Section 309(g)(2)(A) of
the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note)
as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$11,000 per violation, with the maximum amount of any Class I penalty assessed not to
exceed $27,500). Pursuant to 40 CFR Part 19 and the Act, penalties for Class II violations
are not to exceed the maximum amounts authorized by Section 309(g)(2)(B) of the Act
and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note) as
amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$11,000 per day for each day during which the violation continues, with the maximum
amount of any Class II penalty not to exceed $177,500).
Part V Page 1 of 5
PERMIT NO. NCS000410
2. Duty to Mitigate
The permittee shall take reasonable steps to minimize or prevent any discharge in violation of this
permit that has a reasonable likelihood of adversely affecting human health or the environment.
3. Civil and Criminal Liability
Nothing in this permit shall be construed to relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6A, 143-215.613,
143-215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is
responsible for consequential damages, such as fish kills, even though the responsibility for
effective compliance may be temporarily suspended.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve
the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be
subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
Furthermore, the permittee is responsible for consequential damages, such as fish kills, even
though the responsibility for effective compliance may be temporarily suspended.
5. Property Rights
The issuance of this permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any
invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
6. Severability
The provisions of this permit are severable, and if any provision of this permit, or the application
of any provision of this permit to any circumstances, is held invalid, the application of such
provision to other circumstances, and the remainder of this permit, shall not be affected thereby.
7. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the
Director may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating the coverage issued pursuant to this permit or to determine compliance with this
permit. The permittee shall also furnish to the Director upon request, copies of records required
by this permit.
S. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders
inaccurate, any monitoring device or method required to be maintained under this permit shall,
upon conviction, be punished by a fine of not more than $10,000 per violation, or by
imprisonment for not more than two years per violation, or by both. If a conviction of a person is
for a violation committed after a first conviction of such person under this paragraph, punishment
is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4
years, or both.
Part V Page 2 of 5
PERMIT NO. NCS000410
9. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement,
representation, or certification in any record or other document submitted or required to be
maintained under this permit, including; monitoring reports or reports of compliance or
noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than two years per violation, or by both.
10. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a
request by the permittee for a permit modification, revocation and reissuance, or termination, or a
notification of planned changes or anticipated noncompliance does not stay any permit condition.
I]. Duty to Reapply
The permittee is not authorized to discharge after the expiration date. In order to receive
automatic authorization to discharge beyond the expiration date, the permittee shall submit a
permit renewal application and fees as are required no later than 180 days prior to the expiration
date of this permit. Any permittee that has not requested renewal at least 180 days prior to
expiration, or any discharge that does not have a permit after the expiration and has not requested
renewal at least 180 days prior to expiration, will be subject to enforcement procedures as
provided in NCGS 143-215.6 and 33 USC 1251 et seq. The renewal application shall include a
review of the Stormwater Program development and implementation over the life of this permit,
the status of programs and a description of further program development to be implemented over
the future permitting time period.
Part V Page 3 of 5
PERMIT NO. NCS000410
SECTION B: OPERATION AND MAINTENANCE of POLLUTION CONTROLS
1. Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are owned and/or operated by the
permittee to achieve compliance with the conditions of this permit. Proper operation and
maintenance also includes adequate laboratory controls and appropriate quality assurance
procedures, when necessary. This provision requires the operation of back-up or auxiliary
facilities or similar systems that are installed by a permittee only when the operation is necessary
to achieve compliance with the conditions of the permit.
2. Need to Halt or Reduce not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been
necessary to halt or reduce the permitted activity in order to maintain compliance with the
condition of this permit.
Part V Page 4 of 5
PERMIT NO. NCS000410
SECTION C: INSPECTION, ENTRY AND AVAILABILITY OF REPORTS
1. Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an authorized
contractor acting as a representative of the Director), or in the case of a facility which discharges
through a municipal separate storm sewer system, an authorized representative of a municipal
operator or the separate storm sewer system receiving the discharge, upon the presentation of
credentials and other documents as may be required by law, to;
a. Enter upon the permittee's premises where a regulated facility or activity is located or
conducted, or where records shall be kept under the conditions of this permit;
b. Have access to and copy, at reasonable times, any records of the permittee that shall be
kept under the conditions of this permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control
equipment), practices, or operations of the permittee regulated or required under this
permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or
as otherwise authorized by the Clean Water Act, any substances or parameters at any
location under the control of the permittee.
2. Availability of Reports
Except for data determined to be confidential under NCGS 1437215.3(a)(2) or Section 308 of the
Federal Act, 33 USC 1318, all reports prepared in accordance with the terms of this permit shall
be available for public inspection at the offices of the Division of Energy, Mineral, and Land
Resources. Knowingly making any false statement on any such report may result in the
imposition of criminal penalties as provided for in NCGS 143-215.613 or in Section 309 of the
Federal Act.
Part V Page 5 of 5
PERMIT NO. NCS000410
PART VI LIMITATIONS REOPENER
The issuance of this permit does not prohibit the Director from reopening and modifying the permit,
revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations
contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina
Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et. al.
Part VI Page 1 of i
PERMIT NO. NCS000410
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS
The permittee shall pay the administering and compliance monitoring fee within 30 (thirty) days after
being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H
.0105(b)(4) may cause this Division to initiate action to revolve the permit.
Part VII Page 1 of 1
PERMIT NO. NCS000410
PART Vlll DEFINITIONS
Act
See Clean Water Act.
2. Best Management Practice (BMP)
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs can
be structural or non-structural and may take the form of a process, activity, physical structure or
planning (see non-structural BMP).
3. Built -upon Area
"Built -upon area" or "BUA" has the same meaning as in G.S. 143-214.7.
4. Clean Water Act
The Federal Water Pollution Control Act, also known as. the Clean Water Act (CWA), as
amended, 33 USC 1251, et. seq.
5. Common Plan of Development
A construction or land disturbing activity is part of a larger common plan of development if it is
completed in one or more of the following ways:
• In separate stages
• In separate phases
• In combination with other construction activities
It is identified by the documentation (including but not limited to a sign, public notice or hearing,
sales pitch, advertisement, loan application, drawing, plats, blueprints, marketing plans, contracts,
permit application, zoning request, or computer design) or physical demarcation (including but
not limited to boundary signs, lot stakes, or surveyor markings) indicating that construction
activities may occur on a specific plot.
It can include one operator or many operators.
6. Department
Department means the North Carolina Department of Environmental Quality.
7. Division (DEMLR)
The Division of Energy, Mineral, and Land Resources, Department of Environmental Quality.
8. Director
The Director of the Division of Energy, Mineral, and Land Resources, the permit issuing
authority.
Part VIII Page 1 of 5
PERMIT NO. NCS000410
9. EMC
The North Carolina Environmental Management Commission.
10. Illicit Discharge
Any discharge to a MS4 that is not composed entirely of stormwater except discharges pursuant
to an NPDES permit (other than the NPDES MS4 permit), allowable non-stormwater discharges,
and discharges resulting from fire -fighting activities.
1 ] . Industrial Activity
For the purposes of this permit, industrial activities shall mean all industrial activities as defined
in 40 CFR 122.26.
12. Large or Medium Municipal Separate Storm Sewer System
All municipal separate storm sewers that are either:
(a) Located in an incorporated place with a population of 100,000 or more as determined by the
Decennial Census by the Bureau of Census; or
(b) Located in the counties with unincorporated urbanized populations of 100,000 or more,
except municipal separate storm sewers that are located in the incorporated places,
townships or towns within such counties; or
(c) Owned or operated by a municipality other than those described in paragraph (a) or (b) and
that are designated by the Director as part of the large or medium separate storm sewer
system.
13. Major municipal separate storm sewer outfall (or "major outfall")
Major municipal separate storm sewer outfall (or "major outfall") means a municipal separate
storm sewer outfall that discharges from a single pipe with an inside diameter of 36 inches or
more or its equivalent (discharge from a single conveyance other than circular pipe which is
associated with a drainage area of more than 50 acres); or for municipal separate storm sewers
that receive storm water from lands zoned for industrial activity (based on comprehensive zoning
plans or the equivalent), an outfall that discharges from a single pipe with an inside diameter of
12 inches or more or from its equivalent (discharge from other than a circular pipe associated
with a drainage area of 2 acres or more).
14. MEP
MEP is defined in the Federal Register (U.S. EPA, 1999, p. 68754). This document says
that "Compliance with the conditions of the general permit and the series of steps
associated with identification and implementation of the minimum control measures will
satisfy the MEP standard." Minimum control measures are defined in the Federal
Register as (1) public education and outreach, (2) public participation/involvement, (3)
illicit discharge detection and elimination, (4) construction site runoff control, (5) post -
construction runoff control, and (6) pollution prevention/good housekeeping.
Part VIII Page 2 of 5
PERMIT NO. NCS000410
15. Minimum Design Criteria (MDC)
"Minimum Design Criteria" or "MDC' means the requirements set forth in 15A NCAC 02H .1050
through 15A NCAC 02H .1062 for siting, site preparation, design and construction, and post -
construction monitoring and evaluation necessary for the Department to issue stormwater permits that
comply with State water quality standards adopted pursuant to G.S. 143-214.1.
16. Municipal Separate Storm Sewer System (MS4)
Pursuant to 40 CFR 122.26(b)(8) means a conveyance or system of conveyances (including roads
with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels,
or storm drains):
(a) Owned or operated by the United States, a State, city, town, county, district, association,
or other public body (created by or pursuant to State law) having jurisdiction over
disposal of sewage, industrial wastes, stormwater, or other wastes, including special
districts under State law such as a sewer district, flood control district or drainage district,
or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a
designated and approved management agency under Section 208 of the Clean Water Act
(CWA) that discharges to waters of the United States or waters of the State.
(b) Designed or used for collecting or conveying stormwater;
(c) Which is not a combined sewer; and
(d) Which is not part of a Publicly Owned Treatment Works (POTW) as defined in 40 CFR
122.2
17. Non-stormwater Discharge Categories
The following are categories of non-stormwater discharges that the permittee shall address if it
identifies them as significant contributors of pollutants to the storm sewer system: water line
flushing, landscape irrigation, diverted stream flows, rising groundwater, uncontaminated
groundwater infiltration, [as defined in 40 CFR 35.2005(20)], uncontaminated pumped
groundwater, discharges from potable water sources, foundation drains, air conditioning
condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn
watering, individual residential car washing, charity car washing, flows from riparian habitats and
wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or flows
froth firefighting activities are excluded from the definition of illicit discharge and only need to
be addressed where they are identified as significant sources of pollutants to waters of the United
States).
18. Non-structural BMP
Non-structural BMPs are preventive actions that involve management and source controls such
as: (1) Policies and ordinances that provide requirements and standards to direct growth to
identified areas, protect sensitive areas such as wetlands and riparian areas, maintain and/or
increase open space, provide buffers along sensitive water bodies, minimize impervious surfaces,
and/or minimize disturbance of soils and vegetation; (2) policies or ordinances that encourage
inftll development in higher density urban areas, and areas with existing storm sewer
infrastructure; (3) education programs for developers and the public about minimizing water
Part VIII Page 3 of 5
PERMIT NO. NCS0004f0
quality impacts; (4) other measures such as minimizing the percentage of impervious area after
development, use of measures to minimize directly connected impervious areas, and source
control measures often thought of as good housekeeping, preventive maintenance and spill
prevention.
19. Outfall
Outfall means a point source as defined by 40 CFR 122.2 at the point where a municipal separate
storm sewer discharges to waters of the United States and does not include open conveyances
connecting two municipal separate storm sewers, or pipes, tunnels or other conveyances which
connect segments of the same stream or other waters of the United States and are used to convey
waters of the United States.
20. Permittee
The owner or operator issued this permit.
21. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any
pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be
discharged to waters of the state.
22. Redevelopment
"Redevelopment" has the same meaning as in G.S. 143-214.7.
23. Representative Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at
least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A
single storm event may contain up to 10 consecutive hours of no precipitation. For
example, if it rains for 2 hours without producing any collectable discharge, and then
stops, a sample may be collected if a rain producing a discharge begins again within the
next 10 hours.
24. Storm Sewer System
Is a conveyance or system of conveyances which are designed or used to collect or convey
stormwater runoff that is not part of a combined sewer system or treatment works. This can
include, but is not limited to, streets, catch basins, curbs, gutters, ditches, man-made channels or
storm drains that convey stormwater runoff.
25. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying stormwater and
which is directly related to manufacturing, processing or raw material storage areas at an
industrial site. Facilities considered to be engaged in "industrial activities" include those
activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities
or activities excluded from the NPDES program.
Part VIII Page 4 of 5
PERMIT NO. NCS000410
26. Stormwater Control Measures (SCM)
"Stormwater Control Measure" or "SCM," also known as "Best Management Practice" or "BMP," means a
permanent structural device that is designed, constructed, and maintained to remove pollutants from
stormwater runoff by promoting settling or filtration; or to mimic the natural hydrologic cycle by
promoting infiltration, evapo-transpiration, post -filtration discharge, reuse of Stormwater, or a combination
thereof.
27. Stormwater Management Program (SWMP)
The term Stormwater Management Program (SWMP) refers to the stormwater management
program that is required by the Phase I and Phase 11 regulations to be developed by MS4
permittees.
28. Stormwater Plan
The Stormwater Plan is the written plan that is used to describe the various control measures
and activities the permittee will undertake to implement the stormwater management
program. The Stormwater Plan is a consolidation of all of the permittee's relevant ordinances
or other regulatory requirements, the description of all programs and procedures (including
standard forms to be used for reports and inspections) that will be implemented and enforced
to comply with the permit and to document the selection, design, and installation of all
stormwater control measures.
29. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately following
rainfall or as a result of snowmelt.
30. Total Maximum Daily Load (TMDL)
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and
still meet water quality standards, and an allocation of that amount to the pollutant's sources. A
TMDL is a detailed water quality assessment that provides the scientific foundation for an
implementation plan. The implementation plan outlines the steps necessary to reduce pollutant
loads in a certain body of water to restore and maintain water quality standards in all seasons. The
Clean Water Act, Section 303, establishes the water quality standards and TMDL programs.
Part Vill Page 5 of 5
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
September 7, 2005
Mr. Gary Looper
Village of Clemmons
3715 Clemmons Road
Clemmons, North Carolina 27012
William G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Director
Subject: NPDES Permit NCS000410
Village of Clemmons
Dear Mr. Looper:
Thank you for your letter of August 29, 2005 calling to our attention the typographical
error on Part III page 1 of 2 of the subject permit which misstates the annual report coverage
dates. I have changed the text to reflect coverage from August 1 through July 31, as you
correctly noted.
I have enclosed a corrected copy of the permit text which replaces the permit text you
currently hold. No other changes have been made to the permit, and the original signature dates
and other dated information still apply.
Since ly,
P_'t/�
Ken Pickle
cc: DWQ Central Files
Stormwater Permitting Unit files
DWQ Winston-Salem Regional Office
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 One
512 N. Salisbury St., Raleigh, North Carolina 27604 NorthCarolina
Phone: 919-733-70151 FAX: 919.733.24961 Internet: h2o,enr.state.nc.us
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Naturally
STATE of NORTH CAROLINA
DEPARTMENT of ENVIRONMENT and NATURAL RESOURCES
DIVISION of WATER QUALITY
PERMIT NO. NCS000410
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the regulations promulgated and adopted by the North Carolina
Environmental Management Commission, and the Federal Water Pollution Control Act, as
amended,
Village of Clemmons
is hereby authorized to discharge stormwater from the municipal separate storm sewer system
located:
within the Village of Clemmons Jurisdictional Area
Forsyth County
to receiving waters Yadkin River, Ingram's Branch, Blanket Creek, Lasater Lake, Johnson Creek,
Mallard Lake, Muddy Creek, and unnamed tributaries to them, all within the Yadkin -Pee Dee
River basin in accordance with the discharge limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, IV, V, VI, VII and VIII hereof.
This permit shall become effective August 1, 2005.
This permit and the authorization to discharge shall expire at midnight on July 31, 2010.
Signed this day July 15, 2005.
�� r
Alan W. Kli ek, P.E., Director
Division of Water Quality
By the Authority of the Environmental Management Commission
0
TABLE OF CONTENTS
PART I PERMIT COVERAGE
PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES
SECTION A: PROGRAM IMPLEMENTATION
SECTION B: PUBLIC EDUCATION AND OUTREACH
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS
SECTION F: POST -CONSTRUCTION SITE RUNOFF CONTROLS
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR
MUNICIPAL OPERATIONS
PART III PROGRAM ASSESSMENT
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS
PART V STANDARD CONDITIONS
SECTION A: COMPLIANCE AND LIABILITY
SECTION B: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
SECTION C: MONITORING AND RECORDS
PART VI LIMITATIONS REOPENER
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
PART VIII DEFINITIONS
Permit No. NCS000410
PART I PERMIT COVERAGE
During the period beginning on the effective date of the permit and lasting until
expiration, the Village of Clemmons is authorized to discharge Stormwater from the
municipal separate storm sewer system (MS4) to receiving waters, Yadkin River,
Ingram's Branch, Blanket Creek, Lasater Lake, Johnson Creek, Mallard Lake, Muddy
Creek, and unnamed tributaries to them, all within the Yadkin -Pee Dee River Basin.
Such discharge shall be controlled, limited, and monitored in accordance with the
permittee's Comprehensive Stormwater Management Program Report, herein referred to
as the Stormwater Plan. The Stormwater Plan includes components of the permittee's
Phase U Municipal NPDES Stormwater Permit Application, Comprehensive Stormwater
Management Program Report, and any approved modifications.
2. All discharges authorized herein shall be adequately managed in accordance with the
terms and conditions of this permit. Any other point source discharge to surface waters
of the state is prohibited unless it is an allowable non-stormwater discharge or is covered
by another permit, authorization, or approval.
3. This permit does not relieve the permittee from responsibility for compliance with any
other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or
decree.
4. This permit covers activities associated with the discharge of stormwater from the MS4
within the jurisdictional area of the permittee as described in the approved Stormwater
Plan to control potential pollution from the MS4. The permit applies to current and
future jurisdictional areas of the permittee, as well as areas that seek coverage under this
permit through inter -local or other similar agreements with the permittee. Agreements for
coverage under this permit must be approved by the Division of Water Quality, herein
referred to as the Division.
5. The Division may deny or revoke coverage under this permit for separate entities and may
require independent permit coverage as deemed necessary. In addition, the permittee may
petition the Division to revoke or deny coverage under this permit for specific entities.
6. Under the authority of Section 402(p) of the Clean Water Act and implementing
regulations 40 CFR Part 122, 123 and 124, North Carolina General Statutes 143-215.1
and Session Law 2004-163 and in accordance with the approved Stormwater Plan, all
provisions contained and referenced in the Stormwater Plan are enforceable parts of this
permit. The permittee shall develop and implement its approved Stormwater Plan in
accordance with Section 402(p)(3)(B) of the Clean Water Act, provisions outlined by the
Director, and the provisions of this permit.
7. The permit requires the development and proper implementation of the Stormwater
Management Plan. The purpose of the Stormwater Management Plan is to reduce the
discharge of pollutants from the MS4 to the maximum extent practicable, to protect water
quality, and to satisfy the applicable water quality requirements of the Clean Water Act.
Part 1 Page 1 of 2
Permit No. NCS000410
Implementation of best management practices consistent with the provisions of the
Stormwater Management Plan constitutes compliance with the standard of reducing
pollutants to the maximum extent practicable. Successive iterations of the Stormwater
Management Plan and other components of this permit will be driven by the objective of
assuring that discharges do not cause or contribute to the violation of water quality
standards, through the expansion and tailoring of management measures within the scope
of the Stormwater Management Plan,
8. The permit authorizes the point source discharge of stormwater runoff from the MS4. In
addition, discharges of non-stormwater are also authorized through the MS4 of the
permittee if such discharges are:
(a) Permitted by, and in compliance with, another NPDES discharge permit including
discharges of process and non -process wastewater, and stormwater associated
with industrial activity; or
(b) Determined to be incidental non-stormwater flows that do not significantly impact
water quality and may include:
• water line flushing;
• landscape irrigation;
• diverted stream flows;
• rising groundwaters;
• uncontaminated groundwater infiltration;
• uncontaminated pumped groundwater;
• discharges from potable water sources;
• foundation drains;
• air conditioning condensate (commercial/residential);
• irrigation waters (does not include reclaimed water as described in 15A
NCAC 2H .0200);
• springs;
• water from crawl space pumps;
• footing drains;
• lawn watering;
• residential and charity car washing;
• flows from riparian habitats and wetlands;
• dechlorinated swimming pool discharges;
• street wash water;
• flows from emergency fire fighting.
The Division may require that non-stormwater flows of this type be controlled
by the permittee's Stormwater Plan.
Part I Page 2 of 2
Permit No. NCS000410
PART H FINAL LIMITATIONS AND CONTROLS FOR PERMITTED
DISCHARGES
SECTION A: PROGRAM IMPLEMENTATION
The permittee shall implement, manage and oversee all provisions of its Stormwater Plan to
reduce pollutants discharged from the MS4. This includes, but is not limited to, the following
areas:
The permittee shall develop and maintain adequate legal mechanism, such as regulations,
ordinances, policies and procedures to implement all provisions of the Stormwater Plan.
The permittee shall keep the Division advised of the status of development of the legal
mechanisms and will pursue these mechanisms in accordance with the schedule outlined
in the Stormwater Plan.
2. The permittee's Stormwater Plan shall be implemented and managed such that the
discharge of pollutants from the MS4 is reduced to the maximum extent practicable. It is
anticipated that in order to meet this provision, implementation of the Stormwater Plan
shall occur with emphasis given to priority areas and to management measures and
programs that are most effective and efficient at varying stages of the plan's
implementation.
3. The permittee shall implement the components of the Stormwater Plan to prohibit illicit
connections, spills, and illegal dumping into the MS4.
4. The permittee shall implement provisions of the Stormwater Plan as appropriate to
monitor and assess the performance of the various management measures that are a part
of the Stormwater Plan. This shall include the provisions of this permit.
The permittee shall maintain adequate funding and staffing to implement and manage the
provisions of the Stormwater Plan.
6. The permittee shall implement appropriate education, training, outreach, and public
involvement programs to support the objectives of this stormwater discharge permit and
the Stormwater Plan.
7. The permittee shall implement a program to reduce pollution from construction site
runoff as described in the Stormwater Plan and in accordance with this permit.
8. The permittee shall implement a post -construction site runoff controls program to
regulate new development and redevelopment by requiring structural and non-structural
best management practices to protect water quality, to reduce pollutant loading, and to
minimize post -development impacts. This program shall include provisions for long-
term operation and maintenance of BMPs.
Part 11 Page 1 of 13
Permit No. NCS000410
9. The permittee shall evaluate municipal operations and develop and implement an
appropriate program for municipal activities and ongoing operation and maintenance of
municipal facilities to reduce the potential for stormwater pollution.
10. Proposed permit modifications, including schedule changes, must be submitted to the
Director for approval.
11. If the permitted MS4 becomes subject to an approved TMDL, and following notice of
such by the Division, the permittee shall implement a TMDL Water Quality Recovery
Program. The following additional requirements apply.
(a) Within two years after receiving the Division's notice that the permittee is subject to
a TMDL, the permittee shall establish a TMDL Water Quality Recovery Program
and shall identify the locations of all currently known MS4 outfalls within its
jurisdictional area with the potential of discharging the pollutant(s) of concern: to
the impaired segments, to their tributaries, and to segments and tributaries within
the watershed contributing to the impaired segments. The permittee shall also
develop a schedule to discover and locate all other MS4 outfalls within its
jurisdictional area that may be discharging the pollutant(s) of concern: to the
impaired stream segments, to their tributaries, and to segments and tributaries
within the watershed contributing to the impaired segments.
(b) Within two years after receiving the Division's notice that the permittee is subject to
a TMDL, the permittee shall develop a monitoring plan for each pollutant of
concern. The monitoring plan shall include the sample location by verbal
description and latitude and longitude coordinates, sample type, frequency, any
seasonal considerations, and a monitoring implementation schedule for each
pollutant of concern. Where. appropri ate, the permittee may reduce the monitoring
burden by proposing to monitor outfalls that the Division would consider
substantially similar to other outfalls. The permittee may also propose in -stream
monitoring where it would complement the overall monitoring plan. The
monitoring plan shall be adjusted as additional outfalls are identified in accordance
with the schedule required in (a) above and as accumulating data may suggest.
(c) The permittee shall include the location of all currently known MS4 outfalls with
the potential of discharging the pollutant(s) of concern, the schedule for discovering
and locating currently unknown MS4 outfalls with the potential of discharging the
pollutant(s) of concern, and the monitoring plan, (all as required in (a) and (b)
above, and all part of the TMDL Water Quality Recovery Program) in the first
Stormwater Management Plan annual report due no earlier than two years after the
Division's initial notification of the applicability of a TMDL.
(d) The next and each subsequent Stormwater Management Plan annual report shall
include an assessment of the available data for each pollutant of concern, and an
assessment of the effectiveness of the BMPs employed, to determine what, if any,
additional BMP measures may be necessary to return the impaired segments to
compliance with state water quality standards. The permittee shall implement
Part H Page 2 of 13
Permit No. NCS000410
appropriate BMPs to control the pollutant(s) of concern to the maximum extent
practicable. Implementation of the appropriate best management practices
constitutes compliance with the standard of reducing pollutants to the maximum
extent practicable.
(e) Following any review and comment by the Division on the TMDL Water Quality
Recovery Program, the permittee shall incorporate any necessary changes into the
program. The permittee shall incorporate the revised TMDL Water Quality
Recovery Program into the Stormwater Management Plan.
The permittee can identify the impaired stream segments in the MS4 jurisdictional area
by referencing the 2004 Integrated 305(b) and 303(d) Report (or current version),
available on the website of the Division of Water Quality Modeling and TMDL Unit.
Part 11 Page 3 of 13
Permit No. NCS000410
SECTION B: PUBLIC EDUCATION AND OUTREACH
1. Objectives for Public Education and Outreach
(a) Distribute educational materials to the community.
(b) Conduct public outreach activities.
(c) Raise public awareness on the causes and impacts of stormwater pollution.
(d) Inform the public on steps they can take to reduce or prevent stormwater
pollution.
2. BN4Ps for Public Education and Outreach
The permittee shall implement the following BMPs to meet the objectives of the Public
Education and Outreach Program and shall notify the Division prior to modification of any goals.
r BNIl :�.�
�Nieasurable Goals '
M x
r
Y R
.`a- a
r YRy
'-
YRYRYR=
3'
W TR
"'1: �'iY
54 c e
S' ,
(a) Establish a Public
Develop a public education program and
X
X
X
X
X
Education and
implement within 12 months of the permit
Outreach Program
issue date. Incorporate outreach elements
for significant minority and disadvantaged
communities.
(b) Informational Web Site
Develop and maintain an internet web
X
X
X
X
site. Post newsletter articles on
stormwater, information on water quality,
stormwater projects and activities, and
ways to contact stormwater management
program staff.
(c) Public education
Develop general stormwater educational
X
X
X
X
materials for schools,
material to appropriate target groups as
and/or homeowners,
likely to have a significant stormwater
and/or businesses
impact. Instead of developing its own
materials, the permittee may rely on state -
supplied Public Education and Outreach
materials, as available, when
im le nting its own program.
(d) Public education
Distribute written educational material to
X
X
X
X
X
material dissemination
a broad public audience. Possibilities
include, but are not limited to utility
mailouts and at special events.
Part H Page 4 of 13
Permit No. NCS000410
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION
I. Objectives for Public Involvement and Participation
(a) Provide opportunities for the public, including major economic and ethnic groups,
to participate in program development and implementation.
(b) Comply with applicable state and local public notice requirements.
2. BMPs for Public Involvement and Participation
The permittee shall implement the following BNIPs to meet the objectives of the Public
Involvement and Participation Program and shall notify the Division prior to modification of any
goals.
:' t�"x
4
rMeasurable Coals;T,,,_.L 't
C� err, �r
YR
YR`YR`
C,YR�
`�: �
r,YR
: C{r
����
r _ c k. . �"
a.., �
'iu�,ta.-
����-. '
i%t'''°'
i ." �}t
tr.2w.r
''sT }°��.
3
ii• .,
4r�
) ti
5
!X;a „r _' ._.mowL
t n � Y ,-„t r����1.. r4;'r �s`
J
:�i:�
.:_
.�
tx ?
(a) Administer a Public
Develop and implement a Public
X
X
X
X
X
Involvement Program
Involvement and Participation Program.
(b) Allow the public an
Conduct at least one public meeting to
X
X
X
X
X
opportunity to review
allow the public an opportunity to review
and comment on the
and comment on the Stormwater Plan
Stormwater Plan
(c) Organize a volunteer
Organize and implement a volunteer
X
X
X
X
X
community
stormwater related program designed to
involvement program
promote ongoing citizen participation.
(d) Establish a Citizens
Establish a citizens advisory panel to
X
X
X
X
X
Advisory Panel
review the Stormwater Plan, to review the
annual report, and to advise the permittee
on the Stormwater Plan.
Part lI Page 5 of 13
Permit No. NCS000410
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION
1. Objectives for Illicit Discharge Detection and Elimination
(a) Detect and eliminate illicit discharges, including spills and illegal dumping.
(b) Address significant contributors of pollutants to the MS4. The permittee may
require specific controls for a category of discharges, or prohibit that discharge
completely, if one or more of these categories of sources are identified as a
significant contributor of pollutants to the MS4.
(c) Implement appropriate enforcement procedures and actions.
(d) Develop a storm sewer system map showing all outfalls and waters receiving
discharges.
(e) Inform employees, businesses, and the general public of hazards associated with
illegal discharges and improper disposal of waste.
2. BMPs for Illicit Discharge Detection and Elimination
The permittee shall implement the following BMPs to meet the objectives of the Illicit Discharge
Detection and Elimination Program and shall notify the Division prior to modification of any
goals.
BMP -� `, w
1VleasuraFale owls
rYR
EM M"
.
YR
3_,
MYR
(a) Develop/Implement
Develop and implement an Illicit
X
X
X
X
X
Illicit Discharge
Discharge Detection and Elimination
Detection and
Program. Include provisions for program
Elimination Program
assessment and evaluation.
(b) Establish and
Establish and maintain adequate legal
X
X
X
X
maintain appropriate
authorities to prohibit illicit discharges
legal authorities
and enforce the approved Illicit Discharge
Detection and Elimination Program.
(c) Develop a Storm
Identify outfall locations and map
X
X
Sewer System Base
stormwater drainage system components.
Map
At a minimum, mapping components
include outfalls, drainage areas, and
receiving streams.
(d) Implement illicit
Implement an inspection program to
X
X
X
X
X
discharge detection
detect dry weather flows at system
procedures
outfalls. Establish procedures for tracing
the sources of illicit discharges and for
removing the sources. Develop procedures
for identification of priority areas likely to
have illicit discharges. Continue to update
the map of drainage system components
on a priority basis per the approved Illicit
Discharge Detection and Elimination
Program.
Part II Page 6 of 13
Permit No. NCS000410
e. ;BMl'� hey
"K
Me�q�asurableC als ``Y=R
'�4 '� + ' / 6.
`.� �'�
1.
�p rs
ski
'FYc
Vt.
4YR�YR
�k
, ,,eA1 S
r
�YR
7, wv�ft�..
I `� �.:..
(e) Conduct employee
Conduct training for municipal staff on
X
X
X
X
X
cross -training
detecting and reporting illicit discharges.____
(f) Provide public
Inform public employees, businesses, and
X
X
X
X
X
education
the general public of hazards associated
with illegal discharges and improper
disposal of waste.
(g) Establish a public
Establish and publicize a reporting
X
X
X
X
X
reporting mechanism
mechanism for the public to report illicit
discharges.
Part 11 Page 7 of 13
Permit No. NCS000410
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS
1. Objectives for Construction Site Runoff Controls
(a) Reduce pollutants in stormwater runoff from construction activities disturbing one
or more acres of land surface and those activities less than one acre that are part of
a larger common plan of development.
(b) Provide procedures for public input, sanctions to ensure compliance, requirements
for construction site operators to implement appropriate erosion and sediment
control practices, for review of site plans which incorporates consideration of
potential water quality impacts, and procedures for site inspection and
enforcement of control measures.
(c) Establish requirements for construction site operators to control waste that may
cause adverse impacts to water quality such as discarded building materials,
concrete truck washout, chemicals, litter, and sanitary waste.
2. BMPs for Construction Site Runoff Controls
The permittee shall implement the following BMPs to meet the objectives of the Construction
Site Runoff Controls Program and shall notify the Division prior to modification of any goals.
.y E» x 3•'--. ixa��
B1VLP�� .>��
:a�
rTk
;_ Measurable Goals *
ai°4""" $ ,�
"n "!�^3; R '� - .w„t-.S"p . s :.l al
1, ,f
YR)'.YRr
aria ,r,
t
rt 9.
„y� d
�-
�YR
F'ki N;�
xF ca
YR„
- Y,VW
(a) Implement a
Develop a regulatory mechanism and
X
X
X
X
X�
program and
implement a program requiring erosion and
establish a
sediment controls at construction sites and
regulatory
providing for sanctions to ensure compliance.
mechanism for
Instead of originating a new program, the
erosion and
permittee may elect to comply by relying on
sediment control
the NCDENR Division of Land Resources
(DLR) Erosion and Sediment Control
Program, either as administered by the DLR,
or as delegated by the Sedimentation Control
Commission (SCC) to another entity with
appropriate jurisdiction, including the
permittee. The permittee may rely on the DLR
program only to the extent that that program
satisfies all of the following BMPs.
(b) Develop
Require construction site operators to
X
X
X
X
X
requirements on
implement erosion and sediment control BMPs
construction site
and to control construction site wastes that
operators
may cause adverse water quality impacts.
Part 11 Page 8 of 13
Permit No. NCS000410
BP" +" ;
' � i x f t Measurable Goals "h , � ` :� Ys
ly+j,
YR
ryR
Y
'lj...Fx�a-
�YK'
rR
i
Till
1A,
(c) Provide
New materials may be developed by the
X
X
X
X
X
educational and
permittee, or the permittee may use materials
training materials
adopted from other programs and adapted to
for construction
the permittee's construction runoff controls
site operators
program.
(d) Institute plan
Review construction plans and establish
X
X
X
X
X
reviews
procedures that incorporate water quality
considerations in construction site plan
reviews.
(e) Establish public
Establish procedures for receipt and
X
X
X
X
X
information
consideration of erosion and sedimentation
procedures
information submitted by the public. Publicize
the procedures and contact information. The
procedures must lead directly to a site
inspection or other timely follow-up action.
(f) Establish
Establish procedures for site inspection and
X
X
X
X
X
inspection and
enforcement of control measure requirements.
enforcement
The procedures should include prioritizing
procedures
I areas of inspections based on local criteria.
The permittee relies on Forsyth County to comply with this minimum measure. The preceding
table is modified by the following:
➢ The permittee shall conduct random inspections of local land disturbing activities that
have a sediment and erosion control permit, issued by Forsyth County, to see if the site is
in compliance.
➢ The permittee shall monitor the Forsyth County program for effectiveness in the
permittee jurisdiction.
➢ Sites that are not in compliance with their sediment and erosion control permits shall be
reported to Forsyth County.
➢ Follow-up action by Forsyth County shall be monitored.
➢ The permittee shall maintain a record of findings and follow-up procedures.
The permittee shall provide and promote a means for the public to notify the appropriate
authorities of observed erosion and sedimentation problems. The permittee may
implement a plan promoting the existence of the NCDENR, Division of Land Resources
"Stop Mud" hotline to meet the requirements of this paragraph.
Part Il Page 9 of 13
Permit No. NCS000410
SECTION F: POST -CONSTRUCTION SITE RUNOFF CONTROLS
1. Objectives for Post -construction Site Runoff Controls
(a) Manage stormwater runoff from new development I redevelopment that drains to
the MS4 and disturbs an acre or more of land surface, including projects less than
an acre that are part of a larger common plan of development or sale.
(b) Provide a mechanism to require long term operation and maintenance of BMPs-
(c) Ensure controls are in place to minimize water quality impacts.
2. BMPs for Post -construction Site Runoff Controls
The permittee shall implement the following BMPs to meet the objectives of the Post -
construction Site Runoff Controls Program and shall notify the Division prior to modification of
any goals.
�`i .i'M L -Y �S d
�BMP- t
as -,
Nrz...- P„<<«r" iL 'I Yi. S�:.: T -
p� {Measurable Goals "
F.. �':F 'f.,s "�"^' "` ..,,+fd' o f a' d' 1 u _'Y'" i
i ..'
YR,YR}
" yx.,agp
'1
�. y., "j
_
�YRYR�iYR<
Yr
KY
r
US
ark
(a) Establish a Post-
Develop, adopt by ordinance (or similar
X
X
X
X
X
Construction Site
regulatory mechanism), implement, and
Runoff Controls
enforce a program to address stormwater
Program (hereafter
runoff from new development and
the Program)
redevelopment. The ordinance must be
reviewed and approved by the Director prior
to implementation. Ensure that controls are
in place to prevent or minimize water quality
impacts.
(b) Establish strategies
Develop and implement strategies that
X
X
X
X
X
which include BMPs
include a combination of structural and/or
appropriate for the
non-structural BMPs. Provide a mechanism
MS4
to require adequate long-term operation and
maintenance of structural BMPs. Require
annual inspection reports of permitted
structural BMPs performed by a qualified
rofessional.
(c) Establish a program to
Control the sources of fecal coliform to the
X
X
X
X
control the sources of
maximum extent practicable. Develop and
fecal coliform to the
implement an oversight program to ensure
maximum extent
proper operation and maintenance of on -site
practicable
wastewater treatment systems for domestic
wastewater. Municipalities must coordinate
this program with the county health
department.
Part 11 Page 10 of 13
Permit No. NCS000410
3. The evaluation of Post -construction Site Runoff Controls Program measures
(a) Those areas within the jurisdictional area of the permittee that are already subject
to the existing state stormwater management programs listed herein are deemed
compliant with the post -construction stormwater management model practices
identified in (b) below. The listed programs are: the Water Supply Watershed
protection programs for WS-1-- WS-IV waters, the HQW and ORW waters
management strategies, the Neuse River Basin Nutrient Sensitive Waters
Management Strategy, the Tar -Pamlico River Basin Nutrient Sensitive Waters
Management Strategy, and the Randleman Lake Water Supply Watershed
program.
(b) Model Practices. For those areas within the jurisdictional area of the pennittee
that are not subject to the post -construction stormwater management provisions of
another existing state stormwater management program, the permittee's Post -
construction Site Runoff Controls Program must equal or exceed the stormwater
management and water quality protection provided by the following model
practices.
(i) The permittee may issue a local stormwater management permit to a
development or redevelopment project as either a low density project or a
high density project.
(6) A project may be permitted as a low density project if it meets the following
criteria:
(A) No more than two dwelling units per acre or 24% built -upon area;
(B) Use of vegetated conveyances to the maximum extent practicable;
(C) All built -upon areas are at least 30 feet landward of perennial and
intermittent surface waters; and,
(D) Deed restrictions and protective covenants are required by the locally
issued permit and incorporated by the development to ensure that
subsequent development activities maintain the development (or
redevelopment) consistent with the approved plans.
(iii) A project not consistent with the requirements for a low density project may
be permitted as a high density project if it meets the following requirements:
(A) The stormwater control measures must control and treat the difference
between the pre -development and post -development conditions for the
1-year 24-hour storm. Runoff volume drawdown time must be a
minimum of 24 hours, but not more than 120 hours;
(B) All structural stormwater treatment systems must be designed to
achieve 85% average annual removal of total suspended solids;
(C) Stormwater management measures must comply with the General
Engineering Design Criteria For All Projects requirements listed in 15A
NCAC 2H .1008(c);
(D) All built -upon areas are at least 30 feet landward of perennial and
intermittent surface waters; and,
Part 11 Page 11 of 13
Permit No. NCS000410
(E) Deed restrictions and protective covenants are required by the locally
issued permit and incorporated by the development to ensure that
subsequent development activities maintain the development (or
redevelopment) consistent with the approved plans.
(c) Watershed Protection Plans. Public bodies may develop and implement
comprehensive watershed protection plans that may be used to meet part, or all, of
the requirements for post -construction stormwater management.
(d) A regulated entity may develop its own comprehensive watershed plan, may use
the model ordinance developed by the Commission, may design its own post -
construction practices based on the Division's guidance and engineering standards
for best management practices, or it may incorporate the post -construction model
practices to satisfy, in whole or in part, the requirements for post -construction
stormwater management.
Part It Page 12 of 13
Permit No. NCS000410
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR
MUNICIPAL OPERATIONS
I. Objective for Pollution Prevention and Good Housekeeping for Municipal
Operations
Prevent or reduce stormwater pollution from municipal operations.
2. BMPs for the Pollution Prevention and Good Housekeeping for Municipal
Operations
The permittee shall implement the following BMPs to meet the objective of the Pollution
Prevention and Good Housekeeping Program and shall notify the Division prior to modification
of any goals.
BMP 'yM
=iu �rir tG' `�
11!Ie�isurable:Goals'
�.Yf �.i�-r • �+'N. 4. 1 b F-'i 1
i
'xYRYlt�'
M .,y ,
iN3n
i Y
YR
�I t4
i._: •,. 1
.t.7
3�
1 tL
E 'S A
'h
)(
lr. (j�a
tM
iG
,��-7n yNrk��i
���,.7 iill.4.r� z m.w�'i�� i�..9{.�-,
�]p,
�C 1t. �:�
�� L
�
:-
(a) Develop an operation
Develop an operation and maintenance
X
X
X
X
and maintenance
program that has the ultimate goal of
program
preventing or reducing pollutant runoff
from municipal operations.
(b) Inspection and
Develop an inventory of all facilities and
X
X
X
X
X
evaluation of facilities
operations owned and operated by the
and operations, and the
permittee with the potential for generating
MS4 and associated
polluted stormwater runoff, including the
structural BMPs
MS4 and associated structural BMPs.
Inspect potential sources of polluted
runoff, the stormwater controls, and
conveyance systems. Evaluate the sources,
document deficiencies, plan corrective
actions, and document the
accomplishment of corrective actions.
(c) Conduct staff training
Conduct staff training specific for
X
X
X
X
pollution prevention and good
housekeeping rocedures.
(d) Review of municipally
Conduct an annual review of the industrial
X
X
X
X
owned or operated
activities with a Phase I NPDES
regulated industrial
stormwater permit owned and operated by
activities
the permittee. Review the following
aspects: the Stormwater Pollution
Prevention Plan where one is required, the
timeliness of any monitoring reports
required by the Phase I permit, and the
results of inspections and subsequent
follow-U2 actions at the facilities.
Part 11 Page 13 of 13
Permit No. NCS000410
PART III PROGRAM ASSESSMENT
1. Implementation of the Stormwater Plan shall include documentation of all program
components that are being undertaken including, but not limited to, inspections,
maintenance activities, educational programs, implementation of BMPs, enforcement
actions, and other stormwater activities. If monitoring and sampling are being performed
documentation of results shall be included. Documentation shall be kept on -file by the
permittee for a period of five years and made available to the Director or his authorized
representative immediately upon request.
2.. The permittee's Stormwater Plan shall be reviewed and updated as necessary, but at least
on an annual basis. The permittee shall submit a report of this evaluation and monitoring
information to the Division on an annual basis. This information shall be submitted by
October 1 of each year and cover the previous year's activities from August I of the
previous year to July 31 of the current year. The permittee's reporting shall include
appropriate information to accurately describe the progress, status, and results of the
permittee's Stormwater Plan and shall include, but is not limited to, the following
components:
(a) The permittee shall give a detailed description of the status of implementation of
the Stormwater Plan. This shall include information on development and
implementation of all components of the Stormwater Plan for the past year and
schedules and plans for the year following each report.
(b) The permittee shall adequately describe and justify any proposed changes to the
Stormwater Plan. This shall include descriptions and supporting information for
the proposed changes and how these changes will impact the Stormwater Plan
(results, effectiveness, implementation schedule, etc.).
(c) The permittee shall document any necessary changes to programs or practices for
assessment of management measures implemented through the Stormwater Plan.
In addition, any changes in the cost of, or funding for, the Stormwater Plan shall
be documented.
(d) The permittee shall include a summary of data accumulated as part of the
Stormwater Plan throughout the year along with an assessment of what the data
indicates in light of the Stormwater Plan.
(e) The permittee shall provide information on the annual expenditures and budget
anticipated for the year following each report along with an assessment of the
continued financial support for the overall Stormwater Plan.
(f) The permittee shall provide a summary of activities undertaken as part of the
Stormwater Plan throughout the year. This summary shall include, but is not
limited to, information on the establishment of appropriate legal authorities,
Part III Page I of 2
Permit No. NCS000410
project assessments, inspections, enforcement actions, continued inventory and
review of the storm sewer system, education, training, and results of the illicit
discharge detection and elimination program.
3. The Director may notify the permittee when the Stormwater Plan does not meet one or
more of the requirements of the permit. Within 30 days of such notice, the permittee
shall submit a plan and time schedule to the Director for modifying the Stormwater Plan
to meet the requirements. The Director may approve the corrective action plan, approve a
plan with modifications, or reject the proposed plan. The permittee shall provide
certification in writing (in accordance with Part IV, Paragraph 2) to the Director that the
changes have been made. Nothing in this paragraph shall be construed to limit the
Director's ability to conduct enforcement actions for violations of this permit.
4. The Division may request additional reporting information as necessary to assess the
progress and results of the permittee's Stormwater Plan.
Part III Page 2 of 2
NCS000410
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS
1. Records
The permittee shall retain records of all information required by this permit for a period
of at least five years from the date of its acquisition. This period may be extended by
request of the Director at any time prior to the end of the five-year period.
2. Report Submittals
(a) Duplicate signed copies of all reports required herein, shall be submitted to the
following address:
Department of Environment and Natural Resources
Division of Water Quality
Stormwater Permitting Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(b) All applications, reports, or information submitted to DWQ shall be signed by a
principal executive officer, ranking elected official, or duly authorized
representative. A person is a duly authorized representative only if:
(i) The authorization is made in writing by a principal executive officer or
ranking elected official;
(ii) The authorization specifies either an individual or a position having
responsibility for the overall operation of a regulated facility or activity or
an individual or position having overall responsibility for
environmental/stormwater matters; and
(iii) The written authorization is submitted to the Director.
(c) Any person signing a document under paragraphs (a) or (b) of this section shall
make the following certification:
"I certify, under penalty of law, that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information
submitted. Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing
violations."
Part IV Page 1 of 2
NCS0004 t 0
3. Recording Results
For each activity performed or information collected pursuant to the requirements of this
permit, the permittee shall record the following information:
(a) The dates, exact place, and time of the activity or information collected;
(b) The individual(s) who performed the activity;
(c) The techniques or methods used; and
(d) The results of such activity or information collected.
4. Twenty-four Hour Reporting
The permittee shall report to the central office or the appropriate regional office any
noncompliance which may constitute an imminent threat to health or the environment.
Any information shall be provided orally within 24 hours from the time the permittee
became aware of the circumstances. A written submission shall also be provided within 5
days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes;
the period of noncompliance, including exact dates and times, and if the noncompliance
has not been corrected, the anticipated time compliance is expected to continue; and steps
taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The Director may waive the written report on a case -by -case basis if the oral report has
been received within 24 hours.
5. Annual Reporting
The permittee shall submit reporting and monitoring information on an annual basis per
Part III of this permit on forms provided by the DWQ.
6. Additional Reporting
The Director may request reporting information on a more frequent basis as deemed
necessary either for specific portions of the permittee's Stormwater Plan, or for the entire
Program.
7. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts in applying
to be covered under this permit or in any report to the Director, it shall promptly submit
such facts or information.
Part IV Page 2 of 2
NCS000410
PART V STANDARD CONDITIONS
SECTION A: COMPLIANCE AND LIABILITY
1. Duty to Comply
The permittee must comply with all conditions of this permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for
permit termination, revocation and reissuance, or modification; or denial of permit
coverage upon renewal application.
(a) The permittee shall comply with standards or prohibitions established under
Section 307(a) of the Clean Water Act for toxic pollutants within the time
provided in the regulations that establish these standards or prohibitions, even if
the permit has not yet been modified to incorporate the requirement.
(b) The Clean Water Act provides that any person who violates a permit condition is
subject to a civil penalty not to exceed the maximum amounts authorized by
Section 309(d) of the Act and the Federal Civil Penalties Inflation Adjustment Act
(28 U.S.C. §2461 note) as amended by the Debt Collection Improvement Act (31
U.S.C. §3701 note) (currently $27,500 per day for each violation). Any person
who negligently violates any permit condition is subject to criminal penalties of
$2,500 to $25,000 per day of violation, or imprisonment for not more than 1 year,
or both. Any person who knowingly violates permit conditions is subject to
criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for
not more than 3 years, or both. Also, any person who violates a permit condition
may be assessed an administrative penalty not to exceed $11,000 per violation
with the maximum amount not to exceed $137,500. [Ref: Section 309 of the
Federal Act 33 USC 1319 and 40 CFR 122.41(a).]
(c) Under state law, a daily civil penalty of not more than twenty-five thousand
dollars ($25,000) per violation may be assessed against any person who violates
or fails to act in accordance with the terms, conditions, or requirements of a
permit. [Ref: North Carolina General Statutes 143-215.6A]
(d) Any person may be assessed an administrative penalty by the Administrator for
violating sections 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit
condition or limitation implementing any of such sections in a permit issued under
section 402 of this Act. Pursuant to 40 CFR Part 19 and the Act, administrative
penalties for Class I violations are not to exceed the maximum amounts
authorized by Section 309(g)(2)(A) of the Act and the Federal Civil Penalties
Inflation Adjustment Act (28 U.S.C. §2461 note) as amended by the Debt
Collection Improvement Act (31 U.S.C. §3701 note) (currently $1 t,000 per
violation, with the maximum amount of any Class I penalty assessed not to exceed
$27,500). Pursuant to 40 CFR Part 19 and the Act, penalties for Class 11 violations
Parts V, VI, VII & VIlI Page 1 of 12
NCS000410
are not to exceed the maximum amounts authorized by Section 309(g)(2)(B) of
the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461
note) as amended by the Debt Collection Improvement Act (31 U.S.C. §3701
note) (currently $11,000 per day for each day during which the violation
continues, with the maximum amount of any Class U penalty not to exceed
$137,500).
2. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in
violation of this permit which has a reasonable likelihood of adversely affecting human
health or the environment.
3. Civil and Criminal Liability
Nothing in this permit shall be construed to relieve the pennittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3,
143-215.6A, 143-215.613, 143-215.6C or Section 309 of the Federal Act, 33 USC 1319.
Furthermore, the permittee is responsible for consequential damages, such as fish kills,
even though the responsibility for effective compliance may be temporarily suspended.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or
relieve the permittee from any responsibilities, liabilities, or penalties to which the
permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the
Federal Act, 33 USC 1321.
5. Property Rights
The issuance of this permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it.authorize any injury to private property
or any invasion of personal rights, nor any infringement of federal, state, or local laws or
regulations.
6. Severability
The provisions of this permit are severable, and if any provision of this permit, or the
application of any provision of this permit to any circumstances, is held invalid, the
application of such provision to other circumstances, and the remainder of this permit,
shall not be affected thereby.
Parts V, VI, VIl & VI.II Page 2 of 12
NCS000410
7. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information
which the Director may request to determine whether cause exists for modifying,
revoking and reissuing, or terminating the coverage issued pursuant to this permit or to
determine compliance with this permit. The permittee shall also furnish to the Director
upon request, copies of records required to be kept by this permit.
8. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly
renders inaccurate, any monitoring device or method required to be maintained under this
permit shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than two years per violation, or by both. If a
conviction of a person is for a violation committed after a first conviction of such person
under this paragraph, punishment is a fine of not more that $20,000 per day of violation,
or by imprisonment of not more than 4 years, or both.
9. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement,
representation, or certification in any record or other document submitted or required to
be maintained under this permit, including monitoring reports or reports of compliance or
noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per
violation, or by imprisonment for not more than two years per violation, or by both.
10. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The
notification of planned changes or anticipated noncompliance does not stay any permit
condition.
Parts V, VI, VII & VIH Page 3 of 12
NCS000410
SECTION B: OPERATION AND MAINTENANCE of POLLUTION CONTROLS
Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are owned and/or operated by
the permittee to achieve compliance with the conditions of this permit.
2. Need to Halt or Reduce not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been
necessary to halt or reduce the permitted activity in order to maintain compliance with the
condition of this permit.
Parts V, VI, VII & Vl1f Page 4 of 12
NCS000410
SECTION C: MONITORING AND RECORDS
1. Representative Sampling
When required herein, stormwater samples collected and measurements taken shall be
characteristic of the volume and nature of the permitted discharge. Analytical stormwater
sampling shall be performed during a representative storm event. These samples shall be
taken on a day and time that is characteristic of the discharge. Where appropriate, all
stormwater samples shall be taken before the discharge joins or is diluted by any other
waste stream, body of water, or substance. When specified herein, monitoring points
established in this permit shall not be changed without notification to and approval of the
Director.
2. Flow Measurements
Where required, appropriate flow measurement devices and methods consistent with
accepted scientific practices shall be selected and used to ensure the accuracy and
reliability of measurements of the volume of monitored discharges.
3. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations
published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting
Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the
Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136.
To meet the intent of the monitoring required by this permit, all test procedures must
produce minimum detection and reporting levels and all data generated must be reported
down to the minimum detection or lower reporting level of the procedure.
4. Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an
authorized contractor acting as a representative of the Director), or in the case of a facility
which discharges through a municipal separate storm sewer system, an authorized
representative of a municipal operator or the separate storm sewer system receiving the
discharge, upon the presentation of credentials and other documents as may be required
by law, to;
(a) Enter upon the permittee's premises where a regulated facility or activity is located
or conducted, or where records must be kept under the conditions of this permit;
(b) Have access to and copy, at reasonable times, any records that must be kept under
the conditions of this permit;
Parts V, VI, VII & V1II Page 5 of 12
NCS000410
(c) inspect at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this permit;
and
(d) Sample or monitor at reasonable times, for the purposes of assuring permit
compliance or as otherwise authorized by the Clean Water Act, any substances or
parameters at any location.
5. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section
308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms of
this permit shall be available for public inspection at the offices of the Division of Water
Quality. As required by the Act, analytical data shall not be considered confidential.
Knowingly making any false statement on any such report may result in the imposition of
criminal penalties as provided for in NCGS 143-215.6B or in Section 309 of the Federal
Act.
Parts V, VI, VH & V1I1 Page 6 of 12
NCS000410
PART VI LIMITATIONS REOPENER
The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules,
and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A
of the North Carolina Administrative Code, Subchapter 2H .0100; and North Carolina General
Statute 143-215.1 et. al.
Parts V, VI, Vil & V1T1 Page 7 of 12
NCS000410
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
The permittee must pay the administering and compliance monitoring fee within 30 thirty days
after being billed by the Division. Failure to pay the fee in a timely manner in accordance with
15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the permit.
Parts V, VI, VU & VE11 Page 8 of 12
NCS000410
PART VIII DEFINITIONS
1. Act
See Clean Water Act.
2. Best Management Practice (BMP)
Measures or practices used to reduce the amount of pollution entering surface waters.
BMPs can be structural or non-structural and may take the form of a process, activity,
physical structure or planning (see non-structural BMP).
3. Built -upon Area
That portion of a development project that is covered by impervious or partially
impervious surface including, but not limited to, buildings; pavement and gravel areas
such as roads, parking lots, and paths; and recreation facilities such as tennis courts.
"Built -upon area" does not include a wooden slatted deck, the water area of a swimming
pool, or pervious or partially pervious paving material to the extent that the paving
material absorbs water or allows water to infiltrate through the paving material.
4. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as
amended, 33 USC 1251, et. seq.
5. Common Plan of Development
A construction or land disturbing activity is part of a larger common plan of development
if it is completed in one or more of the following ways:
In separate stages
In separate phases
In combination with other construction activities
It is identified by the documentation (including but not limited to a sign, public notice or
hearing, sales pitch, advertisement, loan application, drawing, plats, blueprints, marketing
plans, contracts, permit application, zoning request, or computer design) or physical
demarcation (including but not limited to boundary signs, lot stakes, or surveyor
markings) indicating that construction activities may occur on a specific plot.
It can include one operator or many operators.
Parts V, VI, VU & VIU Page 9 of 12
NCS000410
6. Department
Department means the North Carolina Department of Environment and Natural
Resources.
7. Division (DWQ)
The Division of Water Quality, Department of Environment and Natural Resources.
S Director
The Director of the Division of Water Quality, the permit issuing authority.
9. EMC
The North Carolina Environmental Management Commission.
10. Grab Sample
An individual sample collected instantaneously. Grab samples that will be directly
analyzed or qualitatively monitored must be taken within the first 30 minutes of
discharge.
11. Hazardous Substance
Any substance designated in 40 CFR Part 116 pursuant to Section 311 of the Clean Water
Act.
12. Illicit Discharge
Any discharge to a MS4 that is not composed entirely of stormwater except discharges
pursuant to an NPDES permit (other than the NPDES MS4 permit), allowable non-
stormwater discharges, and discharges resulting from fire -fighting activities.
13. Industriai_ Activity
For the purposes of this permit, industrial activities shall mean all industrial activities as
defined in 40 CFR 122.26.
Parts V, V1, VQ & V111 Page 10 of 12
NCS000410
14. Municipal Separate Storm Sewer System (MS4)
Pursuant to 40 CFR 122.26(b)(8) means a conveyance or system of conveyances
(including roads with drainage systems, municipal streets, catch basins, curbs, gutters,
ditches, manmade channels, or storm drains):
(1) Owned or operated by the United States, a state, city, town, county, district,
association, or other public body (created by or pursuant to state law) having
jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes,
including special districts under state law such as a sewer district, flood control
district or drainage district, or similar entity, or an Indian tribe or an authorized
Indian tribal organization, or a designated and approved management agency under
Section 208 of the Clean Water Act (CWA) that discharges to waters of the United
States or waters of the State;
(ii) Designed or used for collecting or conveying stormwater;
(iii) Which is not a combined sewer; and
(iv) Which is not part of a Publicly Owned Treatment Works (POTW) as defined in 40
CFR 122.2.
15, Non-stormwater Discharge Cate ories
The following are categories of non-stormwater discharges that the permittee must
address if it identifies them as significant contributors of pollutants to the storm sewer
system: water line flushing, landscape irrigation, diverted stream flows, rising
groundwater, uncontaminated groundwater infiltration, [as defined in 40 CFR
35.2005(20)], uncontaminated pumped groundwater, discharges from potable water
sources, foundation drains, air conditioning condensation, irrigation water, springs, water
from crawl space pumps, footing drains, lawn watering, individual residential car
washing, flows from riparian habitats and wetlands, dechlorinated swimming pool
discharges, and street wash water (discharges or flows from fire fighting activities are
excluded from the definition of illicit discharge and only need to be addressed where they
are identified as significant sources of pollutants to waters of the United States).
16. Non-structural BMP
Non-structural BMPs are preventive actions that involve management and source controls
such as: (1) Policies and ordinances that provide requirements and standards to direct
growth to identified areas, protect sensitive areas such as wetlands and riparian areas,
maintain and/or increase open space, provide buffers along sensitive water bodies,
minimize impervious surfaces, and/or minimize disturbance of soils and vegetation; (2)
policies or ordinances that encourage infiil development in higher density urban areas,
and areas with existing storm sewer infrastructure; (3) education programs for developers
and the public about minimizing water quality impacts; (4) other measures such as
minimizing the percentage of impervious area after development, use of measures to
Parts V, VI, VII & VIII Page t 1 of 12
NCS000410
minimize directly connected impervious areas, and source control measures often thought
of as good housekeeping, preventive maintenance, and spill prevention.
17. Outfall
The point of wastewater or stormwater discharge from a discrete conveyance system. See
also point source discharge of stormwater.
18. Permittee
The owner or operator issued this permit.
19. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited
to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which
stormwater is or may be discharged to waters of the state.
20. Redevelopment
Means any rebuilding activity unless that rebuilding activity:
(i) Results in no net increase in built -upon area, and
(ii) Provides stormwater control equal to or greater than that in the previous
development.
21. Stormwater Runoff
The flow of water which results from precipitation and which occurs immediately
following rainfall or as a result of snowmelt.
22. Total Maximum Daily Load „(TMDL)
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can
receive and still meet water quality standards, and an allocation of that amount to the
pollutant's sources. A TMDL is a detailed water quality assessment that provides the
scientific foundation for an implementation plan. The implementation plan outlines the
steps necessary to reduce pollutant loads in a certain body of water to restore and
maintain water quality standards in all seasons. The Clean Water Act, Section 303,
establishes the water quality standards and TMDL programs.
23. Toxic Pollutant
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act,
Parts V, VI, VII & VIII Page 12 of 12