HomeMy WebLinkAboutSW3190806_Supplement EZ Cover Page _9/11/2019SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Courtyards at Emerald Lake
2
Project Area ac
32.5
3
Coastal Wetland Area ac
0
4
Surface Water Area ac
0.5
5
Is this project High or Low Density? i
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
IC7p
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1 0034 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
UMMERA AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
2
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip (IS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell ^—
0
25
Ba Ilter
0
26
Filterra
0
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
Brian Rossi, PE/ Project Manager
28
Or anizati_on:
EMH&T
29
Street address:
301 McCullough Dr
Charlotte NC 28262
30
City, State, Zip:
31
Phone num_be_r(s): _
704-548-0333
brossi@emht.com
32
Email:
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
����\IIIIIIIIIN/���
SEAL =
045526
C_\�\`
Signature of Designer
1?,/z-i111
DRAINAGE AREAS
1 Ils this a high density project? _ Yes
2 If so, number of drainage areas/ SCMs 2
Is all/ of this project subject to previous rule
3 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
wet pond
374014 sf _
374014 sf
wet and
5
Total BUA in project (sq ft
91130 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft
91130 sf
sf
7permitting)
New BUA outside of subdivided lots (subject to
s
sf
8
Offsite - total area (sq ft
sf
13939 sf
9
Offsite BUA (sq ft
sf
10
Breakdown of new BUA outside subdivided lots:
-Parking sq ft
4791 sf
sf
- Sidewalk (sq fit)
17040 sf
2912 sf
- Roof (sq ft
268983 sf
74488 sf
- Roadway s fit)
83200 sf
13730 sf
- Futures ft
sf
sf
- Other, please specify in the comment box
below (sq ft
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft)
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
sf
sf
14
Existing BUA that is already permitted (sq ft
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
16
Percent BUA
46%
50%
17
Desi n storm (inches)
1 inch
1 inch
18
Design volume of SCM cu ft
161487 cf
68175 cf
19
Calculation method for design volume
rational method rational method
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
WET POND
1 Drainage area number
____?]Design volume of SCM
CCMCDnI "A CDn" nlu lnC
1 1 2
31
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
No
No
_ 14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
Yes
Yes
=POND
s the SCM designed by an NC licensed professional? Yes Yes
MQC FROM 02H.1053
181
Method used _
SA/DA
SA/DA
19
Has aotage/sge tab torale been provided in the calculations?
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
627.00
632.40
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
628.00
633.40
22
Elevation of the bottom of the vegetated shelf (fmsl)
634.00
638.80
23
Elevation of the permanent pool (fmsl)
634.50
639.28
24
Elevation of the top of the vegetated shelf (fmsl)
635.00
639.80
25
Elevation of the temporary pool (fmsl)
637.51
640.39
26
Surface area of the main permanent pool (square feet)
19267:1
8773:1
71380 cf
6.00 ft
27
Volume of the main permanent pool (cubic feet)
164773 cf
28
Average depth of the main pool (feet)
6.50 ft
Equation 2
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
21420 cf
6132 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
34
Clean -out depth for forebay (inches)
6 in
6 in
35
Design volume of SCM (cu ft)
161487 cf
68946 c1
36
Is the outlet an orifice or a weir?
Orifice
Orifice
37
If orifice, orifice diameter (inches)
6 in
4 in
381
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2
2
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
42
Are berms or baffles provided to improve the Flow path?
Yes
Yes
43
Depth of forebay at entrance (inches)
73 in
70 in
441
Depth of forebay at exit (inches)
78 in
76 in
451
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
46
Width of the vegetated shelf (feet)
loft
loft
47
Slope of vegetated shelf (H:V)
10:1
10:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm? __
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
Yes
Yes
51
Is a trash rack or other device provided to protect the outlet system?
No
No
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Please use this space to provide any additional
wet pond(s):
Wet Pond 3 1:25 PM 8/27/2019