Loading...
HomeMy WebLinkAbout20090305 Ver 1_Staff Comments_20090805Barnes, Kyle From: Frye, Christopher [CFrye@VHB.com] Sent: Wednesday, August 05, 2009 7:35 AM To: Barnes, Kyle Cc: Winslow, Sara; Dunn, Maria T.; Ronald Renaldi; director@whaleheadclub.com; Reynolds, Neville Subject: Whalehead Club Sill Modifications Attachments: 20090805201711.pdf Kyle, After reviewing other projects and re-evaluating the site conditions, we have been able to reduce the sill dimensions to a level that is hopefully acceptable to the agencies. The sill crest height was lowered to +2.0 (nwl) and the width was reduced by 3 feet to 9-foot wide. Also, the shorter sill sections along the southern shoreline have been removed as we discussed in our meeting last month. The overall footprint on the bottom would be lessened by approximately 2,600 sq. ft., if these changes are accepted. We have attached sketches of the cross section and plan view that show the proposed modifications. Red areas represent the reductions in the footprint. We would be happy to discuss these changes in more detail at your earliest convenience. I'll give you a call in the next few days to make sure you have received the attached. Thanks for your assistance. Christopher W. Frye VHB Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services 351 McLaws Circle, Suite 3 Williamsburg,, VA 23185-6316 Phone: 757.220.0500 x6208 : Fax: 757.220.8544 cfrye@vhb.com www.vhb.com This communication is confidential and intended only for the recipiont(s). Any other use, dissemination, copying, or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify us and destroy it immediately. Vanasse Hangen Brustlin, Inc. is not responsible for any undetectable alteration. transmission error, conversion, media degradation, software error, or interference with this transmission. Vanasse Hangen Brustlin. Inc. 1 101 tNalnut St I Watertown. MA 02472 1617 924,1770