Loading...
HomeMy WebLinkAbout20181733_Scoping Comments_20090914K NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 14, 2009 MEMORANDUM TO: Brenna Poole, NCDOT ) FROM: David Wainwright, NCDWQI SUBJECT: Seeping Review of NCDOT's Proposed Bridge Replacement Project B- 4926; Bridge No. 20 on NC 55 over the Neuse River in Lenoir County fn reply to your correspondence dated September 1, 2009 (received September 9, 2009) in which you requested comments for the above referenced projects, the NCDWQ offers the following comments: Project-Specific Comments The Neuse River is class C;NSW waters of the State. The NCDWQ is very concerned with sediment and erosion impacts that could result from this project. The NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to Slocum Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCDWQ's Stormwater Best Management Practices. 2. This project is within the Neuse River Basin. Riparian buffer impacts should be avoided and minimized to the greatest extent possible pursuant to 15A NCAC 2B..0233. 3. Any anticipated dewatering or access structures necessary for construction of bridges should be addressed in the CE. It is understood that final designs are not determined at the time the CE is developed. However, the CE should discuss the potential for dewatering and access measures necessary due to bridge construction. General Comments Regarding Bridge Replacement Projects 4. The NCDWQ is very concerned with sediment and erosion impacts that could result from this project. The NCDOT should address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 5. If foundation test borings are necessary; it should be noted in the document. Geotechnical work is approved under General 401 Certification Number 3687/Nationwide Permit No. 6 for Survey Activities. 6. If the old bridge is removed, no discharge of bridge material into surface waters is allowed unless otherwise authorized by the US ACOE. Strict adherence to the Corps of Engineers guidelines for bridge demolition will be a condition of the 401 Water Quality Certification. 7. Whenever possible, the NCDWQ prefers spanning structures. Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment. The horizontal and vertical clearances provided by bridges should allow for human and wildlife passage beneath Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location' 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX. 919-733-6893 Internet: htrpalh2o.encstate.nc.us!navetlandsl One NorthCarci ina Naturally" An Equal Opportunity IAffinnative Action Emoloyer the structure. Fish passage and navigation by canoeists and boaters should not be blocked. Bridge supports (bents) should not be placed in the stream when possible. 8. Bridge deck drains should not discharge directly into the stream. Stormwater should be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of the NCDWQ's Stormwater Best Management Practices. 9. If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 10. If temporary access roads or detours are constructed, the site should be graded to its pieconstruction contours and elevations. Disturbed areas should be seeded or mulched to stabilize the soil and appropriate native woody species should be planted. When using temporary structures the area should be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate naturally and minimizes soil disturbance. 11. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 12. All work in or adjacent to stream waters should be conducted in a dry work area unless otherwise approved by the NCDWQ. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures should be used to prevent excavation in flowing water. 13. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 14. In most cases, the NCDWQ prefers the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour should be designed and located to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks. If the structure will be on a new alignment, the old structure should be removed and the approach fills removed from the 100-year floodplain. Approach fills should be removed and restored to the natural ground elevation. The area should be stabilized with grass and planted with native tree species. Tall fescue should not be used in riparian areas. Thank you for requesting our input at this time. The NCDOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and designated uses are not degraded or lost. If you have any questions or require additional information, please contact David Wainwright at (919) 715-3415. cc: William Wescott, US Army Corps of Engineers, Washington Field Office Kathy Matthews, Environmental Protection Agency (electronic copy only) Travis Wilson, NC Wildlife Resources Commission (electronic copy only) Garcy Ward, NCDWQ Washington Regional Office File Copy a STATE OF NORTH CAROLINA BEVERLY EAVES PERDUE GOVERNOR September 1, 2009 FROM: SUBJECT: DEPARTMENT OF TRANSPORTATION EUGENE A. CONTI, JR. SECRETARY Brenna Poole Bridge Project Development Unit Project Development & Environmental Analysis Branch Replacement of bridge in Lenoir County Division 2 for the Field Scoping Meetings 2010 The Project Development and Environmental Analysis Branch is in the process of project development, environmental and engineering studies for the following project: B-4926: Replace Bridge No. 20 over Neuse River on NC 55 in Lenoir Co. The project is included in the North Carolina Transportation Improvement Program and is scheduled for construction in fiscal year 2014. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. Your comments will be used in the preparation of a federally funded Categorical Exclusion. This document will be prepared in accordance with the National Environmental Policy Act. It is desirable that your agency respond by November 1, 2009 so that your comments can be used in the preparation of this document. If you have any questions concerning any of these projects, please contact Brenna Poole at (919) 431-1625 or brennapoole(Dncdotgov. Please include the TIP Project Number in all correspondence and comments. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS BRIDGE PROJECT DEVELOPMENT UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE'. 919431-2000 FAX'. 919-431-2001 WEBSITE. WWW.NCDOT.ORG LOCATION: PDEA ENVIRONMENTAL RESOURCE CENTER 4701 ATLANTIC AVENUE - SUITE 116 RALEIGH NC 27604 Bridge No. 20 1807 I l 804 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS BRANCH LENOIR COUNTY REPLACE BRIDGE NO. 20 ON NC 55 OVER NE.USE RIVER B-4926 , 1.60 f / Figure 1 1 /