Loading...
HomeMy WebLinkAbout19950227 Ver 1_COMPLETE FILE_19950110State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Pros on Howard, Jr., P.E., Director XT:FWA?EHNR April 3, 1995 Wake County DEM Project # 95227 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS Mr. R. James Gamer 6200 Falls of the Neuse Road Suite 102 Raleigh, N. C. 27609 FILE ? p Dear Mr. Gamer: You have our approval to place fill material in 0.98 acres of wetlands or waters for the purpose of a bank and shopping center at NC 55 and SR 1152, as you described in your application dated 2 March 1995. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 2671. This certification allows you to use Nationwide Permit Number 26 when it is issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. For this approval to be valid, you must follow the conditions listed in the attached certification. Stormwater shall be directed to sheetflow across and be detained in the wetlands upslope of the bank site. Fill in wetlands for the bank site shall not occur until DEM has approved the stormwater plan. In addition, you should get any other federal, state or local permits before you go ahead with your project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 30 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Environmental Management under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Sincerely, ston Howard, Jr. P Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Raleigh DEM Regional Office Mr. John Dorney Central Files Kevin Martin; Soil and Environmental Consultants 95227.1tr P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper State of North Carolina Department of Environment, Health and Natural Resources ` • • Division of Environmental Management James B, Hunt, Governor p E H N FI Jonathan B, Howes, Secretary A. Preston Howard, Jr., P.E., Director May 18, 1995 Mr. R. James Garner 6200 Falls of the Neuse Road Suite 102 Raleigh, N.C. 27602 Dear Mr. Garner; FILE COPY Re: Holly Springs Shopping Center DEM # 95227 Wake County DEM staff have reviewed your plans dated 28 April 1995 (submitted by Kevin Martin of Soil and Environmental Consultants) for stormwater management at the Holly Spring Shopping Center. These plans are acceptable and fulfill the additional condition of the 401 Certification issued on 3 April 1995. Please call me at 919-733-1786 if you have any questions. Sincerely, qR ?y . dDomey cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Raleigh DEM Regional Office Mr. John Dorney Central Files Kevin Martin; Soil and Environmental Consultants 95227.1tr P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employar 50% recycled/ 10% post-consumer paper • , • Soil, & Environmental Consultants, Inc. 244 West Millbrook Road ¦ Raleigh, North Carolina 27609 ¦ (919) 846-5900 ¦ Fax (919) 846-9467 DATE: April 28,1995 TO: John Dorney FROM: Kevin Martin MEMO 4 ; RE: Jim Garner, Holly Springs Shopping Center Enclosed are 3 copies of the "green" impoundment proposed for the above named project. The purpose of the "green" impoundment is to "treat" stormwater runoff from the proposed shopping center and bank. No stormwater treatment is required by any other ordinance, but this type of treatment was a condition of your 401 for this project. Please review the plans and call me with any questions. We would like to obtain your a proval as soon as possible so that construction of the bank can begin cc: Danny Smith, Ralg Regional Office Soil/Site Evaluation ¦ Mapping and Physical Analysis ¦ Wetlands Mapping and Mitigation ¦ Environmental Audits On-Site Waste Treatment Sy. .,is, Evaluation and Design H STORMWATER AND POND CALCULATIONS OAK HALL SHOPPING CENTER OUTPARCEL HOLLY SPRINGS, NORTH CAROLINA RLH PROJECT NO: 9509 APRIL 14, 1995 Prepared for: Oak Hall Limited Partnership Mr. Glen Futrell P. O. Box 3006 Cary, NC 27519-3006 (919) 467-6935 Prepared by: RL HORVATH ASSOCIATES, INC. ENGINEERS • PLANNERS P. O. BOX 51806 DURHAM, NC 27717 (919) 490-4990 TABLE OF CONTENTS LOCATION MAP PAGE OBJECTIVE, CALCULATIONS, AND CONCLUSIONS 2 STRUCTURE DESCRIPTION 6 10-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 7 2S-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 16 100-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 25 09 ----------- Feel t?on?lle? ?I NI? ' }rem e 466' \ 1?? = ` - r - ? / _ 4???, / =? '? `; ? • • / ?, ? '' ? ?)? \ (. ` ? ` /\1 n ? / • ?\. ? ?/ -. .__ \ = A C t •?? i ? ?c'aa?: zt" 1• ' .,' ?pj• - ,w? ?' r.?,t -.? \''\ ?0 ?J \\; V 379• I^* e %'-??.,?. -.?,\'li r ?\? ??? af?\\ "1` ?j?????/\\ :•,/ t•??\ ,• •I?w•iiiit Ll:?' ????.?'?`•-.?11-??\\//=?fl... 19Lr? .?Q + r. ate _ •? / ??? ,?: ?' ?? (! /-?`\1; L Tank 1 `!1? l./ /ire: ? ? _ i ,. ? r--- • ?.? . r-•' ? .. /??" /? ` //? ?. \. • ???.?_ •_ 77 17 Ills 1395; 5y I \l c ! li ?, 440' Ill/ ? ?•! ? '•.11 t 1p :i ??? I1 r• .:?1 ?I ?o O Ir ,,,; .r, . ? N ? ? C?'?; 1 ?? 2000 --\ ??. I -_T RL HORVATH ASSOCIATES, INC. ENGINEERS * PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490-4990 JOB 6f-Ie- HALL- 5Hc,PPl)•1(7 Gt=PIIER - 9509 SHEET NO. A OF CALCULATED BY J -ROpC ctI DATE ?? 9 S CHECKED BY DATE SCALE W e T L. RT117J p c -T % >J -1 1 OTJ A-? t` f" QB3ecTIVE ' C) AcAe-,--inf. -the, 1?arc? dc,cv"?"< -, w? o,? 40 1) 7 )'- .r woAC.r-- ? '(oc Sc(A 'rme.r'd / po IIVI G^f r <moVa ?. 2) -O SC. IJJ,?I 1C?e CU JNO ( 0, A 1 S?er n.. oVCr C? ?-tg -7?- ?O??- ?Gr iOU, 3> ` ?iI1 fC`e4SC. \\ ?YlL. 1 ?I 10-\IGnv *Aor rr? V,0. O- VC(rt.a? S1anC 4) 11 A\ r.C,-I n\pa1 14e ov-\?0rce.., ?rAc clvr',,o 11^,e I(DO •Icor ->,,,<.-,, SITE IfJF012r?-r-TIot-J AIrIA(--7E r??EA - ?. ;!0)2 oc.ts CU12Vt 1'\`)Y' "DER 1.)P\ ( CP'- tS. Cn? Fo??c?r,,,_!C SHFc IS?. hF kmA*`:? ?I7 ?oo? S1z ?? c, Com 10UZI -pP-X LLEV ?uKCFcG A52 398 ~ O 4oc) -1 X14 4 oZ Ie,'e °t2 l?an1? 6-r t orf,, . s Si lC I)JFc) Jc,s. ?jC1 ?o F t'• 3F ?,P? ln..e?k = 39?.oc> l Sr -F sr F 0-T"T0vvm EL- E v 398, oo Irlt c -T) t'A E L E V A ' 1(>r ! 40Jo. oo ' USG q-c?t?.c? fir, {rr ?^rorn 3 Quick TR-55 Ver.5.46 SIN: Executed: 06:49:08 04-14-1995 OAK HALL SHOPPING CENTER OUTPARCEL 10-YEAR STORM POST-DEVELOPMENT CONDITION RUNOFF CURVE NUMBER DATA .................................................................. .................................................................. Composite Area: TOTAL DRAINAGE AREA CN SURFACE DESCRIPTION (acres) -------------------------------- --------- ---- WOODED AREAS 22.54 73 GRASSED AREA 3.76 74 IMPERVIOUS AREAS 11.27 98 COMPOSITE AREA ---> 37.56 80.6 ( 81 ) ..................................................... ..................................................... RL HORVATH ASSOCIATES, INC. ENGINEERS • PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490-4990 JOB _ ofZK "AL_L 6 1n1 L-, CENTER- 9S o`1 SHEET NO. 4 OF CALCULATED BY J??,oAOA DATE i 4-- 9 S CHECKED BY DATE SCALE CALWL-?1,7E 7e M-P. POOL. Vol. urnE REQUIRED "To coL-LC C-7 FIRST i RA\.,IF A1`ID REL-EASE D\) ER g8 ?1ouRS ; Use scs METHOD To 'Dt7ERrn1nIE Rvr?oFF F?orn l" RP" %TlFf"u- "P t O. a-, S - I Ooo - 1 O LQ C.'' BI C-POST j7CvEL?pME}?1 f? S 1000 _ IO - 2 ?t} 57 SI 1?- 1 Q= (\ - 0.2 r Z. 345 ? z 0.0980 1? O.B ? 2 345 \/OL = 0.018 x 3 ?. S 12 a O. 30-7 CAL V o? _ 1 3. 3 -7 3 ?-F 'Te nn'Ao R ARC( ?T o tZ A L-i E CRS LUL,A? E \7C-'P7NA- of Tt Yv)PoR ARY PoOL- VOL 7?, cv- PtRr A @ ELEV 4o0 . co o _ -? 6 14 sF ARe P @ ELev 4O?- cx) I6,(o92- sF 4o1. oo F'Re P @ EL- EV A01 . a?) Ib,b`12 - -1614 a 12 253 SF 2 YOL @ 401. OD 7514- 1 IZ,zs3 \ C 1' 1 10,034 ?F a-Too Z J SmA?t_ 401. 30 &RE r. ? 401.30 = \3 sBS ? ? VOL_ @ 4ol. 3o ( \ 3,S SS + '7614- \ (1. 3) - ?3 X01 <? > 13,3 13 cF 2 J vk Tt v\Ap . P c>c L- 'D- c- -i 1 l --? 1 , 3 S,t...? lY)vc. \ ?, Q2' Rc P 31S.oo ?.. ?c.leas' ?i per 39`1. povl? • RL HORVATH ASSOCIATES, INC. ENGINEERS * PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490-4990 JOB -__ Da04) NAi,L SHOPiD106, CefjTEiZ - 9S09 SHEET NO. ` S OF CALCULATED BY J ? kA DATE 4 - 14 - 9 4 CHECKED BY DATE SCALE SIZE ORIFIC-E To Rtk- c Asic 13,373 ct pvcR 48 NouRs LL T Q ° 0, 0. 80 C PRom \ RA\n1FAL? ?p = 37. srotz a«?s T = 48 hours l' = (0,0180 .. )( 3-7. sf- 10 0-0-?O3 cps l 48 hrs Ao = - I - ?h c 9 ° D.U'7o3 G. 0,6 f\? = 0.0703 SF _ I, 8s ni O. (o J2 .32.2 * 1,3 ??ArnETttZ T A Tf J_44-1 C Bs'-n') To ?t E-easE ?vrooF ov E V? ?i 8 No?R t cR? oD, ?ouT10 ?71 ^?ESUL-1S 1D Yrf?R s?ot2r? PekK CLjFV 4o3•g4. NTF?o? S?Zvc?uRE -? A-' RR? R-. ?Z. sc,` sF E: L- SLOPE (?: q 4 . SS G.F S ?1SE ?2 a -1 .O. r?e.cAS? YP f., „.. } 6 Outlet Structure File: 9509WET STR POND-2 Version: 5.17 SIN: Date Executed: Time Executed: >>>>>> Structure NO. 1 <<<<<< (Input Data) STAND PIPE Stand Pipe with weir or orifice flow E1 elev.(ft)? 401.5 E2 elev.(ft)? 406.001 Crest elev.(ft)? 401.5 Diameter (ft)? 4 Weir coefficient? 3.33 Orifice coefficient? .6 Start transition elev.(ft) C ? Transition height (ft)? i Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:38:37 Watershed file: --> 9509WET WSD Hydrograph file: --> 9509WET HYD HOLLY SPRINGS OUTPARCEL LAND DISTURBANCE >>>> Input Parameters Used to Compute Hydrograph <<<< Page 1 Subarea AREA CN Tc * Tt Precip. Runoff Ia/p Description ------- (acres) ----------------- (hrs) -------- (hrs) -------- I (in) ---------- (in) --------- input/used ---------- ---------- AREA TO WETLAND 37.56 81.0 0.20 0.20 5.50 1 3.43 .09 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 131 cfs >>>> Computer Modifications of Input Parameters <<<<< Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) ----------- (hr) (hr) ----------------- (Yes/No) ----------- Messages -------------------- --------------- AREA TO WETLAND ----- 0.20 0.20 ** ** No Computed Ia/p < .1 --------------- * Travel time --------------------------------- from subarea outfall to composite ----------- watershed -------------------- outfall point. ** Tc & Tt are available in the hydrograph table s. b quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:38:37 Watershed file: --> 9509WET WSD Hydrograph file: --> 9509WET HYD HOLLY SPRINGS OUTPARCEL LAND DISTURBANCE >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- AREA TO WETLAND -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 131 -------------- 131 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12.4 ------------ 12.4 Cl POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 ******************************** * * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 10-YEAR STORM CALCULATIONS * * * * ******************************** Inflow Hydrograph: 9509WET HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA Page 1 INTERMEDIATE ROUTING COMPUTATIONS ELEVATION OUTFLOW STORAGE (ft) (cfs) -------- (ac-ft) - - --------- 398.00 - 0.0 ----- --- 0.000 398.50 0.0 0.019 399.00 0.0 0.054 399.50 0.0 0.107 400.00 0.0 0.183 400.50 0.0 0.284 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50' 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 ---------- 128.4 ---------- 4.021 ---------- 2S/t 2S/t + 0 (cfs) ------------ (cfs) ------ - 0.0 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------- 1101.6 ------------- Time increment (t) = 0.100 hrs. 10 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 2 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) ------ (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 11.000 --- 3.00 ----- 0.0 0.0 0.00 398.00 11.100 4.00 7.0 7.0 7.0 0.00 398.64 11.200 4.00 8.0 15.0 15.0 0.00 399.08 11.300 5.00 9.0 24.0 24.0 0.00 399.43 11.400 5.00 10.0 34.0 34.0 0.00 399.72 11.500 6.00 11.0 45.0 45.0 0.00 400.01 11.600 6.00 12.0 57.0 57.0 0.00 400.26 11.700 7.00 13.0 70.0 70.0 0.00 400.52 11.800 9.00 16.0 86.0 86.0 0.00 400.79 11.900 10.00 19.0 105.0 105.0 0.00 401.09 12.000 15.00 25.0 130.0 130.0 0.00 401.44 12.100 27.00 42.0 152.8 172.0 9.60 401.82 12.200 53.00 80.0 175.4 232.8 28.71 402.26 12.300 98.00 151.0 205.4 326.4 60.52 402.79 12.400 131.00 229.0 268.3 434.4 83.01 403.39 12.500 120.00 251.0 334.9 519.3 92.20 403.83 12.600 88.00 208.0 353.8 542.9 94.58 403.94 12.700 60.00 148.0 320.9 501.8 90.42 403.74 12.800 42.00 102.0 259.9 422.9 81.51 403.32 12.900 32.00 74.0 207.8 333.9 63.06 402.83 13.000 23.00 55.0 184.8 262.8 38.99 402.45 13.100 20.00 43.0 173.8 227.8 27.00 402.23 13.200 16.00 36.0 168.2 209.8 20.83 402.11 13.300 14.00 30.0 164.5 198.2 16.83 402.04 13.400 13.00 27.0 162.3 191.5 14.61 401.99 13.500 12.00 25.0 160.2 187.3 13.53 401.96 13.600 12.00 24.0 158.8 184.2 12.74 401.93 13.700 11.00 23.0 157.5 181.8 12.10 401.91 13.800 10.00 21.0 156.0 178.5 11.28 401.88 13.900 9.00 19.0 154.3 175.0 10.37 401.85 14.000 9.00 18.0 152.9 172.3 9.66 401.83 14.100 9.00 18.0 152.3 170.9 9.32 401.81 14.200 8.00 17.0 151.5 169.3 8.90 401.80 14.300 8.00 16.0 150.6 167.5 8.44 401.79 14.400 8.00 16.0 150.2 166.6 8.21 401.78 14.500 7.00 15.0 149.5 165.2 7.85 401.77 14.600 7.00 14.0 148.7 163.5 7.41 401.75 14.700 7.00 14.0 148.3 162.7 7.20 401.74 14.800 6.00 13.0 147.6 161.3 6.84 401.73 14.900 6.00 12.0 146.8 159.6 6.41 401.72 15.000 6.00 12.0 146.4 158.8 6.20 401.71 15.100 6.00 12.0 146.2 158.4 6.10 401.71 15.200 6.00 12.0 146.1 158.2 6.05 401.70 15.300 6.00 12.0 146..0 158.1 6.02 401.70 15.400 6.00 12.0 146.0 158.0 6.01 401.70 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 3 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) - (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 -------- 6.00 12.0 146.0 158.0 6.01 401.70 15.600 6.00 12.0 146.0 158.0 6.00 401.70 15.700 6.00 12.0 146.0 158.0 6.00 401.70 15.800 5.00 11.0 145.5 157.0 5.74 401.69 15.900 5.00 10.0 144.8 155.5 5.36 401.68 16.000 5.00 10.0 144.4 154.8 5.18 401.67 16.100 5.00 10.0 144.3 154.4 5.09 401.67 16.200 5.00 10.0 144.2 154.3 5.04 401.67 16.300 5.00 10.0 144.1 154.2 5.02 401.67 16.400 5.00 10.0 144.1 154.1 5.01 401.67 16.500 5.00 10.0 144.1 154.1 5.00 401.67 16.600 5.00 10.0 144.1 154.1 5.00 401.67 16.700 5.00 10.0 144.1 154.1 5.00 401.67 16.800 4.00 9.0 143.6 153.1 4.74 401.66 16.900 4.00 8.0 142.9 151.6 4.36 401.65 17.000 4.00 8.0 142.5 150.9 4.18 401.64 17.100 4.00 8.0 142.4 150.5 4.09 401.64 17.200 4.00 8.0 142.3 150.4 4.04 401.64 17.300 4.00 8.0 142.3 150.3 4.02 401.64 17.400 4.00 8.0 142.2 150.3 4.01 401.64 17.500 4.00 8.0 142.2 150.2 4.00 401.64 17.600 4.00 8.0 142.2 150.2 4.00 401.64 17.700 4.00 8.0 142.2 150.2 4.00 401.64 17.800 4.00 8.0 142.2 150.2 4.00 401.64 17.900 4.00 8.0 142.2 150.2 4.00 401.64 18.000 4.00 8.0 142.2 150.2 4.00 401.64 18.100 4.00 8.0 142.2 150.2 4.00 401.64 18.200 4.00 8.0 142.2 150.2 4.00 401.64 18.300 4.00 8.0 142.2 150.2 4.00 401.64 18.400 4.00 8.0 142.2 150.2 4.00 401.64 18.500 4.00 8.0 142.2 150.2 4.00 401.64 18.600 3.00 7.0 141.7 149.2 3.74 401.63 18.700 3.00 6.0 141.0 147.7 3.36 401.61 18.800 3.00 6.0 140.7 147.0 3.18 401.61 18.900 3.00 6.0 140.5 146.7 3.09 401.60 19.000 3.00 6.0 140.4 146.5 3.04 401.60 19.100 3.00 6.0 140.4 146.4 3.02 401.60 19.200 3.00 6.0 .140.3 146.4 3.01 401.60 19.300 3.00 6.0 140.3 146.3 3.00 401.60 19.400 3.00 6.0 140.3 146.3 3.00 401.60 19.500 3.00 6.0 140.3 146.3 3.00 401.60 19.600 3.00 6.0 140.3 146.3 3.00 401.60 19.700 3.00 6.0 140.3 146.3 3.00 401.60 19.800 3.00 6.0 140,3 146.3 3.00 401.60 19.900 3.00 6.0 140.3 146.3 3.00 401.60 20.000 3.00 6.0 140.3 146.3 3.00 401.60 iZ POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 4 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) --- (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 ------ 3.00 6.0 140.3 146.3 3.00 401.60 20.200 3.00 6.0 140.3 146.3 3.00 401.60 20.300 3.00 6.0 140.3 146.3 3.00 401.60 20.400 3.00 6.0 140.3 146.3 3.00 401.60 20.500 3.00 6.0 140.3 146.3 3.00 401.60 20.600 3.00 6.0 140.3 146.3 3.00 401.60 20.700 3.00 6.0 140.3 146.3 3.00 401.60 20.800 3.00 6.0 140.3 146.3 3.00 401.60 20.900 3.00 6.0 140.3 146.3 3.00 401.60 21.000 2.00 5.0 139.8 145.3 2.74 401.59 21.100 2.00 4.0 139.1 143.8 2.36 401.58 21.200 2.00 4.0 138.8 143.1 2.18 401.57 21.300 2.00 4.0 138.6 142.8 2.09 401.57 21.400 2.00 4.0 138.5 142.6 2.04 401.57 21.500 2.00 4.0 138.5 142.5 2.02 401.57 21.600 2.00 4.0 138.4 142.5 2.01 401.57 21.700 2.00 4.0 138.4 142.4 2.00 401.57 21.800 2.00 4.0 138.4 142.4 2.00 401.57 21.900 2.00 4.0 138.4 142.4 2.00 401.57 22.000 2.00 4.0 138.4 142.4 2.00 401.57 22.100 2.00 4.0 138.4 142.4 2.00 401.57 22.200 2.00 4.0 138.4 142.4 2.00 401.57 22.300 2.00 4.0 138.4 142.4 2.00 401.57 22.400 2.00 4.0 138.4 142.4 2.00 401.57 22.500 2.00 4.0 138.4 142.4 2.00 401.57 22.600 2.00 4.0 138.4 142.4 2.00 401.57 22.700 2.00 4.0 138.4 142.4 2.00 401.57 22.800 2.00 4.0 138.4 142.4 2.00 401.57 22.900 2.00 4.0 138.4 142.4 2.00 401.57 23.000 2.00 4.0 138.4 142.4 2.00 401.57 23.100 1.00 3.0 137.9 141.4 1.74 401.56 23.200 1.00 2.0 137.2 139.9 1.36 401.55 23.300 1.00 2.0 136.9 139.2 1.18 401.54 23.400 1.00 2.0 136.7 138.9 1.09 401.54 23.500 1.00 2.0 136.6 138.7 1.04 401.54 23.600 1.00 2.0 136.6 138.6 1.02 401.53 23.700 1.00 2.0 136.6 138.6 1.01 401.53 23.800 1.00 2.0 136.5 138.6 1.00 401.53 23.900 1.00 2.0 136.5 138.5 1.00 401.53 24.000 1.00 2.0 136.5 138.5 1.00 401.53 24.100 1.00 2.0 136.5 138.5 1.00 401.53 24.200 1.00 2.0 136.5 138.5 1.00 401.53 24.300 1.00 2.0 136.5 138.5 1.00 401.53 24.400 1.00 2.0 136.,5 138.5 1.00 401.53 24.500 1.00 2.0 136.5 138.5 1.00 401.53 24.600 1.00 2.0 136.5 138.5 1.00 401.53 (3 POND-2 Version: 5.17 SIN: Page 5 EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ROUTING COMPUTATIONS TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) --- (cfs) --------- (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) -------- ----- 24.700 1.00 2.0 136.5 138.5 1.00 - 401.53 24.800 1.00 2.0 136.5 138.5 1.00 401.53 24.900 1.00 2.0 136.5 138.5 1.00 401.53 25.000 0.00 1.0 136.1 137.5 0.74 401.53 25.100 0.00 0.0 135.3 136.1 0.36 401.51 25.200 0.00 0.0 135.0 135.3 0.18 401.51 25.300 0.00 0.0 134.8 135.0 0.09 401.50 25.400 0.00 0.0 134.7 134.8 0.04 401.50 25.500 0.00 0.0 134.7 134.7 0.02 401.50 25.600 0.00 0.0 134.7 134.7 0.01 401.50 25.700 0.00 0.0 134.7 134.7 0.00 401.50 25.800 0.00 0.0 134.7 134.7 0.00 401.50 25.900 --------- 0.00 -------- 0.0 --------- 134.6 ------------- 134.7 ------------ 0.00 ---------- 401.50 ---------- 14 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Page 6 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 131.00 cfs Peak Outflow = 94.58 cfs Peak Elevation = 403.94 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 1.85 ac-ft --------------- Total Storage in Pond = 1.85 ac-ft Warning: Inflow hydrograph truncated on left side. is POND-2 Version: 5.17 SIN: Page 7 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD EXECUTED: 04-14-1995 Peak Inflow = 131.00 cfs 08:21:08 Peak Outflow = 94.58 cfs Peak Elevation = 403.94 ft Flow (cfs) 0 ---- 15 30 -- I ----- ----- 45 60 ----- I--- 75 90 105 120 135 150 165 -- I----- I----- I----- I----- I----- I----- I- 11.7 - x x 11.8 - x x 11.9 - x x 12.0 - x x 12.1 - x x 12.2 - x x 12.3 - x x 12.4 - x x 12.5 - x x 12.6 - * x * x 12.7 - * x * x 12.8 - * x * x 12.9 - * x * x 13.0 - * x * x 13.1 - * x * x 13.2 - * x * x 13.3 - *x *x 13.4 - *x *x 13.5 - x x 13.6 - x TIME (hrs ) * File: 9509WET HYD Qmax = 131.0 cfs x File: OUT HYD Qmax = 94.6 cfs Ib Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:50:27 Watershed file: --> 9509-25 WSD Hydrograph file: --> 9509-25 HYD OAK HALL SHOPPING CENTER WETLAND DETENTION AREA 25-YEAR STORM CALCULATIONS >>>> Input Parameters Used to Compute Hydrograph <<<< Page 1 Subarea AREA CN Tc * Tt Precip. Runoff Ia/p Description -------- (acres) ------------------- (hrs) -------- (hrs) -------- (in) ---------- (in) -------- input/used ----------- ------- TOTAL AREA 37.56 81.0 0.20 0.20 6.10 1 3.97 .08 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 152 cfs >>>> Computer Modifications of Input Parameters <<<<< Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) (hr) (hr) (Yes/No) Messages --------- -------------- TOTAL AREA ----------------- 0.20 0.20 ----------------- ** ** ----------- No ----------- Computed Ia/p < .1 -------------- * Travel time ---------------------------------- from subarea outfall to composite ----------- watershed -------------------- outfall point. ** Tc & Tt are available in the hydrograph table s. 11 Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:50:27 Watershed file: --> 9509-25 WSD Hydrograph file: --> 9509-25 HYD OAK HALL SHOPPING CENTER WETLAND DETENTION AREA 25-YEAR STORM CALCULATIONS >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- TOTAL AREA -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 152 -------------- 152 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12.4 ------------ 12.4 ?a POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 ******************************** * * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 25-YEAR STORM CALCULATIONS * * * * ******************************** Inflow Hydrograph: 9509-25 HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) --------- (cfs) --------- (ac-ft) --- ---- 398.00 0.0 - -- 0.000 398.50 0.0 0.019 399.00 0.0 0.054 399.50 0.0 0.107 400.00 0.0 0.183 400.50 0.0 0.284 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 ---------- 128.4 ---------- 4.021 ---------- Page 1 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfs) ------------ (cfs) ------- 0.0 ------ 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------- 1101.6 ------------- Time increment (t) = 0.100 hrs. 19 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 2 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) - (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 11.000 -------- 4.00 ----- 0.0 0.0 0.00 398.00 11.100 4.00 8.0 8.0 8.0 0.00 398.70 11.200 5.00 9.0 17.0 17.0 0.00 399.16 11.300 5.00 10.0 27.0 27.0 0.00 399.53 11.400 6.00 11.0 38.0 38.0 0.00 399.83 11.500 6.00 12.0 50.0 50.0 0.00 400.12 11.600 7.00 13.0 63.0 63.0 0.00 400.38 11.700 8.00 15.0 78.0 78.0 0.00 400.66 11.800 10.00 18.0 96.0 96.0 0.00 400.96 11.900 11.00 21.0 117.0 117.0 0.00 401.26 12.000 17.00 28.0 139.7 145.0 2.66 401.59 12.100 32.00 49.0 160.9 188.7 13.88 401.97 12.200 61.00 93.0 182.0 253.9 35.94 402.39 12.300 114.00 175.0 215.3 357.0 70.87 402.95 12.400 152.00 266.0 304.6 481.3 88.35 403.64 12.500 138.00 290.0 396.7 594.6 98.95 404.18 12.600 101.00 239.0 431.2 635.7 102.24 404.36 12.700 69.00 170.0 402.2 601.2 99.48 404.21 12.800 48.00 117.0 334.9 519.2 92.19 403.83 12.900 37.00 85.0 257.6 419.9 81.10 403.30 13.000 27.00 64.0 203.8 321.6 58.92 402.76 13.100 23.00 50.0 182.0 253.8 35.91 402.39 13.200 19.00 42.0 172.6 224.0 25.69 402.20 13.300 18.00 37.0 168.1 209.6 20.76 402.11 13.400 16.00 34.0 165.7 202.1 18.18 402.06 13.500 15.00 31.0 164.1 196.7 16.34 402.03 13.600 14.00 29.0 162.9 193.1 15.08 402.01 13.700 13.00 27.0 161.5 189.9 14.20 401.98 13.800 12.00 25.0 159.9 186.5 13.33 401.95 13.900 12.00 24.0 158.6 183.9 12.64 401.93 14.000 11.00 23.0 157.5 181.6 12.06 401.91 14.100 10.00 21.0 155.9 178.5 11.26 401.88 14.200 10.00 20.0 154.7 175.9 10.61 401.86 14.300 9.00 19.0 153.6 173.7 10.04 401.84 14.400 9.00 18.0 152.6 171.6 9.51 401.82 14.500 8.00 17.0 151.7 169.6 8.99 401.80 14.600 8.00 16.0 150.7 167.7 8.48 401.79 14.700 8.00 16.0 150.2 166.7 8.23 401.78 14.800 8.00 16.0 150.0 166.2 8.11 401.77 14.900 7.00 15.0 149.4 165.0 7.80 401.76 15.000 7.00 14.0 148.6 163.4 7.39 401.75 15.100 7.00 14.0 148.2 162.6 7.19 401.74 15.200 7.00 14.0 148.1 162.2 7.09 401.74 15.300 7.00 14.0 148..0 162.1 7.04 401.74 15.400 7.00 14.0 147.9 162.0 7.02 401.74 Zo POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 3 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 --------- 7.00 14.0 147.9 161.9 7.01 401.74 15.600 7.00 14.0 147.9 161.9 7.01 401.74 15.700 7.00 14.0 147.9 161.9 7.00 401.74 15.800 6.00 13.0 147.4 160.9 6.74 401.73 15.900 6.00 12.0 146.7 159.4 6.36 401.71 16.000 6.00 12.0 146.3 158.7 6.18 401.71 16.100 6.00 12.0 146.2 158.3 6.09 401.71 16.200 6.00 12.0 146.1 158.2 6.04 401.70 16.300 5.00 11.0 145.6 157.1 5.76 401.69 16.400 5.00 10.0 144.8 155.6 5.37 401.68 16.500 5.00 10.0 144.4 154.8 5.18 401.68 16.600 5.00 10.0 144.3 154.4 5.09 401.67 16.700 5.00 10.0 144.2 154.3 5.04 401.67 16.800 5.00 10.0 144.1 154.2 5.02 401.67 16.900 5.00 10.0 144.1 154.1 5.01 401.67 17.000 5.00 10.0 144.1 154.1 5.00 401.67 17.100 5.00 10.0 144.1 154.1 5.00 401.67 17.200 5.00 10.0 144.1 154.1 5.00 401.67 17.300 5.00 10.0 144.1 154.1 5.00 401.67 17.400 5.00 10.0 144.1 154.1 5.00 401.67 17.500 5.00 10.0 144.1 154.1 5.00 401.67 17.600 5.00 10.0 144.1 154.1 5.00 401.67 17.700 5.00 10.0 144.1 154.1 5.00 401.67 17.800 4.00 9.0 143.6 153.1 4.74 401.66 17.900 4.00 8.0 142.9 151.6 4.36 401.65 18.000 4.00 8.0 142.5 150.9 4.18 401.64 18.100 4.00 8.0 142.4 150.5 4.09 401.64 18.200 4.00 8.0 142.3 150.4 4.04 401.64 18.300 4.00 8.0 142.3 150.3 4.02 401.64 18.400 4.00 8.0 142.2 150.3 4.01 401.64 18.500 4.00 8.0 142.2 150.2 4.00 401.64 18.600 4.00 8.0 142.2 150.2 4.00 401.64 18.700 4.00 8.0 142.2 150.2 4.00 401.64 18.800 4.00 8.0 142.2 150.2 4.00 401.64 18.900 4.00 8.0 142.2 150.2 4.00 401.64 19.000 4.00 8.0 142.2 150.2 4.00 401.64 19.100 4.00 8.0 142.2 150.2 4.00 401.64 19.200 4.00 8.0 ,142.2 150.2 4.00 401.64 19.300 4.00 8.0 142.2 150.2 4.00 401.64 19.400 4.00 8.0 142.2 150.2 4.00 401.64 19.500 4.00 8.0 142.2 150.2 4.00 401.64 19.600 3.00 7.0 141.7 149.2 3.74 401.63 19.700 3.00 6.0 141.0 147.7 3.36 401.61 19.800 3.00 6.0 140.7 147.0 3.18 401.61 19.900 3.00 6.0 140.5 146.7 3.09 401.60 20.000 3.00 6.0 140.4 146.5 3.04 401.60 Z1 POIW-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 4 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) ------ (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 --------- 3.00 --- 6.0 140.4 146.4 3.02 401.60 20.200 3.00 6.0 140.3 146.4 3.01 401.60 20.300 3.00 6.0 140.3 146.3 3.00 401.60 20.400 3.00 6.0 140.3 146.3 3.00 401.60 20.500 3.00 6.0 140.3 146.3 3.00 401.60 20.600 3.00 6.0 140.3 146.3 3.00 401.60 20.700 3.00 6.0 140.3 146.3 3.00 401.60 20.800 3.00 6.0 140.3 146.3 3.00 401.60 20.900 3.00 6.0 140.3 146.3 3.00 401.60 21.000 3.00 6.0 140.3 146.3 3.00 401.60 21.100 3.00 6.0 140.3 146.3 3.00 401.60 21.200 3.00 6.0 140.3 146.3 3.00 401.60 21.300 3.00 6.0 140.3 146.3 3.00 401.60 21.400 3.00 6.0 140.3 146.3 3.00 401.60 21.500 3.00 6.0 140.3 146.3 3.00 401.60 21.600 3.00 6.0 140.3 146.3 3.00 401.60 21.700 3.00 6.0 140.3 146.3 3.00 401.60 21.800 3.00 6.0 140.3 146.3 3.00 401.60 21.900 3.00 6.0 140.3 146.3 3.00 401.60 22.000 3.00 6.0 140.3 146.3 3.00 401.60 22.100 3.00 6.0 140.3 146.3 3.00 401.60 22.200 3.00 6.0 140.3 146.3 3.00 401.60 22.300 3.00 6.0 140.3 146.3 3.00 401.60 22.400 3.00 6.0 140.3 146.3 3.00 401.60 22.500 3.00 6.0 140.3 146.3 3.00 401.60 22.600 3.00 6.0 140.3 146.3 3.00 401.60 22.700 2.00 5.0 139.8 145.3 2.74 401.59 22.800 2.00 4.0 139.1 143.8 2.36 401.58 22.900 2.00 4.0 138.8 143.1 2.18 401.57 23.000 2.00 4.0 138.6 142.8 2.09 401.57 23.100 2.00 4.0 138.5 142.6 2.04 401.57 23.200 2.00 4.0 138.5 142.5 2.02 401.57 23.300 2.00 4.0 138.4 142.5 2.01 401.57 23.400 2.00 4.0 138.4 142.4 2.00 401.57 23.500 2.00 4.0 138.4 142.4 2.00 401.57 23.600 2.00 4.0 138.4 142.4 2.00 401.57 23.700 2.00 4.0 138.4 142.4 2.00 401.57 23.800 2.00 4.0 138.4 142.4 2.00 401.57 23.900 2.00 4.0 138.4 142.4 2.00 401.57 24.000 2.00 4.0 138.4 142.4 2.00 401.57 24.100 1.00 3.0 137.9 141.4 1.74 401.56 24.200 1.00 2.0 137.2 139.9 1.36 401.55 24.300 1.00 2.0 136.9 139.2 1.18 401.54 24.400 1.00 2.0 136;7 138.9 1.09 401.54 24.500 1.00 2.0 136.6 138.7 1.04 401.54 24.600 1.00 2.0 136.6 138.6 1.02 401.53 .z7- POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ROUTING COMPUTATIONS Page 5 TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) -- - (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 24.700 - ----- 1.00 2.0 136.6 138.6 1.01 401.53 24.800 1.00 2.0 136.5 138.6 1.00 401.53 24.900 1.00 2.0 136.5 138.5 1.00 401.53 25.000 1.00 2.0 136.5 138.5 1.00 401.53 25.100 1.00 2.0 136.5 138.5 1.00 401.53 25.200 1.00 2.0 136.5 138.5 1.00 401.53 25.300 1.00 2.0 136.5 138.5 1.00 401.53 25.400 0.00 1.0 136.1 137.5 0.74 401.53 25.500 0.00 0.0 135.3 136.1 0.36 401.51 25.600 0.00 0.0 135.0 135.3 0.18 401.51 25.700 0.00 0.0 134.8 135.0 0.09 401.50 25.800 0.00 0.0 134.7 134.8 0.04 401.50 25.900 -------- 0.00 --------- 0.0 --------- 134.7 ------------- 134.7 ------------ 0.02 ---------- 401.50 ---------- Z3 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Page 6 ****************** SUMMARY OF ROUTING COMPUTATIONS *****************,* Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 152.00 cfs Peak Outflow = 102.24 cfs Peak Elevation = 404.36 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 2.20 ac-ft --------------- Total Storage in Pond = 2.20 ac-ft Warning: Inflow hydrograph truncated on left side. 24 POND-2 Version: 5.17 SIN: Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD Peak Inflow = 152.00 cfs Peak Outflow = 102.24 cfs Peak Elevation = 404.36 ft Page 7 EXECUTED: 04-14-1995 08:47:22 Flow (cfs) 11.7 - 11.8 - 11.9 - 12.0 - 12.1 - 12.2 12.3 12.4 - 12.5 - 12.6 - 12.7 - 12.8 - 12.9 - 13.0 - 13.1 - 13.2 - 13.3 - 13.4 - 13.5 - 13.6 - TIf (h: * F: x F: 0 20 40 60 80 100 120 140 160 180 200 220 .------ ----- I ----- I ----- I ----- I ----- I ----- I ----- ----- I ----- -----I- x X X X X x x x x x x x x x x x x x *x * x * x * x * x * x * x * x V x * x * x * x * x *x *x *x x x x *x *x 4E ,s) Lle: 9509-25 HYD Qmax = 152.0 cfs Lle: OUT HYD Qmax = 102.2 cfs * * * * ZS Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:40:22 Watershed file: --> 9509-100.WSD Hydrograph file: --> 9509-100.HYD OAK HALL SHOPPING CENTER OUTPARCEL 100-YEAR STORM CALCULATIONS POST-DEVELOPMENT CONDTIONS >>>> Input Parameters Used to Compute Hydrograph <<<< Page 1 Subarea AREA CN Tc * Tt Precip. Runoff Ia/p Description ------------ (acres) ------------------- (hrs) -------- (hrs) -------- I (in) ---------- (in) -------- input/used ----------- --- TOTAL AREA 37.56 81.0 0.20 0.20 7.90 1 5.65 .06 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 216 cfs >>>> Computer Modifications of Input Parameters <<<<< ------------------------------------------------------------------------------- Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) (hr) (hr) (Yes/No) Messages ------------------------------------------------------------------------------- TOTAL AREA 0.20 0.20 ** ** No Computed Ia/p < .1 ------------------------------------------------------------------------------- * Travel time from subarea outfall to composite watershed outfall point. ** Tc & Tt are available in the hydrograph tables. 2-40 Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:40:22 Watershed file: --> 9509-100.WSD Hydrograph file: --> 9509-100.HYD OAK HALL SHOPPING CENTER OUTPARCEL 100-YEAR STORM CALCULATIONS POST-DEVELOPMENT CONDTIONS >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- TOTAL AREA -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 216 -------------- 216 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12.4 ------------ 12.4 z1 i POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 ********************************* * * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 100-YEAR STORM CALCULATIONS * * * * ********************************* Inflow Hydrograph: 9509-100.HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow - 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) - - (cfs) --------- (ac-ft) ---------- --- ---- 398.00 0.0 0.000 398.50 0.0 0.019 399.00 0.0 0.054 399.50 0.0 0.107 400.00 0.0 0.183 400.50 0.0 0.284 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 --------- 128.4 ---------- 4.021 ----------- Page 1 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfs) ----- (cfs) ------------- ------- 0.0 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------ 1101.6 -------------- Time increment (t) = 0.100 hrs. L Z:? POI-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 2 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) -- (cfs) --------- (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- ------ 11.000 6.00 ----- 0.0 0.0 0.00 398.00 11.100 7.00 13.0 13.0 13.0 0.00 399.00 11.200 7.00 14.0 27.0 27.0 0.00 399.53 11.300 8.00 15.0 42.0 42.0 0.00 399.94 11.400 9.00 17.0 59.0 59.0 0.00 400.30 11.500 10.00 19.0 78.0 78.0 0.00 400.66 11.600 11.00 21.0 99.0 99.0 0.00 401.01 11.700 13.00 24.0 123.0 123.0 0.00 401.34 11.800 14.00 27.0 142.1 150.0 3.94 401.63 11.900 16.00 30.0 152.9 172.1 9.63 401.83 12.000 25.00 41.0 163.2 193.9 15.35 402.01 12.100 45.00 70.0 175.5 233.2 28.83 402.26 12.200 87.00 132.0 199.2 307.5 54.14 402.69 12.300 162.00 249.0 278.6 448.2 84.83 403.47 12.400 216.00 378.0 448.7 656.6 103.92 404.45 12.500 197.00 413.0 628.2 861.7 116.76 405.23 12.600 144.00 341.0 724.6 969.2 122.32 405.59 12.700 99.00 243.0 723.1 967.6 122.25 405.58 12.800 69.00 168.0 654.4 891.1 118.34 405.33 12.900 53.00 122.0 552.5 776.4 111.92 404.92 13.000 38.00 91.0 437.8 643.5 102.87 404.39 13.100 32.00 70.0 325.7 507.8 91.03 403.77 13.200 27.00 59.0 231.8 384.7 76.49 403.10 13.300 24.00 51.0 191.2 282.8 45.78 402.56 13.400 22.00 46.0 176.8 237.2 30.22 402.29 13.500 21.00 43.0 171.3 219.8 24.24 402.17 13.600 19.00 40.0 168.6 211.3 21.33 402.12 13.700 18.00 37.0 166.9 205.6 19.39 402.09 13.800 17.00 35.0 165.7 201.9 18.09 402.06 13.900 16.00 33.0 164.7 198.7 17.00 402.04 14.000 15.00 31.0 163.7 195.7 15.97 402.02 14.100 14.00 29.0 162.8 192.7 14.96 402.00 14.200 14.00 28.0 161.9 190.8 14.43 401.99 14.300 13.00 27.0 161.0 188.9 13.95 401.97 14.400 13.00 26.0 160.1 187.0 13.46 401.95 14.500 12.00 25.0 159.2 185.1 12.97 401.94 14.600 12.00 24.0 158.2 183.2 12.47 401.92 14.700 12.00 24.0 157.8 182.2 12.23 401.91 14.800 12.00 24.0 157.6 181.8 12.11 401.91 14.900 11.00 23.0 157.0 180.6 11.80 401.90 15.000 11.00 22.0 156.2 179.0 11.39 401.88 15.100 11.00 22.0 155.8 178.2 11.19 401.88 15.200 11.00 22.0 155.6 177.8 11.09 401.87 15.300 10.00 21.0 155.1 176.6 10.79 401.86 15.400 10.00 20.0 154.3 175.1 10.38 401.85 Z1 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Page 3 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ ROUTING COMPUTATIONS TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) --- (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 ------ 10.00 20.0 153.9 174.3 10.19 401.84 15.600 10.00 20.0 153.7 173.9 10.09 401.84 15.700 10.00 20.0 153.7 173.7 10.04 401.84 15.800 9.00 19.0 153.1 172.7 9.76 401.83 15.900 9.00 18.0 152.4 171.1 9.37 401.82 16.000 9.00 18.0 152.0 170.4 9.18 401.81 16.100 9.00 18.0 151.8 170.0 9.09 401.81 16.200 9.00 18.0 151.8 169.8 9.04 401.81 16.300 8.00 17.0 151.2 168.8 8.76 401.80 16.400 8.00 16.0 150.5 167.2 8.37 401.78 16.500 8.00 16.0 150.1 166.5 8.18 401.78 16.600 8.00 16.0 149.9 166.1 8.09 401.77 16.700 8.00 16.0 149.9 165.9 8.04 401.77 16.800 7.00 15.0 149.3 164.9 7.76 401.76 16.900 7.00 14.0 148.6 163.3 7.37 401.75 17.000 7.00 14.0 148.2 162.6 7.18 401.74 17.100 7.00 14.0 148.1 162.2 7.09 401.74 17.200 7.00 14.0 148.0 162.1 7.04 401.74 17.300 7.00 14.0 147.9 162.0 7.02 401.74 17.400 7.00 14.0 147.9 161.9 7.01 401.74 17.500 7.00 14.0 147.9 161.9 7.00 401.74 17.600 7.00 14.0 147.9 161.9 7.00 401.74 17.700 7.00 14.0 147.9 161.9 7.00 401.74 17.800 6.00 13.0 147.4 160.9 6.74 401.73 17.900 6.00 12.0 146.7 159.4 6.36 401.71 18.000 6.00 12.0 146.3 158.7 6.18 401.71 18.100 6.00 12.0 146.2 158.3 6.09 401.71 18.200 6.00 12.0 146.1 158.2 6.04 401.70 18.300 6.00 12.0 146.0 158.1 6.02 401.70 18.400 6.00 12.0 146.0 158.0 6.01 401.70 18.500 6.00 12.0 146.0 158.0 6.00 401.70 18.600 5.00 11.0 145.5 157.0 5.75 401.69 18.700 5.00 10.0 144.8 155.5 5.36 401.68 18.800 5.00 10.0 144.4 154.8 5.18 401.67 18.900 5.00 10.0 144.3 154.4 5.09 401.67 19.000 5.00 10.0 144.2 154.3 5.04 401.67 19.100 5.00 10.0 144.1 154.2 5.02 401.67 19.200 5.00 10.0 .144.1 154.1 5.01 401.67 19.300 5.00 10.0 .144.1 154.1 5.00 401.67 19.400 5.00 10.0 144.1 154.1 5.00 401.67 19.500 5.00 10.0 144.1 154.1 5.00 401.67 19.600 5.00 10.0 144.1 154.1 5.00 401.67 19.700 5.00 10.0 144.1 154.1 5.00 401.67 19.800 5.00 10.0 144.1 154.1 5.00 401.67 19.900 5.00 10.0 144.1 154.1 5.00 401.67 20.000 5.00 10.0 144.1 154.1 5.00 401.67 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 4 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) -- ---- (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 - -- 5.00 10.0 144.1 154.1 5.00 401.67 20.200 5.00 10.0 144.1 154.1 5.00 401.67 20.300 5.00 10.0 144.1 154.1 5.00 401.67 20.400 5.00 10.0 144.1 154.1 5.00 401.67 20.500 5.00 10.0 144.1 154.1 5.00 401.67 20.600 5.00 10.0 144.1 154.1 5.00 401.67 20.700 5.00 10.0 144.1 154.1 5.00 401.67 20.800 5.00 10.0 144.1 154.1 5.00 401.67 20.900 5.00 10.0 144.1 154.1 5.00 401.67 21.000 4.00 9.0 143.6 153.1 4.74 401.66 21.100 4.00 8.0 142.9 151.6 4.36 401.65 21.200 4.00 8.0 142.5 150.9 4.18 401.64 21.300 4.00 8.0 142.4 150.5 4.09 401.64 21.400 4.00 8.0 142.3 150.4 4.04 401.64 21.500 4.00 8.0 142.3 150.3 4.02 401.64 21.600 4.00 8.0 142.2 150.3 4.01 401.64 21.700 4.00 8.0 142.2 150.2 4.00 401.64 21.800 4.00 8.0 142.2 150.2 4.00 401.64 21.900 4.00 8.0 142.2 150.2 4.00 401.64 22.000 4.00 8.0 142.2 150.2 4.00 401.64 22.100 4.00 8.0 142.2 150.2 4.00 401.64 22.200 4.00 8.0 142.2 150.2 4.00 401.64 22.300 4.00 8.0 142.2 150.2 4.00 401.64 22.400 4.00 8.0 142.2 150.2 4.00 401.64 22.500 4.00 8.0 142.2 150.2 4.00 401.64 22.600 3.00 7.0 141.7 149.2 3.74 401.63 22.700 3.00 6.0 141.0 147.7 3.36 401.61 22.800 3,.00 6.0 140.7 147.0 3.18 401.61 22.900 3.00 6.0 140.5 146.7 3.09 401.60 23.000 3.00 6.0 140.4 146.5 3.04 401.60 23.100 3.00 6.0 140.4 146.4 3.02 401.60 23.200 3.00 6.0 140.3 146.4 3.01 401.60 23.300 3.00 6.0 140.3 146.3 3.00 401.60 23.400 3.00 6.0 140.3 146.3 3.00 401.60 23.500 2.00 5.0 139.8 145.3 2.74 401.59 23.600 2.00 4.0 139.1 143.8 2.36 401.58 23.700 2.00 4.0 138.8 143.1 2.18 401.57 23.800 2.00 4.0 138.6 142.8 2.09 401.57 23.900 2.00 4.0 138.5 142.6 2.04 401.57 24.000 2.00 4.0 138.5 142.5 2.02 401.57 24.100 2.00 4.0 138.4 142.5 2.01 401.57 24.200 2.00 4.0 138.4 142.4 2.00 401.57 24.300 2.00 4.0 138.4 142.4 2.00 401.57 24.400 2.00 4.0 138.4 142.4 2.00 401.57 24.500 2.00 4.0 138.4 142.4 2.00 401.57 24.600 1.00 3.0 137.9 141.4 1.74 401.56 .1 1 POND-2 Version: 5.17 SIN: Page 5 EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH TIME INFLOW (hrs) ----- (cfs) --------- --- 24.700 1.00 24.800 1.00 24.900 1.00 25.000 1.00 25.100 1.00 25.200 1.00 25.300 1.00 25.400 1.00 25.500 0.00 25.600 0.00 25.700 0.00 25.800 0.00 25.900 --------- 0.00 -------- ROUTING COMPUTATIONS I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (cfs) --------- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- 2.0 137.2 139.9 1.36 401.55 2.0 136.9 139.2 1.18 401.54 2.0 136.7 138.9 1.09 401.54 2.0 136.6 138.7 1.04 401.54 2.0 136.6 138.6 1.02 401.53 2.0 136.6 138.6 1.01 401.53 2.0 136.5 138.6 1.00 401.53 2.0 136.5 138.5 1.00 401.53 1.0 136.1 137.5 0.74 401.53 0.0 135.3 136.1 0.36 401.51 0.0 135.0 135.3 0.18 401.51 0.0 134.8 135.0 0.09 401.50 0.0 --------- 134.7 ------------- 134.8 ------------ 0.04 ---------- 401.50 ---------- ?L POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Page 6 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 216.00 cfs Peak Outflow = 122.32 cfs Peak Elevation = 405.59 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 3.50 ac-ft --------------- Total Storage in Pond = 3.50 ac-ft warning: Inflow hydrograph truncated on left side. 5 A POND-2 Version: 5.17 SIN: Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD Peak Inflow = 216.00 cfs Peak Outflow = 122.32 cfs Peak Elevation = 405.59 ft 11.7 - 11.8 - 11.9 - 12.0 - 12.1 - 12.2 - 12.3 - 12.4 - 12.5 - 12.6 - 12.7 - 12.8 - 12.9 - 13.0 - 13.1 - 13.2 - 13.3 - 13.4 - 13.5 - 13.6 - TII (h: * F: x F: Page 7 EXECUTED: 04-14-1995 08:02:03 Flow (cfs) 0 25 50 75 100 125 150 175 200 225 250 275 x x X X X X X X x x x x * * * * * * * * * x * x * x * x * x *x x x RE Is ) Lie: 9509-100.HYD Lie: OUT HYD * x x x x x x x x * x * x x x x x x x x x x * * * * * * * * Qmax = 216.0 cfs Qmax = 122.3 cfs 46 Soil & Environmental Consultants, Inc. :244 West Millbrook Road ¦ Raleigh, North Carolina 27609 ¦ (919) 846-590O N Fax (919) 846-9467 MEMO DATE: April 28,1995 D ?i TO: John Dorney FROM: Kevin Martin w -RE: Jim Garner, Holly Springs Shopping Center Enclosed are 3 copies of the "green" impoundment proposed for the above named project. The purpose of the "green" impoundment is to "treat" stormwater runoff from the proposed shopping center and bank. No stormwater treatment is required by any other ordinance, but this type of treatment was a condition of your 401 for this project. Please review the plans and call me with any questions. We would like to obtain your approval as soon as possible so that construction of the bank can begin. cc: Danny Smith, Raleigh Regional Office Soil/Site Evaluation ¦ Mapping and Physical Analysis ¦ Wetlands Mapping and Mitigation ¦ Environmental Audits On-Site Waste Treatment Systems, Evaluation and Design ,I ? r STORMWATER AND POND CALCULATIONS OAK HALL SHOPPING CENTER OUTPARCEL HOLLY SPRINGS, NORTH CAROLINA RLH PROJECT NO: 9509 APRIL 14, 1995 Prepared for: Oak Hall Limited Partnership Mr. Glen Futrell P. O. Box 3006 Cary, NC 27519-3006 (919) 467-6935 Prepared by: RL HORVATH ASSOCIATES, INC. ENGINEERS • PLANNERS P. O. BOX 51806 DURHAM, NC 27717 (919) 490-4990 r 1+ TABLE OF CONTENTS LOCATION MAP OBJECTIVE, CALCULATIONS, AND CONCLUSIONS PAGE STRUCTURE DESCRIPTION 6 10-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 7 25-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 16 100-YEAR STORM CALCULATIONS (PONDPACK OUTPUT) 25 Ch- 9 ??? ' )ti ((\- ,o Feltonville ?- ZO' r ?? ? ? ?\\ ._?\- ? ` 1 I I ./ •.v 369 ? ? ? ) ) ? // ) :' II - J \ 'A N / .? ? _ X111 ? y???'%? ? v ?(???1?? ? i• /? ? y , I ? ? ? /? ?_ -;`l''?\:, %?/? ?-?'\?= ? I?i-? ? ??? _ ??? -±_ I -rte/? ? c--^?-?:,?'\°?•`? v 'OVAl ater a ?•-?1?.'-- LTnk 39 vv??v///? 116 ,- I it l \\ \ I y F 2000, 1 ?? 4 C- -T RL HORVATH ASSOCIATES, INC. ENGINEERS * PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490-4990 JOB GPclc HALL 5HoPPIk/e, CtNIER - 9So`1 SHEET NO. OF 4 CALCULATED BY J?OA, Lt i DATE "'? 14 9 S CHECKED BY DATE SCALE W L- 7 L_ S -p c 1 c 1J I l O1 I At t QBJE??T?vE ' 10 ?e IFr,.?•?e ??ne ?e 1?wc? c?cl? .?.or O ?r1 n 1) l.,A (<?,cd?n^cn-? Do IIv 'i r?niovo.1. 2) V, t c?CO°?c C SJV-\ Oc \ r mac- a r) \j c C, 4e'?2- V-?UIJC ?CCr?C. \j CC A'icc 1 T?.xr,C :.e '?Ic ?00 f] ITE I*IFOh -T I OP-! U'?ZvE IA v,=F?, ,W ', "c r. `. qty Fo v„ i<- °.r1CC"ISi. Krv?1-0C) Stz ?r'? lr?" t v ,, -? F Qon" ?11-TL'C?k' V 1 39d O 4oo `1 SIG 4 02 14 •'r, 12 poi -A qoL, .F,,-1 z i Y 5F ?? ?< In .P A - 3'16. v(I i ;r ..F Fjc)T-To FLE v/ 1F), 00 M A x E L[ . r 4 C-) ,'1 y Quick TR-55 Ver.5.46 SIN: Executed: 06:49:08 04-14-1995 OAK HALL SHOPPING CENTER OUTPARCEL 10-YEAR STORM POST-DEVELOPMENT CONDITION RUNOFF CURVE NUMBER DATA ................................................................. ................................................................. Composite Area: TOTAL DRAINAGE AREA SURFACE DESCRIPTION (acres) ------------------------------- -------- WOODED AREAS 22.54 GRASSED AREA 3.76 IMPERVIOUS AREAS 11.27 COMPOSITE AREA ---> 37.56 CN 73 74 98 80.6 ( 81 3 RL HORVATH ASSOCIATES, INC. ENGINEERS * PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490.4990 JOB ORK ?1ALL 5\\D???n,C7 CENTER- 9So`1 SHEET NO. 4 OF ^^ CALCULATED BY J oan DATE 4- 14-- 9 is- CHECKED BY DATE SCALE CAL LUt A-I E -ft VA-P, PooL VOL UrAC 'RE QuIRF-b 7 c> coL_ LC C-1 F I RSA l F2A??F Arlo RELEASE Uyep Aa t\(DoRS USE ?? = METHolk*') To 'D 1=ZE-RC4Il'lF TRvr)off F?.orn RP ?l PAL 0,2 S)7 Ip 1 0. as S 1000 - 10 c- rj Chl BI (pos-l l7CvELOlv:, -T 1000 _ to ? ?? 5'1 al Q= (\- o.z x z.?-?1 - O.o98o \ ? O.B * 2.3g5?1 VOL 0. 098 r 3 7, 5 ( 12 a O. 30? c- 11 \loL \3, 3 73 c..s7 7-E7 RAR( STot?AC E ?Iot - \_, , cv NR Ee i\ @ E LE V 4o0 . u c, i Fs 1 4 -,v {\r2E i. ,o. t iE?? 90? Llk) X6.(0`12 sF 401,oo F`ir f cci EulEv Ac) . c , l?,hg2 -18\4 Iz 253 S`_ 2 VOL @ 4o1. OD = ( 7P) 14 1 12-,253 1 ? I 1 10,034 c? 1 X00 Z J SmA?L 40?.3o I?RF P ? 40? ??o _ ?3,s? •:? Vol @. 401.30 C \ 3, SS -7814 (1. 3') - 13 X01 c r 13, 373 c F 2 Ok -' t= rv v. _P o o ? -D 'P 1 4 '' -- r 1 3 RL HORVATH ASSOCIATES, INC. ENGINEERS * PLANNERS P.O. Box 51806 DURHAM, NORTH CAROLINA 27717 (919) 490-4990 JOB DA K N A L s Hc,P Wm ccK)7E iZ - 9So-j SHEET NO. S OF CALCULATED BY DATE 4 I4 - `I CHECKED BY DATE SCALE 5\ZE 0R\F\(-E To Rtue Nit ovc2 gB Vkc,Uhs AD T Q: 0.0-?8o c FZov r RA ?FA?? RD = 37. S(,IZ a?r« T = 48 hour`s 0.0180 1( 3?. c).0-?C) FS 0 46 hr S Ao c ?2.2- C). : 1.3" l\ o7o° U.OIZ r'.I ?F 1. as in' O.? J2 .'?.7 1,3 F- t.? 9 A -Fo ?h L-EASE- ?uNO` ` OV Li? A 4 8 Nov i2 "t CR \ oD. \rl to ?? sv? i s \C) YrPR. ?, j,t\ c- Ay- CL-E\) D?TFLO?? S?T1?uL1uRF ?' 47\A, ??AT11? 1?-\F?E R Ri P = 12.54G. sF \:S IR ?. SLOPE Q= `14 S 0 6 Outlet Structure File: 9509WET STR POND-2 Version: 5.17 SIN: Date Executed: Time Executed: >>>>>> Structure NO. 1 <<<<<< (Input Data) STAND PIPE Stand Pipe with weir or orifice flow E1 elev.(ft)? 401.5 E2 elev.(ft)? 406.001 Crest elev.(ft)? 401.5 Diameter (ft)? 4 Weir coefficient? 3.33 Orifice coefficient? .6 Start transition elev.(ft) @ ? Transition height (ft)? Vuick TR-55 Version: 5.46 SIN: Page 1 TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: Watershed file: --> Hydrograph file: --> 04-14-1995 10:38:37 9509WET WSD 9509WET HYD HOLLY SPRINGS OUTPARCEL LAND DISTURBANCE >>>> Input Parameters Used to Compute Hydrograph <<<< Subarea AREA CN Tc * Tt Precip. Runoff Ia/p Description (acres) (hrs) - (hrs) -------- I (in) ---------- (in) --------- input/used ---------- ----------------- AREA TO WETLAND ----------------- 37.56 81.0 ------- 0.20 0.20 5.50 ( 3.43 .09 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 131 cfs >>>> Computer Modifications of Input Parameters <<<<< Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) (hr) (hr) (Yes/No) Messages -------- --------------- AREA TO WETLAND ----------------- 0.20 0.20 ---------------- ** ** ----------- No ------------ Computed Ia/p < .1 --------------- * Travel time --------------------------------- from subarea outfall to composite ----------- watershed -------------------- outfall point. ** Tc & Tt are available in the hydrograph table s. e Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:38:37 Watershed file: --> 9509WET WSD Hydrograph file: --> 9509WET HYD HOLLY SPRINGS OUTPARCEL LAND DISTURBANCE >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- AREA TO WETLAND -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 131 -------------- 131 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12.4 ------------ 12.4 Cl 1. POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 ******************************** * * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 10-YEAR STORM CALCULATIONS * * * * ******************************** Inflow Hydrograph: 9509WET HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) --------- (cfs) --------- (ac-ft) ----- 398.00 0.0 ----- 0.000 398.50 0.0 0.019 399.00 0.0 0.054 399.50 0.0 0.107 400.00 0.0 0.183 400.50 0.0 0.284 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 ---------- 128.4 ---------- 4.021 ---------- Page 1 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfs) ------------ (cfs) ------------- 0.0 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------- 1101.6 ------------- Time increment (t) = 0.100 hrs. iO POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 2 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) - (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 11.000 --------- 3.00 -------- ----- 0.0 0.0 0.00 398.00 11.100 4.00 7.0 7.0 7.0 0.00 398.64 11.200 4.00 8.0 15.0 15.0 0.00 399.08 11.300 5.00 9.0 24.0 24.0 0.00 399.43 11.400 5.00 10.0 34.0 34.0 0.00 399.72 11.500 6.00 11.0 45.0 45.0 0.00 400.01 11.600 6.00 12.0 57.0 57.0 0.00 400.26 11.700 7.00 13.0 70.0 70.0 0.00 400.52 11.800 9.00 16.0 86.0 86.0 0.00 400.79 11.900 10.00 19.0 105.0 105.0 0.00 401.09 12.000 15.00 25.0 130.0 130.0 0.00 401.44 12.100 27.00 42.0 152.8 172.0 9.60 401.82 12.200 53.00 80.0 175.4 232.8 28.71 402.26 12.300 98.00 151.0 205.4 326.4 60.52 402.79 12.400 131.00 229.0 268.3 434.4 83.01 403.39 12.500 120.00 251.0 334.9 519.3 92.20 403.83 12.600 88.00 208.0 353.8 542.9 94.58 403.94 12.700 60.00 148.0 320.9 501.8 90.42 403.74 12.800 42.00 102.0 259.9 422.9 81.51 403.32 12.900 32.00 74.0 207.8 333.9 63.06 402.83 13.000 23.00 55.0 184.8 262.8 38.99 402.45 13.100 20.00 43.0 173.8 227.8 27.00 402.23 13.200 16.00 36.0 168.2 209.8 20.83 402.11 13.300 14.00 30.0 164.5 198.2 16.83 402.04 13.400 13.00 27.0 162.3 191.5 14.61 401.99 13.500 12.00 25.0 160.2 187.3 13.53 401.96 13.600 12.00 24.0 158.8 184.2 12.74 401.93 13.700 11.00 23.0 157.5 181.8 12.10 401.91 13.800 10.00 21.0 156.0 178.5 11.28 401.88 13.900 9.00 19.0 154.3 175.0 10.37 401.85 14.000 9.00 18.0 152.9 172.3 9.66 401.83 14.100 9.00 18.0 152.3 170.9 9.32 401.81 14.200 8.00 17.0 151.5 169.3 8.90 401.80 14.300 8.00 16.0 150.6 167.5 8.44 401.79 14.400 8.00 16.0 150.2 166.6 8.21 401.78 14.500 7.00 15.0 149.5 165.2 7.85 401.77 14.600 7.00 14.0 148.7 163.5 7.41 401.75 14.700 7.00 14.0 148.3 162.7 7.20 401.74 14.800 6.00 13.0 147.6 161.3 6.84 401.73 14.900 6.00 12.0 146.8 159.6 6.41 401.72 15.000 6.00 12.0 146.4 158.8 6.20 401.71 15.100 6.00 12.0 146.2 158.4 6.10 401.71 15.200 6.00 12.0 146.1 158.2 6.05 401.70 15.300 6.00 12.0 146.0 158.1 6.02 401.70 15.400 6.00 12.0 146.0 158.0 6.01 401.70 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD Page 3 INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------ ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) ----------- (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 --------- 6.00 --------- 12.0 - 146.0 158.0 6.01 401.70 15.600 6.00 12.0 146.0 158.0 6.00 401.70 15.700 6.00 12.0 146.0 158.0 6.00 401.70 15.800 5.00 11.0 145.5 157.0 5.74 401.69 15.900 5.00 10.0 144.8 155.5 5.36 401.68 16.000 5.00 10.0 144.4 154.8 5.18 401.67 16.100 5.00 10.0 144.3 154.4 5.09 401.67 16.200 5.00 10.0 144.2 154.3 5.04 401.67 16.300 5.00 10.0 144.1 154.2 5.02 401.67 16.400 5.00 10.0 144.1 154.1 5.01 401.67 16.500 5.00 10.0 144.1 154.1 5.00 401.67 16.600 5.00 10.0 144.1 154.1 5.00 401.67 16.700 5.00 10.0 144.1 154.1 5.00 401.67 16.800 4.00 9.0 143.6 153.1 4.74 401.66 16.900 4.00 8.0 142.9 151.6 4.36 401.65 17.000 4.00 8.0 142.5 150.9 4.18 401.64 17.100 4.00 8.0 142.4 150.5 4.09 401.64 17.200 4.00 8.0 142.3 150.4 4.04 401.64 17.300 4.00 8.0 142.3 150.3 4.02 401.64 17.400 4.00 8.0 142.2 150.3 4.01 401.64 17.500 4.00 8.0 142.2 150.2 4.00 401.64 17.600 4.00 8.0 142.2 150.2 4.00 401.64 17.700 4.00 8.0 142.2 150.2 4.00 401.64 17.800 4.00 8.0 142.2 150.2 4.00 401.64 17.900 4.00 8.0 142.2 150.2 4.00 401.64 18.000 4.00 8.0 142.2 150.2 4.00 401.64 18.100 4.00 8.0 142.2 150.2 4.00 401.64 18.200 4.00 8.0 142.2 150.2 4.00 401.64 18.300 4.00 8.0 142.2 150.2 4.00 401.64 18.400 4.00 8.0 142.2 150.2 4.00 401.64 18.500 4.00 8.0 142.2 150.2 4.00 401.64 18.600 3.00 7.0 141.7 149.2 3.74 401.63 18.700 3.00 6.0 141.0 147.7 3.36 401.61 18.800 3.00 6.0 140.7 147.0 3.18 401.61 18.900 3.00 6.0 140.5 146.7 3.09 401.60 19.000 3.00 6.0 140.4 146.5 3.04 401.60 19.100 3.00 6.0 140.4 146.4 3.02 401.60 19.200 3.00 6.0 140.3 146.4 3.01 401.60 19.300 3.00 6.0 140.3 146.3 3.00 401.60 19.400 3.00 6.0 140.3 146.3 3.00 401.60 19.500 3.00 6.0 140.3 146.3 3.00 401.60 19.600 3.00 6.0 140.3 146.3 3.00 401.60 19.700 3.00 6.0 140.3 146.3 3.00 401.60 19.800 3.00 6.0 140.3 146.3 3.00 401.60 19.900 3.00 6.0 140.3 146.3 3.00 401.60 20.000 3.00 6.0 140.3 146.3 3.00 401.60 17- POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD Page 4 INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------ ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 --------- 3.00 --------- 6.0 140.3 146.3 3.00 401.60 20.200 3.00 6.0 140.3 146.3 3.00 401.60 20.300 3.00 6.0 140.3 146.3 3.00 401.60 20.400 3.00 6.0 140.3 146.3 3.00 401.60 20.500 3.00 6.0 140.3 146.3 3.00 401.60 20.600 3.00 6.0 140.3 146.3 3.00 401.60 20.700 3.00 6.0 140.3 146.3 3.00 401.60 20.800 3.00 6.0 140.3 146.3 3.00 401.60 20.900 3.00 6.0 140.3 146.3 3.00 401.60 21.000 2.00 5.0 139.8 145.3 2.74 401.59 21.100 2.00 4.0 139.1 143.8 2.36 401.58 21.200 2.00 4.0 138.8 143.1 2.18 401.57 21.300 2.00 4.0 138.6 142.8 2.09 401.57 21.400 2.00 4.0 138.5 142.6 2.04 401.57 21.500 2.00 4.0 138.5 142.5 2.02 401.57 21.600 2.00 4.0 138.4 142.5 2.01 401.57 21.700 2.00 4.0 138.4 142.4 2.00 401.57 21.800 2.00 4.0 138.4 142.4 2.00 401.57 21.900 2.00 4.0 138.4 142.4 2.00 401.57 22.000 2.00 4.0 138.4 142.4 2.00 401.57 22.100 2.00 4.0 138.4 142.4 2.00 401.57 22.200 2.00 4.0 138.4 142.4 2.00 401.57 22.300 2.00 4.0 138.4 142.4 2.00 401.57 22.400 2.00 4.0 138.4 142.4 2.00 401.57 22.500 2.00 4.0 138.4 142.4 2.00 401.57 22.600 2.00 4.0 138.4 142.4 2.00 401.57 22.700 2.00 4.0 138.4 142.4 2.00 401.57 22.800 2.00 4.0 138.4 142.4 2.00 401.57 22.900 2.00 4.0 138.4 142.4 2.00 401.57 23.000 2.00 4.0 138.4 142.4 2.00 401.57 23.100 1.00 3.0 137.9 141.4 1.74 401.56 23.200 1.00 2.0 137.2 139.9 1.36 401.55 23.300 1.00 2.0 136.9 139.2 1.18 401.54 23.400 1.00 2.0 136.7 138.9 1.09 401.54 23.500 1.00 2.0 136.6 138.7 1.04 401.54 23.600 1.00 2.0 136.6 138.6 1.02 401.53 23.700 1.00 2.0 136.6 138.6 1.01 401.53 23.800 1.00 2.0 136.5 138.6 1.00 401.53 23.900 1.00 2.0 136.5 138.5 1.00 401.53 24.000 1.00 2.0 136.5 138.5 1.00 401.53 24.100 1.00 2.0 136.5 138.5 1.00 401.53 24.200 1.00 2.0 136.5 138.5 1.00 401.53 24.300 1.00 2.0 136.5 138.5 1.00 401.53 24.400 1.00 2.0 136.5 138.5 1.00 401.53 24.500 1.00 2.0 136.5 138.5 1.00 401.53 24.600 1.00 2.0 136.5 138.5 1.00 401.53 (3 POND-2 Version: 5.17 SIN: Page 5 EXECUTED: 04-14-1995 08:21:08 Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH TIME INFLOW (hrs) -------- (cfs) --------- 24.700 1.00 24.800 1.00 24.900 1.00 25.000 0.00 25.100 0.00 25.200 0.00 25.300 0.00 25.400 0.00 25.500 0.00 25.600 0.00 25.700 0.00 25.800 0.00 25.900 --------- 0.00 -------- ROUTING COMPUTATIONS I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (cfs) -- ---- (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --- - --- 2.0 136.5 138.5 1.00 - ---- 401.53 2.0 136.5 138.5 1.00 401.53 2.0 136.5 138.5 1.00 401.53 1.0 136.1 137.5 0.74 401.53 0.0 135.3 136.1 0.36 401.51 0.0 135.0 135.3 0.18 401.51 0.0 134.8 135.0 0.09 401.50 0.0 134.7 134.8 0.04 401.50 0.0 134.7 134.7 0.02 401.50 0.0 134.7 134.7 0.01 401.50 0.0 134.7 134.7 0.00 401.50 0.0 134.7 134.7 0.00 401.50 0.0 ---------- 134.6 ------------- 134.7 ------------ 0.00 ---------- 401.50 --------- 1.4 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:21:08 Page 6 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 131.00 cfs Peak Outflow = 94.58 cfs Peak Elevation = 403.94 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 1.85 ac-ft --------------- Total Storage in Pond = 1.85 ac-ft Warning: Inflow hydrograph truncated on left side. POND-2 Version: 5.17 SIN: Pond File: 9509WET PND Inflow Hydrograph: 9509WET HYD Outflow Hydrograph: OUT HYD Peak Inflow = 131.00 cfs Peak Outflow = 94.58 cfs Peak Elevation = 403.94 ft iir Page 7 EXECUTED: 04-14-1995 08:21:08 Flow (cfs) 11.7 - 11.8 - 11.9 - 12.0 - 12.1 - 12.2 - 12.3 - 12.4 - 12.5 - 12.6 - 12.7 - 12.8 - 12.9 - 13.0 - 13.1 13.2 13.3 - 13.4 - 13.5 - 13.6 - TIP (hi * F- x F: 0 15 30 45 60 75 90 105 120 135 150 165 .------ I ----- I ----- ----- I ----- I ----- I ----- I ----- I ----- ----- I ----- I- x X x x x x x x x x x x x x x x x x * x * x * x * x * x * x * x * x * x * x * x * x * x * x *x *x *x *x x x x RE -s ) _le: 9509WET HYD Qmax = 131.0 cfs ale: OUT HYD Qmax = 94.6 cfs * * * * * * Ib Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:50:27 Watershed file: --> 9509-25 WSD Hydrograph file: --> 9509-25 HYD OAK HALL SHOPPING CENTER WETLAND DETENTION AREA 25-YEAR STORM CALCULATIONS >>>> Input Parameters Used to Compute Hydrograph <<<< Page 1 Subarea AREA CN Tc * Tt Precip. I Runoff Ia/p Description (acres) ------------- (hrs) -------- (hrs) -------- (in) ---------- (in) --------- input/used ---------- --------------- TOTAL AREA ------ 37.56 81.0 0.20 0.20 6.10 1 3.97 .08 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 152 cfs >>>> Computer Modifications of Input Parameters <<<<< ------------------------------------------------------------------------------- Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) (hr) (hr) (Yes/No) Messages ------------------------------------------------------------------------------- TOTAL AREA 0.20 0.20 ** ** No Computed Ia/p < .1 ------------------------------------------------------------------------------- * Travel time from subarea outfall to composite watershed outfall point. ** Tc & Tt are available in the hydrograph tables. 1 1 Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:50:27 Watershed file: --> 9509-25 WSD Hydrograph file: --> 9509-25 HYD OAK HALL SHOPPING CENTER WETLAND DETENTION AREA 25-YEAR STORM CALCULATIONS >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- TOTAL AREA -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 152 -------------- 152 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12 . 4 ------------ 12.4 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 ******************************** * * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 25-YEAR STORM CALCULATIONS * * * * ******************************** Inflow Hydrograph: 9509-25 HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA ELEVATION OUTFLOW STORAGE (ft) ------ (cfs) (ac-ft) --- 398.00 --------- 0.0 ---------- 0.000 398.50 0.0 0.019 399.00 0.0 0.054 399.50 0.0 0.107 400.00 0.0 0.183 400.50 0.0 0.284 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 ---------- 128.4 ---------- 4.021 ---------- Page 1 INTERMEDIATE ROUTING COMPUTATIONS 2S/t 2S/t + 0 (cfs) ------------ (cfs) ------------- 0.0 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------- 1101.6 ------------- ) B Time increment (t) = 0.100 hrs. POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD Page 2 19 INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------ ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) ------------ (cfs) ----------- (cfs) --------- (ft) --------- -------- 11.000 --------- 4.00 --------- ----- 0.0 0.0 0.00 398.00 11.100 4.00 8.0 8.0 8.0 0.00 398.70 11.200 5.00 9.0 17.0 17.0 0.00 399.16 11.300 5.00 10.0 27.0 27.0 0.00 399.53 11.400 6.00 11.0 38.0 38.0 0.00 399.83 11.500 6.00 12.0 50.0 50.0 0.00 400.12 11.600 7.00 13.0 63.0 63.0 0.00 400.38 11.700 8.00 15.0 78.0 78.0 0.00 400.66 11.800 10.00 18.0 96.0 96.0 0.00 400.96 11.900 11.00 21.0 117.0 117.0 0.00 401.26 12.000 17.00 28.0 139.7 145.0 2.66 401.59 12.100 32.00 49.0 160.9 188.7 13.88 401.97 12.200 61.00 93.0 182.0 253.9 35.94 402.39 12.300 114.00 175.0 215.3 357.0 70.87 402.95 12.400 152.00 266.0 304.6 481.3 88.35 403.64 12.500 138.00 290.0 396.7 594.6 98.95 404.18 12.600 101.00 239.0 431.2 635.7 102.24 404.36 12.700 69.00 170.0 402.2 601.2 99.48 404.21 12.800 48.00 117.0 334.9 519.2 92.19 403.83 12.900 37.00 85.0 257.6 419.9 81.10 403.30 13.000 27.00 64.0 203.8 321.6 58.92 402.76 13.100 23.00 50.0 182.0 253.8 35.91 402.39 13.200 19.00 42.0 172.6 224.0 25.69 402.20 13.300 18.00 37.0 168.1 209.6 20.76 402.11 13.400 16.00 34.0 165.7 202.1 18.18 402.06 13.500 15.00 31.0 164.1 196.7 16.34 402.03 13.600 14.00 29.0 162.9 193.1 15.08 402.01 13.700 13.00 27.0 161.5 189.9 14.20 401.98 13.800 12.00 25.0 159.9 186.5 13.33 401.95 13.900 12.00 24.0 158.6 183.9 12.64 401.93 14.000 11.00 23.0 157.5 181.6 12.06 401.91 14.100 10.00 21.0 155.9 178.5 11.26 401.88 14.200 10.00 20.0 154.7 175.9 10.61 401.86 14.300 9.00 19.0 153.6 173.7 10.04 401.84 14.400 9.00 18.0 152.6 171.6 9.51 401.82 14.500 8.00 17.0 151.7 169.6 8.99 401.80 14.600 8.00 16.0 150.7 167.7 8.48 401.79 14.700 8.00 16.0 150.2 166.7 8.23 401.78 14.800 8.00 16.0 150.0 166.2 8.11 401.77 14.900 7.00 15.0 149.4 165.0 7.80 401.76 15.000 7.00 14.0 148.6 163.4 7.39 401.75 15.100 7.00 14.0 148.2 162.6 7.19 401.74 15.200 7.00 14.0 148.1 162.2 7.09 401.74 15.300 7.00 14.0 148.0 162.1 7.04 401.74 15.400 7.00 14.0 147.9 162.0 7.02 401.74 Zo POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ------------------ Page 3 ROUTING COMPUTATIONS ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) --------- (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 --------- 7.00 --------- 14.0 --- 147.9 161.9 7.01 401.74 15.600 7.00 14.0 147.9 161.9 7.01 401.74 15.700 7.00 14.0 147.9 161.9 7.00 401.74 15.800 6.00 13.0 147.4 160.9 6.74 401.73 15.900 6.00 12.0 146.7 159.4 6.36 401.71 16.000 6.00 12.0 146.3 158.7 6.18 401.71 16.100 6.00 12.0 146.2 158.3 6.09 401.71 16.200 6.00 12.0 146.1 158.2 6.04 401.70 16.300 5.00 11.0 145.6 157.1 5.76 401.69 16.400 5.00 10.0 144.8 155.6 5.37 401.68 16.500 5.00 10.0 144.4 154.8 5.18 401.68 16.600 5.00 10.0 144.3 154.4 5.09 401.67 16.700 5.00 10.0 144.2 154.3 5.04 401.67 16.800 5.00 10.0 144.1 154.2 5.02 401.67 16.900 5.00 10.0 144.1 154.1 5.01 401.67 17.000 5.00 10.0 144.1 154.1 5.00 401.67 17.100 5.00 10.0 144.1 154.1 5.00 401.67 17.200 5.00 10.0 144.1 154.1 5.00 401.67 17.300 5.00 10.0 144.1 154.1 5.00 401.67 17.400 5.00 10.0 144.1 154.1 5.00 401.67 17.500 5.00 10.0 144.1 154.1 5.00 401.67 17.600 5.00 10.0 144.1 154.1 5.00 401.67 17.700 5.00 10.0 144.1 154.1 5.00 401.67 17.800 4.00 9.0 143.6 153.1 4.74 401.66 17.900 4.00 8.0 142.9 151.6 4.36 401.65 18.000 4.00 8.0 142.5 150.9 4.18 401.64 18.100 4.00 8.0 142.4 150.5 4.09 401.64 18.200 4.00 8.0 142.3 150.4 4.04 401.64 18.300 4.00 8.0 142.3 150.3 4.02 401.64 18.400 4.00 8.0 142.2 150.3 4.01 401.64 18.500 4.00 8.0 142.2 150.2 4.00 401.64 18.600 4.00 8.0 142.2 150.2 4.00 401.64 18.700 4.00 8.0 142.2 150.2 4.00 401.64 18.800 4.00 8.0 142.2 150.2 4.00 401.64 18.900 4.00 8.0 142.2 150.2 4.00 401.64 19.000 4.00 8.0 142.2 150.2 4.00 401.64 19.100 4.00 8.0 142.2 150.2 4.00 401.64 19.200 4.00 8.0 142.2 150.2 4.00 401.64 19.300 4.00 8.0 142.2 150.2 4.00 401.64 19.400 4.00 8.0 142.2 150.2 4.00 401.64 19.500 4.00 8.0 142.2 150.2 4.00 401.64 19.600 3.00 7.0 141.7 149.2 3.74 401.63 19.700 3.00 6.0 141.0 147.7 3.36 401.61 19.800 3.00 6.0 140.7 147.0 3.18 401.61 19.900 3.00 6.0 140.5 146.7 3.09 401.60 20.000 3.00 6.0 140.4 146.5 3.04 401.60 z1 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD Page 4 INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------ ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) -------- (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 --------- 3.00 --------- 6.0 ---- 140.4 146.4 3.02 401.60 20.200 3.00 6.0 140.3 146.4 3.01 401.60 20.300 3.00 6.0 140.3 146.3 3.00 401.60 20.400 3.00 6.0 140.3 146.3 3.00 401.60 20.500 3.00 6.0 140.3 146.3 3.00 401.60 20.600 3.00 6.0 140.3 146.3 3.00 401.60 20.700 3.00 6.0 140.3 146.3 3.00 401.60 20.800 3.00 6.0 140.3 146.3 3.00 401.60 20.900 3.00 6.0 140.3 146.3 3.00 401.60 21.000 3.00 6.0 140.3 146.3 3.00 401.60 21.100 3.00 6.0 140.3 146.3 3.00 401.60 21.200 3.00 6.0 140.3 146.3 3.00 401.60 21.300 3.00 6.0 140.3 146.3 3.00 401.60 21.400 3.00 6.0 140.3 146.3 3.00 401.60 21.500 3.00 6.0 140.3 146.3 3.00 401.60 21.600 3.00 6.0 140.3 146.3 3.00 401.60 21.700 3.00 6.0 140.3 146.3 3.00 401.60 21.800 3.00 6.0 140.3 146.3 3.00 401.60 21.900 3.00 6.0 140.3 146.3 3.00 401.60 22.000 3.00 6.0 140.3 146.3 3.00 401.60 22.100 3.00 6.0 140.3 146.3 3.00 401.60 22.200 3.00 6.0 140.3 146.3 3.00 401.60 22.300 3.00 6.0 140.3 146.3 3.00 401.60 22.400 3.00 6.0 140.3 146.3 3.00 401.60 22.500 3.00 6.0 140.3 146.3 3.00 401.60 22.600 3.00 6.0 140.3 146.3 3.00 401.60 22.700 2.00 5.0 139.8 145.3 2.74 401.59 22.800 2.00 4.0 139.1 143.8 2.36 401.58 22.900 2.00 4.0 138.8 143.1 2.18 401.57 23.000 2.00 4.0 138.6 142.8 2.09 401.57 23.100 2.00 4.0 138.5 142.6 2.04 401.57 23.200 2.00 4.0 138.5 142.5 2.02 401.57 23.300 2.00 4.0 138.4 142.5 2.01 401.57 23.400 2.00 4.0 138.4 142.4 2.00 401.57 23.500 2.00 4.0 138.4 142.4 2.00 401.57 23.600 2.00 4.0 138.4 142.4 2.00 401.57 23.700 2.00 4.0 138.4 142.4 2.00 401.57 23.800 2.00 4.0 138.4 142.4 2.00 401.57 23.900 2.00 4.0 138.4 142.4 2.00 401.57 24.000 2.00 4.0 138.4 142.4 2.00 401.57 24.100 1.00 3.0 137.9 141.4 1.74 401.56 24.200 1.00 2.0 137.2 139.9 1.36 401.55 24.300 1.00 2.0 136.9 139.2 1.18 401.54 24.400 1.00 2.0 136.7 138.9 1.09 401.54 24.500 1.00 2.0 136.6 138.7 1.04 401.54 24.600 1.00 2.0 136.6 138.6 1.02 401.53 4 POND-2 Version: 5.17 SIN: Page 5 EXECUTED: 04-14-1995 08:47:22 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH TIME INFLOW (hrs) -------- (cfs) --------- 24.700 1.00 24.800 1.00 24.900 1.00 25.000 1.00 25.100 1.00 25.200 1.00 25.300 1.00 25.400 0.00 25.500 0.00 25.600 0.00 25.700 0.00 25.800 0.00 25.900 --------- 0.00 -------- ROUTING COMPUTATIONS zz I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (cfs) (cfs) -- (cfs) ----------- (cfs) --------- (ft) --------- --------- 2.0 ---------- 136.6 138.6 1.01 401.53 2.0 136.5 138.6 1.00 401.53 2.0 136.5 138.5 1.00 401.53 2.0 136.5 138.5 1.00 401.53 2.0 136.5 138.5 1.00 401.53 2.0 136.5 138.5 1.00 401.53 2.0 136.5 138.5 1.00 401.53 1.0 136.1 137.5 0.74 401.53 0.0 135.3 136.1 0.36 401.51 0.0 135.0 135.3 0.18 401.51 0.0 134.8 135.0 0.09 401.50 0.0 134.7 134.8 0.04 401.50 0.0 ---------- 134.7 ------------- 134.7 ------------ 0.02 ---------- 401.50 --------- POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:47:22 Page 6 Z3 ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 152.00 cfs Peak Outflow = 102.24 cfs Peak Elevation = 404.36 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 2.20 ac-ft --------------- Total Storage in Pond = 2.20 ac-ft Warning: Inflow hydrograph truncated on left side. z4 f~ POND-2 Version: 5.17 SIN: Page 7 Pond File: 9509WET PND Inflow Hydrograph: 9509-25 HYD Outflow Hydrograph: OUT HYD EXECUTED: 04-14-1995 Peak Inflow = 152.00 cfs 08:47:22 Peak Outflow = 102.24 cfs Peak Elevation = 404.36 ft Flow (cfs) 0 .---- 20 -- ----- 40 I ----- 60 80 I ----- --- 100 -- I ---- 120 140 160 180 200 220 - ----- I ----- I ----- I ----- -----1- 11.7 - x x 11.8 - x x 11.9 - x x 12.0 - x x 12.1 - x x 12.2 - x x 12.3 - x x 12.4 - x x 12.5 - x x 12.6 - *x * x 12.7 - * x * x 12.8 - * x * x 12.9 - * x * x 13.0 - * x * x 13.1 - * x * x 13.2 - * x *x 13.3 - *x *x 13.4 - x x 13.5 - x *x 13.6 - *x TIME (hrs) * File: 9509-25 HYD Qmax = 152.0 cfs x File: OUT HYD Qmax = 102.2 cfs f Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:40:22 Watershed file: --> 9509-100.WSD Hydrograph file: --> 9509-100.HYD OAK HALL SHOPPING CENTER OUTPARCEL 100-YEAR STORM CALCULATIONS POST-DEVELOPMENT CONDTIONS >>>> Input Parameters Used to Compute Hydrograph <<<< Page 1 ZS Subarea AREA CN Tc * Tt Precip. Runoff Ia/p Description (acres) (hrs) ---- (hrs) -------- (in) ---------- (in) -------- input/used ----------- --------------- TOTAL AREA ------------------- 37.56 81.0 ---- 0.20 0.20 7.90 1 5.65 .06 .10 * Travel time from subarea outfall to composite watershed outfall point. Total area = 37.56 acres or 0.05869 sq.mi Peak discharge = 216 cfs >>>> Computer Modifications of Input Parameters <<<<< ------------------------------------------------------------------------------- Input Values Rounded Values Ia/p Subarea Tc * Tt Tc * Tt Interpolated Ia/p Description (hr) (hr) (hr) (hr) (Yes/No) Messages ------------------------------------------------------------------------------- TOTAL AREA 0.20 0.20 ** ** No Computed Ia/p < .1 ------------------------------------------------------------------------------- * Travel time from subarea outfall to composite watershed outfall point. ** Tc & Tt are available in the hydrograph tables. Z!v Quick TR-55 Version: 5.46 SIN: TR-55 TABULAR HYDROGRAPH METHOD Type II Distribution (24 hr. Duration Storm) Executed: 04-14-1995 10:40:22 Watershed file: --> 9509-100.WSD Hydrograph file: --> 9509-100.HYD OAK HALL SHOPPING CENTER OUTPARCEL 100-YEAR STORM CALCULATIONS POST-DEVELOPMENT CONDTIONS >>>> Summary of Subarea Times to Peak <<<< Subarea -------------- TOTAL AREA -------------- Composite Watershed Peak Discharge at Composite Outfall (cfs) -------------- 216 -------------- 216 Page 2 Time to Peak at Composite Outfall (hrs) ------------ 12.4 ------------ 12.4 -Z--7 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 ********************************* * * OAK HALL SHOPPING CENTER * WETLAND DETENTION AREA * 100-YEAR STORM CALCULATIONS * * ********************************* Inflow Hydrograph: 9509-100.HYD Rating Table file: 9509WET PND ----INITIAL CONDITIONS---- Elevation = 398.00 ft Outflow - 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA Page 1 INTERMEDIATE ROUTING COMPUTATIONS ELEVATION OUTFLOW STORAGE (ft) (cfs) (ac-ft) ------- --------- 398.00 --------- 0.0 --- 0.000 398.50 0.0 0.0191 399.00 0.0 0.0541 399.50 0.0 0.107, 400.00 0.0 0.1831 400.50 0.0 0.284, 401.00 0.0 0.407 401.50 0.0 0.556 402.00 14.8 0.733 402.50 41.8 0.947 403.00 74.1 1.209 403.50 85.6 1.523 404.00 95.7 1.894 404.50 104.8 2.326 405.00 113.2 2.821 405.50 121.0 3.385 405.99 128.2 4.008 406.00 ---------- 128.4 ---------- 4.021 ---------- 2S/t 2S/t + 0 (cfs) (cfs) ------------- ------------ 0.0 0.0 4.7 4.7 13.0 13.0 25.8 25.8 44.4 44.4 68.7 68.7 98.6 98.6 134.6 134.6 177.4 192.2 229.2 271.0 292.5 366.6 368.5 454.1 458.3 554.0 562.8 667.6 682.7 795.9 819.2 940.2 969.9 1098.1 973.2 ------------- 1101.6 ------------- Time increment (t) = 0.100 hrs. LS 1 POND-2 Version: 5.17 SIN: Page 2 EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------ ------------------------------------------------------ TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) --- (cfs) ----------- (cfs) --------- (ft) --------- -------- 11.000 --------- 6.00 --------- ----- --------- 0.0 0.0 0.00 398.00 11.100 7.00 13.0 13.0 13.0 0.00 399.00 11.200 7.00 14.0 27.0 27.0 0.00 399.53 11.300 8.00 15.0 42.0 42.0 0.00 399.94 11.400 9.00 17.0 59.0 59.0 0.00 400.30 11.500 10.00 19.0 78.0 78.0 0.00 400.66 11.600 11.00 21.0 99.0 99.0 0.00 401.01 11.700 13.00 24.0 123.0 123.0 0.00 401.34 11.800 14.00 27.0 142.1 150.0 3.94 401.63 11.900 16.00 30.0 152.9 172.1 9.63 401.83 12.000 25.00 41.0 163.2 193.9 15.35 402.01 12.100 45.00 70.0 175.5 233.2 28.83 402.26 12.200 87.00 132.0 199.2 307.5 54.14 402.69 12.300 162.00 249.0 278.6 448.2 84.83 403.47 12.400 216.00 378.0 448.7 656.6 103.92 404.45 12.500 197.00 413.0 628.2 861.7 116.76 405.23 12.600 144.00 341.0 724.6 969.2 122.32 405.59 12.700 99.00 243.0 723.1 967.6 122.25 405.58 12.800 69.00 168.0 654.4 891.1 118.34 405.33 12.900 53.00 122.0 552.5 776.4 111.92 404.92 13.000 38.00 91.0 437.8 643.5 102.87 404.39 13.100 32.00 70.0 325.7 507.8 91.03 403.77 13.200 27.00 59.0 231.8 384.7 76.49 403.10 13.300 24.00 51.0 191.2 282.8 45.78 402.56 13.400 22.00 46.0 176.8 237.2 30.22 402.29 13.500 21.00 43.0 171.3 219.8 24.24 402.17 13.600 19.00 40.0 168.6 211.3 21.33 402.12 13.700 18.00 37.0 166.9 205.6 19.39 402.09 13.800 17.00 35.0 165.7 201.9 18.09 402.06 13.900 16.00 33.0 164.7 198.7 17.00 402.04 14.000 15.00 31.0 163.7 195.7 15.97 402.02 14.100 14.00 29.0 162.8 192.7 14.96 402.00 14.200 14.00 28.0 161.9 190.8 14.43 401.99 14.300 13.00 27.0 161.0 188.9 13.95 401.97 14.400 13.00 26.0 160.1 187.0 13.46 401.95 14.500 12.00 25.0 159.2 185.1 12.97 401.94 14.600 12.00 24.0 158.2 183.2 12.47 401.92 14.700 12.00 24.0 157.8 182.2 12.23 401.91 14.800 12.00 24.0 157.6 181.8 12.11 401.91 14.900 11.00 23.0 157.0 180.6 11.80 401.90 15.000 11.00 22.0 156.2 179.0 11.39 401.88 15.100 11.00 22.0 155.8 178.2 11.19 401.88 15.200 11.00 22.0 155.6 177.8 11.09 401.87 15.300 10.00 21.0 155.1 176.6 10.79 401.86 15.400 10.00 20.0 154.3 175.1 10.38 401.85 719 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Page 3 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ROUTING COMPUTATIONS TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) ------- - (cfs) ----------- (cfs) --------- (ft) --------- -------- 15.500 --------- 10.00 --------- 20.0 - --- 153.9 174.3 10.19 401.84 15.600 10.00 20.0 153.7 173.9 10.09 401.84 15.700 10.00 20.0 153.7 173.7 10.04 401.84 15.800 9.00 19.0 153.1 172.7 9.76 401.83 15.900 9.00 18.0 152.4 171.1 9.37 401.82 16.000 9.00 18.0 152.0 170.4 9.18 401.81 16.100 9.00 18.0 151.8 170.0 9.09 401.81 16.200 9.00 18.0 151.8 169.8 9.04 401.81 16.300 8.00 17.0 151.2 168.8 8.76 401.80 16.400 8.00 16.0 150.5 167.2 8.37 401.78 16.500 8.00 16.0 150.1 166.5 8.18 401.78 16.600 8.00 16.0 149.9 166.1 8.09 401.77 16.700 8.00 16.0 149.9 165.9 8.04 401.77 16.800 7.00 15.0 149.3 164.9 7.76 401.76 16.900 7.00 14.0 148.6 163.3 7.37 401.75 17.000 7.00 14.0 148.2 162.6 7.18 401.74 17.100 7.00 14.0 148.1 162.2 7.09 401.74 17.200 7.00 14.0 148.0 162.1 7.04 401.74 17.300 7.00 14.0 147.9 162.0 7.02 401.74 17.400 7.00 14.0 147.9 161.9 7.01 401.74 17.500 7.00 14.0 147.9 161.9 7.00 401.74 17.600 7.00 14.0 147.9 161.9 7.00 401.74 17.700 7.00 14.0 147.9 161.9 7.00 401.74 17.800 6.00 13.0 147.4 160.9 6.74 401.73 17.900 6.00 12.0 146.7 159.4 6.36 401.71 18.000 6.00 12.0 146.3 158.7 6.18 401.71 18.100 6.00 12.0 146.2 158.3 6.09 401.71 18.200 6.00 12.0 146.1 158.2 6.04 401.70 18.300 6.00 12.0 146.0 158.1 6.02 401.70 18.400 6.00 12.0 146.0 158.0 6.01 401.70 18.500 6.00 12.0 146.0 158.0 6.00 401.70 18.600 5.00 11.0 145.5 157.0 5.75 401.69 18.700 5.00 10.0 144.8 155.5 5.36 401.68 18.800 5.00 10.0 144.4 154.8 5.18 401.67 18.900 5.00 10.0 144.3 154.4 5.09 401.67 19.000 5.00 10.0 144.2 154.3 5.04 401.67 19.100 5.00 10.0 144.1 154.2 5.02 401.67 19.200 5.00 10.0 144.1 154.1 5.01 401.67 19.300 5.00 10.0 144.1 154.1 5.00 401.67 19.400 5.00 10.0 144.1 154.1 5.00 401.67 19.500 5.00 10.0 144.1 154.1 5.00 401.67 19.600 5.00 10.0 144.1 154.1 5.00 401.67 19.700 5.00 10.0 144.1 154.1 5.00 401.67 19.800 5.00 10.0 144.1 154.1 5.00 401.67 19.900 5.00 10.0 144.1 154.1 5.00 401.67 20.000 5.00 10.0 144.1 154.1 5.00 401.67 w l POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH ROUTING COMPUTATIONS Page 4 3o TIME INFLOW I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (hrs) (cfs) (cfs) (cfs) ----- (cfs) ----------- (cfs) --------- (ft) --------- -------- 20.100 --------- 5.00 --------- 10.0 ------- 144.1 154.1 5.00 401.67 20.200 5.00 10.0 144.1 154.1 5.00 401.67 20.300 5.00 10.0 144.1 154.1 5.00 401.67 20.400 5.00 10.0 144.1 154.1 5.00 401.67 20.500 5.00 10.0 144.1 154.1 5.00 401.67 20.600 5.00 10.0 144.1 154.1 5.00 401.67 20.700 5.00 10.0 144.1 154.1 5.00 401.67 20.800 5.00 10.0 144.1 154.1 5.00 401.67 20.900 5.00 10.0 144.1 154.1 5.00 401.67 21.000 4.00 9.0 143.6 153.1 4.74 401.66 21.100 4.00 8.0 142.9 151.6 4.36 401.65 21.200 4.00 8.0 142.5 150.9 4.18 401.64 21.300 4.00 8.0 142.4 150.5 4.09 401.64 21.400 4.00 8.0 142.3 150.4 4.04 401.64 21.500 4.00 8.0 142.3 150.3 4.02 401.64 21.600 4.00 8.0 142.2 150.3 4.01 401.64 21.700 4.00 8.0 142.2 150.2 4.00 401.64 21.800 4.00 8.0 142.2 150.2 4.00 401.64 21.900 4.00 8.0 142.2 150.2 4.00 401.64 22.000 4.00 8.0 142.2 150.2 4.00 401.64 22.100 4.00 8.0 142.2 150.2 4.00 401.64 22.200 4.00 8.0 142.2 150.2 4.00 401.64 22.300 4.00 8.0 142.2 150.2 4.00 401.64 22.400 4.00 8.0 142.2 150.2 4.00 401.64 22.500 4.00 8.0 142.2 150.2 4.00 401.64 22.600 3.00 7.0 141.7 149.2 3.74 401.63 22.700 3.00 6.0 141.0 147.7 3.36 401.61 22.800 3.00 6.0 140.7 147.0 3.18 401.61 22.900 3.00 6.0 140.5 146.7 3.09 401.60 23.000 3.00 6.0 140.4 146.5 3.04 401.60 23.100 3.00 6.0 140.4 146.4 3.02 401.60 23.200 3.00 6.0 140.3 146.4 3.01 401.60 23.300 3.00 6.0 140.3 146.3 3.00 401.60 23.400 3.00 6.0 140.3 146.3 3.00 401.60 23.500 2.00 5.0 139.8 145.3 2.74 401.59 23.600 2.00 4.0 139.1 143.8 2.36 401.58 23.700 2.00 4.0 138.8 143.1 2.18 401.57 23.800 2.00 4.0 138.6 142.8 2.09 401.57 23.900 2.00 4.0 138.5 142.6 2.04 401.57 24.000 2.00 4.0 138.5 142.5 2.02 401.57 24.100 2.00 4.0 138.4 142.5 2.01 401.57 24.200 2.00 4.0 138.4 142.4 2.00 401.57 24.300 2.00 4.0 138.4 142.4 2.00 401.57 24.400 2.00 4.0 138.4 142.4 2.00 401.57 24.500 2.00 4.0 138.4 142.4 2.00 401.57 24.600 1.00 3.0 137.9 141.4 1.74 401.56 POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD INFLOW HYDROGRAPH TIME INFLOW (hrs) -------- (cfs) --------- 24.700 1.00 24.800 1.00 24.900 1.00 25.000 1.00 25.100 1.00 25.200 1.00 25.300 1.00 25.400 1.00 25.500 0.00 25.600 0.00 25.700 0.00 25.800 0.00 25.900 --------- 0.00 -------- ROUTING COMPUTATIONS Page 5 31 I1+I2 2S/t - 0 2S/t + 0 OUTFLOW ELEVATION (cfs) (cfs) ----------- (cfs) ----------- (cfs) --------- (ft) --------- --------- 2.0 - 137.2 139.9 1.36 401.55 2.0 136.9 139.2 1.18 401.54 2.0 136.7 138.9 1.09 401.54 2.0 136.6 138.7 1.04 401.54 2.0 136.6 138.6 1.02 401.53 2.0 136.6 138.6 1.01 401.53 2.0 136.5 138.6 1.00 401.53 2.0 136.5 138.5 1.00 401.53 1.0 136.1 137.5 0.74 401.53 0.0 135.3 136.1 0.36 401.51 0.0 135.0 135.3 0.18 401.51 0.0 134.8 135.0 0.09 401.50 0.0 --------- 134.7 -------------- 134.8 ----------- 0.04 ---------- 401.50 ---------- POND-2 Version: 5.17 SIN: EXECUTED: 04-14-1995 08:02:03 Page 6 3z ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD Starting Pond W.S. Elevation = 398.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 216.00 cfs Peak Outflow = 122.32 cfs Peak Elevation = 405.59 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = 0.00 ac-ft Peak Storage From Storm = 3.50 ac-ft --------------- Total Storage in Pond = 3.50 ac-ft Warning: Inflow hydrograph truncated on left side. 11.7 - 11.8 11.9 - 12.0 - 12.1 - 12.2 - 12.3 - 12.4 - 12.5 - 12.6 - 12.7 - 12.8 - 12.9 - 13.0 - 13.1 - 13.2 - 13.3 - 13.4 - 13.5 - 13.6 - TI! (h: * F: x F: POND-2 Version: 5.17 SIN: Pond File: 9509WET PND Inflow Hydrograph: 9509-100.HYD Outflow Hydrograph: OUT HYD Peak Inflow = 216.00 cfs Peak Outflow = 122.32 cfs Peak Elevation = 405.59 ft Page 7 33 EXECUTED: 04-14-1995 08:02:03 Flow (cfs) 0 25 50 75 100 125 150 175 200 225 250 275 .------ I ----- ----- I ----- I ----- I ----- ----- ----- I ----- I ----- I ----- I- x X X X X X X x x x x x * * * * * * * * * * x * x * x * x * x *x x x 4E Is ) Lle: 9509-100.HYD Lle: OUT HYD * x x x x x x x x * x * x x x x x x x x x x * * * * * * * * Qmax = 216.0 cf s Qmax = 122.3 cfs qpR ?NV?R? ? 1995 ???NT ?? S???N?F4 f _ r #? g5azI Soil & Environmental Consultants, Inc. 244 West Millbrook Road ¦ Raleigh, North Carolina 27609 ¦ (919) 846-5900 ¦ Fax (919) 846-9467 March 2,1995 NCDEH&NR DEM Water Quality Planning, Wetlands Group Attn: Mr. John Dorney 4401 Reedy Creek Road Raleigh, NC 27607 Dear Messrs. Dorney and Alsmeyer: USACOE Attn: Mr. Eric Als 6512 Falls of the N Suite 105 Raleigh, NC 2761r The purpose of this letter is to request a Nationwide Permit 26 and a 401 Water Quality Certification for the project to be known as the Shopping Center for James Garner. The project is located in Holly Springs west of Hwy. 55 and north of (S.R.1152) in Wake County, as shown on the attached vicinity map. Fill in Waters of the U.S. will be required to develop the site for a commercial development, including parking. Under the revised plan it will be necessary to fill 0.98 acres of jurisdictional Waters of the U.S. above headwaters for placement of the proposed facilities. The impacts to one out parcel for a bank total .66 acres of the impact while the shopping center alone could be constructed with .32 acres of impact or less. The remaining wetlands upstream of the bank can be utilized to reduce storm flow intensities and protect the stream on the down stream side of Hwy. 55 (see attached map). The developer and designer have revised the storm drainage system for the Shopping Center so that all stormwater discharges upstream of the proposed bank into the existing wetland area. The client proposes to restrict this outlet and construct an overflow structure that would allow water to pond prior to overtopping the overflow structure. Detailed designs for this will be submitted to DEM for approval once we have an opinion whether this proposal is acceptable. We previously discussed this project with John Dorney and were considering construction of a stormwater pond below Hwy. 55 to offset water quality impacts. However, after further study the engineer concluded the pond could not be constructed on the undeveloped land in the subdivision down stream without flooding previously developed parcels. After examining other potential means of protecting water quality S&EC determined the best alternative to be the proposed "Green pond". The upland adjacent to the wetland on south will be placed in a "conversation easement' to provide a upland buffer to the wetland (disregard grading lines in this area, they represent an attempt to MAR 3 1995 Soil/Site Evaluation ¦ Mapping and Physical Analysis ¦ Wetlands Mapping and Mitigation ¦ Environmental Audits On-Site Waste Treatment Systems, Evaluation and Design design and route stormwater to a pond in this area but it was determined to be boo small and not feasible from a gravity flow standpoint). If the bank is allowed to be constructed as shown the sewer line that is shown to cross the wetland will be moved to the toe of fill behind the bank, further minimizing impacts. The developer is rerouting the storm and sanitary sewer at significant expense to accomplish the scenario described above. If the bank was not constructed as shown the wetland impacts due to the shopping center would be less than 1/3 acre and stormwater would be discharged at the down stream end of the wetland adjacent to Hwy. 55 and the sewerline would be constructed as shown (bisecting the wetland). Please call if you have questions or require further information. We will be glad to meet you on-site if you wish. Sincerely, ?L- v-- L Kevin C. Martin, President cc: (with enclosures) David Franklin (Wilmington Corps) Danny Smith (DEM Raleigh Regional office) KCM/jmb DEM ID: ACTION ID: _ Nationwide Permit Requested (Provide Nationwide Permit #): JOINT FORM FOR Nationwide permits that require notification to the Corps of Engineers Nationwide permits that require application for Section 401 certification WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 1890 Wilmington, NC 28402-1890 ATTN: CESAW-CO-E Telephone (919) 251-4511 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES P.O. BOX 29535 Raleigh, NC 27626-0535 ATTN: MR. JOHN DORNEY Telephone (919) 733-5083 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT. PLEASE PRINT. 1. Owners Name: R James earner 2. Owners Address: 6200 Falls of the Neuse Rd., Ste. 102 Raleigh, NC 27609 3. Owners Phone Number (Home): (Work): 919,/ 8-7 8- 7 753 4. If Applicable: Agent's name or responsible corporate official, address, phone number. Soil and Environmental Consultants, Inc. 244 W. Millbrook Rd., Raleigh, NC 27609 919.1846-5900 5. Location of work (MUST ATTACH MAP). County: Wake County, NC Nearest Town or City: Holly Springs, NC Specific Location (Include road numbers, landmarks, etc.): W e s t n f NC 9q and north o f NC SR 1152 as per attached Apex, NC USGS Topo Quad 6. Name of Closest Stream/River: Little Branch 7. River Basin: Cape Fear River 8. Is this project located in a watershed classified as Trout, SA, HQW, ORW, WSI, or WS II? YES ( ) NO (311) 9. Have any Section 404 permits been previously requested for use on this property? YES ( ) NO ( X) If yes, explain. 10. Estimated total number of acres of waters of the U.S. including wetlands, located on project site: 2 to 3 acre 11. Number of acres of waters of the U.S. including wetlands, impacted Nb a proposed project Filled: Drained: Flooded: Excavated: Total Impacted: 0.98 12 Description of proposed work (Attach PLANS-8 1/2" X 11" drawings only): Cons . ruc-t i on of proposed shopping center. 13. Purpose of proposed work. Allowable reasonable utilization of uplands with minimal wetland impacts for Shopping Center. 14. State reasons why the applicant believes that this activity must be carried out in wetlands. Also, note measures taken to minimize wetland impacts. See attached letter from S & E C . 15. Youere required to contact the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) regarding the presence or any Federally listed or proposed for listing endangered or threatened species or critical habitat in the permit area that may be affected by the proposed project Have you done so? YES ?, ) NO ( ) RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE FORWARDED TO CORPS. 16. You are required to contact the State Historic Preservation Officer (SHPO) regarding the presence of historic properties in the permit area which may be affected by the proposed project? Have you done so? YES ( X) , NO ( ) RESPONSE FROM THE SHPO SHOULD BE FORWARDED TO CORPS. 17. Additional information required by DEM: A. Wetland delineation map showing all wetlands, streams, and lakes on the property. B. If available, representative photograph of wetlands to be impacted by project C. If delineation was performed by a consultant, include all data sheets relevant to the placement of delineation line. D. If a stormwater management plan is required for this project, attach copy. E. What island use of surrounding property? Aaricultural/Residential/ Commercial Y F. If applicable, what is proposed method of sewage disposal? Sanitary s P w P r Agent's Signature Date r 02/27/1995 09:59 02/27/95 12:03 9198469467 TO BE COMPLETED BY CURREN'T' PROPERTY OWNER - NO EXCEPTIONS - Name. Addres Address Phone: Project Name/Descrip Date: d /,;z The Department of the Army U.S. Army Corps of Engineers Wilmingto:l District PO Box 1690 Wilmington, NC 28402 Attn: Q (+ Field Office: LL? Re: Wetlands Related Consultii* and Permitting To Whom It May 'Concern: 760Y PAGE 02 I, the current RKRpgowner, We'by designate and authorize Soil and Environmental Consultants, Ina. to act in my behalf as my Agent in the processing of permit Appltcatioons, to furnish upon request supplemental information in support of applications, etc. from this day forward. This the --,A--7T" day of ---j?k gig f 99?s/ This notification supersedes cozy previous correspondence concerning the agent for this project. -LZI?C- V 4aRVr-R - " Px? Owners Name: cc: Mr. John Dorrwy N.C. Department of RH do NR Division of Env. Mgt, Water Quality Planning 4401 Reedy Creek Road: Raleigh, NC 27607 X 1 919 8762151 PRTE INSURANCE P.02 4 U"eh AA 0 O wners Signature: Mr. Kevin C. Martin Soil and Environmental Consultants, Inc. HOAAy S?RlNc S N, 4C . i h i F eltonville', l30 ??? J ( L I, / Y t R b ? l i i ? ? ? , 1 1 I ? I l Site ti 1 J i I oll 1393 cl BM 71-- ? ? ???'ill ??(,?- ???'?? ' ? _ . ? is ? /?/ice VL??? _, (,l%( ?L?v •{ f ? f . ? ?; ?? -?1 v , "-?? __ ??. ? -?- --? \\\? 1\ 1 rr?/ ?Q3 /I 1115 c O/ / \\ _ ?`\?\ -17 ----------- \ t/ 440 -• 1114 n i i l Shopping Center for James Garner March 24, 1995 This project proposes to build both a shopping center and a bank for a total of 0.98 acres of impact. Kevin Martin explained that if the bank's impacts were not included, only 0.32 acres of wetlands would be filled and no stormwater controls would be implemented (direct pipe to creek). Conversely, Kevin Martin has offered to build stormwater pond (wet retention basin) upstream of the bank, if the bank's impacts are included. It should be required that S&EC submit plans and specification explaining how they proposed to build this stormwater pond. After review of these plans, if you are not confident that this design can handle the basin's drainage, I recommend that Mr. Garner avoid impacts associated with the bank. This is particularly important due to areas upstream are becoming increasing urbanized (approaching 30% impervious). Also important that who ever owns the bank be responsible for maintenance of this detention basin (this should also be spelled out in the 401 Certification). If You have any questions please call. &aAv? ? n WD Cr( it OV I?A? - 5 1 I j"It- IT