October 30, 1996
Mr. William F. Parker
Parker Construction Company
565 Neptune Drive
Swansboro, NC 28584
Dear Mr. Parker,
Re: Certification Pursuant to Section 401 of the Federal Clean Water Act,
Proposed after-the-fact retention of fill for concrete ready-mix plant
Project #960791, COE #199603735
Carteret County
Attached hereto is a copy of Certification No. 3088 issued to William Parker, Parker
Construction Company dated 28 October 1996.
If we can be of further assistance, do not hesitate to contact us.
Attachments
s~~~.
3088. wqc
cc: Wilmington District Corps of Engineers
Corps of Engineers Wilmington Field Office
Wihnington DWQ Regional Office
Mr. John Dorney ·
Mr. John Parker, Division of Coastal Management
Central Files
Division of Water Quality . Environmental Sciences Branch
Enviro. Sciences Branch. 4401 Reedv Creek Rd.. Raleiah. NC 27607 Teleohone 919-733-1786 FAX # 733-9959
NORTH CAROLINA 401 WATER QUALITY CERTIFICATION
THIS CERTIFICATION is issued in conformity with the requirements of Section 401
Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of
Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to William Parker resulting in
0.23 acres of wetland impact in Carteret County pursuant to an application med on the 15th day of
August of 1996 to retain fill placed in wetlands to construct a concrete ready-mix plant.
The application provides adequate assurance that the discharge of fill material into the waters
of East Prong and Sanders Creeks in conjunction with the proposed development will not result in
a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State
of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application
and conditions hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in your application,
as described in the Public Notice or as modified below. If you change your project, you must
notify us and you may be required to submit a revised application. For this approval to be valid,
you must follow the conditions listed below. In addition, you should get any other federal, state
or local permits before you go ahead with your project including (but not limited to) Sediment and
Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations.
Condition(s) of Certification:
1. That the activity be conducted in such a manner as to prevent significant increase in
turbidity outside the area of construction or construction related discharge (50
NTUs in streams and rivers not designated as trout waters by DWQ; 25 NTUs in
all saltwater classes, and all lakes and reservoirs; 10 NTUs in trout waters).
2. Ms. Linda Lewis of the Wilmington DWQ Regional Office shall be contacted for
storm water approval.
Violations of any condition herein set forth shall result in revocation of this Certification and
may result in criminal and/or civil penalties. This Certification shall become null and void unless
the above conditions are made conditions of the Federal 404 and/or coastal Area Management Act
Permit. This Certification shall expire upon expiration of the 404 or CAMA permit.
If this Certification is unacceptable to you have the right to an adjudicatory hearing upon
written request within sixty (60) days following receipt of this Certification. This request must be
in the form of a written petition conforming to Chapter 150B of the North Carolina General
Statutes and filed with the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C.
27611-7447. If modifications are made to an original Certification, you have the right to an
adjudicatory hearing on the mcxiifications upon written request within sixty (60) days following
receipt of the Certification. Unless such demands are made, this Certification shall be final and
binding.
WQC #3088
This the 30th day of October, 1996
ION OF WATER QUALITY
esto~~p.E.
. ~'.
DEPARTMENT OF THE ARMY
Wilmington District, Corps of Engineers
Post Office Box 1890
Wilmington, North Carolina 28402-1890
9G0791
Action ID. 199603735
August 15, 1996
PUBLIC NOTICE
Mr. William F. Parker, Parker Construction Co., Inc., 565 Neptune Drive,
Swansboro, North Carolina 28584, at Telephone No. (919) 393-2206 or 393-2207,
has applied for an after-the-fact Department of the Army permit to DISCHARGE
FILL MATERIAL WITHIN APPROXIMATELY 8,850 SQUARE FEET (0.23 ACRES) OF SECTION
404 WETLANDS FOR THE CONSTRUCTION OF A CONCRETE READY-MIX PLANT located on
Tract 3, west of the existing construction office facility, on the south side
of NC Highway 24, approximately 1.7 miles east of SR 1118 (Bogue Loop Road),
adjacent to East Prong and Sanders creek, in Ocean, Carteret county, North
Carolina.
The following description of the work is taken from data provided by the
applicant, and from observations made during an onsite inspection by a
representative of the U.S. Army Corps of Engineers. The purpose of the
project is to expand the existing construction facility with the addition of a
new concrete plant, a concrete material storage area, and an employee parking
area.
Plans submitted with the application show the site of the proposed
addition is located directly west of the existing maintenance shop and office.
The previously filled wetland drains are approximately 100 Ieet wide X 75 long
and 10 feet wide X 135 feet long. Approximately 8,850 square feet (0.23 AC)
of wetlands has been filled to facilitate construction. The approximate 3,200
cubic yards of fill material consists of sand from an upland borrow pit. The
upstream wetlands of the impacted area are primarily vegetated with ~
svlvatica biflora, ~ svlvatica, Ilex opaca, and Woodwardia virainica. The
underlain soils are hydric, and are mapped as Murville mucky sand and Leon
sand. The applicant has used stone riprap to stabilize the slopes, and has
installed culverts to allow the water to circulate. Plans showing the work
are included with this public notice.
The applicant has determined that the proposed work is consistent with
the North Carolina Coastal Zone Management Plan and has submitted this
determination to the North Carolina Division of Coastal Management for their
review and concurrence. This proposal shall be reviewed for the applicability
of other actions by North Carolina agencies such as:
a. The issuance of a Water Quality Certification under Section 401 of
the Clean Water Act by the North Carolina Division of Environmental
Management.
b. The issuance of a permit to dredge and/or fill under North Carolina
General Statute 113-229 by the North Carolina Division of Coastal Management.
c. The issuance of a permit under the North Carolina Coastal Area
Management Act (CAMA) by the North Carolina Division of Coastal Management or
their delegates.
2
d. The issuance of an easement to fill or otherwise occupy state-owned
submerged land under North Carolina General statute 143-341(4), 146-6, 146-11,
and 146-12 by the North Carolina Department of Administration and the North
Carolina Council of state.
e. The approval of an Erosion and Sedimentation Control Plan by the Land
Quality Section, North Carolina Division of Land Resources, pursuant to the
state Sedimentation Pollution Control Act of 1973 (NC G.S. 113 A-50-66) .
The requested Department of the Army permit will be denied if any
required State or local authorization and/or certification is denied. No
Department of the Army permit will be issued until a State coordinated
viewpoint is received and reviewed by this agency. Recipients of this notice
are encouraged to furnish comments on factors of concern represented by the
above agencies directly to the respective agency, with a copy furnished to the
Corps of Engineers.
This application is being considered pursuant to Section 404 of the Clean
Water Act (33 U.S.C. 1344). Any person may request, in writing within the
comment period specified in the notice, that a public hearing be held to
consider this application. Requests for public hearing shall state, with
particularity, the reasons for holding a public hearing.
The District Engineer has consulted the latest published version of the
National Register of Historic Places for the presence or absence of registered
properties, or properties listed as being eligible for inclusion therein, and
this worksite is not registered property or property listed as being eligible
for inclusion in the Register. Consultation of the National Register
constitutes the extent of cultural resource investigations by the District
Engineer, and he is otherwise unaware of the presence of such resources.
Presently, unknown archeological, scientific, prehistorical, or historical
data may be lost or destroyed by work under the requested permit.
The District Engineer, based on available information, is not aware that
the proposed activity will affect species, or their critical habitat,
designated as endangered or threatened pursuant to the Endangered Species Act
of 1973.
The decision whether to issue a permit will be based on an evaluation of
the probable impacts, including cumulative impacts, of the proposed activity
and its intended use on the public interest. Evaluation of the probable
impacts which the proposed activity may have on the public interest requires a
careful weighing of all those factors which become relevant in each particular
case. The benefits which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. The
decision whether to authorize a proposal, and if so the conditions under which
it will be allowed to occur, are therefore determined by the outcome of the
general balancing process. That decision should reflect the national concern
for both protection and utilization of important resources. All factors which
may be relevant to the proposal must be considered including the cumulative
effects thereof. Among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, cultural values, fish and wildlife values,
flood hazards and flood plain values (in accordance with Executive Order
11988), land use, navigation, shore erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food and fiber
production, mineral needs, considerations of property ownership, and, in
general, the needs and welfare of the people. For activities involving the
placement of dredged or fill materials in waters of the united states, a
permit will be denied if the discharge that would be authorized by such permit
3
would not comply with the Environmental Protection Agencies' 404(b) (1)
guidelines. Subject to the preceding sentence and any other applicable
guidelines or criteria, a permit will be granted unless the District Engineer
determines that it would be contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal,
state and local agencies and officials; Indian Tribes and other interested
parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental
effects and the other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments
are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
Generally, the decision whether to issue this Department of the Army
permit will not be made until the North Carolina Division of Environmental
Management (DEM) issues, denies, or waives state certification required by
Section 401 of the Clean Water Act. The DEM considers whether or not the
proposed activity will comply with Sections 301, 302, 306, and 307 of the
Clean Water Act. The application and this public notice for the Department of
the Army permit serves as application to the DEM for certification.
Additional information regarding the Clean Water Act certification may be
reviewed at the offices of the Environmental operations Section, North
Carolina Division of Environmental Management, Salisbury Street, Archdale
Building, Raleigh, North Carolina. Copies of such materials will be furnished
to any person requesting copies upon payment of reproduction costs.
All persons desiring to make comments regarding the application for Clean
Water Act certification should do so in writing delivered to the North
Carolina Division of Water Quality, 4401 Reedy Creek Road, Raleigh, North
Carolina 27611-7687, on or before September 6, 1996, Attention: Mr. John
Dorney.
Written comments pertinent to the proposed work, as outlined above, will
be received in this office, Attention: Mr. Mickey Sugg, Wilmington Regulatory
Field Office, until 4:15 p.m., September 13, 1996, or telephone (910) 251-
4811.
'tt
4 Hi\I\{ ~
I
elw
'10' ~ J:\P.
~o'S
~W:sP
.
~, 'D~..o.1 \JA~~
~. tOtD'::t
ao;s ..'S~N \Jl~
t{di\ ~~ ~~
~
-,
s'"'u..~ \ ()~ 3
.~-
,.
:g?A\lC~ 'TO S"Q~P
la.~ .l(,'
a\\Plo I(-€E ~A-e~ i ~ ~
rp
TR~~
.
W.V: PAtt21L ~
~K..~ SUi
'BL,iU,DCLL
A
'"11?Pa ~
>
W ,"'. ?Ae~CG(2
It
1\
7
L~\ 'Dt.4\Y\~c...
c,~c,,~
II
II
II
~Qf~ ~u" 1~~I'~c.P
1.4'Sl!- 'BY: I,
I
w:r. ?~~(<. tow~. to
~J-'?~_Z~~ ~~
II
113P
II
II
1I
tI
1I
I
~
'"
..D
w
~~
~ \,\J~ ~~
\b1" AL.\ lJ" ... . 'Z. 4- At:.
Pfo~ lU B~
lASED B~:
~CC rz etm>y.
M ~ ~ Q.o flf>.
'3c.dk. '. \ /I:: 4-b I
lSo.co1
oj:
~~4
<
~
t<a ,'l. MJlo, ~ ~1e~Q;( Ci:ty
t. '2.. Mtl\..e.s -+0 c:::;e ~ I \l ~
~
~u.
J1
· lnybucon c::::::
D e:P
1'~,.w ,,~
W"
· Uatrt
o
~s
;'(".
Q
~.
'0
fl
B
o
G
V E
f~
s'""'~~-\- 3 C)~.3
~~
d7":\
~.9~
. "
\<;",-$~d Island
'-c-" .....-, "
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
Regulatory Branch
~"'l9 '\
~?> U ~)
41 inIfI:C$VI:O
Vb I
f"iVVl.? 9 /9fJ
o~~ ;'6
" ~rA.t.
. . ,,,,}C/E:~('
"fs
REPLY TO
ATTENTION OF
August 8, 1996
Action ID. 199603735
Mr. John Dorney
Division of Water Quality
North Carolina Department of Environment,
Health and Natural Resources
4401 Reedy Creek Road
Raleigh, North Carolina 27607
Dear Mr. Dorney:
Enclosed is the application of Mr. William F. Parker, Parker
Construction Co., Inc., 565 Neptune Drive, Swansboro, North Carolina 28584,
for Department of the Army authorization and a State Water Quality
Certification to discharge fill material within approximately 8,850 square
feet (0.23 Acres) of section 404 wetlands for the construction of a concrete
ready-mix plant located on Tract 3, west of the existing construction office
facility, on the south side of NC Highway 24, approximately 1.7 miles east of
SR 1118 (Bogue Loop Road), adjacent to East Prong and Sanders Creek, in Ocean,
Carteret County, North Carolina. Your receipt of this letter verifies your
acceptance of a valid request for certification in accordance with Section
325.2 (b) (ii) of our administrative regulations.
We are considering authorizing the proposed activity pursuant to Section
404 of the Clean Water Act, and we have determined that a water quality
certification may be required under the provisions of Section 401 of the same
law. A Department of the Army permit will not be granted until the
certification has been obtained or waived.
In accordance with our administrative regulations, 60 days after receipt
of a request for certification is a reasonable time for State action.
Therefore, if you have not acted on the request by October 8, 1996, the
District Engineer will deem that waiver has occurred.
Thank you for your time and cooperation. Questions or comments may be
addressed to Mr. Mickey Sugg, Wilmington Regulatory Field Office, telephone
(910) 251-4811.
Sincerely,
l,~ ~~~~~!MJAJ
'1) Chief, ~~~ry Branch
Enclosure
-2-
Copies Furnished (without enclosure) :
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Jim Gregson
Division of Water Quality
North Carolina Department of Environment,
Health and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
- ..,...-
\J \. 0\ 0... "t"\ ~
w. F. Parker Construction Co., Inc.
565 Neptune Drive
Swansboro, North Carolina 28584
(919) 393-2206/2207
---'~
July 18, 1996
RECEIVED
:JUl 1 9 1996
IEGUlATOlrl BRANr.>>
Department of the Army
Wilmington District, Corp of Engineers
ATTN: Mr. Suggs
P. O. Box 1890
Wilmington, NC 28402-1890
Dear Mr. Suggs:
I have enclosed my after-the-fact permit application for work performed on my property
on Highway 24.
This work was done as a necessary function for expansion of my small business (W. F.
Parker Construction Co., Inc.) for use as employee parking and a future concrete ready-
mix business which will employee an additional 15 employees. I do not own any
additional property adjacent to which I could have expanded and respectfully request that
you look favorable on my permit.
I look forward to meeting with you on August 14, 1996 to discuss this matter along with ,
possible mitigation, if required.
Respectfully,
WI~
.n
;"l ',-,
w. F. Parker, P.E.
. '
~Q"'"
'\~...~ ~
~\.....\.Q~
~ ~C \d
.~~C~t> "
~C~~
o~c(/I
'Q~ c:
~\~"''\I. L ~
't\'''' ~ ~.
~~ "c....
.~'\~\~ ~'
~ _..~ ~~\;p..:~~~
CJ:I':: 0 S' ~
~~. ~~
_~'c ~ ~ ~;:l.1.t:+ .
~cPS' _~w.~...\Q~
~. ,...a ~:
~~\"1 \c,
~.....ctoS. ~,,;:I.
~~. ~\ ~~
, "'\.po\" . ~.sP,d'
#CPS' ,c.c~\~
~. ~,,"'C(/l
'. ,,;a.'o\C '. - ~
~~~~O:.~. ,\0"-
~~. .
. . ~"\o~
\c~~~. .
b......~~\j ~~\.P~ o~~~~\-
.r ,.. ~O \) ~,~~ C
~~ O\-\"\~
o~~~ ~~c~
~ ~O~
\~~ .
~~.
.
,
\~
~c~c~...
~ c;~ ~ ~~~~
~.;o ./0 ~
C. ~cfl~. -~ C}J~
~. ~c.f1I ~
~f!IJ ~c~...
~c~c~4""^~.~
.~~.
~~\'J'\
~o~ We .
Q't~ct
...#.... ~~\"". 0< do \'Iffl
~~~~ ---" ~ p...o<
_-"'"<;P"- ~ ~ <11"'<<'
eJi"":- },O <II' ~.c<' . ~ ~~
~~ \Qdo~. ~~
~-,...-.p~ . ~~\
7'- _~ ~ 0'- ~c.'"
,.J# ~.s <II"~'
~.il~ do ~ ~
0< """ If/< ~ /"
~.;. ~~
~. ,,~" ~c.'"
\). . _aJ.O~
~\~~
,
\
g. What is the CAMA Land Use Plan Classifica-
tion of the site? (Consult the local land use
plan.)
Rt::.GE.\\J~O
2 LOCATION OF PROPOSED Jlll:\ \?96
CT \J h. How is the aact zoned by local government?
PROJE '.. . . iiGR'l RRM-l~ T ~mT~TR TAT .-TN A RF.HOTT~F. (T ~)
l(k~J~ i. How are adjacent waters classified? SA
a. Street address or secondarY road nSumber j. Has a professional archaeological survey been
1 . 7 MILES EAST OF SR III ~. carried out for the aact? NO
b. City h town...~mmunityt or landmark NC If so by whom?
w. r. P AuER CONS' ., NEWPORT, ·
c. County CARTERET
d. Is proposed work within city limits or planning
jurisdiction? NO
e. Name of body of water nearest project
SANDER CREEK - BOGUE SOUND
Please type or print. Carefully describe all an-
ticipated dev~lop~~t activi~es. including .consmJc'
tion excavatlon. fllhng, paving, land cleanng, and
sto~water conuel. If the requested infonnation is
not relevant co your project, write N/A (not ap-
plicable). Ieems 1-4 and 8-9 must be completed for
,all projects.
1.::..APPLICANT' -_.:',':;;:..."._..
.. ..- ';:: - ::~
.... ...-.--:- ~ '.t
N W. F. PARKER
a. ~ 565 NEPTUNE DRIVE
Ci;~-SWANSBORO State NC
Zip 28584 I Day phone q 1 Q-1Q1-??On
X Landowner or Authorized agent
b. Project name (if any) PARKER READY-MIX
YARD
c. If the applicant is not the landowner, also give
the owner's name and address.
N/A
3 DESCRIPTION AND PLANNED,
.:::-.: U$~. QF PROPOSED PROJECT .~
a. Desaibe all development activities you propose
(for example. building a home. motel, marina.
~~~~bc9[ ~~CRETE READY -MIX PLANT
If you plan to build a marina, also complete
and attach Form DCM-MP-2.
b. Is the ProPosed activity maintenance of tt8 ex-
isting project. new work. or both?
c. Will the project be for community, private. or
commercial use? '
COMMERCIAL & PRIVATE
d. Describe the planned use of the pteject.
r.O~~TRIJCT STORAGF. LOT FOR r.ONr.RF.TF.
MATERIAL. EMPLOYEE PARKING ~
NF.W CONCRF.TF. PLANT
~,.. ".AND. "w.. "A.'TER-'~"-;'~~fi~;;:;~.
.'A- T -A 1IIo..TT'\ .. n "'''='.;,M~ ':,'-'
...-r'" ~"LI. : ~~~f~.:'~:t4' _ .~~.
'~ .CHARA~~~~~~~,~.~,.:{e~~t
a. Size of entire tract 1.0
b. Size of individual lot{s) 1.0
Elevation of tract above mean sea level or Na-
c. tional Geodetic Vertical Datum APIIDX. 10.0 MSL
d. Soil type(s) and texcure(s) of aact SANDY
e. Vegetation on aact NONE
f. Man-made featureS now on tract
NONE
Conservation
Developed
Rural
Transitional
Community
Other
x
s UPLAND DEVELO~~i~~I~;~1
. ... . '-.~ "!.'NM'~~;:"~
Complete this section if the project includes any
upland deVelopment.
a. Type and number of buildin~... facilities. or
SmJctures l'tQDOSed 1 BUILl) lNG &
1 CONCRETE PLANT
b. Number of lots or parcels 1
c. Density (Give the number of residential units
and the units per acre.) N / A
d. Size of area to be graded or disturbed
1.0 AC
e. If the proposed project will disturb more than
one acre of land, the Division of I..and
Resources must receive an erosion and sedimen-
tation conuel plan at least 30 days before land
disturbing activity begins. If applicable. has a
sedimentation and erosion conuel plan been
submitted to the Division of I..and Resources?
f. Give the percentage of the tract within 75 feet
of mean high water to be covered by im-
permeable surfaces. such as pavement.
~.orroo~. 2ERO
1
g. List the materials. such as marl. paver stone,
:. WAf&ncme~xW~ ~ f8~ ~5~ AC
h. If applicable, has a stormwater management
plan been submiaed to the Division of En-
vironmental Management!' t>1.' A
i. Describe proposed sewage disposal and/or waste
water creaanent facilities. N / A
j. Have these facilities received state or local
approval? VF.~
k. Describe existing creaanent facilities.
N/A
1. Describe location and type of disd\arges to
waters of the state (for example~surface runoff,
sarUQr( wastewater. industriaUcommerc:ial
effluent, or "wash down"). C:'T'()~MlJ.1TF~
BASIN RETAINS RUNOFF
m. Water supply source WEST CARTERET WATER
n. If the project is oceanfront development.
describe the steps that will be taken to main-
cain established public beach accessways or pro-
vide new access. N / A
o. If the project is on the oceanfront. what will.
be the elevation above mean sea level of the
fim habitable floor! N / A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excava-
tion or fill activities (exdudinll bulkheads.
which are covered in Section 7).
1.cnP Width Depth
Access channel
(ML W) or (NWL)
Boat basin
Other (break-
water.. pier.
boar ruIlP.
rock jeay)
Fill placed in
wedand or below
MHW
t;r~lI
area'
b. Amount of material to be excavated from
below water level in cubic yards n
c. Type of material O' . .
d. Does the area to be excavated inchlde marsh-
land. swamps. or other wetlands! N / A
e. High ground excavation. in cubic yards N / A
f. Dimensions of spoil disposal area N I A
g. location of spoil disposal area N I A
h. Do you claim title to the disposal area!
If not. attach a leaer granting permission from
the owner.
i. Will a disposal area be available for future
maintenance! I N / A
If so. where?
I. Does the disposal area include any marshland.
swampland,'or water areas! N / A
k. Will the fill material be placed below mean
high wated NO
1. Amount of fill in cubic;.. Y.irds 900 CY
m. Type of fill rpaterial t)~ND~
n. Source of fill material BORROW P 11'
o. Will fill material be glaced on manh or other
wetlands! WETLANDS
p. Dimensions of the wetland to be filled ~O I X~O I
q. How WIll excavated or fill material be kept on
site and erosion controlled? RIP-RAP ALL
SLOPES
..
r. What type of construction equipment will be
used (for example. dragline. backhoe, or
hydraulic dredge)? DOZER & BACKHOE
s. Will wetlands be crossed in transpon:1n1J eqUIp-
ment to the project site?~ If yes. explain
the Steps that will be taken to lessen en-
vironmental impacts.
7 SHORELINE STABILIZATION
3. Lcnlrh of bulkhead or riprap
b. Average distanCe warerward of mean high water
or normal water level
c. Shoreline erosion during preceding 12 months.
in feet
d. Type of bulkhead matenal
e. Amount of fill. in cubic yards. to be placed
below mean high water
f. Type of fill material
2
g. List the materials. such as marl. paver stone,
=.IA~et6~n ~ ~~ ~~~ AC
h. If applicable. has a smrmwacer management
plan been submitted to the Division of En-
viraaIlienC2l Manqemenc!' DlI A
i. Describe proposed sewqe dispoml and/or waste
water aaancnt f.aci1ities. N I A
j. Haw these tadli~ received KUe or local
..,.,."nU VF.~
Ie. Describe aiscinl m2a"eltt tXilides_
N/A
1. Describe locadon and type of disdwFs co
wacm of the state (for example~surtace nmoff.
smicI:y WllCCW8ter. indumialIcommercial
etlluenc. or "wash down". C:'1'OgMtJA'1'14"~
__BASIN RETAINS RUNOFF
m. Warersupply source WEST CARTERET WATER
n. If the project is oceanfront development.
describe the steps that will be taken to main-
cain escabUshed public bexh acc:essways or pro-
vide new ac:ccss. N I A
o. If the project is on the oceaniront. what will.
be the elevation above man sea level of the
f'int habicable tloor! N I A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposecl exaw-
tiOll or fill activities (excludina bulkheads.
which are covered in Sectiarl n.
LeaP Width Depth
Access c:hanne1
(ML W) or (NWl)
BoE baiD
om. (beak-
....... pic,
he. raqJ.
rack fcy)
Fill pIKed in
weiand or below
MHW
, 'V ~It
lIaS
b. Amount of material to De exc:avatt:a lrom
below water level in cubic yards 0
c. Type of material o' '
d. Does the area to be exawted indM;e marsh-
land. swamps. or other wetlands! A
e. High around exawtion. in cubic yards N I A
f. DimeNions of spoil disposal area N / A
I. Location of spoil disposal area N / A
h. Do you daim tide to the disposal area!
If not. aaach a leeter erman, permission from
the owner.
i. Will a ~ ala be available for future
main~f.N/A .
If so. where?
j. Does the disposal area include any marshland,
swamplando'or water uas! Nl A
k. Will me fill material be placed below man
high water! NO
1. Amount of fill in cubic:... v:;rds 900 CY
m. Type of fill rpaterial ::i};NO-
n. Source of fill material BURRUW 11 iT
o. Will fill material b~..J~laceci on marsh or other
wedands! WETLANDS
p. DimeNions of the wetland to be filled ~U I X~U I
q. How will cxawted or fill material be ~t on
site and et'CS1on contrOlled? RIP-RAP ALL
SLOPES
;
- ....
..
r. What cype of constnlaion. equipmenc will be
used (for example. ~ine. backhoe. or
hydraulic dredae)? ER & BACKHOE
s. Will wetlands be crossed in mnspomnc eqUIp-
ment to the project site?~ If yes. explain
the steps that win be taken to lessen en-
vironmental impaca.
7 SHORELINE STABlLIZAnON
a. l.matft<< bullche.t or ~
b. A.,.... disanca ....us:..w of man hiIh water
CX' nannal war level." .. ,-
c. ShaIeIine emIioA durinc pNCedf~.12 mambs.
in filet
d. Typeafbn11r"-d maraaal
e. Amount<< fill. in cubic yards. to be pIKed
beiow man hi8h water
f. Type of fUl maurial
2
~~DmqN.Ar;~9RMArrO~ j
In addition to the completed application form, the
following items must be submitted:
A copy of the deed (with state application only) or
other inscrument under which the applicant claims
title to the affected propertY. If the applicant is not
claiming to be the owner of said property, then for-
ward a copy of the deed or other inscrument under
which the owner claims title, plus written permis-
sion from the owner to carry out the project.
An accurate work plat (including plan view and
cross sectional dtawings) drawn to scale in black
ink on 8 11: x II white paper. (Refer to Coastal
Resources Commission Rule 7J.0203 for a detailed
description. )
Please note that original drawings are preferred and
only high quality copies will 'be accepted. Blue-line
prints or other larger plats are acceptable only if 16
high quality copies are provided by the applicant.
(Contact the U.S. Army Corps of Engineers regard-
ing that agency's use of larger drawings.) A site or
location map is a part of plat requirements and it
must be sufficiently detailed to guide agency per-
sonnel unfamiliar with the area to the site. Include
county road (SR) numbers, landmarks, and the like.
A stormwater management plan, if applicable, that
may have been developed in- consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landownen. These
individuals have 30 days in which to submit com-
ments on the proposed project to the Division of
Coastal Management. The applicant must advise
the adjacent landowners of this opportUnity by sen-
ding a copy of the permit application to them by
registered or certified mail. This notification is re-
quired by O.S. 113-229(d).
N MR. . & MRS. FRANK BULLARD
ame
A~ 4019 HWY 24
NEWPORT. NC 28570
Name MR. TOM SINGELTON
A~ 1891 HWY 24 EAST
NEWPORT. NC 28570
Name
A~
A list of previous state or federal permits issued
for work on the project aact. Include permit
numbers, permittee, and issuing dates.
A check for $100 made payable to the Depart-
ment of Natural Resources and Community
Development to cover the costs of processing the
-application.
A sipled AEC hazard notice for projects in ocean-
front and inlet areas.
A statement an the use of public funds. If the
project involves the expenditure of public funds, at-
tach a statement documenting compliance with the
North Carolina Environmental Policy Act
(N.C.G.S. 113A-I to (0).
9 CERTIFICATION AND p~
SION TO ENTER ON ~::.~~
Any permit issued in response to this application
will allow only the development described in the
application. The project will be subject to condi-
tions and restrictions contained in the permit.
[ certify that to the best of my knowledge, the pro-
posed activity complies with the State of North
Carolina's approved Coastal Management Program
and will be conducted in a manner consistent with
such program.
[ further certify that [ am authorized to if3l1t, and
do in fact, grant permission to representatives of
state and federal review agencies to enter on the
aforementioned lands in connection with
evaluating information related to this permit ap-
plication and follow-up monitoring of project.
Th~,is the I E> day of T lA U(
19 L (.. -cr-{:)
X ~J~ ~~cwL ~
Landowner or Authorized agent
Send the completed application materials to the
Division of Coastal Management Office nearest you
and the U.s. Army Corps of Engineas-. See the
map on the inside front cover for the appropriate
OCM office and addresses and phone number.
3
it
4 ~\{ ~
I
elw
&jot ~ !?J>.
W~t>"5
RU'\:s'i)
.
~. 'D~.p.I\JA<1~
~, '2YD':t
t'f d7T ~o ~~
~s ~<?ecrvoN \Jt~ A- A.
.::::0
~
toO-tAN VIBN
7'
~~ 1S?A\JC..;.l "'TO S'"~U,1J P
lq~.l(" rp
Q\ PLo I(-€E PA-tCk:: i kJ &,
TR~~
w. T:' PWZIL l:(Z..
~IC.. ~ S/,\~
'!St.-u.(OCLL
A
l1?Pa '2
,
w,-r.?A€~~
II
II
~
LSw>.N\ ~ ~\ Y\~c..,
C,~C/k..
II
II
II
. Wo~0r1 ~u~ I~~l\ r<'c.P
\AC:;~ 'B,(: I,
I
W:r. P~ltt~f'. U>w~. u; I
(qAC1, J - ~~. Z"Z<P C:, I'
C II
II
Il~
II
II
II
tl
1\
I
I
~
w
.S)
w
...- -------- . ..--------
~k.', lll:: 4-(/
ll?o.cof
Pflo~1( lU B~
lAS ED B'( ,I
P~ct f2 el;"Wy.
M ~ ~ Q.o (Gp.
~D~
~ I}J~ ~Ut~
\bT AL\ lJ" ~ . 'Z. 4- Ac.
~
~J.ZA
-<
~
l(~).'l. MJlo, ~ ~1e~~ c.~
l.~ Milk? -to c:;e:ti I \l~
~
~---
\\
'\~ ' / -/-)
-- - ,~'-....../ /'
. \ \~~ /,("
+p~ t...,
",..~ ~ ~~::r.u_
~ ( "'~~,.~
z...-.------~<......... 7 / I
...... fl/' / I'
'" d> "'-..-/ .'
:;... ". ",' ." ./
~'",.' c::::::\ ~<"'" "~~~ ;lc!J5
," . 'J'-' '" ... \' "" i
()' " \ V Q
~~-_._._';
JI ~.\ 1
~~\I
II
\I
II
J c:::::::.
\...I
1'\
u
A
T
"
XJ9
)(
37
'.
C:?
v
13
o
G
v
E
19 Lovett
cf::T Islend
(8'~
\, \\ "'-'Yl/o
,J ,"~",-;::_~d Islend
I
--
I
r
~.l.
rei-
~