HomeMy WebLinkAbout540141_Plan of Action_20181218C, 4�- ) 0 ) C\
To: Megan Stilley/Martin McLawhorn
From: Clarence Smith
30day POA
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 5-/ 1 County:
Facility Name: (.aG WCC cSA4 /TV f /' �i/S/-%lA)6-
Certified Operator Name: aA46�J a 5M /IM Operator # ,I 7 ZI
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways. ,
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 StructKe 6
Lagoon Name/Id ntifier (ID):
Spillway (Yes or o): 40
�°� s°ce9io
Level (inches):
c�
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 3� day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
ZLiquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan f Action is attached. Agronomic balance is within acceptable range.
Wast is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
propo ed sites with related facility number(s), number acres and receiving crop information_
Contdct and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if an! Imals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste;
I hereby certify thilit l have reviewed the information listed above and Included within the attached Plan
of Action, and tot a best of my knowledge and ability, the information is accurate and correct.
CAka)tc ' SM l 174
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone: 267,- 6-60 /4i�3
Date: -Ptt' 17,205
PoA Cover Page 2/�1/00
I. TOTAL PAN'
2. Cu
0
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD0�2
C'
'O BE LAND APPLIED PER WASTE STRUCTURE
ds�5 Oqe
dr�;�% �OI�
ture Name/Identifier (ID): Clarence Smith 54-141
>nt liquid volume in 25 yr./24 hr_ storm storage & structural freeboard 0,;
a. current liquid level according to marker
17:0 inches
b. designed 25 yr./24 hr. storm & structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
1j88144 ft2
e. line c/12 x line d x 7.48 gallons/ft3
2.34553 gallons
cted volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 232094 ft 3
h. current herd # 7000 certified herd #1 7040
actual waste produced = current herd # x line g = 230775 ft'
certified herd #
i. volume of wash water according to structural design l 0 ft3
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 10/29/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTI?N I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/2 /00
75541.7 ft3
381875 gallons
0.62 ibs/1000 gal.
382.2 lbs. PAN
11. TOTAL PO ND S OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORMS�ORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Stricture ID: Clarence Smith 54-141 line m = 382.2 Ib PAN �GF
O�
2, Stricture ID: line m = => IbkN 2�0
3. Str cture Id: line m lb PAe 290
COI
4. Str cture ID: line m = lbPAN
5. Str cture ID: line m = lb PAN
6. Stricture ID: line m = lb PAN
In. lineal +2+3+4+5+6= 382.2 lb PAN
I
Ill. TOTAL PA� BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o, tract #
p.j field #
q. crop
r. acres
G. ramalning IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
2847
Pivot A
Wheat
9.76
125.00
1220.0
9/1-4/30
2847
Pivot B
Wheat
9.89
125.00
1236.3
9/1-4/30
2832
Solid Set
Wheat
7.10
96.00
681.6
9/1-4130
I
I
I
'State current crop ending application date or next crop application beginning date for available
receiving crops IOuring 30 day draw down period.
v. ITotal PAN available for all fields (sum of column t) = 3137.9 lb. PAN
IV. FACILITrS'!PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 382.2 lb. PAN
X. Crop's remaining PAN balance (line v from section Ill) = 3137.9 lb. PAN
y. Overall PAN balance (w - x) _ -2756 lb. PAN
PoA (30 Day) 2/21/00
May, David
From: May, David
Sent: Monday, December 17, 2018 10:55 AM
To: Stilley, Megan
Cc: Salyer, Marlene; Mclawhorn, Martin
Subject: Clarence Smith Finishing
Megan,
FYI. Martin called to share that he was notified that the Clarence Smith Finishing operation (54-141) reported freeboard
at 17" and a PDA was on the way.
We'll verify the facility when the POA arrives (there's a Clarence Smith Farm also (54-15), but it's deemed permitted, so
I'm guessing the report is for 54-141).
I'll update BIMS Incidents when the POA comes in.
Thanks
David May
Regional Supervisor — Water Quality Regional Operations Section
Department of Environmental Quality — Division of Water Resources
252-948-3939 office
david.may(a.ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
trIail correspondence to and from this address is subject to the
Carolina Public Records Law and may be disc,'osed to third parties.