HomeMy WebLinkAbout20050732 Ver 02_Stormwater Approval_20060807NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
August 7, 2006
NNP-Briar Chapel, LLC
Attn: Mr. Mitch Barron, Vice President Newland Communities
5850 Fayetteville Road, Suite 201
Durham, NC 27713
Subject Property: Briar Chapel Community, Phase I
APPROVAL OF STORM WATER MANAGEMENT PLAN
Dear Mr. Barron:
VViIliam G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Director
DWQ Project # EXP 05-0732v2
Chatham County
The Division of Water Quality (DWQ) has reviewed the Storm Water Management Plan dated July 24,
2006 and subsequent revisions received August 4, 2006 prepared by your engineer, Mr. Jeremy Finch,
P.E., of John R. McAdams Company, Inc. This Plan partially satisfies the stormwater conditions required
by the Individual Water Quality Certification issued on May 9, 2006. You are required to meet the
following conditions:
1. The storm water treatment system, which includes the extended detention pond, preformed scour
holes, and forested filter strips, as approved by this Office, and the drainage patterns depicted on
the plan sheets, must be maintained in perpetuity. No changes to the structural storm water
practices shall be made without written authorization from the Division of Water Quality. The
storm water easements shall allow for the ability to maintain the structures, perform corrective
actions, and shall provide protection of the structures from potential' alternations by future
property owners.
2. You must submit three (3) copies of an executed Declaration of Covenants and Restrictions-
Riparian Areas document within thirty (30) days of recording with the Register of Deeds,
Chatham County, North Carolina.
You must submit the remainder of the stormwater management plans for Phase I within the next
sixty (60) days for approval by DWQ. This final stormwater management plan (including a
signed and notarized Operation and Maintenance Agreement) will include plans and
specifications for stormwater management facilities that are appropriate for surface waters
classified as "Nutrient Sensitive Waters" (NSW). As such, they shall be designed to remove
nitrogen and remove at least 85% TSS.
4. The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing
at the letterhead address within ten (10) days of the commencement of construction.
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733.6893 / Internet htto•//h2o enr.state.nc.us/nmetlands
NorthCarolina
Naturally
Briar Chapel Community, Phase 1 Stormwater Management Plans
Page 2 of 2
August 7, 2006
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please contact Cyndi Karoly at 919.9721 or Cynthia Van Der Wiele,
Ph.D. at 919.715.3473.
Sincerely,
Cyndi Bell Karoly, Program Manager
401 Oversight, Express Review Program
CBK/cvdw
cc: USACE Raleigh Regulatory Field Office
DWQ Raleigh Regional Office
File Copy
Central Files
Jeremy Finch, P.E., John R. McAdams Co., Inc., 2905 Meridian Pkwy., Durham, NC 27713