Loading...
HomeMy WebLinkAboutWQCS00372_Site Visit_20190909Water Quality Monitoring Field Meter Calibration Sheet Collector(s): JOAtj Study/Agency: Z1 Sampling Location: Meter Model: YS If Meter 1 Serial No.: I E CI, d- Date mm/dd/yy Time 24hr hh:mm I ' 'aIs Pre -Sampling Calibration Post -Sampling Check g - ) S ) 5 27 5 Meter Battery Level (V) Barometer Calibration (IF NEEDED) (mmHg) Read in: Lab or Field Initial Reading Calibrated Value -�:*bo -3s-9 If initial readings are close to the QC limits, it is recommended to preform maintenance on the meter before use Dissolved Barometric Initial Reading Img/L) Calibrated Calibrated Oxygen (rng/L) Temp. Initial % Pressure DO Table (Within ± 0.5 of Table) Reading % OC Saturation (mmHg) Value Pre4p N ) Post(Y / N) (mg/L) Saturation Pre -Sampling Calibration 2S.S )oo.�S`� �,�$ g `�3 $•3� �}�.cj Post -Sampling I -Zs. 7? 573. Check Lot #: 2 owl• tL 3 Dry Air Conductivity High Specific Zero (0) Standard Value: o-0 Conduct Conductance (Within ± 2 of 0) Expiration Date: L12 (NSl at Pre(Y / N) Post(Y N) Initial Within ± 109' of 5td) Pr N) Pos (�Y N ) 250C) / Initial Calibrated Initial Reading Reading Reading Pre -Sampling w 00 Calibration Post -Sampling 1 Check pH (SU) Pre -Sampling Calibration Post -Sampling Check Lot #: 29 oSA:+S Conductivity Mid Check Standard Value: 5a O Expiration Date: 4 1 Z 1 Initial (Within ± 10% 6f Std) Pref7/ N) Pos (Y / N) Initial Readi Ljg'1.Z 5_0q Standard Range 100....... 90to 110 500 ....... 450 to 550 1,000 ...... 900 to 1,100 10,000 ..... 9,000 to 11,000 15,000 ..... 13,500 to 16,500 50,000 ..... 45,000 to 55,000 Lot #: vio t Lot #: Buffer #17.0 Buffer pre -Temp: Exp Date: r -c Buffer # 4. 0 0 Buffer pre Temp: Z`f Exp Date: mV• —S0 mV: d• 1 Initia ithin ± 0.2 of Buffer) Initial ithin ± 0.2 of Buffer) Pr Y N) Post(Y / N) Pr Y N) Post(Y / N ) Initial Calibrated Initial Calibrated Reading Reading Reading Reading _02 -�?-o-C> �� Lf Da r7 Buffer mV check: Is Vwithi 0 Pr (Y N) Po [ Y N } Post Check Temp Post C�hQck 7e p Confirmation Buffer 7.0 (Within ± 0.1)6/ N } '-�- o0 Buffer mV check: If initial mV reading is near ±30 during the calibration, perform maintenance on that probe before taking out to the field, and recalibrate. Comments: 14"OCN y '#L 2fl1c)M 8I