HomeMy WebLinkAbout20061573 Ver 1_Triage Comments_20060929__ _
_ __ __ _
DW~~ ~ ~ U ~o ~ Jr ~ 3 Date t ~ ~ ~p Who Reviewed: - ~ S /'~
Plan Detail Yncomplete - • .• ~. •
Please rovide a location map for the project. V~~ ~ ~~~ ` w ~U
~\ p
/`-"'
Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan.
^. Please show all wetland unpacts including fill slopes on the rte plan.
^ Please indicate all buffer impacts on the site plan. ~~ Z~ ~4 ~ t La ~
Please indicate proposed lot layout as overlays on the site plan. ~ `/ ~~ ~ ~, ~ V~ ~ ~~
^ Please indicate the location of the protected buffers as overlay oa tho site plan.
' ^ Please locate all isolated or non-isolaxcd wetlands, streams and other waters of the State as ovarlays on the site plan.
^ Please provide cross section details showing the provisions for aquatic life passage.
^ Please locate any planned•sewar lines on the site plan. •
^ Pleaso provide the location of any proposed stormwater management practices as requirod by QC
^ Please provide detail for the atormwatar management practices as required by GC •
^ Pleaso spoeify tho percent of project imporviousness area based on tho estimated built-out conditions:
^ Please indieato all stormwat ~o~tfalla on tho sito phut. ~Q
Please indicate the diffuse flow provision measures on the site plan. ~ ~~~~
~.
^ Please indicate whether or not the proposed impacts ah-eady been conducted.
Avoidance.and/or Minimization Not Provided
^ • The labeled as on the plans dons not appear to be necessary. Please eliminate the . or provide additional
information as to why it is necessary for this p%~ect..
• . ^ This Office believes that the labslod on the plans as can be moved, or reconfigured to avoid the impacts to the
• . Please revise the plans to avoid the impacts. . .
. ^. This~Office believos that the •lalieled on the plans as ~ can be moved or reconfigured to.minimize the impacts to'the
' .Please revise the plans to minimize the impacts. •
^ The atomzwator discharges at tho location on tho plans labeled will. not provide diffuso flow through the buffar because
. Please i~oviae the plane and providq calculations to show that diffuse flow v-rill be.achieved through the entirobuffer. If it
is not possible to achieve~diffuae flow through the eatiro buffar thon it may bo necessary to provide stormwatar managoment
practices that remove nutrients before the atormwatar can be discharged through the, buffer. .
Other
~.
^•. The application fee was insuf6eient~because over 1S0 feet of stream and/or.ovar 1 acro ofwctland'impacts ware requested. Please
provide $ ~ .This additional fee must be received before your application can be reviewed.
^ Pleaso complete Section(s) on the application. -
^ Pleaso provide a signed copy of the application.
^ Ploaso provide _. copies of the application, . copies of •the site plans and other supporting information:
_ ^ ~ Please submit electronic CAD files showir~.g ~ ;.via: email to ian.mcmillan(oncmail.net and CI}
Mitigation
^ of compensatory mitigation is required for this project. ~ Pleaso provide~a compensatory mitigation plan.. The
plan must conform to the•requirementa in 1 S A NCAC 2H ~.OS00 and must bo appropriate to the type of impacts proposed.
^ Please indicate which 404 Permit the USACE would use to authorize this project.