Loading...
HomeMy WebLinkAbout20191196 Ver 1_PCN Form Submission (3)_20190910DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Oange only if needed. BIMS # Assigned * Version#* 20191196 1 Is a payment required for this project?* r No payment required r Fee received Reviewing Office* r Fee needed - send electronic notification Central Office - (919) 707-9000 Select Project Reviewer* April Norton:eads\arnorton Information for Initial Review 1a. Name of project: Ditch and outfall repair at 1-40 and Millstream Road 1a. Who is the Primary Contact?* NCDOT Division 7 Division Engineer, Mr. Mike Mills, PE 1b. Primary Contact Email:* 1c. Primary Contact Phone:* mmills@ncdot.gov (336)487-0000 Date Submitted 9/10/2019 Nearest Body of Water UT to Little Alamance Creek Basin Cape Fear Water Classification 16-19-3-(0.5); WS-IV; NSW Site Coordinates Latitude: Longitude: 36.058076-79.642336 AProcessing Information U County (or Counties) where the project is located: Guilford Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS # (?) 50455.3.1 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express W Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No FB. Applicant Information 1d. Who is applying for the permit? r- Owner rJ Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NC Department of Transportation 2b. Deed book and page no.: N/A 2c. Responsible party: 2d.Address Street Address PO Box14996 Address Line 2 City State / Frovinre / R�gion Greensboro NC Fbstal / Zip Code Q�untry 27415 USA 2e. Telephone Number: 2f. Fax Number: (336)487-0000 (336)334-3637 2g. Email Address:* * r Yes r No r Yes r No mmills@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: NCDOT Division 7 Division Engineer, Mr. Mike Mills, PE 3b. Business Name: 3c.Address Street Address PO Box14996 Address Line 2 CKY Greensboro Postal / Zip Code 27415 3d. Telephone Number: (336)487-0000 3f. Email Address:* mmills@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: If appropriate) 1c. Nearest municipality/town: Greensboro 2. Project Identification 2a. Property Identification Number: N/A 2c. Project Address Street Address Address Line 2 cfty Postal / Zip Cede 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* UT to Little Alamance Creek 3b. Water Resources Classification of nearest receiving water:* 16-19-3-(0.5); WS-IV; NSW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300020303 4. Project Description and History State / Frwince / Pagion NC Country USA 3e. Fax Number: (336)334-3637 2b. Property size: N/A State / R'winee / RPogion Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing site conditions include industrial property (i.e. LabCorps, General Dynamics) and their associated parking lots, Interstate 40 to the north and Millstream Road to the south (Millstream parallels 1-40 eastbound lanes; the project area is in between these two roads) and AT&T Drive (Mich runs north -south) to the east. There is a small amount of undisturbed forested area within the project boundaries that currently contains a failing/broken concrete flume. The rest of the project is within the maintained right-of-way between Millstream Road and 1-40. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r^ Yes r No r^ Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Millstream_AT&T_Guilford_USGS.pdf 205.66KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Millstream _AT&T _Guilford_Soil.pdf 313.29KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.00 49. List the total estimated linear feet of all existing streams on the property: -40 4h. Explain the purpose of the proposed project:* Collapsed pipes under 1-40 resulting in 2 sinkholes have necessitated the need to collect and redirect stormwater into a drainage system that parallels 1-40 and Millstream Road. The existing drainage systems - which include a grassed swale paralleling 1-40 at grades steeper than 4 % up to 15 % and a concrete flume paralleling Millstream Road (each system drained their respective roadway drainage) - are failing, unstable and cannot handle any additional stormwater and therefore must be reinstalled. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The Department will flowable fill the failing 24-inch pipe under 1-40 and collect the stormwater in a 30-inch RCP which will run parallel to 1-40 and Millstream Road. This pipe will extend to the Millstream Road and AT&T Drive crossing. The pipe size and type wt11 then transition to a 36-inch HDPE which will also pick up the existing drainage from an existing 18-inch pipe under AT&T drive. This will then drop down to a junction box (see attached schematic) which will have a 42-inch HDPE outlet to a rip rap pad at the stream. Please note there is an existing "cut out" in the stream bank (visible in one of the attached pictures) where all the stormwater has and is currently flowing; the Deparment's goal is to tie into that with as little disturbance to the stream bottom as is possible. Additionally, a new grassed ditch between 1-40 east bound lanes and Millstream Road Will collect stormwater for approximately 1.3 acres of pavement, however, the slope will be steeper than 4 % and the Department intends to install rock checks prior to the inlets to slow the water down and provide some treatment. Equipment to be used includes a track hoe, dump truck, paving equipment and various hand tools, possibly a crane to move construction material such as reinforced bars of steel and concrete buckets to place concrete 4j. Please upload project drawings for the proposed project. MillstreamRd_140_plans.pdf 27.14MB MillstreamRd_140_buffer.pdf 2.65MB MillstreamRd_140_buffer_con.pdf 2.71 MB Picture Log.pdf 432.92KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No f Unknown Comments 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type* �[3f. Typeofh* 3h. Impact (?) urisdiction* length* g� Rip rap pad outlet Permanent Rip Rap Fill U`T to Little Alamance Creek Perennial Both 1Ave aqe (feet) 2Qinea feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 3i. Total temporary stream impacts: 25 0 3i. Total stream and ditch impacts: 25 3j. Comments: There is an existing "outlet" through the stream bank where stormwater has traditionally (and continues) to flow, the department will add rip rap stabilization from the outlet of the junction box to tie in with the stream channel. It is the intent to only add enough to insure long term stability and will not fill the entire channel. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Clh ck all that apply. r Neuse r Tar -Pamlico r Catawba r Randleman r Goose Creek W Jordan Lake r Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Grading/Fill P UT to Little Alamance Creek No 2,650 2,180 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 2,650.00 2,180.00 Zone 1 Zone 2 Total combined buffer impacts: 2,650.00 2,180.00 61. Comments: The area was previously impacted when the original stormwater flume was installed. It is currently just outside the "existing transportation facility" (ETF) as defined. The department will limit tree removal to what is strictly necessary and will revegetate the area post construction (native grasses). Currently, the area is severely eroded and the bedrock is exposed (i.e. no mature vegetation in that immediate vicinity). Supporting Documentation E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Collapsed pipes under 1-40 resulting in 2 sinkholes have necessitated the need to collect and redirect stormwater into a drainage system that parallels 1-40 and Millstream Road. The existing drainage systems - which include a grassed swale paralleling 1-40 at grades steeper than 4 % up to 15 % and a concrete flume paralleling Millstream Road (each system drained their respective roadway drainage) - are failing, unstable and cannot handle any additional stormwater and therefore must be reinstalled. The Department will flowable fill the failing 24-inch pipe under 1-40 and collect the stormwater in a 30-inch RCP which will run parallel to 1-40 and Millstream Road. This pipe will extend to the Millstream Road and AT&T Drive crossing. The pipe size and type will then transition to a 36-inch HDPE which will also pick up the existing drainage from an existing 18-inch pipe under AT&T drive. This will then drop down to a junction box (see attached schematic) which will have a 42-inch HDPE outlet to a rip rap pad at the stream. Please note there is an existing "cut out" in the stream bank (visible in one of the attached pictures) where all the stormwater has and is currently flowing; the Department's goal is to tie into that with as little disturbance to the stream bottom as is possible. Additionally, a new grassed ditch between 1-40 east bound lanes and Millstream Road will collect stormwater for approximately 1.3 acres of pavement, however, the slope will be steeper than 4 % and the Department intends to install rock checks prior to the inlets to slowthe water down and provide some treatment. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion and sedimentation BMPs will be installed prior to construction. The outside wetland, stream and riparian areas will be noted with highly visible fencing. Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters, restrictions against staging of equipment in or adjacent to waters of the US and coordination (including a pre -construction meeting) with the Division Environmental Office Supervisor. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The impacts are below mitigation requirement thresholds. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen • Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments G. Supplementary Information v 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments:* The project falls belowthe SEPA notification thresholds. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Per the NC DWQ April 2004 Version 2.1 Cumulative Impacts policy, small scale public transportation projects — such as widening projects, bridge replacements and intersection improvements — have a "low potential for cumulative impact since little (if any) new impervious surface is added and the projects are usually already in developed locales." This proposed project is within a somewhat developed landscape (i.e. existing residences in the vicinity), this is not a road on a new location (i.e. there is an existing road and bridge structure and thus the area already contains impervious surfaces) and the project drains to Little Alamance Creek, which is Class WS-IV; Nutrient Sensitive Waters (NSW), (i.e. not HOW or ORW). We anticipate the NCDWR will advise us if a qualitative or quantitative analysis is needed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes (- No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown Se. Is this a DOT project located within Division's 1-8? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPAC and field investigation. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* This project takes place in Guilford County which not near any coastal habitat that would support EFH (i.e. salt marshes, oyster reefs, etc.) 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* SHPO web map viewer. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT MCA 8c. What source(s) did you use to make the floodplain determination?* NC FRIS Maps Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: James Michael Mills Signature 6—#L�A44,4" Date 9/10/2019