Loading...
HomeMy WebLinkAbout19960830 Ver 1_COMPLETE FILE_19960917Division of Water Quality Water Quality Section MEMORANDUM To: John Parker, DCM From: John Dorney, D CQ '? P> Subject: CAMA Permit Application Calico Jacks Inn and Marina Carteret County DWQ #960830 The Division of Water Quality has no objection to the issuance of a CAMA Permit to the Calico Jacks Inn and Marina to place riprap material in 2,300 square feet of waters. This activity is certified under Water Quality Certification Number 3025. We suggest that pumpout facilities be installed at the marina to better protect water quality. Please call me at 733-1786 if you have any questions. cc: Central Files Wilmington DWQ Regional Office Project File Environmental Sciences Branch Water Quality Section `s y 6-0 83 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Calico Jacks Marina 2. LOCATION OF PROJECT SITE: adjacent to NCSR 1335 and Back Sound, in the community of Harkers Island, Carteret County Photo Index - 1995: 49-585:H-18 1989: 156-6:R-3 State Plane Coordinates - X: 2741100 Y: 350000 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 8-20-96 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received - 8-23-96 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Carteret County Land Classification From LUP - Limited Transition & Conservation (B) AEC(s) Involved: EW & PTA (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - Septic Tanks Planned - (F) Type of Structures: Existing - Motel, Marina, Ships Store Planned - Riprap (G) Estimated Annual Rate of Erosion: None Source - Personal observation (already stabilized) 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands I I ± 2,300 ft.2 Shallow water bottom area (C) Other (D) Total Area Disturbed: f 2,300 ft.2 (E) Primary Nursery Area: No (F) Water Classification: SA ORW Open: No 8. PROJECT SUMMARY: The applicant proposes to place riprap material in front of an existing breakwater in Back Sound at Calico Jacks Marina. i? FIELD INVESTIGATION REPORT: Calico Jacks Marina PAGE #2 9. NARRATIVE DESCRIPTION: The applicant's property consists of an approximately 1.6 acre tract of land located adjacent to Back Sound and NCSR 1335, on the eastern end of Harkers Island, Carteret County. The property was developed into a motel and marina facility in the early 1970's and today approx. 24 motel units, 15 travel trailer spaces and 35 boat slips are available for rent. A ships store and boat ramp facility are also located on the property. The marina basin is located in the open waters of Back Sound and is protected by a concrete sheet breakwater which is located around its perimeter. Over the years the breakwater has begun to show the signs of deterioration and rock riprap has been used to fortify a f 40' long section of the wall. Potable water is supplied by a community water system while sewage disposal is by individual septic tanks located on the property. There is no pump out facility available at the marina facility. Back Sound is classified as SA ORW waters and the immediate area around the marina basin is closed to the harvesting of shellfish. Back Sound is noted for its extensive areas of submerged aquatic vegetation (SAV) and shellfish resources including clams and scallops. Hurricane Bertha caused the breakwater to fail in several areas and the applicant is now requesting a permit which would allow for the placement of rock riprap waterward of the breakwater and into the open waters of Back Sound. Plans included with the application indicate that approx. 180 linear feet of riprap material would be placed in a east to west direction along the south wall of the breakwater with an additional 25' of material being wrapped around the ends of each side. The riprap is proposed to be placed a maximum distance of 10' waterward of the breakwater wall which would be at an angle slightly greater than 3:1. 10. ANTICIPATED IMPACTS: The project as proposed will result in the filling of approx. 2, 300 ft.2 of shallow water bottom area with f 250 cu.3 of riprap material being placed below the mean high water line. The material used for riprap must be of a sufficient size to prevent its easy movement offsite since it will be directly exposed to southwest winds. It is not anticipated that the project would impact any SAV since there should be a "scour zone" immediately waterward of the existing wall. This high energy zone would normally not be a conducive area for SAV or shellfish resources. PREPARED BY: Charles Jones DATE: August 26, 1996 f Form DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town community or landmark 1. APPLICANT CA ° `-M c A?; -rA/'v 4 ^A "` IAAVZKE 1Q S I- //t N0 I?G Lg53 / c. Street address or secondary road number a. Landowner: - 1,690 -t914.10 %i.4e Name I?aS? bcw+% Z1A=MEQ Address fie .ZS 41 .4 l?o 46 City / lAr-hERS =S. State /'V G Zip 26: 5--5 / Day Phone q' -728 -3S 75- Fax N b. Authorized Agent: Name Address City State Zip Fax Day Phone c. Project name (if any) P""36 Ie -BV2.?j£j2 NOTE. Permit will be issued in name of landovmer(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County _ARYERE d. Is proposed work within city limits or planning jurisdiction? -I,G Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) -A4c AN n" A/ A 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. T a Qt=6C=QA, -ice 4A., E,X % /VG f , ? --AleLOATEP- i-"k -hL M -A v a' N+4 F- n r b. Is the proposed activity maintenance of an existing project, new work, or both?/ c. Will the project be for public, private or commercial use? LOMmrI?r^_PA/ d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages, kb 12gw?1 4M N (,Y Lvhk---e A- ?F L&A m J-Ai -44 ,104 4?7 /,,4- -::u- 7 Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS ? a. Size of entire tract 290 ` 123 1S0 b. Size of individual lot(s) c. Approximate elevation of tract above MHW or NWL d. Soil type(s) and texture(s) of tract ,!!gwn?4 e. Vegetation on tract -•lr? a-SS m. Describe existing wastewater treatment facili n. Describe location and type of discharges to of the state. (For example, surface runoff, s? wastewater, industrial /commercial effluent, down" and residential discharges.) - ,6 o. Describe existing drinking water supply sour GOn+rN4N:24 ?A72 f. Man-made features now on tract 436,JU µA.-i:VA/ 2:4 NNiT Mork,. -r A s „ s..b t2 g- 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation •-- 'Transitional Developed Community Rural Other h. How is the tract zoned by local government? Al 4- i. Is the proposed project consistent with the applicable zoning? Yes No (Attach zoning compliance certificate, if applicable) j. Has a professional archaeological assessorpt been done for the tract? Yes L-,' No If yes, by whom? In addition to the completed application forr following items must be submitted: • A copy of the deed (with state application of other instrument under which the applicant Clair to the affected properties. If the applicant claiming to be the owner of said property forward a copy of the deed or other instrument which the owner claims title, plus written pern from the owner to carry out the project. • An accurate, dated work plat (including plat and cross-sectional drawings) drawn to scale in ink on an 8 1/2" by 11" white paper. (Re Coastal Resources Commission Rule 7J.020' detailed description.) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or ell ' le property? Yes No Are there wetlands on the site? Yes --- No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach documentation, if available) Please note that original drawings are preferre only high quality copies will be accepted. Bit prints or other larger plats are acceptable on]) adequate number of quality copies are provid applicant. (Contact the U.S. Army Cori Engineers regarding that agency's use of drawings.) A site or location map is a part c requirements and it must be sufficiently detai guide agency personnel unfamiliar with the area I Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Final Existing Project Length Width Depth Depth Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) Revised 03/95 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards b. Type of material to be excavated . c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? Yes No d. Highground excavation in cubic yards 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area b. Dimensions of disposal area c. Do you claim title to disposal area? Yes No If no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? Yes No If yes, where? Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes No f. Does the disposal include any area in the water? Yes No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization Bulkhead Riprap b. Length c. Average distance waterward of MHW or NWL d. Maximum distance waterward of MHW or NWL e. Shoreline erosion during preceding 12 months (Source of information) f. Type of bulkhead or riprap material g. Amount of fill in cubic yards to be placed below water level (1) Riprap (2) Bulkhead backfrll h. Type of fill material i. Source of fill material 4. OTHER FILL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill aterial be brought to site? Will 0 fill No If yes, (1) Amount of material to be placed it water (2) Dimensions of fill area z?5 ?' Ce (3) Purpose of fill yb .a„ej,,ie t k., h Q:11c?a?o,._. ? o .,1-fir' S• Fir e b. Will fill material be placed in coastal wetl (marsh), SAVs or other wetlands? Yes t? No If yes, (1) Dimensions of fill area (2) Purpose of fill 5. GENERAL a. How will excavated or fill material be kept or and erosion controlled? LIM b. What type of construction equipment will be (for example, dragline, backhoe, or hydr dredge)? . ?s?o w StFF.I/ sea L+ j 02 n• e. c. Will wetlands be crossed in transporting equip to project site? Yes No If yes, explain steps that will be taken to It environmental impacts. Applicant or Project Name Signature ph'1??/ Date Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name /15 L 1. A• XAi:? Address {?o?f!-d??cL%St it/.?•,iN Ar- ?r.S7A Q Phone Name ?A??c7 ?Q'F5E/ j:? Address !2S/3 Awr? .QUA _Z&u/e..v AIC Phone 9/q S5? - SL :7..9'7 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained ;n the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the _2 day of '1994. Print Name W05 /t/*We; ?- /4,m- Signature/"lac.c.+? tS? Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE. Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 Q o? ??s . • • e ? ® o u ?o a -. \ /?. • • 9 6 • C • T - - , 00 •i ?I • 1??aK ?? ??AK?ra / G 1 G v` y E ?' J r S 1-2 sN??RE 7 xws+, -5 7` E,.,IlenCD C.ALfCC 44.2-AC.( 'Z -? ? ?S-r-l r? :?- ? 6 `G ?? ?A / 11.. .5?? {R? 0 ??? A i ?? ? ?' ? r? ?? ?? . ? .- t ' ? r 1 ..?-5?.. ' i '; .I 1 ! ? ?` ? ?? ?? +? ?? 1 { Te?? L? ???\? ? ?_ _ - _ _ _ __ - ?, -a --- -? ? ? l -? e c. ... ??'. G" ; ?, w- ?r `+? O\ ,. ?? `? ?: ? L? ? C_?? _ ?I ? ?-