Loading...
HomeMy WebLinkAbout820426_ENFORCEMENT_20171231NORTH CAROLINA Department of Environmental Quai �-AM-7jiA V__� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Coleen la- Sullins Director AQUIFER PROTECTION SECTION September 8. 2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED Ben L. Parham 2391 Issac Weeks Rd. Clinton NC 28328 I001 - Subject: NOTICE_ OF DEFICIENCY / NOD-2010-PG44_9.9_-- Parham Farms AWS820426 Sampson County Incident No. 201000769 Dear Mr. Parham: Dee f=reeman Secretary On February 08, 2010, staff of the NC Division of Water Quality (DWQ), Aquifer Protection Section (APS) were notified by Ben Parham of a high freeboard level in the lagoon 1. We wish to thank Mr. Parham for notifying DWQ of this incident. As a result of this incident, you are hereby notified that. having been permitted to have a non -discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T Section .1300, you have been found to be in violation of your Certified Animal Waste Management Plan and the Swine Waste System General Permit No. AWG 100000 that you are covered to operate under, as follows: Deficiency 1: Failure to maintain waste levels in your lagoon/storage ponds in accordance with the facility's Certified Animal Waste Management Plan in accordance with Condition V. 2. of Swine Waste System General Permit No. A WG 100000. On February 08, 2010 a lagoon/storage pond level was documented at 17.00 inches in lagoon 1. A level of 19 inches is the maximum level allowed by your permit and Certified Animal Waste Management Plan. North Carolina Division of Water Quality Internet: www.nowaterguatity.org 225 Green St.. Ste. 714 Phone: 910-433-3300 Fayetteville, NC 28301 FAX 910-486-0707 An Equal Opportunity/Affirmative Action Employer- 50°% Recycled/10% Post Consumer Paper NorthCarolina Naturally Mr. Parham September 8, 2010 Page 2 Required Corrective Action for Deficiency 1: DWQ has received a copy of your 30 Day Plan of Action (POA) for the high freeboard occurrence. Take all necessary additional steps to insure lagoon levels remain in compliance with Section 2 of your permit. A compliance inspection was done 07/29/2010 and all records were reviewed and the date and time lagoon 1 was returned to compliance on 02/2212010. If you have any questions concerning this notice, please contact me at (910)-433-3300. Sincerely, Steve Guyton Environmental Specialist Fayetteville Regional Office cc: Keith Larick, CAFO Unit Sampson Soil and Water Conservation District NCDS WC -FRO FRO Compliance Animal Files Prestage Farms Reels Rick From: Glenn Clifton [glennc@prestagefarms.com] Sent: Tuesday, March 16, 2010 11:38 AM To: Revels, Ricky Subject: 30 day POA extension Attachments: parhamB30POA.xls Ben Parham needs a 30 extension on his POA. Attached is his POA. Thanks, Glenn Clifton Environmental Compliance Prestage Farms, Inc P.O. Box 438 Clinton NC 28328 910-596-5749 glennc@prestap-efarms.com f • - i. PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-426 Facility Name: Parham Farms Certified Operator Name: Ben Parham County: Sampson Operator Number: 17879 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spiltway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 34 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 02/1112019 15:27 Fax 19105965799 To: Steve Guyton PRESTAGE A Z From' Glenn Clifton Parc Pages: 4 Phone: 910-596-5749 Dom: 7210/2010 Re: 30d2ayPOA cc: ❑ Urgent X For Review ❑ Pleme Comment D Please Reply ❑ Please Recycle • Comn%wds: PAGE 01 0211112010 16:27 19105965799 PRESTAGE A PAGE 02 PLAN OF AGTIOfN(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 82-426 Facility Name: Parham Farms Certffied Operator Name: Ben Parham County: Sampson Operator Number: 17879 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID, Spillway(Y or N); Level(inches): Lagoons Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures, A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. ZlEt,j P-47r�t-- __.. Phone: q t8 -533- 38'79 Facility Owner/Manager (print) Date: � Facility �Ownerl�Manaqer�(at�ure) 02/11/2010 16:27 19105965799 PRESTAGE A PAGE 03 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 276.8 Ib PAN 2. Structure ID: line m = Ib PAN 3. Structure ID: line m = Ib PAN 4. Structure 10: line m = 1b PAN 5. Structure 10: fine m = Ib PAN 6. Structure ID; line m = Ib PAN n. lineal +2+ 3+4+6+6 = 276.8 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r_ acres s. remaining IRR t TOTAL PAN u. 8pplication window' 2 PAN balance BALANCE FOR Oblaue) FIELD (lbs.) Column r x s 1773 1A Wheat 6.41 144, DO 923.0 SEP -APR v. Total PAN available for all Fields (sum of column t) = 923.0 Ib. PAN IV. FACILITY'S POA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 276.8 Ib. PAN x. Crop's remaining PAN balance (line v from section Ili) _ —923.0 Ib. PAN y. Overall PAN balance (w -x) = -646 Ib. PAN P2/11/2010 16:27 19105965799 PRESTAGE A PAGE 04 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (10): 1 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level aocording to marker 17,0 inches b. designed 25 yr.124 hr. storm & Structural freeboard F 19,0 inches c_ line b - line a (inches in red zone) = 2.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 51338 ft� a. line c/12 x Una d x 7.48 gallonsltt'' 63899 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 55112 ft3 h current herd # 1975 certified herd # 1975 actual waste produced = current hem # x lute g 95712 t`ts certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 31-588 8Jft3 k. (lines h + 1 + j) x 7.48 x 30 days>tine f^ 120553 gallons 4. Total PAN to be land applied during draw down period I, current waste analysis dated 12J2812009 1.50 lbs/1 DOD gal_ m, ((lines e + k)/1000) x line 1= 277 lbs. PAN REPEAT SECTION ( FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) al— r 4 r 1n U. nr5 HIGH FREEBOARD NOTIFICATION FORM Staff please retain your original and place a copy in the High Freeboard Notification Box located in Richard Canady's office. Person Receiving Notification Facility Number _ ZZ Farm Name Pov-1w.., F;m Caller's Name Caller's Telephone Numbers Home# 919, 796 "SZ &S` Farm # Date Receivedw,-A-, Ae.1. S,`o� O Time 8:0S—A.- Cell# Pager# For all callers PLEASE obtain a phone number where they can be reached at any time. (Cell phone numbers, home phone numbers, farm phone numbers, pager numbers) Tell the caller that a member of the CAFO unit or Paul Rawls will contact them as soon as possible. Freeboard (in inches) Lagoon # 1 Lagoon # 4 Lagoon # 2 Lagoon # 5 Lagoon # 3 Lagoon # b Do not instruct the caller on the action they should take_ That is up to the caller. Remind them that they are to remain in compliance with their Permit and Waste Utilization Plan. Make the caller aware that you are assigning a tracking number to their call. Give the caller -the tracking number and tell them to use this number for all future contacts about this particular incident and when they call back reporting they are back into compliance. High Freeboard Level Tracking Number is 9�r� Thank the caller for their cooperation. 'Water Quality Staff Only* If the caller indicates that the lagoon level is <12 inches, contact one of the CAFO staff AND Paul Rawls. Do not leave a note, e-mail or voicemail without contacting the CAFO staff AND Paul Rawls directly on any report of <12 inches. Treat any report of <12 inches as an emergency event_ ----------------------------------------------------------------- *CAFO STAFF ONLY* Establish a Filemaker/ BIMs Entry number for this report. -7C) 1-0 6 D -7 6 l Print the Filemaker/ B1Ms Entry and attach it to this form. + 1J`•1 t: . `:. J � _v ,, ��. �!� :� � _ � ]r{� ' . � � LZI prestage Farms PARHAM FARMS