Loading...
HomeMy WebLinkAbout20191032 Ver 1_Email_20190809Strickland, Bev From: Bodnar, Gregg Sent: Friday, August 09, 2019 11:12 AM To: Hair, Sarah E CIV CESAW CESAD (US); Dunn, Maria T.; Staples, Shane; Mairs, Robb L Cc: Davenport, Ryan Subject: Wainwright Slough Morning all, Based on some conversations with Maria concerning the dimensions of the bird island, Moffat and Nichol is placing the project on hold while they redesign the island. I have requested that they show dimensions of the island at max proposed impact but also a minimum slope and height above MLLW as well in the event the max cubic yardage is not reached. So hopefully that will provide you a range of island dimensions for potential minimum dredge volume to maximum dredge volume. If there is anything else you would like to see in the redesign please let me know. Thanks, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal ZSZ 808 2808 :oW