HomeMy WebLinkAboutSW1190901_Combined_20190910There are no Deed Restrictions and Protective Covenants Processing fee $505 will be sent in via check Section 1 PROJECT OVERVIEW 1.1 Narrative The Asheville Regional Airport - Parking Lots project includes the construction of two new parking lots, Lot A and Lot B, and associated grading, drainage, stormwater, landscaping and erosion control. This project also includes construction of two dry stormwater management ponds. This report includes the stormwater design calculations and facilities that will be installed to meet Buncombe County requirements. The report will also review the stormwater impacts on the property and downstream to ensure no adverse impacts will result from the construction. 1.2 Introduction and Site Description The site is located at Asheville Regional Airport in Fletcher, NC, south of Asheville, North Carolina near Airport Road (35° 26' 10.38" N, 82° 32' 8.61"W). The area that includes airport related operations encompasses approximately 580 acres. For a larger vicinity map, see Appendix A. The Asheville Regional Airport Parking Lots project site is located on an existing undeveloped area in the eastern portion of the airport, located along Airport Road. 9eo Asheville ¢, a ,... Regional 0 Airport For stormwater management planning purposes, the site is comprised of Hydrologic Soil Group (HSG) A and B soils. Appendix A contains the NRCS Soil Survey Maps for each parking lot. The existing land use of the project is grass, gravel, forest, and impervious. The proposed land use will impervious (parking lots) with a small amount of grass for landscaping. As shown in the FEMA FIRM 3700964200K (January 6, 2010) and FEMA FIRM 3700964300K (January 6, 2010) in Appendix A, the disturbance is not located within 200ft of a FEMA floodplain. 1.3 Construction Sequence and Cost As explained later in the report, stormwater management ponds are proposed to reduce post - construction flow rates to pre -construction levels. The construction of the permanent stormwater management measures will occur during the grading phase of the project and will be used as temporary sediment basins to protect downstream receiving stormwater systems from construction activity. After the site is stabilized, the measures will be cleaned out and re -graded to final design grades. The cost of pond Al and B1 are unknown at this time and will be finalized during bidding. The Asheville Regional Airport will be the end -user and responsible for annual inspection, maintenance and repairs of the system. Section 3.3 discusses the operation and maintenance of the ponds. 3 ASHEVILLE REGIONAL AIRPORT- PARKING LOTS INITIAL SUBMITTAL: 8/7/19 STORMWATER MANAGEMENT REPORT REVISION #1: 8/20/19 Section 2 HYDROLOGY 2.1 Project Methodology The NRCS Curve Number Method (also known as the SCS Method) was used to determine Pre - Construction and Post -Construction peak flow rates. The NRCS Method applicable to this area is based on a 24-hour storm event that has a Type II time distribution with a 484 shape factor. The software program, Hydraflow Hydrographs, was used to route the system through a series of hydrographs and determine the effects of the proposed improvements. The following Precipitation Table for Fletcher, NC from NOAA's National Weather Service Hydrometeorological Design Studies Center Precipitation Frequency Data Server was used for the hydrologic analysis. See full NOAA Atlas 14 Precipitation Table in Appendix A. The Buncombe County 1-yr storm post -construction requirement was followed for this report but the 25- and 100-yr storms were checked for capacity and safe conveyance. 24-hr Precipitation Amount (in) 1-yr 25-yr 100-yr 2.91 5.82 7.28 The following curve numbers were used for hydrologic analysis of Lot A: CN= 61 (Open Space, good cond., HSG B) CN= 98 (Impervious area) CN= 85 (Gravel, HSG B) The following curve numbers were used for hydrologic analysis of Lot B: CN= 39 (Open Space, good cond., HSG A) CN= 98 (Impervious area) CN= 76 (Gravel, HSG A) 4 ASHEVILLE REGIONAL AIRPORT- PARKING LOTS INITIAL SUBMITTAL: 8/7/19 STORMWATER MANAGEMENT REPORT REVISION #1: 8/20/19 The Rational Method was used for the parking lots' pipe design on the development. The Intensity Duration Frequency (IDF) curve for Fletcher, NC below was used for the calculations: 1A 21j00 11 I YF 9-00 to s-0o a V� &W 0.na 10 115 20 25 30 35 40 16 60 Ri W T� (mill) The following runoff coefficients were also used for hydraulic (storm inlet and pipe) analysis of Lot A: c = 0.30 (Grass, HSG B) c = 0.50 (Gravel, HSG B) c = 0.95 (Impervious area) The following runoff coefficients were also used for hydraulic (storm inlet and pipe) analysis of Lot B: c = 0.20 (Grass, HSG A) c = 0.45 (Gravel, HSG A) c = 0.95 (Impervious area) 9 ASHEVILLE REGIONAL AIRPORT - PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 2.2 Pre -Construction Hydrology Parking Lot A The existing site consists of a grassed area east of the airport that contains a cell tower and a road to service the cell tower. The offsite areas to the north and east that flow through the subject site consist of a parking lot, a hotel, a gas station, and a car dealership. Overall Basin Al is divided into four (4) sub basins that all converge at an existing 36" pipe that flows under Highway 280. Basin A1.1 contains the parking, gas station, hotel, and car dealership. The runoff generated by this basin sheet flows to the existing drainage network where it is routed to the existing detention pond. Basin A1.2 is the northeast portion of the grassed area which flows to an existing headwall where it is then routed to the existing detention pond. Basin A1.3 is the southeast portion of the grassed area; its runoff sheet flows to an existing headwall where it is then routed to the existing detention pond. Basin A1.4 occupies the northwest portion of the grassed area and it also flows directly to the existing 36" pipe outlet. Basin A2 is a separate sub watershed that does not exit the property at the 36" pipe but rather flows south along Highway 280. Al and A2 converge downstream of airport property and eventually discharge into the French Broad River but for purposes of this report they are separated outfall points. Parking Lot B The existing site consists of a wooded area, a gravel parking lot, and a portion of Wright Brothers Way. The site is divided into two drainage basins: Basin B1 and Basin B2. Basin B1 is the western portion of the basin and it is occupied by a portion of the wooded area, the entire gravel parking lot, and a portion of Wright Brothers Way. The runoff generated by Basin B1 sheet flows to the west and onto Wright Brothers Way where it is collected by grate inlets along the curb line. The runoff then flows to the south where it eventually leaves the site in a pipe that runs underneath Wright Brothers Way. Basin B2 is a separate basin that lies to the southeast of Basin B1. Basin B2 is occupied solely by a wooded area. The runoff generated by Basin B2 sheet flows to the east where is collected by a ditch along Highway 280. The ditch flows to the south where it exits the site. B1 and B2 flow to the same spot down Wright Brothers Way and also merge with Al and A2 at the French Broad River. Appendix B shows the overall Pre -Construction map. The table below illustrates the drainage areas, weighted curve number, and Times of Concentration. PRE -CONSTRUCTION Basin Total Area AC I mperv. Grassed Grassed Gravel Gravel C CN Tc min HSG A, (HSGB, (HSGB. HSG A. 0.95 98 Lot B) 0.20 39 Lot A) 0.30 61 Lot A) 0.50 1 85 Lot B) 0.50 76 Pre Al 13.2 6.1 6.6 0.5 0.61 79 7 Pre A2 0.4 0.4 0.30 61 5 Pre 131 1.7 0.4 0.9 0.4 0.46 63 5 Pre 132 0.4 0.4 0.20 39 5 TOTAL 15.78 6.53 1.27 7.01 0.42 6 ASHEVILLE REGIONAL AIRPORT - PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 2.3 Post -Construction Hydrology Parking Lot A The proposed project will replace most of the grassed area with paved parking lots. Post construction there will be two drainage basins, Basin Al and Basin A2. Basin Al occupies a similar area to pre - construction basin Al and is divided into three sub basins, Al and A2 and A3. Al is the same runoff from the north that flows into the existing 30" CMP system. In post -construction the new Parking Lot A North connects to this system and into the existing pond. The existing pond will be regraded to expand its capacity and a new Outlet Control Structure (OCS) will be constructed to ensure the post - development flow is less than the pre -construction flow for the 1-year storm. Basin A2 collects runoff from the east hotel and undisturbed grass area from the east through new pipes and into the stormwater pond. A3 will be collected in the new Parking Lot A South drainage system and then routed to the stormwater pond. The runoff will exit the site out of an existing 36" CMP pipe that flows under Highway 280. Basin A2 occupies a similar area to pre -construction Basin A2, but the area is reduced. Because of the reduction of area, no stormwater management is needed for the region. The runoff from Basin A2 flows to the south along Highway 280. Al and A2 converge downstream of airport property and eventually discharge into the French Broad River but for purposes of this report they are separate outfall points. Parking Lot B The proposed project will replace the existing gravel parking lot with an expanded paved lot. Post - construction there will be two drainage basins, B1 and B2. Basin B1 will occupy a similar area to pre - construction Basin B1 is entirely the proposed Parking Lot B. The runoff generated by Basin B1 will be collected by a proposed drainage system and routed to a new proposed detention pond. The proposed pond will contain an Outlet Control Structure (OCS) to ensure the post -construction flow is less than the pre -construction flow for the 1-year storm. The pond will contain a 15" concrete outlet pipe and will tie into the existing drainage system and exit the site through a pipe under Wright Brothers Way at the same location as pre -construction. Basin B2 will occupy a similar area to pre -construction Basin B2. Basin B2 is comprised of a grassed area and a small portion of the proposed parking lot. Runoff generated by Basin B2 will sheet flow to the east where it will be collected by a ditch running alongside Highway 280. The ditch flows to the south where it exits the site. B1 and B2 flow to the same spot down Wright Brothers Way and merge with Al and A2 at the French Broad River. 7 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Appendix B shows the overall Post -Construction map and Appendix C contains Grading and Drainage Plans, Stormwater Details, and Pipe Profiles. The table below illustrates the Post -Construction drainage areas, weighted curve number, and Times of Concentration. POST -CONSTRUCTION Basin Total Area AC Imperv. Grassed Grassed Gravel Gravel C CN Tc min HSG A, (HSGB, (HSGB. HSG A. 0.95 98 Lot B) 0.20 39 Lot A) 0.30 61 Lot A) 0.50 85 Lot B) 0.45 76 Post Al 13.5 8.5 5.0 0.5 0.73 88 7 Post A2 0.2 0.2 0.30 61 5 Post B1 1.7 1.0 0.7 0.64 73 5 Post B2 0.4 0.1 0.3 0.39 54 5 TOTAL 15.78 9.60 1.02 5.16 0.00 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Section 3 STORMWATER CALCULATIONS 3.1 Comparison of Pre -Construction vs. Post -Construction Discharges Due to the increase in impervious area in Basins Al and B1 the runoff generated in these areas will increase post -construction. In order to mitigate the effects of this increase, detention ponds were designed to detain the runoff and discharge it at a rate that is less than the pre -construction rate for the 1-year storm. Due to a reduction in area, Basin A2 will generate less runoff post -construction. While the impervious area increased in Basin B2, B2 experienced negligible increases in runoff in the 1-year storm (< 0.1 cfs). Therefore, stormwater management facilities were not proposed for Basin B2. The peak flow rates for the 1-year storm pre -construction and post- construction can be seen below. The details for the stormwater management facilities can be found in Appendix C. Drainaee Basin 1-Year Pre- Construction Flow 1-Year Undetained Post -Development Detention Needed? Post -Construction Flow cfs Increase M Al 26.3 34.1 29.6% Yes A2 0.2 0.1 -61.8% No B1 0.9 2.3 146.6% Yes B2 0.0 0.0 0.0% No As mentioned previously, dry detention ponds were used in Basins Al and B1 to reduce the peak flow. The new post -construction detained flows are listed below showing the reduced flow rates. Drainaee Basin 1-Year Pre- Construction Flow 1-Year Detained Post- Post -Development Detention Construction Flow cfs Increase (%) Achieved cfs Al 26.3 24.1 -8.3% yes B1 0.9 0.7 -21.2% yes ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT The stage storage for the ponds are as shown in the tables below and can be found in the Hydraflow Hydrographs report in Appendix F. Pond Al (Existing) Stage ft Elev ft Proposed Storage (cf) 0.0 2129.5 0 1.5 2131.0 74 2.5 2132.0 278 3.5 2133.0 777 4.5 2134.0 1,728 5.5 2135.0 3,339 6.5 2136.0 5,890 7.5 2137.0 9,701 8.5 2138.0 14,952 9.5 2139.0 22,973 Pond Al (Proposed) Stage ft Elev ft Proposed Storage (cf) 0.0 2129.5 0 0.5 2130.0 487 1.5 2131.0 2,816 2.5 2132.0 5,800 3.5 2133.0 9,365 4.5 2134.0 13,729 5.5 2135.0 19,196 6.5 2136.0 25,905 7.5 2137.0 33,898 8.5 2138.0 43,292 9.5 2139.0 54,299 Pond B1 Stage ft Elev ft Proposed Storage (cf) 0.0 2162.0 0 1.0 2163.0 410 2.0 2164.0 1,017 3.0 2165.0 1,846 4.0 2166.0 2,923 As observed in the two Pond Al tables above, approximately 31,000 cf of extra storage was generated by excavating the existing pond Al. This extra storage, along with the OCS addition, is what reduces the peak flow rates out of the pond. 10 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Adequate freeboard is a concern to ensure the 100-year storm does not overtop the ponds and spill onto the roadways. The tables below illustrate the 1-year, 25-year and 100-year water surface elevations and freeboard in relation to the top of dams. Pond Al Peak Storm Freeboard Elevation Frequency (ft) (ft) 1 2133.1 5.9 25 2136.6 2.4 100 2137.9 1.1 Pond B1 Peak Freeboard Storm Elevation Frequency (ft) (ft) 1 2164.1 1.9 25 2164.7 1.3 100 2165.1 1 0.9 As shown in the tables above, the on -site stormwater management results in a decrease in the flow for the 1-year storm and keeps the 100-year storm contained in the ponds with adequate freeboard. Therefore, the construction of the Asheville Regional Airport Parking Lots Project is not anticipated to have adverse impacts. 11 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT 3.2 Drainage & Erosion Control Design Per Buncombe County requirements, the inlets and pipes were designed for the 25-yr storm. Pipe Charts can be found in Appendix E showing pipe capacity and gutter spread. Energy Dissipators at the proposed pipe outfalls can be found in Appendix C. Erosion Control design can be found in Appendix C. 3.3 Operation and Maintenance Manual The two dry detention ponds require maintenance in order to work properly. An O&M plan has been developed and can be found in Appendix D. 3.4 Design Software and Manuals The following design software programs were used in analysis and development of the stormwater and documents: • Hydraflow Hydrographs for AutoCAD Civil 3D 2019 • Hydraflow Storm Sewers for Auto CAD Civil 3D 2017 • AutoCAD Civil 3D 2018 • Microsoft Office 2017 The following design manuals and literature were used in analysis and development of the stormwater documents: • NCDEQ Stormwater Design Manual— 2017 Edition • Buncombe County Stormwater Management Plan Review Checklist • County of Buncombe Checklist and Guidelines for the Preparation of the Erosion and Sedimentation Control Plans 12 ASHEVILLE REGIONALAIRPORT-PARKING LOTS INITIAL SUBMITTAL:8/7/19; REVISION 1: 8/20/19 STORMWATER MANAGEMENT REPORT Calculations can be found in the separate Stormwater Management Report, last Revised August 20, 2019. Plans can be found in the separate 8.5"x14" package included.