Loading...
HomeMy WebLinkAboutNCC191547_NOI Application_20190911Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/23/2019 10:10:48 AM (NCG01 NOI Submission) Approve by McCoy, Suzanne 8/23/2019 10:40:03 AM (Review- Construction NOI 15211) • The task was assigned to McCoy, Suzanne by round robin distribution 8/23/2019 10:11 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 27, 2019 5:00 PM 8/23/2019 10:11 AM Submit by McCoy, Suzanne 9/11/2019 12:04:41 PM (Payment Verification for NCC191547) * Ingram Tynes. • McCoy, Suzanne assigned the task to McCoy, Suzanne 9/11/2019 12:04 PM • Georgoulias, Bethany changed the task's due date to September 22, 2019 5:00 PM 9/5/2019 12:53 PM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: September 6, 2019 5:00 PM 8/23/2019 10:40 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Retreat at Arden Farms 2. County* Buncombe 3. Highway or Street 539 Long Shoals Rd. Address * Street name only is acceptable if no address number assigned yet 4. City or Township* Arden 5. State * NC 1r-i)iTII1T7i)MfiTif_T1IIa10141 6. Zip Code* 28704 7. Latitude * Enter the latitude in decimal degrees 35.4754 8. Longitude * Enter the longitude in decimal degrees (MIST be negative) -82.5676 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/26/2019 Estimated Construction Project Start Date 10. Date to End* 12/31 /2021 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial Gassification for Development 12. Acres to be 20.70 disturbed* (including off -site borrow and waste areas) 13. Total site area 29.19 (acres)* 14. Post- 10.00 construction (Estimated) impervious area (acres) * NCC Project NCC-BUNCO-2019-Retreat at Arden Farms Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Unnamed Tributary to French Broad River Wate rbody* Narre of waterbody into which stornwater runoff will discharge 15b. Waterbody 6-(54.75) Index No.* NC Waterbody Index Narrber Stormwater rJ No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Tynes Development Corporation Name * 2. First Name* Ingram ff Corporation, enter Registered Agent First l\b e 3. Last Name * Tynes Y Corporation, enter Registered Agent Last Barre 3b. Title President 4. Permitee E-mail (Tynes@TynesDevelopment.Com Address* 5. Permittee 205-877-3199 Telephone No.* 6. Permittee Mailing Street Address Address* 820 Shades Creek Parkway, Suite 2300 Address Line 2 City State / Province / Region Birmingham Alabaman Postal / Zip Code Country 38209 United States Check box if the r% Yes street address the same as mailing address 7. Permittee Street Street Address Address* 820 Shades Creek Parkway, Suite 2300 Address Line 2 City State / Province / Region Birmingham Alabaman Pastal / Zip Code Country 38209 United States C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Ingram Contact - First Name * 3. Primary Site Tynes Contact - Last Name * 4. Title President 5. Site Contact E- ITynes@TynesDevelopment.Com mail Address* 6. Site Contact 205-277-3199 Telephone No.* 7. Organization Tynes Development Corporation Name 8. Site Contact Street Address Mailing Address* 820 Shades Creek Parkway, Suite 2300 Address Line 2 City Birmingham F bstal / Zip Code 38209 9. Consultant Name (optional) First and Last nacre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion Alabama Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/14/2019 Approved * 2. E&SC Plan Project ER02019-00029 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Buncombe County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Erosion Control Approval.pdf 2.33MB Approval Erosion Control Placard.pdf 586.68KB letter/documentation Mast be RJF format 6. NOI Certification Signed NOI Certification Form.pdf 43.74KB Form Mist be RJFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature aiff'-.•f Type Name* Ingram Tynes Title President Organization Tynes Development Corporation Date * 08/23/2019 F. Tracking and COC Info NOI Tracking No. 15211 NC Reference No. NCG01-2019-1547 Uses 'count number variable (incremrented by SP) Certificate of NCC191547 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 1547 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)