Storinwater Pollution Prevention Plan
Stormwater Pollution Prevention Plan
Clariant Corporation
Mount Holly West Plant
January 30, 2009
Revision 5 page 1 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
Certification
I certify that the stormwater outfalls at the Clariant Corporation Mount Holly West Plant have
been evaluated for the presence of non-stormwater discharges.
Kenneth L. Golder
President, USA
Clariant Corporation
Revision 5 page 2 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
I. SFFE PLAN
A.
B.
General Location Map
A general location map of the Mount Holly West (MHW) Plant is shown in Attachment 1.
All of the site's stormwater outfalls discharge into the Catawba River. The stormwater
outfall locations are as follows:
Outfall 001
Outfall 003
Outfall 004
Outfall 005
Outfall 006
Outfall 007
Latitude: 35.17.45
Latitude: 35.17.42
Latitude: 35.17.38
Latitude: 35.17.35
Latitude: 35.17.32
Longitude: 81.00.21
Longitude: 81.00.23
Longitude: 81.00.24
Longitude: 81.00.25
Longitude: 81.00.26
Combines with public stormwater and is discharged through Outfall 006
Narrative Description
Storage Practices
Materials are stored in bulk storage tanks and in a variety of portable container types.
a. Bulk Storage Tanks
Product, intermediate, and raw material storage tanks are located in diked tank
farms. There are six main tank farm areas: Plant 1, Plant 2, Plant 3, Plant 4, Plant
5, and Area 190. There are also two dedicated tank storage areas: one for
ethylene oxide (EO) and one for propylene oxide (PO). Also, there are four
petroleum -based fuel storage tanks located throughout the site; these are not in
diked areas but they are double -walled tanks.
b. Containers
Solid and liquid materials are stored in a variety of container types. The most
common are 275-gallon totes and 55-gallon drums. There are also other drum
sizes as well as several types of bags, supersacks, and buckets. Container storage
locations can be virtually anywhere on site, the most common being inside the
Warehouse, inside of or outside near any of the production buildings (Plant 1,
Plant 3, Plant 4, Plant 5), and outside along the site roadways. Materials in bags
or other containers that could be damaged by rain are not stored outside.
Hazardous wastes are stored separately in designated areas.
Loading and Unloading Activities
Materials are loaded into and/or unloaded from rail cars, tank trucks, and trailers.
There are four rail car loading/unloading areas: Plant 1, Area 190, Plant 4 CFA/SI, and
EO/PO. There are seven tank truck loading areas: Plant 1, Plant 2, Plant 3, Plant 4,
Plant 5, Plant 4 IPF, and Area 190. All of these areas utilize loading racks designed for
that purpose. Containers are loaded into trailers at Warehouse loading docks and Plant
5 loading docks.
3. Outdoor Process Areas
Revision 5 page 3 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
Process areas are mostly covered or inside of buildings. There is some process piping
outside that is connected to the storage tanks in the diked areas. Also there is some
transfer piping outside between different buildings. Some notable examples of outside
process piping are wastewater piping and transfer Iines from Plant 1 to Plant 4. Also,
the entire wastewater treatment plant (WWTP) is located outside.
4. Dust and Particulate Generating Processes
The SCI process in Plant 3 generates a solid flake product. Several processes use
powders or solids as raw materials. All solid material handling is done inside the
process buildings: Plant 3, Plant 4, and Plant 5.
5. Waste Disposal Practices
The MHW Plant has well -established practices that assure the proper handling and
disposal of waste. The following is a brief description of how the most common waste
types are managed.
a. Trash
Generic non -hazardous trash is placed trashcans or small dumpsters, which are
collected daily. The trash is emptied daily, compacted, and placed into a roll -off
container. The roll -off container is removed weekly by a local waste company
and taken to a Clariant-approved Subtitle D landfill. This trash category includes
empty chemical bags, chemical gloves, non -regulated samples, non -regulated
filter pads, foodstuffs, non -recyclable office materials, and miscellaneous
household trash.
b. Chemicals
All chemical wastes are placed in compatible DOT containers. Only personnel
with proper training are authorized to handle chemical waste. The person who
generates a waste obtains the samples and information necessary to characterize
the waste. They then submit the waste, along with a completed Waste Inventory
Sheet (WIS), to the Waste Department. The Waste Department stores the waste
in a designated storage area. The Waste Department then determines the proper
classification and disposal method for the waste. Non -hazardous chemical waste
is typically disposed in a Clariant-approved Subtitle D landfill. Hazardous waste,
and some non -hazardous waste, is sent to a Clariant-approved permitted TSDF.
All chemical waste is tracked by manifest.
C. Recyclable Materials
Various types of containers are staged throughout the MHW site for the
collection of recyclable materials. These materials include paper, cardboard,
wood, and scrap metal. Scrap metal is cleaned prior to recycling and evaluated
by the Waste Department to ensure that it meets the definition of scrap metal and
is managed properly.
d. Universal Waste
Revision 5 page 4 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
Universal wastes such as bulbs, batteries, and mercury -containing devices are
collected as they are generated, secured in appropriate containers, and stored in a
designated area. Universal wastes are periodically picked up and taken to a
Clariant-approved facility.
e. Soil
The MHW Plant has an excavation permit process that ensures that all excavated
soil is properly evaluated, managed, and disposed. The Waste Department
determines the classification of the soil and the appropriate disposal options. If
necessary, soil samples are sent to a certified lab for analysis. if a designated
Solid Waste Management Unit (SWMU) is involved, proper documentation is
developed. Any soil that is determined to be hazardous waste is sent to a
Clariant-approved Subtitle C landfill or other TSDF, as appropriate.
f. Wastewater Residuals
Sludge from the WWTP is collected in a sludge storage building. Approximately
every two weeks, it is Hauled off and land applied according to the site's Land
Application permit. Sometimes if there is no permitted field available the sludge
is disposed in a Clariant-approved Subtitle D landfill-
C. Site Map
Attachment 2 is a map of the industrial areas of the MHW site. All items required to be in the
site map are either shown in Attachment 2 or are described below in this section.
Storage of Materials
Bulk tank storage locations are shown on the site map. Outside areas most commonly
used for storage of materials in containers are also shown on the site map. Inside
storage areas are not specifically indicated, other than designated hazardous waste
storage areas. Inside storage is mainly in the Warehouse.
2. Disposal Areas
There are no disposal areas on site. All wastes are accumulated, stored, and sent off
site for disposal.
3. Process Areas
Process areas are indicated on the site map. The main areas are: Plant 1 (Building 151),
Plant 3 (Building 153), Plant 4 (Building 154), Plant 5 (Building 155), Pilot Plant
(Building 159), and WWTP (Area 163).
4. Loading and Unloading_ Areas
Loading and unloading areas are shown on the site map.
Drainage Structures
Revision 5 page 5 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
The MHW Plant has a network of stormwater sewers and industrial sewers. The
sewers are generally separate systems, although there are locations where stormwater
can be transferred into the industrial sewers. The stormwater system includes not only
sewers but also sumps, curbs, containment walls, a retention pond, and outfall valves.
All of these structures are shown on the site map.
6. Draina a Areas for Each Outfall
The approximate drainage areas for each outfall are indicated on the site map. Note
that Outfall 006 receives a substantial portion of its drainage from public streets and
neighborhoods; these off -site sources of drainage are not on the site map.
Activities Occurring in Each Drainage Area
Activities throughout the M14W Plant have already been described and are indicated on
the site map.
Buildiniz Locations
Building locations are shown on the site map.
9. Existing BMPs
Some of the more significant Best Management Practices (BMPs) are as follows:
a. Secondary containment is provided for the bulk storage of chemicals.
b. Loading and unloading operations are conducted in paved areas that drain into
the industrial sewer.
C. Secondary containment is provided around the truck scale.
d. Process areas utilize written procedures for all chemical -handling tasks.
e. Containment curbing is provided for most of the site, to provide additional
protection for areas having the greatest risk of loss of containment.
£ Outfall valves and containment area valves are normally kept closed. Only
authorized employees open them after inspection of the stormwater.
g. Outfalls and containment structures are inspected regularly.
h. All employees who work in chemical process areas receive training in operating
procedures, spill prevention, and spill response.
i. The site has an emergency response team (EAT) on site, trained in spill
containment and mitigation.
j. Major construction contractors are required to have an erosion control plan.
k. 5S program has been implemented to clean and organize work areas.
10. Impervious Surfaces
Most of the active portion of the site has impervious surfaces. All chemical storage,
handling, loading, and unloading activities are in impervious areas, except the
following areas are gravel: Area 190, Plant 4 CFA/SI, and EO/PO rail car loading
areas; the storage area for roll -off containers of non -hazardous waste drums; and the
WWTP.
Revision 5 page 6 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
11.
12.
Drainage Area Surfaces
The percentage of each drainage area that is impervious can be determined from the
following estimates:
a. Outfall 001
b. Outfall 003
C. Outfall 004
d. Outfall 005
e. Outfall 006
f. Outfall 007
� h1l)
Note that (i) the Outfall 006 estimates include only the on -site drainage areas but not
the public drainage areas and (ii) the Outfall 007 estimate is based only on the truck
dike that drains into it.
Potential Pollutants
Permeable area: 146,800 ft2
Permeable area: 83,700 ft2
Permeable area: 91,200 ft2
Permeable area: 45,000 ft2
Permeable area: 176,400 ft2
Permeable area: 0 ft2
Impervious area: 177,600 ft
Impervious area: 74,300ft2
Impervious area: 43,800ft2
Impervious area: 5,700ft2
Impervious area: 327,700ft2
Impervious area: 1,400ft
Normally, no pollutants are discharged through any of the MHW Plant's stormwatcr
outfalls. The potential pollutants described in this section could be present only in the
event of an unplanned release that enters the stormwater sewer system.
a. Outfall 001
Most of the chemical process areas on site are within the stormwater drainage
area for this outfall. There are more than 400 chemical raw materials and
products on site, and virtually all of them could potentially enter Outfall 001.
Some of the major categories include: fuels, heat transfer fluids, fatty alcohols,
fatty acids, alkylphenols, EO & PO, caustic, acids, amines, resins, phenols,
xylene, formaldehyde, DEET, and biocides. Detailed lists are available in the
site's annual Tier 2 report or in the chemical inventories for each building.
b. Outfall 003
Drainage to this outfall is mainly from Area 190, Plant 1, and the roads south and
east of the Warehouse. There is also the possibility of receiving overflow from
the Outfall 001 drainage area or from the industrial sewer system. Because
virtually any chemical on site could find its way to Outfall 003 from at least one
of these source areas, the list of potential pollutants is the same as for Outfall
001.
C. Outfall 004
This outfall receives overflow from the Outfall 003 drainage area, the Outfall 005
drainage area, and some on -site roads. While there are some chemicals unlikely
to flow all of the way to Outfall 004 (e.g. EO & PO), the chemical transport
vehicle traffic on the on -site roads and the proximity several loading areas makes
it possible for the most of the chemicals described for Outfall 001 to be
considered potential pollutants at Outfall 004. Also, gravel can potentially wash
down from any of several sloped areas into Outfall 004.
Revision 5 page 7 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
d. Outfall 005
The WWTP is the main activity within the drainage area for this outfall.
Potential pollutants from the WWTP include treated wastewater, wastewater
residuals (sludge), liquid polymers, defoamers, phosphoric acid, and urea.
Occasionally some non -hazardous waste is stored near the trash compactor,
which is also located in the Outfall 005 drainage area.
Outfall 006
The drainage area for this outfall includes Plant 5 and the road west of the
WWTP. There are potentially more than 100 chemical raw materials and
products in the Plant 5 area, and virtually all of them could potentially enter
Outfall 006. Some of the major categories include: fatty alcohols, fatty acids,
alkylphenols, caustic, acids, amines, resins, phenols, xylene, and formaldehyde.
Detailed lists will be available in the site's annual Tier 2 report or in the chemical
inventory for Plant 5. Wastewater from the WWTP is another possible pollutant.
Outfall 006 also receives all stormwater flow from Outfall 007. And also,
Outfall 006 receives a large volume a stormwater from the public stormwater
system. Clariant has no knowledge of potential pollutants from sources outside
of its control.
f. Outfall 007
Outfall 007 receives stormwater from the back parking lot, the lawn beside the
Administration Building, the roads around the parking lot, and the truck scale.
The main potential for pollutants comes from the truck scale. Most chemicals on
site are weighed on the scale at some point, so again, with some exceptions, most
of the potential Outfall 001 pollutants are also potential Outfall 007 pollutants.
D. Sinificant Spills
There have been two significant releases to the Catawba River within the past three years.
1. The first occurred on August 21, 2007, when a rupture disk operated in Plant 3,
releasing the contents of a reactor. The reactor contained a mixture of raw materials
used for manufacturing a soap ingredient, Hostapon SCI 65. Approximately 10,000 lbs
were released, with an estimated 500 lbs landing in the river. The raw materials in the
reactor were coca hydrogenated fatty acid (550/6), Hostapon SI 57% (450/0), and zinc
oxide (0.03%). A film of this material developed on top of the river. The incident was
reported to the National Response Center and several local agencies, and the material
was cleaned out of the river within 24 hours. Note that this incident did not actually
involve the site's stormwater system, although it did cause materials to enter the river.
The site's containment systems functioned effectively to prevent any materials landing
on the site property from entering the river through stormwater. The incident report
can be found in Clariant's Incident Management System (IMS) in the Lotus Notes
database, report number 20070045.
2. The second release was discovered on June 3, 2008. A Plant 5 chemical sump pump
malfunctioned and overflowed into the storm sewer during a rain event. The storm
Revision 5 page 8 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
sewer leads to Outfall 006. Residue samples taken from the storm sewers and the
outfall showed evidence of sodium hydroxide and n,n-dimethyl alkyl (C12-C1 S)
amines. These are both production materials that were used in Plant 5 prior to the _
incident discovery. A working committee was convened and as a result there have d
been numerous improvements made to the Plant 5 sewer system. Another incident
identical to the one that occurred is no longer a feasible event. The committee remains
active, with several more stormwater system improvements planned.
Reports of minor spills can also be found in IMS.
U. STORMWATER MANAGEMENT PLAN
A. Feasibility Study
1. Storage Areas
a. Bulk Storage
There is no identified need to change methods of operation to reduce exposure of
bulls storage tanks to stormwater. Although product and raw material storage
tanks are exposed to stormwater, they are all located within secondary
containment. Fuel tanks are not located in secondary containment but they are
double -walled tanks that are inspected regularly.
b. Container Storage
Some chemical containers are stored inside the Warehouse where they are not
exposed to stormwater. However, many chemical containers are stored outside
where they are exposed to stormwater. Except for Plant 5, stormwater runoff
from container storage areas is controlled procedurally through the use of the
outfall valves. In the event of a release from a container, all applicable outfall
valves will be closed and the stormwater will be contained and/or diverted to the
industrial sewer. (The stormwater valves are normally kept closed most of the
time). Plant 5, instead of relying on outfall valves, is set up so that containers are
only stored in locations that drain to the chemical sewer, which does not
discharge to any outfall. Sitewide efforts in 2006 and 2007 successfully
eliminated several outside container storage areas. Further improvements have
been identified to provide covers and/or containment for several remaining
outside container storage areas. In particular, a large contained storage area is
eventually planned for the former Plant 2 location.
2. Material Handling erations
All loading (and unloading) areas are exposed to stormwater. These loading areas have
a variety of secondary containment provisions, ranging from some areas that have the
capability of containing a full tanker load of material, to other areas that do not have
secondary containment at all. Stormwater runoff from loading areas is controlled
procedurally through the use of the outfall valves. All loading activities are attended.
In the event of a release during loading activities, all applicable outfall valves will be
closed and the stormwater will be contained and/or diverted to the industrial sewer.
(The stormwater valves are normally kept closed most of the time). The feasibility of
Revision 5 page 9 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
providing additional protection by constructing full secondary containment for all of
the loading areas will continue to be evaluated. One notable improvement planned for
2009 is the installation of an automated pump to pump out the Plant 4 tanker loading
sump into the contained Plant 4 tank farm dike area.
Manufacturing Operations
There is no identified need to change methods of operation to reduce exposure of
manufacturing processes to stormwater. Virtually all process operations take place
either inside buildings or within contained areas.
4. Fueling Operations
The only fueling operations occur at the gasoline tank, where a few gasoline -fueled
vehicles are fueled. Fueling occurs relatively infrequently. The fueling area is exposed
to stormwater and it does not have secondary containment. Stormwater runoff is
controlled procedurally by ensuring that the Outfa11001 valve is closed while fueling.
The feasibility of providing additional protection by constructing secondary
containment or relocating the gasoline tank is being evaluated.
B. Secondary Containment Schedule
1. Bulk Storage of Liquid_ Materials
Bulk storage areas already have adequate secondary containment. Containment areas
are either pumped to the industrial sewer or drained to the stormwater sewer. Drainage
to the stormwater sewer is controlled by manual valves that are normally kept closed.
Only W WTP employees are authorized to open these valves and release accumulated
stormwater. Before releasing any stormwater, WWTP personnel visually observe the
water for color, foam, staining, sheens, and evidence of dry weather flow. Records of
each inspection and stormwater release are documented and kept in the WWTP. There
is a written WWTP procedure detailing the steps described here.
2. Storage of SARA 313 Water Priority Chemicals
The following SARA 313 water priority chemicals are stored on site: benzyl chloride,
formaldehyde, hydrochloric acid, maleic anhydride, naphthalene, phosphoric acid,
propylene oxide, sulfuric acid, and toluene. Chemicals stored in bulk are within
secondary containment areas. Chemicals stored in containers are generally stored in
the Warehouse but could be stored in any inside or outside storage area. Inside storage
areas, including the Warehouse, have adequate secondary containment. Outside
storage areas do not have local secondary containment. Secondary containment is
provided by the outfall valves as described earlier, and also by the Plant 5 layout as
described earlier. A schedule for providing local secondary containment for additional
protection will be developed.
3. Hazardous Substances
Bulk storage areas already have secondary containment as described above. Containers
of hazardous substances could be stored in any inside or outside storage area. Inside
storage areas have adequate secondary containment. Outside storage areas do not have
Revision 5 page 10 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
local secondary containment. Secondary containment is provided only by the outfall
valves as described earlier, and also by the Plant 5 layout as described earlier. A
schedule for providing local secondary containment for additional protection will be
developed.
C. BMP Summary
The MHW Plant currently uses numerous BMPs to prevent and/or minimize the potential for
pollutants to reach surface waters. These BMPs have been developed and implemented based
on many years of experience, and have taken into consideration the types, volumes, and
locations of potential pollutant sources. A long history of stormwater monitoring data has
affirmed the effectiveness of these BMPs.
l . Secondary containment is provided for the bulk storage of chemicals.
2. Loading and unloading operations are conducted in paved areas that drain into the
industrial sewer.
3. Secondary containment is provided around the truck scale.
4. Process areas utilize written procedures for all chemical -handling tasks.
5. Containment curbing is provided for most of the site, to provide additional protection
for areas having the greatest risk of loss of containment.
6. Outfall valves and containment area valves are normally kept closed. Only authorized
employees open them after inspection of the stormwater.
7. Outfalls and containment structures are inspected regularly.
8. All employees who work in chemical process areas receive training in operating
procedures, spill prevention, and spill response.
9. The site has an emergency response team (ERT) on site, trained in spill containment
and mitigation.
10. Major construction contractors are required to have an erosion control plan.
II1. SPILL PREVENTION AND RESPONSE PLAN
A. Assessment of Potential Pollution Sources
Potential pollution sources are described in detail in the Sections I and II of this Stormwater
Pollution Prevention Plan (SPPP)_ All areas of chemical operations, loading, and storage are
potential pollution sources. All chemicals handled on site are potential pollutants. In relative
terms, the most significant potential sources are those that do not have complete secondary
containment in the immediate vicinity. These areas include process sewers, certain loading
areas, and certain outside chemical container storage areas.
B. Responsible Personnel
Spill prevention and response is the responsibility of all employees working inside the plant.
Some specific responsibilities are detailed within the following two sections of this SPPP.
C. SPW Prevention
Spill prevention is accomplished by the use of standard operating procedures. All employees
who handle chemicals are responsible for following established procedures. Spill prevention
is also effected by properly maintaining equipment in good working condition. Area owning
Revision 5 page 11 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
departments and Maintenance are jointly responsible for ensuring the mechanical integrity of
equipment designed to containment chemicals or prevent spills.
D. Spill Control
Many spills can be controlled without a major "response" effort if proper procedures are
followed to utilize the site's secondary containment facilities_ Employees who handle
chemicals are primarily responsible for ensuring proper use of such facilities in the event of a
spill. Waste Department personnel also have a role in managing certain spill containment
areas. Area supervision is responsible for ensuring the adequacy of the procedures and
containment in their areas.
D. Spill Response
Spill response procedures, equipment, training, and responsibilities are described in detail in
the site's Emergency Response Plan (ERP) and Spill Prevention Control and
Countermeasures (SPCC) Plan. These plans are not duplicated within this SPPP, but they are
incorporated by reference. Both referenced plans describe in detail the responsibilities for
initial response, small spill response, and major spill response.
IV. PREVENTIVE MAINTENANCE AND GOOD HOUSEKEEPING
A. Stormwater System IIISpecWQns
System Inspections
All stormwater systems are formally inspected twice per year. These inspections are
documented using a checklist. These inspections provide a means of systematically
assessing the condition of stormwater facilities. Completed checklists are filed in the
Waste Department.
2. Daily Inspections
WWTP operators visually inspect all stormwater outfalls and stormwater containment
areas at least once per shift. These inspections are intended to identify any obvious or
critical problems.
Correction of Deficiencies
If a deficiency is noted during an inspection, the owning department is notified and
becomes responsible for ensuring that the necessary repairs are completed. The
Environmental Team Leader is responsible for any revisions to this SPPP. Resolution
of corrected deficiencies will be noted on a subsequent inspection checklist.
B. Process Equipment Inspections
Mechanical Integrity Inspections
In accordance with the site's preventive maintenance and mechanical integrity
programs, each production area works with Maintenance to assure that all critical
Revision 5 page 12 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
process equipment in their area is inspected at a designated frequency. Inspections are
scheduled and documented using the SAP computer database and the equipment files.
2. Daily Inspections
Each production area conducts visual inspections of their equipment at least once per
shift. These inspections are intended to identify any obvious or critical problems.
Correction of Deficiencies
Deficiencies identified during inspections are addressed and ultimately corrected. Area
supervision is responsible for ensuring that deficiencies in their area are resolved.
C. Housekeepin.2
1. Daily Housekeeping
All areas of the site maintain housekeeping on an ongoing basis. Areas are kept neat
and organized and are washed down as necessary. Some of the daily housekeeping
responsibilities of each area include:
a. Maintaining clean floor and ground surfaces.
b. Regular pickup of trash and waste materials.
C. Maintaining clean conditions around trash dumpsters.
d. Ensuring that dust and powder levels near building vents are kept to a minimum.
e. Proper labeling of all containers.
f. Prompt cleanup of spills.
g. Maintaining adequate aisle space.
h. Storing containers out of the path of common traffic routes.
i. 5S program has been implemented to clean and organize work areas.
2. Monthly Inspections
Monthly safety and housekeeping inspections are conducted by each department.
These inspections are documented on a checklist. Each department is responsible for
correcting deficiencies identified by these inspections.
V. EMPLOYEE TRAINING
A. Training Schedule
All employees whose jobs have the potential to affect stormwater are trained at least once per
calendar year.
B. Training Content
Annual training includes: proper spill response and cleanup procedures, housekeeping
practices, maintenance and inspection requirements, spill containment facilities and
procedures, and a review of the stormwater sewers and stormwater outfalls at the site.
Additional topics of emphasis are often added each year.
Revision 5 page 13 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
C. D. _esignated Person Responsible for Training
At the MHW Plant, the person responsible for implementing SPPP training is the
Environmental Team Leader. Currently that person is:
Gil Insley Telephone 704-822-2218 Cell Phone 704-301-4598
V1. RESPONSIBLE PARTY
A. Overall SPPP
The Environmental Team Leader is responsible for the overall coordination, development,
implementation, and revisions to the SPPP.
B. Management Support
The Plant Leadership Team (PLT) is responsible for overseeing the implementation and
compliance with the SPPP. The PLT also ensures that the necessary financial and technical
resources are provided as needed to support the SPPP.
C. Engineering & Maintenance
The Engineering and Maintenance staff is responsible for implementing the preventive
maintenance and mechanical integrity related tasks identified in the SPPP, as well as for
implementing any equipment modifications or repairs that may become necessary.
D. Operations
Operations employees are responsible for completing daily tasks such as equipment visual
inspections. They are also responsible for ensuring that their activities are in accordance with
the requirements of this SPPP. Operations supervision is responsible for initiating corrective
actions related to equipment or procedures in their areas.
E. All Employees
All employees who work inside the industrial potion of the MHW site are responsible for:
Following the requirements of this SPPP.
2. Responding to spills appropriately based on their level of training and their familiarity
with the material spilled.
Taking all reasonable precautions to prevent the contamination of stormwater.
VU. PLAN AMENDMENT
This SPPP will be updated as necessary. As a minimum, the SPPP will be updated annually.
Additionally, the SPPP will be updated whenever:
A. There is a change in design, construction, operation, or maintenance which has a significant
effect on the potential to discharge contaminated stormwater to the Catawba River.
Revision 5 page 14 of 15 January 30, 2009
Stormwater Pollution Prevention Plan
B. There is a release of a reportable quantity of a hazardous substance or oil, if the released
material enters the Catawba River.
C. A critical need for an immediate improvement is identified.
VM. FACILITY INSPECTION PROGRAM
Stormwater system inspections are conducted semi-annually as required by the site's permit.
Stormwater discharge monitoring is also conducted semi-annually as required. Copies of all
inspection records and monitoring results are kept on file in the Waste Department.
IX. IMPLEMENTATION
All documentation required by the site's permit is kept on file for at least five years.
Revision 5 page 15 of 15 January 30, 2009
STORAGE TANKS
CLARIANT CORPORATION - MOUNT HOLLY WEST PLANT
7/8/2009
Tank Volume
Area
Tank 9
(gallons)
Current Contents
Plant 1
161
12,000
out of service
162
12,000
out of service
163
8,000
empty
171
3,000-
empty
172
8,000
empty
173
8,000
empty
174
8,000
empty
177
8,000
out of service
Plant 2
261
6,000
OLEIC ACID
262
6,000
empty
263
6,000
OLEIC ACID
264
12,000
TALL OIL FATTY ACID
267
12,000
empty
268
12,000
empty
271
12,000
empty
272
12,000
out of service
273
12,000
RECOVERED OCETYL ALCOHOL
274
10,000
GENAMIN C 050
277
12,000
PROPYLENE GLYCOL
281
12,000
LIAL 111
282
12,000
empty
283
10,000
empty
285
12,000
empty
286
12,000
empty
287
12,000
empty
288
12,000
empty
Plant 3
341
12,000
out of service
342
12,000
DIETHYLAMINE (DEA)
343
6,000
DEA, TEA, & WATER
344
4,500
DEET
351
12,000
DEET & IMPURITIES
352
6,000
DEET & NEMTA
353
6,000
WATER, DEET, & IMPURITIES
361
12,000
DEET
362
12,000
out of service
363
6,600
out of service
371
20,000
NIPACIDE BIT 20 DPG
372
15,000
out of service
373
6,000
DIPROPYLENE GLYCOL
381
20,000
out of service
382
15,000
NIPACIDE BIT 20
---
6,000
NITROGEN (not diked)
Page I of)
Page 3
B. Any stormwater runoff from the affected areas at the site shall be in accordance
with any applicable permit requirements and regulations promulgated by the
Environmental Protection Agency and enforced by the N.C. Environmental
Management Commission. It shall be the permittee's responsibility to contac
the Division of Water Quality to secure any necessary stormwater permits o
other approval documents.
2. A. Any mining process producing air contamination emissions shall be s jec# to
the permitting requirements and rules promulgated by the N.C. Env onmental
Management Commission and enforced by the Division of Air Quality.
B. During mining operations, water trucks or other means thaty be necessary
shall be utilized to prevent dust from leaving the permitted ea.
3. A. Sufficient buffer (minimum 50 foot undisturbed) shall bey6aintained between any
affected land and any adjoining waterway or wetland tcyprevent sedimentation of
that waterway or wetland from erosion of the affected and and to preserve the
integrity of the natural watercourse or wetland.
B. Any mining activity affecting waters of the State/,waters of the U. S., o`r wetlands
shall be in accordance with the requirements d regulations promulgated and
enforced by the N. C. Environmental Manage ent Commission.
4. A. Adequate mechanical barriers including b not limited to diversions, earthen
dikes, check dams, sediment retarding st ctures, rip rap pits, or ditches shall be
provided in the initial stages of any land isturbance and maintained to prevent
sediment from discharging onto adjacqbt surface areas or into any lake, wetland
or natural watercourse in proximity tcythe affected land.
B. All drainage from the affected are,A around the mine excavation shall be diverted
internal to said excavation or ino the stilling basins.
C. Mining activities shall occur s indicated on the Site Plan dated July 30, 2007
and the supplemental inf ation received by the Land Quality Section on
September 24, 2/ed
October 24, 2007.
5. All affected area bound.74 acres) and mining permit boundaries (18.68 acres)
shall be permanently mthe site on 140-foot intervals unless the line of sight
allows for larger spacinls.
6. The angle for grad9d slopes and fills shall be no greater than the angle, which can be
retained by veg tive cover or other adequate erosion control measure, structure, or
device. In an event, exposed slopes or any excavated channels, the erosion of which
may caus ff-site damage because of siltation, shall be planted or otherwise provided
with gro d cover, devices or structures sufficient to restrain such erosion.
STORAGE TANKS
CLARIANT CORPORATION - MOUNT HOLLY WEST PLANT
7/8/2009
Tank Volume
Area Tank -4
(gallons)
Current Contents
Plant 4 401
13,000
ETHYLENE OXIDE
402
13,000
ETHYLENE OXIDE
403
13,000
PROPYLENE OXIDE
456
30,000
HOSTAPON IPF
457
30,000
HOSTAPON SI
458
30,000
C-1218
459
5,000
out of service
462
12,000
CORSAMINE PCD
463
12,000
OKERIN 11044
464
12,000
EMERSOL 136
465
8,000
MPG 1820
466
8,000
DECYL ALCOHOL
467
8,000
CAUSTIC SODA 50%
468
8,000
BENZYL ALCOHOL
469
13,000
NITROGEN (not diked)
472
12,000
CO-1214 ALCOHOL
473
12,000
C-3 HEADS -
474
12,000
COCONUT FATTY ACID
475
8,000
SORBITOL
476
8,000
TRIDECYL ALCOHOL
477
8,000
CASTOR OIL
478
8,000
2-ETHYL HEXANOL
479
8,000
POE 20 SORBITAN
482
12,000
C-3 HEADS
483
12,000
HOSTAGLISS EHS
484
12,000
V-1100
485
12,000
2-BUTOXY ETHANOL
486
12,000
PELARGONIC ACID (TEMP-40)
487
12,000
CORSAMINE PCD
488
5,000
RECOVERED PELARGONIC ACID
489
5,000-
DIESEL FUEL
Plant 5 ST-01
16,000
MONOCHLOROACETIC ACID
ST-02
12,000
COCONUT FATTY ACID IV 1 MAX
ST-03
16,000
CAUSTIC 50%
ST-05
12,000
empty
ST-06
12,000
empty
ST-07
16,000
SAFEWING MP III ECO
ST-08
16,000
empty
ST-09
16,000
ISONONANOIC ACID
ST-10
16,000
empty
ST-11
16,000
ARKOPAL N-090
ST-12
16,000
empty
ST-13
16,000
HOSTAGLISS 1603
ST-14
16,000
HOSTAPUR SAS-30
Page 2 of 3
Page 4
7. The affected land shall be graded so as to prevent collection of pools of water that are,
or likely to become, noxious or foul. Necessary structures such as drainage ditches or
conduits shall be constructed or installed when required to prevent such conditions.
8. Existing vegetation or vegetated earthen berms shall be maintained between the mine
and public thoroughfares whenever practical to screen the operation from the public.
9. Sufficient buffer (minimum 50 foot undisturbed except for a section of the haul road
shall be maintained between any excavation and any mining permit boundary to pro
adjacent property. 7
10. A. No on -site disposal of refuse or other solid waste that is generated out (de of the
mining permit area shall be allowed within the boundaries of the mini permit
area unless authorization to conduct said disposal has first been ob ined from
both the Division of Waste Management and the Land Quality Se on,
Department of Environment and Natural Resources. The metho of disposal
shall be consistent with the approved reclamation plan.
B. Mining refuse as defined by G.S. 74-49 (14) of The Mining ct of 1971
generated on -site and directly associated with the mining ctivity may be
disposed of in a designated refuse area. All othe�wast products must be
disposed of in a disposal facility approved by the is' n of Waste
Management. No petroleum products, acids, solven or their storage containers
or any other material that may be considered hazar ous shall be disposed of
within the permitted area.
C. For the purposes of this permit, the Division of and Resources considers the
following materials to be "mining refuse" (in a dition to those specifically listed
under G.S. 74-49 (14) of the N.C. Mining A of 1971):
1. on -site generated land clearing d ris
2. conveyor belts
3. wire cables
4. v-belts
5. steel reinforced air hoses
6. drill steel
D. If mining refuse is to be per nently disposed within the mining permit
boundary, the following inf mation must be provided to and approved by the
Division of Land Resour s prior to commencement of such disposal:
1. the approxim a boundaries and size of the refuse disposal area;
2. a list of ref a items to be disposed;
3. verificati that a minimum of 4 feet of cover will be provided over the
refus -
4. ve ' cation that the refuse will be disposed at least 4 feet above the -
easonally high water table; and,
Area
Area 190
WWTP
Misc
STORAGE TANKS
CLARIANT CORPORATION -- MOUNT HOLLY WEST PLANT
7/8/2009
Tank Volume
Tank 9
(gallons)
Current Contents
ST-15
16,000
PROPYLENE GLYCOL
ST-16
16,000
PROPYLENE GLYCOL
ST-17
16,000
SAFEWING MP IV LAUNCH
ST-18
16,000
SAFEWING MP IV LAUNCH
ST-19
16,000
SAFEWING MP IV LAUNCH
ST-20
16,000
SAFEWING MP IV LAUNCH
ST-21
16,000
SAFEWING MP IV LAUNCH
ST-22
16,000
SAFEWING MP 1V LAUNCH
-----
16,000
out of service
-----
16,000
out of service
-----
16,000
out of service
ST-01
35,000
HOSTAPUR SAS 30 LS
ST-02
16,000
HOSTAPUR SAS 60 LS
ST-03
35,000
empty .
ST-04
35,000
out of service
ST-05
35,000
HOSTAPUR SAS 30 LS
ST-06
35,000
HYDROCHLORIC ACID
ST-07
35,000
HYDROCHLORIC ACID
ST-08
35,000
out of service
TK-03
10,000
WATER
TK-04
6,000
WATER
-----
13,000
NITROGEN (not diked)
-----
13,060
NITROGEN (not diked)
ST-63-01
6,000
out of service
ST-63-02
6,000
out of service
ST-64-FUEL-1
500
DIESEL FUEL (emergency generator)
-------
500
DIESEL FUEL (fire water pump)
-------
500
DIESEL FUEL (fire water pump)
ST-64-FUEL-4
500
DIESEL FUEL (emergency generator)
1
Page 3 of 3
Page 5
5. verification that a permanent vegetative groundcover will be established.
11. An Annual Reclamation Report shall be submitted on a form supplied by the
Department by February 1 of each year until reclamation is completed and a
12. The operator shall notify the Department in writing of the desire to delete, modi or
otherwise change any part of the mining, reclamation, or erosion/sediment
co roI plan
contained in the approved application for a mining permit or any approved re ision to it.
Approval to implement such changes must be obtained from the Departure prior to
on -site implementation of the revisions.
13. The security, which was posted pursuant to N.C.G.S. 74-54 in the for of a $15,400.00
Irrevocable Standby Letter of Credit, is sufficient to cover the operati as indicated in
the approved application. This security must remain in force for thi permit to be valid.
The total affected land shall not exceed the bonded acreage.
14. A. Authorized representatives of the Division o/he tl History shall be
granted access to the site to determine the significant
archaeological resources.
B. Pursuant to N. C. G. S. 70 Article 3, "The Unan Burial and Human
Skeletal Remains Protection Act," should thr any person in his
employ encounter human skeletal remains, otification shall be
provided to the county medical examiner anrchaeologist, North
Carolina Division of Archives and History.