September 10, 2019
SUBJECT: Compliance Inspection Report
Riegelwood Mill - Cape Fear Woodyard
Non -discharge Permit No. WQ0031879
Columbus County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Riegelwood Mill - Cape
Fear Woodyard on 9/10/2019. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in Non -discharge Permit No. WQ0031879. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Geoff Kegley with the Water
Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
geoff.kegley@ncdenr.gov.
Cc: DWR files (LaserFiche)
Sincerely,
DocuSigned by:
E
lbVt��a S� 6"
E3ABA14AC7DC434...
Morelia Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
North Caro fns.DepartmentofEnviroomeatadQuality I DiiksDnofWater Resources
Wflrnington Feg•3r�a-Offw 1 127 Ca rMnai D3ive Extension I Wilmington, North Car•3,-rs23405
° " a10-7 M-7215
Compliance Inspection Report
Permit: WQ0031879 Effective: 11/01/16 Expiration: 10/31/21 owner: International Paper Company
SOC: Effective: Expiration: Facility: Riegelwood Mill -Cape Fear Woodyard
County: Columbus 865 John L Riegel Rd
Region: Wilmington
Riegelwood NC 28456
Contact Person: William Snyder Title: Fiber Specialist Phone: 910-362-3329
Directions to Facility:
from Wilmington take Hwy 74/76 West to Riegelwood. Take 87 N/Old Stage Rd., turn right onto John Riegel Rd., site is on left
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
NC0003298 International Paper Company - Riegelwood Mill
Inspection Date: 09/10/2019 EntryTime: 10:OOAM Exit Time: 11:OOAM
Primary Inspector: Geoff Kegley Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Closed -Loop Recycle
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Miscellaneous Questions Treatment Treatment Barscreen
Record Keeping Treatment Lagoons Treatment Influent Pump Station
Storage
(See attachment summary)
Page 1 of 5
Permit: WQ0031879 Owner - Facility: International Paper Company
Inspection Date: 09/10/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
This facility was visited for a routine compliance inspection. Jim Durham and Scott Brewer (ORC) were met on -site and were
very helpful during the inspection.
This site uses a series of irrigation pumps to apply water onto stored lumber in six storage basins. This is done to preserve
lumber quality prior to use in the adjacent mill. The applied water is collected in each lumber storage basin and conveyed
back to the storage pond by a series of screened culverts. If needed to maintain the minimum 12" freeboard requirement,
excess water that accumulates after rainfall events is transferred to the Riegelwood Mill (NC0003298) for treatment and
disposal.
All required documentation was made available during the inspection. Records documented daily (Monday -Friday) site
inspections including storage pond level, precipitation amounts and make-up water status recorded on a field sheet and
compiled into a spreadsheet. Records of water transfer to the Riegelwood Mill for water disposal are maintained on a
separate spreadsheet. The operations staff also maintain a Quarterly Physical Inspection sheet that includes a more
comprehensive site inspection and notes any needed repairs or site improvements. A review of the operations documents
indicated several transfers of wastewater to the Riegelwood Mill during 2019 due to seasonal rainfall. Make-up water was
documented also (water source is raw water from the Cape Fear River).
A tour of the wood storage yard was conducted, the woodyard stockpile of material is near capacity at this time, all
equipment appeared clean and well maintained and no evidence of any runoff from the wastewater irrigation was evident.
Some of the culvert screens within the log storage basins had been repaired. The berms surrounding the 9 million gallon
water storage pond were well maintained. The irrigation pumps are housed in a building immediately adjacent to the irrigation
storage pond, one pump was being rebuilt and the remaining pumps and equipment appeared well maintained. Daily check
sheet was available in the pump house documenting pond level, precipitation amounts and make-up water additions.
Page 2 of 5
Permit: WQ0031879
Inspection Date: 09/10/2019
Owner - Facility: International Paper Company
Inspection Type : Compliance Evaluation Reason for Visit: Routine
Type
Yes No NA NE
Reuse (Quality)
❑
Activated Sludge Spray, LR
❑
Lagoon Spray, LR
❑
Activated Sludge Drip, LR
❑
Single Family Spray, LR
❑
Activated Sludge Spray, HR
❑
Single Family Drip
❑
Infiltration System
❑
Recycle/Reuse
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit? 0 ❑ ❑ ❑
Do all treatment units appear to be operational? (if no, note below.) 0 ❑ ❑ ❑
Comment:
Treatment Influent Pump Station
Yes No NA NE
Is the pump station free of bypass lines or structures?
❑
❑ ❑
Is the general housekeeping acceptable?
❑ ❑ ❑
Are all pumps present?
❑ ❑ ❑
Are all pumps operable?
❑ ❑ ❑
Are floats/controls operable?
❑
❑ ❑
Are audio and visual alarms available?
❑
❑ 0 ❑
Are audio and visual alarms operational?
❑
❑ ❑
# Are SCADA/Telemetry alarms required?
❑
❑ ❑
Are SCADA/Telemetry available?
❑
❑ ❑
Are SCADA/Telemetry operational?
❑
❑ ❑
Comment: One pump of three pumps was being rebuilt
Treatment Barscreen
Yes No NA NE
Is it free of excessive debris?
0
❑ ❑ ❑
Is disposal of screenings in compliance?
❑ ❑ ❑
Are the bars spaced properly?
❑ ❑ ❑
Is the unit in good condition?
❑ ❑ ❑
Comment:
Record Keeping Yes No NA NE
Is a copy of current permit available? 0 ❑ ❑ ❑
Page 3 of 5
Permit: WQ0031879 Owner - Facility: International Paper Company
Inspection Date: 09/10/2019 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Are monitoring reports present: NDMR?
❑
❑ 0 ❑
NDAR?
❑
❑ 0 ❑
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are application rates adhered to?
❑
❑ 0 ❑
Is GW monitoring being conducted, if required (GW-59s submitted)?
❑
❑ 0 ❑
Are all samples analyzed for all required parameters?
❑
❑ 0 ❑
Are there any 2L GW quality violations?
❑
❑ 0 ❑
Is GW-59A certification form completed for facility?
❑
❑ 0 ❑
Is effluent sampled for same parameters as GW?
❑
❑ 0 ❑
Do effluent concentrations exceed GW standards?
❑
❑ 0 ❑
Are annual soil reports available?
❑
❑ 0 ❑
# Are PAN records required?
❑
❑ 0 ❑
# Did last soil report indicate a need for lime?
❑
❑ 0 ❑
If so, has it been applied?
❑
❑ 0 ❑
Are operational logs present?
0
❑ ❑ ❑
Are lab sheets available for review?
❑
❑ 0 ❑
Do lab sheets support data reported on NDMR?
❑
❑ 0 ❑
Do lab sheets support data reported on GW-59s?
❑
❑ 0 ❑
Are Operational and Maintenance records present?
0
❑ ❑ ❑
Were Operational and Maintenance records complete?
0
❑ ❑ ❑
Has permittee been free of public complaints in last 12 months?
0
❑ ❑ ❑
Is a copy of the SOC readily available?
❑
❑ 0 ❑
No treatment units bypassed since last inspection?
❑
❑ 0 ❑
Comment:
STORMWATER/RECYCLE -
Storage Yes No NA NE
Storage Type? Lagoon
Million Gallons
Storage amount?
9
# At what point is side -stream wastewater returned to treatment?
Recycle
system
Is there a Spill Control Plan?
0
❑ ❑ ❑
Aerated or Mixed?
NONE
If aeration is present, is it adequate?
❑
❑ ❑
If present, are diffusers cleaned regularly?
❑
❑ ❑
Is influent structure acceptable?
❑ ❑ ❑
Page 4 of 5
Permit: WQ0031879 Owner - Facility: International Paper Company
Inspection Date: 09/10/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Are banks/berms free of seepage and erosion? ❑ ❑ ❑
Are banks/berms free of excessive vegetation? ❑ ❑ ❑
Is pond lined? ❑ ❑ ❑
Liner Type Full, clay
Is liner acceptable? ❑ ❑ ❑
Are baffles/curtains acceptable? ❑ ❑ ❑
Does the pond have a freeboard marker? ❑ ❑ ❑
Required freeboard? 12
Inches
Actual freeboard?
Is there suitable grassed vegetation?
❑ ❑ ❑
Is the vegetation maintained?
❑ ❑ ❑
Is the area free of excessive weeds and/or woody species?
❑ ❑ ❑
Is the area free from signs of overflow?
0
❑ ❑ ❑
Is color acceptable?
❑ ❑ ❑
Are floating mats acceptable?
❑ ❑ ❑
No excessive buildup of solids?
❑ ❑ ❑
Are aerators/mixers acceptable?
❑
❑ ❑
Is effluent structure acceptable?
❑ ❑ ❑
If present, is pond cover acceptable?
❑
❑ 0 ❑
Comment:
Page 5 of 5