Loading...
HomeMy WebLinkAbout20061573 Ver 1_Triage Comments_20060929__ _ _ __ __ _ DW~~ ~ ~ U ~o ~ Jr ~ 3 Date t ~ ~ ~p Who Reviewed: - ~ S /'~ Plan Detail Yncomplete - • .• ~. • Please rovide a location map for the project. V~~ ~ ~~~ ` w ~U ~\ p /`-"' Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ^. Please show all wetland unpacts including fill slopes on the rte plan. ^ Please indicate all buffer impacts on the site plan. ~~ Z~ ~4 ~ t La ~ Please indicate proposed lot layout as overlays on the site plan. ~ `/ ~~ ~ ~, ~ V~ ~ ~~ ^ Please indicate the location of the protected buffers as overlay oa tho site plan. ' ^ Please locate all isolated or non-isolaxcd wetlands, streams and other waters of the State as ovarlays on the site plan. ^ Please provide cross section details showing the provisions for aquatic life passage. ^ Please locate any planned•sewar lines on the site plan. • ^ Pleaso provide the location of any proposed stormwater management practices as requirod by QC ^ Please provide detail for the atormwatar management practices as required by GC • ^ Pleaso spoeify tho percent of project imporviousness area based on tho estimated built-out conditions: ^ Please indieato all stormwat ~o~tfalla on tho sito phut. ~Q Please indicate the diffuse flow provision measures on the site plan. ~ ~~~~ ~. ^ Please indicate whether or not the proposed impacts ah-eady been conducted. Avoidance.and/or Minimization Not Provided ^ • The labeled as on the plans dons not appear to be necessary. Please eliminate the . or provide additional information as to why it is necessary for this p%~ect.. • . ^ This Office believes that the labslod on the plans as can be moved, or reconfigured to avoid the impacts to the • . Please revise the plans to avoid the impacts. . . . ^. This~Office believos that the •lalieled on the plans as ~ can be moved or reconfigured to.minimize the impacts to'the ' .Please revise the plans to minimize the impacts. • ^ The atomzwator discharges at tho location on tho plans labeled will. not provide diffuso flow through the buffar because . Please i~oviae the plane and providq calculations to show that diffuse flow v-rill be.achieved through the entirobuffer. If it is not possible to achieve~diffuae flow through the eatiro buffar thon it may bo necessary to provide stormwatar managoment practices that remove nutrients before the atormwatar can be discharged through the, buffer. . Other ~. ^•. The application fee was insuf6eient~because over 1S0 feet of stream and/or.ovar 1 acro ofwctland'impacts ware requested. Please provide $ ~ .This additional fee must be received before your application can be reviewed. ^ Pleaso complete Section(s) on the application. - ^ Pleaso provide a signed copy of the application. ^ Ploaso provide _. copies of the application, . copies of •the site plans and other supporting information: _ ^ ~ Please submit electronic CAD files showir~.g ~ ;.via: email to ian.mcmillan(oncmail.net and CI} Mitigation ^ of compensatory mitigation is required for this project. ~ Pleaso provide~a compensatory mitigation plan.. The plan must conform to the•requirementa in 1 S A NCAC 2H ~.OS00 and must bo appropriate to the type of impacts proposed. ^ Please indicate which 404 Permit the USACE would use to authorize this project.