Loading...
HomeMy WebLinkAbout20191081 Ver 1_SWM report_20190812STORMWATER MANAGEMENT REPORT RENTAL CAR FACILITIES RELOCATION Id PTI PIEDMONT TRIAD INTERNATIONAL AIRPORT INTERNATIONAL MBI PROJECT NO: 173048 August 2019 TABLE OF CONTENTS I. Introduction.................................................................................................................... l II. Site Description.............................................................................................................1 III. Project Description.....................................................................................................1 IV. Comprehensive Stormwater Management....................................................................2 V. Stormwater Management Design..................................................................................3 VI. Earthwork Analysis.............................................................................................6 Appendix............................................................................................................... 8-111 A-1: Project Vicinity Map and Aerial Project Surface Water Classification Hydrologic Unit Code Assessment Unit Rating for Brush Creek NRCS Soils Map A-2: Existing Conditions Exhibits Proposed and Future Conditions Exhibits A-3 Drainage Area Maps (2001) Miscellaneous Maps (2001) A-4 Pond F-1 Calculations (200 1) A-5 Record Drawings A-6 HydroCAD Model Output A-7 Bioretention Cell Supplement Form Bioretention Operation and Maintenance Agreement I. INTRODUCTION The Piedmont Triad Airport (GSO) is owned and operated by the Piedmont Triad Airport Authority (PTAA). The airport is located west of the city of Greensboro in Guilford County, North Carolina. PTAA is proposing a new project to remove visibility obstructions from the Air Traffic Control Tower (ATCT) as determined by the Federal Aviation Administration (FAA). Additional upgrades to meet the airport needs are also included in this project. See Appendix A-1 for airport maps. II. SITE DESCRIPTION The airport is surrounded by Joseph M Bryan Boulevard to the North, I-73 to the East, I-40 and NC -68 to the west and Radar Road to the south. The main access to the airport is from Joseph M Bryan Boulevard and Ted Johnson Parkway on the north side of the airport. The airport is home to FedEx's mid Atlantic hub, Honda Aircraft Company and HAECO Americas. GSO has a long history of serving the local area and economy. In 1927 the airport began in a field known as Lindley Field. The airport was closed in 1935 but reopened in 1937 with two paved 2,500 -foot runways and a terminal building. During the 1950s, the airport acquired 900 acres, extended its runways, and constructed a new air traffic control tower and an instrument landing system. In 1982 Runway 5R -23L was extended to over 10,000 feet. In the 1990s TIMCO Aviation Services opened their world headquarters at GSO and FedEx announced its intentions to make GSO one of only five FedEx hubs in the country. From 2000-2016 GSO has welcomed Comair, Honda Aircraft Company, Frontier Airlines, and FedEx to their campus. FedEx's hub opened in 2009 followed shortly by a new 9,000 -foot runway in 2010. Alamo, Avis, Budget, DHL Cargo, Enterprise, FedEx, Honda, Haeco, Hertz, National, Timco, United Ground are few tenants at GSO. III. PROJECT DESCRIPTION The project encompasses four sites which are described below. The project site map, surface water classification, Hydrologic Unit Code and NRCS web soil survey are presented in Appendix A-1. 1. Existing Rental Car Facilities: Demolition of Existing Rental Car buildings (East of Taxiway E ) and re -grading. Parking lot pavement to remain. It is assumed that the parking lot (if needed) will be demolished in the future. Demolition of Existing Rental Car buildings, Samaritan Purse building, parking, utilities, and cutting down of existing hill (West of Taxiway E). The entire demolished area to be re -graded for the line of sight obstruction and will be converted to green space. The Samaritan Purse building to be relocated. 2. Proposed Worldwide Drive (WWD) and Future Aerospace Development: Construction of Worldwide Drive and Future Aerospace Development. The existing rental buildings (east of Taxiway E), once demolished, will be pavement/ impervious surface. However, in the future the existing pavement along with existing green space will be turned into the future aerospace development. Page 1 of 111 3. Proposed New Rental Car Facility (Inman Road): Site preparation including clearing and grading for construction of parking lots and proposed buildings for relocation of existing rental car facilities. This site will replace the demolished existing rental car facilities near Taxiway E. 4. Proposed Spoil Embankment (Chimney Rock): Site preparation and stockpiling of cut material removed from the Inman Road Site. This site is east of Honda Aircraft Company Maintenance Repair and Overhaul (MRO) facility. IV. COMPREHENSIVE STORMWATER MANAGEMENT As part of the Comprehensive Stormwater Management effort, PTAA had prepared a Stormwater Management Plan (SWMP) for the entire airport in 2001 that was approved by the North Carolina Division of Water Quality. Three drainage basin boundaries (Brush Creek, Horsepen Creek and Deep River) traverse through the airport property. The Brush Creek and Horsepen Creek drainage basins flow into the Greensboro Water Supply Watershed, and the Deep River drainage basin flows into the High Point Water Supply Watershed. Brush Creek Drainage Basin Approximately 1507 acres on the northwest side of the airport are in the Brush Creek drainage basin, which drains into the Lake Higgins water supply reservoir and from Lake Higgins into the Lake Brandt water supply reservoir. The basin is comprised mostly of wooded areas, with small areas of meadow, residential, commercial and airport development. There are 27 subareas in this basin and the current project impacts 8 out of the 27 subareas namely BC -8 to BC -15. See Table 1. Horsepen Creek Drainage Basin Approximately 1331 acres on the southeast side of the airport are in the Horsepen Creek drainage basin, which drains into the Lake Brandt water supply reservoir. The basin is comprised mostly of urban, residential, commercial, industrial and airport development. There are 30 subareas in this basin and the current project impacts 5 subareas (HP -4,5,28,29&30). See Table 2. Deep River Drainage Basin The remainder of the airport, consisting of approximately 227 acres on its southwest side are in the Deep River drainage basin, which drains into the High Point Watershed. There are 6 subareas in this watershed and this project has no impact in this basin. The development of airport property falls under the jurisdiction of the 2001 SWMP so the project sites were mapped utilizing existing drainage area boundaries (See Appendix A-2). The drainage area maps and other excerpts from the 2001 study are also provided (See Appendix A-3). The change in pervious and impervious per basin namely Brush Creek and Horsepen Creek is presented in Table 1 & Table 2, respectively. The net increase in impervious in Brush Creek is 37.43 acres and in Horsepen Creek is 18.98 acres. Page 2 of 111 Table 1: Brush Creek DrainaLye Area Sunlmary Pre vs Post Development Subarea Area Pre -Development Pervious Impervious 0 Impervious Post Development Pervious Impervious (ac) (ac) (ac) (%) (ac) (ac) (ac) (%) BC -8 28.04 19.32 8.71 31.08 -1.64 20.96 7.07 25.23 BC -9 42.46 20.52 21.94 51.68 3.66 16.85 25.60 60.30 BC -10 12.18 10.32 1.86 15.25 7.60 2.72 9.46 77.69 BC -11 19.06 14.23 4.83 25.32 11.77 2.46 16.60 87.08 BC -12 35.88 26.45 9.43 26.28 14.97 11.48 24.40 68.01 BC -13 54.36 31.58 22.79 41.91 0.50 31.08 23.28 42.83 BC -14 52.32 21.87 30.44 58.19 0.49 21.38 30.93 59.13 BC -15 78.51 49.07 29.45 37.50 0.08 48.99 29.53 37.61 TOTAL 322.80 193.36 129.44 40.10 37.43 155.92 166.88 51.70 Table 2: Horsepen Creek Drainage Area Summary Pre vs Post Development Pre -Development 0 Post Development Subarea V. STORMWATER MANAGEMENT DESIGN The stormwater management requirements are summarized below. Post development peak discharges at Point of Investigation (POI) for Inman Road Site (POI -1) and Chimney Rock (PGI- 2) have also been summarized in this section. Stormwater Management Requirements: • Provide water quality treatment for the 1 -inch storm event • The 1 -yr 24-hour storm event discharge shall be less than the pre -development discharge. • Airports are considered low percentage Built Upon Area (BUA) • No retention or detention pond within 5 miles of an airport Existing Rental Car Facilities: The existing rental car facility is predominantly in Brush Creek basin but part of it also is in Horsepen Creek basin. The existing rental facility west of Taxiway E, once demolished, will be converted into green space. Since there is a reduction in impervious, no stormwater management is required. On the east side of Taxiway E once the existing rental car facilities are demolished pavement/impervious surface will remain. Since no change in impervious is anticipated, no stormwater management is required. Page 3 of 111 Area Pervious Impervious Impervious Pervious Impervious (ac) (ac) (ac) (%) (ac) (ac) (ac) (%) HP -4 308.18 190.83 117.36 38.08 -2.57 193.40 114.78 37.25 HP -5 226.34 198.26 28.09 12.41 0.00 198.26 28.09 12.41 HP -28 43.49 42.79 0.70 1.61 14.82 27.97 15.52 35.68 HP -29 29.81 26.38 3.42 11.48 6.73 19.65 10.15 34.07 HP -30 60.49 41.49 18.99 31.40 0.00 41.49 18.99 31.40 TOTAL 668.30 499.75 168.56 25.22 18.98 480.77 187.53 28.06 V. STORMWATER MANAGEMENT DESIGN The stormwater management requirements are summarized below. Post development peak discharges at Point of Investigation (POI) for Inman Road Site (POI -1) and Chimney Rock (PGI- 2) have also been summarized in this section. Stormwater Management Requirements: • Provide water quality treatment for the 1 -inch storm event • The 1 -yr 24-hour storm event discharge shall be less than the pre -development discharge. • Airports are considered low percentage Built Upon Area (BUA) • No retention or detention pond within 5 miles of an airport Existing Rental Car Facilities: The existing rental car facility is predominantly in Brush Creek basin but part of it also is in Horsepen Creek basin. The existing rental facility west of Taxiway E, once demolished, will be converted into green space. Since there is a reduction in impervious, no stormwater management is required. On the east side of Taxiway E once the existing rental car facilities are demolished pavement/impervious surface will remain. Since no change in impervious is anticipated, no stormwater management is required. Page 3 of 111 Proposed Worldwide Drive (WWD) and Future Aerospace Development: The proposed worldwide drive and future aerospace development is in Brush Creek Basin. Construction of WWD and Future Aerospace Development footprint was part of the ultimate development shown and designed by the 2001 SWMP which incorporated 80 acres of total impervious to Pond F-1. The pond was also sized to minimize the impact on the existing Brush Creek Reservation Easement (See Sheet C-301 and C-302). A comparison incorporating project impervious to the 2001 SWMP was done to ensure the total impervious routed to the pond F-1 was below the total design impervious capacity of 80 acres. The total proposed impervious to Pond F- 1 is 55.45 acres which includes the new impervious of 34.77 acres (BC9, BC 11 and BC 12) and existing impervious of 20.68 acres draining to Pond F-1 as summarized in Table 3 below. Table 3: Pond F-1 Impervious Subarea Existing Impervious New Impervious (ac) (ac) BC -9 3.34 8.03 BC -11 4.83 11.77 BC -12 2.38 14.97 BC -13 10.13 0.00 SUBTOT 20.68 34.77 TOTAL 1 55.45 Additionally, the existing pond size was checked against the designed parameters from 2001 SWMP which are summarized in Table 4 below. The water quality computations in 2001 utilized the 1" runoff treatment which is still the water quality requirement. Table 4: Comparison of Pond F-1 existing vs 2001 design Description Pond Height Pond Bottom Side Slope Embankment Length Width Length Width (ft) (ft) (ft) (-) (ft) (ft) 2001 SWM Plan 10.2 327 109 2 to 1 367.8 150 Existing Pond F-1 10.0 339 109 2 to 1 392.6 158 Based on the impervious area, water quality requirement and pond features the Pond F-1 is deemed adequate to provide stormwater management for the proposed and future development. Please see Appendix A-4 for Pond F-1 Sizing Calculation from 2001 SWMP. Proposed Inman Road New Rental Car Facility: The proposed Inman Road New Rental Car Facility is in Horsepen Creek Basin. This task includes site preparation, clearing and grading for construction of parking lots and proposed construction for relocation of existing rental car facilities. This site will replace the demolished existing rental Page 4 of 111 car facilities. The proposed layout will provide 2104 parking spaces (9'X18') with a 27' drive isle along with 3 buildings. The site SWM will be provided via 3 SCM's. The proposed SCMs are bioretention cell with a riser structure. The riser structure will control larger storm events as no orifice is proposed. Since the site is Hydrologic Soil Group `A' it is assumed that it meets the required infiltration rate of 2 in./hr. However, site infiltration testing and geotechnical investigation is recommended to ensure that the SCM will infiltrate as designed and no ponding occurs. The water quality summary for the proposed 3 SCM's is presented in Table 5. Table 5: Inman Site SCM Summary SCM# Drainage Area WQv Reqd. WQv Provided (sf) (ac) (cf) (cf) 1 569,111 13.06 45,055 47,249 2 308,042 7.07 24,387 31,638 3 616,521 14.15 48,808 56,507 Notes: Water Quality Volume (WQv) Provided = Pe X Rv X A/ 12 WQv Provided is calculated based on 12" of ponding depth & 1" runoff DA -4 (offsite drainage area) not included in water quality computations The SCM's also act as a flood control measure and discharge into existing wetland at non-erosive rates. The outfalls are strategically placed outside the riparian buffer and supply runoff to existing streams and wetland to avoid drying up of these natural features. The peak flowrates for the analysis at POI#1 are summarized in Table 6. Table 6: Flow Rates Summary at POI# 1 Storm Event Flow (cfs) 1 Year 0.63 2 Year 1.91 10 Year 13.73 100 Year 49.87 Based on the record drawing the existing 5'x7' box culvert (POI#1) was sized for the 100 -year storm event with a capacity of 424 cfs. The record drawing also reports that the road overtopping occurs at 706 cfs. Since the site will generate a flow of 38 cfs (100 -year storm event) which is less than 10% of the road overtopping discharge (706 cfs) hence no road overtopping is anticipated. Please see Appendix A-5 for record drawing and Appendix A-6 for HydroCAD model output. Page 5 of 111 Proposed Chimney Rock Site (Spoil Embankment): The proposed Chimney Rock Site is in Horsepen Creek Basin. The cut material removed from the Inman Site will be stockpiled at this site. This site is east of Honda Aircraft Company Maintenance Repair and Overhaul (MRO) facility. There is an existing stream that runs north south which is Horsepen Creek Tributary G. The 100 -year floodplain elevation ranges from 827.8 (North end) and 814.0 (South end) as per the FRIS mapping. There is a riparian buffer for this stream which cannot be encroached upon. When the stockpile was designed, additional space between the riparian buffer and edge of stockpile was created. In this space a shallow swale was designed to reduce the runoff from the stockpile for calming the flow velocity. Since there is no change in impervious no SWM facility is proposed. Assuming the designed Swale is non-functional the proposed flow for the 100 -year storm is 151.26 cfs. This is less than half of the discharge reported by Tributary G (386.5 cfs) shown in Table 7. Based on the record drawing the existing 5'x8' box culvert (POI#2) was sized for the 100 -year storm event with a capacity of 459 cfs. The record drawing also reports that the road overtopping occurs at 989 cfs. The stockpile (assuming non-functional swale) will generate a flow of 151.26 cfs (100 -year storm event). For the 100 -year storm the site will discharge 151 cfs which is —15% of the road overtopping discharge (989 cfs) hence no road overtopping is anticipated. Please see Appendix A-5 for record drawing and Appendix A-6 for HydroCAD output. Table 7: Horsepen Creek Tributary -G Summary Cross Section Stream Station Discharge cfs 1 % Annual Chance WSEL 32 3165.0 386.5 827.8 22 2202.0 386.5 814.0 VI. EARTHWORK ANALYSIS Based on the preliminary grading, the cut volume for the Inman Site is approximately 589,000 cy. Given the stream/floodplain on the west, Chimney Rock Road on the south and Building Restriction Line (BRL) on the north hence the Chimney Rock site is constrained for space. The Chimney Rock Site stockpile was hence designed with a max slope of 3:1 with surrounding swales and a bench at —20' stockpile height. The Chimney rock site as shown provides a volume of 603,000 cy. The future aerospace development including worldwide drive as shown will require a fill volume of 650,000 cy. Given the cut from Inman Road Site of 589,000 cy would be able to meet most of the required fill for the future aerospace development. So, depending on the final project design and construction phasing a flatter stockpile slope and smaller individual stockpile can be achieved. The cut from Inman Site can also be used on other airport projects which will be determined during the final project design. Based on the grading study provided by Parish and Partners the grading west of Taxiway E was updated. The cut volume computed was 256,000 cy. The final design should check and ensure that the proposed elevations resolve the line of site obstruction. Page 6 of 111 The Runway centerline elevation at 23L end is 885' and using a 7:1 slope for 150' vertical plane gives an elevation of 103 5' which is much higher than the proposed stockpile high point. However, a Part 77 analysis will be needed in accordance with the final design/phasing. Page 7 of 111 APPENDIX A-1: PROJECT VICINITY MAP AND AERIAL PROJECT SURFACE WATER CLASSIFICATION HYDROLOGIC UNIT CODE ASSESSMENT UNIT RATING FOR BRUSH CREEK NRCS SOILS MAP Page 8 of 111 Ridge Haven, oartl U� u' d S1asv �a "m or e Z` is L PoPlar Gid a 44 elf o dSVI�AI ll9��l �2il1 � Cardln b R, waY MUM d�p V flrynrn� Ra c m r D�and _ W 1 1 1 � Joaeah � Bryan +ag$` � vF o. LlSiSV�:J a�va Bry�Bl�ci c a 0 3 c t � 1/ Bryan BW'� +9'V.7.ALlS.LLTJ q 0 v .'J I � °d�slrral Ydla9c Rtl ` r Natlanal ItP, `ter Sr y O` a m c�sn �o S°0,0 Pa O �6 Miles 0 1 a FIGURE 1: PROJECT VICINITY MAP S cPa 687�J, � naday Hd G� L vrdm3rA Page 9 of 111 c 11 R ag 1 a W 4ins G^o- e G� W pnendlY pve { t M ISI x � � a PW_5 - __ N n Burnt PoPlar ,p a / � c a N � �6 a _ dp4wl FIGURE 1: PROJECT VICINITY MAP S cPa 687�J, � naday Hd G� L vrdm3rA Page 9 of 111 FIGURE 2: PROJECT AERIAL Page 10 of 111 show search results for Piedm... a Ap d psGolf co Co.,.co Surface Water aassifications: - Stream index: 16-11-4-(l) pp Stream Brush Creek Z Name. Description: From source to a point 0.5 - mile downstream of Guilford se Jos coo County SR 2790 . ep a �Megtt- Classification: WS-III;NSW r, Date of August 2, 1992 Brush Uayv- t Oass.: River Basin. Cape fear k Whatdoes More info I _ mr P1Ba this Class. p>a - TNed- mean? Alr - 4 r IN - Zoom to •.. to A d Farx f1 �rlwl viliBcla '-fid 0.4m3 . � �-. LL Ftiz Ix11Y pv� H"o�LYW State of North Carolina DOT, Esrl, HERE FIGURE 3: PROJECT SURFACE WATER CLASSIFICATION FIf1d Your HUC Piedmcni Triad Internati X Q .� r�,., � �r �� � tP_ _ _ IFI - T! -- !' I 72 -Digit HEICISubwers athI edj 12-Digt Name: Reedy Fork Lake Brandt FJ 12 -Digit Code' 030300020102 !pij `y�krp I! 10©iglt Name Reedy Fork i�,l-' 10 -Digit Cade. 0303000201 -+ r` �,�'' 8 D g€t Code 03030002 Ri,-Basn Cape Fear 12DigtAreaiaol: 23,258.00 — mnm to r mrla3.. hi Na176oal Service FIGURE 4: HYDROLOGIC UNIT CODE , -A. Page 11 of 111 Assessment Unit Rating for Brush Creek 16-11-4-(1)al Rating RED AU Number 16-11-4-(1)al AU Name Brush Creek Length/Area 2.4 Units FW Miles Description From source to UT at SR 2085 Subbasin Haw HUC8 3,030,002 Index Number 16-11-4-(1) Classification WS-III;NSW NC River Bsin Cape Fear River Basin AUID 3,818 Parameter Assessments for 16-11-4-(1)al AU Number 16-11-4-(1)al Assessment Status Exceeding Criteria Integrated Report Category 4t Parameter of Interest Fish Tissue Mercury (Nar, FC, NC) Reason for Rating FOATS EC Collection Year 2012 303(d) Year 2008 Parameter Assessments for 16-11-4-(1)al AU Number 16-11-4-(1)al Assessment Status Exceeding Criteria Integrated Report Category 5 Parameter of Interest Benthos (Nar, AL, FW) Reason for Rating Fair Collection Year 2003 303(d) Year 1998 Parameter Assessments for 16-11-4-(1)ai AU Number 16-11-4-(1)a 1 Assessment Status Exceeding Criteria Page 12 of 111 Integrated Report Category 4t Parameter of Interest Fish Tissue Mercury (Nar, FC, NC) Reason for Rating FOATS EC Collection year 2012 303(d) Year 2008 F � r ea,7v�e u — D/Courm V LEGEND Z �pO �rtlirHlyy y Pleh!1 h V hq [�] FGO . G. Golf 9 re 3y Courre Std Joseph_M_Bry n �,� h�lA ryan.Blvy� N R. esaP stq F pge t 6 3� ti z 41 6B ope ec Q< n ,:ti Pct"y a C ®R c Thad Inrt t ¢d SIL m AirpDrk lit P L 1 N A G� rA cul SSL' GceSc� AVr, t pecan C� � - State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, U5G5, .. FIGURE 5: ASSESSMENT UNIT RATING FOR BRUSH CREEK Page 13 of 111 3 595100 36° 7201' N g 36° 6 14" N 595100 595400 595700 596000 596300 596600 596900 3 Map Scale: 1:14,300 if printed on A landscape (11"x8.5") sheet Meters N 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: LTM Zone 17N WGS84 G}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group—Guilford County, North Carolina 595400 595700 596000 596300 596600 596900 597200 3 M 598100 36° 720"N 597200 597500 597800 _8 36° 6'14!'N 598100 3 Pai46A ¢;FQjq Page 1 of 4 Hydrologic Soil Group—Guilford County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D B B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:20,000. 0 C/D Please rely on the bar scale on each map sheet for map 0 D measurements. p Not rated or not available Source of Map: Natural Resources Conservation Service Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator (EPSG:3857) Transportation Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts Rails distance and area. A projection that preserves area, such as the #%-0 Interstate Highways Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. US Routes This product is generated from the USDA-NRCS certified data as Major Roads of the version date(s) listed below. Local Roads Soil Survey Area: Guilford County, North Carolina Background Survey Area Data: Version 16, Sep 10, 2018 ® Aerial Photography Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Data not available. The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UUP Natural Resources Web Soil Survey Pag6Ab701019 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group -Guilford County, North Carolina Hydrologic Soil Group USDA Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 16 of 111 Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB Casville sandy loam, 2 C 4.4 1.0% to 6 percent slopes 82.1 CkB Clifford sandy loam, 2 to A 19.2% 6 percent slopes CkC Clifford sandy loam, 6 to A 7.8 1.8% 10 percent slopes CI62 Clifford sandy clay loam, B 83.0 19.4% 2 to 6 percent slopes, moderately eroded CIC2 Clifford sandy clay loam, B 45.0 10.5% 6 to 10 percent slopes, moderately eroded CnA Codorus loam, 0 to 2 B/D 48.4 11.3% percent slopes, frequently flooded NaB Nathalie sandy loam, 2 B 3.7 0.9% to 6 percent slopes POC Poplar Forest sandy B 13.9 3.2% loam, 6 to 10 percent slopes PoE Poplar Forest sandy B 0.8 0.2% loam, 15 to 35 percent slopes PpC2 Poplar Forest clay loam, B 53.1 12.4% 6 to 10 percent slopes, moderately eroded PpD2 Poplar Forest clay loam, B 18.6 4.3% 10 to 15 percent slopes, moderately eroded PpE2 Poplar Forest clay loam, B 40.2 9.4% 15 to 25 percent slopes, eroded ToB Tomlin clay loam, 2 to 6 B 0.6 0.1% percent slopes Ur Urban land 26.5 6.2% W Water 0.6 0.1% Totals for Area of Interest 428.4 100.0% USDA Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 16 of 111 Hydrologic Soil Group—Guilford County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher uSDA Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 Page 17 of 111 3 Hydrologic Soil Group—Guilford County, North Carolina 597400 597500 597600 597700 597800 597900 598000 598100 598200 598300 598400 598500 598600 36° 729" N - 36° 729" N ci 0, g C ♦� f _ -� J ci 'r 11 -/vdll • Ill 1 = � � � L ! 36° 7'4!'N i - ..- .. _ r'. + � e d 36° 74" N 597400 597500 597600 597700 597800 597900 598000 598100 598200 598300 598400 598500 598600 598700 3 3 �o Map Scale: 1:3,720 if printed on B landscape (17" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 150 300 600 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: U rM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Page IP0101J Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Guilford County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:20,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Guilford County, North Carolina Survey Area Data: Version 15, Sep 26, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 15, 2016—Mar 12, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UUP Natural Resources Web Soil Survey Pagcl i P701017 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Guilford County, North Carolina Hydrologic Soil Group USDA Natural Resources Web Soil Survey 11/7/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 20 of 111 Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CkB Clifford sandy loam, 2 to A 24.3 32.1% 6 percent slopes 25.2 CkC Clifford sandy loam, 6 to A 33.3% 10 percent slopes CI62 Clifford sandy clay loam, B 7.5 9.8% 2 to 6 percent slopes, moderately eroded CIC2 Clifford sandy clay loam, B 15.8 20.9% 6 to 10 percent slopes, moderately eroded PpE2 Poplar Forest clay loam, B 0.1 0.1% 15 to 25 percent slopes, eroded W Water 2.8 3.7% Totals for Area of Interest 75.7 100.0% USDA Natural Resources Web Soil Survey 11/7/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 20 of 111 Hydrologic Soil Group—Guilford County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher uSDA Natural Resources Web Soil Survey 11/7/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 Page 21 of 111 Hydrologic Soil Group—Guilford County, North Carolina v 597200 597300 597400 597500 597600 597700 5978W 36° 656" Ni 8 K �S 8 36° 610"N 597200 597300 597400 597500 597600 597700 597800 3 En v Map Scale: 1:6,900 if printed on A portrait (8.5" x 11") sheet. Meter N 0 100 200 400 600 Feet 0 300 600 1200 1800 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: LTM Zone 17N WGS84 usDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 597900 598000 598100 M g 36° 6'56'N g g g 597900 598000 598100 36° 610" N 598200 3 o� PagCW01019 Page 1 of 4 Hydrologic Soil Group—Guilford County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:20,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Guilford County, North Carolina Survey Area Data: Version 16, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Data not available. The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UUP Natural Resources Web Soil Survey PagCM01019 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Guilford County, North Carolina Hydrologic Soil Group UT Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 24 of 111 Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CkB Clifford sandy loam, 2 to A 19.4 21.2% 6 percent slopes 3.8 CI62 Clifford sandy clay loam, B 4.1% 2 to 6 percent slopes, moderately eroded CIC2 Clifford sandy clay loam, B 4.4 4.9% 6 to 10 percent slopes, moderately eroded MhB2 Mecklenburg sandy clay C 38.2 41.8% loam, 2 to 6 percent slopes, moderately eroded MhC2 Mecklenburg sandy clay C 13.9 15.2% loam, 6 to 10 percent slopes, moderately eroded PpD2 Poplar Forest clay loam, B 3.2 3.5% 10 to 15 percent slopes, moderately eroded PpE2 Poplar Forest clay loam, B 8.5 9.3% 15 to 25 percent slopes, eroded W Water 0.0 0.0% Totals for Area of Interest 91.5 100.0% UT Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Page 24 of 111 Hydrologic Soil Group—Guilford County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher uSDA Natural Resources Web Soil Survey 6/17/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 Page 25 of 111 APPENDIX A-2: EXISTING CONDITIONS EXHIBITS PROPOSED AND FUTURE CONDITIONS EXHIBITS Page 26 of 111 TAXIWAY J I N T E R N A T 1 0 N A L Lu 4 I HP -4 - '" 1 �� I BC -11 , , LO Y Q "r I RENTAL CAR DRIVE SITE 1 IMPERVIOUS AREA SUMMARY \ DRAINAGE EXISTING EXISTING AREA IMPERVIOUS (AC) PERVIOUS (AC) \ BC -8 8.71 19.32 \ BC -9 21.94 20.52 BC -11 4.83 14.23 / BC -12 9.43 26.45 HP -4 117.36 190.83 BC -13 i I , I ' CARGO APRON Q � l TAXIWAY K �1 Piedmont Triad International Airport SITE 1 - EXISTING RENTAL CAR FACILITIES - EXISTING CONDITIONS EXISTING I FEDEX FACILITY I I '\ I 250 125 0 250 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT 1 ' j `r BC -11 � I I TAXIWAY J I I I� I I ,0 — ---- ---------------CD �- Q- U BC -9 LL. X Q H � - a HP -4 RENTAL CAR DRIVE 0 CARGO APRON ! SITE 1 IMPERVIOUS AREA SUMMARY EXISTING EXISTING NEW NEW DRAINAGE IMPERVIOUS PERVIOUS IMPERVIOUS PERVIOUS AREA (AC) (AC) (AC) (AC) BC -8 8.71 19.32 0.00 1.64 BC -9 21.94 20.52 0.00 4.37 BC -11 4.83 14.23 0.00 0.00 OWN 3C-12 9.43 26.45 0.00 0.00 HP -4 117.36 190.83 0.00 2.57 I I ' Michael Baker Piedmont Triad International Airport I N T E R N A T 1 0 N A L SITE 1- EXISTING RENTAL CAR FACILITIES - PROPOSED CONDITIONS EXISTING I FEDEX FACILITY I I 250 125 0 250 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT AW I I lea BRUSH CREEK CONSERVATION EASEMENT I J , STREAM (383 LF) TO BE FILLED IN � I BC -10 ' I � BC -11 i I o, _J U I, �I �j POND F1 ND F2 V \ �"`f� BC -15 j \ \ W BC -12 BC -13 \ I I NT RE AL CAR DRIVE I , I I •I. Ab , � I / f I / EXISTING FEDEX I FACILITY I EXISTING -\\ FEDEX FACILITY DRAINAGE AREA BC -9 BC -10 BC -11 BC -12 BC -13 BC -14 BC -15 EXISTING EXISTING IMPERVIOUS (AC) PERVIOUS (AC) 21.94 20.52 1.86 10.32 4.83 14.23 9.43 26.45 22.79 31.58 30.44 21.87 29.45 49.07 O \ . _ A 350 175 0 350 SCALE IN FEET Michael Baker Piedmont Triad International Airport T, _ _ I N T E R N A T 1 0 N A L SITE 2 PROPOSED WORLDWIDE DRIVE AND FUTURE AEROSPACE DEVELOPMENT EXISTING CONDITIONS P,EDMONTTRIAD INTERNATIONAL AIRPORT sG� BRUSH CREEK j CONSERVATION EASEMENT lea J SITE 2 IMPERVIOUS AREA SUMMARY DRAINAGE EXISTING EXISTING NEW NEW AREA IMPERVIOUS PERVIOUS IMPERVIOUS PERVIOUS (AC) (AC) (AC) (AC) BC -9 21.94 20.52 8.03 0.00 V I BC -10 1.86 10.32 7.60 0.00 BC -11 4.83 14.23 11.77 0.00 \ • BC -12 9.43 26.45 14.97 0.00 77D BC -13 22.79 31.58 0.50 0.00 BC -14 30.44 21.87 0.49 0.00 BC -15 29.45 49.07 0.08 0.00 \ Ir`f� vBC-15 \ 9 / / \ WORLDWIDE ' I \ DRIVE o �G FUTURE I BC -9 AEROSPACE DEVELOPMENT BC -8 � \ r BC -11 I \ \ \ III \ I \ \ BC -12 ; ry ---------=--------�� - - - - - BC -13 �. EXISTING 0 I FEDEX r � FACILITY Lu RENTAL CAR DRIVE ' Is ` 350 175 0 350 - CARGO APRON IMIMI- AMEL. -'- -- SCALE IN FEET Michael Baker_ Piedmont Triad International Airport _ ��p T, I N T E R N A T 1 0 N A L SITE 2 PROPOSED WORLDWIDE DRIVE AND FUTURE AEROSPACE DEVELOPMENT PROPOSED CONDITIONS PIEDMONT TRIAD INTERNATIONAL AIRPORT SITE 3 IMPERVIOUS AREA SUMMARY ti STREAM (1092 LF) STREAM (487 LF) TO BE FILLED IN \ . ,-C TO BE FILLED IN EXISTING EXISTING DRAINAGE AREA - - IMPERVIOUS (AC) PERVIOUS (AC) - WETLANDS (0.05 AC) - '' �� � ' LF) HP -28 0.70 42.79 STREAM (688 TO BE FILLED IN \ ' TO BE FILLED I� . � � � HP -29 3.42 26.38 HP -30 18.99 41.49 It l - \ At POND (1.8 AC) \ TO BE FILLED IN RIPARIAN \ BUFFER HP -29 / •,� I • Aft WETLANDS p TO REMAIN 1ER T (TYP.) �G POW RIPARIAN BUFFER -1 JiL Aw 100 -YR .h -� ' --�_ �- •- - !{ ... FLOODPLAIN �k 300 100 0 300 - SCALE IN FEET Michael Baker Piedmont Triad International Airport ,PTI _ I N T E R N A T 1 0 N A L SITE 3 NEW RENTAL CAR FACILITY (INMAN ROAD) EXISTING CONDITIONS PIEDMONT TRIAD INTERNATIONAL AIRPORT FaRe3l ot Ill -�.AAk 00 +A SITE 3 IMPERVIOUS AREA SUMMARY EXISTING EXISTING NEW NEW IMPERVIOUS PERVIOUS IMPERVIOUS PERVIOUS AREA (AC) (AC) (AC) (AC) - H P-28 0.70 42.79 14.82 0.01 H P-29 3.42 26.38 6.74 0.01 \--�- HP -30 18.99 41.49 0 0 \ — • wk- . w HP -28 � -- • •' -� '.. Ap PROPOSED SCM #1CHP-29 PROPERTY LINE PROPOSED SCM #3 s� �,t*... • r Michael Baker Piedmont Triad International Airport I N T E R N A T 1 0 N A L SITE 3- NEW RENTAL CAR FACILITY (INMAN ROAD) - PROPOSED CONDITIONS A�. '$f 300 150 0 300 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT INTERNATIONAL --.4mtv AWAO 6 TAXIWAY M IbL 1 A. . . Ilk- UF T -Tr ' Eq H P-5 / HORSEPEN CREEK - TRIBUTARY G / / , / / 1 1 I y�o ir'► I . ;I 44 I .e , ,I ' n � • Z - o _ SITE 4 IMPERVIOUS AREA SUMMARY Piedmont Triad International Airport SITE 4 - SPOIL EMBANKMENT (CHIMNEY ROCK SITE) - EXISTING CONDITIONS HP -25 \ r fop,, ' p +\ r r. ;�s, 410 300 150 0 30011 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT DRAINAGE EXISTING EXISTING y. AREA IMPERVIOUS (AC) PERVIOUS (AC) L H P-5 28.09 198.26 HP -19 15.55 110.06 Piedmont Triad International Airport SITE 4 - SPOIL EMBANKMENT (CHIMNEY ROCK SITE) - EXISTING CONDITIONS HP -25 \ r fop,, ' p +\ r r. ;�s, 410 300 150 0 30011 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT 9 INTERNATIONAL , HONDA AIRCRAFT FACILITY EXISTING WETLANDS I , �. T I t / HORSEPEN CREEK — TRIBUTARY G EL POI#2 SITE 4 IMPERVIOUS AREA SUMMARY .44 EXISTING NEW EXISTING PERVIOUS DRAINAGE IMPERVIOUS y � AREA (AC) 198.26 HP -5 28.09 HP -19 15.55 0.08 EXISTING NEW NEW PERVIOUS IMPERVIOUS PERVIOUS (AC) (AC) (AC) 198.26 0 0 110.06 0 0.08 or �iiiol�40w / -�._ +'tib• 1, A" / — —I Piedmont Triad International Airport SITE 4 - SPOIL EMBANKMENT (CHIMNEY ROCK SITE) - PROPOSED CONDITIONS w 300 150 0 300 SCALE IN FEET SPT/ PIEDMONT TRIAD INTERNATIONAL AIRPORT APPENDIX A-3: DRAINAGE AREA MAPS (2001) MISCELLANEOUS MAPS (2001) Page 35 of 111 sm VC9 IMPT, Z2111me I RSHRr L ,.. I uvvu G.vnul i wn I - I - - I -- • AIRPORT AREA i INFIELD AREA c MEADOW AIRFIELD PAVEMENT a IMPERVIOUS AREA fioo ioa o 6ao 1200 1000 Ige 39 of 111 1" = 600' APPENDIX A-4 POND F-1 CALCULATIONS (2001) Page 40 of 111 POND F-1 POND SIZING CALCULATIONS FOR. FUTURE CONDITIONS Page 41 of 111 PIEDMONT 'TRIAD AIRPORT AUTHORITY DATE OF STORMWATER MANAGEMENT POND DESIGN FORM SUBMITTAL: APRIL 2001 1. Basin Name and Location 2. Proposed Pond Name and Location Future Cargo Area I F -i 3. Existing Conditions 4, Proposed Conditions Total Basin Area 80 acres Revised Basin Area 80 acres Existing Impervious Area 20 arres, Proposed Impervious Area 80 acres 5. Peak Runoff Calculations 6. Pond Choice F_s_t,or_m7 Pre -Developed Post -Developed Peak! Choose one by checking box Event Peak in CFS in CFS 2 Year 918 228.0 Wet Retention 7 10 Year 145.2 418.0 Dry Detention F7�77 100 Year 211.8 6 8.0 7. Maximum Post -Developed Peak Discharge Rates through the Pond and Outlet Structure: Based upon the hydraulics and routing of the storm through the pond of the outlet structure as defined in sections 8 through 12. All Dewatering Dewatering time of the Temporary Water 4 days Perforations Quality Storage Volume - one inch storm Cubic Feet per Second event (days} Principal Spillway81 'Cubic Feet per Second Emergency Spillway 467 Cubic Feet per Second 8. Pond Size: Bottom of Pond 9. Pond Size: Top of Embankment Length 327 tp Length 367,8 Width109 Width IF 149.8 Side Slope 2:1 Height 10.2 Height is measured from the toe of slope to the top of the embankment. I of 3 Page 42 of 111 PIEDMONT TRIAD AIRPORT AUTHORITY STORmwATER MANAGEMENT POND DESIGN FORM DATE OF SUBMITTAL: APRIL 2001 10. Pond Volume Storage Permanent Sediment Storage 36,519 Maximum Water Surface 819.7 Cubic Feet Elevation Permanent Water Quality Depth N/A Feet Insert NIA if this is a dry detention submittal Permanent Water Quality Volume N/A Cubic Feet Insert NIA if this is a dry detention submittal 11. Outlet Structure Wet Retention Pond 12. Outlet Structure Dry Detention Pond Diameter Invert Crest Diameter Invert Crest (feet) Elevation Elevation (feet) Elevation Elevation Barrel: Barrel 2.S 806.5 First Row First Row Of Perforations Of Perforations (Permanent Water Quality Elevation) (Permanent Water Quality Elevation) 23 8I 1 Second Row Second Row .23 812 Of Perforations Of Perforations Third Row Of Perforations Third Row Of Perforations 23 813 Principal Spillway Principal Spillway 3.75 817 (Riser) (Riser) Emergency Spillway Emergency Spillway 20S 818.25 (Length) (Length) Maximum Water Maximum Water 819.7 Surface Elevation Surface Elevation Total Water Storage Capacity. (Volume at Maximum Water Total Water Storage Capacity (Volume at Maximum Water 9.9 acre feet Surface Elevation.) Surface Elevation.) 2 of 3 Page 43 of 111 PIEDMONT TRIAD AIRPORT AUTHORITY STORMWATER MANAGEMENT POND DESIGN FORM 13. Dam Permit Required? Check one. Yes No Explain Why: Explain Why Not: Maximum water storage is less than 10 feet. Height of the embankment is less than 15 feet. 14. Oil Water Separator Required? Yes Check One Box. No 15. For PTAA Use REVISE AND RESUBMIT: Comments: APPROVED: ame: DATE OF SUBMITTAL: APRIL 2001 acheck this box 3 of 3 Page 44 of 111 STEP 1 Pre -Developed Weighted C Calculate Composite C values Area in acres Drainage Basin: Development area Insert Basin name and pond name. Pond Name: F-1, F-2 and F-3 Date: Dec -DO insert this date for the modified Rational Equation Surface Cover C value " total land%r Developed area Weighted C 80 0.38 Insert an area for each EXISTING surface cover found in the basin. "See Table 1 STEP 2 Time of Concentration jPredeveloped Insert Reach Input Velocity in feet Length in feet per second " sheet flow 300 2.27 shallow concentrated flow 1000 3 gutter or pipe flow 1750 4 pipe velocity = 24 inch concrete, 2%, full, use Mannings Equation, N of .012 Total Runoff Length 3050 Pre and Post Development Runoff Calculations Basin Comments; this calculation is for the fedex site ponds F-1 F-2 and F-3 Post -Developed Wel hied C Calculate Composite C values for the modified Rational Equation Area D 0 bare packed soil 0.6 total land Post -Developed area Weighted C 60 0.95 Insert an area for each NEW surface cover found in the basin. "'See Table 1 Time of Concentration in minutes 15.05 — See Table 3 The Designer Round the time of For this pond makes the following Concentration to the design use choice. nearest S Minute Increment 15.00 Comments inserted: place cursor on cell for comments small red triangle in upper right comer indicates comment. Red text indicates a value to be inserted by the designer Blue text indicates a value that is referenced from another calculation. Insertion is automatic. Computed Flow Time 2.00 0.00 9.62 Time of Concentration in minutes 11.62 " See Table 3 Round the time of Forthls pond Concentration to the design use ........ nearest 5 Minute Increment :::::,.00 FEDEX2ponds.XLS 1 of 2 Page 45 of 111 Time of Concentrat[on Postdevelo ed Computed Flow Insert Reach Input Velocity in feet Time in minutes Length in feet per second " 2.20 sheet flow 300 2.5 5.56 shallow concentrated flow 0 3 7.28 gutter or pipe flow 4500 7.8 pipe velocity = 24 inch concrete, 1 %, full, use Mannings Equation, N of .012 Total Runoff Length 4800 Time of Concentration in minutes 15.05 — See Table 3 The Designer Round the time of For this pond makes the following Concentration to the design use choice. nearest S Minute Increment 15.00 Comments inserted: place cursor on cell for comments small red triangle in upper right comer indicates comment. Red text indicates a value to be inserted by the designer Blue text indicates a value that is referenced from another calculation. Insertion is automatic. Computed Flow Time 2.00 0.00 9.62 Time of Concentration in minutes 11.62 " See Table 3 Round the time of Forthls pond Concentration to the design use ........ nearest 5 Minute Increment :::::,.00 FEDEX2ponds.XLS 1 of 2 Page 45 of 111 STEP 3 DralnageBasln: I Development area Pond Name: IF -1, F-2 and �F.3 Date: Dec -00 Total Drainage area Peak Runoff Calculation Rational Equation 0- CIA SeeTable 2 Pre and Post Development Runoff Calculations lPre-Developed j I 12 year Peak j Weighted C 1 0.38 .3" from cell G24 1 insert this value 3.1 art to, ualue A 80 from cell G70 Peak Q cfs am CIS FP—re-Developed Peak Runoff Calculation 110 year Peak Rational Equation Q= CIA Weighted C 0.38 from cell G24 SeeTable 2 1 4.8 insert this value A 80 from cell G70 Peak Q cfs 1452 cfs Peak Runoff Calculation Rational Equation Q= CIA SeeTable 2 lPre-Developed -1 I 100 year Peak 0!�—j Weighted C 0,38 from cell G24 I insert this value A 80 from cell G70 Peak Q cfs 211& cfs lPost-Developed Runoff Calculation 12 year Peak_ nal Equation Q= CIA Weighted C from cell N 24 SeeTable 2 1 1 31insert this value A 80 from cell G 70 Peak Q cfs 228.0 cts lPast-Developed Runoff Calculation [II]I year Peak nal Equation Q= CIA Weighted C 0.951 from cell N 24 SeeTable 2 I 5.5 insert this value A 80 from cell G 70 Peak Q cfs 418,0 cfs Post -Developed Peak Runoff Calculation 100 year Peak Rational Equation Q= CIA Weighted C 0.95 from cell N 24 SeeTable 2 1 8dinsert this value A 80 from cell G 70 Peak Q cfs 608.0 cis FEDEX2ponds.XLS 2 of 2 Page 46 of 111 DRY POND OPERATION STEP 1 t3 } :��Ik�aWi, �,�t mala... Development area lCorial Discharge Rates for the Pond Operation This sheet computes discharge rates based upon the pond stage elevadans found an Ory Pond sheet Pond Name: F-1. F-2 and FJ� Data: Dec -00 D' ,PiSnd 4iiBot'Sti"vctere S1iln :�. - � Emerg.ndy Dewataring Pertoratians Principaa $piitway ist row 2nd row 31d row 35 35 35 # hates B•rret P P'l..Ipd Spillway. River Emergency Ispillway @23 0.23 0.23 Marrs _ Length of Weir B11,00 612 613 invertor" Barrel gNmater River Diameter foot C 1.444 1.444 1.444 eft area 2.5 ft. 3.75 n. 205 gown 3,33 811.11 812.11 813.11 datum 0,6 0.6 0.6 coefficient Head Head The depth of Bow determines the velocity of the discharge, Depth of llow above the centanm. of the brepef Depth of flewabove riser The designer should modify the length of the weir to ft, the pond. hole diameters 2.75 inches Pick is height of the dser pipe The Head is depth of Bow ever the emergency The designer should infer to Table 6 for spiMray velocity guidance insert diameter The value is measured from the centet9ntl of the barrel spowely plus one foot. Th. emergency spillway The Head is this height pies th. dept of Bowaver must be at least one fed Above the principal spillway. _ Depth of flow Yelocdy poa The pond is automatically set up with critical elevaflons the prmdpal spowity. The Head can be adjusted based upon the erevatien 05 2.35 fps dinere ser the designer sets between principal spillway 0.75 2.96 its the emergency spillway, t 3.33 fps Perforations cannot be above principal spillway crest Barrel Ca city Formula Id Risar Ca ac3 1.5 4.1 fps Principal Crest 617 c 0.6 Cl3.33 These faire remalnihe same no matterwh.t the length of weir. • 4.90875 L 11.78 CLWI.5 = LHV h determined o table beta Insert 999 in invert elevation cell if perforation is not to be used g 32.2 In de(etmined an table below Q=ca((2gh}x.5) Comments inserted: else. cursor on cell far comments small red triangle in upper right corner indicates comment. Red text indicates a value to be inserted by the designer Blue text indicates a valva that is referenced from another calculation. Insertion is automatic, FEDEX2ponds.XLS 1 of 2 Flow banstion formula from weir to oril werthe principal Standard Value.: weir Q=CLH"L5 Wait Coetftctern 3.33 orifice Q=;-((2gh)1.5) off" Coefr len 0.6 2 year pre. 10 year pre. 100 year post - developed davelopcd developed Peak peak Peak 83.775 1 145.2 608 Page 47 of 111 ORY PONOOPERATION STEP WatieHdet emtom of Pond Principal Principal Principal Controlling Controlling Principal Principal Tat Row or 2nd Row of 3rd Row of Spillway Spillway Spillway Barret flow over flow Through Spillway Total Water Surface Spillway Creat Perforations Perforations Perforations Weir flow In Orifice flow in flow In CFS Principal Principal Discharge In Elevation Elevation flaw In CFS flow In CFS flow In CFS CFS CFS (orifice flow) Spillway Spillway CFS Sediment Elevation 811.00 817 orifice or 0.00 0.00 0.00 0.00 weir Fast Row pt emtom of Pond 810 817 0.00 0.00 O.DO 0.00 0.00 0.00 Pemanent 15.75 54.80 59.46 75.67 Estimated Water 0.00 0.00 Surface Ef-Imn 0.00 0.00 6.54 Sediment Elevation 811.00 817 0.00 0.00 0.00 0.00 0.00 0.06 Fast Row pt 817 .20,40 ig,.i8 17.88 176.87 87.67 80.95 Top of 0.00 45.93 Embarkment 620.73 54.80 Perforations 811.00 8t7 0.00 0.00 O.DO 0.00 0.00 0.00 Intermediate elevation 812.00 817 6.54 0.00 0.00 0.00 0.00 0.00 intemledude elevation 813.00 817 9.54 6.54 DAO 0.00 0.00 OAO intermediate elevation 814.00 817 11.81 9.64 6.54 0.00 0.00 0.00 Temporary WO Eie.Wh (Crest of Pnn' at shwa Bill 817 16.86 15.36 13.70 0.00 0.00 0.00 Crest of 0,00 0.00 Emergency 0.00 ' S 'ehva 818.25 817 118.57 17.22 15.75 54.80 59.46 75.67 Estimated Water 0.00 0.00 Surface Ef-Imn 0.00 0.00 6.54 ver the 6.54 0.00 0.00 Emergenoy a0O 16.08 0,00 SpOrvay 819.73 817 .20,40 ig,.i8 17.88 176.87 87.67 80.95 Top of 0.00 45.93 Embarkment 620.73 54.80 54.80 Adjust the Estimated Water Surface elevation and the Emergency Spillway Wolin to determine the peak lbw through the total outlet structure. 106,33 The goal Is to pass the 100 year storm through the outlet strucule and adaln a velocity, over the emergency spillway, of less than 2 5 fps. The designer must reviaw the length of the emergency spl6way so that d is oompatible wah the length orvadth of me pond Sea Ory Poral for height of embankment and total storage volume, Total Flow through the Emergency system based Velocity Spillway upon the over the Discharge in stage of the Emergency CFS pond Spillway For an earth spahvay vebcdy should be about 2.5 FPS velocity aver the emergency spillway 0.00 0.00 0.00 ' 0,00 0.00 0.00 0.00 CLOD 0.00 0.00 UO 0.00 0.00 0.00 OM 0.00 0.00 6.54 0.00 6.54 0.00 0.00 16.08 a0O 16.08 0,00 0.00 27.69 0.00 27.89 0.00 0.00 45.93 0.00 45.93 54.80 54.80 106.33 0.00 106,33 Pond Sarely Passes 100 Year 87.67., 80.95 138.41 Peak 1229.11 1367.52 4.05 Barrel Discharge Vefcalty 10 year pre. 100 year post - developed Peak developed Peak 26.20 fps 1458 Baa FEDEX2ponds.XLS 2 of 2 Page 48 of 111 DRY DETENTION POND CALCULATIONS Drainage Basin: Pond Name: 2 year pre -developed Peak 10 year pre -developed 100 year post. Date: Dec -00 Peak developed Peak r 93.775 145.2 gill STEP 1 Permanent Sediment 1/8 inch per acre of total drainage area Total 0.125 Permanent sediment volume in cubic feet Total Area 801 36,300.000 Required sediment storage per acre. This is a constant. 454 Icubic feet STEP 2 C,Ornp4to T" ,ra Stokes Temporary Water Quality Storage Total Area 80 Built Upon Area Post -Developed 80 Be careful to check the total impervious area as referenced from Peak Runoff Calculations sheet. Percentage Built Upon 100.00 Runoff coeff 0.95 Runoff Volume 6,33 acre feet 276,88-0 001 cubic feet This water surface volume is measured to the crest of the Principal Spillway. Comments inserted: place cursor on cell for comments small red triangle in upper right corner indicates comment. Red text indicates a value to be inserted by the designer Blue text indicates a value that is referenced from another calculation. Insertion is automatic. FEDEX2ponds.XLS 1 of 3 Page 49 of 111 DRY DETENTION POND CALCULATIONS STEP 3 .CtiiilpaHott to Alto lgch lComparison to one inch design storm volume. Runoff Volume 6.33 acre feet 1 275,880=00 cubic feet STEP 4 FEDEX2ponds,XLS Total Area 80 Runoff Volume/Total Area 1 inch Permanent Water Quality Storage Not Applicable to the Dry Pond Total Area 80 lCreate an Elevation Table Elevation Table Centerline of 0 Principal Barrel 808 Bottom of pond 810 Permanent so Sediment Storage 811.00 1 st tow of roofs perforations invert 811,00 Crest of Principal Area D Spilway 817 Crest of Emergency go Spillway 131815 SCS Peak Discharge Method —A The estimated runoff from a 1 inch design storm equals: Cumulative Rainfall since the beginning of the storm P I inches Potential Maximum this value is computed retention after runoff using the weighted CN begins S. 0.20 value below Cumulative Runoff since the beginning of the storm Q 8110 inches Runoff Volume is OK This calculation is taken from Figure 5.F.9 Solution of Runoff Equation NC Stormwater Guidance Manual Weighted CN Post Developed Conditions Data from Peak Runoff Calculations spreadsheet Area Area in Acres Surface Cover CN Value From Guilford County Soil Survey Soil Group Area A 0 grass B Area B so impervious Area C 0 roofs newly graded Area D 0 area go Weighted CN Centerline of barrel is set at pond bottom minus two feet ( computed value Insert Bottom of Pond Elevation Permanent Sediment Storage: minimum of 6 inches. This math shows 12 inches. 1 st row of perforations is set at the top of the permanent sediment elevation Crest of Principal is adjusted to meet required volume of Temp. W 0 storage as inserted in step 5 below Crest of the Emergency Spillway is set at the Principal plus 1.25 feet 2 of3 See Table 5 for CN Values 69 98 98 as 98 Page 50 of 111 DRY DETENTION POND CALCULATIONS STEP 5 Bottom of pond Permanent Sediment Storage 1st Row of Perforations Permanent Sediment Storage Crest of Principal Spillway Crest of Emergency Spillway Estimated peak water surface elevation ( see Dry Pond Operation) Top of Embankment Compute Pond Volumes and Elevations 811.00 817 818.25 819.73 820.73 Estimated Total Height of Embankment Estimated Total Temporary Water Storage Estimated Area of Top of the Embankment FEDEX2ponds.XLS 331 Date: Dec -00 Pond Name: F4, F-2 and F-3 0.00 36,519.471 1 Steps 1 Adjust Length of Bottom of Pond and or Side Slope to compute the necessary Permanent Sediment Storage volume 2 Adjust Length of Bottom of Pond and or Side Slope to meet the necessary Permanent Pool SADA Ratio 3 Adjust the elevation of the Crest of the Principal Spillway in the Elevation Table to meet the Temporary W Q volume Storage (above 4 The SADA ratio tan be improved ( closer to 1 ) by increasing the depth of permanent sediment storage thereby making the pond smaller. Permanent Sediment The riser height will increase meet the Temporary Storage volume Volume) cumulative 355 137.0 volume between volume of pond 275,880.00 Elevation Length Width Side Slope elevations (cubic feet) (cubic feet) 356,237.59 Adjust Riser Height Minimum Permanen4 810 327 109,0 2 0 0 Sediment Volume to 434,109.69 9.97 Match Estimated Total OK Minimum Sediment 811.00 331.00 113.0 36,519.47 36,519.47 36,300.000 Volume is met 811.00 817 818.25 819.73 820.73 Estimated Total Height of Embankment Estimated Total Temporary Water Storage Estimated Area of Top of the Embankment FEDEX2ponds.XLS 331 113.0 0.00 36,519.471 1 Available Total Temporary WQ Storage (above Permanent Sediment Total Temporary WO Volume) Storage Required 355 137.0 257,377.70 293,897.16 257,377.70 275,880.00 360 142.0 62,340.43 356,237.59 Adjust Riser Height 365.92 147.9 77,872.10 434,109.69 9.97 Estimated Total Temporary Water 369.92 151.9 55,159.33 489,269.01 Storage in Acre Feet VOLUME = Ht3 x (length + width + (length x width)11t2) 10.73 Feet Dam maybe exempt INC Dam Safety Exemptions Height less than 15 feet 9.97 Acre Feet Dam may be exempt Volume less than 10 acre -feat 1.28 Acres The designer is responsible to investigate exemptions for Dam Safely Permits 3of3 Page 51 of i 11 • -10- >>>> Routing Summary <t« Peak Inflow - 608.00 cf s Peak Outflow - 604..91 cfs Peak Elevation = 819.73 ft ..... Summary of Approximate Peak Storage Initial Storage - 0 cu -ft Peak Storage From Storm = 434,237 cu -ft Total Storage in Pond - 434,237 cu -ft Page 52 of 111 DETENTION OUTLET STRUCTURES f.STRI FEDEX1W FEDEX11-1 Ihis File VOL File = = FEDEX1W .PND File 810 Min.Elev. 820.2 .25 Max.Elev. Incr. y (y/n) DUMP All? Ofher Elevs: west side pond —1< fedex developed conditions -Titles pond number 1 west side 80 acres Precedence > 111312fNM 6 6 0ICA 0 Orifice d 9' fifm -Elevation an a ORIFICE 5 5 ORIFT. 11 6 ORIFICE 4 4 ;:`This D'.N /7) Another ID out ORIFICE 3 WEIR -VR 2 > 3 2 , E 16-1. STAND PIPE 1 ? 6 AD 12 elby, E ij:, -9. Orifice 6. Inver, f A") 7 Datum 62t�: Orifice '.:area isqft}? Page 53 of 111 DETENTION OUTLET STRUCTURES f.STRI FEDEX114 - FEDEX1W = FEDEX1W810 820.2 .25 Y (v/n) This File - VOL File = PND File I Min.Elev. Max.Elev. Incr. Dump All? Other Elevs: west side pond fedex developed conditions pond number 1 west side 80 acres < Precedence > ORIFICE 6 E2 elev.�..Cft? 6 11111112MM 5 f Invert. elevft? 5 ORIFICE 4 Orifice. bitlea (sq ft)? 4 ORIFICE 3 3 WEIR -VR 2 2 STAND PIPE I ? 6 AD < Structure-: Data >— Orif lice': -:Based on A1^6a:*; and Datum ORIFICE i s .T D.No� (-17/7). Another El elml,ft):11 E2 elev.�..Cft? 020. 9 Orif ffF'. iI f Invert. elevft? S13 Datum e1ey. (ft.) 819.11 Orifice. bitlea (sq ft)? 1.444 I<-Titles Elevation 5 ID out Page 54 of 111 DETENTION OUTLET STRUCTURES f.STR} - FEDEX1W - FEDEX11.1 = FEDE'RlW 810 820.2 i This File - VOL File = PND File ! Min.Elev. Max.Elev Other- Elevs: west side pond fedex developed conditions pond number 1 west side 80 acres 25 y (Y/n ) Tncr. Dump All? < Precedence > < . Structure =Da#a > ORIFICE 6 -> 6 Orifac based on Nrea and. Datum ORIFICE 5-> S ORIFICE r� �tim 4 -> 4 Th1s ID.No {�/} Another ORIFICE WEIR -VR 3 2 -> 3 2 E1 lelev.:t�. t X2.11` STAND PIPE l ? 6 -> AD E2 elevyft X0.9 'Ori f icebef f , 6i 16vert Datum eluft '?2.11 Orifice area lsq ft 's 1:..'444 -Titles Elevation 4 -> ID out Page 55 of 111 DETENTION OUTLET STRUCTURES [.STR} — FEDEX1W - FEDEX1W = FEDEMI 810 820.2 .25 y (yln) [his File VOL File = PND File Min.Elev. Max.Elev. Incr. Dump All? Other Elevs: west side pond Fedex developed conditions pond number 1 ales# side 80 acres t Precedence > ORIFICE 6 -> 6 ORIFICE 4 -> 4 WEIR -'VR 2 -> 2 STRND PIPE 1 ? 6 -> AD <-Ti Iles ru+rrrtruDt.a, 4n _,.:.It. W:` ertd Da#gum llevat ion Th,s TSI N : `{} Another ' -> ID out El- E2 l E2 elev..�f#�? 82D.9 Orifice ;oe:? 4;. Invert :? elevyft.$... . Qa#um els. �ft� ?.1,'11 Orifice a %A..,�to ftp' Page 56 of 111 DETENTION OUTLET STRUCTURES (.STRJ FEDEX114 - FEDEX1W = FEDEX1W 810 820.2 .25 Y (Y/n) This File - VOL File = ..PND File Min.Elev. Max.Elev. Incr. Dump All? Other Elevs: west side pond fedex developed conditions pond number 1 west side 80 acres 391210*Mff El elevAff-PT E2 elevJffl! I< - 1- 1. Hes Weir coefficient? 31.3 Weir ele*q�-(ft)?. 818,25 Length fft)? 80 Contract:d" IS d C presse Page 57 of 111 Precedence > ORIFICE 6 ->.6 ORIFICE 5 5 ORIFICE 4 4 ORIFICE 3 3 MWFINTIM 2 2 391210*Mff El elevAff-PT E2 elevJffl! I< - 1- 1. Hes Weir coefficient? 31.3 Weir ele*q�-(ft)?. 818,25 Length fft)? 80 Contract:d" IS d C presse Page 57 of 111 DETENTION OUTLET STRUCTURES FEDEX1W - FEDEX1W = FEDEX1W 810 1-ile - VOL File = PND File Min.Elev. 01[ier Hevs: west side pond fedex developed conditions pond number 1 west side 80 acres IND PIPE MM �,Aff (-STRJ 820.2 Max. E 1 ev. .25 Y (v/n) Incr. Dump 11,11? < Structure -Data >- Stand Hoe with weir or orifice STAND PIPE 6 f loot <--T1 t les This iflo./ Another out El. eiev,-.-I t Precedence > 820:9;' ORIFICE 6 6 ORIFICE 5 .6ht. Orif ice q .: o e -:f f icdeint? -6 5 ORIFICE 4 (ft)?* 4 ORIFICE 3 3 WEIR -VR 2 2 IND PIPE MM �,Aff (-STRJ 820.2 Max. E 1 ev. .25 Y (v/n) Incr. Dump 11,11? < Structure -Data >- Stand Hoe with weir or orifice STAND PIPE 6 f loot <--T1 t les This iflo./ Another out El. eiev,-.-I t E2 el e'.v. I eft )? 820:9;' Crest 61 0(f,fl?''.8,17..., . �31. 75 Weffici r coefficient? ei C .6ht. Orif ice q .: o e -:f f icdeint? -6 Start tra hS.1,11o:n e lev.. '(-;f, 1 t ? Transitionheight (ft)?* Page 58 of 111 Page 59 of 111 Page 60 of 111 Page 61 of 111 APPENDIX A-5 RECORD DRAWINGS Page 62 of 111 BENCH MARK-,,, #24 RAILROAD SPIKE IN BASE OF 600mm 0 POPLAR 12.9m RIGHT OF STA. 1+36.2 --LOOP A- ELEV. 253.819 FOR UTILITY INFORMATION SEE UTILITY PLANS AND �o �� LOCATION SKETCH SPECIAL PROVISIONS ASSEMBLED BY : M. G. SHAIKH DATE : 11-29-01 CHECKED BY H.T. BARBOUR DATE : 1-22-02 DRAWN BY : EEM 6/97 CHECKED BY ARB 7/97 19.105m _ � LOOP A 27.5m 3.000m 1.500m i� 1o000m 25.000m 18.000m 14.000m 23.000m 17.500m -RAMP CA - 254.9± A -254.9± 253.8 ± 253.1+-) I 2.53.0 ± 252.0 ± ' 252.1 i 249.5± PROFILE ALONG CULVERT 5.000m LJJ.V 3.1± ROADWAY DATA GRADE POINT ELEV. @ STA. 25+07.000 -RAMP CA- = 260.375 BED ELEV. @ STA. 25+07.000 -RAMP CA- = 250.245 ROADWAY SLOPES = 201 RT. 4:1 L T . HYDRAULIC DATA DESIGN DISCHARGE = 11.00 Guam./s. 388 cfs FREQUENCY OF DESIGN FLOOD = 50 YR. DESIGN HIGH WATER ELEV. = 253.18 830.64 ft DRAINAGE AREA BASIC DESCHARGE (0100) BASIC HIGH WATER ELEV. = 46 He 113.7 ac = 12.00 cu.m./s. 424 cfs - 253.290 831.00 ft OVERTOPPING FLOOD DATA OVERTOPPING DISCHARGE 706 cfs = 20.00 cu.m./s. FREQUENCY OF OVERTOPPING FLOOD = 100 YR.+ OVERTOPPING FLOOD ELEV. 833.66 ft = 254.10± CLASS A C CRETE FOR For TOTAL STRUCTURE QUANTITIE CLA A CONCRETE FOR TAPERED INLET BARREL 6D 2.54 m3 /m 5.6 m3 CLASS A C CRETE FOR BARREL C�7 18 m3 /m 215.8 m3 WINGS ETC. 13.8 m3 TOTAL 235.2 m3 REINFORCING STEE BARREL 21105 kg WINGS ETC. 151 kg TOTA 2125 kg CULVER EXCAVATION --------------- L MP SUM FOU ATION COND. MAT'L ---- 173 METRIC TONS F TER FABRIC ------------------------- 31. m LASS I RIP RAP --------- 30.9 METRIC TON W:\squadj\u2524bb\mshoikh\Microstation\U-2524BB12.dgn adavenport F.A. PROJECT NO. -, NHF-1241(11) NOTES ASSUMED LIVE LOAD----------MS18 OR ALTERNATE LOADING. DESIGN FILL ----------------- 10.560m FOR OTHER DESIGN DATA AND NOTES SEE STANDARD NOTE SHEET. 76m m 0 WEEP HOLES INDICATED TO BE IN ACCORDANCE WITH THE SPECIFICATIONS. CONCRETE IN CULVERTS TO BE POURED IN THE FOLLOWING ORDER: 1. WING FOOTINGS AND FLOOR SLAB INCLUDING 100m m OF ALL VERTICAL WALLS. 2. THE REMAINING PORTIONS OF THE WALLS AND WINGS FULL HEIGHT FOLLOWED BY ROOF SLAB AND HEADWALLS. THE RESIDENT ENGINEER SHALL CHECK THE LENGTH OF CULVERT BEFORE STAKING IT OUT TO MAKE CERTAIN THAT IT WILL PROPERLY TAKE CARE OF THE FILL. DIMENSIONS FOR WING LAYOUT AS WELL AS ADDITIONAL REINFORCING STEEL EMBEDDED IN BARREL ARE SHOWN ON WING SHEET. TRANSVERSE CONSTRUCTION JOINTS SHALL BE USED IN THE BARREL,SPACED TO LIMIT THE POURS TO A MAXIMUM OF 21.0m. LOCATION OF JOINTS SHALL BE SUBJECT TO APPROVAL OF THE ENGINEER. AT THE CONTRACTOR'S OPTION, HE MAY SPLICE THE VERTICAL REINFORCING STEEL IN THE INTERIOR FACE OF THE EXTERIOR WALLS ABOVE THE LOWER WALL CONSTRUCTION JOINT. THE SPLICE LENGTH SHALL BE AS PROVIDED IN THE SPLICE LENGTH CHART SHOWN ON THE PLANS. EXTRA WEIGHT OF STEEL DUE TO THE SPLICES SHALL BE PAID FOR BY THE CONTRACTOR. NO PRECAST REINFORCED BOX CULVERT OPTICIN WILL BE ALLOWED. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED. ALL ELEVATIONS ARE IN METERS. A 900m m STRIP OF FILTER FABRIC SHALL BE ATTACHED TO THE FILL FACE OF THE WING COVERING THE ENTIRE LENGTH OF THE EXPANSION JOINT. AT THE CONTRACTOR'S OPTION THE VERTICAL CONSTRUCTION JOINT BETWEEN THE OUTLET WINGS AND THE BARREL MAY BE ELIMINATED AND THE "C" BARS IN THE BARREL MAY BE EXTENDED TO REPLACE THE "D" AND "H" BARS IN THE WINGS AND SLAB. FOR CULVERT DIVERSION DETAILS AND PAY ITEM, SEE EROSION CONTROL PLANS. THE CONTRACTOR SHALL PROVIDE INDEPENDENT ASSURANCE SAMPLES OF REINFORCING STEEL AS FOLLOWS: FOR PROJECTS REQUIRING UP TO 360,000kg OF REINFORCING STEEL, ONE 760m m SAMPLE OF EACH SIZE BAR USED, AND FOR PROJECTS REQUIRING OVER 360,000kg OF REINFORCING STEEL, TWO 760m m SAMPLES OF EACH SIZE BAR USED. THE BARS FROM WHICH THE SAMPLES ARE TAKEN MUST THEN BE SPLICED WITH REPLACMENT BARS OF THE SIZE AND LENGTH OF THE SAMPLE, PLUS A MINIMUM LAP SPLICE OF THIRTY BAR DIAMETERS. =� SEAL -s - 022506 C ARO1110,, ••�FsS10r, :9 ''• SEAL :• 10730 �OA •• r O �y 10 I _Z73 milli 0 ,jw,* PROJECT N0. U-2524BB GUILFORD COUNTY STATION: 25+07°000 -RMP CA - SHEET 1 OF 6 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RALEIGH SINGLE 2.100m X 1.500n CONCRETE BOX CULVERT 63 °-41'-10"SKEW 1310 REVISIONS SHEET NO. NO. BY: DATE: NO. BY: DATE: r �1 TOTAL lJ SHEETS L 28 STR# P1,263of111 W:\squad j\u2524bb\msholKh\Microstat ion\U-2524BBIl.dgn K '�' 1 1 Page 64 of 111 APPENDIX A-6 HYDROCAD OUTPUT Page 65 of 111 DA-1 DA-2 DA-3 SCM-1 SCM-2 Z SCM-3 \ I / POI-1 Subcat Reach On Link Routing Diagram for INMAN SITE Prepared by {enter your company name here}, Printed 8/5/2019 HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 66 of 111 INMAN SITE Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 2 Area Listing (selected nodes) Area CN Description (sq -ft) (subcatchment-numbers) 1,239,283 98 (DA -1, DA -2, DA -3) 157,646 68 <50% Grass cover, Poor, HSG A (DA -3) 96,745 72 Dirt roads, HSG A (DA -3) 1,493,674 93 TOTAL AREA Page 67 of 111 INMAN SITE Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 3 Soil Listing (selected nodes) Area Soil Subcatchment (sq -ft) Group Numbers 254,391 HSG A DA -3 0 HSG B 0 HSG C 0 HSG D 1,239,283 Other DA -1, DA -2, DA -3 1,493,674 TOTAL AREA Page 68 of 111 INMAN SITE Prepared by {enter your company name here} HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Printed 8/5/2019 1:30:04 PM Page 4 Pipe Listing (selected nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 SCM -1 851.00 850.00 82.0 0.0122 0.013 24.0 0.0 0.0 2 SCM -2 850.00 849.00 62.0 0.0161 0.013 30.0 0.0 0.0 3 SCM -3 842.00 841.00 55.0 0.0182 0.013 30.0 0.0 0.0 Page 69 of 111 INMAN SITE Type 11 24 -hr 1 -inch Rainfall=1.00" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 5 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentDA-1: Runoff Area=569,111 sf 100.00% Impervious Runoff Depth>0.79" Tc=6.0 min CN=98 Runoff=16.57 cfs 37,475 cf SubcatchmentDA-2: Runoff Area=308,042 sf 100.00% Impervious Runoff Depth>0.79" Tc=6.0 min CN=98 Runoff=8.97 cfs 20,284 cf SubcatchmentDA-3: Runoff Area=616,521 sf 58.74% Impervious Runoff Depth>0.20" Tc=6.0 min CN=86 Runoff=4.44 cfs 10,131 c1 Pond POI -1: Inflow=0.00 cfs 0 cf Primary=0.00 cfs 0 cf Pond SCM -1: Peak Elev=854.78' Storage=37,462 cf Inflow=16.57 cfs 37,475 cf Outflow=0.00 cfs 0 cf Pond SCM -2: Peak Elev=854.58' Storage=20,277 cf Inflow=8.97 cfs 20,284 cf Outflow=0.00 cfs 0 cf Pond SCM -3: Peak Elev=845.18' Storage=10,123 cf Inflow=4.44 cfs 10,131 cf Outflow=0.00 cfs 0 cf Total Runoff Area = 1,493,674 sf Runoff Volume = 67,890 cf Average Runoff Depth = 0.55" 17.03% Pervious = 254,391 sf 82.97% Impervious = 1,239,283 sf Page 70 of 111 INMAN SITE Type 11 24 -hr 1 -inch Rainfall=1.00" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment DA -1: Runoff = 16.57 cfs @ 11.96 hrs, Volume= 37,475 cf, Depth> 0.79" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -inch Rainfall=1.00" Area (sf) CN Description 569,111 98 569,111 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -2: Runoff = 8.97 cfs @ 11.96 hrs, Volume= 20,284 cf, Depth> 0.79" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -inch Rainfall=1.00" Area (sf) CN Description 308,042 98 308,042 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -3: Runoff = 4.44 cfs @ 11.99 hrs, Volume= 10,131 cf, Depth> 0.20" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -inch Rainfall=1.00" Area (sf) CN Description 362,130 98 157,646 68 <50% Grass cover, Poor, HSG A 96,745 72 Dirt roads, HSG A 616,521 86 Weighted Average 254,391 41.26% Pervious Area 362,130 58.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Page 71 of 111 INMAN SITE Type 1124 -hr 1 -inch Rainfall=1.00" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 7 Summary for Pond P0I-1: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 1,493,674 sf, 82.97% Impervious, Inflow Depth = 0.00" for 1 -inch event Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Pond SCM -1: Inflow Area = 569,111 sf,100.00% Impervious, Inflow Depth > 0.79" for 1 -inch event Inflow = 16.57 cfs @ 11.96 hrs, Volume= 37,475 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 854.78'@ 24.00 hrs Surf.Area= 49,238 sf Storage= 37,462 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 854.00' 209,703 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 47,249 0 0 856.00 52,372 99,621 99,621 858.00 57,710 110,082 209,703 Device Routing Invert Outlet Devices #1 Primary 851.00' 24.0" Round Culvert L= 82.0' Ke= 0.500 Inlet/ Outlet Invert= 851.00'/850.00' S=0.0122'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=854.00' (Free Discharge) L1=Culvert (Passes 0.00 cfs of 21.39 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Summary for Pond SCM -2: Inflow Area = 308,042 sf,100.00% Impervious, Inflow Depth > 0.79" for 1 -inch event Inflow = 8.97 cfs @ 11.96 hrs, Volume= 20,284 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100°/x, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 72 of 111 INMAN SITE Type 1124 -hr 1 -inch Rainfall=1.00" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 8 Peak Elev= 854.58'@ 24.00 hrs Surf.Area= 35,442 sf Storage= 20,277 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 854.00' 156,485 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 33,998 0 0 856.00 38,942 72,940 72,940 858.00 44,603 83,545 156,485 Device Routing Invert Outlet Devices #1 Primary 850.00' 30.0" Round Culvert L= 62.0' Ke= 0.500 Inlet / Outlet Invert= 850.00'/ 849.00' S= 0.0161 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=854.00' (Free Discharge) L1=Culvert (Passes 0.00 cfs of 39.19 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Summary for Pond SCM -3: Inflow Area = 616,521 sf, 58.74% Impervious, Inflow Depth > 0.20" for 1 -inch event Inflow = 4.44 cfs @ 11.99 hrs, Volume= 10,131 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100°/x, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 845.18'@ 24.00 hrs Surf.Area= 57,087 sf Storage= 10,123 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 845.00' 324,105 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 845.00 56,507 0 0 846.00 59,762 58,135 58,135 848.00 66,480 126,242 184,377 850.00 73,248 139,728 324,105 Device Routing Invert Outlet Devices #1 Primary 842.00' 30.0" Round Culvert L= 55.0' Ke= 0.500 Inlet/ Outlet Invert= 842.00'/841.00' S=0.0182'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf Page 73 of 111 INMAN SITE Type 1124 -hr 1 -inch Rainfall=1.00" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 9 #2 Device 1 847.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=845.00' (Free Discharge) Ll =Culvert (Passes 0.00 cfs of 31.27 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Page 74 of 111 INMAN SITE Type 1124 -hr 1 -yr Rainfall=2.74" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 10 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentDA-1: Runoff Area=569,111 sf 100.00% Impervious Runoff Depth>2.51" Tc=6.0 min CN=98 Runoff=49.00 cfs 118,916 cf SubcatchmentDA-2: Runoff Area=308,042 sf 100.00% Impervious Runoff Depth>2.51" Tc=6.0 min CN=98 Runoff=26.52 cfs 64,366 cf SubcatchmentDA-3: Runoff Area=616,521 sf 58.74% Impervious Runoff Depth>1.44" Tc=6.0 min CN=86 Runoff=35.06 cfs 74,002 cf Pond POI -1: Inflow=0.63 cfs 15,947 cf Primary=0.63 cfs 15,947 cf Pond SCM -1: Peak EIev=856.08' Storage=104,050 cf Inflow=49.00 cfs 118,916 cf Outflow=0.63 cfs 15,947 cf Pond SCM -2: Peak EIev=855.78' Storage=64,346 cf Inflow=26.52 cfs 64,366 cf Outflow=0.00 cfs 0 cf Pond SCM -3: Peak EIev=846.26' Storage=73,969 cf Inflow=35.06 cfs 74,002 cf Outflow=0.00 cfs 0 cf Total Runoff Area = 1,493,674 sf Runoff Volume = 257,284 cf Average Runoff Depth = 2.07" 17.03% Pervious = 254,391 sf 82.97% Impervious = 1,239,283 sf Page 75 of 111 INMAN SITE Type 1124 -hr 1 -yr Rainfall=2.74" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DA -1: Runoff = 49.00 cfs @ 11.96 hrs, Volume= 118,916 cf, Depth> 2.51" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -yr Rainfall=2.74" Area (sf) CN Description 569,111 98 569,111 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -2: Runoff = 26.52 cfs @ 11.96 hrs, Volume= 64,366 cf, Depth> 2.51" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -yr Rainfall=2.74" Area (sf) CN Description 308,042 98 308,042 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -3: Runoff = 35.06 cfs @ 11.97 hrs, Volume= 74,002 cf, Depth> 1.44" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -yr Rainfall=2.74" Area (sf) CN Description 362,130 98 157,646 68 <50% Grass cover, Poor, HSG A 96,745 72 Dirt roads, HSG A 616,521 86 Weighted Average 254,391 41.26% Pervious Area 362,130 58.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Page 76 of 111 INMAN SITE Type 1124 -hr 1 -yr Rainfall=2.74" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 12 Summary for Pond P0I-1: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 1,493,674 sf, 82.97% Impervious, Inflow = 0.63 cfs @ 18.22 hrs, Volume= Primary = 0.63 cfs @ 18.22 hrs, Volume= Inflow Depth > 0.13" for 1 -yr event 15,947 cf 15,947 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Pond SCM -1: Inflow Area = 569,111 sf,100.00% Impervious, Inflow Depth > 2.51" for 1 -yr event Inflow = 49.00 cfs @ 11.96 hrs, Volume= 118,916 cf Outflow = 0.63 cfs @ 18.22 hrs, Volume= 15,947 cf, Atten= 99%, Lag= 375.6 min Primary = 0.63 cfs @ 18.22 hrs, Volume= 15,947 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 856.08'@ 18.22 hrs Surf.Area= 52,597 sf Storage= 104,050 cf Plug -Flow detention time= 724.6 min calculated for 15,914 cf (13% of inflow) Center -of -Mass det. time= 425.1 min ( 1,180.5 - 755.4 ) Volume Invert Avail.Storage Storage Description #1 854.00' 209,703 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 47,249 0 0 856.00 52,372 99,621 99,621 858.00 57,710 110,082 209,703 Device Routing Invert Outlet Devices #1 Primary 851.00' 24.0" Round Culvert L= 82.0' Ke= 0.500 Inlet/ Outlet Invert= 851.00'/850.00' S=0.0122'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.63 cfs @ 18.22 hrs HW=856.08' (Free Discharge) Ll =Culvert (Passes 0.63 cfs of 30.57 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.63 cfs @ 0.93 fps) Summary for Pond SCM -2: Inflow Area = 308,042 sf,100.00% Impervious, Inflow Depth > 2.51" for 1 -yr event Inflow = 26.52 cfs @ 11.96 hrs, Volume= 64,366 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100°/x, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 77 of 111 INMAN SITE Type 1124 -hr 1 -yr Rainfall=2.74" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 13 Peak Elev= 855.78'@ 24.00 hrs Surf.Area= 38,393 sf Storage= 64,346 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 854.00' 156,485 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 33,998 0 0 856.00 38,942 72,940 72,940 858.00 44,603 83,545 156,485 Device Routing Invert Outlet Devices #1 Primary 850.00' 30.0" Round Culvert L= 62.0' Ke= 0.500 Inlet / Outlet Invert= 850.00'/ 849.00' S= 0.0161 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=854.00' (Free Discharge) L1=Culvert (Passes 0.00 cfs of 39.19 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Summary for Pond SCM -3: Inflow Area = 616,521 sf, 58.74% Impervious, Inflow Depth > 1.44" for 1 -yr event Inflow = 35.06 cfs @ 11.97 hrs, Volume= 74,002 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100°/x, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 846.26'@ 24.00 hrs Surf.Area= 60,645 sf Storage= 73,969 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 845.00' 324,105 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 845.00 56,507 0 0 846.00 59,762 58,135 58,135 848.00 66,480 126,242 184,377 850.00 73,248 139,728 324,105 Device Routing Invert Outlet Devices #1 Primary 842.00' 30.0" Round Culvert L= 55.0' Ke= 0.500 Inlet/ Outlet Invert= 842.00'/841.00' S=0.0182'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf Page 78 of 111 INMAN SITE Type 1124 -hr 1 -yr Rainfall=2.74" Prepared by {enter your company name here} Printed 8/5/2019 1:30:04 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 14 #2 Device 1 847.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=845.00' (Free Discharge) Ll =Culvert (Passes 0.00 cfs of 31.27 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Page 79 of 111 INMAN SITE Type 1124 -hr 2 -yr Rainfall=3.31 " Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 15 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentDA-1: Runoff Area=569,111 sf 100.00% Impervious Runoff Depth>3.07" Tc=6.0 min CN=98 Runoff=59.48 cfs 145,817 cf SubcatchmentDA-2: Runoff Area=308,042 sf 100.00% Impervious Runoff Depth>3.07" Tc=6.0 min CN=98 Runoff=32.20 cfs 78,926 cf SubcatchmentDA-3: Runoff Area=616,521 sf 58.74% Impervious Runoff Depth>1.93" Tc=6.0 min CN=86 Runoff=46.58 cfs 99,101 cf Pond POI -1: Inflow=1.91 cfs 46,520 cf Primary=1.91 cfs 46,520 cf Pond SCM -1: Peak Elev=856.18' Storage=108,891 cf Inflow=59.48 cfs 145,817 cf Outflow=1.91 cfs 42,353 cf Pond SCM -2: Peak EIev=856.05' Storage=74,777 cf Inflow=32.20 cfs 78,926 cf Outflow=0.27 cfs 4,167 cf Pond SCM -3: Peak EIev=846.67' Storage=99,059 cf Inflow=46.58 cfs 99,101 cf Outflow=0.00 cfs 0 cf Total Runoff Area = 1,493,674 sf Runoff Volume = 323,844 cf Average Runoff Depth = 2.60" 17.03% Pervious = 254,391 sf 82.97% Impervious = 1,239,283 sf Page 80 of 111 INMAN SITE Type 1124 -hr 2 -yr Rainfall=3.31 " Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment DA -1: Runoff = 59.48 cfs @ 11.96 hrs, Volume= 145,817 cf, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -yr Rainfall=3.31" Area (sf) CN Description 569,111 98 569,111 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -2: Runoff = 32.20 cfs @ 11.96 hrs, Volume= 78,926 cf, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -yr Rainfall=3.31" Area (sf) CN Description 308,042 98 308,042 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -3: Runoff = 46.58 cfs @ 11.97 hrs, Volume= 99,101 cf, Depth> 1.93" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -yr Rainfall=3.31" Area (sf) CN Description 362,130 98 157,646 68 <50% Grass cover, Poor, HSG A 96,745 72 Dirt roads, HSG A 616,521 86 Weighted Average 254,391 41.26% Pervious Area 362,130 58.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Page 81 of 111 INMAN SITE Type /124 -hr 2 -yr Rainfall=3.31 " Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 17 Summary for Pond P0I-1: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 1,493,674 sf, 82.97% Impervious, Inflow Depth > 0.37" for 2 -yr event Inflow = 1.91 cfs @ 13.74 hrs, Volume= 46,520 cf Primary = 1.91 cfs @ 13.74 hrs, Volume= 46,520 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Pond SCM -1: Inflow Area = 569,111 sf,100.00% Impervious, Inflow Depth > 3.07" for 2 -yr event Inflow = 59.48 cfs @ 11.96 hrs, Volume= 145,817 cf Outflow = 1.91 cfs @ 13.74 hrs, Volume= 42,353 cf, Atten= 97%, Lag= 106.9 min Primary = 1.91 cfs @ 13.74 hrs, Volume= 42,353 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 856.18'@ 13.74 hrs Surf.Area= 52,842 sf Storage= 108,891 cf Plug -Flow detention time= 452.2 min calculated for 42,353 cf (29% of inflow) Center -of -Mass det. time= 266.4 min ( 1,017.6 - 751.2 ) Volume Invert Avail.Storage Storage Description #1 854.00' 209,703 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 47,249 0 0 856.00 52,372 99,621 99,621 858.00 57,710 110,082 209,703 Device Routing Invert Outlet Devices #1 Primary 851.00' 24.0" Round Culvert L= 82.0' Ke= 0.500 Inlet/ Outlet Invert= 851.00'/850.00' S=0.0122'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=1.90 cfs @ 13.74 hrs HW=856.18' (Free Discharge) Ll =Culvert (Passes 1.90 cfs of 30.91 cfs potential flow) L2=Orifice/Grate (Orifice Controls 1.90 cfs @ 1.35 fps) Summary for Pond SCM -2: Inflow Area = 308,042 sf,100.00% Impervious, Inflow Depth > 3.07" for 2 -yr event Inflow = 32.20 cfs @ 11.96 hrs, Volume= 78,926 cf Outflow = 0.27 cfs @ 22.96 hrs, Volume= 4,167 cf, Atten= 99%, Lag= 659.8 min Primary = 0.27 cfs @ 22.96 hrs, Volume= 4,167 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 82 of 111 INMAN SITE Type /124 -hr 2 -yr Rainfall=3.31 " Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 18 Peak Elev= 856.05'@ 22.96 hrs Surf.Area= 39,075 sf Storage= 74,777 cf Plug -Flow detention time= 1,005.3 min calculated for 4,158 cf (5% of inflow) Center -of -Mass det. time= 555.5 min ( 1,306.7 - 751.2 ) Volume Invert Avail.Storage Storage Description #1 854.00' 156,485 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 33,998 0 0 856.00 38,942 72,940 72,940 858.00 44,603 83,545 156,485 Device Routing Invert Outlet Devices #1 Primary 850.00' 30.0" Round Culvert L= 62.0' Ke= 0.500 Inlet / Outlet Invert= 850.00'/ 849.00' S= 0.0161 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.26 cfs @ 22.96 hrs HW=856.05' (Free Discharge) 't--1 =Culvert (Passes 0.26 cfs of 51.77 cfs potential flow) L2=Orifice/Grate (Orifice Controls 0.26 cfs @ 0.70 fps) Summary for Pond SCM -3: Inflow Area = 616,521 sf, 58.74% Impervious, Inflow Depth > 1.93" for 2 -yr event Inflow = 46.58 cfs @ 11.97 hrs, Volume= 99,101 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100°/x, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 846.67'@ 24.00 hrs Surf.Area= 62,020 sf Storage= 99,059 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 845.00' 324,105 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 845.00 56,507 0 0 846.00 59,762 58,135 58,135 848.00 66,480 126,242 184,377 850.00 73,248 139,728 324,105 Device Routing Invert Outlet Devices #1 Primary 842.00' 30.0" Round Culvert L= 55.0' Ke= 0.500 Inlet/ Outlet Invert= 842.00'/841.00' S=0.0182'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf Page 83 of 111 INMAN SITE Type /124 -hr 2 -yr Rainfall=3.31 " Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 19 #2 Device 1 847.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=845.00' (Free Discharge) Ll =Culvert (Passes 0.00 cfs of 31.27 cfs potential flow) L2=Orifice/Grate ( Controls 0.00 cfs) Page 84 of 111 INMAN SITE Type 1124 -hr 10 -yr Rainfall=4.77" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 20 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentDA-1: Runoff Area=569,111 sf 100.00% Impervious Runoff Depth>4.53" Tc=6.0 min CN=98 Runoff=86.22 cfs 214,839 cf SubcatchmentDA-2: Runoff Area=308,042 sf 100.00% Impervious Runoff Depth>4.53" Tc=6.0 min CN=98 Runoff=46.67 cfs 116,285 cf SubcatchmentDA-3: Runoff Area=616,521 sf 58.74% Impervious Runoff Depth>3.25" Tc=6.0 min CN=86 Runoff=76.76 cfs 166,955 cf Pond POI -1: Inflow=13.73 cfs 192,745 cf Primary=13.73 cfs 192,745 cf Pond SCM -1: Peak Elev=856.66' Storage=135,038 cf Inflow=86.22 cfs 214,839 cf Outflow=12.20 cfs 110,353 cf Pond SCM -2: Peak Elev=856.21' Storage=81,301 cf Inflow=46.67 cfs 116,285 cf Outflow=2.53 cfs 40,990 cf Pond SCM -3: Peak Elev=847.15' Storage=129,349 cf Inflow=76.76 cfs 166,955 cf Outflow=1.56 cfs 41,402 cf Total Runoff Area = 1,493,674 sf Runoff Volume = 498,079 cf Average Runoff Depth = 4.00" 17.03% Pervious = 254,391 sf 82.97% Impervious = 1,239,283 sf Page 85 of 111 INMAN SITE Type 11 24 -hr 10 -yr Rainfall=4.77" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment DA -1: Runoff = 86.22 cfs @ 11.96 hrs, Volume= 214,839 cf, Depth> 4.53" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -yr Rainfall=4.77" Area (sf) CN Description 569,111 98 569,111 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -2: Runoff = 46.67 cfs @ 11.96 hrs, Volume= 116,285 cf, Depth> 4.53" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -yr Rainfall=4.77" Area (sf) CN Description 308,042 98 308,042 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -3: Runoff = 76.76 cfs @ 11.97 hrs, Volume= 166,955 cf, Depth> 3.25" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -yr Rainfall=4.77" Area (sf) CN Description 362,130 98 157,646 68 <50% Grass cover, Poor, HSG A 96,745 72 Dirt roads, HSG A 616,521 86 Weighted Average 254,391 41.26% Pervious Area 362,130 58.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Page 86 of 111 INMAN SITE Type 1124 -hr 10 -yr Rainfall=4.77" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 22 Summary for Pond P0I-1: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 1,493,674 sf, 82.97% Impervious, Inflow = 13.73 cfs @ 12.39 hrs, Volume= Primary = 13.73 cfs @ 12.39 hrs, Volume= Inflow Depth > 1.55" for 10 -yr event 192,745 cf 192,745 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Pond SCM -1: Inflow Area = 569,111 sf,100.00% Impervious, Inflow Depth > 4.53" for 10 -yr event Inflow = 86.22 cfs @ 11.96 hrs, Volume= 214,839 cf Outflow = 12.20 cfs @ 12.21 hrs, Volume= 110,353 cf, Atten= 86%, Lag= 14.7 min Primary = 12.20 cfs @ 12.21 hrs, Volume= 110,353 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 856.66'@ 12.21 hrs Surf.Area= 54,147 sf Storage= 135,038 cf Plug -Flow detention time= 284.3 min calculated for 110,123 cf (51 % of inflow) Center -of -Mass det. time= 160.3 min ( 904.4 - 744.2 ) Volume Invert Avail.Storage Storage Description #1 854.00' 209,703 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 47,249 0 0 856.00 52,372 99,621 99,621 858.00 57,710 110,082 209,703 Device Routing Invert Outlet Devices #1 Primary 851.00' 24.0" Round Culvert L= 82.0' Ke= 0.500 Inlet/ Outlet Invert= 851.00'/850.00' S=0.0122'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=12.20 cfs @ 12.21 hrs HW=856.66' (Free Discharge) Ll =Culvert (Passes 12.20 cfs of 32.67 cfs potential flow) L2=Orifice/Grate (Orifice Controls 12.20 cfs @ 3.05 fps) Summary for Pond SCM -2: Inflow Area = 308,042 sf,100.00% Impervious, Inflow Depth > 4.53" for 10 -yr event Inflow = 46.67 cfs @ 11.96 hrs, Volume= 116,285 cf Outflow = 2.53 cfs @ 12.83 hrs, Volume= 40,990 cf, Atten= 95%, Lag= 52.1 min Primary = 2.53 cfs @ 12.83 hrs, Volume= 40,990 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 87 of 111 INMAN SITE Type 1124 -hr 10 -yr Rainfall=4.77" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 23 Peak Elev= 856.21'@ 12.83 hrs Surf.Area= 39,545 sf Storage= 81,301 cf Plug -Flow detention time= 391.2 min calculated for 40,904 cf (35% of inflow) Center -of -Mass det. time= 223.0 min ( 967.2 - 744.2 ) Volume Invert Avail.Storage Storage Description #1 854.00' 156,485 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 33,998 0 0 856.00 38,942 72,940 72,940 858.00 44,603 83,545 156,485 Device Routing Invert Outlet Devices #1 Primary 850.00' 30.0" Round Culvert L= 62.0' Ke= 0.500 Inlet / Outlet Invert= 850.00'/ 849.00' S= 0.0161 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=2.52 cfs @ 12.83 hrs HW=856.21' (Free Discharge) 't--1 =Culvert (Passes 2.52 cfs of 52.65 cfs potential flow) L2=Orifice/Grate (Orifice Controls 2.52 cfs @ 1.48 fps) Summary for Pond SCM -3: Inflow Area = 616,521 sf, 58.74% Impervious, Inflow Depth > 3.25" for 10 -yr event Inflow = 76.76 cfs @ 11.97 hrs, Volume= 166,955 cf Outflow = 1.56 cfs @ 15.79 hrs, Volume= 41,402 cf, Atten= 98%, Lag= 229.3 min Primary = 1.56 cfs @ 15.79 hrs, Volume= 41,402 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 847.15'@ 15.79 hrs Surf.Area= 63,639 sf Storage= 129,349 cf Plug -Flow detention time= 439.9 min calculated for 41,402 cf (25% of inflow) Center -of -Mass det. time= 299.4 min ( 1,101.9 - 802.5 ) Volume Invert Avail.Storage Storage Description #1 845.00' 324,105 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 845.00 56,507 0 0 846.00 59,762 58,135 58,135 848.00 66,480 126,242 184,377 850.00 73,248 139,728 324,105 Device Routing Invert Outlet Devices #1 Primary 842.00' 30.0" Round Culvert L= 55.0' Ke= 0.500 Inlet/ Outlet Invert= 842.00'/841.00' S=0.0182'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf Page 88 of 111 INMAN SITE Type 1124 -hr 10 -yr Rainfall=4.77" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 24 #2 Device 1 847.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=1.55 cfs @ 15.79 hrs HW=847.15' (Free Discharge) Ll =Culvert (Passes 1.55 cfs of 46.70 cfs potential flow) L2=Orifice/Grate (Orifice Controls 1.55 cfs @ 1.26 fps) Page 89 of 111 INMAN SITE Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 25 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentDA-1: Runoff Area=569,111 sf 100.00% Impervious Runoff Depth>6.83" Tc=6.0 min CN=98 Runoff=128.20 cfs 323,709 cf SubcatchmentDA-2: Runoff Area=308,042 sf 100.00% Impervious Runoff Depth>6.83" Tc=6.0 min CN=98 Runoff=69.39 cfs 175,214 cf SubcatchmentDA-3: Runoff Area=616,521 sf 58.74% Impervious Runoff Depth>5.43" Tc=6.0 min CN=86 Runoff=124.50 cfs 278,871 cf Pond POI -1: Inflow=49.87 cfs 468,321 cf Primary=49.87 cfs 468,321 cf Pond SCM -1: Peak Elev=857.71' Storage=193,148 cf Inflow=128.20 cfs 323,709 cf Outflow=23.25 cfs 217,746 cf Pond SCM -2: Peak Elev=856.84' Storage=106,536 cf Inflow=69.39 cfs 175,214 cf Outflow=14.64 cfs 99,155 cf Pond SCM -3: Peak Elev=847.69' Storage=164,115 cf Inflow=124.50 cfs 278,871 cf Outflow=12.63 cfs 151,420 cf Total Runoff Area = 1,493,674 sf Runoff Volume = 777,794 cf Average Runoff Depth = 6.25" 17.03% Pervious = 254,391 sf 82.97% Impervious = 1,239,283 sf Page 90 of 111 INMAN SITE Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment DA -1: Runoff = 128.20 cfs @ 11.96 hrs, Volume= 323,709 cf, Depth> 6.83" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -yr Rainfall=7.07" Area (sf) CN Description 569,111 98 569,111 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -2: Runoff = 69.39 cfs @ 11.96 hrs, Volume= 175,214 cf, Depth> 6.83" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -yr Rainfall=7.07" Area (sf) CN Description 308,042 98 308,042 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Summary for Subcatchment DA -3: Runoff = 124.50 cfs @ 11.96 hrs, Volume= 278,871 cf, Depth> 5.43" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -yr Rainfall=7.07" Area (sf) CN Description 362,130 98 157,646 68 <50% Grass cover, Poor, HSG A 96,745 72 Dirt roads, HSG A 616,521 86 Weighted Average 254,391 41.26% Pervious Area 362,130 58.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Min. Tc Page 91 of 111 INMAN SITE Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 27 Summary for Pond P0I-1: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 1,493,674 sf, 82.97% Impervious, Inflow Depth > 3.76" for 100 -yr event Inflow = 49.87 cfs @ 12.19 hrs, Volume= 468,321 cf Primary = 49.87 cfs @ 12.19 hrs, Volume= 468,321 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Pond SCM -1: Inflow Area = 569,111 sf,100.00% Impervious, Inflow Depth > 6.83" for 100 -yr event Inflow = 128.20 cfs @ 11.96 hrs, Volume= 323,709 cf Outflow = 23.25 cfs @ 12.16 hrs, Volume= 217,746 cf, Atten= 82%, Lag= 11.9 min Primary = 23.25 cfs @ 12.16 hrs, Volume= 217,746 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 857.71'@ 12.16 hrs Surf.Area= 56,939 sf Storage= 193,148 cf Plug -Flow detention time= 235.9 min calculated for 217,746 cf (67% of inflow) Center -of -Mass det. time= 134.2 min ( 872.3 - 738.1 ) Volume Invert Avail.Storage Storage Description #1 854.00' 209,703 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 47,249 0 0 856.00 52,372 99,621 99,621 858.00 57,710 110,082 209,703 Device Routing Invert Outlet Devices #1 Primary 851.00' 24.0" Round Culvert L= 82.0' Ke= 0.500 Inlet/ Outlet Invert= 851.00'/850.00' S=0.0122'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 3.14 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=23.23 cfs @ 12.16 hrs HW=857.71' (Free Discharge) Ll =Culvert (Passes 23.23 cfs of 36.14 cfs potential flow) L2=Orifice/Grate (Orifice Controls 23.23 cfs @ 5.81 fps) Summary for Pond SCM -2: Inflow Area = 308,042 sf,100.00% Impervious, Inflow Depth > 6.83" for 100 -yr event Inflow = 69.39 cfs @ 11.96 hrs, Volume= 175,214 cf Outflow = 14.64 cfs @ 12.14 hrs, Volume= 99,155 cf, Atten= 79%, Lag= 10.7 min Primary = 14.64 cfs @ 12.14 hrs, Volume= 99,155 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 92 of 111 INMAN SITE Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 28 Peak Elev= 856.84'@ 12.14 hrs Surf.Area= 41,312 sf Storage= 106,536 cf Plug -Flow detention time= 261.5 min calculated for 99,155 cf (57% of inflow) Center -of -Mass det. time= 143.2 min ( 881.2 - 738.1 ) Volume Invert Avail.Storage Storage Description #1 854.00' 156,485 cf Custom Stage Data (Prismatic) -fisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 854.00 33,998 0 0 856.00 38,942 72,940 72,940 858.00 44,603 83,545 156,485 Device Routing Invert Outlet Devices #1 Primary 850.00' 30.0" Round Culvert L= 62.0' Ke= 0.500 Inlet / Outlet Invert= 850.00'/ 849.00' S= 0.0161 T Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf #2 Device 1 856.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=14.62 cfs @ 12.14 hrs HW=856.84' (Free Discharge) 't--1 =Culvert (Passes 14.62 cfs of 55.86 cfs potential flow) L2=Orifice/Grate (Orifice Controls 14.62 cfs @ 3.66 fps) Summary for Pond SCM -3: Inflow Area = 616,521 sf, 58.74% Impervious, Inflow Depth > 5.43" for 100 -yr event Inflow = 124.50 cfs @ 11.96 hrs, Volume= 278,871 cf Outflow = 12.63 cfs @ 12.39 hrs, Volume= 151,420 cf, Atten= 90%, Lag= 25.3 min Primary = 12.63 cfs @ 12.39 hrs, Volume= 151,420 cf Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 847.69'@ 12.39 hrs Surf.Area= 65,448 sf Storage= 164,115 cf Plug -Flow detention time= 245.3 min calculated for 151,420 cf (54% of inflow) Center -of -Mass det. time= 136.7 min ( 924.8 - 788.1 ) Volume Invert Avail.Storage Storage Description #1 845.00' 324,105 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 845.00 56,507 0 0 846.00 59,762 58,135 58,135 848.00 66,480 126,242 184,377 850.00 73,248 139,728 324,105 Device Routing Invert Outlet Devices #1 Primary 842.00' 30.0" Round Culvert L= 55.0' Ke= 0.500 Inlet/ Outlet Invert= 842.00'/841.00' S=0.0182'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 4.91 sf Page 93 of 111 INMAN SITE Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:30:05 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 29 #2 Device 1 847.00' 24.0" W x 6.0" H Vert. Orifice/Grate X 4.00 C= 0.600 Primary OutFlow Max=12.63 cfs @ 12.39 hrs HW=847.69' (Free Discharge) Ll =Culvert (Passes 12.63 cfs of 49.82 cfs potential flow) L2=Orifice/Grate (Orifice Controls 12.63 cfs @ 3.16 fps) Page 94 of 111 CR -1 POI -2 SubCat Reach On Link Routing Diagram for Chimney Rock Prepared by {enter your company name here}, Printed 8/5/2019 HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 95 of 111 Chimney Rock Prepared by {enter your company name here} Printed 8/5/2019 1:39:48 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 30.450 62 Row crops, C&T, Good, HSG A (CR -1) 30.450 62 TOTAL AREA Page 96 of 111 Chimney Rock Prepared by {enter your company name here} Printed 8/5/2019 1:39:48 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 30.450 HSG A CR -1 0.000 HSG B 0.000 HSG C 0.000 HSG D 0.000 Other 30.450 TOTAL AREA Page 97 of 111 Chimney Rock Prepared by {enter your company name here} Printed 8/5/2019 1:39:48 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG -A HSG -B HSG -C HSG -D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 30.450 0.000 0.000 0.000 0.000 30.450 Row crops, C&T, Good CR -1 30.450 0.000 0.000 0.000 0.000 30.450 TOTAL AREA Page 98 of 111 Chimney Rock Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:39:48 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 5 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR -20 method, UH=SCS, Weighted -CN Reach routing by Stor-Ind method - Pond routing by Stor-Ind method SubcatchmentCR-1: RunoffArea=1,326,385 sf 0.00% Impervious Runoff Depth>2.85" Tc=6.0 min CN=62 Runoff=151.26 cfs 7.228 all Pond POI -2: Inflow=151.26 cfs 7.228 of Primary=151.26 cfs 7.228 of Total Runoff Area = 30.450 ac Runoff Volume = 7.228 of Average Runoff Depth = 2.85" 100.00% Pervious = 30.450 ac 0.00% Impervious = 0.000 ac Page 99 of 111 Chimney Rock Type 1124 -hr 100 -yr Rainfall=7.07" Prepared by {enter your company name here} Printed 8/5/2019 1:39:48 PM HydroCAD® 10.00-25 s/n 02923 © 2019 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment CR -1: Runoff = 151.26 cfs @ 11.98 hrs, Volume= 7.228 af, Depth> 2.85" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -yr Rainfall=7.07" Area (sf) CN Description 1,326,385 62 Row crops, C&T, Good, HSG A 1,326,385 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Summary for Pond P0I-2: [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 30.450 ac, 0.00% Impervious, Inflow Depth > 2.85" for 100 -yr event Inflow = 151.26 cfs @ 11.98 hrs, Volume= 7.228 of Primary = 151.26 cfs @ 11.98 hrs, Volume= 7.228 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Page 100 of 111 APPENDIX A-7 BIORETENTION CELL SUPPLEMENTAL FORM BIORETENTION OPERATION AND MAINTENANCE AGREEMENT Page 101 of 111 II. DESIGN INFORMATION Permit Number: Drainage area (to be provided by DWQ) ARM 569,111 ft' SOF W ATFRQ v NCDENR Design rainfall depth 1.0 inch STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Rental Car Facilities Relocation - Inman Road Site Contact name Phone number Date Drainage area number DA -1 II. DESIGN INFORMATION Site Characteristics Drainage area 569,111 ft' Impervious area 569,111 ft' Percent impervious 100.0% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? 1 -yr, 24 -hr runoff depth 1 -yr, 24 -hr intensity Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In-situ soil: Soil permeability Planting media soil: Soil permeability Soil composition % Sand (by volume) % Fines (by volume) % Organic (by volume) Phosphorus Index (P -Index) of media Form SW401-Bioretention-Rev.8 June 25, 2010 Y (Y or N) 2.51 in 2.74 in/hr ft3 /sec 0.000 ft3 /sec 0.000 ft3 /sec 45,055.0 ft3 47,249.0 ft3 OK 12 inches OK 1.00 ft 57,710.0 ft2 OK ft ft ft 14 hr Insufficient ponded volume drawdown time. —hr 14 hr 2.00 in/hr OK 2.00 in/hr OK 88% OK 9% OK 3% OK Total: 100% 30 (unitless) OK Page 102 of 111 Parts I and 11. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation 855.00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions): 0 ft Is this a grassed cell? n (Y or N) Is this a cell with trees/shrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 854 fmsl Depth of mulch 3 inches OK Bottom of the planting media soil 853.75 fmsl Planting media depth 0.25 ft Depth of washed sand below planting media soil 2 ft Are underdrains being installed? n (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 851.75 fmsl SHWT elevation fmsl Distance from bottom to SHWT 851.75 ft OK Internal Water Storage Zone (IWS) Does the design include IWS (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 854 ft Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the (Y or N) bioretention cell? Does volume in excess of the design volume flow evenly distributed (Y or N) through a vegetated filter? What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? (Y or N) Is the BMP located at least 30 feet from surface waters (50 feet if (Y or N) SA waters)? Is the BMP localed at least 100 feet from water supply wells? (Y or N) Are the vegetated side slopes equal to or less than 3:1? y (Y or N) OK Is the BMP located in a proposed drainage easement with access n (Y or N) Insufficient ROW location to a public Right of Way (ROW)? Inlet velocity (from treatment system) ft/sec Is the area surrounding the cell likely to undergo development in the (Y or N) future? Are the slopes draining to the bioretention cell greater than 20%? n (Y or N) OK Is the drainage area permanently stabilized? (Y or N) Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8+inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other Form SW401-Bioretention-Rev.8 Page 103 of 111 June 25, 2010 Parts I and 11. Design Summary, Page 2 of 2 II. DESIGN INFORMATION Permit Number: Is pre/post control of the 1 -yr, 24 -hr peak flow required? Drainage area (to be provided by DWQ) ARM 308,042 ft2 SOF W ATFRQ v NCDENR Design rainfall depth 1.0 inch Pre -development 1 -yr, 24 -hr peak flow STORMWATER MANAGEMENT PERMIT APPLICATION FORM Post -development 1 -yr, 24 -hr peak flow 401 CERTIFICATION APPLICATION FORM Pre/Post 1 -yr, 24 -hr peak control BIORETENTION CELL SUPPLEMENT Storage Volume: Non -SA Waters This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Volume provided 31,638.0 ft3 Project name Rental Car Facilities Relocation - Inman Road Site Contact name 1.5" runoff volume ft3 Phone number Pre -development 1 -yr, 24 -hr runoff ft3 Date Post -development 1 -yr, 24 -hr runoff ft3 Drainage area number DA -2 0 ft3 II. DESIGN INFORMATION Site Characteristics Is pre/post control of the 1 -yr, 24 -hr peak flow required? Drainage area 308,042 ft2 Impervious area 308,042 ft2 Percent impervious 100.0% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 2.51 in 1 -yr, 24 -hr intensity 2.74 in/hr Pre -development 1 -yr, 24 -hr peak flow ft3 /sec Post -development 1 -yr, 24 -hr peak flow 0.160 ft3 /sec Pre/Post 1 -yr, 24 -hr peak control 0.160 ft3 /sec Storage Volume: Non -SA Waters Minimum volume required 24,387.0 ft3 Volume provided 31,638.0 ft3 OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1 -yr, 24 -hr runoff ft3 Post -development 1 -yr, 24 -hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 44,603.0 ft2 OK Length: ft Width: ft -or- Radius ft Media and Soils Summary Drawdown time, ponded volume hr Drawdown time, to 24 inches below surface hr Drawdown time, total: 0 hr In-situ soil: Soil permeability 2.00 in/hr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by volume) 88% OK % Fines (by volume) 9% OK % Organic (by volume) 3% OK Total: 100% Phosphorus Index (P -Index) of media 30 (unitless) OK Form SW401-Bioretention-Rev.8 June 25, 2010 Page 104 of 111 Parts I and 11. Design Summary, Page 1 of 2 Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8+inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other Form SW401-Bioretention-Rev.8 June 25, 2010 855.00 fmsl n (Y or N) N (Y or N) 854 fmsl 3 inches OK 853.75 fmsl 0.25 ft 2 f (Y or N) Oft 851.75 fmsl fmsl 851.75 ft (Y or N) fmsl 854 ft (Y or N) (Y or N) ft (Y or N) (Y or N) (Y or N) y (Y or N) n (Y or N) ft/sec (Y or N) OK Insufficient ROW location. n (Y or N) OK (Y or N) Permit Number: (to be provided by DWQ) Page 105 of 111 Parts I and 11. Design Summary, Page 2 of 2 II. DESIGN INFORMATION Permit Number: Is pre/post control of the 1 -yr, 24 -hr peak flow required? Drainage area (to be provided by DWQ) ARM 362,130 ft2 SOF W ATFRQ v NCDENR Design rainfall depth 1.0 inch Pre -development 1 -yr, 24 -hr peak flow STORMWATER MANAGEMENT PERMIT APPLICATION FORM Post -development 1 -yr, 24 -hr peak flow 401 CERTIFICATION APPLICATION FORM Pre/Post 1 -yr, 24 -hr peak control BIORETENTION CELL SUPPLEMENT Storage Volume: Non -SA Waters This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Volume provided 56,507.0 ft3 Project name Rental Car Facilities Relocation - Inman Road Site Contact name 1.5" runoff volume ft3 Phone number Pre -development 1 -yr, 24 -hr runoff ft3 Date Post -development 1 -yr, 24 -hr runoff ft3 Drainage area number DA -3 0 ft3 II. DESIGN INFORMATION Site Characteristics Is pre/post control of the 1 -yr, 24 -hr peak flow required? Drainage area 616,521 ft2 Impervious area 362,130 ft2 Percent impervious 58.7% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 1.44 in 1 -yr, 24 -hr intensity 2.74 in/hr Pre -development 1 -yr, 24 -hr peak flow ft3 /sec Post -development 1 -yr, 24 -hr peak flow 0.000 ft3 /sec Pre/Post 1 -yr, 24 -hr peak control 0.000 ft3 /sec Storage Volume: Non -SA Waters Minimum volume required 48,808.0 ft3 Volume provided 56,507.0 ft3 OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1 -yr, 24 -hr runoff ft3 Post -development 1 -yr, 24 -hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 73,248.0 ft2 OK Length: ft Width: ft -or- Radius ft Media and Soils Summary Drawdown time, ponded volume hr Drawdown time, to 24 inches below surface hr Drawdown time, total: 0 hr In-situ soil: Soil permeability 2.00 in/hr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by volume) 88% OK % Fines (by volume) 9% OK % Organic (by volume) 3% OK Total: 100% Phosphorus Index (P -Index) of media 30 (unitless) OK Form SW401-Bioretention-Rev.8 June 25, 2010 Page 106 of 111 Parts I and 11. Design Summary, Page 1 of 2 Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8+inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other Form SW401-Bioretention-Rev.8 June 25, 2010 846.26 fmsl n (Y or N) N (Y or N) 845 fmsl 3 inches OK 844.75 fmsl 0.25 ft 2 f (Y or N) Oft 842.75 fmsl fmsl 842.75 ft (Y or N) fmsl 845 ft (Y or N) (Y or N) ft (Y or N) (Y or N) (Y or N) y (Y or N) n (Y or N) ft/sec (Y or N) OK Insufficient ROW location. n (Y or N) OK (Y or N) Permit Number: (to be provided by DWQ) Page 107 of 111 Parts I and 11. Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/ debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 Page 108 of 111 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 Page 109 of 111 BMP element: Potentialproblems: How I will remediate the problem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Page 110 of 111 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 Page 111 of 111