HomeMy WebLinkAbout670035_Inspection_20190822aype of visa: w %_.ompuance inspection v operation KevIew V atructure r:vaivatnon u rectnmcai Assistance
Reason for Visit: 10 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:—,�a -7 1 Arrival Time: Departure Time: County: CUB Region:
Farm Name: ;!�ai) Owner Email:
Owner Name: Phone: f/d ' �� — 111-3
Mailing Address:
Physical Address: " - / ' I I I ' ' ' ' '
Facility Contact: �4� "'� Title:
Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Longitude:
❑ Yes [+f] No ❑ NA ❑ NE
❑ Yes ❑ No
0 Yes [—]No
❑ NA ❑ NE
❑ NA ❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facili Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
EO/No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): _
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
�No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
Es No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environment 1 threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
o
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
VNo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
[ (No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ N A ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): a&s VLZZd�L Zd 75
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes o
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes 7,No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑Yes
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes � o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes VNo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes o
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes VNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 56 No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall InspectiojW)
El Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes
o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facili Number: 1p - .3S Date of inspection:-
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ NA ❑ NE
❑NA ❑NE
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes VNo ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ Yes
2/No
❑ NA
❑ NE
❑ Yes
[/No
❑ NA
❑ NE
❑ Yes
[�J/No
❑ NA
❑ NE
❑ Yes
V(No
❑ NA
❑ NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes
34. Does the facility require a follow-up visit by the same agency? ❑ Yes
�o ❑ NA ❑ NE
V9 ❑ NA ❑ NE
N ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�Pw
2-d9-/? = '-).di
Id - / 9 - / T ; 1 y6�_
Reviewer/Inspector Name:
Reviewer/Inspector Signatur
Page 3 of 3
Phone: jzy�
Date: G
/4/201 S