HomeMy WebLinkAbout540141_Response to Notice_20190204Mr. May
�o
I contacted your office December 181"1 2018 to report my
lagoon at 17" and I also faxed a completed 30day POA.
Since the storm in September it has rained on a consistent basis
and made it very difficult to find the right time and proper
conditions to pump and maintain my lagoon.
Due to wet conditions I was unable to get my soybeans out of
the field until December and that delayed my pumping causing
me to get out of compliance.
I have never had any issues maintaining my lagoon and keeping
it in compliance and I'm doing everything possible to ensure
this never happens again.
If you have any questions or suggestions please feel free to
contact me at 252-560-1463.
Sincerely,
Clarence Smith