Loading...
HomeMy WebLinkAbout20190653 Ver 1_SAW-2019-00864_NWP14verification_20190910U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-00864 County: Yadkin U.S.G.S. Quad: NC -Farmington GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: North Carolina Dept. of Transportation Philip Harris Address: 1598 Mail Service Center Raleizh, NC 27699 Telephone Number: 919-707-6108 E-mail: pharris(&ncdot.Lrov Size (acres) SIZE Nearest Town Lewisville Nearest Waterway Deep Creek River Basin Upper Yadkin: Upper Pee Dee USGS HUC 03040101 Coordinates Latitude: 36.105545 Longitude:-80.515655 Location description: The proiect area is located alone the northbound lane of US421 between where it crosses over the Yadkin River and the intersection with Dinkins Bottom Road, near Lewisville, Yadkin County, North Carolina. Description of projects area and activity: This verification authorizes the permanent impact of 23 linear feet of stream for bank stabilization, 234 linear feet (0.03 acre) of temporary stream impacts associated with dewaterina for temporary stream crossing/bridEe replacement and 0.03 acre of permanent wetland fill associated with the replacement of Bridle 105 on US421 over the Yadkin River Overflow. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 14. Linear Transportation Projects SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 5/17/2019, and the enclosed plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Steve Kichefski at 828-271-7980 x 4234 or steven.l.kichefski(ausace.army.mil. KICHEFSKI.STEVEN.L.1386908539 Digitally signed by KICHEFSKI.STEVEN.L.1386908539 Corps Regulatory Official: Date: 2019.09.1016:38:23-04'00' Date: 9/10/2019 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.artny.mil/cm apex/f?p=l36:4:0 Copy furnished (via email): Dave Wanucha - DWR Action ID Number: SAW-2019-00864 County: Yadkin Permittee: North Carolina Dept. of Transportation, Philip Harris Project Name: NCDOT/B5389/US421/BridgeI05/YadkinCo/DivI I Date Verification Issued: 9/10/2019 Project Manager: Steve Kichefski Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Steve Kichefski Asheville Regulatory Office U.S Army Corps of Engineers 454 Patton Avenue, Room 208 Asheville, North Carolina 28801 or steven.l.kichefski@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date