Loading...
HomeMy WebLinkAboutSW3190806_BMP Record Drawings Courtyards at Emerald Lake_9/11/20191• HfI 34 --� 643.70 RTM=643iT" )D-3 PDD- -E --- _- 33 --------- ----- MILS MILS V s MS _ 1"US _ Y!. __.__T-MI1S _ _,• MI1S- vp-15"Stm RIM=642.11 --a � .18"5tm- - Ff� PqD-3 PDD-3Fi PDD-3 �a �PDD-3 RIM 641.31 \ PDD 3 1 I fill I Lot 7 05 FFE= 645.82 Lot 5 0�0 FFE=o645.32 ot 1 FFE=644.91 Lot 4 Lot 3 Lot 2 FFEL 642.65 FFE=645.09 FFE=644.60 FFE=642.97 I 1 644.82 1 644.41 644.59 1 64.4.10 1 643.09 642.15 1 1 1 1 I I 1 r l :,, .- 1 -- �.. 643.52 _ ... 12 - 26 642.851 W W on Place . �,SAX__ va sirl _ IM=cw� / drop A , W -ram R� -. PVMT 843.82 / RIM=f+ r. {--�--�° HP 640 e- 643 27 5DE / _ - _ --_ - �Ra \ (c\j, / FES3 prep•: BMP INV= � Aj , r' ` �, 28 FES8 y / Rill=� ,"stm� 0.70% �r1 _ r�-_----- --- - IS SIN 9" 27 RIM- 3r� I -_- - - ----- --- -- ----- - - ? i 640.90 / VIP _ _ ~ :ui / / ,', �O� •e? k o� `4t3` / /°�''/ N 35.00 +I'�Gi�gpt 1NV.- NORMAk/WATE / FES7 \ '�c9 ° LEV \' FES 1 30Radius BOC,' BMP 363�3)�63 d' 1 Class 38 �� �� ��� �o FES9 46�� 30' Radius BOC �!_ ,��.•' / /ce INV 63 4 / HW 1 INV=625.$8 Prop. 10' Emergent � 63�13iv3- / / Spillway 0 639.5E;^ 639.10 PFep- 10'x3O' Level Spreade (See Detail Sheet C5.6A)go EO Wet Pond Volume Basin Storage Volumes Elevation Area (ft2) Volume (ft3) 634.50 19,267 0 635.00 23,340 10 652 636.00 25,936 24,368 637.00 28,646 27,291 638.00 31,469 30,058 639.00 34,391 32,930 640.00 37,447 1 35,919 Volume of Basin = 161,487 ft3 BMP 1&2 Wet Pond Volume - ASBUILT Basin Storage Volumes Elevation Area (ft2) Volume (ft3) 634.50 23,258 0 635.00 25,467 12 181 636.00 28,426 26,947 637.00 31,044 29,735 638.00 33,745 32,395 639.00 36,635 35,190 639.75 38,899 28,325 Volume of Basin = 164,773 ft3 LEGEND ELLi- 10' Littoral Shelf Scientific Name Common Name Quantity North Quantity (South) Zone Alisma subcordatum Water plantain 70 35 Shallow pool Asclepias incarnato Swamp milkweed 115 55 Shallow land Carex tenero Quill sedge 125 65 Shallow land Eupatoriadelphus fistulosus Joe Pye Weed 70 35 Shallow land Hibiscus coccineus Scarlet rose mallow 70 35 Shallow land Lobelia siphilitica Great blue Lobelia 85 45 Shallow land Nelumbo lutea American lotus 55 30 Deep pool Nuphar lutea adveno Yellow pond lily 55 30 Deep pool Peltandra virginica Arrow arum 70 35 Shallow pool Pontederia cordato Pickerelweed 85 45 Shallow pool Sagittaria latifolia Arrowhead 55 30 Shallow pool Sagittaria lancifolia Bulltongue 55 30 Shallow pool Schoenoplectus tabermontani Soft stem bulrush 45 25 Shallow pool Sparganium americanum American burreed 55 30 Shallow pool Co (4) 24"x9" Wind 6» Elev= 63 4- - Diameter Pipe Normal Pool Elev=634.5 634.50 38 639.21 ►\IUM ncrete Slab Top ow 7.5 637- 7.51 Flow 63, 630.09 639.3 'S Structure to be Filled with Flowable Fill Flowable Controlled Density Fill After Installation of 15" Diameter RCP Storm Sewer P• 628.09 640. 640.0 640.0 635.0 635.0 Northern BMP 10: MAX. 634.5 635.0 - Permanent Pool-634.5 1 634. �c Foreboy 10: I MAX. > :10 MAX. 640.0 640.0 50YR= 638.46 638.25 25YR=-638.2-3- 638.04 10YR= 6�T 637.77 2YR= 636.2,8 636.13 1 YR CPV= �fJ8 637.44 WQ= c�;T 635.74 15" STM fr30 35 630.09 Pi Drop Inlet 629.9 PERMANENT OUTLET STRUCTURE Cap w/2.00" Hole Cut Inv=��34.50 634.50 .50 Inv 634 635.0 640.0 Road 24" RCP w/Water N Tight Joints 627.91 Southern BMP 634.5 r? 629.0 626.0 626.0 SHWT = UNKNOWN (SEE NOTE THIS SHEET ABOUT CLAY LINER.) STORMWATER BASIN SECTION A -A Scale: None 634.5 0 Permanent Pool-6-_, - f'rep:Perm anent Structure see detail this sheet 1p;1 MAX• 634.0 N 635.0 Prop. Inv. -658.35- SHWT =UNKNOWN (SEE NOTE THIS SHEET ABOUT CLAY LINER.) 630.09 STORMWATER BASIN SECTION B-B 10: 1 MAX. Inflow Scale: None 628.0 634.5 Permanent Pool=63S 628.0 N! 640.00 MAX � 10:1 635.0 .0 LProp, 15"RCP w/Water Tight Joints Install 3 Anti -Seep Collars Evenly Spaced Along Prop. 30"RCP w/Water Tight Joints 10.1 MAX' 635.0 34.0 Ex.Grade SHWT = UNKNOWN (SEE NOTE THIS SHEET ABOUT CLAY LINER.) STORMWATER BASIN SECTION C-C Scale: None BMP MAINTENANCE SCHEDULE 1. After every significant runoff producing rainfall event and at least monthly. a) Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b) Check and clear the orifice of any obstructions such that the drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately. Re -seed the embankment as necessary to maintain good vegetative cover. Mow vegetative cover on embankment to maintain a maximum height of six inches, remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swoles, riprop, etc.) quarterly to maintain proper functioning. 4. Remove woody vegetation not part of the approved plan along the dam embankment. 5. Remove invasive and dead vegetation on the littoral shelf and replant as necessary. 6. Remove accumulated sediment from the wet detention basin system semiannually or when the depth is reduced to 75% of the original design depth. removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). 7. Perform annual inspection of the pond (annual inspection reports to be kept by the owner). Prior to inspection notification must be given to Storm Water Services. RECORD DRAWING NOTE: THIS DRAWING HAS BEEN MODIFIED TO REFLECT CHANGES MADE DURING CONSTRUCTION OF THE PROJECT. PROVIDED INFORMATION IS BASED ON INFORMATION OBTAINED FROM THE CONTRACTOR AND SURVEYOR, AND/OR OBSERVATION BY THE ENGINEER'S AUTHORIZED REPRESENTATIVES. Note: Contractor to consult a geotechnical engineer to determine if a clay liner is required. Infiltration rate shall not exceed 0.01 IN/HR. If basin permanent pool is within 6" of SHWT no liner is required. Fill embankments shall be formed of suitable material placed in successive layers not to exceed more than six (6) inches in depth for the full width of the cross-section, including the width of the slope area. No stumps, trees, brush, rubbish or other unsuitable materials or substances shall be placed in the embankment. Each successive six (6) inch layer shall be thoroughly compacted by the sheepsfoot tamping roller, 10-ton power roller, pneumatic -tired roller, or other methods approved by the Town/County Engineer. Embankments over and around all pipe culverts shall be of select material, placed and thoroughly tamped and compacted as directed by the Town/County Engineer or his representative. Pond embankments shall be installed in this some manner and shall be compacted to meet a density of 95% Standard Proctor Test. DATA RIOrK Permanent Temporary Water Top of Pool Pool Quality Weir Elevation Elevation Orifice Size (Emergency) STORMWATER 2.00 BASIN fi34� 5� �0.6313.5 GRAPHIC SCALE 0 t5 30 60 1 inch = 30 feet 634.50 637.51 634.50 639.10 Q 1� W � � Z y •-- c 0 M Ili N 00 F S Innv.0ut A U 630.0 W C N C e-w �i z E" A x� O W z �O W Vj �A �/►� V1 �O O O f; y�pppQ cc CV cr Z n yV_m c t2 -°a ri oCa� v rb E a: C 0 0 v T T v co E �o2 fu 3�ro ��m� U D n Z) vi U arn�a W mot DATE September 25, 2018 SCALE 1" = 40' JOB NO. 151NlIff!!!/ CARQZ '�.,, � f��i `�,� / %�' 2014-1128 ����� +EVANS• /�'�� '.MECHWART. - SEAL _ HAMBLETON & ' TILTON, INC. 0 55 S - iC[ SHEET RECORD DRAWING 3 � 1.43 I W } I 0 S2 0 548.4.3 1 Lot 56 "�> I FFE=647.93 Lot 57 FFE=647.40 PDD-3 PDD--3 Lot 58 FFE=646.40 PDD-3 Lot 59 FFE=646.31 PDD-3 =3 rrr � � �� sT�l�-•-� Nor 5' Rea Setback (Typ) 11 of 1 � rn I FIFE PDD- lUl 638.92 @ 3 29 Inv=� - A1 CZ 1 fi 645.74 FES4 Prop. Swale = 637,130- at - m ^Y A Normal Pool 637.47 RIM=� - iIN 4 V it 51 -648.43 I 5' Side CA Setback a ' (TYp) ' �` 4 Class "B° RipRop 1 (5,609 CF) rp -Pr07. B M P 3 .5'Wide Trail a� Q PVC Pipe See A 3 (See detail tthj6 sfieef),/r Detail Sheet • Bottom ♦~lev. / I / ; 633.4 C9.2) A 50 =648.93 a ■ ■ 0_.co D37 4, ■ rk ro , I t ARA Lot 49 `a9 / - - FFE=649.43 0 -- -- ♦ / . CL 645 636.32. 10' Emergency - - FES6 Weir / Crest--- 14-.� 642.71 / BMP3 Wet Pond Volume Wet Pond Volume As -Built Basin Storage Volumes Elevation Area (ft2) Volume (ft3) 639.00 1931 0 640.00 13090 6683 641.00 16673 14845 642.00 18459 17558 643.00 20474 19458 643.50 21134 10402 Volume of Basin = 68,946 ft3 Forebay Volume Foreboy Storage Volumes Elevation Area (ft2) Volume (ft3) 634.00 467 0 635.00 792 622 636.00 1,194 986 637.00 1,666 1423 638.00 2,205 1929 Volume of Forebay = 4,960 ft3 v 0 N Basin Storage Volumes Elevation Area (ft2) Volume (ft3) 639.00 8773 0 640.00 11439 10106.00 641.00 13400 12419.50 642.00 18522 15961.00 643.00 23054 20788.00 643.50 25369 12105.75 Volume of Basin = 71,380.25 ft3 ForebCly Volume As -Built Forebay Storage Volumes Elevation Area (ft2) Volume (ft3) 634.00 927 0 635.00 1200 1063.50 636.00 1500 1350.00 637.00 1862 1681.00 638.00 2213 2037.50 Volume of Forebay = 6,132.00 ft3 643.8 639.8 ' ° .' MAX. 639.28 Permanent Pool-639. Forebay 633.40 __ 633..8 633.40 638.8 1a:1 MAX. 643.8 M 639.8 SHWT = UNKNOWN (SEE NOTE THIS SHEET ABOUT CLAY LINER.) STORMWATER BASIN SECTION A -A Scale: None Prop.Permanent Structure see detail 10:1 MAX. this sheet V TJ.V �7 642.70 Rim= Concrete Slab Top 24"x9" Window EIev=640.35 640.39 4" Diameter Pipe PVC kL Cap w/1.00" Normal Pool639.28 6339..639.28Elev=�3 - 2' Minimum -� shelf ;71\1638.8 Flow Reduce Ifrom 8" PVC to 4" PVC 8" Diameter Pipe PVC 636.6C Structure to be Filled with Fiowable Fill Flowable Controlled Density Fill After Installation of 24" Diameter RCP Storm Sewer Pi e 643.8 643.8 10;1 y 50:1 MAX,CLMAX 639.28 10:1 MAY 641.8 83g 8 Permanent Pool-659.3 44 638. �, 638.3 639.8 ss 638.8 Prop.FES 4 Inv.Out=636r.5B 636,32 �. 633.40 SHWT = UNKNOWN (SEE NOTE THIS SHEET ABOUT CLAY LINER.) STORMWATER BASIN SECTION B-B 50YR= 641.44 641.61 25YR= 641.22 641.37 10YR= 64E).97 641.08 2YR= 640.48 640.53 1 YR CPV= -64E).45 640.50 4" STM fr30 636.60 P Drop Inlet 634.70 PERMANENT OUTLET STRUCTURE Hole Cut Inv = 639.z39 639.28 Inv Scale: None Prop.lnv.=63{r7$ �- Prop. 15"RCP 636.60 w/Water Tight Joints Install 3 Anti -Seep Collars Evenly Spaced Along Prop. 30"RCP w/Water Tight Joints BMP MAINTENANCE SCHEDULE 1. After every significant runoff producing rainfall event and at least monthly: (3) Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b) Check and clear the orifice of any obstructions such that the drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately. Re --seed the embankment as necessary to maintain good vegetative cover. Mow vegetative cover on embankment to maintain a maximum height of six inches, remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove woody vegetation not part of the approved plan along the dam embankment. 5. Remove invasive and dead vegetation on the littoral shelf and replant as necessary. 6. Remove accumulated sediment from the wet detention basin system semiannually or when the depth is reduced to 75% of the original design depth. removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water duality (i.e. stockpiling near ❑ wet detention basin or stream, etc.). 7. Perform annual inspection of the pond (annual inspection reports to be kept by the owner). Prior to inspection notification must be given to Storm Water Services. REQQRD DRAWING NOTE: THIS DRAWING HAS BEEN MODIFIED TO REFLECT CHANGES MADE DURING CONSTRUCTION OF THE PROJECT. PROVIDED INFORMATION IS BASED ON INFORMATION OBTAINED FROM THE CONTRACTOR AND SURVEYOR, AND/OR OBSERVATION BY THE ENGINEER'S AUTHORIZED REPRESENTATIVES. Note: Contractor to consult a geotechnical engineer to determine if a clay liner is required. Infiltration rate shall not exceed 0.01 IN/HR. If basin permanent pool is within 6" of SHWT no liner is required. Fill embankments shall be formed of suitable material placed in successive layers not to exceed more than six (6) inches in depth for the full width of the cross-section, including the width of the slope area. No stumps, trees, brush, rubbish or other unsuitable materials or substances shall be placed in the embankment. Each successive six (6) inch layer shall be thoroughly compacted by the sheepsfoot tamping roller, 10-ton power roller, pneumatic -tired roller, or other methods approved by the Town/County Engineer. Embankments over and around all pipe culverts shall be of select material, placed and thoroughly tamped and compacted as directed by the Town/County Engineer or his representative. Pond embankments shall be installed in this some manner and shall be compacted to meet a density of 95% Standard Proctor Test. DATA BLOCK Permanent Temporary Water Top of Pool Pool Quality Weir Elevation Elevation Orifice Size (Emergency) STORMWATER cam` 1.00 BASIN �''� -643-•� 639.28 640.39 639.28 642.71 O "~ N C) W p N Z C, xA zo W I 0 o � 0 Q A' Z, o zA g- � 14, G� a aW w H O� F �Q} V E N DATE September 25, 2018 SCALE 1" = 40' �}tisiiia JOB NO. ,� r ���tirurr►rrr .�` � 14, % 2014-1128 GRAPHIC SCALE 0 15 30 60'�2�'.. EVANS•• '/y9=� _ SEAL MECHWART - 45 - HAMBLEiON 8c SHEET TILTON, INC. No. F-1016 ' 1 inch = 30 feet % ' " H� `���.!�OS��`�\�� C5.7 OF ,.A•'',``��,� �''��rrrrrirtJ1w 1 'rfrrririr��� ()�Y RECORD DRAWING