Loading...
HomeMy WebLinkAbout20080889 Ver 2_Approval Letter_20090915A ?A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary Mr. Carl von Isenburg Geoscience & Technology, P.A. 2050 Northpoint Dr., Suite A Winston-Salem, NC 27101 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Isenburg: September 15, 2009 DWQ# 08-0899 ver 2 Forsyth County The Tanner's Park Townhome Owners Association has our approval, in accordance with the attached conditions, to place fill in 249 linear feet of Tar Branch in order reduce bank slope failure and provide additional safety to residences at the top of bank in the Tanners Park Tohwnhomes located off Wachovia Street in Winston-Salem, NC in Forsyth County, as described in your application received by the Division of Water Quality (Division) on August 20, 2009. This approval shall replace a previous approval issued by the Division on June 8, 2008. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3705, which can be viewed on our web site at htip://www.ncwaterquality.org/wetlands.html. This Certification allows you to use Nationwide Permit Number 29 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: 1. The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Stream Identifier Stream Impact len th S1 Tar Branch 149 linear feet permanent impact S1 Tar Branch 100 linear feet temporary impact Total 249 linear feet impact North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer North Carolina Naturally Carl von Isenburg DWQ# 08-0899 v2 September 15, 2009 Page 2 of 3 2. This certification does not automatically authorize impacts on property owned by others. Tanner's Park Townhome Owners Association shall be responsible for securing all access rights necessary to complete this work. No new impervious surface shall be developed as a result of this stream impact. Any increase in impervious surface at either the Tanner's Park Townhomes or the Tar Branch Investors, LLC property shall require a modification to this certification to address additional stormwater runoff. 4. Please note that the Division does not believe that permanent stream impacts by piping is the proper solution to inadequate stormwater management practices and subsequent streambank erosion. Any future impacts to Tar Branch within this vicinity as a result of continued stress to the stream system from stormwater runoff must be adequately addressed from a stormwater management perspective. 5. All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed and bed profile after construction is complete and the site shall be stabilized with natural woody vegetation and restored to prevent erosion. 6. Immediately upon completion of the restoration of the temporary impacts, the Permittee shall contact the Division for a post construction site inspection. 7. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the §401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCDWQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@ncmail.net. Sincerely, Coleen H. Sullins, Director Division of Water Quality cc: John Thomas, U. S. Army Corps of Engineers, Asheville Regulatory Field Office Alice W. Revelle, President, Tanner's Park Townhome Owners Association, 525 Tanners Park Court, Winston- Salem, NC 27101 Q Winston-Salem Regional Office DWQ Central Files DWQ Wetlands/401