Loading...
HomeMy WebLinkAboutSW1190901_SW Report_20190910STORMWATER MANAGEMENT REPORT FOR ASHEVILLE REGIONAL AIRPORT FLETCHER, NORTH CAROLINA INITIAL SUBMITTAL: AUGUST 7, 2019 REVISION #1: AUGUST 20, 2019 STORMWATER ENGINEER: AULICK ENGINEERING, LLC DAVID A. SKURKY, P.E. 4364 S. ALSTON AVENUE, SUITE 300 DURHAM, NC 27713 Manghmd l'e 0 ULICK ENGINEERING LLC �� HYDRAULICS & HYDROLOGY I EROSION CONTROL ' AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION TABLE OF CONTENTS Section 1 PROJECT OVERVIEW 1.1 Narrative..............................................................................................................................3 1.2 Introduction and Site Description......................................................................................3 1.3 Construction Sequence and Cost........................................................................................3 Section 2 HYDROLOGY 2.1 Project Methodology...........................................................................................................4 2.2 Pre -Construction Hydrology................................................................................................6 2.3 Post -Construction Hydrology.............................................................................................7 Section 3 STORMWATER CALCULATIONS 3.1 Comparison of Pre -Project vs. Post -Project Discharges......................................................9 3.2 Drainage & Erosion Control Design Calculations...............................................................12 3.3 Operation and Maintenance Manual................................................................................12 3.4 Design Software and Manuals...........................................................................................12 Appendices REFERENCE MATERIAL Appendix A - Vicinity, Soil Survey, FEMA Maps and NOAA Rainfall Data Appendix B - Pre -Construction Drainage Maps & Post -Construction Drainage Maps Appendix C - Erosion Control Sheets & Details, Stormwater Management Facility Sheets & Details (including Pond and OCS Details), & Pipe Profiles Appendix D - Operation and Maintenance Manual Appendix E - Supplemental EZ Storm & Drainage Calculations Appendix F - Hydraflow Hydrographs Output Section 1 PROJECT OVERVIEW 1.1 Narrative The Asheville Regional Airport - Parking Lots project includes the construction of two new parking lots, Lot A and Lot B, and associated grading, drainage, stormwater, landscaping and erosion control. This project also includes construction of two dry stormwater management ponds. This report includes the stormwater design calculations and facilities that will be installed to meet Buncombe County requirements. The report will also review the stormwater impacts on the property and downstream to ensure no adverse impacts will result from the construction. 1.2 Introduction and Site Description The site is located at Asheville Regional Airport in Fletcher, NC, south of Asheville, North Carolina near Airport Road (35° 26' 10.38" N, 82° 32' 8.61"W). The area that includes airport related operations encompasses approximately 580 acres. For a larger vicinity map, see Appendix A. The Asheville Regional Airport Parking Lots project site is located on an existing undeveloped area in the eastern portion of the airport, located along Airport Road. 9eo Asheville ¢, a ,... Regional 0 Airport For stormwater management planning purposes, the site is comprised of Hydrologic Soil Group (HSG) A and B soils. Appendix A contains the NRCS Soil Survey Maps for each parking lot. The existing land use of the project is grass, gravel, forest, and impervious. The proposed land use will impervious (parking lots) with a small amount of grass for landscaping. As shown in the FEMA FIRM 3700964200K (January 6, 2010) and FEMA FIRM 3700964300K (January 6, 2010) in Appendix A, the disturbance is not located within 200ft of a FEMA floodplain. 1.3 Construction Sequence and Cost As explained later in the report, stormwater management ponds are proposed to reduce post - construction flow rates to pre -construction levels. The construction of the permanent stormwater management measures will occur during the grading phase of the project and will be used as temporary sediment basins to protect downstream receiving stormwater systems from construction activity. After the site is stabilized, the measures will be cleaned out and re -graded to final design grades. The cost of pond Al and B1 are unknown at this time and will be finalized during bidding. The Asheville Regional Airport will be the end -user and responsible for annual inspection, maintenance and repairs of the system. Section 3.3 discusses the operation and maintenance of the ponds. 3 ASHEVILLE REGIONAL AIRPORT- PARKING LOTS INITIAL SUBMITTAL: 8/7/19 STORMWATER MANAGEMENT REPORT REVISION #1: 8/20/19 Section 2 HYDROLOGY 2.1 Project Methodology The NRCS Curve Number Method (also known as the SCS Method) was used to determine Pre - Construction and Post -Construction peak flow rates. The NRCS Method applicable to this area is based on a 24-hour storm event that has a Type II time distribution with a 484 shape factor. The software program, Hydraflow Hydrographs, was used to route the system through a series of hydrographs and determine the effects of the proposed improvements. The following Precipitation Table for Fletcher, NC from NOAA's National Weather Service Hydrometeorological Design Studies Center Precipitation Frequency Data Server was used for the hydrologic analysis. See full NOAA Atlas 14 Precipitation Table in Appendix A. The Buncombe County 1-yr storm post -construction requirement was followed for this report but the 25- and 100-yr storms were checked for capacity and safe conveyance. 24-hr Precipitation Amount (in) 1-yr 25-yr 100-yr 2.91 5.82 7.28 The following curve numbers were used for hydrologic analysis of Lot A: CN= 61 (Open Space, good cond., HSG B) CN= 98 (Impervious area) CN= 85 (Gravel, HSG B) The following curve numbers were used for hydrologic analysis of Lot B: CN= 39 (Open Space, good cond., HSG A) CN= 98 (Impervious area) CN= 76 (Gravel, HSG A) 4 ASHEVILLE REGIONAL AIRPORT- PARKING LOTS INITIAL SUBMITTAL: 8/7/19 STORMWATER MANAGEMENT REPORT REVISION #1: 8/20/19 The Rational Method was used for the parking lots' pipe design on the development. The Intensity Duration Frequency (IDF) curve for Fletcher, NC below was used for the calculations: 1A 21j00 11 I YF 9-00 to s-0o a V� &W 0.na 10 115 20 25 30 35 40 16 60 Ri W T� (mill) The following runoff coefficients were also used for hydraulic (storm inlet and pipe) analysis of Lot A: c = 0.30 (Grass, HSG B) c = 0.50 (Gravel, HSG B) c = 0.95 (Impervious area) The following runoff coefficients were also used for hydraulic (storm inlet and pipe) analysis of Lot B: c = 0.20 (Grass, HSG A) c = 0.45 (Gravel, HSG A) c = 0.95 (Impervious area) 9 ASHEVILLE REGIONAL AIRPORT - PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 2.2 Pre -Construction Hydrology Note: Parking Lot B is no longer included in this project. Lot B will be a future project so please do not review the Parking Lot A isections relating to Lot B. The existing site consists of a grassed area east of the airport that contains a cell tower and a road to service the cell tower. The offsite areas to the north and east that flow through the subject site consist of a parking lot, a hotel, a gas station, and a car dealership. Overall Basin Al is divided into four (4) sub basins that all converge at an existing 36" pipe that flows under Highway 280. Basin A1.1 contains the parking, gas station, hotel, and car dealership. The runoff generated by this basin sheet flows to the existing drainage network where it is routed to the existing detention pond. Basin A1.2 is the northeast portion of the grassed area which flows to an existing headwall where it is then routed to the existing detention pond. Basin A1.3 is the southeast portion of the grassed area; its runoff sheet flows to an existing headwall where it is then routed to the existing detention pond. Basin A1.4 occupies the northwest portion of the grassed area and it also flows directly to the existing 36" pipe outlet. Basin A2 is a separate sub watershed that does not exit the property at the 36" pipe but rather flows south along Highway 280. Al and A2 converge downstream of airport property and eventually discharge into the French Broad River but for purposes of this report they are separated outfall points. Parking Lot B The existing site consists of a wooded area, a gravel parking lot, and a portion of Wright Brothers Way. The site is divided into two drainage basins: Basin B1 and Basin B2. Basin B1 is the western portion of the basin and it is occupied by a portion of the wooded area, the entire gravel parking lot, and a portion of Wright Brothers Way. The runoff generated by Basin B1 sheet flows to the west and onto Wright Brothers Way where it is collected by grate inlets along the curb line. The runoff then flows to the south where it eventually leaves the site in a pipe that runs underneath Wright Brothers Way. Basin B2 is a separate basin that lies to the southeast of Basin B1. Basin B2 is occupied solely by a wooded area. The runoff generated by Basin B2 sheet flows to the east where is collected by a ditch along Highway 280. The ditch flows to the south where it exits the site. B1 and B2 flow to the same spot down Wright Brothers Way and also merge with Al and A2 at the French Broad River. Appendix B shows the overall Pre -Construction map. The table below illustrates the drainage areas, weighted curve number, and Times of Concentration. PRE -CONSTRUCTION Basin Total Area AC I mperv. Grassed Grassed Gravel Gravel C CN Tc min HSG A, (HSGB, (HSGB. HSG A. 0.95 98 Lot B) 0.20 39 Lot A) 0.30 61 Lot A) 0.50 1 85 Lot B) 0.50 76 Pre Al 13.2 6.1 6.6 0.5 0.61 79 7 Pre A2 0.4 0.4 0.30 61 5 Pre 131 1.7 0.4 0.9 0.4 0.46 63 5 Pre 132 0.4 0.4 0.20 39 5 TOTAL 15.78 6.53 1.27 7.01 0.42 6 ASHEVILLE REGIONAL AIRPORT - PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 2.3 Post -Construction Hydrology Parking Lot A The proposed project will replace most of the grassed area with paved parking lots. Post construction there will be two drainage basins, Basin Al and Basin A2. Basin Al occupies a similar area to pre - construction basin Al and is divided into three sub basins, Al and A2 and A3. Al is the same runoff from the north that flows into the existing 30" CMP system. In post -construction the new Parking Lot A North connects to this system and into the existing pond. The existing pond will be regraded to expand its capacity and a new Outlet Control Structure (OCS) will be constructed to ensure the post - development flow is less than the pre -construction flow for the 1-year storm. Basin A2 collects runoff from the east hotel and undisturbed grass area from the east through new pipes and into the stormwater pond. A3 will be collected in the new Parking Lot A South drainage system and then routed to the stormwater pond. The runoff will exit the site out of an existing 36" CMP pipe that flows under Highway 280. Basin A2 occupies a similar area to pre -construction Basin A2, but the area is reduced. Because of the reduction of area, no stormwater management is needed for the region. The runoff from Basin A2 flows to the south along Highway 280. Al and A2 converge downstream of airport property and eventually discharge into the French Broad River but for purposes of this report they are separate outfall points. Parking Lot B The proposed project will replace the existing gravel parking lot with an expanded paved lot. Post - construction there will be two drainage basins, B1 and B2. Basin B1 will occupy a similar area to pre - construction Basin B1 is entirely the proposed Parking Lot B. The runoff generated by Basin B1 will be collected by a proposed drainage system and routed to a new proposed detention pond. The proposed pond will contain an Outlet Control Structure (OCS) to ensure the post -construction flow is less than the pre -construction flow for the 1-year storm. The pond will contain a 15" concrete outlet pipe and will tie into the existing drainage system and exit the site through a pipe under Wright Brothers Way at the same location as pre -construction. Basin B2 will occupy a similar area to pre -construction Basin B2. Basin B2 is comprised of a grassed area and a small portion of the proposed parking lot. Runoff generated by Basin B2 will sheet flow to the east where it will be collected by a ditch running alongside Highway 280. The ditch flows to the south where it exits the site. B1 and B2 flow to the same spot down Wright Brothers Way and merge with Al and A2 at the French Broad River. 7 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Appendix B shows the overall Post -Construction map and Appendix C contains Grading and Drainage Plans, Stormwater Details, and Pipe Profiles. The table below illustrates the Post -Construction drainage areas, weighted curve number, and Times of Concentration. POST -CONSTRUCTION Basin Total Area AC Imperv. Grassed Grassed Gravel Gravel C CN Tc min HSG A, (HSGB, (HSGB. HSG A. 0.95 98 Lot B) 0.20 39 Lot A) 0.30 61 Lot A) 0.50 85 Lot B) 0.45 76 Post Al 13.5 8.5 5.0 0.5 0.73 88 7 Post A2 0.2 0.2 0.30 61 5 Post B1 1.7 1.0 0.7 0.64 73 5 Post B2 0.4 0.1 0.3 0.39 54 5 TOTAL 15.78 9.60 1.02 5.16 0.00 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Section 3 STORMWATER CALCULATIONS 3.1 Comparison of Pre -Construction vs. Post -Construction Discharges Due to the increase in impervious area in Basins Al and B1 the runoff generated in these areas will increase post -construction. In order to mitigate the effects of this increase, detention ponds were designed to detain the runoff and discharge it at a rate that is less than the pre -construction rate for the 1-year storm. Due to a reduction in area, Basin A2 will generate less runoff post -construction. While the impervious area increased in Basin B2, B2 experienced negligible increases in runoff in the 1-year storm (< 0.1 cfs). Therefore, stormwater management facilities were not proposed for Basin B2. The peak flow rates for the 1-year storm pre -construction and post- construction can be seen below. The details for the stormwater management facilities can be found in Appendix C. Drainaee Basin 1-Year Pre- Construction Flow 1-Year Undetained Post -Development Detention Needed? Post -Construction Flow cfs Increase M Al 26.3 34.1 29.6% Yes A2 0.2 0.1 -61.8% No B1 0.9 2.3 146.6% Yes B2 0.0 0.0 0.0% No As mentioned previously, dry detention ponds were used in Basins Al and B1 to reduce the peak flow. The new post -construction detained flows are listed below showing the reduced flow rates. Drainaee Basin 1-Year Pre- Construction Flow 1-Year Detained Post- Post -Development Detention Construction Flow cfs Increase (%) Achieved cfs Al 26.3 24.1 -8.3% yes B1 0.9 0.7 -21.2% yes ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT The stage storage for the ponds are as shown in the tables below and can be found in the Hydraflow Hydrographs report in Appendix F. Pond Al (Existing) Stage ft Elev ft Proposed Storage (cf) 0.0 2129.5 0 1.5 2131.0 74 2.5 2132.0 278 3.5 2133.0 777 4.5 2134.0 1,728 5.5 2135.0 3,339 6.5 2136.0 5,890 7.5 2137.0 9,701 8.5 2138.0 14,952 9.5 2139.0 22,973 Pond Al (Proposed) Stage ft Elev ft Proposed Storage (cf) 0.0 2129.5 0 0.5 2130.0 487 1.5 2131.0 2,816 2.5 2132.0 5,800 3.5 2133.0 9,365 4.5 2134.0 13,729 5.5 2135.0 19,196 6.5 2136.0 25,905 7.5 2137.0 33,898 8.5 2138.0 43,292 9.5 2139.0 54,299 Pond B1 Stage ft Elev ft Proposed Storage (cf) 0.0 2162.0 0 1.0 2163.0 410 2.0 2164.0 1,017 3.0 2165.0 1,846 4.0 2166.0 2,923 As observed in the two Pond Al tables above, approximately 31,000 cf of extra storage was generated by excavating the existing pond Al. This extra storage, along with the OCS addition, is what reduces the peak flow rates out of the pond. 10 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Adequate freeboard is a concern to ensure the 100-year storm does not overtop the ponds and spill onto the roadways. The tables below illustrate the 1-year, 25-year and 100-year water surface elevations and freeboard in relation to the top of dams. Pond Al Peak Storm Freeboard Elevation Frequency (ft) (ft) 1 2133.1 5.9 25 2136.6 2.4 100 2137.9 1.1 Pond B1 Peak Freeboard Storm Elevation Frequency (ft) (ft) 1 2164.1 1.9 25 2164.7 1.3 100 2165.1 1 0.9 As shown in the tables above, the on -site stormwater management results in a decrease in the flow for the 1-year storm and keeps the 100-year storm contained in the ponds with adequate freeboard. Therefore, the construction of the Asheville Regional Airport Parking Lots Project is not anticipated to have adverse impacts. 11 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 3.2 Drainage & Erosion Control Design Per Buncombe County requirements, the inlets and pipes were designed for the 25-yr storm. Pipe Charts can be found in Appendix E showing pipe capacity and gutter spread. Energy Dissipators at the proposed pipe outfalls can be found in Appendix C. Erosion Control design can be found in Appendix C. 3.3 Operation and Maintenance Manual The two dry detention ponds require maintenance in order to work properly. An O&M plan has been developed and can be found in Appendix D. 3.4 Design Software and Manuals The following design software programs were used in analysis and development of the stormwater and documents: • Hydraflow Hydrographs for AutoCAD Civil 3D 2019 • Hydraflow Storm Sewers for Auto CAD Civil 3D 2017 • AutoCAD Civil 3D 2018 • Microsoft Office 2017 The following design manuals and literature were used in analysis and development of the stormwater documents: • NCDEQ Stormwater Design Manual— 2017 Edition • Buncombe County Stormwater Management Plan Review Checklist • County of Buncombe Checklist and Guidelines for the Preparation of the Erosion and Sedimentation Control Plans 12 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT APPENDIX A VICINITY MAP, SOILS SURVEY, FEMA MAPS & NOAA RAINFALL DATA U s Q �. Asheville w '3, ❑ W IS LT17 El �1.EMO VII LAll Woodside r �❑ Hills C9 33 Enka Village Candler 7 � BEltmore e Forest 0 Bern Creek 75 Beaverdaan i3r 4E • RoynlPines @ Avery Creek Arden Asheville Regional Alrpon Regionaall Fletcher Naples 'J:'lls RiYer Mountain him Home VICINITY MAP NTS Goodluck Swannanoa iffiv --T i4 Fairview Fruitland o�ua MoUntai Gerton 11Li 74 Edneyville STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM LEGEND JOINS 1INE1 SPECIAL FI-OD HAZARD - (SFNAh) SUBJECT TO INUNDAT101O1-111AINUAICIA- 'Ile 0 F �A `1� Z"A.NaZ�. ZONE X re ZONE AS IE AE ZONE -.P APa,e AS B.. -P AP RIVER TRIBUTARY 149 ZAE°ey area - ZONE A ZONE A - v NE ZONE A i,o, r .d AE 2 -N A AREAS IN ZONE AE ZINE VE S3 - I c- B,011OOD AREAS 11. -,-,UU31 d A- :n DATUM INFORMATION 37 P'. Tp...C..) C, OTHER ARE. A 37oo3i =�A MI.' nhiVd.� The.� COASTAL SARI SR RESOURCES 8- (CRITS) A- P ZONE. OTHERVASE PROTECTED AREAS (OPA.) R.- .f , RS E ('Ag '14 1 1 and A� -p - I I 'i, . .... I. =_11 1:1.= =-,I -- DID S) a. wvm.ry ­0 =d arona 2,13 ZONE X .................. I FIR. Th==muane - ZONE AE -i", Ch- I- S.* Phea„u 17 0 -Si N11hl 32 BUNCOMBE COUNTY -y.1 (11) 111-Z HIT.D-N C.-I BUNCO- 10- uj -.-I N- -d - 3701?5 1111. RET g �P Sl A NC l-I mad �nen h_ hN, II - ZONE A BMI hv=. Ma H.- 101. IN- .11. E 1- Ih- ZONE A -S 15 ZONE AE h, -11- FLOOD HAZARD DATA TABLE 11NE A Parking Lot B 7�,0,568 FRENCH BROAD RIVER 31 NEAE Lot B L T SCI ZONE X . ............ 4- X 370125 213, ZONE A... w\e HIGGINSBRINCH x Lot IS- P Parkin n g Lot A ZONE X i,:2. 11P Hand as p.a<m Pro 1-0 IDERSON IOU- S. OMSECO oa IhzOxE iN 37003 1 1_ AIL ARP I -Ex ji, -fMifl, Ri- 376025 G' - 3 IINNIN 032 ZONE X 2. ZONE X ZONE AS�ar JE 1 0 oll ZON, l 41 ZONEX ryow 7 1 --I-Itld A-, F JOINS PANEL 9642 NOTES TO USERS 1-N' ENDS TDRY nlwm hNNh,h'I___.'.,::N I- h -11= IN -S ON. In.- 1. .1 1.- 1". OR. 1 R-1 11 sw Pi =.hD1WN.dF==- S-1 d Sh- 8=.. lb��ih '. , _ hhh. � C_ p 1`111- m� MSP •1=rzz EFF-I-STE(I)II EVIINiOTDTHIPANEL eunique " " " -'I. "P. h. _'_D­ I =P FIR. 1ANUA-­l' (ORS) P-1,­ N h_ I—` ­hl. =Up -thh- f C-1--hh.-I h,h. F1 I -I. Th. It Pih h. 1.- 11. ft NI -I Ii,ih. 'U.Nd Hamm 1� Z.,ramh, -N. H-, h_ -11- 1,- 1--- A, S­ I hiii, F-A i. .-..d IBI FIR.. C S S, -. N. . T, T ..'N-'-I C ..... P.M.- ' .-p'phr. P ". 11-P.. Ain- In-ii- P­- N-C 1- ubee1111 P1. ..1. �.ncflmdmapsxomsoured �BhBPUEEI th. RNI 11 111 C- . 11-NS-Il N, NAP SCALE I = BOB V : GJNO) Iw PANEL 16- FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 9643 M 'W ZIP MAP REVISED MAPNUMBER JANUARY 6, 2010 3700964300K II-Wiillyp RI Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* �'It Latitude: 35.4347*, Longitude:-82.5374* Elevation: 2145.24 ft * *source: ESRI Maps 'w,�w, source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 4.38 (3.95-4.87) 5.22 6.25 1 (5.64-6.95) 11 7.04 (6.32-7.81) 11 8.08 (7.20-8.94) 8.86 1 (7.86-9.79) 9.65 1 (8.52-10.7) 10.4 1 (9.16-11.6) 11.5 1 (9.92-12.8) 12.3 1 (10.5-13.8) 3.50 4.17 5.01 5.63 6.43 7.06 7.67 8.27 9.07 9.68 10-min (3.16-3.89) 1 (4.51-5.57) 11 (5.06-6.24) 11 (5.74-7.12) 1 (6.26-7.80) 1 (6.77-8.50) 1 (7.25-9.19) 1 (7.85-10.1) 1 (8.30-10.9) 2.92 3.50 4.22 4.75 5.44 5.96 6.46 6.96 7.61 8.10 15-min (2.63-3.24) 11 (3.16-3.88) 1 1 (4.85-6.02) (5.28-6.58) 1 (5.70-7.16) 1 (6.10-7.73) 1 (6.59-8.50) 1 (6.94-9.10) 2.00 2.41 3.00 3.44 4.03 4.48 4.95 5.42 6.05 6.56 30-min (1.80-2.22) 1 (2.70-3.34) 11 (3.09-3.81) 11 (3.59-4.46) 1 (3.98-4.96) 1 (4.37-5.48) 1 (4.75-6.02) 1 (5.24-6.77) 1 (5.62-7.37) 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 60-min (1.12-1.39) (1.37-1.68) (1.73-2.14) 1 1 (2.39-2.97) 1 (2.69-3.36) 1 (3.01-3.78) 1 (3.33-4.22) 1 (3.76-4.85) 1 (4.10-5.38) 0.729 0.885 1.12 1.30 1.56 1.77 2.00 2.23 2.56 2.83 2-hr (0.655-0.809) (0.796-0.980)1 1 (1.16-1.44) 11 (1.39-1.73) 1 (1.56-1.97) 1 (1.75-2.22) 1 (1.94-2.48) 1 (2.20-2.86) 1 (2.40-3.18) 0.520 0.626 0.786 0.916 1.11 1.26 1.43 1.62 1.88 2.10 3-hr (0.469-0.581) (0.564-0.698) (0.706-0.873) (0.820-1.02) (0.982-1.23) 1 (1.11-1.41) 1 (1.25-1.60) 1 (1.40-1.80) 1 (1.60-2.11) 1 (1.76-2.37) 0.325 0.387 0.477 0.554 0.666 0.761 F 0.864 F 0.976 1.14 1.27 6-hr (0.297-0.358) (0.353-0.425) (0.435-0.524) (0.503-0.609) (0.600-0.732) (0.680-0.835) (0.764-0.951) (0.853-1.08) (0.978-1.26) (1.08-1.42) 0.204 0.243 0.298 0.342 0.404 0.454 0.506 0.560 0.635 0.694 12-hr (0.188-0.223) (0.223-0.265) (0.274-0.325) (0.314-0.373) (0.368-0.440) (0.412-0.496) (0.457-0.553) (0.502-0.614) (0.563-0.702) (0.609-0.773) 0.121 0.145 0.179 0.206 0.243 0.273 0.303 0.335 0.380 0.415 24-hr (0.112-0.131) (0.135-0.158) (0.166-0.194) (0.190-0.223) (0.223-0.262) (0.250-0.295) (0.277-0.328) (0.305-0.362) (0.342-0.411) (0.371-0.450) 0.072 0.086 0.105 0.120 0.140 0.157 0.174 0.192 0.216 0.235 2-day (0.067-0.078) (0.080-0.093) (0.097-0.113) (0.111-0.129) (0.130-0.151) (0.145-0.169) (0.160-0.188) (0.175-0.207) (0.196-0.234) (0.212-0.255) 0.051 0.061 0.074 0.084 0.098 0.109 0.120 0.131 0.147 0.159 3-day (0.048-0.055) (0.057-0.066) (0.069-0.079) (0.078-0.090) (0.091-0.105) (0.100-0.117) (0.110-0.129) (0.120-0.141) (0.133-0.158) (0.144-0.172) 0.041 0.049 0.058 0.066 0.076 0.084 0.093 0.101 0.112 0.121 4-day (0.038-0.044) (0.045-0.052) (0.054-0.062) (0.061-0.071) (0.071-0.082) (0.078-0.090) (0.085-0.099) (0.093-0.108) (0.102-0.120) (0.110-0.130) 0.027 0.032 0.039 0.044 0.051 0.056 0.062 0.067 0.075 0.081 7-day (0.025-0.029) (0.030-0.035) (0.036-0.041) (0.041-0.047) (0.047-0.054) (0.052-0.060) (0.057-0.066) (0.062-0.072) (0.069-0.081) (0.074-0.088) 0.022 0.026 0.031 0.034 0.040 0.044 0.048 0.052 0.057 0.062 10-day (0.021-0.023) (0.024-0.027) (0.029-0.033) (0.032-0.037) (0.037-0.042) (0.041-0.046) (0.044-0.051) (0.048-0.055) (0.053-0.061) (0.057-0.066) 0.015 0.017 0.020 0.022 0.025 0.027 0.030 0.032 0.034 0.036 20-day (0.014-0.016) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.029) (0.028-0.031) (0.030-0.033) (0.032-0.036) (0.034-0.038) 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.024 0.025 0.027 30-day (0.011-0.013) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) (0.024-0.027) (0.025-0.028) 0.010 0.012 0.014 0.015 0.016 0.017 0.018 0.019 0.020 0.020 45-day (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.018-0.021) (0.019-0.021) 0.009 0.011 0.012 0.013 0.014 0.015 0.015 0.016 0.017 0.017 60-day (0.009-0.010) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.015-0.017) (0.016-0.018) (0.016-0.018) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 1 /4 6/20/2019 Precipitation Frequency Data Server I161616I6161 10.000 C 41 1.000 C GJ a-� C � 0.100 L Ld a 0.010 PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.4347°, Longitude: -32.5374' 0.0011 t t Jr t L N N O r{4 N rq rq rq N rq N Alb A q r, O O O Ln O ,1 r-1 rn w 1-4N rn v Ln Duration 100.000 10.000 L k 1.000 w c e 0.100 4.1 49 0.010 0.001 1 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMT}: Thu Jun 20 13:16:24 2019 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 30-rnw — 7-day — 6 Wain — 10-day — 2fir — 20-day — "r — 30-day — 8fir — 45-day — 12fir — 60-day - 24--hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Fletcher" Fa.1i MIL15 a. xNaa, f 3km 2mi + _ Nanles Large scale terrain Kingsport' Bristol Johnson City' 3 Winston -Soler Knoxville' ti h•1t Nlit&rell rk�}l1 ', 1Asherille NORTH C Charl t •Greenville lookm SOUTH CARD 6 mi V Large scale map Johnson City i � mston� f to f 100km —. Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 3/4 I::iNIMI ] Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=intensity&units=english&series=pds 4/4 II-Wiillyp RI Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Fletcher, North Carolina, USA* �'It Latitude: 35.4347*, Longitude:-82.5374* Elevation: 2145.24 ft * *source: ESRI Maps 'w,�w, source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.365 0.435 0.521 0.587 0.673 0.738 0.804 0.870 0.955 1.02 5-min (0.329-0.406) (0.393-0.483) (0.470-0.579) (0.527-0.651) (0.600-0.745) (0.655-0.816) (0.710-0.891) (0.763-0.966) (0.827-1.07) (0.878-1.15) 0.584 0.695 0.835 0.939 1.07 1.18 1.28 1.38 1.51 1.61 10-min (0.526-0.649) (0.628-0.772) (0.752-0.928) (0.843-1.04) (0.956-1.19) 1 (1.04-1.30) 1 (1.13-1.42) 1 (1.21-1.53) (1.31-1.69) (1.38-1.81) 0.729 0.874 1.06 1.19 1.36 1.49 1.62 1.74 1.90 2.02 15-min (0.657-0.811) (0.789-0.971) (0.951-1.17) 1 (1.07-1.32) 1 (1.21-1.50) 1 (1.32-1.65) 1 (1.43-1.79) 1 (1.53-1.93) (1.65-2.13) (1.74-2.28) 1.00 1.21 1.50 1.72 2.01 2.24 2.47 2.71 3.03 3.28 30-min (0.901-1.11) 1 (1.09-1.34) 1 (1.35-1.67) 1 (1.80-2.23) 1 (1.99-2.48) 1 (2.18-2.74) 1 (2.37-3.01) (2.62-3.38) (2.81-3.69) 1.25 1.51 1.92 2.24 2.68 3.04 3.41 3.80 4.34 4.79 60-min (1.12-1.39) (1.37-1.68) (1.73-2.14) (2.01-2.48) (2.39-2.97) (2.69-3.36) (3.01-3.78) (3.33-4.22) (3.76-4.85) (4.10-5.38) 1.46 1.77 2.24 2.60 3.13 3.55 3.99 4.47 5.13 5.67 2-hr (1.31-1.62) (1.59-1.96) (2.00-2.47) (2.33-2.88) (2.77-3.47) (3.13-3.93) (3.49-4.43) (3.88-4.96) (4.39-5.73) (4.81-6.37) 1.56 1.88 2.36 2.75 3.33 3.80 4.31 4.86 5.65 6.30 3-hr (1.41-1.75) (1.70-2.10) (2.12-2.62) (2.46-3.06) (2.95-3.70) (3.35-4.23) (3.76-4.79) 1 (4.19-5.41) (4.80-6.34) (5.29-7.11) 1.95 2.32 2.86 3.32 3.99 4.56 5.18 5.85 6.82 7.64 6-hr (1.78-2.14) (2.11-2.55) (2.60-3.14) (3.01-3.65) (3.59-4.38) (4.07-5.00) (4.57-5.69) 1 (5.11-6.44) (5.86-7.56) (6.48-8.52) 2.46 2.93 3.59 4.12 4.87 5.47 6.09 6.74 7.65 8.36 12-hr (2.26-2.68) 1 (2.69-3.20) 1 (3.30-3.92) 1 (4.44-5.31) 1 (4.97-5.97) 1 (5.50-6.66) 1 (6.05-7.40) (6.78-8.45) (7.34-9.31) 2.91 3.49 4.29 4.94 5.82 6.54 7.28 8.05 9.12 9.97 24-hr (2.69-3.15) (3.24-3.79) (3.97-4.66) (4.56-5.34) (5.36-6.30) (6.00-7.07) (6.65-7.86) (7.31-8.70) (8.21-9.87) (8.90-10.8) 3.46 4.13 5.03 5.75 6.74 7.54 8.36 9.20 F 10.4 11.3 2-day (3.22-3.73) (3.84-4.45) (4.67-5.42) (5.33-6.19) (6.23-7.25) (6.94-8.11) (7.67-9.00) (8.40-9.93) (9.39-11.2) (10.2-12.2) 3.69 4.39 5.32 6.04 7.03 7.82 8.62 9.44 10.6 11.4 3-day (3.44-3.96) (4.10-4.72) (4.95-5.71) (5.62-6.48) (6.52-7.54) (7.22-8.39) (7.93-9.27) (8.65-10.2) (9.60-11.4) (10.3-12.4) 3.92 4.67 5.60 6.34 7.33 8.10 8.89 9.68 10.7 11.6 4-day (3.66-4.19) (4.35-5.00) (5.22-5.99) (5.90-6.78) (6.80-7.84) (7.50-8.67) (8.20-9.53) (8.90-10.4) (9.81-11.6) (10.5-12.5) 4.57 5.42 6.50 7.36 8.52 9.44 10.4 11.3 F 12.6 13.7 7-day (4.27-4.89) (5.07-5.82) (6.07-6.97) (6.86-7.88) (7.92-9.11) (8.75-10.1) 1 (9.59-11.1) 1 (10.4-12.1) (11.5-13.6) (12.4-14.7) 5.23 6.19 7.34 8.25 9.49 10.5 11.4 12.4 F 13.8 14.8 10-day (4.93-5.56) (5.83-6.58) (6.92-7.81) (7.77-8.77) (8.90-10.1) (9.79-11.1) 1 (10.7-12.2) 1 (11.6-13.2) (12.7-14.7) (13.6-15.9) 7.11 8.36 9.71 10.8 12.1 13.2 14.2 15.1 16.4 17.4 20-day (6.72-7.51) (7.91-8.84) (9.18-10.3) (10.2-11.4) (11.4-12.8) (12.4-13.9) 1 (13.3-15.0) 1 (14.2-16.0) (15.3-17.4) (16.1-18.5) 8.72 10.2 11.7 12.8 14.2 15.3 16.2 17.2 F 18.3 19.1 30-day (8.28-9.20) (9.72-10.8) (11.1-12.3) (12.2-13.5) (13.5-15.0) (14.4-16.1) 1 (15.3-17.1) 1 (16.2-18.1) (17.2-19.4) (17.9-20.3) 11.1 13.0 14.6 15.8 17.3 18.3 19.2 20.1 F 21.1 21.8 45-day (10.6-11.6) (12.3-13.6) (13.9-15.3) (15.0-16.6) (16.4-18.1) (17.4-19.2) 1 (18.2-20.2) 1 (19.0-21.1) (20.0-22.2) (20.6-23.0) 13.3 15.5 17.3 18.6 20.2 21.3 22.3 23.2 24.2 24.9 60-day (12.7-14.0) (14.8-16.3) (16.5-18.2) (17.8-19.6) (19.2-21.3) (20.2-22.4) (21.2-23.5) (22.0-24.4) (22.9-25.6) (23.5-26.3) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 1 /4 6/20/2019 Precipitation Frequency Data Server Pas -based depth -duration -frequency (DDF) curves Latitude: 35.4347", Longitude: -32.5374" �J-I 20 c n t t Jr t L N N r{4 N rq rq rq N rq O N Alb A q r, O O O Ln O ,1 r-I rn ro � N rn v Ln Duration 25 20 c 0 I I I I I I i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, VoIume 2, Version 3 Created {GMT}: Thu Jun 20 13:18:29 2019 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 30-rnw — 7-day — 6 Wain — 10-day — 2fir — 20-day — "r — 30-day — 8fir — 45-day — 12fir — 60-day - 24--hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=engIish&series=pds 2/4 6/20/2019 Precipitation Frequency Data Server Fletcher" Fa.1i MIL15 a. xNaa, f 3km 2mi + _ Nanles Large scale terrain Kingsport' Bristol Johnson City' 3 Winston -Soler Knoxville' ti h•1t Nlit&rell rk�}l1 ', 1Asherille NORTH C Charl t •Greenville lookm SOUTH CARD 6 mi V Large scale map Johnson City i � mston� f to f 100km —. Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 3/4 I::iNIMI ] Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.4347&Ion=-82.5374&data=depth&units=english&series=pds 4/4 APPENDIX 6 PRE -CONSTRUCTION DRAINAGE MAPS & POST - CONSTRUCTION DRAINAGE MAPS r O N 00 r) C6 n a a w w 0 a z ry 0 n U n 06 U) w I` I O 0 0 r) Q U 0 N z CD W r) N C0 H O J z Y Q n J Q O T_ O O i J Q O O It z O U al O NT H U w O PRE -CONSTRUCTION Basin Total Area t&CI I mperv. Grassed Grassed Gravel (HSGB. Gravel HSG A. C CN Tc min HSG A, (HSGB, 0.95 98 Lot B) 0.20 39 Lot A) 0.30 61 Lot A) 0.50 85 Lot B) 0.50 76 Pre Al 13.2 6.1 6.6 0.5 0.61 79 7 Pre A2 0.4 0.4 0.30 61 5 Pre 131 1.7 0.4 0.9 0.4 0.46 63 5 Pre 132 0.4 0.4 0.20 39 5 TOTAL 15.78 6.53 1.27 7.01 0.42 Note: Parking Lot B is no longer included in this project. Lot B will be a future project so please do not review the sections relating to Lot B. >or 001, sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 80' REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER APP. B1 r O N 00 r) C6 I a a w w 0 a z ry 0 I U I1 06 U) w I` I O 0 0 r) Q U 0 N z CD W r) N C0 H O J z Y Q I J Q O T_ O O i J Q O O It z O U al O NT U w POST -CONSTRUCTION Basin Total Area AC Imperv. Grassed Grassed Gravel HSG B. Gravel (HSG A. C CN Tc min (HSG A Lot B) 0.20 39 (HSG B Lot A) 0.30 61 0.95 98 Lot A) 0.50 85 Lot B) 0.45 76 Post Al 13.5 8.5 5.0 0.5 0.73 88 7 Post A2 0.2 0.2 0.30 61 5 Post 131 1.7 1.0 0.7 0.64 73 5 Post 132 0.4 0.1 0.3 0.39 54 5 TOTAL 15.78 9.60 1.02 5.16 0.00 Note: Parking Lot B is no longer included in this project. Lot B will be a future project so please do not review the sections relating o Lot B. DETENTION I BASINS I NON -DETENTION BASINS 1-Year Pre- 1-Year UndetainedPost- Detention Drainage Post -Construction Construction Flow Achieved Basin Flow cfs cfs Drainage Basin 1-Year Pre- Construction Flow 1-Year Detained Post- Post -Development Development Construction Flow cfs Increase cfs Increase (%) cfs Al 26.3 24.1 -8.3% yes A2 0.2 0.1 0.1 131 0.9 0.7 -21.2% yes 132 0.0 0.0 0.0 >to". --" sheville 0000 REGIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION -AuENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 80' REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER APP. B2 APPENDIX C EROSION CONTROL SHEETS & DETAILS, STORMWATER MANAGEMENT FACILITY SHEETS & DETAILS (INCLUDING POND AND OCS DETAILS), & PIPE PROFILES rn r 0 N lit 00 0 0 C� w 0 z a 0- 06 U) w 0 0 a U 0 N z C0 w 0 N U) H O J c� z V ry a J a 0 0 0 lit a 0 0 lit O U a� 0 lzt U) w O ry GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA ;Env" ironmental Quality ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 0 0 0 0 NM aw.) 0 0 ES SAHNDDAGS trip.) SD.T �p�--� � �� I OR STAPLES 0 0 0 0 0 0 0 t. CLEARLY HHARIGM SIO AGE NUTDLG DEVICE arX04' HIM ASFOR &Atl. SECTION A -A LLOCATION DETEROED IN FZLD L THE CONCRETE WASHOUT STRUCTURES SHALL LE HADRADED WHEN THE L WOO MGM SOLD REACHES 7SX OF THE STRUCTURES 3IOICRETE WASHOUT STRUCTUE HEEDS TO BE CLEW HATED WITH SIGILIIGE NOTING DEVICE. I: � : H : TI�I�i•�� TI�iiil a� AHN.ES PLASTIC TmN RYPJ 77 4 �SANNNAGS CTYPJ 119= LR STAPLES L ACTUAL LOCATDDL OETERNm III CLEARLY HHARIOU XIGNAGE FRU P�r HOTDJG DEVOTE C10'X24• IOL> LTHE CONCRETE WASHOUT SONJCTIOES STALL BE NAWAI EO WHEN THE Liam ANIRM SOLID IRE ICHES 7DX OF THE STRUCTURES CAPACITY TO HMOWI•E ADEWATE HOLDING CIPACRY WITH A HOORM PLR U DOES OF FRIaOMU. 3AU CRETE WASHOUT STRUCTUE HEEDS TO SE CLEW HARIED WITH SOINAGE HOTIM DH:VICE, ABOVE GRADHOr E WASHOUT Tn SCALE STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 1111111/,,,� C A Q 019 O 'f0 .......... DAVID A. SKURKY, P.E. NC SEAL #040195 >to- -I s0 hevi e REGIONAL AIRPORT SERIES AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AuLICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-01 O� r 0 N 00 0 0 C� w I- O 0- 0- 06 67 w I 0 0 ij a U 0 N Z (7 W w 0 N U) I- O J C� z V ry a J a 0 0 0 J a O O z O al 0 IZI- i) I-_ C) w O PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. NORTH CAROLINA Environmental Quality l_1:4mill SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment e Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated . A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated . Within 24 hours, an oral or electronic notification. bypasses [40 CFR . Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance . Within 24 hours, an oral or electronic notification. with the conditions . Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 IIIIH/// ,,,, CAR 1k q� ; L9� DAVID A. SKURKY, P.E. NC SEAL #040195 >to- -I s0 hevi e REGIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION L.- .W0IIIIIII1`1 ASHEVILLE REGIONAL AIRPORT ASHEVILLE NORTH CAROLINA RI® mar o KEY PLAN PARKING LOTS EROSION CONTROL NOTES NO. 2 PARKING LOT A & B ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-02 rn 0 N c� 00 Q J d 0- 06 w 04 o_ CD a N z w c) N U) H O CD z v a D_ J a 0 0 0 lit a O 0 lit O a� 0 lzt U) H U w ry a M �w bd S& Jitidsb JO b M, 9L's. 90`� o �� c M \ '� �sz o co TEMPORARY s�s DIVERSION TO ® EXISTING \ � � � \\---------------' DROP INLET, � � \ CONTRACTOR TO � ��\ • � � SEE DETAIL ENSURE SEDIMENT GDP \ DOES NOT FLOW ONTO / ♦ alb, �-------------- -- SHEET ES-07 AIRPORT PARK ROAD � o i CE l_ '� • - MATTING BLANKET 4tb6A2.4 .. WATTLE TO BE INSTALLED / ; ON STEEP SLOPES ALONG EXISTING DRIVEWAY. ♦--- --------------- - NEAR DI A2.3 _y CONTRACTOR TO ADJUST AS 1 NEEDED TO AVOID Lon CONSTRUCTION TRAFFIC Art / EXISTING 12" CPP A CT INLET SEDIMENT TRAP LW Lon Lob Epp CHECK DAM �: , ♦ DI A2.2 `�b� OCK C CK DAM TS DI A2. (707 LOD FROM DAMAGE ------------ TO BE REMOVED o '� - ' // ; /'/; / ,DC lb S" DC TS i s , % J/ a _ EXISTING INLETS TO BE �o ��o MATTING BLANKET / , /, / /� / M ABANDONED �N , 1 Q z ON INTERIOR POND `� ; ; ; ��; / , I ; 1 ci 9 �, ----"� -- SLOPES - - i i'/i / /i 17 g ` ,' /�' / INLET SEDIMENT I I I EX 4A '� i/' v / f E \ �� \ TRAP Ab COY / / / INLET SEDIMENT ;�� /� / ,/ / /� ,� TS -- INLET SEDIMENT 1 1 I - _ / I TRAP, SEE 1 , ` � 1 1 no n°_� / I— - __� - . I' ` '. TRAP / / / �, �, ��_ / / N ES 07 7— no g •-'`�—_=_`�� ?� ',' 1 /' ;` ---- - �`, _ _ DETAIL 0 8 / n° ono- �� ♦ OLD ��f-_ ---- 30 " EX C � TS , PS / 2 — \ _ _ _________ �/ _ ,-\' / Ile` � c � a �� �nD n°� - 3 ___ MP __ ,_ °`' ,, �; ,, - \ ��\ CI A3.1------____ _24" HDPE' ` n° lam_ - _ A1.1/ / - _ �, — _ _ I - �" X CMPi - RR _ _-- `i �,; - _ -24" HDPE _ ® ♦ `� ��s� �� �Ca` ten° �,,.° � � _ ��=r� ,y'��� ,� 1 #1 _ __ RR _ � ---- CI A3.3 _--___ � SF .. ---- ---- _ � Epp OCK CHECK AM p _-- ---------------- --- Lon SF�� PS i� _ % `_;'���- �o _ � -- -- --- _—ems- ass —cis—ors——a►s-�a�--�--� ��c�==�_=�xs—� ♦ a ----_,��_____ _- ------------------ _ -__ -- _ "F°� __ - �1on w CE----------- - -- -----------= — — Z_t SILT FENCE WITH TEMPORARY �� ---- = �- — = = -� — — --`' ---- -�� " _ ° --° —°� _ • SILT FENCE WITH ' -GRAVEL AND RIP = _ REINFORCED STABILIZED DIVERSION TO BAFFLES ` 1 - - _ __� __ RAP INLET - - , _ _°- - REINFORCED STABILIZED - - __- -_ �� - �� -- - OUTLET (TYP) NEW wrum LONG PORT ROAD A��1 / ;# a&& ° ON ES-07 10 RIGHT-OF-WAY pER ONTRACTOR NOT TO 'I1n _T pR JECT REFERENCE # 1-5501 SHEET q STORMWATER POND Al TO ALSO SERVE AS AFTER FINAL EXCAVATE NEAR THE GAS LINE � SEDIMENT BASIN WITH STABILIZATION .�\ ; \ CONTRACTOR TO CLEAN `� �\ INSTALL PERMANENT J BAFFLES AND SKIMMER OUT SEDIMENT TRAP ��' GRASS IN OLD DRIVEWAY AND GRADE TO FINAL a LOCATION ONCE PROPOSED CONSTRUCTION CONDITIONS ENTRANCE IS REMOVE ES&PCP LEGEND North 0' 15' 30' 60' GRAPHIC SCALE IN FEET ..... INLET SEDIMENT SILT FENCE ... TRAP, BLOCK AND SF — SF— GRAVEL LIMITS OF DISTURBANCE GRAVEL LOD LOD LOD CE CONSTRUCTION TEMPORARY DIVERSION ENTRANCE 1 ROCK CHECK DAM DISTURBED AREA TS STABILIZE WITH TEMP. SEEDING RR RIPRAP DISTURBED AREA SKIMMER pS STABILIZE �- WITH PERM. SEEDING - EXISTING CONTOUR 1.0 FT INTERVAL DC DUST CONTROL 888'J PROPOSED CONTOUR 1.0 FT INTERVAL WATTLE TO BE INSTALLED ALONG EXISTING DRIVEWAY. CONTRACTOR TO ADJUST AS NEEDED TO AVOID CONSTRUCTION TRAFFIC FROM DAMAGE EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 3. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE FOR ALL EXPOSED SOILS FOR THE DURATION OF CONSTRUCTION. 4. INSTALL CONSTRUCTION ENTRANCE (CE). 5. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN. 6. ON -SITE INSPECTION BY INSPECTOR TO APPROVE PERIMETER EROSION CONTROL DEVICES. 7. PROCEED WITH GRADING. 8. CLEAN SEDIMENT BASINS WHEN ONE-HALF FULL. 9. REPAIR OR REPLACE ALL EROSION CONTROL MEASURES AS NEEDED. 10. SEED AND MULCH DENUDED AREA, AS REQUIRED, AFTER FINISHED GRADES ARE ESTABLISHED. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER ESTABLISHED. 12. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. 13. REMOVE ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. — ,.- LOT A LIMITS OF DISTURBANCE: 3.1 ACRES g,q, j g ENSURE SEDIMENT DOES NOT FLOW ONTO NEW AIRPORT ROAD \�\\\\\%0I I III///I / �N CAR /// GUI III', 11100\ 9 • 1 DAVID A. SKLIRKY, P.E. NC SEAL #040195 >fro- e e REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-03 rn 0 N CO 00 Q J d 0- 06 w CV 0 U 0 N_ z W w 0 Ill U) H O J z v ry a D_ J a 0 O O J a O O z O U a� 0 11:71- U) U w ry a 1ilarth !,,Piro Carolina --' /A \ I db db / A, 411111 / I I I 1 I i j I I I I I 6 I I cp / � I I ` ------------------ / / \ `4-------------------------- / I— — — — ----- ' LOD t�D LOD LOD LOD -vu - LSD — — CONTRACTOR TO 8 _ PS , ---_ __------- --- _ -- - -- �/- -- ENSURE SEDIMENT \ CE ---- _ ------ DOES NOT FLOW ONTO AVIATION WAY 88r North 0' 15' 30' 60' ;\� \�'O `,� 8 M GRAPHIC SCALE IN FEET I oa `\\\;; \ b` 44 ` `� `�� 1 ss� N.\\' \ \ `` O I 111 /r'`� � y,O,O�d 1 I 1 I 1 1 N 11 ' "i /' DU au 1 � OU � Uu \ I 1 I♦\ l \ _ o N/S\ by O au au all all \_ \ \ <01 AFFLES MATTING BLANKET �,r I APPROX. 12 FT - ON INTERIOR POND �, LONG LOD SLOPES ODLOLOOE— LOE,LOLOLO LOD EDIMENT BASIN \ - TS `\ ` WITH SKIMMER ��--_----------- \ \ \ ``\\\ IN, \ IN, i \\ ``\ �� \\\ RIPRAP �? - � �------------ . ^ ` SPILLWAY `. ❑ DC- I � h WATTLE TO BE INSTALLED $ SFSF LOD - —-sue- - - -��- -_-�, - LOD ------ ----- / \`-----_'f ALONG EXISTING DRIVEWAY. z ?o ��; __________ z, - _ _ - - - - - _ - - -- -- o_ - - - - - CONTRACTOR TO ADJUST AS Zz "�,2 _,-------------------------------------------_--______= - - -� __-_-''" _____ =____----------� _,_------------------_ --------------- -------------" ----- r--------------- , --- NEEDED TO AVOID = _ - - _ L--yL CONCRETE�� — — — -------------------------- CONCRETE ---- CONCRETE i (� CONSTRUCTION TRAFFIC CRO sWAL1% Y - _ _ _ _ _ o b' FROM DAMAGE �S INLET SEDIMENT Will o ��6 ^ TRAP O z mF WRIGHT B f INLET SEDIMENT / _ TRAP ES&PCP LEGEND ..... INLET SEDIMENT SILT FENCE ... TRAP, BLOCK AND SF — SF — GRAVEL LIMITS OF DISTURBANCE GRAVEL LOD LOD LOD CE CONSTRUCTION TEMPORARY DIVERSION ENTRANCE 1 ROCK CHECK DAM DISTURBED AREA TS STABILIZE WITH TEMP. SEEDING RR RIPRAP DISTURBED AREA SKIMMER pS STABILIZE - WITH PERM. SEEDING - EXISTING CONTOUR 1.0 FT INTERVAL DC DUST CONTROL 888'J PROPOSED CONTOUR 1.0 FT INTERVAL EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. SOFT DIG UTILITIES WITHIN GRADING AREA TO IDENTIFY POTENTIAL CONFLICTS. 3. MAINTAIN NPDES TEMPORARY SEEDING SCHEDULE FOR ALL EXPOSED SOILS FOR THE DURATION OF CONSTRUCTION. 4. INSTALL CONSTRUCTION ENTRANCE (CE). 5. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN. 6. ON -SITE INSPECTION BY INSPECTOR TO APPROVE PERIMETER EROSION CONTROL DEVICES. 7. PROCEED WITH GRADING. 8. CLEAN SEDIMENT BASINS WHEN ONE-HALF FULL. 9. REPAIR OR REPLACE ALL EROSION CONTROL MEASURES AS NEEDED. 10. SEED AND MULCH DENUDED AREA, AS REQUIRED, AFTER FINISHED GRADES ARE ESTABLISHED. 11. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER ESTABLISHED. 12. REQUEST FINAL APPROVAL BY CONSTRUCTION INSPECTOR. 13. REMOVE ALL TEMPORARY SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. LOT B LIMITS OF DISTURBANCE: 0.99 ACRES 5F _goo ■ ■ •GRASSm ' 1 I � \ Lp 1 I `:------ a \ \ \ c0 _ N C it -E'T E III � �w"II 2 N ^" N " Sc T H E R S A Y CONTRACTOR TO o l' ENSURE SEDIMENT DOES NOT FLOW ONTO I I WATTLE WRIGHT BROTHERS WAY Y Rh c FARO ' U lip DAVID A. SKURKY, P.E. NC SEAL #040195 OR ■ s evi e REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMJ ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-04 O� CD CV 00 J a H W Q 0- 0- 06 07 W I 0 a U N_ z (D W 0 N_ 07 H O J z V ry a J a 0 T_ 0 0 J a 0 0 III O U al 0 U) H U W O Ir a- 11 3'-0" r-�llil-ll= 11 � �11=11=1L=11 11=k'IAl f, 1=11 11 � III-II-II-11 I=� (=11�11=11- 11 TI`�11- SIDE STEEL T POST ,—WIRE FENCING (18" TO 36") SILT FENCE FABRIC (36" MIN WIDTH) WIRE OR PLASTIC TIES (3 MIN) FILL / /- SLOPE 8 8" MIN, COVER OVER SKIRT (SEE NOTE 2) T WI I, TIE MIN. 14 GA. FENCING EXISTING GRADE LIRE FENCE SILT FENCE ��r.�.irnyrn NOTES: 1. SILT FENCE MUST BE PLACED 18" (MIN) FROM TOE OF SLOPE. IT CAN NOT BE USED TO HOLD BACK FILL MATERIALS 2. BOTTOM 12 INCHES OF SILT FENCE MUST BE BURIED. PLACE IT IN A TRENCH 8" DEEP AND 4" WIDE 3. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW OR IN A STREAM BED. City of Asheville, NC Standard Specifications and Details Manual i_ 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER I1 SILT FENCE /- WIRE FENCE. 14 GA. II / MIN/6" OPENING MAX II STANDARD TEMPORARY SILT FENCE FRONT VIEW MAXIMUM SLOPE LENGTH AND SLOPE WHICH SEDIMENT FENCE IS APPLICABLE* SLOPE SLOPE LENGTH FT MAXIMUM AREA SO FT <2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 * TABLE INFORMATION TAKEN FRON THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DETAIL 6.62A. ttVIJIUNJ ISTD. NO. DESCRIPTION GRAPHIC REP. REVISIONS 7.01 50' MIN. NOTES: 1. THIS ENTRANCE APPLIES ONLY TO ENTRANCES FOR COMMERCIAL SITES. 2. FIRST 5' MUST DRAIN AWAY FROM THE STREET (MIN Y4" PER 1' FALL) o - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. FLOW FROM PROJECT SHALL NOT ENTER THE PUBLIC STREET. o o o 4. FABRIC MAY BE ADDED UNDER THE STONE WHICH WOULD ADD TOTAL LIFE TO 3 0 0 0 0 0 0 0 0 0 0 THE CONSTRUCTION ENTRANCE. Q 25' OR WIDTH OF < oRAILROAD BALLAST STON� o PROPOSED 0 0 0 ISET z GREATER. oU oU In Ld o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLAN REMOVE CURB AND GUTTER NEW CONSTRUCTION - EXISTING ROADWAY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6" MIN. CROSS SECTION City of Asheville, NC COMMERCIAL REVISIONS STD. NO. DATE DESCRIPTION 7.03 Standard Specifications CONSTRUCTION ENTRANCE and Details Manual STANDARD TEMPORARY SILT FENCE (SEE STD. 4' MAX. DETAIL 7.01) HORIZONTAL BRACE WIRE OR PLASTIC TIES (5 MINEnnis I I=III-1 I1=1I I I I=11I_I I I-11 � I� I�-1 / j �� III-1I I-1I �I I I-1I1=1I I-1I1-1I H"-1I1=1I1=1I1=1I I� I C I �I I CI I CI I I-1I C� I �I I I�,I I1-1I L "� I �I I1=1I I LI I I-1I I �I I �I I CI I I- CI I I-1I �I I iII-1 �I�I�I�III `� -III-II�I�I 1II-III L-III-III�I�I�11-III-III-III Ian- - ,_III -III ;III-u�II-II -III III I I I -I III -I I1-"'-" I I I -I I I�kl=1l r ��ITII o II=III=1 I-1T=1 _III-T TTI IIII III �11-1�1-[�-1T r�Fl IIIITI IITTIIIL_1lT iTI i WIRE FENCING = STEEL T POST T=I T1L1TL ll�T-II-1_-1_ -11I-III I-III-1 =1I �I I- I; I1=1 III 11 I=1I I-1I 1=11 I�IF 11=11 =1' WIRE OR PLASTIC `I_II-I 111=111- -III RIPRAP SPLASH _III =1TI1. v1-1_II_ 1=III- i=111�1 I�=111�IH_II- STEEL T POST TIES (5 MIN.) TI=11�F PAD-IIII-I HORIZONTAL BRACE "=T= 5' MIN. FRONT VIEW SILT FENCE FABRIC NOTES: (36" MIN WIDTH) 1. SET FABRIC HEIGHT AT 1 FT MAXIMUM BETWEEN SUPPORT POSTS SPACED NO MORE THAN 4 FT APART. 2. SET OUTLET ELVATION SO THAT WATER DEPTH CANNOT EXCEED 1.5 IT AT THE / LOWEST POINT ALONG THE FENCELINE. 5' MIN. RIPRAP SPLASH 1' MAX. 3 INSTALL A HORIZONTAL BRACE BETWEEN THE SUPPORTPOSTS TO SERVE AS PAD AN OVERFLOW WEIR AND OSUPP RTTOP OFFABRIC. 4. PROVIDE A RIPRAP SPLASH PAD AS SHOWN ABOVE. EXCAVATE FOUNDA11ON - � I� I I I=1I 1=1 I1=1 I1=1I 1=1I 1=1I 1=1 I1=1 I1=1 � 1=1TI=1TI=� FOR THE SPLASH PAD A MINIMUM 5 FT WIDE, 1FT DEEP, AND 5 FT LONG ON 911I II�II I=III=III=III=III=III=III=III=III=III=III- LEVEL GRADE. THE FINISHED SURFACE OF THE RIPRAP SHOULD BLEND WITH 1' MIN. 1-11MME =1TI=1 I1=1I=1TI=1I 1=1TI=1TI=1I=1TI=1 1=' :II=I I II. =III=ITT-IT=III-III=III=III-III=III=1' SURROUNDING AREA, ALLOWING NO OVERALL THE AREA AROUND THE PAD -III-III-ITT-ITT-ITT-III-III-III-III I' i=1=1Ti-11Ti-ITi=1TI lI1-rILl=1Tl � MUST BE STABLE. -IIi o o ��ll�_-I illl_il= 5. DIG A V-TRENCH IN THE LINE OF THE FENCE AS SHOWN ABOVE. 6. AVOID JOINTS, PARTICULARLY AT LOW POINTS IN THE FENCE LINE. WHERE r�1 ="'- "=III=III- _ �Ik�l-III-III-IIH11= JOINTS ARE NECESSARY, FASTEN FABRIC SECURELY TO SUPPORT POSTS AND �I III -III -III -' =III -III OVERLAP TO THE NEXT POST. ITT=III-' 7. TO REDUCE MAINTENANCE, EXCAVATE A SHALLOW SEDIMENT STORAGE AREA ON UPSLOPE SIDE OF FENCE WHERE SEDIMENTATION IS EXPECTED. PROVIDE GOOD ACCESS TO DEPOSITION AREAS FOR CLEANOUT AND MAINTENANCE. SIDE VIEW City ofAsheville, NC STANDARD TEMPORARY SILT FENCE WITH REVISIONS STD. NO. DATE DESCRIPTION 7.01 A Standard Specifications and Details Manual REINFORCED STABILIZED OUTLET WOODEN STAKE WITH WATTLE ANCHORED TO THE TOP FILTER FABRIC 12" DIAMETER STRAW FILLED WATTLE OR DITCH LINER WITH POLYACRYLAMIDE (PAM) APPLIED AT A RATE APPROVED BY DWQ AQUATIC TOXICOLOGY UNIT DITCHLINE NOTES: 1. WATTLES SHALL BE FILLED WITH STRAW OR OTHER APPROVED '�i�\�\\� i\\i�`` MATERIAL 2. POLYACRYLAMIDE (PAM) MAY BE APPLIED AT A RATE APPROVED BY PROFILE VIEW DWQ AQUATIC TOXICOLOGY UNIT. 3. SPACING FOR WATTLES SHALL BE DETERMINED BY THE SITE ENGINEER. 4. WATTLES MAY BE USED FOR 12" DIAMETER STRAW FILLED WATTLE PROTECTION OF CATCH BASINS AND FASTENED TO WOODEN STAKE BY NAIL DROP INLETS WITH APPROVAL BY OR STAPLE THE STORMWATER SERVICES WOODEN STAKE MANAGER OR DESIGNEE. DITCHLINE FILTER FABRIC OR DITCH LINER FLOW 6" COVER 8" FABRIC STAPLE 18" 18" City of Asheville, NC REVISIONS STD. NO. DATE WATTLE DETAIL Standard Specifications 7.05 and Details Manual >fro_ s0 hevi e REGIONAL AIRPORT AVICON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT &INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 m1111Joo,,\ DAVID A. SKURKY, P.E. NC SEAL #040195 SHEET NUMBER ES-05 O� CD CV (0 CD J a w 0 0- 0- 06 U) W I 0 a U N_ Z (D CO w 0 N U) H O J 0 z V ry a J a O O O J a O O III- O U al O vJ I- U LLI O Iry 13- SIDE VIEW 1.5' TOP ELEVATION OF STORMWATER 2' MAX AT CENTER 1'�I FILTER FABRIC WASHED 12" OF #57° 1 MAX. STONE EXISTING SLOPE CLASS B RIP -RAP 4' TO 6' EXISTING SLOPES Ir 9" MIN 1.5' ' 5 1 ��III 'III_ - # 57 WASHED STONE 1.5' =1 1 II T_ T-n TllF - II�II-111i�LlL� NOTE: HEIGHT & WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. FRONT VIEW FILTER FABRIC City of Asheville, NC Standard Specifications CHECK DAM REVISIONS STD. NO. DATE DESCRIPTION 7.07 and Details Manual POND Al POND B1 A: 13.5 AC A: 1.72 AC REQUIRED VOL: 23,400 CF REQUIRED VOL: 720 CF 1 PROPOSED VOL: 53,000 CF PROPOSED VOL: 2923 CF BAFFLES SPACED: 20FT APART BAFFLES SPACED: 15FT APART EMERGENCY NOTE: FOR 10 ACRE MAXIMUM DRAINAGE AREA SPILLWAY y y W MINIMUM L/W RATIO: 2:1 V V V V y y MAXIMUM L/W RA110: 6:1 y y y y y y y y V V y V y i V y y y y y y y y y V V V V V y J Y y MINIMUM DEPTH: 2 FEET y y y MAX DAM HEIGHT: 5 FEET y y y MIN DEWATERING TIME: 48 HOURS V V V V STORAGE VOLUME: 1800 CF/ACRE + y y y y yyy Porous Baffles y y y y (Section 6.65 y y y DENR Manual) yyy y PVC VENT PIPET V V I V V INFLOW - 1-�IOU LET V y y CLASS B W W SKIMMER (SEE COA y RIP -RAP V V V V V V V V V DETAIL 7.09a) y y V V V V V V W V y y V V y PLAN VIEW V V y y V V CLASS 8 RIP -RAP DISPERSION PAD DESIGNED BY ENGINEER EMERGENCY MIN 1' FREEBOARD SPILLWAY —III=I �—�-III-I NZONE-� DEWATERING I I I EMBANKMENT I I I I I (_ FILTER FABRIC 111-III-I i I i —- - - - - - - - SEDIMENT STORAGE ZONE __ =�IITCE1` CROSS—SECTION L---JSKIMMER MAY ALSO BE USED WITH APPROVED STRUCTURES City of Asheville, NC Standard Specifications SKIMMER SEDIMENT BASIN REVISIONS STD. NO. DATE DESCRIPTION Wns REV. MIN. DEWATERING T ME 7.9 � and Details Manual /J POND Al POND 131 SKIMMER SIZE: 8 IN SKIMMER SIZE: 2 IN ORIFICE DIAMETER: 6 IN ORIFICE DIAMETER: 2 IN DEWATERING: 1 DAY DEWATERING: 1 DAY FASTENING DEVICE FOR THE DEWATERING UNIT 0 DEWATERING 0 UNIT 000 000 01 PVC END CAP O OUTLET PVC PIPE WITH Y2" HOLES (TYP) IN UNDERSIDE 0 Y2., HOLES (TYP) DEWATERING 0 IN UNDERSIDE TUBE/ARM AIR -TIGHT SCHEDULE 40 ASSEMBLY PVC "C" ENCLOSURE PVC VENT PIPE O 0 O NOTES: ** SKIMMER ORIFICE SIZE IS DETERMINED BY **ORIFICE PLATE STORAGE VOLUME OF BASIN AND DESIRED DEWATERING TIME. SEE TABLE 6.64b OF THE NC PVC TEE ROPE TO FREE SKIMMER IF DENR EROSION AND SEDIMENT CONTROL LODGED ON BOTTOM OF BASIN PLANNING AND DESIGN MANUAL 3" SCHEDULE 40 PVC: MINIMUM SIZE ALLOWABLE FOR THE CONSTRUCTION OF SKIMMER. FLEXIBLE SCHEDULE 40 PVC HOSE PIPE OUTLET City of Asheville, NC REVISIONS STD. No. DATE DESCRIPTION SKIMMER DETAIL Standard Specifications 7.09A and Details Manual C A R A DAVID A. SKURKY, P.E. INC SEAL #040195 11_s evi e GIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-06 O� CD CV (0 00 0 J H w 0 0- 0- 06 C) w I 0 a U N_ Z (D w 0 N_ 07 H O J z v ry a D_ J a O T- O O a O O III- 0 a of U) H w ry PLACED IN FRONT OF OCS Al, OCS 1131, AND EW A2.1 NOTE: GRAVEL & RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED TO SECTION THRU BASIN FILTER AND CULVERT PIPE PROTECT EXISTING PIPE INVERTS THAT DRAIN 10 ACRES OR LESS. RIP RAP HEADWALL FLOOD STORAGE ZONE �1 3 _— - DISTURBED AREA —_ 2 -11 — — NATURAL GROUND 7 PIPE INVERT (CUT, FILL, ETC.) I _' M - _ Z - I=1 qk �� ---- 1-III 40pE � t� - 4I - - y- iN FLOW . ----------- - 1T �Tl�i T—LL — — III _ _ — — -�I ''-I--�` TI1=1 1=1 1=1 1=1-I 1=1 1=1 1=1 1=1 SEDIMENT STORAGE 1.5' MAX DEPTH — CLASS B RIP -RAP (CLEAN OUT POINT) #57 WASHED STONE � � ' . I- � � � ,::..: • - . �.•. � � �.. � . � -III-III- _. >:::-.•�''": .; •: •:: �;:. : '' = 1 I 1=1 11=1 11=1 I I -I I I-, I- _- I I- I = _I I -_= I-1 :. �.::�':.:�.'�::�..::.::•�,� ��'��`��������T: I I' -_I-I � �— III -I I1=1 I1-1I I -I III -III III=III III -III -I I I_I III-III-1 I L-III-III _ RIP RAP HEADWALL I. III=III-III=1 -=111-I I_ -III I1=111 :.. Li, AND CONTINUATION =111 11=111 11=I1,- OF RIP RAP BERM----III-- i � 11=I I 1=1 I I-1 I I —I I M DISTURBED AREA WITH1-'� -MAX SLOPE OF 2:1-I �' ' ' '�� III 1 III III 1 III III -III III (CUT, FILL, ETC.) =1 1-I 1 P11=1 I-III-11-1 1-I-I 1-I 1-I 11=11 I- "�" •�- I I 11-I 1 I-1 I I-III-III-III-1 I 11- - I,-, � I -III-, = I-1 � -III -I ."::��.' :. �. �� ��_ ��� -1 � -I � -I � III -III -III -III -III -III- :' ' •.� _ :: _ _ _ rttI11-1tt-ttl rt 1-III=1I1=, FLOW �?��_ I � 1-1 � 1-1 I �-1 11-1 I �-� 11=III :'"•� :� ,•.: �.`'. ,, : �= 1=II 1=1I a III -I 1-I 1-11-1 1-1 I SEDIMENT STORAGE -`>_ ^� _^o r„ _ -III -III -III ��" �- � _- I--II-III-III-11I-1I I I I III-III=1 11- - .• ���� �_ _������ I -III -III -I � 1-I 1 I -I 11-I I I-1 I I-11 I -III= I I' _ -111_1II=1I1=1':�.. `•. � . • � � -1 I 1-I 11-III-I 11=11 I-III-1 I 1-I I 1-1 I 1-II1- r - _�� -1II=1l1=III=1 � 1 >.: �, �•'�: •', ;:.. '� 1=1I1=1I1=1 � 1=1I1=1 1 1=1I1=1I1=1I1=1I1=1IF I_II- _ -III- III-III� =1 I —III -III -III -I - _ #57 WASHED STONE=1 1=1 I- -III=1 I I=1 I I- �•��; :::'.:.;::•: - �:•'t', �'�. •. '��� I=1 I I-1 11=1 � 1=1 11=1 1I- '=III=III-III-���>; �� ����•'•���•��•�� •� � •• J=III=III=III-III=1'' ;III -III -III- ��.� :���.>~:::• .�:,.:•. -III-III- I i , i„i 1- III -III- = ..... • ' - 1- 1=1 City of Asheville, NC GRAVEL &RIP RAP REVISIONS STD. NO. DATE DESCRIPTION 7.10 Standard Specifications PIPE INLET PROTECTION and Details Manual CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL —„—III=III—III—III—III—III—III—III—III—III-11,- SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X —III—III—III—III—III—III—III- (- -III—III—III—III—III—I 1 ,- —III— 4 WOOD STUDS THROUGH BLOCK OPENINGS. 1-1111-11 M. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENINGS OVER ALL I I 1 III- BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. - — -- 3. USE CLEAN GRAVEL, 3/4- TO 1/2-INCH IN -111 -III=III DIAMETER, PLACED 2 INCHES BELOW THE TOP OF NO N■ - THE BLOCK ON A 2:1 SLOPE OR FLATTER AND -III- -III- = SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED ■ - I —III- STONE IS RECOMMENDED. I I -III -I -III-I 11= -11�=III= ■ j=_III-_ I I I 1=1 -III-I I 1=1 11= ■ < 1=1 11= II1111 ■ IIIIIIIIII WIRE SCREEN -1-I -III-1 TEMPORARY SEDIMENT I —III_ ■ —III—_ POOL DEWATERING -III-I � ■ IIIIIIIIIII �IIIIIIIII�, � ° , a 1' MIN. a ° = � = I �' ■ = � = I -I 2 =III -III -III- ' MAX. A-------- - = -----------a ------ I_-III- 1I- =1111=11 Ili 1 I I -III-' -1 11 I I-11 I-111=111=1 11=1 I E. ° a - ' 1 I-III-1 I I=1 11=1 11=1 I I SEDIMENT =1 I I=1 I I-III=1 I I=1 I I=II I -III- I=1 I I-1 I I-1 I I-1 I I= 11=1 I I=1 I I -I 11- -1 I I -II I -II I -II I -II I -II I -II I -II I -II I -II I-III=1 I I-III-III-1 � 1- ' - 1 i 1-1 I I 1-11IM11=III=III=III=III-III„1 11-111=1 11-1T1= City of Asheville, NC BLOCK AND GRAVEL REVISIONS STD. NO. DATE DESCRIPTION Standard Specifications and Details Manual INLET PROTECTION 7.11 A 2� �— STEEP CUT OR FILL SLOPE -III II =III=III= 2:1 SLOPE (MAX) 1=1 11= I I' -Illllllilllll� STABILIZE DIVERSION DITCH CROSS SECTION WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING UPSLOPE TOE POSITIVE GRADE 1.0% MAX. z IN SIDE SLOPES 2 : 1 (MAX.) STEEP CUT OR FILL SLOPE PLAN VIEW City of Asheville, NC Standard Specifications and Details Manual DIVERSION DITCH REVISIONS STD. NO. DATE 7.04 Rp'''%,,, A DAVID A. SKURKY, P.E. NC SEAL #040195 >fro- 11-s evi e GIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 I UNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-07 O� CD CV r 00 Cn J a w 0 0- U w 06 07 w �I 0 >D U 0 N Z CD W w 0 N_ U) H O J Z V a J a O O J a O O Z O U a I O U) 1— w ry - TEMPORARY SEEDING SCHEDULE 13 Temporary Seeding P rY g Installation Seedbed Apply soil amendments evenly and incorporate to a depth of 4-6 inches, Preparation if possible. Follow recommendations of soil tests or apply 2000 lb/acre ground agriculture limestone and 700-1000 lb/acre 10-10-10 fertilizer. Loosen surface just before broadcasting seed (reference Practice 6.11, Permanent Seeding). Plant Select an appropriate temporary species based on the calendar in Figure Selection 6.1Ob. Avoid seeding in December or January. If necessary to seed at these times, use rye grain and a securely tacked mulch. J I F I M I A I M I J I J I A( S O I N I D Mountains Above 2500' Below 2500' — 3 — — — 5 — — — 4f Piedmont - Coastal Plain 4 2 Recommended Plantings Legend 1 Korean Lespedeza with .............................. 50 lb/acre Rye Grain .................................................. 120 lb/acre 2 Kobe Lespedeza with .................................. 50 lb/acre Rye Grain .................................................. 120 lb/acre 3 German Millet or .......................................... 40 lb/acre Sudangrass................................................ 50 lb/acre 4 German Millet .............................................. 40 lb/acre 5 Rye Grain .................................................. 120 lb/acre Figure 6.10b Calendar for scheduling temporary seedings. 6.10.2 PERMANENT SEEDING SCHEDULE 6.11 Seedbed ■ Apply ground agricultural limestone, unless a soil test indicates pH Preparation 6.0 or greater. If a soil test is not available, use a rate based on soil texture: Coarse textured: 1 - 1 1/2 tons/acre Fine textured: 2 - 3 tons/acre ■ Apply a complete fertilizer at rates recommended by soil tests. In the absence of soil test, use the following as a guide: Grasses: 800-1200 lb/acre of a 10-10-10 analysis fertilizer (or equivalent) Grass -legume mixtures: 800-1200 lb/acre of a 5-10-10 fertilizer (or equivalent) ■ Incorporate lime and fertilizer to a depth of 4-6 inches by disking or chiseling on slopes up to 3: 1. Do not mix lime and fertilizer prior to application. ■ Fill in depressions that can collect water. Where mowing is planned, continue tillage until a uniform, finely pulverized seedbed is achieved. Jan I Feb I Mar i Apr i May i Jun i Jul I Aug i Sep I Oct i Nov I Dec y Tall fescue (above 2500') c Tall fescue (below 2500') Tall fescue (low maint.) c 0 E Tall fescue (high maint.) m a" Common Bermudagrass Tall fescue mixture c a Hybrid Bermudagrass ul Common Bermudagrass 0 0 Centipedegrass _ Optimum Possible Figure 6.11 b Calendar for permanent seeding recommendations by region. 6.11.3 B I _-I I I- I—� I — IIIII IIIIIIIIIIIIIIII-III III M III — II _ ITil�l=30' —III 10" II III 4 II IIIII �10 =III 1-IIIIII 10" IIIIIIII _ c 6 -III—III =III=1 STAPLE CHECK MATTING IN DITCHES 4 10" 10„ 4" 30' B Staple ^� Check -- ----- MATTING ON SLOPES 18" EXISTING (MIN.) GROUND BACKFILL 6" (MIN.) STAPLES ON 1' CENTERS IN TRENCH �— 6" MIN MATTING SHALL BE STAPLES ON PLACED IN TRENCH 1' CENTERS AND BACKFILLED IN TRENCH GWGRA,M U 6 3' Staple X X Iv 3' x DLAGBP,PA (B) Staple Check Pattern 4" 99 Staple 4 Permanent Seeding 13 Fertilization Satisfactory establishment may require refertilizing the stand in the sec- ond growing season. ■ Do not fertilize cool season grasses in late May through July. ■ Grass that looks yellow may be nitrogen deficient. ■ Do not use nitrogen fertilizer if stand contains more than 20% le- gumes. Table 6.11 a Tolerance, Maintenance, and Propagation Characteristics of Erosion Control Plants Mainte- Region Drainage Planting Tolerance nance c c _ •• p — 0 ca c (con c ca ` N0c- E C a) 0) S CD$ a c LL Grasses -IZ�o 2 E 8 a.A 0rncn2H -9 Bahiagrass • • • • • • • • • • 14-28 000 • Bermudagrass (common) • • • • • • • • • • 21 000 • Bermudagrass (hybrid) • • • • • • • • • — • • • Centipedegrass • • • • • • • • • 28 • • • Fescue, tall • • • • • • • • 5-14 • • • • • Fescue,red • • • • • • • • • 7-28 • • • • • German millet2 • • • • • • • • • • 4-14 • Kentucky bluegrass • • • • • • • • • 10-28 • • • Redtop • • • • • • • • • 5-10 • • • Rye grain • • • • • • • • • • 4-7 • Sudangrass • • • • • • • • • • 4-10 • Legumes Crown vetch • • • • • • • • 14-21 • • Kobe lespedeza • • • • • • • • • • 5-14 • • Korean lespedeza • • • • • • • • 5-14 • Sericea lespedeza • • • • • • • • • • 7-28 • • 'Number of days required for majority of seeds to germinate under favorable conditions. 2 Also "Foxtail millet" 6.11.6 z oco Q Q Iz—i�C='SV U_ _J O O O = wQ¢U= Q U = 00 W U_ 0 J OOU)Q z H � :1 0-1--I W 0 1 0 = O Z U O 0 H z Q J J � Q Q y 0 Z Q (D /� C Z F-I 0 a o � NOTES THIS DETAIL APPLIES TO STRAW, EXCELSIOR, COIR FIBER MAT AND PERMANENT SOIL REINFORCEMENT MAT (PSRM) INSTALLATION AND AS DIRECTED. STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1 INCH AND NOT LESS THAN 6 INCHES IN LENGTH. NOT TO SCALE SHEET 1 OF 1 1631 .01 *CONTRACTOR TO COORDINATE EXACT GRASSING SPECIES WITH LANDART 0195 �p: DAVID A. SKURKY, P.E. NC SEAL #040195 >fro- sheville REGIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ASHEVILLE REGIONAL AIRPORT ASHEVILLE NORTH CAROLINA o �® o KEY PLAN PARKING LOTS EROSION CONTROL DETAILS NO.4 PARKING LOT A & B ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMM1 ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-08 0 CV r 00 0 J W 0- 0- 06 U) W �I 0 0 a U N z W 0 U) O C� z V a D_ J a 0 0 O J a O 0 z O U a� 0 U) U W O ry 0- Pracfice SianelarM and S�pef �'flradans Baffles need to be installed cor ectl, In order to fully provide their benefits. Refer to F1 moire 6.65h and the :kllo win gr Ley points: * The baffle material nee& to be sec»ed .aft the bottom .and sides 116 Most of the sediment - will aecuAlate M the fiat bay, so this should be rear .accessible for maintenance. 0wo baRe rnaxKWI overwlr-e main -rand urewft, plastic ties at posts and on wke emy 12" 1� Gauge M, in High Tension W IimStrand 5 N I W SKIU red To Porst Tb Support e Material i! ;a rail a Material • { If tha tc-rnporary sediment basin wi11 be converter to a perry a nen t 5to rmwater basin of gr•"ater depth, the baffle height -should be brmpd on thopool depth dLiflng ose Asa tors porary aril basin. Not . I rista11'thir {3) coir fi to Habits i n basi n at 1Jralinage outlets with a spacing of 1Y4 the baI n IE!ngth. TwVr, I2'I coif f Ller baNe5 car? Lse ir- .ykdIled In t ho basins 1;2-b� iIIar120 ft. lin longth witl`b a Spacirlig of 113 tl c. basin losLng 11. Extend 9gKiuge wii e to W iiiii side or initall T-p st to anchor k ffilo Co s I d P of hz and Preto werrical reost Variable Depth SQLc L,r-P hnttorn of baffle to gr'onnd with 12' staples at 1Z rnwdrnum spacing. I�la�#eflal l _0 Al L d Fjjrkc 5t apla s t baffleMaterial shoold be wured to the bottonn and skWs of Hasin using 12 y Landscape staples Figure B. 5b Cain Finer Baffle Detail Cross section of a porous Raffle in a sediment basin. OUTLET W/DITCH OUTLET W/0 DITCH D CLASS RIP RAP CLASS I RIP RAP CLASS RIP RAP CLASS I RIP RAP TONS GEO- T S V=LE S.Y. TONS GEO- T S.Y- =LE TONS GEO- T S Y=LE S.Y. TONS GEO- T S Y LE 12" 2 5 5 2 5 1 4 2 1 4 15" 2 7 7 3 7 1 5 3 2 6 18" 3 10 9 4 10 2 7 4 2 8 24" 5 14 15 7 15 3 11 7 4 12 30" 8 21 21 11 22 5 16 11 7 17 36" 11 28 29 15 30 7 22 16 10 23 42" 15 37 39 20 39 10 28 22 13 30 48" - - 49 26 50 - - 28 17 38 54" - - 60 33 62 - - 36 21 47 60" - - 73 40 75 - - 44 26 56 66" - - 87 48 89 - - 54 32 67 72" - - 102 57 104 - - 64 38 78 4 X D z O � �} Q )) 0 0 Z�=U 0 O o0U)=z QLL LU O� ------- ° =~zLU (nHLLOJ D �• 000W< H 0 — — — — — — — W r-I T 0 V�------- ' 0 1------- NOTE: 4 X D FOR CALCULATION PURPOSES _ _ _ CLASS 'B' RIP RAP = 100 LBS. /FT3 W ° 0�1 CLASS I RIP RAP = 105 LBS./FT3 ° J 2 X D �° O O 0�LL D IL /4 a a PLAN o Q 0 D SLOPE 1 %2 : 1 OR FLATTER �� Q a ° Q U) IL 1 � H D Q DC 0 2 �° T P LAN Q O LL GEOTEXTILE oOC SECTION A -A° T G PIPE OUTLET WITH DITCH ° �0 0 c� H= RIP RAP TO TOP OF PIPE (MAX. H = D + T) GEOTEXTILE T= 15" CLASS I RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS SECTION B-B T= 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS SHEET 1 OF 1 PIPE OUTLET WITHOUT DITCH 876.02 Rip Rap Calculations RR ID ID No. D0 (IN) La (4*D) (FT.) Ws (2*D) (FT.) Wz (6*D) (FT.) dso (IN.) T (IN.) Area (Sy) #1 A1.0 30 10 5 15 8 12.0 11.1 #2 A2.0 18 6 3 9 8 12 4.0 #3 A3.0 24 8 4 12 8 12.0 7.1 #4 B1.0 15 5 2.5 7.5 8 12.0 2.8 CA L DAVID A. SKURKY, P.E. NC SEAL #040195 >fro_ s0 heville REGIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO.I DATE I BY I DESCRIPTION 1 18/20/19 IWMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER ES-09 Riffle rn 0 N r_ C>D 0 Z J D_ w ry 0 C/)I 0 a 0 N Z w 0 U) H f0 V Z v a J a 0 0 0 J a 0 O z 0 a� 0 IZI- U) U w ry a I! M bd 1� SS Jitidsb 00 b M„ "`t."s� u 91 EZ 90 i� w 4�• cV -- //s SOS` _ `\\ \ ---- ----- 0RECONSTRUCT A2 DROP INLET \----------- i DI A IV Cp, 4L. DI A2. /------------ ---' / L _ 2 0 mow, o 1 North 0' 15' 30' 60' GRAPHIC SCALE IN FEET \ \ 1 3+0 / n C? — EXISTING 12" CPP TO %, ' / CI A2.2 4+00 BEREMOV J ------ Z UT o / i i i i i i M A2.1 CC). - i \i ` 6+00 00 EX A1.1 B ,� f ---------- '� l f // EW A2. \ 36" RCP WITH PIPE COLLAR Cg HiR - =DRIV.9, a i - k i i Ali /i \ `; // CONNECTING OCS TO EXISTING `\ / / / ,� f o �er#r`c / k�� _ _ c\ I , // /, / I ----- ' — _ i AVOID no�no_ / r-g�/ - ___ -�__ ,' k//i /��// % % N ' ��� ` S !NG GA.S LI�`�E.j Tno�no / _i__OLD_==______ 30"EXCMP 18' RC / ��/ �ii �/ 2130--� / 8 a �� b C �no,no / / '` - '0_qa__ CI Al C���'— �_ \ ��` CI A3.1 24" HDPE / �� \ n0— �— ---__ - MH A1.1 ' --------:/i- �____ _- ____---- _ .- CI A3.2 \� \` \ 30" EX C i/l 'i;--- ---- _ - `\ - - 24" HDPE ® lay,C no. __fi-fr/ �H--'MP — — — _ � DPE + CI A3.3 � ,\ / --- \` -- / :l ` _ ------_— ------- - /-------- - _--------------------------- " -" ��% / / I,1- `�,_ OCJ A \ 1 -- --- _ __ — — — — — — ------------------- \ — — — — — __ j/ _ _ �� _ \ _ _ —dI GAS � — — — — — — — — _ - ---- / //[/ (— — — -ram' — ——oA6 _ --���_ - --- — — — — - - ib +b-- - --___-�__--- -----------,--------�/ /�%ram~u�= --------Q=�n------°�S"7�o� / times ox�w+6 ___a►c�--a►s -- er►e--°ns-- -a- -c--------- - - —--=�___-- 8 '� —-------r/--UFQ—��—� —�UFo— UFO— ff11$�t SOAR __ _— _ -----__Z ____=_''�--___- w.�_== ��_ — — _ _ _T�--------------------------- - —na — - non- =rc� - _ =- MANHOLE RAISED FROM IN _____----__--- _/ -- - !� - NEW Al --------�a aer+cr ORT ROA \\; \\ a , I �,� a&e- EXISTING DROP INLET 2.1 FT, 100 R HT-OF-WgypER \ 25YR PONDING ��� ���' SEE INLET ADJUSTMENT DRY DETENTION TREFERENCE#1-5501 HEETq `� �� ELEVATION DETAIL ON SW-04 POND Al, SEE I DETAILS SW-06 ��� \\ (2136.6) MINIMUM 1 % GRADE FROM ALL ENDWALLS TO OCS STORMWATER LEGEND— Fai PRECAST CONCRETE CATCH BASIN 1 CONCRETE DROP INLET 1 PRECAST CONCRETE J ENDWALL EXISTING PIPE X-X=K EXISTING PIPE REMOVED ® PROPOSED PIPE OUTLET CONTROL STRUCTURE 'Al', SEE DETAIL ON SW-06 a'b 4 _ CAR E 1.:I:ql ZZ DAVID A. SKURKY, P.E. NC SEAL #040195 >fro_ ■ s evi e 0 REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER sw-01 0 N 00 0 Z J a w ry O c/)I 0 (D a U 0 N_ z w 0 U) H O J z Y ry a J a 0 0 0 J a 0 0 mi- O U a� 0 IZI- U) U w O ry a 0 —STORMWATER LEGEND— Fai PRECAST CONCRETE CATCH BASIN WCONCRETE DROP INLET 1 PRECAST CONCRETE J ENDWALL EXISTING PIPE X-X-K EXISTING PIPE REMOVED ® PROPOSED PIPE IN 11-2 11 �n 2 cvCO ? C) North 8 Z o GRAPHIC SCALE IN FEET 41 4111 /� __� I _ ti 1 �� ` S I // �'L O yC\� � �y OU � OU O 013 OU ou ou O <01 ---------------- '�----' % / � `\ \ \ � \ � � � � 25YR PONDING ---------- �—----------- / ; \ `\ `\ \ s ELEVATION ---------------------- ------- DRY DETENTION ---_ -_-- J \ ,,I- --- _-__ POND B1, SEE— _------- ------- --- DETAIL ON SW-07 1) I(( I-1111 `� / —�-+�� -----/ LJ i___ — — — — — — — — — -- �~— ------------- �s �— ss— sslip—Moss— ss-_ 1 IL pO \ _________ _____- 7--------- -----'"-- _---------------------- -- �—----------IrRcp --- --T—' --- ------------ ------------------,W�------------------------------- a h � z2 WRIGHT BROTHERS WAY --sS ----ss�—'--ss —0"i INTO EXISTING CATCH BASIN 5FT WIDE 1 FT DEEP SPILLWAY AT s ELEVATION 2165.1 ;S B \ \ yy 1 \ OUTLET CONTROL � STRUCTURE'B', SEE nA DETAIL ON SW-07 _ er S \ EX CI II , - N 22 iPPPIII""' CONTRACTOR TO SAW CUT SIDEWALK AND REPLACE AFTER 1 m PIPE INSTALLATION AA 10R "///IIIIIIIII\ 0 DAVID A. SKURKY, P.E. NC SEAL #040195 >Iro- -"" ■ s evi e 0 REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-02 CA O N 00 0 Uj W w LOL v) I LO 0 U 0 N_ Z W 0 U) 0 z V ^a LL J a 0 0 O mi- a 0 O mi- O a I O U) H U W ry 0- SHALLOW TYPE (5 FEET OR LESS IN DEPTH) INTERMEDIATE TYPE (4'X4') DEEP TYPE (5'X5') (5 FEET TO 20 FEET IN DEPTH) (OVER 20 FEET IN DEPTH) STANDARD a ° 36" °.. ,REINFORCED STEPS 16" REINFORCED ON CENTER--------_36 CONCRETE a ;. s CONCRETE SLABSLAB ,d 6„ 36 ° ° STANDARD STEPS 16" ON 48 STANDARD STEPS 16" 60" ^� ° PAVED INVERT--.. 1 CENTER a ON CENTER °`. 6 r 6„ PAVED INVERT 1 nA ° MIN. < °< 1 MAX PAVED INVERT 6"J .' ° a MIN. 6" NCDOT #57 STONE BEDDING 6' ,;, " ' . ._. 6' FRAME, GRATE & HOOD PER D.O.T. STD. 840.03 MIN. 6' NCDOT #57 MIN. 6" NCDOT #57 STONE BEDDING FRAME, GRATE & HOOD STONE BEDDING FRAME, GRATE & HOOD PER D.O.T. STD. 840.03 PER D.O.T. STD. 840.03 - 26"- NOT TO EXCEED 5' REINFORCED CONCRETE SLAB c r-C,N REINFORCED CONCRETE SLAB ° �_26"- ` 6„11 g 7, MIN. ' ^26" <a 6„ 60" OVER 20' M IN. MIN. 6" NCDOT #57 ° 4 STONE BEDDING 6"� .. ........ 48 n FROM 5' TO 20' 6" MIN. 6' MIN °., . NOTE: 1. CONCRETE SHALL BE 4000 PSI MIN. FOR ALL PRECAST ' "a ?"' 6" g CONCRETE CATCH BASINS. 2. PRECAST CONCRETE STRUCTURES MAY ONLY BE INSTALLED TO DEPTHS CERTIFIED AS ACCEPTABLE BY THE 6"� . _ .... ti.. .. MANUFACTURER. \MIN. 6" NCDOT #57 SLAB DETAIL MIN 6 NCDOT #57 3. "WAFFLE" (KNOCK OUT) BOXES ARE ACCEPTABLE FOR STONE BEDDING STONE BEDDING SHALLOW TYPE CATCH BASINS WITH MAXIMUM 30 INCH DIA. PIPE ALLOWED. SLAB DETAIL 4. ALL STRUCTURES 4' OR DEEPER SHALL HAVE ACCESS STEPS. STEPS SHALL BE INSTALLED 16" ON CENTER. f SLAB THICKNESS AND 6 SLAB THICKNESS AND 36" REINFORCEMENT FOR 5. EACH DRAINAGE STRUCTURE SHALL HAVE A PAVED INVERT 6„ REINFORCEMENT FOR 72" 26 J SOIL AND TRAFFIC WITH A MAXIMUM 5:1 SLOPE FROM THE INVERT OF THE PIPE 60" `36 SOIL AND TRAFFIC LOADING BY AN TO THE WALL OF THE STRUCTURE. 6. APPLY NON -SHRINK AROUND PIPE. 26"� LOADING BY AN ENGINEER ENGINEER 7. HORIZONTAL, RISER, AND BOXES MUST BE SEALED WITH BUYTL RUBBER JOINTS. City of Asheville, NC PRECAST CONCRETE REVISIONS STD. NO. DATE DESCRIPTION 6/9/15 REV. 12" O.C. TO 16" IN DETAIL Standard Specifications 8.03 and Details Manual CATCH BASIN #4 BARS "V"® Ix- 6EQUAL SPACES 4'-6" FRAME,ATE 33 PER D.O D.O.T.T840 03HOOD " " M M F #4 BARS � #4,U ®S EQUAL REFERENCE POINT FOR EXPANSION JOINT 6' EQUAL SPACES PLAN SPACES STAKING PLAN (SW-1 1) CURB & GUTTER WITH CATCH BASIN ON STEEP GRADES 3" 3" TOP ELEVATION USE ON FLAT GRADES 2% &UNDER X PLAN OF TOP SLAB SECTION S-S s" EXPANSION JOINT 3' 3' 1 5" ELEVATION #8" JOINT 8 "W" BARS NORMAL CURB &GUTTER ON LIGHT GRADES #4 BARS #4 "V" BARS ® 12" TOP ELEVATION EXPANSION EQUALS SPACES - 6" USE ON GRADES OVER 2% g" 1.5" - #4 "U" BARS 6" 10" MAX" DEPRESSED GUTTER LINE SECTION R-R DOWEL 1 s' ELEVATION NORMAL CURB & GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN (BASED ON MIN. HEIGHT, H, WITH NO RISER) * DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU. YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U BARS-V BARS-W TOTAL LES. TOP SLAB BOTTOMI SLAB TOT. CONC. FOR MINIMUM HEIGHT, H D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH C.M. R.C. 12" 3'-0" 2'-2" -- -- 2'-9" -- -- -- -- -- -- -- -- -- -- 0.235 0.772 0.015 0.026 15" S-0" 2'-2" S-O" -- -- -- -- -- -- -- -- -- -- 0.235 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" -- -- -- -- -- -- -- -- -- -- 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" -- -- -- -- -- -- -- -- -- -- 0.235 1.001 0.059 0.085 30" S-0" 2'-2" S-4" 4'-3" 1'-2" 4'-0" 4 1'-5" 2 S-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 36" 42" 3'-0" S-0" 2'-2" 2'-2" 3'-10" 4'-5" 4'-9" 5-3" 1'-8" 1'-5" 4'-0" S-2" 4 4 1'-11" 1'-8" 3 2 3'-9" 2'-11" 3 3 3'-9" 2'-11" 43 32 0.161 0.122 0.358 0.318 1.714 1.738 0.132 0. 0.178 City of Asheville, NC Standard Specifications and Details Manual PRECAST CONCRETE CATCH BASIN DATE 180 0.243 235 0.317 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER 297 0.401 FOOT HEIGHT REVISIONS STD. NO. DESCRIPTION 8■03A I Y PLAN WITH GRATE & FRAME REMOVED (oI SEE NOTE WEEP HOLES J BRICK COPING(INCIDENTAL) TOP ELEVATION - STD. 840.16 FRAME - & GRATE A 1 1 6" SECTION X-X co DOWEL(SEE NOTE) GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. PIPE THIS SIDE - 18" SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. coNGR TE FGH MINIMUM HEIGHT, H C.M. R.C. 12" T -0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" 2'-3" 0.648 0.023 0.036 18" 2'-6" 0.703 0,033 0 0049 24" T-0;' 0.814 0.059 0.085 30 3-0 2-0 3 -6 0.222 0.222 0.925 0.092 0,127 DROP INLETS TO BE USED ON: A2.3, A2.4, A2.2A '" ^r-^^BSSION SECTION G-G SECTION H-H 1 %2 rr T\ 15/8rr ��15/8rr 0 co - 0 --- - O N � O O II u N fl LO 1'-4%2" 1'-4%2" T 1'-75/8rr 1 r-7/8rr PLAN OF GRATING CAST IRON 1/8 it 1/8 rr 1 rr 1 rr 3'-33/" 1/8 II I 3 „ 3 rr I 1/$ rr _ / 3r 2rr 2/8" 3'-13/" N N 3'-6" SECTION E-E 1 #4 BAR N 6" DOWEL E -A F -� PLAN OF FRAME CAST IRON REFERENCE POINT FOR STAKING PLAN (SW-1 1) /8 F? 1/8 it /I, �/lI 2'-2" 21/8rr 2'-13/rr N N 2'-6rr SECTION F-F O � L' W (D J �Z-I Z LU CL Q ~ H CL IL O � O O C0 � 0 Q Z) Q W = I-- ~ cn W } N T Z � O O Q SHEET 1 OF 1 840.14 z O CD Qa rZ- Cr CD LL..-i Z OOCn= WQZL.L QUCrOH H CnH-�O J 00Cncr 1 LU O o LID r W o o o LL z �a C H Q T Q Z o � Q � OD W cf) < CD z LPL O Q , OLLI H } J Cn < Z x Q O a [r O w Cn � O O LL. SHEET 1 OF 1 840.16 DAVID A. SKURKY, P.E. NC SEAL #040195 sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 ITUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ASHEVILLE REGIONAL AIRPORT ASHEVILLE NORTH CAROLINA o �® mar o KEY PLAN PARKING LOTS STORMWATER DETAILS NO. 1 PARKING LOT A & B ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-03 rn 0 N rn 00 0 J H w w a O I- C/)I LO O_ >(D a U N_ z w 0 N U) I- O C� z a D_ J a o_ O O J a O O ml- O a 0 I U) I- w ir a v z m v� o� H z 43" NOTE: USE TYPE "E", "F" AND "G" GRATE =� Q Q > -1 0 UNLESS OTHERWISE NOTED. coN PM\ S/ P H U Ii -rz�=> B r 00co= =BOO 21/$rr ,21/$n QU�OH z�0r-" _ _ _ _ _ _ N-� N CD F- Lo_j n 0 z = o o 1-4 SECTION - LL SECTION - MM O 0 1-4 Q >> oo - z Cr V M A A ALIGN FRAME WITH INSIDE 13/8" �O I- H CA H EDGE OF WALL TO ALLOW O CL O T , W 0 Z O o o FOR VERTICAL ADJUSTMENT o. L err r\ p WALL SECTION--------________,,. SECTION - BB B SECTION - PP SECTION - NN PLAN 411 z FRAME, GRATE, & HOOD ASS'Y J a 3/ rr N oc 0 s7 `� `�' LL _ Q m m H 6rr 2'-0" Err v = " 2 rz O -I U z 3'-0" �� 14rr �r Z Q D cn a�) �\ - 13_v K K ,4D N N L M �NQ ULU Qomy (A p SECTION - AA �, z Q v" vLQ pC H > Z L L z = 0 Z J FRAME PLAN SECTION - JJ � W O D ids" ids" 3 - 0 /g 0 u) Cl)0 =� - — — — — R— — 3rr R 1/2rr LU L LL 6'r Err 1 /2 -Olf 6" 3/ rr T T � 2 T 3%2n 31_011 3i.2rr 3/rr O3�„ —J Y 11 r SECTION - KK r T 1 2'-11/2' 4/g" SHEET 1 OF 2 R r,840. EET 1 OF 2 840.03 HOOD ELEVATION SECTION - RR 03 v vm H � DETAIL SHOWING TYPES OF GRATES D 0 0 USE ACCORDING TO WATER FLOW. H r0TI�Cn ImiZ�=D _ > m TYPE "G" TYPE "E" TYPE "F" z Cn o 0 = m z"-V , r- • ,Q Q H > DD - WATER FLOW SAG E WATER FLOW E C H V 0 o -171 ------------------------------------- 0 -n M m z - WATER FLOW - SAG -E WATER FLOW F C 0 � r m m Cn H 0 %m = TYPE "Fr' TYPE "E" TYPE "Gr' z Cn CD -A > n z P z -1 0 RAISED FLOW ARROW 23/4" N v %6" HIGH v Z11/2n \ co\ 0 z /-/$ rr > D O Q' O 1 rr 1�2CD Mr, H 1/2rr 13/r, F /8 z 2'-113/4rr �I i.'1/2 It 11/2rLI—] �—t/8rr 13/4" SECTION A -A SHEET 2 OF 2 TYPE - F 940.03 2'-113/4" 13/4rr 21/4rr SECTION A -A 23/4 rr 1 %2 " rr '� I 9%g" I 0/ it 1%2rr 13/4 rr SECTION B-B z 00 H QQ H = m V LL.JaHz 0065m LU oC z QU�OIOi Cl) H LL-0 0 Ci Q M , >Lu °c _I O O ii cc L Q O H m CD z _ = TYPE - E inQ Q U 9 RAISED FLOW ARROW 3 Q 0 /6 HIGH 2 U) Q D W 0 Q z 413 r\ z Q T T Q oC Cl) r z m .10 a1/$" co\ H W w 9 13/ rr CD T 1 1/2"R rr w LPL 2'-113/4" 1 %2 rr f� TYPE G T 1/g O LL 11/21r 7z8 n SECTION A -A SHEET 2 OF 2 840.03 2 4" Iv PIPE BE 1 /2 0 611 M 12" 1 �, I vvvv� vvv� I �I 6" BIKE LANE FRAME, GRATE &HOOD PER D.O.T. 840.03 6" BIKE LANE EXISTING PAVEMENT EXISTING PAVEMENT GENERAL NOTES 1. FRAME, GRATE AND HOOD ASSEMBLY WILL BE DOMESTIC STEEL PRODUCT 2. WHEN WARRANTED GRATES WILL BE TYPE E OR BICYCLE SAFE TYPE F AND TYPE G PER NC DOT STD. DETAIL 840.03 PAGE 2 OF 2. 3. CURB AND GUTTER WILL BE CONSTRUCTED WITH 4000 PSI CONCRETE 4. ANY SUBSTITUTION OF GRATE TYPES OR VARIANCE OF CONSTRUCTION PRACTICES MUST BE APPROVED BY THE STORMWATER SERVICES MANAGER OR APPOINTED DESIGNEE. City of Asheville, NC CURB INLETS FOR DATE REVISIONS DESCRIPTION STD. NO. Standard Specifications and Details Manual �+ 1 8 � � & 2 4„ CURB & GUTTER 18.051 CURB INLETS TO BE USED ON: A1.1 C, A2.2, A3.1, A3.2, A3.3, B1.1 i n" i n" WHERE WATER IS NCOUNTERED IN 24" MIN. -RENCH, PLACE 3RANULAR MATERIAL -0 TOP OF PIPE - DR AS DIRECTED. PIPE BELL JSE #57 STONE 1 /2 O.D. 6" MIN. PIPE BEDDING N.T.S. PROPOSED FINISHED GRADE "I�L 12" MIN. o CUT AND REMOVE EXIST. STRUCTURE WALLS AS NEEDED TO PLACE NEW LID AND CAP AT PROPOSED ELEVATION. 1211 1 1 1211 GENERAL BACKFILL 6LEC�ED ��ACKLY WHERE WATER IS )AN0 'PLACEb 'AN ENCOUNTERED IN TAMPEb/ TRENCH, PLACE GRANULAR MATERIAL TO TOP OF PIPE OR AS DIRECTED. COMPACTED SAND OF SANDY SOIL PIPE BEDDING DETAIL FOR POND OUTLET PIPES N.T.S. 1 NEW MANHOLE LID J ° NEW 3500 PSI CONCRETE °�° STRUCTURE CAP 00 #5 REBAR, 2-FT LONG MIN, 12" n C-C, EPDXIED TO EXISTING CONCRETE EXISTING INLET INLET ADJUSTMENT DETAIL N.T.S. 1. STRUCTURE MAY BE CAST IN PLACE OR PRECAST 2. WALLS SHALL BE REINFORCED WITH WIRE MESH AT 0.2 IN. SQ./FT. 3. CAP SHALL BE REINFORCED WITH #4 REBAR AT 12" O.C. EACH WAY.- WIRE MESH MAY BE SUBSTITUTED FOR #4 REBAR AT 12" O.C. AT 0.2 IN.SQ/FT. C AR q INE ..• .� DAVID A. SKURKY, P.E. NC SEAL #040195 >fro- ishev le REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION 1111i.- ASHEVILLE REGIONAL AIRPORT ASHEVILLE NORTH CAROLINA o �® "MI o KEY PLAN PARKING LOTS STORMWATER DETAILS NO. 2 PARKING LOT A & B ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-04 O� O N C� 00 0 J W cl ry w H a ry 0 W Lo I 0 0 b a U cl N_ z W W 07 H 0 z Y a D_ J a o_ O J a O O lzt 0 a I O 07 H W 12' v v m �a r-I Z 70000 r � n cf) m1-4 z =� _ m D y m V =000 Z" Or --I O �DDD 0 O ' Z w m O Z �-qm� c n m > O N cn O z 7=D Z v C N m v - � v m > m , Z Z Sao o CD m r SHEET 1 OF 1 838.80 W1 (FT.) ELEVATION W2 (FT. D 6" ] F 1'-0" 0 I I H1 I I - 1o" ---- io 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE Hw ID PIPE DIA. Al .0 2.5' A2.0 1 .5' A3.0 2.0' �y ;0 1.25 H2 Err 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE A T M1 M- NOTES: * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.213 838.27, 838.33, 838.39, 838.51, 838.57, 838.63 AND 838.69. * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. * USE 4000 PSI CONCRETE. * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. * PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR * ALL ELEMENTS PRECAST TO MEET ASTM C913. * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. * CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ B" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.5 #5 @ 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.0019.25 13.50/15.75 5.0 #5 @ 8" 4.50/5.00 1 7.00/8.50 3.25/4.00 1 7.25/9.25 1 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 #5 @ 8" 4.50/5.00 1 7.50/8.50 3.25/4.00 1 7.75/9.25 1 14.75/16.75 3 W cn J Y O J LL O 0 3 rn H Z Q W a cz d �= QUJ cm z Z = � O 1- In N x H O C4 W JaCD 0 V fZI ZLu W Ccc O LL HEET 1 OF 1 838.80 m v NOTES: INSTALL ALL STEPS PROTRUDING 4" FROM INSIDE FACE OF STRUCTURE WALL. z O� O < Z STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED H Q Q �-I 70000 THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. Z== mZ�=D,r ooc=Z x-n>>m L� HUQox 1" Q C7 =(ADO z,�-0rTl 1r, Hx Zw 00,E n=�Z - rn cnWO_I D . Dcn °�'"JI\I+T m 00cAQ a:_m z O _ cmn-o Z I 1� I Q PLAN SIDE PLAN LAN SIDE ELEVATION per, m \7 N r �Z � =CL r- W m r - � �' 1 0' I _ r -' N > _ '� CAST IRON CAST IRON z ELEVATION ELEVATION W m 1 �� 0 � 1 /s„ C.± 1 „ 83/4 rr T - y 11/4 „ #6 BAR OR #8 BAR = cc 0 v rn 1/rr GALV D . Z H Q m N \ �a � I 1 ` CW'3 N Z -n P LAN POLYPROPYLENE SIDE PLASTIC J N C7 ia„ �2 - ELEVATION COMPOSITE PLAN SIDE ELEVATION w Z *12" P=7777� cnl REINFORCING STEEL ELEVATION NOTE: #3 DEFORMED 12 DO NOT USE IN STEEL ROD SECTION A -A `�' ELEVATION SANITARY SEWER MANHOLES. SF HEET 1 066 1 5840 HEET 1 Q66 840 v vm �� I-i ' Z =(J)0CD ro„�� Im-I z --I= D =-nzym =(l)C5O z-ar�I 60- C*)DDD -< � U F-I O z w 10 m a m a0 r F-I 1 = N � r rn --imD x C D co N v v �z� m v F-I Z 0) 0 v 0 m m 840.52 v v m H � I -4. Z 7o CD 0 r0m�O Im-I Z x D =oZDm =(A=O ZF,-0r-I 0 0 H c7DDD f� No z aZ z� O O r = mcn m--1 � v D m v a� z v> Z 0 m0 840.54 GENERAL NOTES USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS ACCORDANCE WITH AASHTO M199. ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" FROM THE TOP TO THE BOTTOM OF THE MANHOLE. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF BOTTOM SLAB. THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE THINNEST PORTION OF THE TOP/BOTTOM SLAB. * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS A DISTINGUISHABLE TOP AND BOTTOM. 'D' + 2 'W' 1" MIN. ADDITIONAL CLR. #4 REBAR _, 1" MIN. USE MIN. AREA OF STEEL IN TOP CLR. SLAB OF #4'S @ 8" CTS. EACHWAY/EACH FACE *. FLAT TOP SLAB ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE PLACE BARS DIAGONAL TO CORNERS (TYP.) 'I1 1 1 -IL- -II 11� = JL - ,I FRAME AND GRATES STD. NO. TRAFFIC BEARING 840.37 NONTRAFFIC BEARING: 840.22 840.24 840.20 840.29 B40.33 GRATED INLET OPTION A L_ ALTERNATE CONE SECTION D W T As INTERNAL DIAMETER (FT.) MIN. WALL THICKNESS (IN.) MIN. TOP/BOTTOM SLAB THICKNESS (IN.) MIN. CIRCUMFERENTIAL AREA OF STEEL PER VERTICAL FT. (SQ. IN.) 4 4 6 0.12 5 1 5 1 8 1 0.15 6 1 6 1 8 1 0.18 ,Zr-Orr GRADE RING I I v a MIN. AREA OF STEEL .p IS 0.07 in .2 ECCENTRIC CONE ---i LOCATE WALL REINFORCEMENT IN MIDDLE THIRD OF WALL ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE) FRAME & GRATE i D- 14 I �1 ,0 At PLAN OF FRAME MANHOLE OPTION RISER SEE STD. 840.54 FOR MANHOLE RING AND COVER 6" MAX. SPACING OF CIRCUM. R/F N STEP STD. NO. 840.66 As (CIRCUMFERENTIAL REINFORCEMENT) LONGITUDINAL REINFORCEMENT '. e ,D, W, z---BASE r U REINFORCED CONC FTG. (SEE STD. 1525.01 IF •,P;:i?'...•<;:: :o • .n • : ' ':e .' ?',..•0';:: P'.• '�' - - USE MIN. AREA OF STEEL -� I REQUIRED) _ ~ I IN BASE SLAB OF I I _ _ _ _ _ _ 0.12 in PER LINEAR _ _ _ _ _ _ , FOOT EACH WAY TYPICAL MANHOLE SECTION SOLID COVER SHOWN PERFORATED. PERFORATED AVAILABLE IF SPECIFIED. STATE USE OF SYSTEM ON COVER (I.E.: SEWER, STORM DRAIN, ELECTRICAL) TOP OF COVER B BOTTOM OF COVER REFERENCE POINT FOR STAKING PLAN (SW-1 1) 2'-11/4" 1'-113/4 1'-10%8" 1" / TYPE #1 \ / ~ ALTERNATE e, 43,trr 2'-01/2„ 2'-91/4" \ SECTION A -A TYPE #2 PLAN OF COVER 1' 111/2" M 7 3� " I II r 43/4 rr 1 '-105/8" SECTION B-B MANHOLE STRUCTURE TO BE USED ON: A2.1, MANHOLE _LID_ TO BE USED ON: All MINIMUM WEIGHTS LBS. FRAME 180 COVER - 120 TOTAL - 300 z oN < Q<Q � FZ-I OC O V LL -J 1 -I Z O O N x WQQWx QUpCOH H N Q O � Q z j= 1 a,fn WD r 0 cc W W = 0 O LL C co Z LIJ " 0 D- Z ac a a 0 _ 0 Lo co CC n z Q W Ix- c J T O T I --I J Q a Z W CA V cc 0- HEET 1 OF 1 840.54 C A R CN INE ... ' DAVID A. SKURKY, P.E. NC SEAL #040195 f0 ro- shevi e REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-05 rn r O N 00 c� 0 vj _J W 0 IY W a ry 0 1- W I u7 O_ (D a U N_ Z (D W W 0 N_ 0) 1- 0 CD Z v ry a _J a O O O J a O O z 0 al 0 U) 1- w 0 ry ...J 1 L/I tlL ULL.J L.J 11 tlV SECTION X-X (SEE SIDE VIEW - GRATE DETAIL) N.T.S. Tnnc-11 nnn1, nrn111RED ON TOP OF STRUCTURE. BE APPROVED BY THE (,.nNgTPIIrTinN SFF TRASH PERT. E.F. PERT. E.F. AGE DETAILS '-2" CTS QED ENTRANCE -LOW ­-AM.- EXISTING 36" OUTLET PIPE 1 8" E. W. I Ur & BOTTOM 1 2' MMWWdIN0�WEW WAWAII\\rJ SECTION Y-Y N.T.S. DIAMETER DIAMETER B1 DIMENSION F DIAMETER ELEVATION B B2 WIDTH D ELEVATION A ELEVATION B1 (PVC STAND ELEVATION D ELEVATION E (HEIGHT OF DIMENSION G DIMENSION H (OUTLET PIPE) ) (POND (DRAWDOWN (WEIR) (OUTLET PIPE) (ORIFICE) PIPE) (WEIR) (TOP OF RISER) RISER) (IN) (IN) (IN) BOTTOM) ORIF.) (in) (in.) (FT) (in.) 2129.5 1 36 1 2129.5 1 2129.5 1 27.0 N/A 2133.0 1 18.0 2136.5 1 7.0 60.0 1 72.0 2161.0 1 15 1 2162.0 1 2162.0 1 6.0 4.5 30.0 42.0 v z m O O DSO= < < . �mCD M --I CD ���'-'z I�z�=> OOP= =-nDDm HUQ0 = 0 oco0 =-0 0 rn E S~Z L�U "Z. O'-' ^--------- -- � cnH OJ0 0C/)> �� ---------- -- - � <y � � N1-- I_4 Z �P E E V EXIST. PIPE i PROP. PIPE D r o I OS�ty - - - - - - - - - - - - - - - - - - - - - - - - - m F CC O r O7 E Z S r-1 oC cn m D SIDE ELEVATION 0 o ELEVATION 0 0 o v r z W r� <a = GENERAL NOTES: O M a z O USE PIPE COLLAR FOR EXTENDING EXISTING CONCRETE PIPE CULVERTS AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. THIS INCLUDES EXTENDING F-1 J O EXISTING PIPES WITH PIPES OF DIFFERENT MATERIALS. Z CONSTRUCT THE PIPE COLLAR WITH CLASS "B" LLI OR BETTER CONCRETE. OBSERVE ALL REQUIREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. * USE 12 INCH DIAMETER VALUES FOR PIPE DIAMETERS LESS THAN 12 INCH. SHEET 1 OF 1 SHEET 1 OF 1 840.72 840.72 PARKING LOT A, POND Al D E F CU. YD. 12 12" 12" 0.3528 15" 12 12" 0.3990 18" 12" 12" 0.4465 24" 12" 12" 0.5526 30 12" 12" 0.6560 36" 12" 12" 0.7640 42" 12" 12" 0.8856 48 12" 12" 1.0126 54" 18" 18" 2.5793 60 18" 18" 2.8506 66" 18" 18" 3.1307 72" 18" 18" 3.4176 1 T AIRPORT ROAD N OUTLET CONTROL STRUCTURE TOP VIEW N.T.S. NOTES: 1. 4000 PSI, CONCRETE TO BE USED THROUGHOUT. 2. ALL REINFORCING STEEL WHERE JOINED SHALL HAVE 18" MIN. OVERLAP UNLESS NOTED OTHERWISE. 3. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 4. RISERS OVER 3'-6" IN DEPTH SHALL BE PROVIDED WITH STEPS ON 1 '-2" CTRS. SEE DETAIL, SEE DRAINAGE DETAILS. EXISTING EMERGENCY SPILLWAY, SEE SW-08 MOMM EXISTING 36" PIPE ------------------ IL A 0 6" RCP PIPE COLLAR RISER CREST ELEV.:<RISER ELEV.> - WSEL�- ------ \-POND BOTTOM EW AT RISER ELEV.: RZ <POND BOTTOM> STORMWATER MANAGEMENT FACILITY DETAIL N.T.S. INLET PIPE SLOPE, SEE PLAN VIEW (1 % MIN.) POND SPILLWAY TOP OF 25-YR 25-YR FB Pond ID T (FT) SS1 SS2 D (IN) S L (FT) M BOTTOM ELEV. DAM ELEV. WSEL (ft) Al 2129.5 2138.0 2139.0 N/A Exist N/A Existing 2136.6 2.4 7 B1 2162.0 2165.1 2166.0 4.0 2 Exist 15 4.7 43 CMP 2164.7 1.3 *Note: Pond Al Spillway, Top of Dam, Interior Side Slope, and Outlet Pipe are all existing. STORMWATER FACILITY TABLE NOTES: 1. CONTRACTOR SHALL CLEAN OUT POND TO FINAL GRADES AND GRASS AFTER ALL UPSTREAM DISTURBANCE IS STABILIZED. H C A t n 1Qd ..� 6..... DAVID A. SKURKY, P.E. NC SEAL #040195 ■ s evi e REGIONAL AIRPORT AVCON, INC. ENGINEERS &PLANNERS 13801 REESE BLVD, SUITE 160 HLJNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.avconinc.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT &INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 8/20/19 WMM ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-06 rn 0 N 00 O 0 J W 0 ry W IY O I- c/)I LO o_ (D a U N_ z (D W 0 N U) I- O J z Y IY a J a 0 0 0 J a 0 0 z O al 0 U) I- w ry a TRASH RACK REQUIRED ON TOP OF STRUCTURE. TRASH RACK SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. SEE SHEET SW-08 FOR DETAILS. 11 a #4 @ 8" VERT. E.F. H G ELEVATION E 2" CLR. :° 4.4 (TYP.) ° °49 6 PVC STAND °Id 2 CER. ..: a G #4 @ 8" VERT. E.F. D a 6:.� PIPE WITH (TYP.) ORIFICE END :.'; F a .: ° : a. CAP SEE DETAIL ROUNDED ENTRANCE a.. ° , DB1 SW-08. I � ° 11299 FLOW DIA ELEVATION B • a B2 TYP. -�� q ELEVATION A 1 2" a da ° a°' ° ° 4 ° OUTLET PIPE 12" ° 2" (TYP.). 12" 6„ #5 3 „ d @ 8" E.W. a ° ° ° TOP .a & BOTTOM ° ORIFICE OPENING 12" STONE BEDDING WITH END CAP. SEE DETAIL ON SW-08 SECTION X-X (SEE SIDE VIEW - GRATE DETAIL) N.T.S. STONE BEDDING SECTION Y-Y N.T.S. DIAMETER DIAMETER B1 DIMENSION F DIAMETER A ELEVATION B B2 WIDTH D ELEVATION A ELEVATION B1 (PVC STAND ELEVATION D ELEVATION E (HEIGHT OF DIMENSION G DIMENSION H Pond ID (OUTLET PIPE) (POND (DRAWDOWN (WEIR) (OUTLET PIPE) (ORIFICE) PIPE) (WEIR) (TOP OF RISER) RISER) (IN) (IN) (IN) BOTTOM) ORIF.) (in) (in.) (FT) (in.) Al 2129.5 36 2129.5 2129.5 27.0 N/A 2133.0 18.0 2136.5 7.0 60.0 72.0 B1 2161.0 15 2162.0 2162.0 6.0 4.5 N/A N/A 2164.25 3.3 30.0 42.0 1 2 " 06111111111044 ANTI-SEE_r' BARREL ANTI SEEP COLLAR N.T.S. rnNlrPFTF ANTI-�FFP ' MIN. 1. AFTER FILL HAS BEEN PLACED A MIN. 18" OVER BARREL, CONTRACTOR TO EXCAVATE ANTI -SEEP COLLAR TO MIN. DIMENSIONS SHOWN AND BACKFILL WITH CLASS A CONCRETE. 2. COST OF PIPE COLLARS SHALL BE INCIDENTAL TO THE COST OF RCP ITEM. 3. PERIMETERS OF CONCRETE COLLARS DO NOT HAVE TO BE SMOOTH LINES. COLLARS MAY BE FORMED AGAINST COMPACTED OR UNDISTURBED SOIL. DIMENSIONS AND SHAPE CAN VARY AS LONG AS MINIMUM DIMENSIONS SHOWN IN DETAIL ARE MAINTAINED. PARKING LOT 139 POND B1 SIDE SI-OpE' <SS2>•I EXISTING ' CURB INLET I I I ALONG WRIGHT --BROTHERS WAY --- I I I I ------------------- DAM WIDTH: -T- ELEVATION E ELEVATION D #4 @ 8" VERT. E.F. #4 @ 8" VERT. E.F. ELEVATION B ELEVATION A N #5 @ 8" E.W. TOP & BOTTOM TOP OF DAM ELEV.: <TOP OF DAM ELEV.> EMERGENCY SPILLWAY (SEE SW-08) ELEV.: <SPI LLWAY ELEV.> OUTLET PIPE, DIAM <D>, SLOPE :S>, LENGTH <L> MATERIAL <M ANTI -SEEP COLLAR J (TYP), SEE DETAIL THIS SHEET. STORMWATER MANAGEMENT FACILITY DETAIL N.T.S. IW OUTLET CONTROL STRUCTURE TOP VIEW N.T.S. NOTES: 1. 4000 PSI, CONCRETE TO BE USED THROUGHOUT. 2. ALL REINFORCING STEEL WHERE JOINED SHALL HAVE 18" MIN. OVERLAP UNLESS NOTED OTHERWISE. 3. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 4. RISERS OVER 3'-6" IN DEPTH SHALL BE PROVIDED WITH STEPS ON 1 '-2" CTRS. SEE DETAIL, SEE DRAINAGE DETAILS. RISER CREST ELEV.:<RISER ELEV.> ---- WSEL_v------- '--SLOPE, SEE PLAN VIEW POND BOTTOM (1 % MIN.) AT RISER ELEV.: <POND BOTTOM> Pond ID POND BOTTOM SPILLWAY ELEV. TOP OF DAM ELEV. T (FT) SS1 SS2 D (IN) S L (FT) M 25-YR WSEL 25-YR FB (ft) Al 2129.5 2138.0 2139.0 N/A Exist N/A Existing 2136.6 2.4 131 2162.0 2165.1 2166.0 4.0 2 Exist 15 4.7 43 CMP 2164.7 1.3 *Note: Pond Al Spillway, Top of Dam, Interior Side Slope, and Outlet Pipe are all existing. STORMWATER FACILITY TABLE NOTES: 1. CONTRACTOR SHALL CLEAN OUT POND TO FINAL GRADES AND GRASS AFTER ALL UPSTREAM DISTURBANCE IS STABILIZED. INLET PIPE l0�?9//ems .,q •NGNE..•�.�,. DAVID A. SKURKY, P.E. NC SEAL #040195 11_s evi e GIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-07 rn 0 N 00 0 v� J Q w 0 ry, a ry O WI 0 0 U N z (D co w 0 N Cn O c� z v ry a D_ J a 0 O 0 lit a 0 0 lzl- O U a� 0 lzl- U) H U w O ry a TOP OF STRUCTURE DE POLYETHI STRUCI,,..,,. PLASTIC TRASH RACK MANUFACTURED BY PLASTIC SOLUTIONS INC. 877-877-5727 OR APPROVED EQUAL. TRASH RACK SHALL HAVE A REMOVABLE ACCESS HATCH AND SHALL BE BOLTED TO THE CONCRETE STRUCTURES PER MANUFACTURER'S INSTRUCTIONS. CONCRETE RIS OUTLET PIF 7-VIC'TIN1( n7n1 INIF1 BOTTOM WIDTH 10 FT. SPILLWAY RIP RAP DITCH N.T.S. TRASH RACK SPACING SET BY PLASTIC SOLUTIONS INC. TRASH RACK ASSEMBLY ELEV. A POND A B C Al 65 8" 66" 7 "' B l 38 4" 38 4" 7 "' TOP VIEW H L-- I I LL-- ,3RIC 1 POLYETHYLENE STRUCTURAL TOP VIEW PLASTIC TRASH RACK N.T.S. TRASH RACK MANUFACTURED BY PLASTIC SOLUTIONS INC. 877-877-5727 OR APPROVED EQUAL CONCRETE RIB SCHEDULE 40 PVC THREADED END CAP WITH PVC THREADED PLUG 000 0000 SCHEDULE 40 D 0 0 0 PERFORATED PVC (6" MIN. 0 0 0 DIA.) (3/8" HOLE DIA.) o 0 0 0 SCHEDULE 40 PLUG TRASH RACK ASSEMBLY ELEV. B Mann will ��Jmmmm SIDE VIEW 45° BEND )000 0000 0 : O O 0 0000 I O O 0 O O O O I O O 0 OFA 00 n$o 1010101011-01. 0 In TEE AND PIPE TO BE PERFORATED TO WITHIN 3" OF WALL/STRUCTURE CONCRETE WALL/OUTLET STRUCTURE ; ; > -I > CONTRACTOR TO SECURE STAND PIPE TO OUTLET CONTROL STRUCTURE. STRAP OR OTHER DEVICE SHALL BE WATER RESISTANT AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION. SCHEDULE 40 SOLID PVC (6" MIN. DIA.) ORIFICE STAND PIPE DETAIL N.T.S. 6" DIAM. (131) SCHEDULE 40 PVC 6" DIAM. (131) SCHEDULE 40 PVC THREADED END CAP DRILL DRAWDOWN (B2) ORIFICE-DIA HOLE IN CENTER OF THREADED PLUG FOR ORIFICE AT ORIFICE ELEVATION 6" DIAM. PVC THREADED PLUG. PLUG MAY BE PERIODICALLY REMOVED FROM END CAP FOR CLEANING AND MAINTENANCE. (DO NOT CEMENT PLUG TO END CAP) FILL GAP BETWEEN STRUCTURE AND PVC PIPE WITH MORTAR Y�P.11101mowl Immo THREADED END CAP WITH PVC THREADED PLUG B2 SEE TABLE ON SW-07 FOR B 1 AND B2 SIZES. 3" CLEAR (MIN.) ORIFICE END CAP DETAIL N.T.S. 11111111///I/// ..loNq by ' DAVID A. SKURKY, P.E. NC SEAL #040195 r- >f�� -") sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-08 rn r O N r 00 0 vj J a w 0 ry w a 0 C/)� Lo 0 0 b a U N_ z CD w 0 U) H 0 z Y a J a 0 r O O lit J a r O O lit O U a� O U) U w O ry a 1 2155 2150 2145 2140 2135 2130 2125 10+00 p co + r r aQ U)O° m U aao ti r O r co ti N f` r r rM ` N Lo Lo r r + N N� U (D N Z Z r a--o r Lu Lu Lu a � U cn a Lo co co~ CID rN Ln r N 0o O w I— — GRADE 019 L.F. - . jtJST INLET, S)ECIE DETAIL " C — — CrvlP . o 10+50 STORM LINE Al HORIZONTAL SCALE 1" = 20' VERTICAL SCALE V = 5' 2160 2155 2150 2145 2140 2135 10+00 11 +00 (A2.2 2160 2155 2155 2150 2150 2145 2145 2140 2140 2135 2135 2130 2130 2125 11+34 C.I.: CURB INLET, SEE SW-03 D.I.: DROP INLET, SEE SW-03 E.W.: ENDWALL, SEE SW-05 2125 10+00 A2.1 (A2)2 (A2.3 (A2.)4 p M r + CV N a aN co � M C? Lo r OM N Lo qtr + r N 1---r N Z) N Z N �— OW W U� a co N N a aa� op0 LLQ M 0 t O r CA 0-)� CN p� �N N IL: (=) N M Z Z �j W— — 0W W W 0 N a aI-- �(:)� 4 CA � r CA 04Nt N M lnr + N � N f Z �— N 0W W� Q N NLO N r (`N 7-H N� OW A2.Lo r rn � FZ r C`7 M 0 p r N OIO a z r O Lu r V' 0 0 10+50 11+00 STORM LINE A2 HORIZONTAL SCALE 1" = 20' VERTICAL SCALE 1" = 5' A2.2A LL CD N r CN U cn r .. co N N N a aar` CO CD 00 O u) M q .4 O r M M 't 't N rN N IL: a' CN .. .. N r �z z 0 N � LLI LLI LLI 0 cn N a O Coo Lf) 0� N N a0 � LLI 8" RCP 6% 25- R HGL 10+50 2160 2155 2150 2145 2140 2160 2155 2150 2145 2140 2135 2130 2125 11+50 11+67 \\\\\I11111111///I/ CA 2135 0 �� 11 +00 11 +50 11 +68 19cl STORM LINE A2.2%'�'/11ql 11$K"•�\ HORIZONTAL SCALE 1" = 20' DAVID A. SKURKY, P.E. VERTICAL SCALE 1" = 5' NC SEAL #040195 00 0000 ishev le REGIONAL AIRPORT AVCON AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 8/20/19 WMM ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER SW-09 r O N 00 0 v� J a w 0 ry w a ry O H I Lo CD 0 b a U 0 N z w 0 N U) 1-- 0 J z V a J a 0 0 O lit a O O z O al O cn U w a 1 2155 2150 2145 2140 2135 2130 2125 10+00 nA32 (A3-)3 N M + 0 0 ar a W (n co Q Oq N r O CO M � coN + r 0 Nz C15 0-- ad �W U U) O co a Q N '*� M O P r p co N �N + N coZO a— ad �W W U U) r M a Q cow M I— r N� pM N CO �r + 04 NN Z) M a— c� ad FW W U� N Q OM r rN NZ) 0- o �W EXISTING GRADE REMOVED 12" 24" FIDPEE 24" HDPE D 24" HDPE 24 L.F. — 1.20% I PRAP #3 C.I.: CURB INLET, SEE SW-03 D.I.: DROP INLET, SEE SW-03 E.W.: ENDWALL, SEE SW-05 2170 2165 2160 2155 10+00 10+50 11+00 11+50 STORM LINE A3 HORIZONTAL SCALE 1" = 20' VERTICAL SCALE 1" = 5' U-) O+ cp r r co w m O 't O C�or) r CO Cfl r O+ r CN r N Z r O uj EXISTING GRADE co 1-- 0 m cfl O O Or N CO r N Z) O uj ENT ANCE DRIVE 1511 RCP 96 L.R.o D PROPOSED GRADE RAP 10+50 STORM LINE B1 HORIZONTAL SCALE 1" = 20' VERTICAL SCALE 1" = 5' 11+00 2170 2165 2160 2155 11+36 12+00 2170 2165 2160 2155 2150 2145 10+00 12+50 0 N N + O r U Q X H w cn m �O �- �- Co O00 O N qCO N u) u) N O r r + r N N CD N .. .. m r az z 0 u) Q O uj uj uj U F- 1-- O cn PROPOSED GRADE O O U7r NCO �N CO r N nO O Uj H - WRIGHT vy 0% 43 10+50 STORM LINE C HORIZONTAL SCALE 1" = 20' VERTICAL SCALE 1" = 5' 13+00 2170 EXISTING GRADE 2165 2160 2155 2150 2145 10+77 2155 2150 2145 2140 2135 2130 2125 13+25 CA R A. S 111I I IIIAO DAVID A. SKURKY, P.E. NC SEAL #040195 -11�. >fro- sheville A,=00 IONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION AULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: N.T.S. REVISIONS: NO. DATE BY DESCRIPTION 1 8/20/19 WMM ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER sw-lo rn 0 N rn r DO 0 Z J Q_ z Y H UI 0 0 f� V 0 0 a U 0 N z (D U) w 0 N U) 1-- 0 CD z V ry a In J > a 0 O O i J > Q O O NT z O U al 0 Nt U) U w O IY n CD z ry w w z z w 'w U Q J n V O V U) O Q U I / / / • 4 • S9 • • 159.0 2157. .** - - - -- STORM LINE A2 DI A2.3 10 32 CI 21 2155.00 / �, ' �, M H A2.1 co 9 -- -- STORM LINE Al '/' % /' C) / / / V ' i l � �''�'/� 1 � ' 17 N g _ 4- 30" E 2153.00 18' RCP,�' , 7 0 . - no --- , RCMP CI A1.1C ;','' \ N CI A3.1 1 no no �� i'�/'/'i' - ---- _ MH A1.1 33 �. '.:,�-- -- - `�'�� '/ //, / // ;;__- WA A3.0 4 13 13" EX CMP(� i; /_� 21 17-�rr�i�l �'t�f2 _ _ -4"�Nt NOPE 31 2� 43 0 2142.0 747.0 /-24" HDPE CI A3.2 14 1 �� a►s- , ,, -- k ----------- -'---- - 30 _ ----- //�//,� /,�, //� c�e� n \ _-----------_ OCS -; - = \ - _1' __a: ---------------- ----- DRY DETENTION -- A GAS 41 be,___--��________�� POND All, SEE -- UFj�------------- - "I- ------_= DETAILS SW-06 TILT _,ne na ---- ------ NEW AIRPORT ROAD 100' RIGHT- -no- 71, 71,3 RM LINE A3 24" HDPE 7is 71 6 7'5�> _----- 1 5 - - - - - - - -i��-c�l►s-a►s -c1v►s -cans -�as -�♦ics-�c♦ccs -�� uFo ------------------ ---- natna=n�OI>a-� ---__ Point Table Point # Elevation Northing Easting 1 0.00 632410.1434 947004.9572 2 2131.00 632412.4109 946950.7742 3 2131.00 632337.5326 946957.2215 4 4262.00 632348.1865 946979.9787 6 2131.00 632387.6002 946994.1341 7 2131.00 632414.4881 946980.3006 8 2131.00 632373.8551 946948.3885 9 2140.33 632413.2304 947024.4615 10 2152.97 632451.0557 947078.1901 11 2151.86 632502.8643 946919.5704 12 2151.82 632487.8274 946928.7446 13 2140.02 632326.0222 946989.4015 14 2140.74 632225.2050 947011.7644 15 2141.46 632125.4062 947033.9381 16 2135.00 632280.2043 946972.6675 17 2142.00 632436.6874 946993.5919 18 2162.00 632983.1673 946660.3058 19 2162.00 632991.2263 946682.8577 20 2162.00 632983.5455 946685.6489 21 2162.00 632978.6879 946650.6217 22 2168.38 633071.9924 946619.6908 23 2166.00 632963.8139 946651.6088 24 2166.00 632982.8209 946643.7111 25 2166.00 632986.4514 946693.8418 26 2166.00 632975.3436 946703.0132 27 2166.00 632975.6896 946688.3676 29 2162.00 632971.6070 946653.4779 30 2135.00 632366.4765 946952.5069 31 2145.95 632369.1723 947175.4597 32 2149.08 632416.6920 947049.5983 33 2151.83 632476.4863 946944.5622 North 0' 15' 30' 60' GRAPHIC SCALE IN FEET SEE STORMWATER DETAIL SHEETS SW-03 AND SW-05 FOR LOCATION OF POINTS ON DRAINAGE STRUCTURES. ��\\\II111111111/,,,, CAR "fl.A 111111100 DAVID A. SKURKY, P.E. NC SEAL #040195 >toI sheville REGIONAL AIRPORT AVCON, INC. ENGINEERS & PLANNERS 13801 REESE BLVD, SUITE 160 HUNTERSVILLE, NC 28078 OFFICE: (704) 954-9008 www.aveonine.com ISSUED FOR BID NOT RELEASED FOR CONSTRUCTION ULICK ENGINEERING, LLC HYDRAULICS & HYDROLOGY I EROSION CONTROL AIRFIELD DESIGN I CONSTRUCTION MANAGEMENT & INSPECTION ATTENTION: THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC., FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE. WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN WHOLE OR IN PART, IS STRICTLY PROHIBITED SCALE: 1" = 30' REVISIONS: NO. DATE BY I DESCRIPTION 1 8/20/19 WMMI ADDENDUM #2 DESIGNED BY: W.M.M. DRAWN BY: W.M.M. CHECKED BY: D.A.S. APPROVED BY: D.A.S. DATE: AUGUST 7, 2019 STATE LICENSE # P-1430 PROJECT NO. 400101 SHEET NUMBER Z ( SW-11 APPENDIX D OPERATION AND MAINTENANCE MANUAL APPENDIX E SUPPLEMENTAL EZ STORM & DRAINAGE CALCULATIONS Supplement EZ Form: Not Applicable Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D0 Plan B1.1 12 Outfall EX A1.1 B rn X AA. 1 6 4 DI A2.4 10 5 Outfay I A2.3 Outfall 1 .1-A ABA 2 DI A2.2A A3.2 3 A3.3 Project File: Asheville Storm Sewers v2,stm Number of lines: 12 Date: 8/16/2019 Storm Sewers 02 00 Storm Sewer Tabulation Page I Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line F(ac (ft) ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) I End 28,460 0,74 1.74 0,95 0,70 1,65 5,0 7.1 7,3 12.13 12.37 5,19 24 1,02 2131,00 2131,29 2132,25 2132,89 2136,20 2140,04 A3. 1 -A3. 0 2 1 101,000 0,52 1,00 0,95 0,49 0,95 5,0 6.4 7,6 7,18 12.25 4,05 24 1,00 2134,44 2135,45 2135,54 2136,55 2140,04 2140,73 A3.2-A3.1 3 2 101,000 0,48 0,48 0,95 0,46 0,46 5,0 5,0 8,11 3,67 12.25 2.69 24 1,00 2135,45 2136,46 2136,68 2137,19 2140,73 2141,46 A3.3-A3.2 4 End 66,000 0,00 8,79 0,00 0,00 6.25 0,0 6.9 7.4 46.39 17.29 9,71 30 0,61 2132,30 2132,70 2134,55 2137,41 2135,00 2149,70 A1.1-A1.0 5 4 184,000 8,09 8,09 0,69 5,58 5,58 6.5 6.5 7,5 42.08 22.22 8,57 30 1,00 2132,70 2134,54 2138,80 2145,41 2149,70 2152,69 EXA1.1B-A1.1 6 4 18.855 0,70 0,70 0,95 0,67 0,67 5,0 5,0 8,1 5,36 10.27 5,38 18 0,96 2147.17 2147,35 2147,94 2148,24 2149,70 2151,83 A1,1CtoA1,1 7 End 14.000 0,00 1,83 0,00 0,00 0,82 5,0 10.1 6.6 5,40 14.03 4,90 18 1,79 2131,00 2131,25 2131,90 2132,15 2148,40 2140,33 A2. 1 -A2. 0 8 7 25,000 0,05 1,83 0,95 0,05 0,82 5,0 10.0 6.6 5,42 40.67 10.45 18 15.00 2135,72 2139,47 2136,09 2140,37 2140,33 2149,08 A2.2-A2.1 9 8 41.000 0,12 1,45 0,65 0,08 0,68 5,0 5,3 8,0 5,38 32.35 9,23 18 9,49 2144,08 2147,97 2144,49 2148,86 2149,08 2152,97 A2.3-A2.2 10 9 44.000 1,33 1,33 0,45 0,60 0,60 5,0 5,0 8,1 4,82 32.71 4,55 18 9,70 2147,97 2152,24 2148,86 2153,08 2152,97 2157,24 A2.4-A2.3 11 8 135,000 0,33 0,33 0,30 0,10 0,10 5,0 5,0 8,1 0,80 10.31 3,10 18 0,96 2140,50 2141,80 2140,78 2142,13 2149,08 2145,95 A2.2A-A2.2 12 End I 96.000 0,82 0,82 I 0,95 I 0,78 I 0,78 I 5,0 I 5,0 I 8,1 6.27 6.46 I 5,90 I 15 I 1,00 I 2163,00 2163,96 I 2164,01 I 2164,97 I 2163,00 I 2169,00 I 131.1-131.0 I Project File: Asheville Storm Sewers v2,stm Number of lines: 12 Run Date: 8/16/2019 NOTES:Intensity = 62,39 / (Inlet time + 11.00) A 0.74; Return period =Yrs, 25 c = cir e = ellip b = box Storm Sewers v12+00 APPENDIX F HYDRAFLOW HYDROGRAPHS OUTPUT 1 Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Legend Hyd• Origin 1 SCS Runoff 2 SCS Runoff 3 SCS Runoff 4 SCS Runoff 5 Combine 6 Reservoir 8 SCS Runoff 9 SCS Runoff 10 SCS Runoff 11 SCS Runoff 12 Combine 13 Reservoir 15 SCS Runoff 16 SCS Runoff 18 Combine 19 Combine 21 SCS Runoff 22 SCS Runoff 23 Reservoir 25 SCS Runoff 26 SCS Runoff 28 Combine 29 Combine 1 2 3 4 CD CD CD CD \V5/ Description 8 9 10 11 1 1-x5-- 1*6-- 1 1 /21 19 ED Pre Al.1 Pre A1.2 Pre A1.3 Pre A1.4 Pre Al Total Pre Al Routed Post Al.1 Post A2 Post A3 Post A Sheet Flow Post Al Total Post Al Routed Pre A2 Post A2 Pre A Total (Al + A2) Post A Total (Post Al Routed + Post A2) Pre B1 Post B1 Post B1 Routed Pre B2 Post B2 Pre B Total (131 + 132) Post B Total (Post B1 Routed + Post 132) 22 25 26 231, Ig CD CD 29 Project: Hydraflow - AVL Parking Lots V02.gpw Monday, 08 / 19 / 2019 Hydrograph Return Period ReHycadra p w Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 24.75 ------- ------- ------- ------- 68.78 ------- 91.30 Pre A1.1 2 SCS Runoff ------ 0.523 ------- ------- ------- ------- 4.131 ------- 6.373 Pre A1.2 3 SCS Runoff ------ 0.243 ------- ------- ------- ------- 1.921 ------- 2.964 Pre A1.3 4 SCS Runoff ------ 0.622 ------- ------- ------- ------- 2.823 ------- 4.107 Pre A1.4 5 Combine 1, 2, 3, 26.14 ------- ------- ------- ------- 77.43 ------- 104.61 Pre Al Total 4 6 Reservoir 5 26.28 ------- ------- ------- ------- 55.77 ------- 89.17 Pre Al Routed 8 SCS Runoff ------ 25.09 ------- ------- ------- ------- 62.87 ------- 81.76 Post A1.1 9 SCS Runoff ------ 1.997 ------- ------- ------- ------- 8.236 ------- 11.86 Post A2 10 SCS Runoff ------ 6.857 ------- ------- ------- ------- 13.86 ------- 17.36 Post A3 11 SCS Runoff ------ 0.365 ------- ------- ------- ------- 2.882 ------- 4.446 Post A Sheet Flow 12 Combine 8, 9, 10, 34.07 ------- ------- ------- ------- 87.73 ------- 115.37 Post Al Total 11 13 Reservoir 12 24.11 ------- ------- ------- ------- 55.43 ------- 70.57 Post Al Routed 15 SCS Runoff ------ 0.170 ------- ------- ------- ------- 1.345 ------- 2.075 Pre A2 16 SCS Runoff ------ 0.065 ------- ------- ------- ------- 0.512 ------- 0.790 Post A2 18 Combine 6, 15, 26.45 ------- ------- ------- ------- 56.88 ------- 90.86 Pre A Total (Al + A2) 19 Combine 13, 16, 24.17 ------- ------- ------- ------- 55.86 ------- 71.17 Post A Total (Post Al Routed + Post 21 SCS Runoff ------ 0.930 ------- ------- ------- ------- 5.934 ------- 8.974 Pre 131 22 SCS Runoff ------ 2.293 ------- ------- ------- ------- 8.419 ------- 11.89 Post 131 23 Reservoir 22 0.733 ------- ------- ------- ------- 8.483 ------- 10.99 Post 131 Routed 25 SCS Runoff ------ 0.000 ------- ------- ------- ------- 0.107 ------- 0.443 Pre B2 26 SCS Runoff ------ 0.021 ------- ------- ------- ------- 0.881 ------- 1.493 Post B2 28 Combine 21, 25, 0.930 ------- ------- ------- ------- 6.015 ------- 9.417 Pre B Total (131 + 132) 29 Combine 23, 26, 0.751 ------- ------- ------- ------- 9.365 ------- 12.48 Post B Total (Post 131 Routed + Post Proj. file: Hydraflow - AVL Parking Lots V02.gpw Monday, 08 / 19 / 2019 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 24.75 2 718 49,955 ------ ------ ------ Pre A1.1 2 SCS Runoff 0.523 2 718 1,455 ------ ------ ------ Pre A1.2 3 SCS Runoff 0.243 2 718 677 ------ ------ ------ Pre A1.3 4 SCS Runoff 0.622 2 718 1,324 ------ ------ ------ Pre A1.4 5 Combine 26.14 2 718 53,412 1, 2, 3, ------ ------ Pre Al Total 4 6 Reservoir 26.28 2 718 53,412 5 2132.27 404 Pre Al Routed 8 SCS Runoff 25.09 2 716 50,979 ------ ------ ------ Post Al. 1 9 SCS Runoff 1.997 2 718 4,140 ------ ------ ------ Post A2 10 SCS Runoff 6.857 2 716 15,953 ------ ------ ------ Post A3 11 SCS Runoff 0.365 2 718 1,015 ------ ------ ------ Post A Sheet Flow 12 Combine 34.07 2 716 72,088 8, 9, 10, ------ ------ Post Al Total 11 13 Reservoir 24.11 2 720 72,084 12 2133.10 9,654 Post Al Routed 15 SCS Runoff 0.170 2 718 474 ------ ------ ------ Pre A2 16 SCS Runoff 0.065 2 718 181 ------ ------ ------ Post A2 18 Combine 26.45 2 718 53,885 6, 15, ------ ------ Pre A Total (Al + A2) 19 Combine 24.17 2 720 72,264 13, 16, ------ ------ Post A Total (Post Al Routed + Post 21 SCS Runoff 0.930 2 718 2,290 ------ ------ ------ Pre B1 22 SCS Runoff 2.293 2 718 4,643 ------ ------ ------ Post B1 23 Reservoir 0.733 2 724 4,641 22 2164.09 1,091 Post B1 Routed 25 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ Pre B2 26 SCS Runoff 0.021 2 722 203 ------ ------ ------ Post B2 28 Combine 0.930 2 718 2,290 21, 25, ------ ------ Pre B Total (131 + 132) 29 Combine 0.751 2 724 4,845 23, 26, ------ ------ Post B Total (Post B1 Routed + Post Hydraflow - AVL Parking Lots V02.gpw Return Period: 1 Year Monday, 08 / 19 / 2019 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 1 Pre A1.1 Hydrograph type = SCS Runoff Peak discharge = 24.75 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 49,955 cuft Drainage area = 10.680 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.50 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Pre A1.1 Hyd. No. 1 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Pre Al. 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 5.00 0.00 0.00 Travel Time (min) = 5.03 + 0.00 + 0.00 = 5.03 Shallow Concentrated Flow Flow length (ft) = 200.00 0.00 0.00 Watercourse slope (%) = 5.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.61 0.00 0.00 Travel Time (min) = 0.92 + 0.00 + 0.00 = 0.92 Channel Flow X sectional flow area (sqft) = 4.91 0.00 0.00 Wetted perimeter (ft) = 3.93 0.00 0.00 Channel slope (%) = 5.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) =29.76 0.00 0.00 Flow length (ft) ({0})900.0 0.0 0.0 Travel Time (min) = 0.50 + 0.00 + 0.00 = 0.50 Total Travel Time, Tc.............................................................................. 6.50 min A Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 2 Pre A1.2 Hydrograph type = SCS Runoff Peak discharge = 0.523 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,455 cuft Drainage area = 1.290 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre A1.2 Hyd. No. 2 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 3 Pre A1.3 Hydrograph type = SCS Runoff Peak discharge = 0.243 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 677 cuft Drainage area = 0.600 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre A1.3 Hyd. No. 3 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 4 Pre A1.4 Hydrograph type = SCS Runoff Peak discharge = 0.622 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,324 cuft Drainage area = 0.670 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre A1.4 Hyd. No. 4 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report 9 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 5 Pre Al Total Hydrograph type = Combine Peak discharge = 26.14 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 53,412 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 13.240 ac Q (cfs) 28.00 24.00 20.00 16.00 12.00 Pre Al Total Hyd. No. 5 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 A--- — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 — Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (min) Hyd No. 4 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 6 Pre Al Routed Hydrograph type = Reservoir Peak discharge = 26.28 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 53,412 cuft Inflow hyd. No. = 5 - Pre Al Total Max. Elevation = 2132.27 ft Reservoir name = Existing Pond A Max. Storage = 404 cuft Storage Indication method used. Q (cfs) 28.00 24.00 20.00 16.00 12.00 Pre Al Routed Hyd. No. 6 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 6 — Hyd No. 5 Total storage used = 404 cult Pond Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Pond No. 1 - Existing Pond A Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 2129.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 2129.50 00 0 0 1.50 2131.00 99 74 74 2.50 2132.00 309 204 278 3.50 2133.00 688 499 777 4.50 2134.00 1,215 952 1,728 5.50 2135.00 2,006 1,611 3,339 6.50 2136.00 3,097 2,552 5,890 7.50 2137.00 4,525 3,811 9,701 8.50 2138.00 5,976 5,251 14,952 9.50 2139.00 10,066 8,021 22,973 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 36.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 50.00 0.00 Span (in) = 36.00 36.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 2138.20 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 2129.50 2129.50 0.00 0.00 Weir Type = --- --- Broad --- Length (ft) = 159.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 2.00 0.00 0.00 n/a N-Value = .024 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 4.00 2.00 0.00 ' 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 2139.50 40.0 60.0 80.0 2137.50 2135.50 2133.50 2131.50 2129.50 100.0 120.0 140.0 160.0 Discharge (cfs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 8 Post A1.1 Hydrograph type = SCS Runoff Peak discharge = 25.09 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 50,979 cuft Drainage area = 9.020 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.50 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post A1.1 Hyd. No. 8 -- 1 Year 0.00 1---J— I I I ' ' 0 120 240 360 480 600 720 840 — Hyd No. 8 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 9 Post A2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.830 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.91 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 Post A2 Hyd. No. 9 -- 1 Year 120 240 360 480 600 720 840 960 Hyd No. 9 Monday, 08 / 19 / 2019 = 1.997 cfs = 718 min = 4,140 cuft = 70 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 10 Post A3 Hydrograph type = SCS Runoff Peak discharge = 6.857 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 15,953 cuft Drainage area = 1.750 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post A3 Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 10 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 11 Post A Sheet Flow Hydrograph type = SCS Runoff Peak discharge = 0.365 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,015 cuft Drainage area = 0.900 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Post A Sheet Flow Hyd. No. 11 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 12 Post Al Total Hydrograph type = Combine Peak discharge = 34.07 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 72,088 cuft Inflow hyds. = 8, 9, 10, 11 Contrib. drain. area = 13.500 ac Post Al Total 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 13 Post Al Routed Hydrograph type = Reservoir Peak discharge = 24.11 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 72,084 cuft Inflow hyd. No. = 12 - Post Al Total Max. Elevation = 2133.10 ft Reservoir name = Proposed Pond A Max. Storage = 9,654 cuft Storage Indication method used. Q (cfs) 35.00 'G • • 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 13 Hyd No. 12 Total storage used = 9,654 cult Pond Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Pond No. 3 - Proposed Pond A Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 2129.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 2129.50 00 0 0 0.50 2130.00 1,948 487 487 1.50 2131.00 2,709 2,329 2,816 2.50 2132.00 3,260 2,985 5,800 3.50 2133.00 3,869 3,565 9,365 4.50 2134.00 4,860 4,365 13,729 5.50 2135.00 6,074 5,467 19,196 6.50 2136.00 7,343 6,709 25,905 7.50 2137.00 8,644 7,994 33,898 8.50 2138.00 10,143 9,394 43,292 9.50 2139.00 11,871 11,007 54,299 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 27.00 Inactive 0.00 Crest Len (ft) = 22.00 1.50 50.00 0.00 Span (in) = 36.00 27.00 0.00 0.00 Crest El. (ft) = 2136.50 2133.00 2138.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 2129.50 2129.50 0.00 0.00 Weir Type = 1 Rect Broad --- Length (ft) = 159.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 2.00 0.00 0.00 n/a N-Value = .024 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 AM 4.00 r M M Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 20.0 40.0 60.0 80.0 Total Q Stage / Discharge Elev (ft) 2139.50 2137.50 2135.50 2133.50 2131.50 2129.50 100.0 120.0 140.0 160.0 180.0 200.0 220.0 Discharge (cfs) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 15 Pre A2 Hydrograph type = SCS Runoff Peak discharge = 0.170 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 474 cuft Drainage area = 0.420 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre A2 Hyd. No. 15 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 16 Post A2 Hydrograph type = SCS Runoff Peak discharge = 0.065 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 181 cuft Drainage area = 0.160 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 Post A2 Hyd. No. 16 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 18 Pre A Total (Al + A2) Hydrograph type = Combine Peak discharge = 26.45 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 53,885 cuft Inflow hyds. = 6, 15 Contrib. drain. area = 0.420 ac Q (cfs) 28.00 24.00 20.00 16.00 12.00 Pre A Total (Al + A2) Hyd. No. 18 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 18 Hyd No. 6 Hyd No. 15 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 19 Post A Total (Post Al Routed + Post A2) Hydrograph type = Combine Peak discharge = 24.17 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 72,264 cuft Inflow hyds. = 13, 16 Contrib. drain. area = 0.160 ac Q (cfs) 28.00 24.00 20.00 16.00 12.00 Post A Total (Post Al Routed + Post A2) Hyd. No. 19 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 19 Hyd No. 13 Hyd No. 16 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 21 Pre B1 Hydrograph type = SCS Runoff Peak discharge = 0.930 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,290 cuft Drainage area = 1.700 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre 1131 Hyd. No. 21 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 22 Post B1 Hydrograph type = SCS Runoff Peak discharge = 2.293 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 4,643 cuft Drainage area = 1.700 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post 1131 Q (cfs) Hyd. No. 22 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 22 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 23 Post B1 Routed Hydrograph type = Reservoir Peak discharge = 0.733 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 4,641 cuft Inflow hyd. No. = 22 -Post B1 Max. Elevation = 2164.09 ft Reservoir name = Proposed Pond B Max. Storage = 1,091 cuft Storage Indication method used Q (cfs) 3.00 I'm 1.00 0.00 0 120 240 — Hyd No. 23 Post 1131 Routed Hyd. No. 23 -- 1 Year 360 480 600 720 Hyd No. 22 Q (cfs) 3.00 r M� 1.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Total storage used = 1,091 cult Pond Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Pond No. 7 - Proposed Pond B Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 2162.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 2162.00 317 0 0 1.00 2163.00 502 410 410 2.00 2164.00 712 607 1,017 3.00 2165.00 947 830 1,846 4.00 2166.00 1,207 1,077 2,923 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 4.50 0.00 0.00 Span (in) = 15.00 4.50 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 2161.00 2162.00 0.00 0.00 Length (ft) = 50.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes No No Stage (ft) 4.00 Ulm RIM M Weir Structures [A] [B] [C] [D] Crest Len (ft) = 9.00 0.00 10.00 0.00 Crest El. (ft) = 2164.25 0.00 2165.00 0.00 Weir Coeff. = 3.33 3.33 2.60 3.33 Weir Type = 1 --- Broad --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 - Total Q Elev (ft) 2166.00 2165.00 2164.00 2163.00 2162.00 36.00 40.00 Discharge (cfs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 25 Pre B2 Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 0.400 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 Pre B2 Hyd. No. 25 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0 20 40 60 80 100 120 Hyd No. 25 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 26 Post B2 Hydrograph type = SCS Runoff Peak discharge = 0.021 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 203 cuft Drainage area = 0.400 ac Curve number = 54 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 Post B2 Hyd. No. 26 -- 1 Year Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 26 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 28 Pre B Total (131 + 132) Hydrograph type = Combine Peak discharge = 0.930 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 2,290 cuft Inflow hyds. = 21, 25 Contrib. drain. area = 2.100 ac Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Pre B Total (1131 + 1132) Hyd. No. 28 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 28 Hyd No. 21 Hyd No. 25 Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 29 Post B Total (Post B1 Routed + Post 132) Hydrograph type = Combine Peak discharge = 0.751 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 4,845 cuft Inflow hyds. = 23, 26 Contrib. drain. area = 0.400 ac Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Post B Total (Post 1131 Routed + Post 1132) Hyd. No. 29 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 29 Hyd No. 23 Hyd No. 26 Time (min) 31 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 68.78 2 716 142,642 ------ ------ ------ Pre A1.1 2 SCS Runoff 4.131 2 718 8,280 ------ ------ ------ Pre A1.2 3 SCS Runoff 1.921 2 718 3,851 ------ ------ ------ Pre A1.3 4 SCS Runoff 2.823 2 718 5,662 ------ ------ ------ Pre A1.4 5 Combine 77.43 2 716 160,435 1, 2, 3, ------ ------ Pre Al Total 4 6 Reservoir 55.77 2 720 160,435 5 2137.27 10,861 Pre Al Routed 8 SCS Runoff 62.87 2 716 133,380 ------ ------ ------ Post A1.1 9 SCS Runoff 8.236 2 718 16,585 ------ ------ ------ Post A2 10 SCS Runoff 13.86 2 716 33,244 ------ ------ ------ Post A3 11 SCS Runoff 2.882 2 718 5,777 ------ ------ ------ Post A Sheet Flow 12 Combine 87.73 2 716 188,986 8, 9, 10, ------ ------ Post Al Total 11 13 Reservoir 55.43 2 720 188,982 12 2136.55 29,613 Post Al Routed 15 SCS Runoff 1.345 2 718 2,696 ------ ------ ------ Pre A2 16 SCS Runoff 0.512 2 718 1,027 ------ ------ ------ Post A2 18 Combine 56.88 2 720 163,131 6, 15, ------ ------ Pre A Total (Al + A2) 19 Combine 55.86 2 720 190,009 13, 16, ------ ------ Post A Total (Post Al Routed + Post 21 SCS Runoff 5.934 2 718 11,869 ------ ------ ------ Pre 131 22 SCS Runoff 8.419 2 716 17,008 ------ ------ ------ Post 131 23 Reservoir 8.483 2 718 17,007 22 2164.67 1,566 Post 131 Routed 25 SCS Runoff 0.107 2 720 536 ------ ------ ------ Pre B2 26 SCS Runoff 0.881 2 718 1,825 ------ ------ ------ Post B2 28 Combine 6.015 2 718 12,406 21, 25, ------ ------ Pre B Total (131 + 132) 29 Combine 9.365 2 718 18,832 23, 26, ------ ------ Post B Total (Post 131 Routed + Post Hydraflow - AVL Parking Lots V02.gpw Return Period: 25 Year Monday, 08 / 19 / 2019 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 1 Pre A1.1 Hydrograph type = SCS Runoff Peak discharge = 68.78 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 142,642 cuft Drainage area = 10.680 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.50 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 70.00 40.00 20.00 10.00 Pre A1.1 Hyd. No. 1 -- 25 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 1 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 2 Pre A1.2 Hydrograph type = SCS Runoff Peak discharge = 4.131 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,280 cuft Drainage area = 1.290 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 Pre A1.2 Hyd. No. 2 -- 25 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 3 Pre A1.3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.600 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.82 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 Pre A1.3 Hyd. No. 3 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 3 Monday, 08 / 19 / 2019 = 1.921 cfs = 718 min = 3,851 cuft = 61 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 4 Pre A1.4 Hydrograph type = SCS Runoff Peak discharge = 2.823 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 5,662 cuft Drainage area = 0.670 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre A1.4 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 36 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 5 Pre Al Total Hydrograph type = Combine Peak discharge = 77.43 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 160,435 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 13.240 ac Q (cfs) 80.00 70.00 40.00 20.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (min) Hyd No. 4 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 6 Pre Al Routed Hydrograph type = Reservoir Peak discharge = 55.77 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 160,435 cuft Inflow hyd. No. = 5 - Pre Al Total Max. Elevation = 2137.27 ft Reservoir name = Existing Pond A Max. Storage = 10,861 cuft Storage Indication method used. Pre Al Routed 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 8 Post A1.1 Hydrograph type = SCS Runoff Peak discharge = 62.87 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 133,380 cuft Drainage area = 9.020 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.50 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post A1.1 Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 8 Time (min) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 9 Post A2 Hydrograph type = SCS Runoff Peak discharge = 8.236 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 16,585 cuft Drainage area = 1.830 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 Were . OX 4.00 r w Post A2 Hyd. No. 9 -- 25 Year Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 10 Post A3 Hydrograph type = SCS Runoff Peak discharge = 13.86 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 33,244 cuft Drainage area = 1.750 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 14.00 12.00 10.00 .M 4.00 e Post A3 Hyd. No. 10 -- 25 Year Q (cfs) 14.00 12.00 10.00 m 4.00 2.00 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 10 Time (min) Hydrograph Report 41 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 11 Post A Sheet Flow Hydrograph type = SCS Runoff Peak discharge = 2.882 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 5,777 cuft Drainage area = 0.900 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post A Sheet Flow Q (cfs) Hyd. No. 11 -- 25 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 12 Post Al Total Hydrograph type = Combine Peak discharge = 87.73 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 188,986 cuft Inflow hyds. = 8, 9, 10, 11 Contrib. drain. area = 13.500 ac Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 0.00 --- ��-- — 1 11 0 120 240 360 480 600 720 840 960 1080 1200 1320 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 13 Post Al Routed Hydrograph type = Reservoir Peak discharge = 55.43 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 188,982 cuft Inflow hyd. No. = 12 - Post Al Total Max. Elevation = 2136.55 ft Reservoir name = Proposed Pond A Max. Storage = 29,613 cuft Storage Indication method used. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Post Al Routed Hyd. No. 13 -- 25 Year MR 1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 •1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 15 Pre A2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.420 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.82 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 Pre A2 Hyd. No. 15 -- 25 Year 120 240 360 480 600 720 840 960 Hyd No. 15 Monday, 08 / 19 / 2019 = 1.345 cfs = 718 min = 2,696 cuft = 61 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 16 Post A2 Hydrograph type = SCS Runoff Peak discharge = 0.512 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,027 cuft Drainage area = 0.160 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Post A2 Hyd. No. 16 -- 25 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 18 Pre A Total (Al + A2) Hydrograph type = Combine Peak discharge = 56.88 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 163,131 cuft Inflow hyds. = 6, 15 Contrib. drain. area = 0.420 ac Q (cfs) 60.00 40.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 18 Hyd No. 6 Hyd No. 15 Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 19 Post A Total (Post Al Routed + Post A2) Hydrograph type = Combine Peak discharge = 55.86 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 190,009 cuft Inflow hyds. = 13, 16 Contrib. drain. area = 0.160 ac Q (cfs) 60.00 40.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 19 Hyd No. 13 Hyd No. 16 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 21 Pre B1 Hydrograph type = SCS Runoff Peak discharge = 5.934 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 11,869 cuft Drainage area = 1.700 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 3.00 rM 1.00 Pre 1131 Hyd. No. 21 -- 25 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1' J ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 21 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 22 Post B1 Hydrograph type = SCS Runoff Peak discharge = 8.419 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 17,008 cuft Drainage area = 1.700 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 Were . OX 4.00 r w Post 1131 Hyd. No. 22 -- 25 Year Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 22 Time (min) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 23 Post B1 Routed Hydrograph type = Reservoir Peak discharge = 8.483 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 17,007 cuft Inflow hyd. No. = 22 -Post B1 Max. Elevation = 2164.67 ft Reservoir name = Proposed Pond B Max. Storage = 1,566 cuft Storage Indication method used. Q (cfs) 10.00 Were . UX 4.00 r W Post 1131 Routed Hyd. No. 23 -- 25 Year Q (cfs) 10.00 H. We 4.00 r W 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 23 Hyd No. 22 Total storage used = 1,566 cult 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 25 Pre B2 Hydrograph type = SCS Runoff Peak discharge = 0.107 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 536 cuft Drainage area = 0.400 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre B2 Hyd. No. 25 -- 25 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 25 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 26 Post B2 Hydrograph type = SCS Runoff Peak discharge = 0.881 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,825 cuft Drainage area = 0.400 ac Curve number = 54 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.82 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Post B2 Hyd. No. 26 -- 25 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 26 Time (min) Hydrograph Report 53 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 28 Pre B Total (131 + 132) Hydrograph type = Combine Peak discharge = 6.015 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 12,406 cuft Inflow hyds. = 21, 25 Contrib. drain. area = 2.100 ac Q (cfs) 7.00 5.00 3.00 1.00 Pre B Total (1131 + 1132) Hyd. No. 28 -- 25 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 1 1- ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 28 Hyd No. 21 Hyd No. 25 Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 29 Post B Total (Post B1 Routed + Post 132) Hydrograph type = Combine Peak discharge = 9.365 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 18,832 cuft Inflow hyds. = 23, 26 Contrib. drain. area = 0.400 ac Q (cfs) 10.00 Were . UX 4.00 r W Post B Total (Post 1131 Routed + Post 1132) Hyd. No. 29 -- 25 Year 120 240 360 480 600 720 Hyd No. 29 Hyd No. 23 Q (cfs) 10.00 H. We 4.00 r W 0.00 840 960 1080 1200 1320 1440 1560 Hyd No. 26 Time (min) 55 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 91.30 2 716 192,360 ------ ------ ------ Pre A1.1 2 SCS Runoff 6.373 2 718 12,756 ------ ------ ------ Pre A1.2 3 SCS Runoff 2.964 2 718 5,933 ------ ------ ------ Pre A1.3 4 SCS Runoff 4.107 2 716 8,295 ------ ------ ------ Pre A1.4 5 Combine 104.61 2 716 219,344 1, 2, 3, ------ ------ Pre Al Total 4 6 Reservoir 89.17 2 720 219,344 5 2138.63 19,477 Pre Al Routed 8 SCS Runoff 81.76 2 716 176,513 ------ ------ ------ Post A1.1 9 SCS Runoff 11.86 2 716 23,991 ------ ------ ------ Post A2 10 SCS Runoff 17.36 2 716 41,931 ------ ------ ------ Post A3 11 SCS Runoff 4.446 2 718 8,900 ------ ------ ------ Post A Sheet Flow 12 Combine 115.37 2 716 251,335 8, 9, 10, ------ ------ Post Al Total 11 13 Reservoir 70.57 2 722 251,331 12 2137.89 41,316 Post Al Routed 15 SCS Runoff 2.075 2 718 4,153 ------ ------ ------ Pre A2 16 SCS Runoff 0.790 2 718 1,582 ------ ------ ------ Post A2 18 Combine 90.86 2 720 223,497 6, 15, ------ ------ Pre A Total (Al + A2) 19 Combine 71.17 2 720 252,913 13, 16, ------ ------ Post A Total (Post Al Routed + Post 21 SCS Runoff 8.974 2 718 18,003 ------ ------ ------ Pre 131 22 SCS Runoff 11.89 2 716 24,169 ------ ------ ------ Post 131 23 Reservoir 10.99 2 718 24,168 22 2165.07 1,878 Post 131 Routed 25 SCS Runoff 0.443 2 718 1,185 ------ ------ ------ Pre B2 26 SCS Runoff 1.493 2 718 3,003 ------ ------ ------ Post B2 28 Combine 9.417 2 718 19,189 21, 25, ------ ------ Pre B Total (131 + 132) 29 Combine 12.48 2 718 27,171 23, 26, ------ ------ Post B Total (Post 131 Routed + Post Hydraflow - AVL Parking Lots V02.gpw Return Period: 100 Year Monday, 08 / 19 / 2019 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 1 Pre A1.1 Hydrograph type = SCS Runoff Peak discharge = 91.30 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 192,360 cuft Drainage area = 10.680 ac Curve number = 83 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.50 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Pre A1.1 Hyd. No. 1 -- 100 Year 0 120 240 360 480 600 720 840 960 Hyd No. 1 0 Q (cfs) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 2 Pre A1.2 Hydrograph type = SCS Runoff Peak discharge = 6.373 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 12,756 cuft Drainage area = 1.290 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 Pre A1.2 Hyd. No. 2 -- 100 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 0.00 ' 1 1 11 — ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 58 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 3 Pre A1.3 Hydrograph type = SCS Runoff Peak discharge = 2.964 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 5,933 cuft Drainage area = 0.600 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre A1.3 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 4 Pre A1.4 Hydrograph type = SCS Runoff Peak discharge = 4.107 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,295 cuft Drainage area = 0.670 ac Curve number = 68 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 Pre A1.4 Hyd. No. 4 -- 100 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 60 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 5 Pre Al Total Hydrograph type = Combine Peak discharge = 104.61 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 219,344 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 13.240 ac Pre Al Total Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 —�- -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (min) Hyd No. 4 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 6 Pre Al Routed Hydrograph type = Reservoir Peak discharge = 89.17 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 219,344 cuft Inflow hyd. No. = 5 - Pre Al Total Max. Elevation = 2138.63 ft Reservoir name = Existing Pond A Max. Storage = 19,477 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 Pre Al Routed Hyd. No. 6 -- 100 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 6 — Hyd No. 5 Total storage used = 19,477 cult 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 8 Post A1.1 Hydrograph type = SCS Runoff Peak discharge = 81.76 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 176,513 cuft Drainage area = 9.020 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.50 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 — Hyd No. 8 Post A1.1 Hyd. No. 8 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 9 Post A2 Hydrograph type = SCS Runoff Peak discharge = 11.86 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 23,991 cuft Drainage area = 1.830 ac Curve number = 70 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post A2 Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 9 Time (min) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 10 Post A3 Hydrograph type = SCS Runoff Peak discharge = 17.36 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 41,931 cuft Drainage area = 1.750 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •M .M 3.00 e Post A3 Hyd. No. 10 -- 100 Year Q (cfs) 18.00 15.00 12.00 m m 3.00 y' ' ' 0.00 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 10 Time (min) 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 11 Post A Sheet Flow Hydrograph type = SCS Runoff Peak discharge = 4.446 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,900 cuft Drainage area = 0.900 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 1.00 Post A Sheet Flow Hyd. No. 11 -- 100 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) Hydrograph Report 66 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 12 Post Al Total Hydrograph type = Combine Peak discharge = 115.37 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 251,335 cuft Inflow hyds. = 8, 9, 10, 11 Contrib. drain. area = 13.500 ac Post Al Total Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 12 Hyd No. 8 Hyd No. 9 Hyd No. 10 Time (min) Hyd No. 11 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 13 Post Al Routed Hydrograph type = Reservoir Peak discharge = 70.57 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 251,331 cuft Inflow hyd. No. = 12 - Post Al Total Max. Elevation = 2137.89 ft Reservoir name = Proposed Pond A Max. Storage = 41,316 cuft Storage Indication method used. Q (cfs) 120.00 100.00 40.00 20.00 Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 13 Hyd No. 12 Total storage used = 41,316 cult Hydrograph Report 68 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 15 Pre A2 Hydrograph type = SCS Runoff Peak discharge = 2.075 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 4,153 cuft Drainage area = 0.420 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre A2 Q (cfs) Hyd. No. 15 -- 100 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 15 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 16 Post A2 Hydrograph type = SCS Runoff Peak discharge = 0.790 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,582 cuft Drainage area = 0.160 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 Post A2 Hyd. No. 16 -- 100 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 16 Time (min) Hydrograph Report 70 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 18 Pre A Total (Al + A2) Hydrograph type = Combine Peak discharge = 90.86 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 223,497 cuft Inflow hyds. = 6, 15 Contrib. drain. area = 0.420 ac Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 10.00 0.00 0 Pre A Total (Al + A2) Hyd. No. 18 -- 100 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 18 Hyd No. 6 Hyd No. 15 Hydrograph Report 71 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 19 Post A Total (Post Al Routed + Post A2) Hydrograph type = Combine Peak discharge = 71.17 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 252,913 cuft Inflow hyds. = 13, 16 Contrib. drain. area = 0.160 ac Q (cfs) 80.00 70.00 40.00 20.00 10.00 Post A Total (Post Al Routed + Post A2) Hyd. No. 19 -- 100 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 19 Hyd No. 13 Hyd No. 16 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 21 Pre B1 Hydrograph type = SCS Runoff Peak discharge = 8.974 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 18,003 cuft Drainage area = 1.700 ac Curve number = 63 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 Were . OX 4.00 r w Pre 1131 Hyd. No. 21 -- 100 Year Q (cfs) 10.00 N. We 4.00 r w 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 Time (min) 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 22 Post B1 Hydrograph type = SCS Runoff Peak discharge = 11.89 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 24,169 cuft Drainage area = 1.700 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post 1131 Q (cfs) Hyd. No. 22 -- 100 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 22 Time (min) 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 23 Post B1 Routed Hydrograph type = Reservoir Peak discharge = 10.99 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 24,168 cuft Inflow hyd. No. = 22 -Post B1 Max. Elevation = 2165.07 ft Reservoir name = Proposed Pond B Max. Storage = 1,878 cuft Storage Indication method used. Q (cfs) 12.00 10.00 M M 4.00 r M� Post 1131 Routed Hyd. No. 23 -- 100 Year Q (cfs) 12.00 10.00 M . �� 4.00 r M� 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 23 Hyd No. 22 Total storage used = 1,878 cult 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 25 Pre B2 Hydrograph type = SCS Runoff Peak discharge = 0.443 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,185 cuft Drainage area = 0.400 ac Curve number = 39 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 Pre B2 Hyd. No. 25 -- 100 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 25 Time (min) Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 26 Post B2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.400 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.28 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 Post B2 Hyd. No. 26 -- 100 Year 120 240 360 480 600 720 840 960 Hyd No. 26 Monday, 08 / 19 / 2019 = 1.493 cfs = 718 min = 3,003 cuft = 54 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 77 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 28 Pre B Total (131 + 132) Hydrograph type = Combine Peak discharge = 9.417 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 19,189 cuft Inflow hyds. = 21, 25 Contrib. drain. area = 2.100 ac Q (cfs) 10.00 UR . UX 4.00 r W Pre B Total (1131 + 1132) Hyd. No. 28 -- 100 Year 120 240 360 480 600 720 Hyd No. 28 Hyd No. 21 Q (cfs) 10.00 H. We 4.00 r W 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 25 Hydrograph Report 78 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Hyd. No. 29 Post B Total (Post B1 Routed + Post 132) Hydrograph type = Combine Peak discharge = 12.48 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 27,171 cuft Inflow hyds. = 23, 26 Contrib. drain. area = 0.400 ac Q (cfs) 14.00 12.00 10.00 01 M 4.00 ItX Post B Total (Post 1131 Routed + Post 1132) Hyd. No. 29 -- 100 Year Q (cfs) 14.00 12.00 10.00 . �� 4.00 of 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 29 Hyd No. 23 Hyd No. 26 Time (min) Hydraflow Rainfall Report 79 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2020 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 28.8114 5.7000 0.6999 -------- 2 35.5734 6.2000 0.7184 -------- 3 0.0000 0.0000 0.0000 -------- 5 45.5740 6.6000 0.7318 -------- 10 51.8424 6.5000 0.7301 -------- 25 58.2307 6.2000 0.7171 -------- 50 60.7598 5.7000 0.6997 -------- 100 62.7033 5.2000 0.6814 -------- File name: FLETCHER 2019.IDF Intensity = B / (Tc + D)^E Monday, 08 / 19 / 2019 Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 5.48 4.19 3.46 2.97 2.62 2.36 2.15 1.99 1.85 1.73 1.63 1.54 2 6.27 4.81 3.97 3.41 3.00 2.70 2.46 2.27 2.10 1.97 1.85 1.75 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.58 5.83 4.81 4.13 3.64 3.27 2.98 2.74 2.54 2.38 2.23 2.11 10 8.71 6.70 5.52 4.74 4.18 3.75 3.41 3.14 2.92 2.73 2.56 2.42 25 10.30 7.90 6.52 5.60 4.94 4.44 4.05 3.73 3.46 3.24 3.05 2.88 50 11.57 8.85 7.29 6.27 5.53 4.98 4.54 4.19 3.90 3.65 3.44 3.25 100 12.88 9.82 8.09 6.96 6.15 5.54 5.06 4.67 4.35 4.08 3.84 3.64 Tc = time in minutes. Values may exceed 60. C:WutotaskWorkDlace\Enaineerina Proiects\00 Enaineerina Desian\OLD\Hvdroloav\GENERAL\PCP\Fletcher.DcD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 2.91 3.49 0.00 4.29 4.94 5.82 6.60 7.28 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents Hydraflow -AVL Parking LotsV02.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 08 / 19 / 2019 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre A1.1................................................................................ 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, Pre A1.2................................................................................ 6 Hydrograph No. 3, SCS Runoff, Pre A1.3................................................................................ 7 Hydrograph No. 4, SCS Runoff, Pre AlA................................................................................ 8 Hydrograph No. 5, Combine, Pre Al Total.............................................................................. 9 Hydrograph No. 6, Reservoir, Pre Al Routed........................................................................ 10 Pond Report - Existing Pond A......................................................................................... 11 Hydrograph No. 8, SCS Runoff, Post A1.1............................................................................. 12 Hydrograph No. 9, SCS Runoff, Post A2................................................................................ 13 Hydrograph No. 10, SCS Runoff, Post A3.............................................................................. 14 Hydrograph No. 11, SCS Runoff, Post A Sheet Flow............................................................ 15 Hydrograph No. 12, Combine, Post Al Total......................................................................... 16 Hydrograph No. 13, Reservoir, Post Al Routed..................................................................... 17 Pond Report - Proposed Pond A....................................................................................... 18 Hydrograph No. 15, SCS Runoff, Pre A2............................................................................... 19 Hydrograph No. 16, SCS Runoff, Post A2.............................................................................. 20 Hydrograph No. 18, Combine, Pre A Total (Al + A2)............................................................ 21 Hydrograph No. 19, Combine, Post A Total (Post Al Routed + Post A2).............................. 22 Hydrograph No. 21, SCS Runoff, Pre B1............................................................................... 23 Hydrograph No. 22, SCS Runoff, Post B1............................................................................. 24 Hydrograph No. 23, Reservoir, Post B1 Routed..................................................................... 25 Pond Report - Proposed Pond B....................................................................................... 26 Hydrograph No. 25, SCS Runoff, Pre B2............................................................................... 27 Hydrograph No. 26, SCS Runoff, Post B2............................................................................. 28 Hydrograph No. 28, Combine, Pre B Total (B1 + 132)............................................................ 29 Hydrograph No. 29, Combine, Post B Total (Post B1 Routed + Post 132).............................. 30 25 - Year SummaryReport ....................................................................................................................... 31 HydrographReports................................................................................................................. 32 Hydrograph No. 1, SCS Runoff, Pre A1.1.............................................................................. 32 Hydrograph No. 2, SCS Runoff, Pre A1.2.............................................................................. 33 Hydrograph No. 3, SCS Runoff, Pre A1.3.............................................................................. 34 Hydrograph No. 4, SCS Runoff, Pre AlA.............................................................................. 35 Hydrograph No. 5, Combine, Pre Al Total............................................................................ 36 Hydrograph No. 6, Reservoir, Pre Al Routed........................................................................ 37 Hydrograph No. 8, SCS Runoff, Post A1.1............................................................................. 38 Hydrograph No. 9, SCS Runoff, Post A2................................................................................ 39 Hydrograph No. 10, SCS Runoff, Post A3.............................................................................. 40 Hydrograph No. 11, SCS Runoff, Post A Sheet Flow............................................................ 41 Contents continued... Hydraflow - AVL Parking Lots V02.gpw Hydrograph No. 12, Combine, Post Al Total......................................................................... 42 Hydrograph No. 13, Reservoir, Post Al Routed..................................................................... 43 Hydrograph No. 15, SCS Runoff, Pre A2............................................................................... 44 Hydrograph No. 16, SCS Runoff, Post A2.............................................................................. 45 Hydrograph No. 18, Combine, Pre A Total (Al + A2)............................................................ 46 Hydrograph No. 19, Combine, Post A Total (Post Al Routed + Post A2).............................. 47 Hydrograph No. 21, SCS Runoff, Pre B1............................................................................... 48 Hydrograph No. 22, SCS Runoff, Post B1............................................................................. 49 Hydrograph No. 23, Reservoir, Post B1 Routed..................................................................... 50 Hydrograph No. 25, SCS Runoff, Pre B2............................................................................... 51 Hydrograph No. 26, SCS Runoff, Post B2............................................................................. 52 Hydrograph No. 28, Combine, Pre B Total (B1 + 132)............................................................ 53 Hydrograph No. 29, Combine, Post B Total (Post B1 Routed + Post 132).............................. 54 100 - Year SummaryReport ....................................................................................................................... 55 HydrographReports................................................................................................................. 56 Hydrograph No. 1, SCS Runoff, Pre A1.1.............................................................................. 56 Hydrograph No. 2, SCS Runoff, Pre A1.2.............................................................................. 57 Hydrograph No. 3, SCS Runoff, Pre A1.3.............................................................................. 58 Hydrograph No. 4, SCS Runoff, Pre A1.4.............................................................................. 59 Hydrograph No. 5, Combine, Pre Al Total............................................................................ 60 Hydrograph No. 6, Reservoir, Pre Al Routed........................................................................ 61 Hydrograph No. 8, SCS Runoff, Post A1.1............................................................................. 62 Hydrograph No. 9, SCS Runoff, Post A2................................................................................ 63 Hydrograph No. 10, SCS Runoff, Post A3.............................................................................. 64 Hydrograph No. 11, SCS Runoff, Post A Sheet Flow............................................................ 65 Hydrograph No. 12, Combine, Post Al Total......................................................................... 66 Hydrograph No. 13, Reservoir, Post Al Routed..................................................................... 67 Hydrograph No. 15, SCS Runoff, Pre A2............................................................................... 68 Hydrograph No. 16, SCS Runoff, Post A2.............................................................................. 69 Hydrograph No. 18, Combine, Pre A Total (Al + A2)............................................................ 70 Hydrograph No. 19, Combine, Post A Total (Post Al Routed + Post A2).............................. 71 Hydrograph No. 21, SCS Runoff, Pre B1............................................................................... 72 Hydrograph No. 22, SCS Runoff, Post B1............................................................................. 73 Hydrograph No. 23, Reservoir, Post B1 Routed..................................................................... 74 Hydrograph No. 25, SCS Runoff, Pre B2............................................................................... 75 Hydrograph No. 26, SCS Runoff, Post B2............................................................................. 76 Hydrograph No. 28, Combine, Pre B Total (B1 + 132)............................................................ 77 Hydrograph No. 29, Combine, Post B Total (Post B1 Routed + Post 132).............................. 78 OFReport.................................................................................................................. 79